HomeMy WebLinkAbout01-36 - Resolutions RESOLUTION NO. 01-36
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING TENTATIVE TRACT
SUBTT16164, A RESIDENTIAL SUBDIVISION OF 20 LOTS, ON 6.26
ACRES OF LAND IN THE LOW-MEDIUM RESIDENTIAL DISTRICT
(4-8 DWELLING UNITS PER ACRE) OF THE VICTORIA COMMUNITY
PLAN, LOCATED AT THE SOUTHWEST CORNER OF DAY CREEK
BOULEVARD AND VICTORIA PARK LANE, AND MAKING FINDINGS IN
SUPPORT THEREOF - APN: 1089-031-07 AND A PORTION OF 08.
A. Recitals.
1. Trimark Pacific Homes filed an application for the approval of Tentative Tract
SUBTT16164 as described in the title of this Resolution. Hereinafter in this Resolution, the subject
tentative tract map request is referred to as "the application."
2. On the 11th day of April 2001, the Planning Commission of the City of Rancho
Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing
on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission
of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the above-
referenced public hearing on April 11, 2001, including written and oral staff reports, together with
public testimony, this Commission hereby specifically finds as follows:
a. The application applies to property located on the west side of Day Creek
Boulevard, south of Victoria Park Lane, and is presently vacant and is rough graded; and
b. The property to the north of the subject site is Victoria Park Lane (a linear park)and
single-family development (under construction for William Lyon's Tract 15871). The property to the
east is Day Creek Boulevard and single-family development (under construction for Kaufman and
Broad's Tract 15875). The property to the west is the previously approved Tract Map 16081 for
101 units that are under construction. The property to the south is an unused railroad corridor(future
multi-purpose Pacific Electric Trail); and
C. The application contemplates a residential subdivision of 20 single-family residential
lots on 6.26 acres of land within the Low-Medium Residential District; and
d. The proposed project, together with the conditions applicable thereto, will not be
detrimental to the public health, safety, or welfare or materially injurious to properties or
improvements in the vicinity.
PLANNING COMMISSION RESOLUTION NO. 01-36
SUBTT16164 —TRIMARK PACIFIC HOMES
April 11, 2001
Page 2
3. Based upon the substantial evidence presented to this Commission during the above-
referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2
above, this Commission hereby finds and concludes as follows:
a. The tentative tract is consistent with the General Plan, Development Code, and any
applicable specific plans; and
b. The design or improvements of the tentative tract is consistent with the General
Plan, Development Code, and any applicable specific plans; and
C. The site is physically suitable for the type of development proposed; and
d. The design of the subdivision is not likely to cause substantial environmental
damage and avoidable injury to humans and wildlife or their habitat; and
e. The tentative tract is not likely to cause serious public health problems; and
f. The design of the tentative tract will not conflict with any easement acquired by the
public at large, now of record, for access through or use of the property within the proposed
subdivision.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, together with all written and oral reports included for the environmental assessment for
the application, the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and
Monitoring Program attached hereto, and incorporated herein by this reference, based upon the
findings as follows:
a. That the Mitigated Negative Declaration has been prepared in compliance with the
California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines
promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared
therefore reflect the independent judgment of the Planning Commission; and, further, this
Commission has reviewed and considered the information contained in said Mitigated Negative
Declaration with regard to the application.
b. Although the Mitigated Negative Declaration identifies certain significant
environmental effects that will result if the project is approved, all significant effects have been
reduced to an acceptable level by imposition of mitigation measures on the project,which are listed
below as Conditions of Approval.
C. Pursuant to the provisions of Section 753.5(c)of Title 14 of the California Code of
Regulations, the Planning Commission finds as follows: In considering the record as a whole, the
Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the
proposed project will have potential for an adverse impact upon wildlife resources or the habitat upon
which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated
Negative Declaration, the staff reports and exhibits, and the information provided to the Planning
Commission during the public hearing, the Planning Commission hereby rebuts the presumption of
adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations.
