HomeMy WebLinkAbout19-077 - Resolution RESOLUTION NO. 19-077
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
RANCHO CUCAMONGA, STATE OF CALIFORNIA, ADOPTING
THE MEASURE "I" FIVE YEAR CAPITAL PROJECT NEEDS
ANALYSIS FOR FISCAL YEARS 2020/2021 THROUGH
2024/2025
WHEREAS, San Bernardino County voters approved passage of Measure "I" in
November 2004, authorizing the San Bernardino County Transportation Authority to impose a
one-half of one percent retail transactions and use tax applicable in the incorporated and
unincorporated territory of the County of San Bernardino; and
WHEREAS, revenue from the tax can only be used for transportation improvement and
traffic management programs authorized in the Expenditure Plans set forth in Ordinance No. 89-1
and Ordinance No. 04-1 of the Authority; and
WHEREAS, the Strategic Plan requires each local jurisdiction applying for revenue from
certain Measure "I" Programs to annually adopt and update a Five-Year Capital Project Needs
Analysis.
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RANCHO CUCAMONGA,
CALIFORNIA, HEREBY RESOLVES to adopt the Measure "I" Five-Year Capital Project Needs
Analysis for Fiscal Years 2020/2021 through 2024/2025, a copy of which is attached to this
resolution.
Resolution No. 19-077 - Page 1 of 2
PASSED, APPROVED, AND ADOPTED this 18th day of September, 2019.
L. Dennis Michael, Mayor
ATTEST:
ice . Reynolds, Clerk
STATE OF CALIFORNIA )
COUNTY OF SAN BERNARDINO ) ss
CITY OF RANCHO CUCAMONGA )
I, Janice C. Reynolds, City Clerk of the City of Rancho Cucamonga,
do hereby certify that the foregoing Resolution was duly passed, approved, and adopted by
the City Council of the City of Rancho Cucamonga, at a Regular Meeting of said Council held
on the 18th day of September 2019.
AYES: Hutchison, Kennedy, Michael, Scott, Spagnolo
NOES: None
ABSENT: None
ABSTAINED: None
Executed this 19th day of September, 2019, at Rancho Cucamonga, California.
r
ani . Reynolds, Clerk
Resolution No. 19-077 - Page 2 of 2
NO. STREET&LIMITS IMPROVEMENT COST ESTIMATE FY START STATUS
Vallev Arterial Sub-Program,
1 Wilson Ave from East Ave to Wardman Bullock Rd new street $ 71434,218 06/07 Post Construction
-
2 Victoria St from Etiwanda High School to 1-15 ECL widening, sidewalk and rehabilitation $ 412,341 13/14 Post Construction
-
3 Carnelian St at Ban an St install new traffic signal $ 600,297 14/15 Post Construction
4 16th St at Utica Ave install new traffic signal $ 5957946 14/15 Post Construction
5 16th St at Rochester Ave install new traffic signal $ 738,737 16/17 Post Construction
6 Rochester Ave at Jersey Blvd install new traffic signal $ 738,737 16/17 Post Construction
7 East Ave at Miller Ave install new traffic signal $ 738,737 16/17 Post Construction
8 Milliken Ave at 5th St install new traffic signal $ 7381737 16/17 Post Construction
9 East Ave at Highland Ave install new traffic signal $ 6747133 18/19 Pre Construction
10 6th St at Hellman Ave install new traffic signal $ 709,133 18/19 Pre Construction
Total: $ 137381,016
Note: See individual work sheets for funding years
Note: Measure"I"Financial Public Share responsibility shall be 71.3%of actual cost for eligible expenditures
Contact: Gianfranco Laurie, Senior Civil Engineer 909 774-4037
Capital Project Needs Analysis
�
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Widen Wilson Ave from East Ave to Wardman/Bulloch from 0 to 4 lanes
Agency Project Name: Wilson Ave Extension
