Loading...
HomeMy WebLinkAbout2012/06/19 - Agenda Packet THE CITY OF RANCHO CUCAMONGA t DESIGN REVIEW COMMITTEE L•�_Mr REVISED AGENDA RANCHO C� "MONal JUNE 19, 2012 - 7:00 PM Rancho Cucamonga Civic Center Rains Room 10500 Civic Center Drive Rancho Cucamonga, California {Cm i„ toxOxnE Roll Call Regular Members: Lou Munoz_ Ray Wimberly_ Jeff Bloom _ Donald Granger_ Alternates: Frances Howdyshell_ Richard Fletcher Francisco Oaxaca II. ?PROJECfRE_yIEW ITEMS' I The following items will be presented by the applicant and/or their representatives. Each presentation and resulting period of Committee comment is limited to 20 minutes. Following each presentation, the Committee will address major issues and make recommendations with respect to the project proposal. The Design Review Committee acts as an advisory Committee to the Planning Commission. Their recommendations will be forwarded to the Planning Commission as applicable. The following items do not legally require any public testimony, although the Committee may open the meeting for public input. 1 of 2 s DESIGN REVIEW COMMITTEE L••-e• RANCHO REVISED AGENDA CocemoNGA JUNE 19, 2012 A. SPECIFIC PLAN DRC2008-00940 AND TENTATIVE TRACT MAP SUBTT16925-MILLER DEVELOPMENT CO.—A review of the Specific Plan and Tentative Tract Map and Conceptual Grading Plan for the Carrari Ranch project (the proposed subdivision of approximately 74 acres for 107 single-family lots generally, located north of the City boundary, north of Delphin Place and west of Archibald Avenue in the City's Sphere-of-Influence. Related files: Environmental Impact Report (EIR) DRC2004-01048 for Annexation DRC2005-00602, Development District Amendment DRC2005-00477, and General Plan Amendment DRC2006-00030. (Continued from June 5, 2012, Design Review Committee.) III, PUBLIC COMMENTS --- This is the time and place for the general public to address the Committee. State law prohibits the Committee from addressing any issue not previously included on the Agenda. The Committee may receive testimony and set the matter for a subsequent meeting. Comments are limited to five minutes per individual. IV . ADJOURNMENT The Design Review Committee has adopted Administrative Regulations that set an 11:00 p.m.adjournment time. If items go beyond that time,they shall be heard only with the consent of the Committee. I, Gail Elwood, Office Specialist ll for the City of Rancho Cucamonga,hereby certify that a true, accurate copy of the foregoing agenda was posted on June 12, 2012, at least 72 hours prior to the meeting per Government Code Section 54954.2 at 10500 Civic Center Drive, Rancho Cucamonga. 2 of 2 DESIGN REVIEW COMMENTS 7:00 p.m. Candyce Burnett June 19, 2012 SPECIFIC PLAN DRC2008-00940 AND TENTATIVE TRACT MAP SUBTT16925- MILLER DEVELOPMENT CO.— A review of the Specific Plan and Tentative Tract Map and Conceptual Grading Plan for the Carrari Ranch project (the proposed subdivision of approximately 74 acres for 107 single-family lots generally, located north of the City boundary, north of Delphin Place and west of Archibald Avenue in the City's Sphere-of-Influence. Related files: Environmental Impact Report (EIR) DRC2004-01048 for Annexation DRC2005-00602, Development District Amendment DRC2005-00477, and General Plan Amendment DRC2006-00030 BACKGROUND The Design Review Committee (DRC) reviewed the Tentative Tract Map, Conceptual Grading Plan, and the Carrari Ranch Specific Plan for the proposed Carrari Ranch Project on June 5, 2012, and provided comments to staff. The applicant was not in attendance at the DRC meeting. The staff itemized a large number of areas of conflict in the design of the tract and specific plan with current City development standards which the applicant has been unwilling to change. The Committee discussed the possibility of recommending denial of the tract map and specific plan, but requested staff to notify the applicant that it was continuing the discussion of this project submittal to the June 19, 2012, meeting to allow the applicant one more opportunity to discuss the project proposal with the committee before forwarding a final recommendation to the Planning Commission. Specifically, the project has the following major outstanding issues: • The Tentative Tract Map, Conceptual Grading Plan, and the Carrara Ranch Specific Plan do not meet the intent of the General Plan, Hillside Grading Standards, Hillside Grading Ordinance, and Design Guidelines. • The applicant has not submitted copies of easement agreements for all off-site improvements. This includes all grading easements along the west property line for the construction of the primary access road and along the emergency access road through Thorpe Canyon. Additionally, this includes easement agreements to maintain all off-site Fuel Modification zones for the project(along the east and west property line and along access roads). • There are outstanding issues related to the private sewer pump station for Lots 37 thru 51. Both the City and the Cucamonga Valley Water District (CVWD) has not accepted the proposal as submitted. This outstanding condition must be addressed and submitted for approval to both the CVWD and the Building and Safety Services Department • The Water Quality Management Plan (WQMP) has not been accepted as complete. The WQMP still has many outstanding corrections that if amended could affect the project and the special studies that were analyzed in the Draft EIR. • Additionally, there are outstanding corrections with the driveway locations and grades and on-site drainage. Staff Comments: Staff presented the major comments during the June 5, 2012, DRC meeting. No additional comment. Staff Recommendation: Staff recommends that the Design Review Committee forward a recommendation for denial of the Tentative Tract Map, Conceptual Grading Plan, and Carrari Ranch Specific Plan to the Planning Commission for review and action. DRC AGENDA SPECIFIC PLAN DRC2008-00940 AND TENTATIVE TRACT MAP SUBTT16925-MILLER DEVELOPMENT CO. June 19, 2012 Page 2 Design Review Committee Action: Staff Planner: Candyce Burnett Members Present: