HomeMy WebLinkAbout2009/03/17 - Agenda Packet ACTION AGENDA
DESIGN REVIEW COMMITTEE MEETING
TUESDAY MARCH 17, 2009 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
Committee Members: Lou Munoz Pam Stewart Larry Henderson
Alternates: Ray Wimberly Frances Howdyshell Richard Fletcher
CONSENT CALENDAR
7:00 p.m.
(Tom) ENVIRONMENTAL ASSESSMENT AND DESIGN REVIEW DRC2006-00540R - DEVELOPMENT
REVIEW DRC2006-00540 REVISED - PITASSI ARCHITECTS - Due to the location of a previously
unknown gas line easement, the applicant submitted a request to revise the Site Plan and building
elevations for one building in the northwest corner of a previously approved 225-unit workforce
apartment complex on 12.87 acres of land in the Medium Residential District (8-14 dwelling units
per acre), located at 13233 Foothill Boulevard, west of the Etiwanda San Sevaine Flood Control
Channel and east of the SCE Transmission Line Corridor-APN: 0229-041-10.
PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant regarding
their development application. The following items do not legally require any public testimony, although
the Committee may open the meeting for public input.
7:10 p.m.
(Steve/Willie) CONDITIONAL USE PERMIT DRC2008-00134 - MICHAEL WILLIAMS ON BEHALF OF NEW
BEGINNINGS FAMILY WORSHIP CENTER - A request to add 2,657 square feet to an existing
church facility on a .42-acre site for additional worship area, storage room, and meeting room in the
Low Residential District, located at 8137- 8139 9th Street -APN: 0207-241-31, 40, and 46.
ADJOURNMENT
The meeting adjourned at 7:15 p.m.
CONSENT CALENDAR
DESIGN REVIEW COMMENTS
7:00 p.m. Tom Grahn March 17, 2009
ENVIRONMENTAL ASSESSMENT AND DESIGN REVIEW DRC2006-00540R - DEVELOPMENT REVIEW
DRC2006-00540 REVISED - PITASSI ARCHITECTS - Due to the location of a previously unknown gas line
easement, the applicant submitted a request to revise the Site Plan and building elevations for one building in the
northwest corner of a previously approved 225-unit workforce apartment complex on 12.87 acres of land in the
Medium Residential District (8-14 dwelling units per acre), located at 13233 Foothill Boulevard, west of the
Etiwanda San Sevaine Flood Control Channel and east of the SCE Transmission Line Corridor -
APN: 0229-041-10.
Oral presentation to be given at the meeting.
Design Review Committee Action:
The Committee approved the proposed changes to the site plan and building elevations, subject to the
placement of additional stone veneer on all elevations of the revised Building E.
Members Present: Munoz, Wimberly
Staff Planner: Tom Grahn
Attachment A - Detailed Site Plan
Attachment B - Elevations
ObS00-900Z #D2IG 1Y. 1
,§ z 21
W
o! s W 1t
47.4 u :i
Q lx•
--- ---
zi
11.0 iiitH
•-
__ iii ;flt1
- ----- gi :." .:':
I
fed #�,1
� xli111111111 &I .fins 1
> j>?>? >j§fig i €S$=PS
inn� � ;I
a
% a Egg
Yr—�I r, �. aaar.a ae
& i i 1-. ms�m�oW � �
I I
I - -- - _'
na R "§n
LJ \�< ('.
i
as
k III .t/ m d r
7 I
`• ;� I a�N°
•-...,....... i4 A , m^ n
.� O
ct
Z V
C
mow=col ao
_ /DI IPj'.YI ..
aI
LU
W �
Attachment A
O17S00-900Z #J2JO = ii
u
0
co
1Iwl I•II I U Se
11 7
ki -1r _IN w It' � Q I
;e ime
III s t .,., a 'a
o � � �f3# .
R■ Z f' p K CO '
• d1 a r i0 e Lu
mai -r 4J '� I
ez
�1 iti W tltl W on
t C �E� P I I W + I-I W al Ell co
C C
•I O] In m
A+/. a N E
I !14m !
c
ea
—
of�,_:_'J , _O1I
F . h 5.I a .' L.L -5 LL U
3 1 , 9
Or rl.1-1fri:lil lit IL
nil
Mir., E
r - — I=_. iuuu., m _ \ O
0T \ ._
06- . U
__— — r tO
�e F ■ ellllllllIIIIIIIIH C
ry c ry Mr C
A li 1 t L 9 O'i� l
als
P LT_ -aro i
Ea (C V t § a -4'.-4'.0_,,/ N_ �l U
x- lt - •II• I I0- . €Ei v a d s t
U 1al El-
r, 1 o
mm�mmw .mnnnmm = a a T
wmuumi�\ ��uuuunuun c 'c m
xm®a
Attachment B o 1-f t-
\m I _11;i. 0 i_a
`
ill cal d
DESIGN REVIEW COMMENTS
7:10 p.m. Steve Fowler March 17, 2009
CONDITIONAL USE PERMIT DRC2008-00134 - MICHAEL WILLIAMS ON BEHALF OF NEW
BEGINNINGS FAMILY WORSHIP CENTER - A request to add 2,657 square feet to an existing church
facility on a .42-acre site for additional worship area, storage room, and meeting room in the
Low Residential District, located at 8137 and 8139 9th Street - APN: 0207-241-31, 40, and 46.
Design Parameters: The applicant is proposing to construct a 2,657 square foot addition to an existing
church facility at 8137 and 8139 9th Street. This site is on the south side of 9th Street Grove Avenue
and Calaveras Avenue in the Low Residential District. The over all current lot coverage is 2,550 square
feet, with 1,750 square feet on the first floor and 1,750 square feet in the basement. The new lot
coverage will be 5,007 square feet.
The proposal is to demolish 200 square feet of the existing building and add 1,674 square feet to the first
floor to allow for additional worship area and larger restrooms. The basement will be .enlarged by
983 square feet to allow for more storage area. The exterior of the building is proposed to remain
relatively the same. The building has a stucco finish and a composition shingle roof. The proposed site
plan includes the removal of the existing chain link fence from the perimeter of the site and to replace it
with a decorative block wall and landscaping around the entire site. The proposed worship area is to
have 108 fixed seats for the parishioners to utilize and 27 parking stalls. The site currently only has one
entrance and one exit. The site currently has seats for approximately 70 people and contains 26 parking
stalls.
The existing building is located within the front setback, but the addition has been setback to conform to
the current Development Code.
Staff Comments: The following comments are intended to provide an outline for the Committee
discussion regarding this project.
Major Issues: The applicant worked hard with staff to follow the criteria outlined in the Development
Code. There are no major issues regarding this project at this time.
Staff recommendation: Staff recommends that the Design Review Committee recommend approval of
this Conditional use Permit to the Planning Commission.
Design Review Committee Action:
The Committee approved the project as presented.
Members Present: Munoz, Wimberly, Henderson
Staff Planner: Steve Fowler
DESIGN REVIEW COMMENTS
March 17, 2009
PUBLIC COMMENTS
There were no public comments.
ADJOURNMENT
The meeting adjourned at 7:15 p.m.
Respectfully submitted,
Larry Henderson, AICP
Principal Planner