HomeMy WebLinkAbout84-151 - ResolutionsRESOLUTION NO. 84-151
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO
CUCAMONGA, CALIFORNIA, GIVING ITS PRELIMINARY APPROVAL OF
CITY ENGINEER'S REPORT FOR STREET LIGHTING MAINTENANCE
DISTRICT NO. 4 (TERRA VISTA PLANNED CO~dUNITY)
WHEREAS, on May 24, 1984, the City Council of the City of Rancho
Cucamonga directed the City Engineer to make and file with the City Clerk of
said City a report in writing as required by the Landscaping and Lighting Act
of 1972; and
WHEREAS, the City Engineer has made and filed with the City Clerk of said
City a report in writing as called for pursuant to said Act, which report has
been presented to this Council for consideration; and
WHEREAS, said City ICouncil has duly considered said report and each and
every part thereof, and finds that each and every part of said report is
sufficient, and that said report, nor any part thereof, requires or should be
modified in any respect.
NOW, THEREFORE BE IT RESOLVED by the City Council of the City of Rancho
Cucamonga as follows:
SECTION 1: That the Engineer's Estimate of the itemized costs and
expenses of said work and of the incidental expenses in connection therewith,
contained in said report be, and each of them are hereby, preliminarily
approved and confirmed.
SECTION 2: That the diagram showing the Assessment District referred to
and de~crib~d in said report, the boundaries of the subdivisions of land
within said Assessment District are hereby preliminarily approved and
confirmed.
SECTION 3: That the proposed assessment upon the subdivisions of land in
said A~sessment District in proportion to the estimated benefit to be received
by said subdivision, respectively, from said work and of the incidental
expenses thereof, as contained in said report is hereby preliminarily approved
and confirmed.
SECTION 4: That said report shall stand as the City Engineer's Report
for the purposes of all subsequent proceedings, and pursuant to the proposed
district.
PASSED, APPROVED, and ADOPTED this 24th day of May, 1984.
AYES:
Buquet, Mikels, King, Dahl
NOES: None
ABSENT: None
ABSTAIN: Wright
ATTEST:
Beverly, A. Authelet, City Clerk
~Y
o~ik
Resolution No. 84-151
Page 2
CITY OF RANCH0 CUCAMONGA
ENGINEER'S REPORT
FOR
STREET LIGHTING MAINTENANCE DISTRICT NUMBER 4
TERRA VISTA PLANNED CO~4~JNITY
SECTION 1. AUTHORITY FOR REPORT
This report is prepared in compliance with the requirements of Article 4,
Chapter 1, Divison 15, of the Street and Highways Code, State of California
(Landscape and Lighting Act of 1972).
SECTION 2. GENERAL DESCRIPTION
This report deals with the establishment of a Street Lighting Maintenance
District for the Terra V'ista Planned Community. The District will eventually
include the majority of the area included with the Planned Community, as
approved by Ordinance No. 190. Areas to be included in the work program are
the street lights within the rights-of-way or designated easements of streets
dedicated to the City and are limited to local, collector and secondary
arterial streets, including Tetra Vista Parkway. The work program excludes
maintenance of street lights in rights-of-way of major arterial highways (Base
Line Road, Haven Avenue, Foothill Boulevard, Rochester Avenue and Milliken
Avenue) and Church Street. These areas will be included in the city-wide
lighting district for arterial highways.
SECTION 3- SCOPE OF WORK
The specific areas to be maintained by the District as defined in the
preceding section, will become part of the active work program at such time as
the specific areas are annexed into the District. The normal process will be
the dedication of the areas to the City, construction of the street lighting
system, and, upon demonstration of satisfactory operation, the acceptance by
the District no later than the following July. The Developer will make a
sufficient deposit with the Southern California Edison Company to provide for
up to twelve (12) months of ordinary and usual maintenance, operation and
servicing costs of the street lights in each development at the time of
initial operation of the lighting system. Upon establishment of assessment
effective July 1 of each year, any remaining deposit shall be refunded to the
developer. Work to be provided for, with the assessments established by the
District, consists of maintenance, operation and servicing of street lights.
Annual Engineer's reports will be prepared and approved by the City Council
defining the specific work program for each year and its estimated cost.
The plans and specifications for all street lighting will be prepared by the
developers for the subdivision improvements and will be approved by the City
Engineering Division.
Detailed maintenance activities on the Street Lighting Maintenance District
include: the furnishing of services and materials for the ordinary and usual
maintenance, operation and servicing of any street light improvement and the
repair, removal, or replacement of all or any part of any improvement,
providing for the illumination of the subject area.
SECTION 4. ESTIMATED COSTS
As development proceeds within the Terra Vista Planned Community, the area to
be maintained by the District will increase and so will the cost; however, the
number of dwelling units will also increase. It is anticiapted that the
number of dwelling units will increase at approximately the same rate as the
maintenance area will increase, thereby keeping relatively constant the cost
per dwelling unit, excluding cost of living increases. Based on historical
data adjusted for inflation, it is estimated that the quantity of street
lights and the maintenance and energy costs for assessment purposes will be as
follows:
Resolution No. 84-151
Page 3
A. Phase One Construction
The estimated cost (at current dollars) for the District as initially
formed comprising the 397 dwelling units of Tract Nos. 12316, 12316-1,
12317, 12317-1, 12364, 12364-1 and 12402 is:
Lamp Quantity* Rate** Month/Year
75 ea. 5800 Lumen x
$8.75 x
12 = $7,875/year total
annual maintenance cost
B. Complete District
The estimated cost (at current dollars) for the District upon completion of
all areas within the entire Terra Vista Planned Community is:
Lamp Quantity* Rate** Month/Year
1,500 ea. 5800 Lumen x
118 ea. 9500 Lumen x
$8.75 x
$9-85 x
12 = $157,500
12 = 13,950
$171,450/year total
annual maintenance cost
· Assumed to be high pressure sodium vapor, 5800 lumen or 9500
lumen;actual type and size may vary.
** All night energy service per lamp per month including maintenance
costs.
All the costs are based on Southern California Edison Company monthly rates
including maintenance. All costs and areas are based on current estimates and
may or may not be valid for future years. The total cost and unit cost vary
as the monthly rate varies and as additional areas for maintenance are annexed
to the District. The monthly rate is established by the Southern California
Edison Company and is not currently controlled by the size of an area or any
operation of the developer. The size of the areas being annexed to the
District only has an influence on the total cost. The costs shown are
estimates only, and the actual assessment will be based on actual cost data.
SECTION 5. ASSESSMENT DIAGRAM
A copy of the proposed Assessment Diagram for the tracts that will comprise
the Maintenance District orginally is attached to this report and labeled
"Street Lighting Maintenace District No. 4". This diagram is hereby
incorporated within the text of this report.
The District will originally comprise Tract Nos. 12316, 121316-1, 12317,
12317-1, 12364, 12364-1 and 12402 of Phase One of Terra Vista as each tract is
recorded and annexed into the District at the time of recordation. Additional
tracts will be annexed into the District upon individual tract recordation.
SECTION 6. ASSESSMENTS
Maintenance costs for the entire District are found to be of specific benefit
to all developed residental property within the District in accordance with
the following relationship:
Land Use Assessment Units
Single family residential dwelling unit 1 unit
Multifamily/attached residential dwelling unit .5 unit
Resolution No. 84-151
Page 4
Estimated Annual Assessments
Estim~ted Phase One:
Total annual cost (Section 4)
Assessment units
Single family 245 d.u. x 1 unit
Multifamily 152 d.u. x .5 unit
Total 397 d.u.
7,875
245 assessment units
76 assessment units
321 assessment units
Estimated assessment rate = $7,875
321 = $24.53 per year
Thus, estimated assessments of $24.53 per single family dwelling unit and
$12.27 per multifamily dwelling unit will initially be required for the
original District.
Estimated Planned Community complete:
Total annual cost (Section 4) $171,450
Assessment units
Single family 3,488 d.u. x I unit = 3,488 assessment units
Multifamily 4,512 d.u. x .5 unit= 2,256 assessment units
~,000 d.u. 5,7"~assessment units
Estimated assessment rate = $171,450
5,744 = $29.85 per year
Thus, estimated annual assessments of $29.85 per single family dwelling
unit and $14.93 per multifamily dwelling unit are projected to be required
at project completion.
Estimated assessments are for comparison only. Actual assessments will be set
by public hearing each year in June and will be based on actual energy and
maintenance expenses and developed land use summ~-ies.