PLANNING COMMISSION RESOLUTION NO. 01-36
SUBTT16164 —TRIMARK PACIFIC HOMES
April 11, 2001
Page 3
5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth below
and in the Standard Conditions, attached hereto and incorporated herein by this reference.
Planning Division
1) The design of the Day Creek Boulevard parkway shall conform with the
Day Creek Boulevard Scenic and Recreational Corridor Master Plan as
approved by the Planning Commission.
2) The developer shall submit detailed plans of the Day Creek Boulevard
parkway, including landscaping and irrigation, for review and approval
by the City Planner and City Engineer, prior to recordation of the final
map.
Engineering Division
1) All conditions of Tentative Tract 16081 shall apply.
2) Toe of slope shall be 2 feet away from the edge of sidewalk.
Environmental Mitigation
Air Quality
1) The site shall be treated with water or other soil stabilizing agent
(approved by SCAQMD and RWQCB) daily to reduce PM10 emissions,
in accordance with SCAQMD Rule 403.
2) Victoria Park Lane and Day Creek Boulevard shall be swept according
to a schedule established by the City to reduce PM10 emissions
associated with vehicle tracking of soil off-site. Timing may vary
depending upon time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM10 emissions from the site during such episodes.
4) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for
96 hours or more to reduce PM10 emissions.
5) The construction contractor shall select the construction equipment
used on-site based on low-emission factors and high-energy efficiency.
The construction contractor shall ensure the construction grading plans
include a statement that all construction equipment will be tuned and
maintained in accordance with the manufacturer's specifications.
6) The construction contractor shall utilize electric or clean alternative
fuel-powered equipment where feasible.
PLANNING COMMISSION RESOLUTION NO. 01-36
SUBTT16164 —TRIMARK PACIFIC HOMES
April 11, 2001
Page 4
7) The construction contractor shall ensure that construction grading plans
include a statement that work crews will shut off equipment when not in
use.
Noise
1) Sound barriers at least 7 feet high must be erected along the east side
of Lots 1 thru 20. Each completed noise control barrier must present a
solid face from top-to-bottom.
2) Interior noise control shall be achieved through building construction
guidelines outlined in Tables 4 and 5 of the Project Noise Study
(Bricken, January 23, 2001).
Biological Resources
1) The four Eucalyptus trees to be removed shall be replaced on a
one-for-one basis with species and location to be approved by the City
Planner.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 11 TH DAY OF APRIL 2001.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY: yltujA )� ;r
arty T. M 01, Chairman
ATTEST.
Br r, S reJo y
I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby
certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the
Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning
Commission held on the 11th day of April 2001, by the following vote-to-wit:
AYES: COMMISSIONERS: MANNERINO, MCNIEL, STEWART, TOLSTOY
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: MACIAS
City of Rancho Cucamonga
MITIGATION MONITORING
PROGRAM
Project File No.: Tentative Tract 161641 and Development Review 01-02
This Mitigation Monitoring Program(MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration for the above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components - This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action
and the procedure necessary to ensure compliance. The mitigation measure conditions of
approval are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary. This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management-The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation)that relate to that department.
Procedures -The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action, what action will be taken and when,
and to whom and when compliance will be reported. All monitoring and reporting
documentation will be kept in the project file with the department having the original authority
for processing the project. Reports will be available from the City upon request at the following
address:
City of Rancho Cucamonga - Lead Agency
Planning Division
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
Mitigation Monitoring Program
TT 16164/DR 01-02
April 11, 2001
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staff's is needed,
as determined by the project planner or responsible City department, to monitor specific
mitigation activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures. The project planner is responsible for approving any such refinements or
additions. An MMP Reporting Form will be completed by the project planner or responsible
City department and a copy provided to the appropriate design, construction, or operational
personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring after
written notification has been issued. The project planner or responsible City department also
has the authority to hold certificates of occupancies if compliance with a mitigation measure
attached hereto is not occurring. The project planner or responsible City department has the
authority to hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Community Development Department. The
Department shall require the applicant to post any necessary funds (or other forms of
guarantee) with the City. These funds shall be used by the City to retain consultants and/or
pay for City staff time to monitor and report on the mitigation measure for the required period
of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the
monitoring results to the City. Said plan shall identify the reporter as an individual qualified to
know whether the particular mitigation measure has been implemented. The
monitoring/reporting plan shall conform to the City's MMP and shall be approved by the
Community Development Director prior to the issuance of building permits.
