HomeMy WebLinkAbout1994/05/03 - Agenda Packet DESIGN REVIEW COMMITTEE MEE4'ING
ACTION COMMENTS AND KINUTES
MAY 3, 1994
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOK
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
Committee Members: Larry McNiel John Melcher Dan Coleman
Alternates: Peter Tolstoy Heinz Lumpp Dave Barker
CONSENT CALENDAR
The following items are expected to be routine and non-controversial. Typically
they are items such as plan revisions prepared in response to discussions at a
previous meeting.
5:00 P.M.
(Scott) CONDITIONAL USE PERMIT 90-37 - FOOTHILL MARKETPLACE PARTNERS - Review
of pylon sign design for Foothill Marketplace, a commercial/retail
center located on the south side of Foothill Boulevard between I-15
and Etiwanda Avenue.
5:20 p.m.
(Steve H. ) DEVELOPMENT REVIEW 94-04 - NORTH TOWN -HOUSING DEVELOPMENT CORPORATION
- Review of project meeting room elevations for a 88 unit affordable
housing complex located on the south side of Peron Boulevard west of
Old Town Park.
PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to
an applicant regarding their development application. The following items do not
legally require any public testimony, although the Committee may open the meeting
for public input.
5:40 p.m.
(Steve H. ) ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 14208 - RITTENHOUSE -
The proposed development of a 20-unit residential detached
condominium project on 3.0 acres of land in the Medium Residential
Development District (8-14 dwelling units per acre) , located on the
north side of Base Line Road, west of Alta Cuesta Drive - APN: 202-
025-01 , 04, 07, and 08.
PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State
law prohibits the Committee from addressing any issue not previously included on
the Agenda. The Committee may receive testimony and set the matter for a
subsequent meeting. Comments are limited to five minutes per individual.
ADJOURNMENT
DESIGN REVIEW COMMENTS
5:00 p.m. Consent Calendar May 3, 1994
(Scott) CONDITIONAL USE PERMIT 90-37 - FOOTHILL MARKETPLACE PARTNERS - Review
of pylon sign design for Foothill Marketplace, a commercial/retail
center located on the south side of Foothill Boulevard between I-15
and Etiwanda Avenue.
Design Review Cammittee Action:
The Committee (Melcher, Coleman) reviewed the pylon sign design and recommended
approval to the Planning Commission.
(Steve H. ) DEVELOPMENT REVIEW 94-04 - NORTH TOWN HOUSING DEVELOPMENT CORPORATION
- Review of project meeting room elevations for a 88 unit affordable
housing complex located on the south side of Feron Boulevard west of
Old Town Park.
Design Review Committee Action:
The Design Review Committee (Melcher, Coleman) reviewed the project meeting room
and day care building elevations and recommended approval subject to the
following:
1 . Clarify that the tile surround used around the entrance to the internal
courtyard and mail box areas will return into the recessed portions of the
building arches.
DESIGN REVIEW COMMENTS
5:40 p.m. Steve Hayes May 3, 1994
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 14208 - RITTENHOUSE - The proposed
development of a 20-unit residential detached condominium project on 3.0 acres of
land in the Medium Residential Development District (8-14 dwelling units per
acre) , located on the north side of Base Line Road, west of Alta Cuesta Drive -
APN: 202-025-01 , 04, 07, and 08.
Background:
Tentative Tract 14208 and related Development District Amendment 89-07 were
previously reviewed and approved by the Planning Commission on July 10, 1992 and
the Development District Amendment adopted by the City Council on August 5,
1992. Approval included the development of a 32 unit attached condominium project
ranging from one detached unit up to a seven-plex configuration. All required
common open space and amenities were also incorporated into the project design.
Design Parameters:
The site is bounded by residential development (both attached and detached) to the
north, single family residential development to the south, single family homes and
flood control channel to the east and multiple unit residential buildings to the
west. The 3-acre subject site is part of a larger 5-acre site that already has 3
single family homes on the portion not proposed for development at this time. The
property is several feet higher than the surrounding land in all directions. A
large number of mature trees exist on the property, many of which will be removed
and replaced per Tree Removal Permit 91-40, approved by the Commission in
conjunction with the attached condominium scheme. Of special concern is the large
Coast Live Oak tree along the Base Line Road frontage. The most recent arborist
report recommended that the Oak tree be retained in place and proper protection
measures applied for its continued health. An access easement for the single
family homes currently exists along Base Line Road. Private drive aisles that
meet the criteria of the Fire District and Building and Safety Division are
proposed to serve the site. The site currently slopes from northwest to southeast
at approximately 3 percent.
Staff Comments:
The following comments are intended to provide an outline for Committee
discussion.
Major Issues : The following broad design issues will be the focus of Committee
discussion regarding this project:
1 . The main common open space area and guest parking should be more centrally
located and away from the Base Line Road frontage (see attached Options A and
B) . In turn, three homes can be proposed backing onto Base Line Road in the
currently proposed location of the common open space.
DESIGN REVIEW COMMENTS
TT 14208 - RITTENHOUSE
May 3, 1994
Page 2
2. A one-story model should be introduced into the project mix to break up the
massing of the units, especially along Base Line Road. In addition, using
like models next to each other (i.e. , Base Line Road frontage) should be
avoided.
3. If a one-story model is not recommended by the Committee, then further
variation should be introduced into the proposed product line, especially in
the rear elevations backing onto Base Line Road and the apartment complex to
the west and north.
4. As currently proposed, a Variance will be necessary for a reduction in the
amount of common open space within the project. The Committee should
consider whether the common open space area should be increased to meet the
minimum 35 percent common open space area requirement or whether the large
amount of private open space and having the required number of recreational
amenities satisfies the intent of the code in this specific situation.
Secondary Issues: Once all of the major issues have been addressed, and time
permitting, the Committee will discuss the following secondary design issues:
1 . The Committee should consider and recommend the best option relative to the
future status of the Coast Live Oak tree. As mentioned earlier, the most
recent arborist study recommends preserving the tree in place with no
disruptions within the drip line of the tree. However, future street
improvements for Base Line Road as recommended by City staff would be in
conflict with the goal of giving the best environment for the tree to be
preserved in place. Therefore, staff strongly recommends that the tree be
relocated for preservation beyond the limits of construction of any
improvements that would interfere with the continued survival potential of
the Oak tree. Numerous Coast Live Oak trees have been transplanted in other
Inland Empire communities with a fairly high success ratio.
2. The use of varying accent materials (in addition to the stone veneer) is
encouraged (i.e. , brick veneer, real river rock, etc. ) and should be utilized
to the return wall location on all garage side elevations.
3. The southernmost visitor parking space on the cul-de-sac bulb should be
relocated or eliminated.
4. The perimeter wall separating the project from the apartment project to the
west and north should be combined into a single wall.
Policy Issues: The following items are a matter of Planning Commission policy and
should be incorporated into the project design without discussion:
1 . Pilasters should be introduced into the walls and fences along the interior
property lines.
DESIGN REVIEW COMMENTS
TT 14208 - RITTENHOUSE
May 3, 1994
Page 3
2. Create a strong pedestrian connection between units and common open space
areas. Pedestrian crossings using enriched paving materials are encouraged.
3. Strengthen project entry statements with expanded accent landscaping
decorative paving and special architectural features. A "focal point" should
be created to terminate the entry statement.
4. Pair garages to create larger front yards wherever possible (i.e. , along
southerly private streets) .
5. Three elevation types per floor plan should be provided.
6. Stamped concrete should be eliminated and replaced with a different enriched
paving material.
Staff Recommendation:
Based on the significance of the major issues, staff recommends that the applicant
address all issues which the Committee feels appropriate and resubmit the project
for further review of the Committee.
Attachments: Options A 6 B
Design Review Committee Action:
Members Present: Larry McNiel, John Melcher, Dan Coleman
Staff Planner: Steve Hayes
The Design Review Committee recommended approval of the project subject to the
following conditions:
1. The common open space area should be relocated per option "B. "
2. The units along Base Line Road should be replotted so like models are not
plotted adjacent to each other, and variety of front/rear setback is
increased, subject to review and approval of the Planning Division.
3. The rear elevations of the Plans 2 and 3 should be upgraded to the
satisfaction of the Planning Division prior to the issuance of building
permits. With this, the Committee felt a one-story model need not be
introduced into the unit mix.
4. The status of the Oak Tree should be deferred to the Planning Commission for
further discussion.
5. Real river rock should be used on the wall pilasters and as the accent
material for the homes.
6. A tile roofing material should be used, per City policy. Specific tile
samples should be submitted for review and approval of the Planning Division
prior to the issuance of building permits.
DESIGN REVIEW COMMENTS
May 3 , 1994
PUBLIC COMMENTS
There were no public comments at this time.
ADJOURNMENT
The meeting adjourned at 6:35 p.m.
Respectfully submitted,
Brad Buller
Secretary