Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout2013/03/19 - Agenda Packet THE CITY OF RANCHO CUCAMONGA
S% DESIGN REVIEW COMMITTEE
L% J AGENDA
CuRAMONGA MARCH 19, 2013 - 7:00 P.M.
Rancho Cucamonga Civic Center
Rains Room
10500 Civic Center Drive
Rancho Cucamonga, California
I. CALL TO ORDER
Roll Call
Regular Members: Richard Fletcher_ Francisco Oaxaca _
Jeffrey Bloom _ Donald Granger
Alternates: Frances Howdyshell_ Ray Wimberly
Lou Munoz
II. PROJECT REVIEW ITEMS
The following items will be presented by the applicant and/or their representatives.
Each presentation and resulting period of Committee comment is limited to
20 minutes. Following each presentation,the Committee will address major issues
and make recommendations with respect to the project proposal. The Design
Review Committee acts as an advisory Committee to the Planning Commission.
Their recommendations will be forwarded to the Planning Commission as
applicable. The following items do not legally require any public testimony,although
the Committee may open the meeting for public input.
A. ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW -
DRC2013-00053 - RANCHO TECH -A request to add a 16,616 square foot
addition to an existing 76,405 square foot office building on the north side of
9th Street and west of Archibald Avenue within the General Industrial
Development District, located at 9518 9th Street-APN: 0209-021-05. Staff
has prepared a Mitigated Negative Declaration of environmental impacts for
consideration.
1 of 2
Satyr DESIGN REVIEW COMMITTEE AGENDA
Lni MARCH 19, 2013
RANCHO
CUCAMONGA
III. PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State law
prohibits the Committee from addressing any issue not previously included on the
Agenda. The Committee may receive testimony and set the matter for a subsequent
meeting. Comments are limited to five minutes per individual. •
IV. ADJOURNMENT I
The Design Review Committee has adopted Administrative Regulations that set an
11:00 p.m. adjournment time. If items go beyond that time, they shall be heard only with
the consent of the Committee.
I, Gail Elwood, Office Specialist ll for the City of Rancho Cucamonga,hereby certify that a
true, accurate copy of the foregoing agenda was posted on March 6, 2013, at least
72 hours prior to the meeting per Government Code Section 54954.2 at 10500 Civic
Center Drive, Rancho Cucamonga.
2 of 2
DESIGN REVIEW COMMENTS
7:00 p.m. Tabe van der Zwaag March 19, 2013
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2013-00053 -
RANCHO TECH - A request to add a 16,616 square foot addition to an existing
76,405 square foot office building on the north side of 9th Street and west of
Archibald Avenue within the General Industrial Development District, located at
9518 9th Street - APN: 0209-021-05. Staff has prepared a Mitigated Negative
Declaration of environmental impacts for consideration.
Project Proposal: The applicant proposes adding a 16,616 square foot single-story
addition along the west elevation of an existing 76,405 square foot two-story office
building. The addition will architecturally match the existing building and the entire
building will be painted a new color scheme. The 9.73-acre project site is currently
developed with four buildings totaling 274,110 square feet and 933 parking spaces.
There will be 882 parking spaces remaining with the proposed Site Plan changes, which
includes realigning one of the 9th Street drive entrances, leaving 175 parking spaces in
excess of the minimum requirement. The parking lot landscaping adjacent to the
addition will be enhanced with new tree planters to meet current Development Code
standards. A wrought iron fence with decorative pilasters will be constructed around a
portion of the parking lot in front (south) of the existing building to meet the security
needs of the future tenant of the building.
Staff Comments: The applicant has made all the changes recommended by staff, and
the project meets all related Development Code requirements. The addition is designed
to match the existing building, and the new parking lot landscaping will enhance the
project as seen from 9th Street. The relocated vehicle entrance brings it into alignment
with the existing public street to the south for improved vehicle safety. The proposed
project, along with façade changes recently approved by the City for the other large
building on the site, will modernize and greatly enhance the overall project.
Maior Issues: None.
Secondary Issues: None.
Staff Recommendation: Staff recommends that the Committee approve the project as
presented and forward it to the Planning Commission for final approval.
Design Review Committee Action:
Staff Planner: Tabe van der Zwaag
Members Present: