HomeMy WebLinkAbout21-62 ResolutionRESOLUTION NO. 21-62
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO
CUCAMONGA, CALIFORNIA, RECOMMENDING THAT THE CITY COUNCIL
APPROVE MINOR USE PERMIT DRC2021-00315, A REQUEST TO ALLOW A
LARGE DISTRIBUTION/FULFILLMENT CENTER (E-COMMERCE
DISTRIBUTION) USE RELATED TO THE CONSTRUCTION OF TWO NEW
INDUSTRIAL WAREHOUSE BUILDINGS TOTALING APPROXIMATELY
2,175,000 SQUARE FEET ON CERTAIN PROPERTY LOCATED
APPROXIMATELY 1,000 FEET EAST OF SANTA ANITA AVENUE AND 2,300
FEET WEST OF ETIWANDA AVENUE, NORTH OF 4TH STREET AND SOUTH
OF 6TH STREET; AND MAKING FINDINGS IN SUPPORT THEREOF — APNS:
0229-283-50 AND 51.
A. Recitals.
1. Bridge Point Rancho Cucamonga, LLC filed an application for the approval of Minor Use
Permit DRC2021-00315, as described in the title of this Resolution. Hereinafter in this Resolution, the
subject Minor Use Permit request is referred to as "the application."
2. On September 22, 2021, the Planning Commission of the City of Rancho Cucamonga
conducted a duly noticed public hearing on the application and concluded said hearing on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of
the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A,
of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the
above -referenced public hearing on September 22, 2021, including written and oral staff reports,
together with public testimony, this Commission hereby specifically finds as follows:
a. The 91.39-acre project site is located approximately 1,000 feet east of Santa Anita
Avenue and 2,300 feet west of Etiwanda Avenue, north of 41h Street and south of 61 Street and is
improved with an existing 1,431,000 square foot industrial warehouse building and an existing 23,240
square foot retail building and associated improvements such as parking areas, drive aisles, loading
areas, landscaped areas and a rail spur which serves properties to the east of the project site. The site
also includes an area comprising approximately 11-acres of vacant land which was previously used as a
vineyard. All existing improvements, with the exception of an existing rail spur, will be demolished as part
of this project
b. The existing Land Use, General Plan and Zoning Designations for the project site and
adjacent properties are as follows:
Land Use
General Plan
Zoning*
Site
Industrial
Warehouse,
Heavy Industrial (HI) and General
Industrial Employment (IE)
and Neo-Industrial NI
Exhibit 0
PLANNING COMMISSION RESOLUTION NO. 21-62
MUP DRC2021-00315 — BRIDGE POINT RANCHO CUCAMONGA, LLC
September 22, 2021
Page 2
Commercial
Industrial (GI)
District
Retail, and
former vineyard
North
Industrial
Heavy Industrial (HI)
Industrial Employment (IE)
District
South
Industrial
Industrial
Industrial (Crossroads
Business Park Specific Plan)
(City of Ontario)
West
Industrial
General Industrial (GI)
Industrial Employment (IE)
and Neo-Industrial (NI)
District
East
Industrial and
Heavy Industrial (HI) and
Industrial Employment (IE)
Public Facility
Civic/Regional
and Neo-Industrial (NI)
District
C. The project site is improved with an existing 1,431,000 square foot industrial warehouse
building and an existing 23,240 square foot retail building and associated improvements such as parking
areas, drive aisles, loading areas, landscaped areas and a rail spur which serves properties to the east
of the project site. The site also includes an area comprising approximately 11-acres of vacant land
which was previously used as a vineyard. All existing improvements, with the exception of the rail spur,
will be demolished as part of this project; and
d. The project scope includes General Plan Amendment DRC2020-00213, Zoning Map
Amendment DRC2020-00267, Tentative Parcel Map SUBTPM20271, Design Review DRC2020-00202,
Tree Removal Permit DRC2020-00266, Minor Use Permit DRC2021-00315 and Development
Agreement DRC2021-00180; and
e. The project is for the development of two new industrial warehouse buildings on two
new parcels of land: Building 1 will total approximately 1,422,500 square feet including a mezzanine not
to exceed 25,000 square feet, and Building 2 will total approximately 752,500 square feet and include a
mezzanine not to exceed 16,000 square feet; and
f. The project requires 469 parking stalls and 268 trailer loading stalls for Building 1 and
184 parking stalls and 91 trailer loading stalls for Building 2. Accordingly, the project provides 478
parking stalls and 268 trailer loading stalls for Building 1, and 221 parking stalls and 91 trailer loading
stalls for Building 2; and
g. The project's compliance with the related development standards is shown in the
following tables:
Development
Standard
Required
Proposed
Complies?
