Loading...
HomeMy WebLinkAbout2016-05-25 - Agenda Packet- Item C - Capital Improvement Program_FY 2016-2017 PC-HPC Fiscal Year 2o16/2017 Capital Improvement Program Presented by: City of Rancho Cucamonga Engineering Services Department 10500 Civic Center Drive Rancho Cucamonga, California 91730 Tel: 909.477.2740 Fax: 909.477.2741 www.cityofrc.us CITY OF RANCHO CUCAMONGA COMMUNITY DEVELOPMENT DEPARTMENT ENGINEERING SERVICES DEPARTMENT CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2016/17 SUMMARY Categories Budqeted Unfunded General Plan: Policy Reference A. Beautification........................... (3) $ 637,000 $ - GP: CM-3.1 1,PS-1 2.7 B. Drainage.................................. (1) $ 3,900,000 $ - GP: CM-4.4, CM-3.7 C. Facilities................................... (20) $ 38,521,130 $ 8,225,000 GP: ED-3.1, PF-1.1, PF-1.4, PF-1.5 D. Miscellaneous.......................... (5) $ 1,644,530 $ - GP: CM-1.4, CM-2.1, CM-3.7, CS-6.3, LU-1 1.2, PS-1 2.4 E. Municipal Utility.................... (6) $ 941,500 $ - GP: PF-1.4, RC-4.2 F. Parks........................................ (6) $ 930,000 $ 7,868,000 GP: CS-1.8, PF-1.4 G. Railroad Crossings.................. (2) $ 1,125,000 $ - GP: CM-1.2, CM-4.4 H. Streets..................................... (22) $ 11,329,920 $ 7,300,000 GP: CM-1.1, CM-2.1, CM-4.4, ED-4.3 I. Traffic....................................... (10) $ 2,946,500 $ ..- 110,000 GP: CM-4.1, CM-4.2 TOTAL............................... (75) $ 61,975,580 $ 23,503,000 J. Future & Unfunded Projects.... (20) $ 83,325,300 GP: CM-1.1, CM-4.4, CS-1.8, ED-3.1, PS-12.4 Index CITY OF RANCHO CUCAMONGA- CAPITAL IMPROVEMENT PROGRAM- FISCAL YEAR 2016/17 No. Project Fund Account Amount($) A. Beautification 1 Archibald Ave east side north of Sunflower-widening Beautification 11103165650/1945110-0 187,000 2 Archibald Ave n/o Norbrook to Carrari St-Community Trail Beautification 11103165650/1830110-0 150,000 3 LMD 4R-Water Conservation and Landscape Renovations LIVID 4R 11343035650/1787134-0 300,000 (Multi-Phased Project) Beautification UnFunded Total: 0 B. Drainage Beautification Funded Total: 637,000 1 Cucamonga Storm Drain Upper Phase 3-East of Hellman to Base Line to General Drainage 11123035650/1928112-0 800,000 Roberds,North on Amethyst to 19th St,and Easterly 300 feet Measure 1 11763035650/1928176-0 400,000 Citywide Infrastructure 11983035650/1928198-0 2,700,000 3,900,000 Drainage UnFunded Total: 0 C. Facilities Drainage Funded Total: 3,900,000 1 Animal Care&Adoption Center Makeover Capital Reserve 10250015650/1920025-0 701,500 2 Archibald Library Office Re-design Library Reserve 1329601-5602 205,000 3 Central Park-Emergency Backup Power Fire Capital Projects 32885015650/1914288-0 50,000 (Design Only) 4 Central Park-Flooring Replacement Capital Reserve 1025001-5602 310,000 5 City Facilities-Roofing Replacement&Repairs Capital Reserve 1025001-5602 250,000 Capital Reserve 1025001-5602 125.000 375,000 6 City Hall-Elevator Modernization Capital Reserve 1025001-5602 95,000 7 Civic Center-Council Chambers AV Replacement Phase III Capital Reserve 1025001-5602 150,000 8 Civic Center-Human Resources Office Relocations Capital Reserve 1025001-5602 350,000 9 Civic Center-Landscape Renovation Phase II Capital Reserve 1025001-5607 500,000 10 Fire District-Emergency Operations Center(EOC)Reconfiguration Fire Capital Projects 3288501-5606 250,000 Homeland Security-Fire 1380501-5606 32,280 282,280 11 Fire District-Jersey Station(174)Training Facility Fire Capital Projects 32885015650/1735288-0 20,182,350 12 Fire District-San Bernardino Rd Station(172)Relocation Fire Capital Projects 3288501565011733288-0 750,000 Fire Capital Projects 32885015650/1733288-0 6,000,000 6,750,000 13 Fire District-Water Conservation Landscaping Fire Capital Projects 3288501-5602 600,000 (Stations 175 and 176,and Utica Property) 14 LoanMart Stadium-Sound System Capital Reserve 1025001-5603 50,000 15 LoanMart Stadium-Team Locker Rooms Carpet Replacement Capital Reserve 1025001-5602 25,000 16 LoanMart Stadium-Team Locker Rooms Shower Capital Reserve 1025001-5602 30,000 Fixtures Replacement 17 Public Works Services Department-Warehouse Expansion Capital Reserve 10250015650/1927025-0 170,000 Capital Reserve 10250015650/1927025-0 1,700,000 1,870,000 18 Rancho Cucamonga Family Sports Center-Relocation Capital Reserve 10250015650/1896025-0 2,500,000 Citywide Infrastructure 11980015650/1896198-0 7,000,000 Recreation Fund Reserve 12504015650/1896250-0 250,000 Equip/Veh Replacement 17120015650/1896712-0 750,000 Park Development 11204015650/1896120-0 2_700.000 13,200,000 Index-1 CITY OF RANCHO CUCAMONGA- CAPITAL IMPROVEMENT PROGRAM- FISCAL YEAR 2016/17 No. Project Fund Account Amount($) 19 Victoria Gardens Cultural Center-Courtyard Redesign Capital Reserve 10250015650/1894025-0 120,000 Unknown xb0000cx:ax/1894xxx 400,000 520,000 20 Victoria Gardens Cultural Center-Exterior Joint Replacement,Roofing and Capital Reserve 10250015650/1890025-0 500,000 Exterior Paint Facilities UnFunded Total: 8,225,000 D. Miscellaneous Facilities Funded Total: 38,521,130 1 ADA Ramps at Various Locations Measure I 11773035650/1150177-0 200,000 (Design and Construction) 2 Arrow Route from Bear Gulch to West of Archibald Ave-Utility Underground Underground Utilities 11293035650/1777129-0 724,360 (Continuation of Design with Construction funded FY16/17) Note: additional funding coming from Rule 20A 3 Base Line Rd from Carnelian St to Vineyard Ave-Utility Underground Underground Utilities 11293035650/1776129-0 559,570 (Continuation of Design with Construction funded FY16/17) Note: additional funding coming from Rule 20A 4 Bus Stop Pads at Various Locations AB 2766 Air Quality Impry 11053035650/1823105-0 16,000 (Design and Construction funded with TDA Grant and City match) TDA Article 3 12143035650/1823214-0 46.600 62,600 5 Pacific Electric Trail above Victoria Park Lane Tunnel-Fencing LMD 2 1131303-5607 98,000 Miscellaneous UnFunded Total: 0 E. Municipal Utility-Electrical Miscellaneous Funded Total: 1,644,530 1 Arrow Rte:Bear Gulch to Archibald-Fiber Conduit Municipal Utility 17053035650/1947705-0 88,500 2 City Fiber Optics Improvements Municipal Utility 17053035650/1910705-0 100,000 3 Commercial Smart Meter Replacement Municipal Utility 17053035650/1938705-0 375,000 4 Day Creek Blvd and Base Line Road-Line Extension Municipal Utility 17053035650/1917705-0 200,000 5 Foothill Blvd at Spruce Ave-Line Extension Municipal Utility 17053035650/1938705-0 153,000 6 Haven Avenue @ 6th St-St Light Installation Municipal Utility 17053035650/1948705-0 25,000 Municipal Utility UnFunded