HomeMy WebLinkAbout1991/06/06 - Agenda PacketDATE:
TO:
FROM:
SUBJECT:
CITY 0FRANCHOCUCAMONGA
MEMORANDUM
June 13, 1991
Commercial/Industrial
Design Review Committee
Suzanne Chitiea
Wendy Vallette
Otto Kroutil
John Melcher (Alternate)
Scott Murphy, Associate Planner~
DESIGN REVIEW COMMITTEE MEETING OF JUNE 6,
1991
The following is a description Of projects which require review and
rating by the Design Review Committee. Please review the attached
plans, visit the project sites, and write down your comments using the
blank space provided under each project on the attached sheets. After
the meeting, the consensus of the Committee's concerns will be typed up
as the formal action/reco~unendation of the Comittee and distributed to
the Commission and Council.
As always, feel free to contact the appropriate project manager (noted
in parentheses along the left margin), prior to the meeting date, if you
have specific questions related to the scheduled projects. Dinner will
be provided between 5:00 5:45 p.m., Consent Calendar items will be
reviewed between 5:45 p.m. - 6:30 p.m., with the first design review
item being heard at 6:30 p.m. Please notify our department if you will
be unable to attend the meeting, or if you will be late, so that the
dinner can be properly ordered and the necessary arrangements made.
6:30 - 7:00
(Steve R.)
ENVIRONMENTAL ASSESSMENT GR 89-08, CONDITIONAL USE
PERMIT 90-16 - CHIN0 BASIN MUNICIPAL WATER DISTRICT - A
request to establish a wastewater treatment plant on
32.5 acres of land in the Heavy Industrial District
(Subarea 15) of the Industrial Area Specific Plan,
located at the southwest corner of 6th Street and
Etiwanda Avenue - APN: 229-283-62. Related File:
Tree Removal Permit 90-43.
7:00 - 8:00
(Steve H.)
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE
PERMIT 90-42 - HUGHES INVESTMENTS - The development of
an integrated shopping center including 15 commercial
buildings totaling 320,975 square feet and a service
station/car wash building totaling 2,300 square feet on
31.13 acres of land with Phase I development consisting
DRC AGENDA
JUNE 6, 1991
Page 2
8:00 - 9:00
(Scott)
of 5 buildings totaling 267,960 square feet on
approximately 22 acres in the Regional Related
Office/Commercial District Of the Victoria Community
Plan, located on the south side of Foothill Boulevard,
west of the future Day Creek Boulevard - APN: 229-021-
10, 15, 19, and 28. Related File: Tentative Parcel
Map 13808.
PLANNING COMMISSION WORKSHOP
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT
90-37 - THE WATTSON COMPANY - A request for master plan
approval Of a ±60 acre retail/commercial center
containing approximately 550,000 square feet of leasable
space and a request for approval of conceptual site plan
and building elevations for the Price Club facility in
the Regional Related Co~nercial and Light Industrial
designations of the Foothill Boulevard Specific Plan
(Subarea 4), located on the south side of Foothill
Boulevard between Interstate 15 and Etiwanda Avenue
APN: 229-031-03 thru 13, 15, 16, and 20. Related
Files: Foothill Boulevard Specific Plan Amendment 90-03
and Tentative Parcel Map No. 13724.
SM:mlg
Attachments
cc: Planning Commission/City Council
COMMERCIAL/INDUSTRIAL
CONSENT CALRNDAR ITEMS AGENDA
June 6, 1991
DR 91-09 -ALPHA BETA
(Jerry)
Committee Action:
Review of proposed sign.
The Con~nittee (Chitiea, Vallette,
Buller) reviewed the proposed parapet
wall and new sign location and did not
recommend approval. It was the
opinion of the Committee that the
proposed change in sign location would
reduce the visibility of the sign and
cause extensive pruning (topping) of
the parking lot trees. Although the
new corporate colors and logo will not
be consistent with the rest of the
center, the Committee was willing to
recommend approval of the new signage
if it was installed in the same
location as the existing sign.
Further, it was felt that the recently
approved monument signage on 19th and
Carnelian Streets will provide greater
visibility for the motorist and the
existing wall sign located in front of
the main drive aisle provides the best
visibility once on-site.
MDR 91-19 - MIGHTY D=VM~OPM~T
(Steve R.) Exterior modifications.
Committee Action:
The Cor~nittee (Chitiea, Vallette,
Buller) recommended approval of the
proposed revisions subject to the
following conditions:
The horizontal accent bands shall
be made using brick veneer in a
soldier course pattern. The
color of the accent band should
be dark brown or black to match
the color of the window mullions
and the areas of painted metal.
Both brick accent bands shall be
the same width.
The mechanism for the rolling
grates shall be located
completely within the ceiling
CONSENT CALENDAR AGENDA
JUNE 6, 1991
Page 2
during regular business hours.
The grates shall be painted to
match the accent color.
UNIFORM SIGN PROGRAM - PERRY'S
(Anna-Lisa) Review of Uniform Sign Program
Perry's Market Center.
for
Committee Action:
The Con~nittee (Chitiea, Vallette,
Buller) reviewed and approved the
Uniform Sign Program for Perry's
Market Center subject to the following
conditions:
The developer should replace all
existing signage to be consistent
with the Sign Program prior to
final occupancy of Phases 1 and
2.
Any existing tenant that applies
to the City for replacement,
repair or maintenance of any
existing signs, should comply
with the Sign Program.
DESIGN REVIEW COMMENTS
6:30 - 7:00 Steve R.
June 6, 1991
ENVIRONMENTAL ASSESSMENT GR 89-08, CONDITIONAL USE PERMIT 90-16 - CHINO
BASIN MUNICIPAL WATER DISTRICT - A request to establish a wastewater
treatment plant on 32.5 acres of land in the Heavy Industrial District
(Subarea 15) of the Industrial Area Specific Plan, located at the
southwest corner of 6th Street and Etiwanda Avenue - APN: 229-283-62.
Related File: Tree Removal Permit 90-43.
Background:
The Chino Basin Municipal Water District is proposing to construct a
wastewater reclamation plant on the west side of Etiwanda Avenue between
6th Street and the West Valley Detention Center. The service area of
the 32.5 acre plant will encompass a 35 square mile region which
includes portions of Rancho Cucamonga, Fontana, and some presently
unincorporated territory. The ultimate capacity of the plant will be 28
million gallons per day when the final phase is scheduled to be
completed in 2007.
On November 28, 1990, the Planning Commission held a joint meeting with
the Chino Basin Municipal Water District and received additional
comments on the Draft Environmental Impact Report (EIR) during the
public hearing. The comments from the meeting were incorporated into
the Final EIR which was recently certified by the Chino Basin Municipal
Water District.
Due to the nature of the project, the Design Review Committee will have
to determine what level of articulation is appropriate for this project.
Design Parameters:
The site is bounded by 6th Street to the north, Etiwanda Avenue on the
east, the existing Kenco warehouse on the west, and the West Valley
Detention Center on the south. The most important design features will
be those elements which are visible from Etiwanda Avenue and 6th Street.
Staff comets:
The perimeter of the site will be guarded by an 8-foot high block wall
which will be located at the required setback. The proposed wall design
is similar to the wall along the Kenco site. Landscaping along the
streetscape will comply with all City standards.
The design of the project has been dictated by the functional
requirements of the plant facilities. Exterior building walls are
proposed to be constructed using a combination of "split face" and
"ribbed" (also called "fluted") concrete block. Metal fascia panels are
proposed along the roofline of the buildings.
DESIGN REVIEW COMMENTS
CUP 90-16 - CHINO BASIN
JUNE 6, 1991
Page 2
Major Issues:
The streetscape is of primary concern because it will be the most
visible portion of the project. The streetscape will have a
lasting visual impact on drivers due to the length of the frontage
of the project. A greater offset and variation of the wall setback
along the street frontage would add to the visual interest of the
streetscape.
The proposed architecture for the buildings utilizes decorative
concrete block for the building walls and metal fascia panels along
the roof. The proposed architecture has minimal articulation and
is a stark contrast to the stylistic, post-modern architecture of
the West Valley Detention Center.
The architecture of the Operations building, like the rest of the
site, is of a very functional, utilitarian design which could use
additional articulation. Some type of focal point may be a desired
addition.
Secondary Issues:
The picnic plaza should be integrated with the design of the
building by adding garden walls and a lattice patio cover.
Special paving should be used at the project entries around the
Administration building.
