Loading...
HomeMy WebLinkAbout2000/11/14 - Agenda Packet - (2) DESIGN REVIEW COMMITTEE MEETING ACTION AGENDA AND MINUTES TUESDAY NOVEMBER 14, 2000 7:00 P.M. RANCHO CUCAMONGA CIVIC CENTER RAINS ROOM 10500 CIVIC CENTER DRIVE RANCHO CUCAMONGA Committee Members: Larry McNiel Pam Stewart Dan Coleman Alternates: Peter Tolstoy Rich Macias John Mannerino CONSENT CALENDAR The following items are expected to be routine and non-controversial. Typically they are items such as plan revisions prepared in response to discussions at a previous meeting. 7:00 p.m. (Brent) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 99-50 — •VANTIGER - A request to develop a 5,130 square foot service station (Shell) with drive-thru fast food service (Wendy's) and a self serve car wash on 2 acres of land in the Community Commercial District of the Foothill Boulevard Specific Plan (Subarea 4), located at the northeast corner of Etiwanda Avenue and Foothill Boulevard —APN: 1100-161-002. PROJECT REVIEW ITEMS This is the time and place for the Committee to discuss and provide direction to an applicant regarding their development application. The following items do not legally require any public testimony, although the Committee may open the meeting for public input. 7:10 p.m. (Rudy) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 00-40 - ARROW ROUTE AND UTICA AVENUE PARTNERS LLC. — The development of a warehouse/office building consisting of 27,018 square feet on 1.72 acres of land in General Industrial District (Subarea 8) of the Industrial Area Specific Plan, located at the southeast corner of Arrow Route and Utica Avenue - APN: 209- 491-79. 7:30 p.m. (Brent) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 00-47 (TRACT NO: 10035) — CONCORDIA HOMES — The Design Review of building elevations and detailed site plan for 21 existing lots within approved Tract 10035 on 15.7 acres of land in the Low Residential District (2 to 4 dwelling units per acre), located on the south side of Camino Pradera south of Red Hill Country Club Drive—APN: 207-641-01 through 10, 207-631-01 through 11. DRC AGENDA November 14, 2000 Page 2 7:50 p.m. (Brent) DEVELOPMENT REVIEW 00-05 MODIFICATION —SCRIPTO TOKAI A request to modify a previously approved project to construct a 120,000 square foot industrial building (Scripto-Tokai) on 8.26 acres of land in Subarea 7 (Industrial Park) of the Industrial Area Specific Plan located south of Foothill Boulevard, east of Milliken Avenue—APN: 229-011-32. 8:00 p.m. (Emily) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 00-73 — MARC DALE AND ASSOC. - The development of 2 industrial buildings totaling 125,728 square feet on 7.34 acres of land in the General Industrial District (Subarea 13) of the Industrial Area Specific Plan, located at the end of Rochester Court, east of Sixth Street—APN: 229-263-08. 8:20 p.m. (Brent) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 99-56 = SACRED HEART CHURCH — The expansion of the existing Sacred Heart Church with Phase one consisting of a new 20,000 square foot sanctuary building and Phase two consisting of an additional 2,200 square feet of sanctuary space and 5,400 square feet of additional classroom space on 11 acres of land in the Regional Related Commercial district (Subarea 4) of the Foothill Boulevard Specific Plan located at 12704 Foothill Boulevard — APN: 227-211-02, 24, and 25 and 227-221-01 and 02. PUBLIC COMMENTS This is the time and place for the general public to address the Committee. State law prohibits the Committee from addressing any issue not previously included on the Agenda. The Committee may receive testimony and set the matter for a subsequent meeting. Comments are limited to five minutes per individual. ADJOURNMENT CONSENT CALENDAR 7:00 p.m. Brent Le count November 14, 2000 ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 99-50 — VANTIGER A request to develop a 5,130 square foot service station (Shell) with drive-thru fast food service (Wendy's) and a self serve car wash on 2 acres of land in the Community Commercial District of the Foothill Boulevard Specific Plan (Subarea 4), located at the northeast corner of Etiwanda Avenue and Foothill Boulevard—APN: 1100-161-002. Design Review Committee�Action: Members Present: Larry McNiel, Pam Stewart, Dan Coleman Staff Planner: Brent Le Count The Committee approved the revised design plans. DESIGN REVIEW COMMENTS 7:10 p.m. Rudy Zeledon November 14, 2000 ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 00-40 - ARROW ROUTE AND UTICA AVENUE PARTNERS. LLC. — The development of a warehouse/office building consisting of 27,018 square feet on 1.72 acres of land in General Industrial District (Subarea 8) of the Industrial Area Specific Plan, located at the southeast corner of Arrow Route and Utica Avenue - APN: 209-491-79. Design Parameters: Arrow Route is designated as a Special Boulevard by the General Plan and Industrial Area Specific Plan. The site is surrounded to the north and south by single-story tilt-up industrial warehouse/office buildings, to the east by vacant lot and a public storage building and to the west by a vacant undeveloped site. The site slopes from north to south at approximately 2 percent. The individual