Total: 0 F. Parks Municipal Utility Funded Total: 941,500 1 Central Park-Ph II Design Study Park Development 1120401-5650/1660120-0 250,000 2 Central Park-Replace Rubberized Surface Park Development 1120401-5607 80,000 3 Central Park-Trail Head Improvements Park Development 11204015650/1871120-0 25,000 (Design with Construction TBD) Park Development 11204015650/1871120-0 2,488.000 2,513,000 4 Etiwanda Creek Park-Phase II Park Development 11204015650/1664120-0 300,000 (Design with Construction TBD) Park Development 1120401565011664120-0 5,380,000 5,680,000 5 LMD 4R Parks-Lighting Retrofits Phase III LMD 4R 11343035650/1858134-0 135,000 6 Victoria Arbors Park-Replace Rubberized Playground Surface LMD 2 1131303-5607 140,000 Parks UnFunded Total: 7,868,000 G. Railroad Crossings Parks Funded Total: 930,000 1 Arrow Route at Railroad Spur-New Concrete Panels Gas Tax R&T 7360 11743035650/1819174-0 75,000 (Continuation of Design with Construction funded) 2 Hellman Avenue at Metrolink Tracks-Widen Crossing Transportation 1124303565011847124-0 1,050,000 (Continuation of Design with Construction funded) Note: Railroad Improvements funded by SCRRA Railroad Crossings UnFunded Total: 0 Railroad Crossings Funded Total: 1,125,000 Index-2 CITY OF RANCHO CUCAMONGA- CAPITAL IMPROVEMENT PROGRAM- FISCAL YEAR 2016/17 No. Project Fund Account Amount($) H. Streets 1 6th St from Milliken to Charles Smith-Pavement Rehabilitation Gas Tax R&T 7360 11743035650/1930174-0 35,000 (Design with Construction funded FY 17/18) Unknown 1x>oo=5650/=000x-0 300.000 Note: approved CalRecycle Rebate 335,000 2 9th St from Grove to Hellman-Pavement Rehabilitation Measure 1 11773035650/1904177-0 300,000 Note: approved CalRecycle Rebate 3 Arrow Route along the s/s 500'to 1300'e/o 1-15 freeway-Widening Gas Tax R&T 7360 11743035650/1907174-0 5,000 (Design Feasibility with Construction possibly funded FY 17/18) Unknown 1xxx3035650/1907xxx-0 300,000 305,000 4 Base Line Rd-at 1-15 Interchange Transportation 11243035650/1361124-0 100,000 (Continuation of Construction) SAFETEA(federal) 12093035650/1361209-0 5,091,000 Prop 1B-SLPP(state) 12113035650/1361211-0 19,920 5,210,920 5 Base Line Rd from Milliken to w/o Day Creek Blvd-Pavement Rehabilitation Measure 1 11773035650/1880177-0 900,000 Note: approved CalRecycle Rebate 6 Carnelian St from Lemon Ave to Wilson Ave-Pavement Rehabilitation Measure 1 11773035650/1722177-0 468,000 Note: approved CalRecycle Rebate 7 Church St from Pepper to Heilman-Pavement Rehabilitation Measure 1 11773035650/1906177-0 200,000 Note: approved CalRecycle Rebate 8 East Ave from Chickasaw,west side,north 370 feet-Widen and Sidewalk Gas Tax R&T 7360 1174303565011931174-0 55,000 (Design and Construction) Citywide Infrastructure 11983035650/1931198-0 55,000 110,000 9 Etiwanda Ave from 6th St to Arrow Route-Street Widening Improvement Transportation 11243035650/1076124-0 450,000 (Design and Construction) 10 Foothill Blvd across SCE Corridor West of Day Creek Channel-Sidewalk Citywide Infrastructure 11983035650/1826198-0 145,000 Improvements(Design and Construction) 11 Foothill Blvd from Haven to Milliken-Pavement Rehabilitation Measure 1 11773035650/1932177-0 50,000 (Design with Construction funded FY 17/18) Measure 1 11773035650/1932177-0 900.000 Note: possible CalRecycle Rebate 950,000 12 Haven Ave from Foothill to Base Line-Pavement Rehabilitation Measure 1 11773035650/1933177-0 50,000 (Design with Construction funded FY 17/18) Measure 1 11773035650/1933177-0 900,000 Note: possible CalRecycle Rebate 950,000 13 Hellman Ave from San Bernardino Rd to Base Line Rd-Pavement Measure 1 1177303565011905177-0 357,000 Rehabilitation Note: approved CalRecycle Rebate 14 Hermosa Ave from Arrow to Foothill-Pavement Rehabilitation Measure 1 11773035650/1934177-0 35,000 (Design with Construction funded FY 17/18) Measure 1 11773035650/1934177-0 300,000 Note: approved CalRecycle Rebate 335,000 15 Hillside Rd from Archibald to Haven-Pavement Rehabilitation Measure 1 11773035650/1879177-0 850,000 Note: approved CalRecycle Rebate 16 Jersey Blvd from Haven to Rochester-Pavement Rehabilitation Gas Tax R&T 7360 11743035650/1929174-0 50,000 (Design with Construction funded FY 17/18) Unknown 1xxx3035650/k000 x-0 550.000 Note: approved CalRecycle Rebate 600,000 17 Local Street Pavement Rehabilitation at Various Locations Gas Tax R&T 7360 11743035650/1022174-0 850,000 (Design and Construction) Citywide Infrastructure 11983035650/1022198-0 50,000 900,000 18 Rochester Ave from Base Line to Banyan-Pavement Rehabilitation Measure 1 11773035650/1935177-0 50,000 (Design with Construction funded FY 17/18) Measure 1 11773035650/1935177-0 900,000 Note: possible CalRecycle Rebate 950,000 19 Rochester Ave from Foothill to Base Line-Pavement Rehabilitation Measure 1 11773035650/1821177-0 610,000 Note: approved CalRecycle Rebate 20 San Bernardino Rd from Carnelian to Archibald-Pavement Rehabilitation Gas Tax R&T 7360 11743035650/1877174-0 200,000 Note: approved CalRecycle Rebate Fire Protection Capital 32885015650/1877288-0 200,000 400,000 Index-3 CITY OF RANCHO CUCAMONGA- CAPITAL IMPROVEMENT PROGRAM- FISCAL YEAR 2016/17 No. Project Fund Account Amount($) 21 San Bernardino Rd from Grove to Foothill-Pavement Rehabilitation Gas Tax R&T 7360 11743035650/1903174-0 104,000 Note: approved CalRecycle Rebate 22 Youngs Canyon Road from Koch Place to Cherry Ave-Street Extension AD 88-2 Etiwanda/Highlnd 18133035650/1601813-0 50,000 (Environmental,Design and Flood Control Review) AD 88-2 Etiwanda/Highlnd 18133035650/1601813-0 3,150.000 3,200,000 Streets UnFunded Total: 7,300,000 I. Traffic Streets Funded Total: 11,329,920 1 6th at Rochester-Traffic Signal Installation Transportation 11243035650/1939124-0 513,000 2 Archibald at Victoria-Traffic Signal Installation Transportation 11243035650/1510124-0 551,500 3 Base Line Rd at Lion St-Pedestrian Hybrid Beacon Citywide Infrastructure 11983035650/1921198-0 80,000 4 East at Miller-Traffic Signal Installation Transportation 11243035650/1888124-0 524,000 5 Freeway and Arterial Signal Synchronization at various intersections AB 2766 Air Quality 11053035650/1900105-0 112,810 where City streets intersect SR 210 and 1-15-Phase 1 Transportation 11243035650/1900124-0 207,190 320,000 6 Intelligent Transportation System Upgrade-Citywide Transportation 11243035650/1831124-0 100,000 7 Milliken at 5th-Traffic Signal Installation Transportation 11243035650/1940124-0 469,000 8 Milliken Ave Traffic Signals at Millenium Ct and Vintage Dr-Upgrade Left Transportation 11243035650/1875124-0 54,000 Turn Phases 9 Rochester at Jersey-Traffic Signal Installation