The following is a description Of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/recommendation of the Committee and distributed to
the Commission and Council.
AS always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 - 5:45 p.m., Consent Calendar items will be
reviewed between 5:45 p.m. - 6:30 p.m., with the first design review
item being heard at 6:30 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:30 - 7:30
(Steve H.)
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE
PERMIT 90-42 - HUGHES INVESTMENTS - The development of
an integrated shopping center including 15 commercial
buildings totaling 320,975 square feet and a service
station/car wash building totaling 2,300 square feet on
3{.13 acres of land with Phase I development consisting
of 5 buildings totaling 267,960 square feet on
approximately 22 acres in the Regional Related
Office/Commercial District of the Victoria Community
Plan, located on the south side of Foothill Boulevard,
west of the future Day Creek Boulevard - APN: 229-021-
10, 15, 19, and 28. Related File: Tentative Parcel Map
13808.
DRC AGENDA
APRIL 18, 1991
Page 2
7:30 - 7:50
(Lori)
PLANNING COMMISSION WORKSHOP - PRELIMINARy DESIGN AWARDS
PRESENTATION
8:00
(Bey)
PLANNING COMMISSION WORKSHOP - DEVELOPMENT REVIEW 91-05
- CENTRAL PARK LIBRARY
SM:mlg
Attachments
cc: Planning Commission/City Council
DESIGN REVIEW COMMENTS
6:30 - 7:30 Steve H. April 18, 1991
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE pERMIT 90-42 HUGHES
INVESTMENTS - The development of an integrated shopping center including
15 commercial buildings totaling 320,975 square feet and a service
station/car wash building totaling 2,300 square feet on 31.13 acres of
land with Phase I development consisting of 5 buildings totaling 267,960
square feet on approximately 22 acres in the Regional Related
Office/Commercial District Of the Victoria Community Plan, located on
the south side of Foothill BOulevard, west of the future Day Creek
Boulevard - APN: 229-021-10, 15, 19, and 28. Related File: Tentative
Parcel Map 13808.
Background:
On April 4, 1991, the developer presented an overview of the proposed
project and touched on some of the major design issues identified by
staff during the initial stages of the development review process.
Staff Comments:
At the time Of comment preparation, the April 4, 1991 meeting had not
been held, therefore, some or all of the following issues may have
already been discussed and/or resolved. For the sake of expediency
tonight, any issues on the list that have been resolved previously will
not require discussion. However, any issues from the following list
that require a resolution should be addressed by the Committee.
Site Plan:
The site plan has been designed to take advantage of the view
corridor from the Devote Freeway, Day Creek Boulevard and to a
lesser extent, Foothill Boulevard. Consequently, with this design,
the rear elevations of the main row of buildings are oriented in
view of eastbound traffic on Foothill Boulevard. As mentioned
earlier, a Southern California Edison Utility Corridor runs
north/south, adjacent and parallel to the west property line of the
project. In most situations, Edison has strict landscape
limitations within their easements. Therefore, the opportunity for
providing a dense landscape buffer to screen the west elevations is
substantially limited. The Committee should consider this
constraint when reviewing the proposed site plan and the west
elevations of Buildings K through N (Home Depot and K-Mart
included).
Now that the site plan has been designed per the Engineering
Division policies for driveway spacing from intersections, no
driveways are located on the future service station parcel.
However, service station users may short cut through parking areas
for other building pads (example: Building "B") and increase the
risk for internal circulation conflicts. Therefore, it may be
advisable to study the possibility of relocating the service
DESIGN REVIEW COMMENTS
CUP 90-42 - HUGHES INVESTMENTS
APRIL 18, 1991
Page 2
station to a parcel closer to a shopping center ingress/egress
point (example: pads "A" and "B") Or redesigning the primary
circulation routes as to eliminate "short cuts" through parking
areas for other buildings.
(If the service station is continued to be proposed for the
northeast corner parcel, it should be oriented to hide the pump
islands from view of perimeter streets. Staff suggests that the
building back up at an angle to the Day Creek/Foothill
intersection, and combined with berming, low walls, and/or a
landscape, hedgerow, the screening potential should be
significantly increased.)
A barrier should be provided between the main vehicular aisle and
the loading areas in front of Home Depot to encourage a continuous
flow of traffic.
Although the parking aisle widths and stall sizes technically meet
the minimum requirements specified in the Development Cede, the
angled parking area east Of K-Mart and Shops "L" should be designed
to accommodate two-way traffic through each aisle.
Proportionally equal numbers of parking spaces should be within a
close distance of all buildings to minimize pedestrian crossings of
primary circulation routes. Please note the deficiency of parking
spaces in front Of Buildings "D" and "F."
The planter area at the southern end of the angled parking stalls
should be expanded to include the southernmost row of parking
spaces and drive aisle between.
The loading area on the west side of Building "J" should be
eliminated or relocated to an area less visible from Day Creek
Boulevard.
Architecture:
Given the close proximity of the rear of the K-Mart and Home Depot
buildings to the west property line and the potential viewsheds to
these elevations from the perimeter streets and the future trail
along Day Creek, these elevations should be significantly upgraded
to achieve a similar amount of articulation as shown on other
elevations. This is especially important given the limitations for
landscaping within the Southern California Edison Utility
corridor. Suggested items include additional layering and/or
material variations around all arches and column bases, additional
vine trellises, tile insets, etc.
DESIGN REVIEW COMMENTS
CUP 90-42 - HUGHES INVESTMENTS
APRIL 18, 1991
Page 3
The Home Depot and K-Mart garden centers should be screened by
solid perimeter screen walls, as opposed to wrought iron fencing.
These screen walls should be fully integrated into the architecture
of the buildings.
A reefstone wainscot should be provided on all planters adjacent to
buildings.
4. All back sides of towers shall be treated equally architecturally-
5. The stucco finish should be of a smoother texture.
Roll-up doors on the east and west elevations of Home Depot should
be relocated to areas less subject to public view.
Generally, the level of architectural detail should be increased to
create variety and additional interest in the overall design.
Landscape:
All pedestrian nodes should include street furniture and be large
enough and to serve their intended function and integrated with the
architectural concept. At the terminus of all walkways, adjacent
to storefronts, the use of enriched paving and landscaping should
be increased to create areas of special interest.
The tree species within the parking lots adjacent to buildings
should be revised to increase the potential for shade. Tree wells
should be of sufficient size and shape to accommodate mature trees.
The planters adjacent to the west elevation of the Home Depot
should be expanded in width to provide for greater growth potential
for trees and to provide a sufficient landscape buffer.
Design Review Co~{ttee Action:
Members Present: Suzanne Chitiea, Wendy Vallette, Otto Kroutil
Staff Planner: Steve Hayes
The Design Review Committee did not recommend the project
presented. The Committee did recommend that the project return
further Committee review addressing the following design issues:
as
for
1. The rear (west) elevations of Home Depot and K-Mart should be
upgraded through the following interrelated methods:
DESIGN PaVIEW COMMENTS
CUP 90-42 - HUGHES INVESTMENTS
APRIL 18, 1991
Page 4
The assurance for the continued health of the landscaping
adjacent to the west (rear) elevation of the Home Depot and
K-Mart should be increased by:
1) Increasing the planter width to a minimum of 6 feet
(inside dimension) and/or;
2)
Selecting a tree and shrub palette that can grow in
narrow planters, while providing a dense evergreen
screen in a short amount of time. Selective placement
of all trees and shrubs will be of extreme importance
with this method.
The tower elements on the rear elevations should be popped out
further from the main building plane. Also, all towers should
be of a uniform shape, size and incorporate the tile domes
currently used on some of the rear elevation towers.
The grade level door on the rear (west) elevation of the Home
Depot may remain in its present location if it can be
significantly hidden by:
1)
Extending the screen wall on the north side of the Home
Depot the additional planter width adjacent to the west
building face and/or;
2)
Further recessing the grade level door into the building
plane.
The applicant should contact Southern California Edison to
check into the feasibility of constructing a wrought iron
fence with landscaping to further address the rear elevation
screening issue.
The Co~unittee recommended that the conceptual redesign of the
service station parcel was preferred to the original site plan
design and that the site plan should be revised accordingly. The
Committee will study the redesign in greater detail at the next
meeting.
The vehicular loading area in front of the Home Depot was
acceptable to the Connnittee with the following provisions:
All columns adjacent to the loading area should be protected
with concrete curbing at their bases;
The planters adjacent to the loading zones should be expanded
in width to provide a sufficient landscape area, similar to
the areas in front of the K-Mart building;
DESIGN REVIEW COMMENTS
CUP 90-42 - HUGHES INVESTMENTS
APRIL 18, 1991
Page 5
10.
11.
12.
The loading zone should consist of the identical interlocking
paver utilized throughout the project.
The Committee directed the applicant to prepare enlarged detailed
drawings of the Home Depot and K-Mart garden center fence/wall
screens that revolve the Committee concerns of architectural
integration, embellishment of garden center entrances and
visibility of packaged materials (fertilizer, etc.) from public
view. The Committee recommended that the development team visit
the Target garden center as an example of successful screening and
architectural integration of a garden center.
The depth of the hardscape in front of the primary K-Mart entrance
should be increased to 16 feet from door to curb and 12 feet from
the corner of the tower to curb.
The planter in front of the Home Depot garden center should be
widened to assure a greater potential for tree and shrub growth.
A greater percentage of trees and shrubs should be planted into the
ground (versus in pots) in the primary pedestrian plaza area, in
front of shops Building "L."
The project entry statement at the Foothill/Day Creek Boulevard
intersection should be architecturally integrated with the
buildings to a greater extent; other design alternatives should be
explored by the development team.
The roof pitch should be steepened and/or the arcade depth
increased in areas where the visibility of roof tile areas is
questionable.
The pre-cast columns supporting the K-Mart and Home Depot arcade
overhangs should be doubled in number or enlarged significantly to
appear more proportional with the building and as a more supportive
element.
The architect should explore possible design alternatives to the
accent metal grill work, tile colors and designs. Furthermore,
alternatives to the shape of the tile inset details should be
brought back to the Committee for further review.
The architect should prepare enlarged details of typical cornices,
tile insets, trees, etc., for further review of the Committee.