lot is currently vacant with only native grasses present. No structures or trees exist on-site. The site is located within area identified as potential habitat for the Delhi Sands Flower Loving Fly. The applicant has submitted a biological survey for the site. The street frontages along both Arrow Route and Utica Avenue are improved with curb and gutter and no sidewalks. Access to the site will be through an existing drive approach on Utica Avenue. The project will consist of a 27,018 square foot concrete tilt-up building with an office area (2,175 square feet) and warehouse. The Site Plan and Elevations are very similar to Development Review 00-32, which was recently approved at the southeast corner of 7th and Utica. The building is oriented on an east-west axis, with a building setback of zero along the east property line. A conceptual Master Plan has been submitted to address future development of the vacant site to the east. The building has been designed for single user and will be self sufficient with independent access, parking and utility services. The loading dock area will be on the south side of the building and screened from public view. The proposed tilt-up concrete building is designed to be consistent with the architectural style of the surrounding area. The proposed building design incorporates two primary buildings materials such as sandblasted and painted concrete. Spandrel glass is being used as a secondary material to frame the main entrance area at the northwest corner of the building (the area visible from Arrow Route and Utica Avenue). In addition, the north elevation of the building, along Arrow Route, features sandblasted columns and spandrel glass at the northeast corner. Staff Comments: The following comments are intended to provide an outline for Committee discussion. Major Issues: The following broad design issues will be the focus of Committee discussion regarding this project: 1. The spandrel glass treatment to the northeast corner of the north elevation should wrap around to the east elevation of the building to provide visual interest along Arrow Route, which is a Special Boulevard and a major arterial street. 2. The sandblasted concrete column element and reveals, along the north elevation, should be continued around to the entire east elevation. Secondary Issues: Once all of the major issues have been addressed, and time permitting, the Committee will discuss the following secondary design issues: 1. Provide decorative paving, outside public right-of-way, at driveway entrance. DRC COMMENTS DR 00-40 —ARROW ROUTE & UTICA AVE. PARTNERS, LLC. November 14, 2000 Page 2 2. To maintain a required setback of 5 feet from property line, the proposed trash enclosure location should be moved west 5 feet from property line. In addition a landscape strip, between the trash enclosure and perimeter wall, should be provided. Staff Recommendation: Approval, subject to revisions being addressed with staff, prior to Planning Commission. Design Review Committee Action: Members present: Larry McNiel, Pam Stewart, Dan Coleman Staff Planner: Rudy Zeledon The Committee reviewed the project and recommended approval subject to the following conditions: 1. The sandblasted concrete column element and reveals, along the north elevation shall wrap around to the entire east elevation. 2. Provide decorative paving, outside public right-of-way, at driveway entrance. 3. The applicant shall work with staff in toning down the proposed secondary (Mayan, Frazee No. DE 968 and accent colors (Cuprite, Frazee No, DE 965) of the building. DESIGN REVIEW COMMENTS 7:30 p.m. Brent Le Count November 14, 2000 ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 00-47 (TRACT NO 10035) - CONCORDIA HOMES - The Design Review of building elevations and detailed site plan for 21 existing lots within approved Tract 10035 on 15.7 acres of land in the Low Residential District (2 to 4 dwelling units per acre), located on the south side of Camino Pradera south of Red Hill Country Club Drive-APN: 207-641-01 through 10, 207-631-01 through 11. Background: The Committee reviewed the project on October 3, 2000 and requested that the project be revised and brought back for further review. The Committee had the following comments: 1. The Committee is in favor of using variation in slope gradient in order to reduce the height of the 22-foot high retaining wall. The applicant was able to reduce the height of the 22-foot high retaining wall down to 10.5 feet by utilizing a variable slope gradient and by introducing retaining wall terraces on the slopes. The current wall configuration is a 10-foot wall along the south edge of the site (within the rail road right-of-way), a 10.5-foot high wall along the mid portion of the site (previously 22 feet high), and scattered segments of 2- to 6-foot high retaining walls throughout the slopes. The grading has also been contoured to have a more natural, rounded appearance. 2. Lower the pad elevations on Lots 16 and 17 by utilizing the sewer access easement as access similar to lots to the west. The project has been .revised to lower the pad elevations for Lots 16 and 17 substantially. The homes on these lots will now utilize the sewer easement as suggested by the Committee. 