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: TT 16164, DR 01-02 Applicant: TRI MARK PACIFIC HOMES
Initial Study Prepared by: _Nancy Ferguson Date: February 26. 2001
Mitigation Measures No./ Responsible Monitoring
Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance
�..ti o.'t'"t� w:c��'� 'i.E"� TeA>-. ,fi..... -.-.,. z.. '^ :- ,moi aG•.'r u`�`� X1.4„�u��i2�s^�.Y�c�,o .. . .
w, s
The site shall be treated with water or other soil stabilizing agent) CP C Review of plans A/C 2
approved by SCAOMD and RW QCB)daily to reduce PM,0
emission,in accordance with SCAQMD Rule 403.
Victoria Park Lane and Day Creek Boulevard shall be swept CP C Review of plans A/C 2
according to a schedule established by the City to reduce PM,.
emissions associated with vehicle tracking of soil off-site. Timing
may vary depending upon time of year of construction.
Grading operations shall be suspended when wind speeds exceed
25 mph to minimize PM,o emissions from the site during such CP C Review of plans A/C 2
episodes.
Chemical soil stabilizers(approved by SCAQMD and RW QCB)shall
be applied to all Inactive construction areas that remain inactive for CP C Review of plans A/C 2
96 hours or more to reduce PMro emissions.
Contractor shall select the construction equipment based on low
emission factors and high-energy efficiency. All construction CP B/C Review of plans A/C 2
equipment will be tuned and maintained in accordance with the
manufacturers specifications.
Contractor shall utilize electric or clean alternative fuel powered CP B/C Review of
equipment where feasible. plans A/C 2
Grading plans shall include a statement that work crews will shut off CP/CE B Review of lens C 2
equipment when not in use. p -
• -«'ka u 5 'rc4' 1 ae- ak f. ++a. �e —v. rose
• Nga �: '.� ,w .` z }'
4.re,..K ``..”. .rk" mmtdt;
w ab, mss+
- �` ��. .!.W ' f�+ti•. 2L, u.x r1 .:'. '�..-:...$i:�'.��",�,.�_x3J+..,.,.,n
Sound barriers at least 7 feet high must be erected along the east BO D Review of plans/On C/A 2
side of Lots 1 through 20.Each completed noise control barrier Completion
must present a solid face from top-to-bottom.
Interior noise control shall be achieved through building construction BO D Review of plans/on C/A 2
guidelines outlined in Tables 4 and 5 of the Project Noise
Study. . , *completion
,8 :o'�go
�
,I
Trees will be replaced on a one-for-one basis as mitigation. CP C Review of plans C 3
Key to Checklist Abbreviations
r�sM ;n"a`r`f g7 `h� 37W"`
w Rag ponslblelPefson
�.£ �'�,.*,�S-> L-...7..._ 2fm<.+.`�..,.�a-+arns-s+..gdw.rQn+.«v.y a..:e��`',4. .`ms`s,.]i i4.-, ver111C8IlOnt= y.Y - a" q 8nC tOnB n n �"Sq �a h-•w t a*
CDD-CommunityDevelo ment Director A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Ma
CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/A2proval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans 4-Stop Work Order
PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee
6-Revoke CUP
I:\PLANNING\DOUG\7776164 AND DR01-02(TRIMARK 20 LOTS)WEW FOLDER(4)\TT16164MMPCHKLST.DOC
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: TENTATIVE TRACT 16164 AND DEVELOPMENT REVIEW 01-02
SUBJECT: 20 LOT SUBDIVISION
APPLICANT: TRIMARK PACIFIC HOMES
SOUTHWEST CORNER OF DAY CREEK BOULEVARD AND
LOCATION: VICTORIA PARK LANE
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DIVISION, (909) 477-2750, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
A. General Requirements Comoletion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City, its _/_/_
agents, officers, or employees, because of the issuance of such approval, or in the alternative, to
relinquish such approval. The applicant shall reimburse the City, its agents, officers, or
employees, for any Court costs and attorney's fees which the City, its agents, officers, or
employees may be required by a court to pay as a result of such action. The City may, at its sole
discretion, participate at its own expense in the defense of any such action but such participation
shall not relieve applicant of his obligations under this condition.