Building Height I
Maximum 35 feet at front
I Building 1: 54 feet; Building 2:
YES
PLANNING COMMISSION RESOLUTION NO. 21-62
MUP DRC2021-00315 - BRIDGE POINT RANCHO CUCAMONGA, LLC
September 22, 2021
Page 3
setback) and
50 feet
75 feet (1-foot increment
from the front setback
line
Floor Area Ratio
50-60%
Building 1: 59.2%; Building 2:
YES
FAR
57.8%
Front Building
45 feet (41 Street);
Building 1: -1 IS feet
Setback
35 feet (61 Street)
(41 Street); Building 2: -215
YES
feet 61 Street
Street Side
25 Feet (Street A)
Building 1: -185 feet;
YES
Setback
Building 2: -93 feet
Average Depth of
45 feet (4u Street);
45 feet (4 1Street);
Landscape
35 feet (6 Street);
-72 feet (61 Street);
YES
25 feet Street A
25 feet Street A
25 feet (41 Street);
46 feet (41 Street);
Parking Setback
20 feet (61 Street);
-72 feet (61 Street);
YES
15 feet Street A
25 feet Street A
Interior Side Yard
Min. 5 feet
Building 1: 136 feet
YES
Setback
Building2: 45 feet
Rear Yard
Min. 0 feet
Building 1: 77 feet
YES
Setback
Building 2: -90 feet
Open
Space/Landscape
10%
10%
YES
Standards
Parking Ratio
Required
Parking
Provided
Parking
Complies?
1 per 1,000 sf for the first
Building
YES
20,000 sf; 1 per 2,000 sf for
1: 469
Building 1:
Warehouse/storage
the next 20,000 sf, and 1 per
stalls;
478;
and office
4,000 sf for remaining sf
Building
Building 2:
2: 268
268
Office requires 1 per 250 sf
stalls
Building
Building 1:
YES
Trailer Loading
1 per loading dock
1: 184;
221;
Stalls
Building
Building 2:
2: 91
91
3. Based upon the substantial evidence presented to this Commission during the
above -referenced public hearing and upon the specific findings of facts set forth in Paragraphs 1 and 2
above, this Commission hereby finds and concludes as follows:
a. The site is physically suited for the type, density, and intensity of the proposed use
including access, utilities, and the absence of physical constraints, and can be conditioned to meet all
related performance criteria and development standards.
PLANNING COMMISSION RESOLUTION NO. 21-62
MUP DRC2021-00315 — BRIDGE POINT RANCHO CUCAMONGA, LLC
September 22, 2021
Page 4
b. The operating characteristics of the proposed use, including traffic, noise, light, and
other characteristics, will be in keeping with the character of the neighborhood and other adjacent uses in
the vicinity. The project involves the demolition of an existing industrial warehouse use and the
construction of two new industrial warehouse uses of similar scale and characteristics. The proposed use
is required to comply with all relevant industrial performance standards pursuant to Development Code
Section 17.66.110 for noise, vibration, particulate matter and air contaminants, odor, and humidity, heat,
and glare. Further, the Environmental Impact Report prepared for the project identified mitigation
measures which when implemented will mitigate traffic characteristics to less than significant levels.
C. The proposed improvements of the site, including building design, height and bulk of
buildings, setbacks fencing, landscaping, signage size and location are compatible with the surrounding
neighborhood or area. The project meets all relevant development standards including height, setbacks,
fencing and landscaping. The buildings design, including bulk and massing, comply with design criteria
established by the Development Code. Specifically, the project meets design provisions established by
Development Code Section 17.122.030.
d. The proposed use shall not result in conditions that would be detrimental to the public
health, safety, or welfare of the community. An Environmental Impact Report (EIR) was prepared for the
project which determined that, with the implementation of certain mitigation measures, the project will not
result in significant environmental impacts. The project includes the construction of a new public street,
running north -south along the eastern property line of the project site, which will connect 41 Street and
61h Street thereby improving traffic circulation within the vicinity of the project. The new public street will
also improve vehicular access, as well as emergency access, to the project site and proposed industrial
buildings and users.
e. Adequate public facilities and services are available to serve the proposed use of will
be made available concurrent with the proposed development. The project has street frontage on 41
Street, 61 Street and a new north -south public street proposed to be located along the eastern property
line of the project site which will connect 4ch Street and 61h Street. The site is served, or will be
conditioned to be served by, services and utilities provided by Burrtec Waste Industries, Cucamonga
Valley Water District, Southern California Edison, Rancho Cucamonga Municipal Utility, and all other
public and private services that accommodate the operation of Large Distribution/Fulfillment Center (E-
Commerce Distribution).
f. Allowing the proposed use at the proposed location would be consistent with and help
achieve the goals, objectives and policies of the general plan and the development code. Large
Distribution/Fulfillment Center (E-Commerce Distribution) is permitted within the Neo-Industrial (NI)
District subject to the approval of a Minor Use Permit. Allowing the proposed use at the proposed
location would achieve General Plan Policy ED-1.5 (Support housing opportunities for workers of all
income ranges) and Policy ED-4.5 (Review and understand the fiscal, job creation, and economic
benefits of new proposed uses in the City's industrial -zoned areas) as the developer has agreed to pay a
Community Benefit Fee to offset any impact to the City's affordable housing demand as a result of the
number of jobs anticipated to be created by the use. The project would also achieve ED-4.3 (Improve
connectivity between development projects to create a more cohesive atmosphere) as the project
involves the construction of a new north -south public street which connects 4"' Street and 6'h Street,
thereby improving connectivity within the vicinity of the project site.