3. Lower the pad elevation/home elevation of Lot 18 by providing longer, steeper driveway. The driveway has been,steepenned to approximately 9 percent grade and the garage sits about a foot below the level of Camino- Predera. The Hillside Development Ordinance allows a maximum driveway grade of 20 percent, which would allow the garage to be lowered an additional 3 feet. 4. Significantly upgrade the architectural design of the homes to provide 360-degree architecture and greater differentiation from home-to-home. Homes should have a custom look as opposed to tract home appearance. Provide a mix of architectural styles. Provide divided light windows throughout. Provide second-story balconies on rear elevations. Use upgraded building materials (stone, brick, etc.) on all elevations. The revised architecture has been minimally upgraded with some window treatment(shutters and pot shelves on some windows), some rear wall change of plane, and the use of an occasional second story balcony. Staff is of the opinion that substantially more enhancement is necessary to provide true 360-degree architectural quality, as there are still substantial areas of blank stucco walls. The homes still have a very tract-like appearance. There is substantial room to provide greater differentiation from home-to-home (custom appearance) by changing architectural styles, use of divided light windows, and material upgrades. Upgrade DRC COMMENTS DR 00-47—CONCORDIA HOMES November 14, 2000 Page 2 ) the side and rear elevations of the homes to have the similar level of architectural detail and quality as the fronts. The rear elevation of the Plan 3 homes comes closest to the desired level of detailing. With the addition of upgraded building materials and divided light windows the rear elevation of Plan 3 serves as a good example for the remaining plan side and rear elevation treatment. Outstanding Secondary Issues: The following issues have not been addressed in the revised plans but staff is of the opinion that they can be conditions of approval once an acceptable level of architectural design is achieved: 1. Reduce the elevation of the pad for Lot 18 by increasing the driveway grade to the maximum grade allowed, 20 percent if possible. 2. The "loefelstien" walls should be planted with a hardy vine or shrub that will eventually completely cover the walls and irrigated accordingly. The down slope side of the high retaining walls should also be well landscaped to soften the walls. Provide low maintenance landscape plant materials for the slope areas. Provide railroad tie steps or similar means to facilitate maintenance. Home sites with rear yard sound walls such as Lots 1 through 5, 16, and 17 will have to have some form of gate or wall opening to permit slope maintenance. 3. Provide cascading vines or similar plant types along the top of retaining walls and train them to cascade down over walls. 4. The manufactured slopes on Lots 1, 2, and 3 shall have a natural or "contoured" look as opposed to a harsh, angular look. 5. Slope drainage features shall have a naturalized, dry streambed appearance through the use of river rock application. 6. Provide landscape planters around the base of the homes where possible to soften their appearance and reduce visible bulk. Policy Issues: The following items are a matter of Planning Commission policy and should be incorporated into the project design without discussion: 1. All walls shall be decorative masonry (split faced block - both sides) with decorative masonry caps. No wood fencing shall be permitted (even between homes) given the visual prominence of the development. All pilasters shall have river rock or similar treatment on all sides. 2. All river rock treatment shall be natural river rock as opposed to manufactured veneer. Other rock treatment, such as slate, may be of a manufactured product. 3. Provide a minimum of 15 feet of usable rear yard depth at the rear of all homes. 4. Provide additional landscaping (additional trees, large sized trees, and shrubs) along the south/down slope side of the homes to screen downslope elevations. i Staff Recommendation: Staff recommends that the project be revised in light of the above comments, especially related to home design, and brought back for further review. DRC COMMENTS DR 00-47 —CONCORDIA HOMES November 14, 2000 Page 3 Desian Review Committee Action: Members Present: Larry McNiel, Pam Stewart, Dan Coleman Staff Planner: Brent Le Count The Committee was in favor of the revised grading concept but directed the applicant to revise the architectural design of the homes to provide better 360 degree architecture, more variation from home to home (a custom appearance). The rear elevation of Plan 3C-U is a good example of how rear elevations should be designed. Avoid several homes of the same plan type adjacent to one another. The applicant agreed to restudy the design. DESIGN REVIEW COMMENTS 7:50 p.m. Brent Le Count November 14, 2000 DEVELOPMENT REVIEW 00-05 MODIFICATION — SCRIPTO TOKAI A request to modify a previously approved project to construct a 120,000 square foot industrial building (Scripto-Tokai) on 8.26 acres of land