Agency reported Total Project Cost: $7,434,218
Escalation Factor:%
Actual Prior Year Dollars and escalated costs in subsequent years(not in I..000s)
Public Share: 71.30% 1 Dev. Share: 28.70%
Funding Prior FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Future Total
Nexus Total Project Cost PA&ED MI ART 117,650 0 0 0 0 0 0 117
,650
(All phases):
630009000 DEV FEE 47,350 0 0 0 0 0 0 47,350
Total 165,000 0 0 0
0 0 01 1 ,
Total Presented Funding: PS&E MI ART 528,007 0 0 0 0
0 0 528j0071
DEV FEE 212,534 0 0 0 0 0 0 212, 3
5 4
7,434,218
Total 740,5411 0 0 0 0 0 0 ' ' 7 541
Total Measure I Request: ROW MI ART 44,451 0 0 563,988
0 0 0 6089439
5,399,271
DEV FEE 17,657 0 0 227,019 0 0 0 244,676
M I LOCAL 247 0 0 0 0 0 0 247
STREET
Total 62,355 0 0 791,007 0 0' 0
8539362,11
CONST MI ART 1 2,508,990 7947856 621,582 121,073 0 p 0
4,04695011
DEV FEE 999,610 319,949 1627093 481735 0 0 0 1 530 387
MI LOCAL 10,318 0 88,109 0 0 0 0 98,427
STREET
Total 3,518,918 11114,805 8719784 169,808 p 0 065
, i5
Total 4,486,894 111149805 8719784 9609815 0 0
1 01'- 7.y434y218-
*Prior should identify any expenses incurred in prior years that have not yet been reimbursed by
SBCTA including FY 19/20 expenses.
Project Comments: Project Comments
Last Update: 9/4/2019 2:45:00 PM
Reference: Measure I Policy 40006
Capital Project Needs Analysis
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Construct a Traffic Signal at the Intersection of Milliken and 5th
Agency Project Name: Milliken and 5th Traffic Signal Improvement
Agency reported Total Project Cost: $738,737
Escalation Factor:%
Actual Prior Year Dollars and escalated costs in subsequent years(not in 1,000s)
Public Share: 71.30% 1 Dev. Share: 28.70%
Funding Prior FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Future Total
Nexus Total Project Cost PA&ED Total
(All phases):
350,000
Total Presented Funding: PS&E MI ART 99804 0 0 0 0 0 0 91804
DEV FEE 31946 0 0 0 0 0 0 35946
7385737 0 113 7
Total 13,75n O 0 0 0 0
r 50
Total Measure I Request: ROW Total
526,720
CONST MI ART 516,916 0 0 0 0 0 0 516,916
DEV FEE 208,071 0 0 0 0 0 0 208,071
Total 724,987 0 0 0 0 0 0 '124,937
Total 1 7389737 9 0 0 0 0 0 -'7381737
*Prior should identify any expenses incurred in prior years that have not yet been reimbursed by
SBCTA including FY 19/20 expenses.
Project Comments: Project Comments
Last Update: 9/4/2019 2:48:13 PM
Reference: Measure I Policy 40006
Capital Project Needs Analysis
�
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Construct a Traffic Signal at the Intersection of Rochester and Jersey
Agency Project Name: Rochester and Jersey Traffic Signal Improvement
Agency reported Total Project Cost: $738,737
Escalation Factor:%
Actual Prior Year Dollars and escalated costs in subsequent years(not in 1,000s)
Public Share: 71.30% 1 Dev. Share: 28.70%
Funding Prior FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Future Total
Nexus Total Project Cost PA&ED Total
(All phases):
350,000
Total Presented Funding: PS&E MI ART 91804 0 0 0 0 0 0 99804
DEV FEE 31946 0 0 0 0 0 0 31946
7389737 Total 13 750 0 0 0 0 0 0 1 T5
Total Measure I Request: ROW Total
526,720
CONST MI ART 5162916 0 0 0 0 0 0 5169916
DEV FEE 208,071 0 0 0 0 0 0 208,071
Total 7249987 0 0 0 0 0 0 7 087
1
Total 7389737 0 0 0 0 0 0 738,737
*Prior should identify any expenses incurred in prior years that have not yet been reimbursed by
SBCTA including FY 19/20 expenses.