2. A copy of the signed Resolution of Approval or City Planner's letter of approval, and all Standard —J_/
Conditions, shall be included in legible form on the grading plans, building and construction
plans, and landscape and irrigation plans submitted for plan check.
B. Time Limits
1. This tentative tract map or tentative parcel map shall expire, unless extended by the Planning _/_/
Commission, unless a complete final map is filed with the City Engineer within 3 years from the
date of the approval.
2. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if
building permits are not issued or approved use has not commenced within 5 years from the date
of approval. No extensions are allowed.
SC-8-00 1
Project No.:TT 16164&DR 01-02
Completion Date
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which include
site plans, architectural elevations, exterior materials and colors, landscaping, sign program, and
grading on file in the Planning Division, the conditions contained herein, Development Code
regulations, and the Victoria Community Plan.
2. Revised site plans and building elevations incorporating all Conditions of Approval shall be
submitted for City Planner review and approval prior to the issuance of building permits.
3. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment,
building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved
use has commenced, whichever comes first.
4. Approval of this request shall not waive compliance with all sections of the Development Code,
all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the
time of building permit issuance.
5. If no centralized trash receptacles are provided, all trash pick-up shall be for individual units with
all receptacles shielded from public view.
6. Street names shall be submitted for City Planner review and approval in accordance with the
adopted Street Naming Policy prior to approval of the final map.
7. All building numbers and individual units shall be identified in a clear and concise manner,
including proper illumination.
8. The Covenants, Conditions, and Restrictions (CC&Rs) shall not prohibit the keeping the equine
animals where zoning requirements for the keeping of said animals have been met. Individual lot
owners in subdivisions shall have the option of keeping said animals without the necessity of
appealing to boards of directors of homeowners'associations for amendments to the CC&Rs.
9. The Covenants, Conditions, and Restrictions (CC&Rs) and Articles of Incorporation of the
Homeowners' Association are subject to the approval of the Planning and Engineering Divisions
and the City Attorney. They shall be recorded concurrently with the Final Map or prior to the
issuance of building permits, whichever occurs first. A recorded copy shall be provided to the
City Engineer. The Homeowners' Association shall submit to the Planning Division a list of the
name and address of their officers on or before January 1 of each and every year and whenever
said information changes.
10. All parkways, open areas, and landscaping shall be permanently maintained by the property
owner, homeowners' association, or other means acceptable to the City. Proof of this landscape
maintenance shall be submitted for City Planner and City Engineer review and approved prior to
the issuance of building permits.
11. The developer shall submit a construction access plan and schedule for the development of all
lots for City Planner and City Engineer approval; including, but not limited to, public notice
requirements, special street posting, phone listing for community concerns, hours of construction
activity, dust control measures, and security fencing.
12. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall
condition would result, the developer shall make a good faith effort to work with the adjoining
property owners to provide a single wall. Developer shall notify, by mail, all contiguous property
owner at least 30 days prior to the removal of any existing walls/ fences along the project's
perimeter.
SC-8-00 2
Project No.:TT 16164&DR 01-02
Completion Date
13. For single family residential development, a 2-inch galvanized pipe shall be attached to each
support post for all wood fences, with a minimum of two /z-inch lag bolts, to withstand high winds.
Both post and pipe shall be installed in an 18-inch deep concrete footing. Pipe shall extend at
least 4 feet, 6 inches above grade.