in Subarea 7 (Industrial Park) of the Industrial Area Specific Plan located south of Foothill Boulevard, east of Milliken Avenue—APN: 229-011-32. Background: The Design Review Committee McNiel, Stewart, Coleman reviewed the project on April 4, 2000. At the Design Review Committee meeting, there was considerable discussion regarding fencing along the north property line. The Committee expressed concern about protecting the north parking lot area from sands that could blow in from the vacant site to the north during Santa Ana winds. A condition of approval requires that a low wall with wrought iron above be provided along the north property line to address this concern. See attached copy of Design Review Committee minutes. The City Planner approved the project on July 3, 2000. Requested Modification: The applicant wishes to eliminate the security fencing along the north and west boundaries of the site. It is felt that the concrete screen walls surrounding the truck loading area on the south side of the building provide adequate security. The applicant contends that the existing grape vines on the vacant site to the north will keep sand from blowing away during high seasonal winds. The applicant is also proposing a 4-foot high berm along the north property line of the Scripto-Tokai site and is willing to provide hydro-seeded plants on the vacant land to the north to further address the wind blown sand concern. Staff Recommendation: Staff is of the opinion that the berm as proposed by the applicant along the north property line will adequately mitigate sand from being blown on to the site from the vacant site to the north so long as it is heavily landscaped with trees, shrubs, and ground cover. Staff recommends approval of the requested modification. Attachment Design Review Committee Action: Members present: Larry McNiel, Pam Stewart, Dan Coleman Staff Planner: Brent Le Count The Committee approved the revised design. DESIGN REVIEW COMMENTS 8:00 p.m. Emily Wimer November 14, 2000 ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 00-73 — MARC DALE AND ASSOC. - The development of 2 industrial buildings totaling 125,728 square feet on 7.34 acres of land in the General Industrial District (Subarea 13) of the Industrial Area Specific Plan, located at the end of Rochester Court, east of Sixth Street—APN: 229-263-08. Design Parameters: The two buildings are to be built on a speculative basis for light and/or medium warehousing and distribution users. According to the applicant, the buildings will support up to 10 percent of the building area as office use for administration and operational support. The offices are oriented to front the nearest public streets. The loading areas are oriented to the rear of the site with adequate screening particularly from Charles Smith Drive and the 115 freeway. The building wall surfaces facing the streets feature articulated changes of plane, use of sandblasted concrete, and tinted glazing. On the north side, both front entryways incorporate a painted steel trellis. The Floor Plan and Elevations are identical on both buildings. Staff Comments: The following comments are intended to provide an outline for Committee discussion. Major Issues: The following broad design issues will be the focus of Committee discussion regarding this project: 1. Relocate sandblasted bands from the bottom of the building to the middle or top where it can be more visible. Secondary Issues: Once all of the major issues have been addressed, and time permitting, the Committee will discuss the following secondary design issues: 1. An accent color shall be used on the two metal trellises for a focal point at the entryways. 2. Provide a minimum 2-foot parapet wall return at vertical change of plane to avoid a "fin". like appearance. 3. Provide a sidewalk connection from the nearest man door to both outdoor employee eating areas. 4 Provide sidewalk connection from both main office entrances to the public sidewalk on Rochester Court (Building. A) and Charles Smith Drive (Building. B). Policy Issues: The following items are a matter of Planning Commission policy and should be incorporated into the project design without discussion: 1. No exterior downspouts shall be visible from the streets. Exterior downspouts are only allowed in the loading area. Staff Recommendation: Staff recommends that the project be approved subject to the above comments. 'f DRC COMMENTS DR 00-73—MARC DALE AND ASSOCIATES. November 14, 2000 Page 2 Design Review Committee Action: Members Present: Larry McNiel, Pam Stewart, Dan Coleman Staff Planner: Emily Wimer The applicant provided an exhibit that displayed the style and architecture that was satisfactory to the Committee. The dimensional rendering revealed movement and articulation of the building. The Committee approved of the use of design as it was presented. The Committee was satisfied with the applicant's proposal and recommended approval of the project without modifications. t DESIGN REVIEW COMMENTS 8:20 p.m. Brent Le Count November 14, 2000 ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 99-56 — SACRED HEART CHURCH — The expansion of the existing Sacred Heart Church with Phase one consisting of a