g. The project would not result in a negative effect to the City's land use inventory
available for residential and economic development, consistent with the intent of the general plan land
PLANNING COMMISSION RESOLUTION NO. 21-62
MUP DRC2021-00315 — BRIDGE POINT RANCHO CUCAMONGA, LLC
September 22, 2021
Page 5
use element. The project site proposes to be redesignated from a currently split -zoned orientation
between the Neo-Industrial. (NI) and Industrial Employment (IE) Districts to Neo-Industrial (NI) which
does not permit residential development. The applicant has provided a Fiscal Impact Analysis (Kosmont,
2020, rev. 2021) which estimates that the project will result in the creation of approximately 1,470 jobs
and a total estimated net fiscal impact to the City of $402,700 annually. Policy ED-1.5 requires that the
City "Support housing opportunities for workers of all income ranges." As such, ,and to offset any impacts
on the project's impacts to affordable housing demand, the developer and the City have negotiated a
development agreement which will result in the developer paying the City a Community Benefit Fee in
the amount of $9 million within the first five years of the operation of both Building 1 and Building 2.
4. The Minor Use Permit, in addition to the General Plan Amendment, Zoning Map Amendment,
Tentative Parcel Map, Design Review, Tree Removal Permit and Development Agreement (collectively,
the "Project") were environmentally reviewed pursuant to the California Environmental Quality Act
(CEQA), the State CEQA Guidelines, and the City's Local 'CEQA Guidelines. Pursuant to CEQA
Guidelines Section 15060(d), the City determined that an EIR would clearly be required for the Project,
and therefore prepared an environmental impact report (EIR) that focused on the potentially significant
effects of the Project. Based upon the facts and information contained in the EIR prepared for
the Project and the entire record before it, the Planning Commission recommends the City
Council certify the final EIR for the Project, adopt findings of fact pursuant to CEQA, and adopt the
Mitigation Monitoring and Reporting Program (MMRP) for the Project, based upon the findings as follows
Based upon the facts and information contained in the environmental assessment prepared for the
project, the Planning Commission finds that there is no substantial evidence that the project will have a
significant effect upon the environment and recommends the City Council certify an Environmental
Impact Report (EIR) and mitigation Monitoring and Reporting Program (MMRP), incorporated herein by
this reference, based upon the findings as follows.
a. A Notice of Availability advertising the availability of the Draft EIR
was circulated for a period of 45-days beginning on May 7, 2021 and ending on June 21, 2021;
and
b. Pursuant to CEQA Guidelines Section 15025(c), the Planning
Commission has reviewed the EIR in both its draft and final forms, attached as Exhibit C and D of
the staff report accompanying the Planning Commission's consideration of the Project and
incorporated herein by this reference, and all comments received regarding the EIR and, based
on the whole record before it, finds that the EIR was prepared in compliance with CEQA; and The
Planning Commission further finds that this recommendation reflects the independent judgment
and analysis of the Planning Commission; and
C. The Planning Commission has also reviewed and considered the
Mitigation Monitoring and Reporting Program (MMRP) for the project that has been prepared
pursuant to the requirements of Public Resources Code Section 21081.6 and finds that such
Program is designed to ensure compliance with the mitigation measures during project
implementation; and
d. The custodian of records for the EIR, Mitigation Monitoring
Program, and all other materials which constitute the record of proceedings upon which the City
Council's decision is based is the Planning Director of the City of Rancho Cucamonga. Those
documents are available for public review in the Planning Department of the City of Rancho
Cucamonga located at 10500 Civic Center Drive, Rancho Cucamonga, California 91730,
telephone (909) 477-2750.
PLANNING COMMISSION RESOLUTION NO. 21-62
MUP DRC2021-00315 — BRIDGE POINT RANCHO CUCAMONGA, LLC
September 22, 2021
Page 6
5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this
Commission hereby hereby recommends that the City Council approve the application subject to each
and every condition set forth below and in the Conditions of Approval, attached hereto and incorporated
herein by this reference.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 22nd DAY OF SEPTEMBER 2021.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
Francisco Oaxaca, Chairman
ATTEST: jl� i/✓" �--
nne McIntosh, AICP, Se
I, Anne McIntosh, AICP, Secretary of the Planning Commission of the City of Rancho Cucamonga, do
hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by
the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning
Commission held on the 22nd day of September 2021, by the following vote -to -wit:
AYES: COMMISSIONERS: GUGLIELMO, OAXACA, DOPP, MORALES, WILLIAMS
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS: