HomeMy WebLinkAbout1987/08/20 - Agenda Packet CITY OF RANCHO CUCAMONGA GvCA
MEMORANDUM
s
0 0
DATE: August 6, 1987 ACTION AGENDA a
1977
TO: Commercial/Industrial
Design Review Committee Dave Blakesley
Suzanne Chitiea
Otto Kroutil
Larry McNiel (Alternate)
FROM: Nancy Fong, Associate Planner
SUBJECT: DESIGN REVIEW COMMITTEE MEETING OF AUGUST 20, 1987
The following is a description of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/recommendation of the Committee and distributed to
the Commission and Council .
As always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 - 5:30 p.m. , Consent Calendar items will be
reviewed between 5:30 p.m. - 6:00 p.m. , with the first design review
item being heard at 6:00 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:00 - 6:30
(Debra) CONDITIONAL USE PERMIT 84-34 (MODIFIED) - SHERIFF AND
roposa or 1211o 11P ng e s ore ron
act minor building additions and reconstruct drive
approaches for an existing neighborhood commercial
shopping center on 7.8 acres of land in the Neighborhood
Commercial (NC) District located at the northeast corner
of Carnelian Avenue and Base Line Road - APN: 201-381-
24, 25, 26, 28-33, 35 and 36.
6:30 - 7:00
(Chris) ENVIRONMENTAL ASSESSMENT AND DEVEOPMENT REVIEW 87-30 -
proposal cons ruc u i- eanwBAIRES om
in us ria uildings
totalling 30,502 square feet on 1.8
acres of land in the General Industrial District,
Subarea 3, located at the northwest corner of Helms
Avenue and Feron Boulevard - APN: 209-031-57.
DESIGN REVIEW COMMITTEE AGENDA
Commercial/Industrial
August 20, 1987
Page 2
7:00 - 7:30
(Chris) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 87-16 -
TE - A--pr-o—p—os-aT to construct a 1,010 square oo remo e
switching station on approximately one half acre of land
in the General Industrial Area, Subarea 8, located on
the west side of Etiwanda Avenue approximately 1,200
feet north of Arrow Highway - APN: 229-031-18.
NF:vc
Attachments
CC: Planning Commission/City Council
DESIGN REVIEW COMMENTS
6:00 - 6:30 Debra August 20, 1987
CONDITIONAL USE PERMIT 84-34 (MODIFIED) - SHERIFF AND ASSOCIATES -
Proposal for remo a ing e storefront aca e, minor ui ing a i ons
and reconstruct drive approaches for an existing neighborhood commercial
shopping center on 7.8 acres of land in the Neighborhood Commercial (NC)
District located at the northeast corner of Carnelian Avenue and Base
Line Road - APN: 201-381-24, 25, 26, 28-33, 35 and 36.
Background: The Planning Commission approved the modification to this
Mon-Uft—io—na-T Use Permit on April 22, 1987. One of the conditions of
approval require that roof color selection shall be presented to the
Design Review Committee for review and approval . The reason being that
the Commission was not completely satisfied with the proposed two metal
roof colors -- orange was proposed at the towers and green was proposed
for the remainder of the arcade area. The applicant will be presenting
the roof color selections at the meeting including colored plans,
therefore no plans will be routed before hand.
Design Review Committee Action:
Members Present: Larry McNiel , David Blakesley, Brad Buller
Staff Planner: Debra Meier
The Committee and applicant discussed the different color options and it
was determined that the roof colors should be green with a darker shade
of green at the tower elements. Accent colors could be provided at the
columns or window mullions which included the use of orange and/or green
of the same hue.
DESIGN REVIEW COMMENTS
7:00 - 7:30 Chris August 20, 1987
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 87-30 - BAIRES-ADAIR - A
proposal o construct wo multi--tenant industrial bui Ings o a ing
30,502 square feet on 1.8 acres of land in the General Industrial
District, Subarea 3, located at the northwest corner of Helms Avenue and
Feron Boulevard - APN: 209-031-57.
Background:
The project has been reviewed once by the Design Review Committee and it
was recommended that it come back for additional review after revisions
were made addressing the Committee's concerns. Those concerns included
general architecture, loading area screening, landscaping areas,
vehicular circulation and handicap access.
Design Review Committee Action:
Members Present: Larry McNiel , Dave Blakesley, Otto Kroutil
Staff Planner: Chris Westman
The Committee reviewed the revised site plan and elevations, and agreed
that the project could be scheduled for the next Planning Commission
agenda with the following modifications:
1. The lower half of the building should have a change in color
and Or texture from the upper half and it should be continuous,
360 , on both buildings.
2. A glass element could be introduced to the east facade of
building "B".
3. A second plaza area should be provided at the east end of
building "B".
4. Both plaza area shall be reviewed and approved by the City
Planner prior to the issuance of building permits.
5. Intensive landscaping with specimen sized trees should be
provided along Feron Avenue.
6. A landscape focal point should be provided adjacent to the
building in-line with the drive at Helms Avenue.
• i
DESIGN REVIEW COMMENTS
DR 87-30 - Baires-Adair
August 20, 1987
Page 2
7. The placement and treatment of the trash enclosure was in
question. The applicant should work with staff in addressing
both technical and aesthetic restraints.
8. If all technical requirements can be satisfied, one of the
driveways on Helms should be eliminated.
DESIGN REVIEW COMMENTS
7:00 - 7:30 Chris August 20, 1987
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 87-16 - GTE - A proposal
o construct a square oo remo a sw1 c ng station on
approximately one half acre of land in the General Industrial Area,
Subarea 8, located on the west side of Etiwanda Avenue approximately
1,200 feet north of Arrow Highway - APN: 229-031-18.
Background: The project was referred back to the Design Review
ommi ee y the Planning Commission to discuss the materials to be used
on the perimeter wall and building, the purpose was to re-assess the
visual compatability of the GTE switching station with the residential
project directly east.
Design Review Committee Action:
Members Present: Larry McNiel , David Blakesley, Brad Buller
Staff Planner: Chris Westman
The Committee discussed the type of materials being used for the project
and its compatability with the residential project. It was the
Committee's preference to use colors and materials that would make the
building "disappear" on this type of structure rather than draw
attention to it. The use of similar color and materials as the adjacent
resident project across the street would provide a visual link but would
also draw attention to this type of structure and may not provide visual
compatibility to future industrial project immediately north and south
of this project. The Committee made the following modifications:
1. The driveway shall use of turf block vs. concrete.
2. The perimeter wall shall be of gray slumpstone vs. vertical
scored concrete block.
3. The banding at the top of the building shall be of different
shades of color vs. a vertical scored plaster.