14. Wood fencing shall be treated with stain, paint, or water sealant.
15. Slope fencing along side property lines may be wrought iron or black plastic coated chain link to
maintain an open feeling and enhance views.
16. On corner side yards, provide minimum 5-foot setback between walls/fences and sidewalk.
17. For residential development, return walls and corner side walls shall be decorative masonry.
18. Where rock cobble is used, it shall be real river rock. Other stone veneers may be manufactured
products.
D. Parking and Vehicular Access (indicate details on building plans)
1. Multiple car garage driveways shall be tapered down to a standard two-car width at street.
2. On flag lots, use a 12-foot driveway within flag to maximize landscape area.
E. Landscaping
1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in
the case of residential development, shall be prepared by a licensed landscape architect and
submitted for City Planner review and approval prior to the issuance of building permits or prior
final map approval in the case of a custom lot subdivision.
2. Existing trees required to be preserved in place shall be protected with a construction barrier in
accordance with the Municipal Code Section 19.08.110, and so noted on the grading plans. The
location of those trees to be preserved in place and new locations for transplanted trees shall be
shown on the detailed landscape plans. The applicant shall follow all of the arborist's
recommendations regarding preservation, transplanting, and trimming methods.
3. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1
slope, shall be, at minimum, irrigated and landscaped with appropriate ground cover for erosion
control. Slope planting required by this section shall include a permanent irrigation system to be
installed by the developer prior to occupancy.
4. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater
slope shall be landscaped and irrigated for erosion control and to soften their appearance as
follows: one 15-gallon or larger size tree per each 150 sq. ft. of slope area, 1-gallon or larger size
shrub per each 100 sq. ft. of slope area, and appropriate ground cover. In addition, slope banks
in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or
larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in
staggered clusters to soften and vary slope plane. Slope planting required by this section shall
include a permanent irrigation system to be installed by the developer prior to occupancy.
5. For single family residential development, all slope planting and irrigation shall be continuously
maintained in a healthy and thriving condition by the developer until each individual unit is sold
and occupied by the buyer. Prior to releasing occupancy for those units, an inspection shall be
conducted by the Planning Division to determine that they are in satisfactory condition.
6. Front yard and corner side yard landscaping and irrigation shall be required per the Development
Code and/or the Etiwanda Specific Plan. This requirement shall be in addition to the required
street trees and slope planting.
SC-8-00 3
Project No.:TT 16164&DR 01-02
Completion Date
7. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be included
in the required landscape plans and shall be subject to City Planner review and approval and
coordinated for consistency with any parkway landscaping plan which may be required by the
Engineering Division.
8. Special landscape features are required along East Avenue.
9. Landscaping and irrigation systems required to be installed within the public right-of-way on the
perimeter of this project area shall be continuously maintained by the developer.
10. All walls shall be provided with decorative treatment. If located in public maintenance areas, the
design shall be coordinated with the Engineering Division.
11. On projects which abut the 1-15 Freeway, the developer shall provide landscaping within the
freeway right-of-way along the boundary of this project or pay an in-lieu of construction cash
deposit. The landscape and irrigation plans shall be prepared in conformance with Caltrans and
City Standards through the City of Rancho Cucamonga. Plans shall be reviewed and approved
by the City Planner and City Engineer. Landscape and irrigation shall be installed prior to the
release of occupancy of the project. If final approvals and/or installation are not complete at that
time, the City will accept a cash deposit for future landscaping of the Caltrans right-of-way.
F. Environmental
1. A final acoustical report shall be submitted for City Planner review and approval prior to the
issuance of building permits. The final report shall discuss the level of interior noise attenuation
to below 45 CNEL, the building materials and construction techniques provided, and if
appropriate, verify the adequacy of the mitigation measures. The building plans will be checked
for conformance with the mitigation measures contained in the final report.
2. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required to
post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the
amount of $719.00 prior to the issuance of building permits, guaranteeing satisfactory
performance and completion of all mitigation measures. These funds may be used by the City to
retain consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
G. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location
of mail boxes. Multi-family residential developments shall provide a solid overhead structure for
mail boxes with adequate lighting. The final location of the mail boxes and the design of the
overhead structure shall be subject to City Planner review and approval prior to the issuance of
building permits.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 477-2710,
FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
H. General Requirements
1. Submit five complete sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
SC-8-00 4
Project No.:TT 16164&DR 01-02
Completion Date
c. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of
service entrance conductors, panel schedules, and single line diagrams;
f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water and waste
diagram, sewer or septic system location, fixture units, gas piping, and heating and air
conditioning; and
g. Planning Division Project Number (i.e., TT #, CUP #, DR #, etc.) clearly identified on the
outside of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal.
3. Separate permits are required for fencing and/or walls.
4. Contractors Contractors must show proof of State and City licenses and Workers' Compensation coverage to
the City prior to permit issuance.
I. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with the project file number (i.e., CUP 98-01). The applicant shall comply with the latest
adopted Uniform Building Code, Uniform Mechanical Code, Uniform Plumbing Code, National
Electric Code, Title 24 Accessibility requirements, and all other applicable codes, ordinances, and
regulations in effect at the time of permit application. Please contact the Building and Safety
Division for availability of the Code Adoption Ordinance and applicable handouts.
2. Prior to issuance of building permits for a new residential dwelling unit(s) or major addition to
existing unit(s), the applicant shall pay development fees at the established rate. Such fees may
include, but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation
Development Fee, Permit and Plan Checking Fees, and School Fees. Applicant shall provide a
copy of the school fees receipt to the Building and Safety Division prior to permit issuance.
3. Street addresses shall be provided by the Building Official, after tract/parcel map recordation and
prior to issuance of building permits.
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday, with no construction on Sunday or holidays.
J. New Structures
1. Provide compliance with the Uniform Building Code for the property line clearances considering
use, area, and fire-resistiveness.
2. Provide compliance with the Uniform Building Code for required occupancy separation(s).
3. Roofing material shall be installed per the manufacturer's "high wind" instructions.
K. Grading
1. Grading of the subject property shall be in accordance with the Uniform Building Code, City
Grading Standards, and accepted grading practices. The final grading plan shall be in
substantial conformance with the approved grading plan.
SC-8-00 5
Project No.:TT 16164&DR 01-02
Completion Date
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to
perform such work.
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading plan check.
4. The final grading plans shall be completed and approved prior to issuance of building permits.
5. A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more of
combined cut and fill. The Grading Plan shall be prepared, stamped, and signed by a California
Registered Civil Engineer.
APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
L. Dedication and Vehicular Access
1. Rights-of-way and easements shall be dedicated to the City for all interior public streets, _/_J_
community trails, public paseos, public landscape areas, street trees, traffic signal encroachment
and maintenance, and public drainage facilities as shown on the plans and/or tentative map.
Private easements for non-public facilities (cross-lot drainage, local feeder trails, etc.) shall be
reserved as shown on the plans and/or tentative map.
2. Dedication shall be made of the following rights-of-way on the perimeter streets (measured from
street centerline):
a. Varies from 71 feet to 83 feet on Day Creek Boulevard.
b. 76 total feet on Victoria Park Lane.
3. Corner property line cutoffs shall be dedicated per City Standards.
4. The developer shall make a good faith effort to acquire the required off-site property interests
necessary to construct the required public improvements, and if he/she should fail to do so, the
developer shall, at least 120 days prior to submittal of the final map for approval, enter into an
agreement to complete the improvements pursuant to Government Code Section 66462 at such
time as the City acquires the property interests required for the improvements. Such agreement
shall provide for payment by the developer of all costs incurred by the City to acquire the off-site
property interests required in connection with the subdivision. Security for a portion of these
costs shall be in the form of a cash deposit in the amount given in an appraisal report obtained by
the developer, at developer's cost. The appraiser shall have been approved by the City prior to
commencement of the appraisal. This condition applies in particular, but not limited to: Day Creek
Blvd. And "A"Street connection to Day Creek Blvd.