Project Comments: Project Comments
Last Update: 9/4/2019 2:48:03 PM
Reference: Measure I Policy 40006
Capital Project Needs Analysis
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Widen Victoria Ave from EHS to 1-15
Agency Project Name: Victoria Ave Street Improvements
Agency reported Total Project Cost: $412,341
Escalation Factor:%
Actual Prior Year Dollars and escalated costs in subsequent years(not in 1,000s)
Public Share: 71.30% 1 Dev. Share: 28.70%
Funding Prior FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Future Total
Nexus Total Project Cost PA&ED Tota!
(All phases):
305,000
Total Presented Funding: PS&E MI ART 111864 0 0 0 0 0 0 119864
MI LOCAL 49305 0 0 0 0 0 0 41305
4129341 STREET
DEV FEE 471 0 0 0 0 0 0 471
Total 169640 0 0 0 0 0 fl
Total Measure I Request: ROW Total 0
411,870
CONST MI ART 282,135 0 0 0 0 0 0 282,135
MI LOCAL 113,566 0 0 0 0 0 0 113,566
STREET
Total 395,701 0 0` 0 0 0 0 395,701
Total 4129341 0 0 0 0 0 0 411 '
*Prior should identify any expenses incurred in prior years that have not yet been reimbursed by
SBCTA including FY 19/20 expenses.
Project Comments: Project Comments
Last Update: 9/4/2019 2:46:36 PM
Reference: Measure I Policy 40006
Capital Project Needs Analysis
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Construct a Traffic Signal at the Intersection of East and Miller
Agency Project Name: East and Miller Traffic Signal Improvement
Agency reported Total Project Cost: $738,737
Escalation Factor:%
Actual Prior Year Dollars and escalated costs in subsequent years(not in 1,000s)
Public Share: 71.30% 1 Dev. Share: 28.70%
Funding Prior FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Future Total
Nexus Total Project Cost PA&ED Total
(All phases):
350,000
Total Presented Funding: PS&E MI ART 9,804 0 0 0 0 0 0 9,804
DEV FEE 31946 0 0 0 0 0 0 39946
738,737 . so
Total 139750 0 0 0 0 0 01 13
Total Measure I Request: ROW Total
526,720
CONST MI ART 516,916 0 0 0 0 0 0 516,916
DEV FEE 208,071 0 0 0 0 0 0 208,071
Total 724,987 0 0 0 0 } 7241"T
Total 1 738,737 0 0 0 0 0 0 738J37
*Prior should identify any expenses incurred in prior years that have not yet been reimbursed by
SBCTA including FY 19/20 expenses.
Project Comments: Project Comments
r
Last Update: 9/4/2019 2:48:53 PM
Reference: Measure I Policy 40006
Capital Project Needs Analysis
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Construct a Traffic Signal at the Intersection of 6th and Rochester
Agency Project Name: 6th and Rochester Traffic Signal Improvement
Agency reported Total Project Cost: $738,737
Escalation Factor:%
Actual Prior Year Dollars and escalated costs in subsequent years(not in 1,000s)
Public Share: 71.30% 1 Dev. Share: 28.70%
Funding Prior FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Future Total
Nexus Total Project Cost PA&ED Total
(All phases):
350,000
Total Presented Funding: PS&E MI ART 99804 0 0 0 0 0 0 91804
DEV FEE 39946 0 0 0 0 0 0 31946
738,737
Total 13,750 0 0 0 0 0 0 xJ50
Total Measure I Request: ROW Total 0
526,720
CONST MI ART 516,916 0 0 0 0 0 0 516,916
DEV FEE 208,071 0 0 0 0 0 0 2089071
Total 724,987 0 0 0 0 0 0 724, '
Total 7389737 0 0 0 0 0 4 738,737
*Prior should identify any expenses incurred in prior years that have not yet been reimbursed by
SBCTA including FY 19/20 expenses.
Project Comments: Project Comments
Last Update: 9/4/2019 2:49:29 PM
Reference: Measure I Policy 40006
Capital Project Needs Analysis
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Construct a Traffic Signal at the Intersection of Camelian and Banyan
Agency Project Name: Carnelian at Banyan Traffic Signal Improvement
Agency reported Total Project Cost: $600,297
Escalation Factor:%
Actual Prior Year Dollars and escalated costs in subsequent years(not in 1,000s)
Public Share: 71.30% 1 Dev. Share: 28.70%
Funding Prior FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Future Total
Nexus Total Project Cost PA&ED Total
(All phases):
363,000
Total Presented Funding: PS&E MI ART 89749 0 0 0 0 0 0 81749
DEV FEE 31522 0 0 0 0 0 0 3,522'
600,297
Total 12,271 0 0 0 0 0 0 12Y 271
Total Measure I Request: ROW Tota!
428,012
CONST M I ART 419,263 0 0 0 0 0 0 4199263
DEV FEE 168,763 0 0 0 0 0 0 168,763
Total 588,026 0 0 0 0 0 0 , moi
Total 1 6009297 0 0 0 0 0
*Prior should identify any expenses incurred in prior years that have not yet been reimbursed by
SBCTA including FY 19/20 expenses.
Project Comments: Project Comments
Last Update: 9/4/2019 2:49:13 PM
Reference: Measure I Policy 40006
Capital Project Needs Analysis
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Construct a Traffic Signal at the Intersection of 6th and Hellman
Agency Project Name: 6th and Hellman Traffic Signal Improvement
Agency reported Total Project Cost: $709,133
Escalation Factor:%
Actual Prior Year Dollars and escalated costs in subsequent years(not in 1,000s)
Public Share: 71.30% 1 Dev. Share: 28.70%
Funding Prior FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Future Total
Nexus Total Project Cost PA&ED Total
(All phases):
350,000
Total Presented Funding: PS&E MI ART 35,032 0 0 0 0 0 0 359032
DEV FEE 14,101 0 0 0 0 0 0 142101
709,133
Total 499133 0 0 0 0 0 0 494�Y
Total Measure I Request: ROW Total 0
505,612
CONST MI ART 470,580 0 0 0 0 0 0 470,580
DEV FEE 189,420 0 0 0 0 0 0 189,420
Total 6609000 0 0 0 0 0 0 6"11000
Total 709,133' 9 0 0 0 0 0 7
*Prior should identify any expenses incurred in prior years that have not yet been reimbursed by
SBCTA including FY 19/20 expenses.
Project Comments: Project Comments
Last Update: 9/4/2019 2:49:36 PM
Reference: Measure I Policy 40006
J
Capital Project Needs Analysis
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Construct a Traffic Signal at the Intersection of East and Highland
Agency Project Name: East and Highland Traffic Signal Improvements
Agency reported Total Project Cost: $674,133
Escalation Factor:%
Actual Prior Year Dollars and escalated costs in subsequent years(not in 1,000s)
Public Share: 71.30% 1 Dev. Share: 28.70%
Funding Prior FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Future Total
Nexus Total Project Cost PA&ED Total
l I
(All phases):
350,000
Total Presented Funding: PS&E MI ART 359032 0 0 0 0 0 0 35,032
DEV FEE 14,101 0 0 0 0 0 0 149101
674,133
Total 49,133 0 0 0 0 0 0 �, 33`
Total Measure I Request: ROW Teta
480,657
CONST MI ART 445,625 0 0 0 0 0 0 445,625
DEV FEE 179,375 0 0 0 0 0 0 179,375
Total 625,000 0 0 0 0 0 0
Total 674,133 0 0 0 0 0 0 074,13
*Prior should identify any expenses
enses incurr
d in priorr ears that have
not
et been reimbursed b
Y
SBCTA including FY 19/20 expenses.
