HomeMy WebLinkAbout1989/02/02 - Agenda Packet CITY OF RANCHO CUCAMONGA
MEMORANDUM ,°
DATE: February 6, 1989 ACTION AGENDA
TO: Commercial /Industri al
Design Review Committee Larry McNiel 1977
Peter Tolstoy
Dan Col eman
Bruce Emerick (Alternate)
FROM: Bruce Abbott, Associate Planner
SUBJECT: DESIGN REVIEW COMMITTEE MEETING OF FEBRUARY 2, 1989
The following is a description of projects which require review by the
Design Review Committee. Please review the attached plans, visit the
project sites, and write down your comments as necessary. After the
meeting, the Committee's concerns will be typed up as the formal
action/recommendation of the Committee and distributed to the Commission
and Council.
As always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 4:00 - 4:30 p.m. Please notify our department if
you will be unable to attend the meeting, or if you will be late, so
that the dinner can be properly ordered and the necessary arrangements
made.
4:00 - 4:30 DINNER
4:30 - 6:30
(~ki) PRELIMINARY ETIWANDA NORTH SPECIFIC PLAN - Development
of an approximately 7,063 acre area located generally
north of 24th Street and east of the extension of
Milliken Avenue.
6:30 - 7:00 CONSENT CALENDAR
7:00 - 7:30
(Chris) ENVIRONENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 88-
13 - CRHO, INC. - The development of a five story office
building totaling 74,697 square feet on approximately 2
acres of land in the Industrial Park District, Subarea
6, and the Haven Avenue Overlay District, located at the
DESIGN REVIEW COMMITTEE
February 2, 1989
Page 2
southeast corner of Haven Avenue and Arrow Route - APN: 209-142-16.
7:30 - 8:30
(Brad) WORKSHOP TO CONSIDER REVISIONS TO TARGET STORE
ELEVATIONS
8:30 - 9:30
(Debra) TERRA VISTA TOWN CENTER SIGN PROGRAM WORKSHOP
BA:mlg
Attachments
CC: P1 anning Commission/City Council
Commercial/Industrial
CONSENT CALENDAR ITEMS AGEI~A
February 2, 1989
1. DR 88-29 CASTILLO COMPANY
(Steve) Review proposed building color changes
for State Farm Office building.
Committee Action: The Committee did not approve the
color change as presented. The
Committee preferred that the accent
color be changed to the Amertone color
"Caracas" as specified in the approved
color chart for the Bixby Business
Park Master Plan. The applicant shall
submit a revised color chart and paint
chip sample for review and approval of
the Design Review Committee.
2. DR 80-16 I~EYER INVESTI(NTS
(Steve) Review proposed building color changes
for the Archicenter Office Building
Committee Action: The Committee did not approve the
color modifications to buildings 100
through 300 as presented. The
Committee preferred that bui 1 di ngs 100
through 300 maintain the colors as
previously painted. The Committee did
approve the color changes to buildings
400 through 800 as presented.
3. CUP 87-04 DONNELLY/BENNbmm ARCHITECTS
(Chris) Review of building accent stripe color
for Chaffey Plaza neighborhood
conmercial center.
Committee Action: The Committ selected and approved
Freno Green (QT37T) by Dunn Edwards to
replace the existing building accent
stripe paint.
DESIGN REVIEW COMMENTS
4:30 - 6:30 Miki February 2, 1989
PRELIMINARY ETIWANDA NORTH SPECIFIC PLAN - Development of an
approximately 7,063 acre area 1 ocated generally north of 24th Street and
east of the extension of Millikan Avenue.
Staff Comments:
Review of the Preliminary Etiwanda North Specific Plan by the Design
Review Committee is requested. The Plan has been delivered under
separate cover.
This is a pre-application review. The purpose of this review is to
identify problems at the early stages of plan preparation. Please give
special attention to the Community Design Section. Comments on all
sections will be received and forwarded to the applicant.
The Specific Plan will establish development densities, zoning
regulations, development standards and community design guidelines. It
will also include requi ramants for circulation, drainage and mitigation
measures in response to the environmental review process.
The Specific Plan will not be a substitute for tract maps and
development review for individual projects within the Specific Plan
area.
Design Review Committee Action:
Members Present: Larry McNiel, Suzanne Chitlea, Peter Tolstoy, Bruce
Enerick, David ~akesley, Brad Buller, Dan Colmen
Staff Planner: Miki Bratt
The Planning Commission commented on architectural themes and
neighborhood monuments. The applicant was directed to respond to
comments in writing by February 16, 1989 and to return to Design Review
on March 2, 1989.
The applicant was requested to do the following:
o Review the possible design mix using the Etiwanda Specific plan
methodology for the six architectural types which have been
offered.
o Identify design criteria which indicates distinctive features of
each architectural type.
o If necessary, add a 7th architectural type.
o Revise minimum unit size upward to reflect actual expected
minimun unit sizes.
DESIGN REVIEW COMMENTS
ETIWANDA NORTH SPECIFIC PLAN
February 2, 1989
Page 2
o Present guidelines to vary streetscapes, inclu~ ng mix of wide,
lots, alley treatment in limited areas, mix of side-on garages,
mix of recessed garages, mix of single story units and massing
strategies.
o Provide a matrix for development standards.
o Submit design standards for commercial areas.
o Specify natural materials for fencing.
o Submit monument designs which minimize maintenance.
DESIGN REVIEW COMMENTS
6:30 - 7:00 Chris February 2, 1989
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 88-13 - CRHO, INC. -
Re development of a five story office building totaling 74,697 square
feet on approximately 2 acres of land in the Industrial Park District,
Subarea 6, and the Haven Avenue Overlay District, located at the
southeast corner of Haven Avenue and Arrow Route - APN: 209-142-16.
Staff Coemeents:
Consider the elimination of the space frame canopy at the northwest
entrance to the building.
Background:
This i tam was approved by the P1 anning Commission on June 22, 1988. A
modification to the northwest entry was proposed and reviewed as a
consent calendar item on January 19, 1989. The modification was not
approved.
The applicant has requested that he and the architect be given the
opportunity to present the proposed modifications to the Design Review
Committee for reconsideration. Plans will be available at the meeting
for review of the proposed deletion of the archway at the building
entrance.
Oesign Review Coam~ittee Action:
Members Present: Larry McNiel, Peter Tolstoy, Dan Coleman
Staff Planner: Chris Westman
The Committee reviewed the proposal as presented by the architect and
determined the space frame canopy at the northwest entrance to the
building to be an integral part of the building design and pedestrian
circulaiton. It also provides an element for human scale at the
building entrance. Therefore, that element shall remain.
If the applicant wishes to propose a variation on the same concept, the
Design Review Committee shall review the proposal.
The Committee also discussed the ribbon glass on the upper stories of
the building and agreed to the removal of the "column" panels.