HomeMy WebLinkAbout1989/04/06 - Agenda Packet - (2) CITY OF RANCHO CUCAMONGA
MEMORANDUM
DATE: April 10, 1989 l[;TlON Cll$1ENTS
T0: Residential/Institutional
~si~n Review Comjt~e karry
Bruce
0t~ Kroutj 1
David Blakesley
FROI~: Debra Moier, Associate Planner
SUBJECT: DESIGN REVIEW COtiMITTEE MEETING OF APRIL 6, 1989
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your conments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Conmittee's concerns will be typed up
as the formal action/recommendation of the Committee and distributed to
the Conmission and Council.
As always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided betv~en 5:00 - 5:30 p.m., Consent Calendar items will be
reviewed between 5:30 p.m. 6:00 p.m., with the first design review
item being heard at 6:00 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:00
(Bruce) ENVIROII~ENTAL ASSESS)tENT AND CO~ITIONAL USE PERMIT 88-
46 - JAI~ES CARTER - Development of a neighborhood
shopping center consisting of three buildings totaling
30,105 square feet on 4.45 acres in the Neighborhood
Commercial District located at the southwest corner of
Base Line Road and Hellman Avenue - APN: 208-202-13 and
14.
8:00
(Debra) PLANNING COI~MISSION WORKSHOP - TERRA VISTA TOWN CENTER -
The purpose of the workshop is to preview site plan and
elevations of Montgomery Ward (Major 3).
DM:mlg
Attachments
CC: Planning Conmission/City Council
Residential/Institutional
CONSENT C/LENDAR ITEMS AGE]iDA
April 6, 1989
1. TRACT 12332-2 BROCK
(Bev) Committee to review replotttng of
units
Confnittee Action: The Committee (Kroutil, HcNiel,
Emerick) approved the replotting
contingent upon acceptance by the Home
Owner's Association. If the Home
Owner's Association is not satisfied,
approval by Design Review Coenittee is
void.
2. TRACT 11626 BRIMAR
(Bey) COmmittee to review replotting of
units
Conmnittee Action: The Coenittee (Kroutil, HcNiel,
Emerick) did not recommend approval of
the proposed replotting of Lots 78, 81
and 82.
DESIGN REVIEW COMMENTS
6:00 Bruce April 6, 1989
ENVIRO~4ENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 88-46 - JAMES
CARTER - Development of a neighborhood shopping center consisting of
~uildings totaling 30,105 square feet on 4.45 acres in the
Neighborhood Conmercial District located at the southwest corner of Base
Line Road and Hel lman Avenue '- APN: 208-202-13 and 14.
Background:
This project was reviewed as a regular item at the Design Review
Committee meeting of January 19, 1989. At that time the applicant ts
directed to revise certain aspects of the development plans related to
architecture, the site plan and landscaping. Since that time the
proposed entry drive to the Neighborhood Center has been shifted to the
east onto the applicants property in order to solve access problems with
the adjacent County library. The revised plans will reflect this change
along with a reduction of floor space for building "A" and building "B".
Staff C~ments:
The Design Review Committee should examine the resubmitted plans and
elevations for completion of the following revisions as recommended to
the applicant during the meeting of January 19, 1989.
Architecture:
1. All building facades should receive additional architectural
detail/relief. The design and materials of construction should be
modified so that the facades are compatible with the residential
development to the south.
2. Tenant signage should be reduced in size.
Site Plan:
1. Planter area and pedestrian space should be expanded along the
north side of building "C". The planter area should cover the full
length of the building "C" and be wide enough to accommodate trees
larger than currently specified.
2. A substantial planter area should be added along the south side of
building "C" to accommodate trees.
3. Planter area width on the west and east side of building "A" should
be expanded to accommodate trees.
4. The planter area width on the south side of building "B" should be
expanded for trees.
DESIGN REVIEW COIMENTS
CUP 88-46 - JAMES CARTER
April 6, 1989
Page 2
5. Entry and corner monument signs should tie in with the project
architecture.
6. Additional enriched paving should be provided at the east parking
lot entrance off of Hel lman Avenue.
7. Enriched paving should be provided between the south side of
building "B" and the northeast corner of building "C".
8. Enriched paving should be provided as a pedestrian link between the
sidewalk at the east side of building "C" and the sidewalk along
Hel lman Avenue.
9. The paved area adjacent to the furtherest easterly parking stall at
the northeast corner of building "C" should be converted to a
planter area with an 12 inch wide walk inside the curb adjacent to
the parking stall.
Landscape:
1. The buffer landscaping along Spur Drive should have an informal
design. The formal screen hedge should be substituted with an
informal mass planting of shrubs.
2. Landscaping adjacent to Base Line Road should conform to
requirements for that special boulevard treatment. The palm trees
proposed for the landscape setback on Base Line Road, therefore,
should be substituted with another tree such as Liquidamber which
is being proposed and is on the approved street tree list for Base
Line Road.
3. The above requirement will modify the design intent of the palm
trees. Therefore, the palm trees in the parking lot island north
of building "C" should be substituted with Cupaniopsis which is the
predominant tree within the parking lot.
4. Palm trees should still be utilized in the design by incorporating
them in the expanded planter area along the north side of building
"C", replacing the Photinia standards. Palms should be clustered
at the north entrance to emphasize that location.
i)estiln ~view Committee Action:
Members Present: Larry McNiel, Bruce Emerick, Otto Kroutil
Staff Planner: Bruce Abbott
The Design Review Committee recon~nded that revised plans be
resubmitted with the following:
DESIGN REVIEW COMMENTS
CUP 88-46 - JAMES CARTER
April 6, 1989
Page 3
Architecture:
1. The form of buildings "A" and "B" should be revised to make a
stronger architectural statement and include more detail and
elements which tie in with the main building "C".
2. The small square tile work below the cornice should be deleted and
an additional cornice placed below the built-up cornice on building
"C". The additional cornice should continue around the entire
building including the towers.
3. The metal framework structures on the front of building "C" should
be revised to be wood and the paint should be changed to gray.
Alternative paint samples for the structures and other elements
such as the storefronts should be resubmitted. The white color as
presented for the stucco should remain.
4. The square tile work ornaments at the towers should be inset 6
inches.
5. Additional pilasters should be used along the entire length of the
rear of building "C". The pilasters should be 6 inches in depth.
6. An architectural element should be added to the rear facade of
building "C", aligning with the rear automobile entrance of the
center.
7. The arcade element at the east elevation of building "C" should be
continued around the south east corner of the buildings, aligning
with the top of the roof slope on the same side.
Site Plan Landscaping:
1. A retaining wall and guard rail should be provided at the south
side of the rear parking lot of building "C" in order to lower the
proposed grade and preserve the existing eucalyptus trees at the
southern edge of the project. The grading plan should be revised
to indicate the additional retaining wall and the existing grade
around the trees as remaining.
2. The revised plans should incorporate all those llans such as
planter areas and enriched paving as indicated on the plans as
reviewed at the April 6, 1989 Design Review Comnittee meeting. The
enriched paving should be labeled as pre-cast concrete pavers with
concrete banding.
DESIGN REVIEW C)MENTS
CUP 88-46 - JAZ4ES CARTER
April 6, 1989
Page 4
3. A continuous planter area with trees and shrubs should be provided
along the south side of building "C" with the exception of the
parking stalls and service walks which will remain. Wood trellises
should be provided on the south side of building "C" only where the
proposed parking is located. There should not be any further
modification of the parking (additional) at the rear of building