Project Comments: Project Comments
Last Update: 9/4/2019 2:49:03 PM
Reference: Measure I Policy 40006
Capital Project Needs Analysis
Agency: Rancho Cucamonga
Program: Valley Arterial Sub-Program
Project Name: Construct a Traffic Signal at the Intersection of 6th and Utica
Agency Project Name: 6th St at Utica Traffic Signal Improvement
Agency reported Total Project Cost: $595,946
Escalation Factor:%
Actual Prior Year Dollars and escalated costs in subsequent years(not in 1,000s)
Public Share: 71.30% 1 Dev. Share: 28.70%
Funding Prior FY 20/21 FY 21/22 FY 22/23 FY 23/24 FY 24/25 Future Total
Nexus Total Project Cost PA&ED Total
(All phases):
363,000
Total Presented Funding: PS&E MI ART 51647 0 0 0 0 0 0 51647
DEV FEE 21273 0 0 0 0 0 0 21273
595,946
Total 71920 0 0 0 0 0 0 7990
Total Measure I Request: ROW Total
424,910
CONST MI ART 419,263 0 0 0 0 0 0 4199263
DEV FEE 168,763 0 0 0 0 0 0 168,763
Total 588,026 0 0 0 0 0 0
Total 1 595,946 0 0 0 0 0 a
*Prior should identify any expenses incurred in prior years that have not yet been reimbursed by
SBCTA including FY 19/20 expenses.
Project Comments: Project Comments
Last Update: 9/4/2019 2:49:21 PM
Reference: Measure I Policy 40006
ATTACHMENT 3
■
a■J I W
■ M
r falll
HILLSIDE RD. a I . ■ H
■ a� iEVMR
■ _
UM
•
WVILSON E. I', -•-- WILSON A1�. .�■
a,
I M ■ •
$ANYAN S 4_ y BANYAN ST
4■.w ....■w a ..
3
1.LW
♦ I.EMON_AVE. LEWN AVE . a
q
♦ (HIGHLAND AVE, HIGHLAND AVE _ 210 Y
_ - W HIGAL
AND AVE. -- - FISHER •
10 -- to sr.
9 •
r z >
19th ST. VICTORIA W VICTORIA STS ♦♦
PAW 4N
• VISTAt1TF MONTE VISTA ST.', 2
JI N
Y, i►RR
UP"D 1 ,� FONTANA
o° _ >
BASE L
BAS NE_AVE_ 1"lE R$AD
!. �+1
- Q z r�PPKVY � i►
♦ > P >
r ti CH!lROH--_ST.o CHURCH__
ll7
Z
.i HILL SAN BERNARDIN .1 RD W, O
c. w FOOTHILL BLVD.; CSR66> y - I
DEVON ST pper�►
W■ V W �IiILL
>
■
cIVIC
t '
- CF 1t DR
i
AlROUtE ■
to ;
z 9th S JERSEY .
WHITTRAN■AVE
q 6 ATiiRR
ET
',,.7th STREET '
O .
>
6th STREET11W
51dh.ST__ O� ■
■ 8
j.4th STREET
= CUCAMONGA
�GAUSTI PARD I-10 FREEI I NY
ONTARIO
MAJOR STREET ARTERIAL PROGRAM
O WILSON AVE FROM EAST AVE TO WARDMAN BULLOCK RD
O VICTORIA ST FROM ETIWANDA AVE TO ECL (1-15)
�3
CARNELIAN ST AT BANYAN ST
O 6TH ST AT UTICA AVE
O 6TH ST AT ROCHESTER AVE
O ROCHESTER AVE AT JERSEY BLVD
�7 EAST AVE AT MILLER AVE
O MILLIKEN AVE AT 5TH ST
O EAST AVE AT HIGHLAND AVE
10 6TH ST AT HELLMAN AVE
CITY OF RANCHO CUCAMONGA
MEASURE I FIVE-YEAR CPNA FY 2020/21 TO 2024/25 r
RANCHO
CUCAMONGA
PROJECT LOCATIONS
1,