M. Street Improvements
1. All public improvements (interior streets, drainage facilities, community trails, paseos, landscaped
areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards.
Interior street improvements shall include, but are not limited to, curb and gutter, AC pavement,
drive approaches, sidewalks, street lights, and street trees.
SC-8-00 6
Project No.:TT 16164&DR 01-02
Completion Date
2. Construct the following perimeter street improvements including, but not limited to:
Street Name Curb& A.C. Side- Drive Street Street Comm Median Bike Other
Gutter Pvmt walk Appr. Lights Trees Trail Island Trail
Day Creek Blvd. and
Victoria Park Lane x x x x x o f
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be
provided for this item. (e) Access ramps. (f) Perimeter theme wall.
3. Improvement Plans and Construction:
a. Street improvement plans, including street trees, street lights, and intersection safety lights
on future signal poles, and traffic signal plans shall be prepared by a registered Civil
Engineer and shall be submitted to and approved by the City Engineer. Security shall be
posted and an agreement executed to the satisfaction of the City Engineer and the City
Attorney guaranteeing completion of the public and/or private street improvements, prior to
final map approval or the issuance of building permits, whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction
permit shall be obtained from the City Engineer's Office in addition to any other permits
required.
c. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and
interconnect conduit shall be installed to the satisfaction of the City Engineer.
d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction
project along major or secondary streets and at intersections for future traffic signals and
interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of
BCR, ECR, or any other locations approved by the City Engineer
Notes:
(1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a maximum of 200 feet
apart, unless otherwise specified by the City Engineer.
(2) Conduit shall be 3-inch (at intersections) or 2-inch (along streets) galvanized steel with
pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer.
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A cash
deposit shall be provided to cover the cost of grading and paving, which shall be refunded
upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be
installed to City Standards, except for single family residential lots.
h. Street names shall be approved by the City Planner prior to submittal for first plan check.
4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program.
SC-8-00 7
Project No.:TT 16164&DR 01-02
Completion Data
5. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with
adopted policy. On collector or larger streets, lines of sight shall be plotted for all project
intersections, including driveways. Local residential street intersections and commercial or
industrial driveways may have lines of sight plotted as required.
N. Public Maintenance Areas
1. A separate set of landscape and irrigation plans per Engineering Public Works Standards shall
be submitted to the City Engineer for review and approval prior to final map approval or issuance
of building permits, whichever occurs first. The following landscaped parkways, medians,
paseos, easements, trails or other areas shall be annexed into the Landscape Maintenance
District: Victoria Park Lane and Day Creek
2. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building
permits whichever occurs first. Formation costs shall be borne by the developer.
3. All required public landscaping and irrigation systems shall be continuously maintained by the
developer until accepted by the City.
4. Parkway landscaping on the following street(s) shall conform to the results of the respective
Beautification Master Plan: East Avenue Beautification Concept.
O. Drainage and Flood Control
1. A final drainage study shall be submitted to and approved by the City Engineer prior to final map
approval or the issuance of building permits, whichever occurs first. All drainage facilities shall
be installed as required by the City Engineer.
P. Utilities
1. Provide separate utility services to each parcel including sanitary sewerage system, water, gas,
electric power, telephone, and cable TV (all underground) in accordance with the Utility
Standards. Easements shall be provided as required.
2. The developer shall be responsible for the relocation of existing utilities as necessary.
3. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga County Water District (CCWD), Rancho Cucamonga Fire Protection District, and the
Environmental Health Department of the County of San Bernardino. A letter of compliance from
the CCWD is required prior to final map approval or issuance of permits, whichever occurs first.
Such letter must have been issued by the water district within 90 days prior to final map approval
in the case of subdivision or prior to the issuance of permits in the case of all other residential
projects.
Q. General Requirements and Approvals
1. Permits shall be obtained from the following agencies for work within their right-of-way: So. Cal
Edison, SANBAG
2. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all
new street lights for the first six months of operation, prior to final map approval or prior to
building permit issuance if no map is involved.