new 20,000 square foot sanctuary building and Phase two consisting of an additional 2,200 square feet of sanctuary space and 5,400 square feet of additional classroom space on 11 acres of land in the Regional Related Commercial district of Subarea 4 of the Foothill Boulevard Specific Plan located at 12704 Foothill Boulevard—APN: 227-211-02, 24, 25 and 227-221-01 and 02. Background: The project was reviewed by the Committee on October 17, 2000. The Committee (Stewart and Coleman) had the following comments: 1. The excessive 59-foot building height is an issue. Restudy the building to lower it as much as possible while still meeting the functional necessities of the church. The applicant has provided two alternative designs for the Committee to review. Both show an overall building height of 51 feet (6 feet above the maximum height allowed by the Foothill Boulevard Specific Plan) and both have an 8-foot high cross on top. Both alternatives are 8 feet lower than the original proposal. The alternative designs differ slightly in terms of use of materials, subtle massing differences, and cross details. Staff is of the opinion that both alternatives represent a reasonable compromise for building height and achieve a high quality of architectural design. The Committee has the opportunity to pick their preferred alternative. Staff believes that the increase in building height is reasonable given that the church requires certain technical and aesthetic considerations that dictate the building height that are different from the commercial uses now permitted in the area. The applicant is concurrently processing a Foothill Boulevard Specific Plan amendment to allow churches in the Regional Commercial land use designation of Subarea 4. The Specific Plan can also be amended to allow churches to be up to 60 feet high when not located within 300 feet of a residential area (the Sacred Heart Church sanctuary building is approximately 350 feet away from the nearest residential property) subject to approval of a Conditional Use Permit. 2. Have the noise consultant analyze the possibility of providing noise mitigation directly along the playground edge. This could be in the form of a combined berm with sound wall on top. The east side of the berm could act as informal stadium seating for the playground. After further research, Staff has determined that the noise barrier is only necessary to mitigate freeway noise for the playground area, not for the sanctuary building. The playground area is an existing part of the church campus and the future classrooms planned with this application will not increase the number of students at the facility. Normal construction should provide adequate sound attenuation, to comply with city standards for interior noise levels, for the sanctuary and other new buildings. Therefore, it has been determined that sound attenuation is not required for the project in order to address compliance with the California Environmental Quality Act (CEQA) and the General Plan. DRC COMMENTS CUP 99-56—SACRED HEART CHURCH November 14, 2000 Page 2 Outstanding Issues: The following issues were identified in the previous comments to the Committee dated October 17, 2000, but remain unresolved. The applicant agreed to the comments. They should be included as conditions of approval for the project. 1. Columns for the pergola connecting the northern parking lot to the sanctuary should match those of the sanctuary. 2. Parking lot landscape islands should have the typical oval shape rather than a sharp, crescent shape. The sharply pointed planters leave less room for plants to grow and can result in irrigation over spray onto the parking area. 3. Provide mostly Sycamore trees along the Foothill Boulevard frontage consistent with Foothill Boulevard Specific Plan. Sycamores are Foothill Boulevard theme trees that Caltrans has typically not allowed within the Foothill Boulevard right-of-way so they must be shifted on-site. 4. Augment the berm/low wall/trees along the Foothill Boulevard frontage with shrub planting to further screen views of the parking area. 5. All roof- and ground-mounted equipment and utilities shall be fully screened. 6. Surround trash enclosure and Edison box with dense shrub planting. 7. Trash enclosure should feature overhead shade trellis and roll-up door. 8. Avoid having a double fence condition along the project perimeter. Church should make a good faith effort to work with adjoining property owners to remove existing chain link fence and replace with single fence. Staff Recommendation: Staff recommends that the Committee recommend approval subject to the above comments. Design Review Committee Action: Members Present: Larry McNiel, Pam Stewart, Dan Coleman Staff Planner: Brent Le Count The Committee reviewed the revised plans and chose Alternative B. However, the Committee is comfortable with both the original design and Alternative B and if the applicant so chooses, Both alternatives can proceed to the Planning Commission for review. i DESIGN REVIEW COMMENTS NOVEMBER 14, 2000 PUBLIC COMMENTS There were no public comments at this time. ADJOURNMENT The meeting adjourned at 9:05 p.m. Respectfully submitted, Brad Buller Secretary