Design Review Com~{ttee Action:
Members Present: Suzanne Chitlea, Wendy Vallette, Brad Buller
Staff Planner: Steven Ross
The Committee reviewed the project and recommended that the following
revisions be made. If the revised plans adequately address these
comments, the project may return to the Design Review Committee for
review as a Consent Calendar item. If staff feels that additional
revisions are necessary, the project should be scheduled as a regular
item on the next available agenda.
Due to the nature of the project, the streetscape will be one of
the most important elements of its design. Therefore, given the
prominence of the screen wall in this design, the wall should have
greater variation in its setback from the street, while still
maintaining the minimum average setback of 45 feet. In addition,
pilasters should be used to help accentuate the wall offsets.
DESIGN REVIEW COMMENTS
CUP 90-16 - CHINO BASIN
JUNE 6, 1991
Page 3
Raised planters should be incorporated into the design of the
perimeter wall, especially at the corner of 6th Street and Etiwanda
Avenue and at entries of the project, to vary the streetscape.
Intensified landscaping should be provided in these areas.
The landscaping palette should be revised to include a lush variety
of plants to create a pleasant streetscape,. Evergreen trees
should be used primarily to screen the facility throughout the
year.
Additional contrast between the building colors should be used to
provide some interest to the buildings.
A sloped roof system, similar to that used on the Operations
buildings, should be used on the most prominent buildings to
improve the view of the project from the street.
DESIGN REVIEW CO~MENTS
7:00 - 8:00 Steve H.
June 6, 1991
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 90-42 - HUGHES
INVESTMENTS - The development of an integrated shopping center including
15 conunercial buildings totaling 320,975 square feet and a service
station/car wash building totaling 2,300 square feet on 31.13 acres Of
land with Phase I development consisting of 5 buildings totaling 267,960
square feet on approximately 22 acres in the Regional Related
Office/Commercial District of the Victoria Co~nunity Plan, located on
the south side of Foothill Boulevard, west of the future Day Creek
Boulevard - APN: 229-021-10, 15, 19, and 28. Related File: Tentative
Parcel Map 13808.
Design Parameters:
The 56 gross acre parcel is immediately adjacent to and west of the
future extension of Day Creek Boulevard, with the southern part of the
site bisected by the Boulevard where it curves to terminate at Rochester
Avenue. A 300-foot wide Southern California Edison Utility Corridor
borders the entire length of the west property line of the project. The
site slopes slightly from north to south at approximately 3 percent. No
significant native vegetation exists on the property, for it was most
recently used as a grape vineyard, but has since been abondoned and is
in a state of decay. All driveway locations are in conformance with the
minimum standards of the City's driveway policies for spacing and
distance from intersections.
Background:
The project has been reviewed on two occasions; once as a preliminary
oral presentation/Planning Commission workshop (April 4, 1991) and by
the Design Review Committee (April 18, 1991). At the latter meeting,
the Committee (Chitiea, Vallette, Kroutil) recommended that the project
return to the Committee as a regular item addressing the following
design issues:
The rear (west) elevations of Home Depot and K-Mart should be
upgraded through the following interrelated methods:
a)
The assurance for the continued health of the landscaping
adjacent to the west (rear) elevation of Home Depot and K-Mart
should be increased by:
Increasing the planter width to a minimum of 6 feet
(inside dimension) and/or;
Selecting a tree and shrub palette that can grow in
narrow planters while providing a dense evergreen screen
in a short amount of time. Selective placement of all
trees and shrubs should be of extreme importance with
this method.
DESIGN REVIEW COMMENTS
CUP 90-42 - HUGHES INVESTMENTS
JURE 6, 1991
Page 2
b)
The tower elements on the rear elevations should be popped out
further from the main building plane. Also, all towers should
be of a uniform shape, size and incorporate the tile cupolas
currently used on some of the rear elevation towers.
c)
The grade level door on the rear (west) elevation Of Home
Depot may remain in its present location if it can be
significantly hidden by:
Extending the screen wall on the north side of Home Depot
the additional planter width adjacent the west building
face and/or;
Further recessing the grade level door into the building
plane.
d)
The applicant should contact Southern California Edison to
check into the feasibility of constructing a wrought iron
fence with intertwined landscaping to further address the rear
elevation screening issue.
The conceptual redesign of the service station parcel was preferred
to the original site plan design. Therefore, the site plan should
be revised accordingly.
The vehicular loading area in front of Home Depot should include
the following design elements:
a)
All columns adjacent to the loading area should be protected
with concrete curbing at their bases;
b)
The planters adjacent to the loading zones should be expanded
in width to include a sufficient landscape area similar to the
areas in front of the K-Mart building.
c) The loading zone should consist of the identical interlocking
paver utilized throughout the project.
Enlarged detailed drawings of the Home Depot and K-Mart garden
center fence/wall screens that solves the Committee concerns of
architectural integration, embellishment of garden center entrances
and visibility of packaged materials (fertilizer, etc.) from public
view areas should be reviewed by the Committee.
The depth of the hardscape in front of the primary K-Mart entrance
should be increased to 16 feet from door to curb and 12 feet from
the corner of tower to curb.
DESIGN REVIEW COMMENTS
CUP 90-42 - HUGHES INVESTMENTS
JUNE 6, 1991
Page 3
The planter in front of the Home Depot garden center should be
widened to assure a greater potential for tree and shrub growth.
A greater percentage of trees and shrubs should be planted into the
ground (versus in pots) in the primary pedestrian plaza area, in
front of shops Building "L."
The project entry statement at the Foothill/Day Creek Boulevard
intersection should be architecturally integrated with the
buildings to a greater extent; other design alternatives should be
explored by the development team.
The roof pitch should be steepened and/or the arcade depth
increased in areas where the visibility of roof tile areas is
questionable.
10.
The pre-cast columns supporting the K-Mart and Home Depot arcade
overhangs should be doubled in number or enlarged significantly to
appear more proportional with the building mass and as a supportive
element.
11.
Design alternatives to the accent metal grill work, tile colors,
designs and alternatives to the shape of the tile inset details
should be brought back to the Committee for further review.
12. The Comanittee should review the enlarged details of typical
cornices, tile insets, etc.
Staff Comments:
At the time of comment preparation, revised plans depicting these design
issues had not been received by staff. Therefore, the Design Review
Committee should review the attached revised plans in light of the
previous meetings issues and comments. Also, it should be noted that
the previous reviews of the project were intended to highlight and
discuss the major site plan and architectural design issues only.
Therefore, once the major issues from the previous meeting have been
addressed, and time permitting, the Committee should discuss the
following secondary design issues:
Site Plan:
The loading area adjacent to the K-Mart garden center should be
discussed in greater detail.
DESIGN REVIEW COMMENTS
CUP 90-42 - HUGHES INVESTMENTS
JUNE 6, 1991
Page 4
The loading area on the west side of Building "J" should be
eliminated or relocated to an area less visible from Day Creek
Boulevard. (At this time, this building is shown in concept only,
however, the Committee may choose to clarify for the review that
this pad should not have a loading dock highly subject to public
view.)
All parking spaces west of fast food restaurant pad no. 2 should
face east/west to minimize conflicts with the primary vehicular
spine.
Architecture:
1. Phase One pad and shop buildings should be discussed in more
detail.
A reefstone wainscot with protective curbing should be provided on
all planters adjacent to buildings.
3. The stucco finish should be of a smoother texture.
Policy Issues:
~ne following items are a matter of Planning Commission policy and
should be incorporated into the project design without discussion.
All back sides of towers shall be treated equally architecturally.
Additional enriched pavement should be provided across vehicular
drive aisles at key pedestrian crossing locations.
Design Review Committee Action:
Members Present: Suzanne Chitiea, Wendy Vallette, Brad Buller
Staff Planner: Steve Hayes
The Design Review Committee recommended approval of the project subject
to the following:
The identical patterned metal grill work proposed for the Home
Depot Garden Center should be utilized on the K-Mart Garden Center.
The pilasters within the K-Mart Garden Center screen
be finished with a more substantial cap, possibly an
resembles the cornice detail on the buildings.
fence should
element that
DESIGN REVIEW COMMENTS
CUP 90-42 - HUGHES INVESTMENTS
JUNE 6, 1991
Page 5
The lone circular column on the front of the shop buildings should
be replaced with an identical square colu~tn already used on these
buildings.
Metal grill work should be utilized within the openings on all dome
towers, above the tile roof areas. The metal grill work should be
similar in design and color to the metal grill work proposed in
other areas within the center.
Alternative tile styles and finishes should be brought back to the
Committee for further review. Suggested options include a coarser,
less glossy quarry tile or a tile that is either more traditional
or innovative in its style.
Twenty-four inch box trees should be exclusively used in the
planter within the long row of parking spaces south of the K-Mart
Garden Center.