MEMORANDUM
DATE: August 21, 1989 ACTION CO!~EI(TS
TO: Commercial /Industrial 1977
Design Review Committee Suzanne Chitlea
Peter Tolstoy
Dan Coleman
Betsy Weinberger (Alternate}
FROM: Bruce Abbott, Associate Planner
SUBJECT: DESIGN REVIEW COMMITTEE MEETING OF August 17~ 1989
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/recommendation of the Committee and distributed to
the Commission and Council.
As always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 - 5:30 p.m., Consent Calendar items will be
reviewed between 5:30 p.m. - 6:00 p.m., with the first design review
item being heard at 6:00 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:00 - 6:30
{Brett} ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 88-
28 - PERRY The development of a 5,580 square fool
retail building on 0.52 acres of land within an existing
shopping center in the Community Commercial District of
the Foothill Specific Plan, located on the southwest
corner of Foothill BoUlevard and Malachite Avenue
APN: 208-261-20.
6:30 - 7:00
(Vince} MINOR DEVELOPMENT REVIEW 89-23 - SIMMONS CABLE TV - The
design review of building elevations and site plan for
satellite dishes and processing equipment contained
within a building and freestanding walls totalling 1,490
square feet on 203 acres of land in the Medium Density
Residential District located at 6611 Amethyst Street
APN: 202-101-07.
DESIGN REVIEW AGENDA
AUGUST 17, 1989
Page 2
8:00
(Otto) THE CONCOURSE AT RANCHO CUCAMONGA - FORMA/MESSENGER
INVESTMENTS Planning Commission Workshop for the
review of a preliminary Master Plan for a 300-acre mixed
use development located on the west side of Milliken
Avenue, between 4th and 8th Streets.
BA:mlg
Attachments
cc: Planning Commission/City Council
COMMERCIAL/INDUSTRIAL
CONSENT CALENDAR ITEMS AGENDA
AUGUST 17, 1989
OR 87-56 (OAVZS OEV.)
(Vince) Review of colors and revised
elevations.
Committee Action: The Committee (Chitlea, Tolstoy,
Coleman} reviewed the colors and
revised elevations and requested the
following revisions:
1. The accent color of wildfire
6345R should be deleted. The
Committee requeted to see how the
colors work with the new
elevations.
2. The Committee did not approve the
deletion of the windows on the
2nd floor of the south elevations
of Buildings A and C.
2. DR 89-07 IAJA)
(Steve H. Review of revised elevations and site
plan.
Committee Action: The Committee {Chitlea, Tolstoy,
Coleman) did not recommend approval of
the revised building elevations and
site plan as presented. Instead, the
Committee recommended that the project
be rescheduled as a full item before
the Committee to allow the applicant a
chance to address Committee concerns
in person.
3. TRACT 13886 & CUP 88-01 (BARMAKIAN)
(Bev) Review of roof material and color
scheme
Committee Action: The Committee (Chitlea, Tolstoy,
Coleman) approved the fourth color
262H (Dryad Blue} but did not approve
the proposed Hardishake roof material.
DESIGN REVIEW COMMENTS
6:00 - 6:30 Brett August 17, 1989
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 88-28 - PERRY - The
development of a 5,580 square foot retail building on 0.52 acres of land
within an existing shopping center in the Community Commercial District
of the Foothill Specific Plan, located on the southwest corner of
Foothill Boulevard and Malachite Avenue - APN: 208-261-20.
Background:
This project was last heard by the Design Review Committee on April 20,
1989. The Committee identified a number of concerns, some of which have
been addressed in the revised plans. The following comments have been
prepared by staff based on previous Committee reviews and review of the
new plans:
Site Plan:
1. Provide enhanced paving at entry off of Malachite Avenue.
Architecture:
1. Stone, wood, and/or similar materials should be used on the
storefronts.
2. A tile roof element should be considered on the south elevation.
Master Plan:
1. A planter area should be provided east of the existing market.
This area becomes a focal point from the two new driveways off
Malachite Avenue and Hampshire Street.
3. A screen wall should be provided behind the loading area by
Hampshire Street.
Design Review Committee Action:
Members Present: Suzanne Chitlea, Peter Tolstoy, Dan Coleman
Staff Planner: Brett Homer
The Committee recommended the following revisions to the plans:
1. The proposed trash enclosure should be moved to the west when
development of the market and/or the corner parcel at the northeast
corner of the center occurs.
2. Within 6 months of Phase I being completed for occupancy, Phase II
should be under construction.
DESIGN REVIEW COMMENTS
CUP 88-28 - PERRY
August 17, 1989
Page 2
3. The accent color should be revised.
4. A minimum of 8" colored concrete base should be used to protect the
columns outside the storefronts.
5. Heavy wood timbers should be utilized under the canopy sections.
Decorative lighting fixtures should be provided as well.
6. A sight line study should be provided to depict the back side of
the parapet wall.
7. The enhanced paving material at the driveway entrance should be
provided with Phase I construction.
8. The alley to the rear of the shops should be closed off and
landscaped with appropriate tree, vine, shrub, and groundcover
planting.
The Committee expressed it's concern with the lack of improvements
proposed along Foothill Boulevard. However, they realized that the
applicant did not own or have the legal ability to improve that portion
of the center. The new retail building, the Committee stated, should
set the tone for the redevelopment of the rest of the center.
DESIGN REVIEW COMMENTS
6:30 - 7:00 Vince August 17, 1989
MINOR DEVELOPMENT REVIEW 89-23 - SIMMONS CABLE TV - The design review of
building elevations and site plan for satellite dishes and processing
equipment contained within a building and freestanding walls totalling
1,490 square feet on 203 acres of land in the Medium Density Residential
District located at 6611 Amethyst Street - APN: 202-101-07.
Background:
A minor development review for an antenna tower measuring 50 feet in
height was approved on September 15, 1988. The project's conditions of
approval required landscaping to screen the antenna and approval of a
Conditional Use Permit for the existing on-site trailer. To date
neither of these conditions have been met.
On the current proposal, staff has been working with the applicant to
resolve major design issues since April 1989. In staff's view, the
project is still inconsistent with Planning Commission policy on
design. The Design Review Committee is reviewing the project to inform
the applicant of its position on the proposed structure.
Staff Conmments:
Landscaping:
1. A combination of trees and shrubs should be planted along the
perimeter of the head-end building and satellite pit.
2. Landscaping of the existing antenna tower should be provided as
required by Minor Development Review 88-40.
Architecture:
1. Walls should be enhanced by using materials split face block, or
stucco over concrete block.
2. A roof tile sample has not been submitted by the applicant.
Design Review Conmittee Action:
Members Present: Suzanne Chitlea, Peter Tolstoy, Dan Coleman
Staff Planner: Vince Bettoni
The Committee reviewed the plans and recommended the following changes:
1. Walls, both building and freestanding, should be treated with a
stucco finish.
2. Freestanding walls should be integrated with the building and
provided with a decorative cap.
DESIGN REVIEW COMMENTS
DR 89-23 - SIMMONS CABLE TV
August 17, 1989
Page 2
3. Architectural enhancement should be added to the building, picking
up elements from the adjacent apartments.
4. Pilasters should be added along the walls to add architectural
interest and provide relief from the blank exteriors.
5. A hip roof should be used instead of a mansard roof.
Revised plans incorporating the above changes should be reviewed again
by the Design Review Committee as a Consent Calendar item.
THE CONCOURSE AT RANCHO CUCAMONGA FORMA/MESSENGER INVESTMENTS -
Planning Commission Workshop for the review of a preliminary Master I!'lan
for a 300-acre mixed use development located on the west side of
Milliken Avenue, between 4th and 8th Streets.