SC-8-00 8
Project No.:TT 16164&DR 01-02
Completion Date
3. Prior to finalization of any development phase, sufficient improvement plans shall be completed
beyond the phase boundaries to assure secondary access and drainage protection to the
satisfaction of the City Engineer. Phase boundaries shall correspond to lot lines shown on the
approved tentative map.
APPLICANT SHALL CONTACT THE FIRE PREVENTION/NEW CONSTRUCTION UNIT,
(909) 477-2730, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
R. General Fire Protection Conditions
1. Mello Roos Community Facilities District requirements shall apply to this project. The developer
shall commence, participate in, and consummate or cause to be commenced, participated in, or
consummated, a Mello-Roos Community Facilities District(CFD)for the Rancho Cucamonga Fire
Protection District to finance construction and/or maintenance of a fire station to serve the
development. The CFD shall be formed by the District and the developer by the time recordation
of the final map occurs.
2. Fire flow requirement shall be: —/—/—
a. 1 500 gallons per minute, Per'97 UFC Appendix III-A, 3, (b) (Increase).
b. A fire flow shall be conducted by the builder/developer and witnessed by fire department
personnel prior to water plan approval.
C. For the purpose of final acceptance, an additional fire flow test of the on-site hydrants
shall be conducted by the builder/developer and witnessed by fire department personnel
after construction and prior to occupancy.
3. Fire hydrants are required. All required public or on-site fire hydrants shall be installed, flushed,
and operable prior to delivery of any combustible building materials on site (i.e., lumber, roofing
materials, etc.). Hydrants flushing shall be witnessed by fire department personnel.
4. Existing fire hydrant locations shall be provided prior to water plan approval. Required hydrants,
if any, will be determined by the Fire District. Fire District standards require a 6-inch riser with a
4-inch and a 2-1/2-inch outlet. Substandard hydrants shall be upgraded to meet this standard.
Contact the Fire Safety Division for specifications on approved brands and model numbers.
5. Prior to the issuance of building permits for combustible construction, evidence shall be
submitted to the Fire District that an approved temporary water supply for fire protection is
available, pending completion of the required fire protection system.
6. Hydrant reflective markers (blue dots) shall be required for all hydrants and installed prior to final
inspection.
7. An automatic fire extinguishing system(s) will be required as noted below:
a. Other: To mitigate culdesac length...
Note: Special sprinkler densities are required for such hazardous operations as woodworking,
plastics manufacturing, spray painting, flammable liquids storage, high piled stock, etc. Contact
the Fire Safety Division to determine if the sprinkler system is adequate for proposed operations.
8. Roadways within project shall comply with the Fire District's fire lane standards, as noted:
a. All roadways per Rancho Cucamonga Fire Protection District Ordinance 32.
9. Fire department access shall be amended to facilitate emergency apparatus.
10. Emergency secondary access shall be provided in accordance with Fire District standards.
SC-8-00 9
Project No.:TT 16164&DR 01-02
Completion Date
11. Emergency access, a minimum of 26 feet wide, shall be provided, and maintained free and clear
of obstructions at all times during construction, in accordance with Fire District requirements.
12. Fire District fee(s), plus a $1 per "plan page" microfilm fee will be due to the Rancho Cucamonga _/_/_
Fire Protection District as follows:
a. $132 for CCWD Water Plan review/underground water supply.
b. $132 for Single Family Residential Tract (per phase).
"Note: Separate plan check fees for Tenant Improvement work, fire protection systems
(sprinklers, hood systems, alarms, etc.) and/or any consultant reviews will be assessed upon
submittal of plans.
APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE
WITH THE FOLLOWING CONDITIONS:
S. Security Hardware
1. A secondary locking device shall be installed on all sliding glass doors.
2. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within
40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used.
3. All garage or rolling doors shall have slide bolts or some type of secondary locking devices.
T. Windows
1. All sliding glass windows shall have secondary locking devices and should not be able to be lifted _/_J_
from frame or track in any manner.
U. Building Numbering
1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime
visibility.
SC-8-00 10