Transportation 11243035650/1941124-0 315,000 10 Terra Vista Parkway at Spruce-Safety Lighting Installation SLID 4 11543035650/1902154-0 20,000 (Design with Construction funded FY 17/18) SLID 4 11543035650/1902154-0 110,000 130,000 Traffic UnFunded Total: 110,000 Traffic Funded Total: 2,946,500 Index-4 CITY OF RANCHO CUCAMONGA- CAPITAL IMPROVEMENT PROGRAM- FISCAL YEAR 2016/17 No. Project Fund Account Amount($) J. Future&Unfunded Projects 1 6th St at BNSF Spur Crossing west of Etiwanda Avenue Unknown x00o0Xow/1839xxx-0 16,953,000 Future Grade Separation 2 9th St along north side west of Vineyard Ave-Sidewalk Improvements Citywide Infrastructure 11983035650/1808198-0 25,000 Safe Route To School 12343035650/1808234-0 90,800 115,800 3 Archibald Ave from Church to Palo Alto-Storm Drain Unknown x�1805xxx-0 1,215,000 4 Distribution System Automation-Switch to RCMU Service Area Municipal Utility 17053035650/xxa705-0 250,000 5 Epicenter-Hardscape Parking Lots B and C Planter Islands Unknown x0oo0o00cah0000=-0 66,000 6 Etiwanda Ave Grade Separation at Metrolink Tracks Unknown x00o0o0ooW1922xxx-0 40,000,000 7 Etiwanda Ave Line Extension from Arrow to Foothill Municipal Utility 17053035650/1885705-0 602,500 8 Fire District-Central Station 178(New Fire Station) Fire Capital Projects 32885015650/1645288-0 9,000,000 9 Foothill Blvd from Grove Ave to San Bernardino Rd-Widening with Median Unknown 0000a0000cx/1189xxx-0 4,630,000 Island including Landscaped Median to Vineyard (Right-of-Way and Construction) 10 Foothill Blvd from San Bernardino Rd to Vineyard Ave-Median Landscape Unknown xoocoocowJ1908xxx-0 300,000 11 Haven Ave from Banyan to Wilson along the East side-sidewalk Gas Tax R&T 7360 11743035650/1864174-0 75,000 (Design and Construction funded with proposed TDA Grant and City match) TDA Article 3 12143035650/1864214-0 189,000 264,000 12 Haven Ave from Wilson to Vivienda-Community Trail West Side Unknown x00000oocoJ1829x x-0 150,000 (Continuation of Design with Construction funded) 13 Hermosa Ave from Banyan to Wilson-Pavement Rehabilitation Gas Tax R&T 7360 11743035650/1815174-0 260,000 (Continuation of Design,with Construction FY16/17 if funds are available) Related to Hermosa storm drain 14 Hermosa Ave from the Alta Loma Basin to Wilson-Storm Drain Unknown xoo000000cc/1810x x-0 2,245,000 Related to Hermosa pavement rehabilitation 15 Lemon Ave from Archibald to Haven-Pavement Rehabilitation Gas Tax R&T 7360 11743035650/1793174-0 560,000 (Continuation of Design,with Construction FY17/18 if funds are available) Related to Lemon storm drain 16 Lemon Avenue from Haven to 1300 feet west-Storm Drain Unknown x000000cax/1791xxx-0 1,700,000 Related to Lemon pavement rehabilitation 17 LMD 2(Victoria)Area-Paseo Lighting Repair and Replace LMD 2 Victoria 11313035650/1716131-0 150,000 18 Paul A.Biane Library-Second Floor Rancho KIDS Project Unknown xoc0000co0d1867xxx-0 4,250,000 19 Rochester Ave and Arrow Route,North East Corner-Street Widening Unknown xococeoo00'J=0o=-0 414,000 and Sidewalk Improvements 20 Victoria Gardens Cultural Center-Loading Bay Capital Reserve 10250015650/1895025-0 25,000 Unknown x00000000W1895xx 175,000 200,000 Future&Unfunded Total: 83,325,300 Index-5 Beautification w . ,r _Mai Typical Beautification projects include parkway landscape, median islands, plant material replacement, community trail landscape and open space preservation.The City strives to plan and budget for projects that exemplify Rancho Cucamonga's aesthetic standards, particularly in areas of the City that are older and undergoing rehabilitation. Many Beautification projects bring these areas into alignment with the rest of the City. The City adheres to a Xeriscape policy in all of its plant material selection,ensuring current water conservation standards, as well as the adaptability of plants,trees,flowers and shrubs to Southern California's warm and dry climate. This practice helps to reduce ongoing maintenance and irrigation costs. Project List& FY 2016-17 Expenditures Sources of Funding for FY 2016-17 1 Archibald Ave east side n/o $ 187,000 Sunflower-Widening $300,000 2 Archibald Ave n/o Norbrook-Carrari $ 150,000 St-Community Trail 3 LIVID 4R-Water Conservationa & $ 300,000 Landscape Renovation $ 637,000 $337,000 ■Beautification ■LMD 4R A Project Number: 800-2015-13 JL Key: 1945 Object: 5650 Archibald Avenue east side north of Sunflower-Widening Project Location: U, Archibald Avenue -East side north of Sunflower � JE1 WILSON AVE NEF EELEIV Est.Construction Start/End: 02/2017-04/2017 ] J F—PR JE COC TI - Project Status: a Design and Constructon z ` C= Department: HA_NYgI_i.5,7� Engineering AN ST Project Manager: Romeo David Description: Widen Street along the east side and construct a community trail. Justification: This project will improve the traffic flow with the wider road and allow room for bicyclists. In addition,pedestrian circulation and safety will be improved with the addition of the community trail. Project Cost Estimate($}: Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $o $o $0 $0 So $0 Design/Plan Review $0 $0 $o $0 $0 $0 $0 Right-of-Way $0 $o $o $o $o $o $0 Construction $0 $150,000 $0 $0 $0 $o $150,000 Inspection&Administration $0 $22,000 $0 $0 $o $0 $22,000 Contingency $o $15,000 $0 $0 $0 $0 $15,000 Total Costs: $0 $187,000 $0 $0 $o $0 $187,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Beautification Fund(110) $0 $187,000 $0 $0 $0 $0 $187,000 Total Costs: $o $187,000 $o $o $o $0 $187,000 Impact on Operations: This stretch will add a few hundred feet to the City's trail inventory,requiring trash removal,weed abatement,and routine maintenance. Al Project Number: 800-2016-12 J L Key: 1830 Object: 5650 Archibald Ave from North of Norbrook to Carrari St-Community Trail West Side Project Location: Archibald Avenue- From North of I IIUnEN FARrd RD �1 Norbrook to Carrari Street, West Side 97 1 CARRARI ST -,R-RARI CT Est.Construction Start/End: z 02/2017-04/2017 v lZ Q WHIRI.AWAY ST G Project Status: WHIR!_AWAY ST = PROJECT LOCATION Design and Construction a Department: Engineering CINCH RING LN (� NORUROOK UR I Project Manager: Romeo David z Description: Construction of an equestrian trail on Archibald Avenue along the west side.Project includes the installation of a 2 rail PVC fence, mow curbs and decomposed granite surface material. Justification: This stretch along the west side of Archibald Avenue will remove existing public landscaping and trees, and replace with a community trail as part of the City trail master plan. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $10,000 $0 $0 $0 $0 $10,000 Right-of-Way $0 $0 $0 $o $0 $0 $0 Construction $0 $100,000 $0 $0 $0 $0 $100,000 Inspection&Administration $0 $30,000 $0 $0 $0 $0 $30,000 Contingency $0 $10,000 $0 $0 $0 $0 $10,000 Total Costs: $0 $150,000 $0 $0 $0 $0 $150,000 Project funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Beautification(110) $0 $150,000 $0 50 So $0 $150,000 Total Costs: $0 $150,000 $0 $0 $o $0 5150,000 Impact on Operations: This stretch will add an additional quarter mile to the City's trail inventory, requiring trash removal, weed abatement,and routine maintenance. But,it also removes public landscaping and trees,thus reducing water costs and mainenance,and most likely reducing the overall cost of maintenance along this stretch. A Project Number: J L Key: 1787 Object: 5650 LMD 4-Water Conservation and Landscape Renovation Project Location: CIC : U I( t ��U LIVID 4 N -- -�—, N<:crvfc elcC7WL'rani dQ� � c 4A SF'l'iNe'p _ Est.Construction Start/End: July 2015—July 2017 vC Cy 9q Project Status: �� RR�?JE�T��QC�TION: oil Construction Department: Public Works Services T (} z w a Project Manager: Dean Rodia Description: The replacement of high maintenance turf and vegetation with low water use landscaping that meets the need to conserve resources,reduce maintenance costs,while providing landscape alternatives to the surrounding community. Justification: The new landscaping will reduce maintenance costs and water use requirements. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $19,730 $0 $0 $0 $0 $0 $19,730 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $332,310 $300,000 $0 $0 $0 $0 $632,310 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $352,040 $300,000 $0 $0 So $0 $652,040 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL LIVID 4RTerra Vista(134) $352,040 $300,000 $0 $0 $0 $0 $652,040 Total Costs: $352,040 $300,000 $0 $0 $0 $0 $652,040 Impact on Operations: There will be disruptions when the existing landscaping is removed and new landscaping installed. However, once completed,maintenance and irrigation costs will be much lower. A Drainage r I fiju .ate �`• �`�'_ .�. _ Drainage projects include the construction of new storm drains,storm drain lateral connections,flood control channels,catch basins,debris racks and other forms of infrastructure that protect the public right-of-way from hazards caused by flooding and severe weather events. Drainage projects are scheduled and planned due to the availability of funding,safety concerns,new development,and weather/emergency events. In extreme circumstances,inadequate drainage can prevent development from taking place. The City consults with many other agencies when constructing new drainage improvements,including utility companies,the Cucamonga Valley Water District,the San Bernardino Flood Control District and the Army Corps of Engineers,as needs dictate. Drainage projects are typically funded from Drainage Funds and eligible street funding sources such as Measure I or Gas Tax. Project List& FY 2016-17 Expenditures Sources of Funding for FY 2016-17 1 Cucamonga Storm Drain Upper Phase 3- E/0 $ 3,900,000 Hellman to 19th Street $ 3,900,000 $800,000 Ng gi� $400,000 $2,700,000 i.i General Drainage ■Measure I Citywide Infrastructure B Project Number: 800-2016-01 JL Key: 1928 Object: 5650 Cucamonga Storm Drain Upper Phase 3, e/o Hellman Avenue,Amethyst Street to 19th Street Project Location: East of Hellman Avenue,Amethyst q 41 E Street to 19th Street F R JJ�'=--iJ177 C=— L Est.Construction Start/End: 04/2017—10/2017 YL Ls� A-Y ALTA LOMA Project Status: PRO CT LO 30 Under Design Department: Engineering F- DAHL L(NL H L 11-1^RK --Alr L A f-111N Project Manager: ) ; I' Romeo David 1T Description: Construct the Master Plan Storm Drain, install storm drain mainline, install catch basins, manholes, Laterals, curb and gutter, sidewalks and overlay the entire road with asphalt rubber hot mix. Justification: This project will improve the drainage problems within the area and enhance the traffic circulation,including the improvement of pedestrian safety. Project Cost Estimate Expenditure/Category Prior Years 2016/17 2017/18 2018/19 2019/20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $150,000 $0 $0 $0 $0 $150,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $3,200,000 $0 $0 $0 $0 $3,200,000 Inspection&Administration $0 $230,000 $0 $0 $0 $0 $230,000 Contingency $0 $320,000 $0 $0 $0 $0 $320,000 Total Costs: $0 $3,900,000 $0 $0 $0 $0 $3,900,000 Project Funding: Funding Source Prior Years 2016/17 2017/18 2018/19 2019 20 TBD TOTAL General Drainange Fund(112) $0 $800,000 $0 $0 $0 $0 $800,000 Measure I Fund(176) $0 $400,000 $0 $0 $0 $0 $400,000 Infrastructure Fund(198) $0 $2,700,000 $0 $0 $0 $0 $2,700,000 Total Costs: $0 $3,900,000 $0 $0 $0 $0 $3,900,000 Impact on Operations: Less routine maintenance thus freeing up maintenance crews to attend to other needed areas. In addition, the storm drain will allow for the flood zone designation to be changed for the residents and businesses in the area, and relieving the need for additional flood insurance. B 1 Facilities ■ _ + III I:' ' Projects that construct new buildings or that either improve, add on to,or renovate existing buildings and ancillary structures are typically classified as Facilities Projects. These projects ultimately result in new structures being added to the City's fixed facility inventory; however,some projects placed in this category are considered capital rehabilitation as they focus on the remodeling or restoration of existing facilities. The majority of these projects are funded via City Reserve funds. Major projects may qualify for state,federal and/or grant funding. Typical operating expenses for facilities include increases in staffing,building and systems maintenance costs,overhead expenses and utilities. Project List& FY 2016-17 Expenditures _Project List& FY 2016-17 Expenditures 1 Animal Care&Adoption Center Mak $ 701,500 16 LoanMart Stadium-Team Locker $ 30,000 Rm. Showers 2 Archibald Library Office Design $ 205,000 17 PWSD- Warehouse $ 170,000 3 Central Park-Emergency Backup $ 50,000 18 RCFSC-Relocation $13,200,000 Power 4 Central Park-Flooring Rplcmt $ 310,000 19 Victoria Gardens Cultural Cntr- $ 120,000 Courtyard Re-Design 5 City Facilities-Roofing Rplcmt& $ 250,000 20 Victoria Gardens Cultural Cntr- $ 500,000 Repairs Painting 6 City Hall-Elevator Modification $ 95,000 $38,521,130 7 Civic Center-Council Chambers AV $ 150,000 Rplcmt Ph2 Sources of Funding for FY 2016-17 8 Civic Center-Human Resources $ 350,000 Office Relocations $zso,oOA2 280 $_$750,000 9 Civic Center-Lndscp Renov. Ph 2 $ 500,000 $205,000 $5,751,500 10 Fire District-EOC Reconfiguration $ 282,280 11 Fire District-Jersey Station Trng $ 20,182,350 Facility $7,000,000 12 Fire District- San Bernardino Rd $ 750,000 4 Station Relocation $2,700,000 13 Fire District-Water Conservation $ 600,000 Unknown ■Capital Reserve Lndscping Park Development ■City Infrastructure 14 LoanMart Stadium- Sound System $ 50,000 Recreation Reserve ■Library Reserve 15 LoanMart Stadium-Team Locker $ 25,000 Rms Carpet W Homeland Security ■Equip/Veh Replacement C Project Number: 1L Key: 1920 Object: 5650 Animal Care and Adoption Center Makeover Project Location: 1 Animal Care and Adoption Center Fa<Tn,LL al�O ��\ =JEa9;;T,.Lri iv X RANCHO CUCAMONGAADULT SPORTS CO Est.Construction Start/End: July 2016—June 2017 Project Status: Carry over from FY 15-16 ❑ ❑W —_ARR /r Department: W PWSD/Animal Sheter PROJECT LOCATION Project Manager: j— Rser a��o �E�sf T.Quaintance/V.Pincher la Description: This project includes:complete painting of interior,removal of epoxy coating throughout the facility,energy efficient lighting,new kennel gates,installation of new sinks, new tile floors in the main lobby, enhancement of plumbing in the kennel area and new sound acoustics to assist with the interior noise level. Justification: The Animal Care and Adoption Center has been open to the community for over 9 years and is showing signs of wear due to the busy day-to-day operations and the high volume of animals and visitors the center receives. This project will address many of the needs for the animals,as well as the community and city staff. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $38,500 $0 $0 $0 $0 $0 $38,500 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $110,000 $651,500 $0 $0 $0 $0 $761,500 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $50,000 $0 $0 $0 $0 $50,000 Total Costs: $148,500 $701,500 $0 $0 $0 $o $850,000, Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Capital Reserve(025) $148,500 $701,500 $o $0 $0 $0 $850,000 Total Costs: $148,500 $701,500 $0 $0 $0 $0 $850,000 Impact on Operations: This project will update the Center's physical appearance as well as become more energy efficient with the new lighting and plumbing fixtures.The new floors will assist with the overall maintenance operations. Relocation of some of the animals during the kennel area may be needed during the makeover phase. C1 Project Number: JL Key: Object: 5602 Archibald Library Office Redesign Project Location: 406�Rfi.Ss=T Archibald Library staff areas: first _ floor (Circulation staff area) and RDrUN<yT second floor (staff area and �. —_ � BASE LINT RD L literacy office) a FEPP_ER 5 r � a � � u; ARCHIBALD LIBRARY Y G IRCi I:IW.b:O.D^ST Y a Q DFR_.ST Est.Construction Start/End: c= ALD.EF S+T (\F r VYAI-NIIT'l;T TBD rdAavNia IA,r r I (J z I "J _tty S � J Project Status: BAL^aA_5T " < a (AL�.A� Design and Build 4i z W a_�i CANDLE YJy'�<a,U_S:f Department: J a a Library < c % YLV'd(4I Ins-nQ•.✓ Project Manager: —/( a =_ Michelle Perera I t AI:TG7N;pF2 0 Description: Redesign and new furniture for staff areas at the Archibald Library,including first floor staff office and area in Circulation,second floor administration area,staff room,and offices;and second floor literacy offices. Most of the work will be cosmetic. Justification: Existing staff area is over 20 years old and contains all original furniture,with the exception of the chairs. Limited storage space and functional cubicles has led to boxes,carts,and library materials crowding staff areas. Creating a more efficient and ergonomic space will allow for better workflow,better working conditions,as well as more inviting for the public into admin area. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $5,000 $0 $0 $0 $0 $5,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $200,000 $0 $0 $0 $0 $200,000 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $0 $205,000 $0 $0 $0 $o $205,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Library Reserve(329) $0 $205,000 $0 $0 $0 $0 $205,000 Total Costs: $0 $205,000 $0 $0 $0 $0 $205,000 Impact on Operations: No impact on operations. Overall space remains the same. C2 Project Number: JL Key: 1914 Object: 5650 Central Park- Emergency Backup Power Project Location: Central Park U N P7��JEACT fL0 AZION'� � � w � PACIFIC LLC IRIC 7RAIL Est.Construction Start/End: TBD J'(i v\� ) RANCHO CUCAMONGA CEN TRAVPARK• � Project Status: N Design Department: Eng/Fire/PW �` Project Manager. � ` \ COYOYO E CANYOy PARK \i C Billings/M.Courtney/Ty Q. Description: To design an emergency backup power system that will provide 100%power for Central Park which is to be used as an evacuation center. Justification: The emergency back up power will be used during emergency situations where Central Park is used as an evacuation center. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $o $0 $0 $0 $0 $0 Design/Plan Review $0 $50,000 $0 $0 $0 $0 $50,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $o $0 $0 $0 $0 $0 $0 Inspection&Administration $0 $0 $0 $0 $0 $0 $o Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $0 $50,000 $0 $0 $o $o $50,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Fire Fund(288) $0 $50,000 $0 $0 $0 $0 $50,000 Total Costs: $0 $50,000 $0 $0 $0 $0 $50,000 Impact on Operations: None C3 Project Number: JL Key: Object: 5602 Central Park- Flooring Replacements Project Location: / Central Park / X �� �1 PROJEerLOCAT1.O777, N �t IC FLEC HH 7RAIL Est.Construction Start/End: ��� r-✓� �- 14(07/2016-06/2017 RANCHO CV CAMONGA CENTRA L'PARK• Project Status: Design/Construction DASE LMt Department: Public Works Services Project Manager: C R y n OYOE� ON PARK T uaintance Description: Replace marmoleum flooring in halls and rooms-Rancho Hall(4,512 SF), David Drier Hall(3,192 SF),Creative Corner(1,140 SF), Bear Flat & Grizzly Gulch (750 SF each), Raccoon (600 SF), Fox (700 SF), Chipmunk (800 SF), Playschool Hall (250 SF), Staff Breakroom(400 SF),Snack Bar(200 SF),Game Point(850 SF),Crafters Den(750 SF)and Clay Creek(1,152 SF). Total of 16,046 SF. Justification: The existing flooring is over 10 years old and in need of replacement thoughout the facility. The marmoleum pieces are coming up in sections. Due to funding limits, Base Bid will be Rancho Hall and David Drier Hall marmoleum replacement. There will be Additive Bids for all the remaining rooms/halls. Additive Bids will be awarded depending on remaining funds after Base Bid amount. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $o $0 $0 $0 $0 Design/Plan Review $0 $10,000 $0 $0 $0 $0 $10,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $300,000 $0 $0 $0 $0 $300,000 Inspection&Administration $0 $o $0 $0 $0 $0 $0 Contingency $0 $0 $o $o $0 $o $o Total Costs: $0 $310,000 $0 $0 $0 $0 $310,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Capital Reserve(025) $0 $310,000 $0 $0 $0 $0 $310,000 Total Costs: $0 $310,000 $0 $0 $0 $0 $310,000 Impact on Operations: Installation will have significant impact on the usage of the halls and rental rooms. Existing marmoleum must be removed, concrete treated and adhesive and new flooring applied. No foot traffic on new flooring for minimum of 7 days after installation. PWSD must coordinate with CSD to ensure rooms will not be used during installation period. C4 Project Number: JL Key: Object: 5602 City Facilities- Roofing Replacement and Repairs Project Location: �� 1 v 1 Animal Care, Cultural Arts, Family Resource Center, Lions East and VI T I.IPA CN 5 b 8 Lions West �E �-- � TR y � i 41i1BgLRL•.NI \. W � 9 NS N S W ST suTw a' ftASE:L Nam- . "� `I TT Est.Construction Start/End: 3 � - 07/2016-06/2017 Zu F { r'.IniLLtlty —q Project Status: ( AA E� E ENTER NIM 1eN ER-1� Design/Construction � !_h 1� L— ARRGwR.T t 'A HRE STATION ITER5E�=CkVIJ=-'I AT/ Department: M TR INK STATION Public Works Services -fNi> i � a�MPIRE•lARE3 GOl i R E e_� 1 �bTH•a� }M� --eTH 9•T Project Manager: <_ E PIRE l KESSGGO OURS $ Ty Quaintance Description: Replace roofing systems at Lions West. Roofing repairs are required at Lions East as well as the Animal Care and Adoption Center. The RC Family Resources Center roofing will be replaced at a later date,possibly FY 2017/18,since future of this facility still needs to be determined. Justification: During FY 15/16,a consultant performed an evaluation of the roofing systems at all City facilities,with the exception of the Civic Center. The results of the roofing survey recommended that the roofs at these noted facilities need to be replaced and/or repaired. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $0 $0 $0 $0 $0 $0 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $200,000 $125,000 $0 $0 $0 $325,000 Inspection&Administration $0 $50,000 $0 $0 $0 $0 $50,000 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $0 $250,000 $125,000 $0 $0 $0 $375,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Capital Reserve(025) $0 $250,000 $125,000 $0 $0 $0 $375,000 Total Costs: $0 $250,000 $125,000 $0 $0 $0 $375,000 Impact on Operations: Replacement or repair of roofing at the mentioned facilities will reduce maintenance requirements at these facilities. C5 Project Number: JL Key: Object: 5602 City Hall - Elevator Modernization Project Location: I T-L I City Hall R TJO.W qFJ -PROJECT LO Est.Construction Start/End: 07/2016-06/2017 E—�' 1;1 HALL OLI STATION Project Status: I!__NTFR_OH J 0 Construction AY Department: qEE -$A Public Works Services L_ 0 F AIIIIOw L U_o I F RIE Project Manager: Ty Quaintance Description: Modernization of the City Hall elevator to be in compliance with current ADA requirements. Justification: Bids for this project were originally opened in March 2016. The current low bid for this project did not include necessary items, such as fire detection and phone work. Will need to go back out to bid to include all improvements. Project Cost Estimate Expenditure/Category Prior Years 2016/17 2017/18 2018/19 2019/20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $8,160 $0 $0 $0 $0 $0 $8,160 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $95,000 $0 $0 $0 $0 $95,000 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $8,160 $95,000 $0 $0 $0 $0 $103,160 Project Funding: Funding Source Prior Years 2016/17 2017/18 2018/19 2019/20 TBD TOTAL Capital Reserve(025) $8,160 $95,000 $0 $0 $0 $0 $103,160 Total Costs: $8,160 $95,000 $0 $0 $0 $0 $103,160 Impact on Operations: City Hall elevator will be out of commission while work is being performed. C 6 Project Number: 1L Key: Object: 5602 Civic Center- Council Chambers AV Replacement Phase III Project Location: Civic Center-Council Chambers w c FU011111 L BLVO V�_ d� N Est.Construction Start/End: < CIVIC CENTER 07/2016-06/2017 �J 111 = CIVIC.0 EN TE OR Project Status: Design/Construction PROJECT L I ATION a. Department: W Public Works Services ARROW R1E Project Manager: Ty Quaintance Description: Phase III of the Council Chamber AV Replacement. Justification: This phase will complete the AV replacement project and new HD cameras,additional hardware and software updates,various lighting improvements and facility enhancements. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $30,000 $50,000 $0 $0 $0 $0 $80,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $530,520 $100,000 $0 $0 $0 $0 $630,520 Inspection&Administration $o $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $o $0 $0 $0 Total Costs: $560,520 $150,000 $0 $0 $o $0 $710,520 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Capital Reserve(025) $300,000 $0 $0 $0 $0 $0 $300,000 PEG(882)*** $250,000 $150,000 $0 $0 $0 $o $400,000 Fire Fund(288) $10,520 $0 $0 $0 $o $0 $10,520 Total Costs: $560,520 $150,000 $0 $0 $0 $0 $710,520 ***Cost incurred in Capital Reserve funding for 2015/2016 and 2016/2017,will be reimbursed with PEG funding. Impact on Operations: None C7 Project Number: JL Key: Object: 5602 Civic Center- Human Resources Office Relocation Project Location: City Hall,Lower Level FO"OTHICL BCVD N w Z: w 7 � Z LU G ` Est.Construction Start/End: July 2016-December 2016 CIVIC-CENTER DR Project Status: \ PRf)JECT OCATION Preliminary space plan Department: w Human Resources and Finance 0 w s Project Manager: Robert Neiuber ARROW RTE Description: Current GIS space and part of adjacent IS space,would be reconfigured to become a new space for Human Resources. Space would include an Intern bullpen to be shared with all departments,a training and collaboration room,storage and offices.The old Human Resources offices would be repurposed and reconfigured for Finance staff to occupy. Justification: Current shared space with Finance is too small to accommodate both staffs,along with their storage and meeting space needs. The new space will better fit HR's organizational development role and allow us to continue to improve our onboarding process with new people coming into Team RC.It will also provide a more efficient work space for staff and a centralized location for interns to encourage collaboration among departements. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $6,000 $0 $0 $0 $0 $0 $6,000 Furnishings $0 $150,000 $0 $0 $0 $0 $150,000 Construction $0 $200,000 $0 $0 $0 $0 $200,000 Inspection&Administration $0 $0 $0 $o $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $6,000 $350,000 $0 $0 $0 $0 $356,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL General Fund(001) $6,000 $0 $0 $0 $0 $0 $6,000 Capital Reserve(025)* $0 $350,000 $0 $0 $0 $0 $350,000 Total Costs: $6,000 $350,000 $0 $0 $0 $0 $356,000 *Comprised of Capital Facilities Replacement Reserve($325,000)and Self-Insurance Reserve($25,000) Impact on Operations: No additional ongoing operating costs. C8 Project Number: 1L Key: Object: 5607 Civic Center- Landscape Renovation Phase I & If Project Location: _ v Civic Center FO�OTHICL BCVD w! z! w z a Est.Construction Start/End: O 07/2016—06/2017 CIV.LC-CENTER UR Project Status: Construction PROJ CST LOCATION r- Department: Y�-- a+ Public Works Services Project Manager: ROW RTE Dean Rodia I I r— Description: Continue the replacement of the high maintenance and water consuming turf and vegetation with low water use landscaping. This will provide landscaping alternatives to the surrounding community while conserving resources and reducing maintenance costs. Justification: The new landscaping will significantly reduce maintenance costs and comply with water use requirements along with establishing a landscape conservation show piece for the community and future development. Work will start at perimeter and turf areas. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2018 19 TBD TOTAL Environmental/NPDES $0 s0 $0 $0 So $0 SO Design/Plan Review $91,750 $0 $0 $0 $0 $0 $91,750 Right-of-Way $0 So $0 $0 $0 $0 $0 Construction $0 $475,000 $0 $0 $0 $0 $475,000 Inspection&Administration $0 $0 $0 $0 $0 $0 So Contingency $0 $25,000 $0 $0 $0 $0 $25,000 Total Costs: $91,750 $500,000 $0 $0 $0 $o 5591,750 Project Funding: Funding Source Prior Years 201617 201718 201819 2018 19 TBD TOTAL Capital Reserve(025) $91,750 $500,000 $0 $0 So $0 $591,750 Total Costs: $91,750 $500,000 $0 $0 So $0 $591,750 Impact on Operations: There will be disruptions when the existing landscaping is removed and new landscaping installed. However,once completed,maintenance and irrigation costs will be much lower. C9 Project Number: JL Key: Object: 5606 Fire District-Emergency Operations Center{EOC) Reconfiguration Project Location: � Imo,`` 10510 Civic Center Drive Police FOOTFi�LI B'LVD W Facility-Third Floor a z w a z n z w 3 y CIVIC CENTER Est.Construction Start/End: �cfvIc_cEn+TER nR June 2016-December 2016 P OJECT LOCATION Project Status: I In Design :J Department: ARROW RTE Fire Protection District Project Manager: Chief Cloughesy/B.Medina Description: Reconfiguration of the existing Emergency Operations Center workstations and completion of upgrades to the audiovisual equipment. Justification: This project will serve the entire community of Rancho Cucamonga and provide updated and adequate response capability to the existing outdated equipment for the management of natural disasters such as fire,flood,wind and earthquake.Based on real world incidents,exercises and trainings these upgrades have been identified through after action reporting and will provide enhanced collaboration with internal and external agencies and allow for increased incident management. Project Cost Estimate($): Expenditure/Catesory Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Audio/Visual Technology $20,000 $25,000 $0 $0 $0 $0 $45,000 Ergonomic Workstations $0 $197,280 $0 $0 $0 $0 $197,280 Chairs $0 $50,000 $0 $0 $0 $0 $50,000 Magnetic Whiteboard $0 $10,000 $0 $0 $0 $0 $10,000 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $20,000 $282,280 $0 $0 $0 $0 $302,280 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Fire Capital Projects(288) $20,000 $250,000 $0 $0 $0 $0 $270,000 FY2015 Homeland Security(380) $0 $32,280 $0 $0 $0 $0 $32,280 Total Costs: $20,000 $282,280 $0 $0 $0 $0 $302,280 Impact on Operations: This project will increase capacity of the Emergency Operations Center(EOC) potentially saving the City money through the procurement of disaster recovery funds based on proper incident management techniques. C10 Project Number: J L Key: 1735 Object: 5650 Fire District-Jersey Station (174) Training Facility Project location: Behind Jersey Fire Station (174) p �I and the Fire Maintenance Facility _ � on Jersey Boulevard. - N ARROW R_T.E i Est.Construction start/End: ROJECT OCATIO 92015/16-2016/17JLJ �jLE.l BL'VE) FIRE-STATIO ---r �r 174 Project Status: a Bid for construction '=W 117E=FR 0L+IN K-S TATI0N d Department: Z. Fire Protection District — JI Project M 5-T. E��`Manager: o J g Chief Clough esy/Pamela Pane Description: Architect approved by the Fire Board on July 2,2014,for Phase II of the Architectural Design Services. Justification: A training facility has been part of the Jersey Station Master Plan since its inception. Several multi-story hotels have been constructed and additional mid-rise professional offices are proposed in the future necessitating this training tower. It will include expanded classrooms,a live burn building,multi-story training building and other props that will simulate construction features in present and future developments.Will include a Data Center that will provide for redundancy of services to strengthen our City's IS infrastructure.Will also include the FIRE DOC and centralized storage for the District.Other driving forces for this All Risk Training Center are population growth,increased need to train with regional cooperating agencies and provison of a realistic facility our PD parners can utilize for local training and coordination. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $15,980 $0 $0 $0 $0 $0 $15,980 Design/Plan Review $1,704,086 $o $0 50 $0 $0 $1,704,086 Construction Management $1,875,680 $0 $0 $o $0 $0 $1,875,680 Construction $191,353 $19,182,350 $o 50 $0 $0 $19,373,703 Inspection&Administration $0 $50,000 $o $o $0 $0 $50,000 Contingency $o $950,000 $0 50 $0 $0 $950,000 Total Costs: $3,787,099 $20,182,350 $0 50 $0 $o $23,969,449 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Fire Capital Projects(288) $3,787,099 $20,182,350 $0 $o $0 $0 $23,969,449 Total Costs: $3,787,099 $20,182,350 $0 $0 $0 $0 $23,969,449 Impact on Operations: Fire District operations and maintenance cost will increase. The cost will be better determined after the design phase is complete. Opportunities may exist for regional partnerships that could help effect operational costs. C11 Project Number: 1L Key: 1733 Object: 5650 Fire District-San Bernardino Station 172 Relocation Project Location: At the northwest corner of San w z� N z Bernardino Road and Vineyard U(16UNNET DH Avenue rd' o Roa onstructionStart/End: Unknown PROJECT LOCATION Unknown C Project Status: .0 Property purchased for a � 3 proposed location Department: z z > a FOOTHILL BLVD Fire Protection District Project Manager: Chief Mike Costello/Pamela Pane Description: New Fire Station construction at a new location. Property has been purchased for a proposed new location.Alternate locations are also being evaluated. Justification: Rebuilding and possibly relocating a 50+year old fire station. This station serves the southwestern portion of the Rancho Cucamonga community. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $750,000 $0 $0 $0 $0 $750,000 Land Acquisition $881,334 $0 $0 $0 $0 $0 $881,334 Construction $101,460 $0 $6,000,000 $0 $0 $0 $6,101,460 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $982,794 $750,000 $6,000,000 $0 $0 $0 $7,732,794 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Fire Capital Projects(288) $982,794 $750,000 $6,000,000 $0 $0 $0 $7,732,794 Total Costs: $982,794 $750,000 $6,000,000 $0 $0 $0 $7,732,794 Impact on Operations: No additional personnel costs - current San Bernardino Station personnel will move to the new station when complete. Larger station design could create an increase in maintenance costs, but greater efficiency in station equipment could make it a wash. C12 Project Number: JL Key: Object: 5602 Fire District-Water Conservation Landscaping Project Location: 1= Banyan Fire Station (175), East IRE STATION 'YF1 76 ­3� Avenue Fire Station(176) and the Z_ tc FIRE S M M District Utica PropertyN L-T M Z-1110-Al I­V1 NIA 111A pj( Est.Construction Start/End: Mpg, 07/2016—06/2017 AAM: I 71 01T_ CIF111 CLEC7R f �q !i I TAIII 73 m Project Status: T c oose Working on design with Architect 3 1.3 -7 Vh\� JUM E 4"�Department: PROJECT LOCATION Fire Protection District V LV — T.- Project Manager: Chief Cloughesy/Pam Pane A 0__ Description: Removal of high water use turf and replace with drought tolerant landscape plant materials with drip system retrofit. The low impact design allows for utilizing certain stations with bio swales to allow for on-site nuisance water retention and percolation. Also includes hardscape improvements for vehicular circulation,perimeter gate/fencing modification and ADA improvements to both the front public parking and entrance. Justification: Executive order from the State of California to take measures to reduce water consumption. Project Cost Estimate Expenditure/Category Prior Years 2016/17 2017/18 2018/19 2019/20 TBD TOTAL Environmental/NPDES $0 $0 $0 $o $0 $0 $0 Design/Plan Review $166,350 $0 $0 $0 $0 $0 $166,350 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $600,000 $0 $0 $0 $0 $600,000 Inspection&Administration $0 $0 $0 $0 $0 $o $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $166,350 $600,000 $0 $0 $0 $0 $766,350 Project Funding: Funding Source Prior Years 2016/17 2017/18 2018/19 2019/20 TBQ TOTAL Fire Capital Fund(288) $166,350 $600,000 $0 $0 $0 $0 $766,350 Total Costs: $166,350 $600,000 $0 $0 $0 $0 $766,350 Impact on Operations: Decrease in maintenance and operations. Will not know the full impact until we have a design. C 13 Project Number: JL Key: Object: 5603 LoanMart Stadium -Sound System Project Location: LoanMart Stadium �� i O U sT YLRv411E5_3T���_i= viG T� ft�GN�I N = ;ram _PRO ECT LOCATION' FnOTMiLL 6LVC j �/ Est.Construction Start/End: & 07/2016-06/2017 Project Status: Design/Construction RANC110 CUC MONGA ADULT SPORTS COMPLEX ,yam/ Department: PWSD/Community Services / Project Manager: � / n:RRYlW ItT Ty Quaintance/Christen Mitchell Description: Fix, if possible, the sound system at LoanMart Stadium. If the sound system cannot be fixed, the entire sound system will be replaced(new speakers,mixer,amplifier,wiring,etc.). Justification: The existing sound system at LoanMart Stadium is the original sound system from when the stadium opened in 1993. The system needs to be upgraded or replaced. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $50,000 $0 $0 $0 $0 $50,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $0 $0 $0 $0 $0 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $0 $50,000 $0 $0 $0 $0 $50,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Capital Reserve(025) $0 $50,000 $0 $0 $0 $0 $50,000 Total Costs: $0 $50,000 $0 $0 $0 $0 $50,000 Impact on Operations: None C14 Project Number: JL Key: Object: 5602 LoanMart Stadium -Team Locker Rooms Carpet Replacement Project Location: — Epicenter Jr N PROJECT LOCATION o Est.Construction Start/End: / 07/2016-06/2017 RANCHO CUCATADN aA An,LT SPORES C6TTP1Ex i Project Status: Construction Department: ARROW ROUTE A'RW Public Works Services a' 4: W Project Manager: Ty Quaintance n Description: Replace carpeting in team locker rooms. Justification: Carpeting in home team locker room was last replaced in 2010. The carpeting must be replaced due to the wear and tear that the athletes inflict on the carpeting every baseball season. Base bid will be to replace carpeting in visitor locker room with additive bid to replace carpeting in home team's locker room. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $0 $0 $0 $0 $0 $0 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $25,000 $0 $0 $0 $0 $25,000 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $0 $25,000 $0 $0 $0 $0 $25,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Capital Reserve(025) $0 $25,000 $0 $0 $0 $0 $25,000 Total Costs: $0 $25,000 $0 $0 $0 $0 $25,000 Impact on Operations: None C15 Project Number: JL Key: Object: 5602 LoanMart Stadium -Team Locker Rooms Shower Fixtures Replacement Project Location: Epicenter ` i_ w N ROJECT LOCATION Est.Construction Start/End: / 07/2016-06/2017 RANCHO CUCAMONGA DADA VLTSPORTS COMPLEX Project Status: Construction Department: aRrt A-RRz Public Works Services a w W Project Manager: 0 Ty Quaintance n s Description: Replace original communal shower fixtures in both team locker rooms. Total of six communal shower fixtures (three in each locker room). Justification: The communal shower fixtures(with 3 sprayer heads and 3 hot/cold water controls per fixture)in team locker rooms are the original fixtures from when the stadium first opened back in 1993, Over the years,staff has repaired the fixtures multiple times. However,the fixtures are at the end of their useful life cycle. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $0 $0 $0 $0 $0 $0 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $30,000 $0 $0 $0 $0 $30,000 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $0 $30,000 $0 $0 $0 $0 $30,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Capital Reserve(025) $0 $30,000 $0 $0 $0 $0 $30,000 Total Costs: $0 $30,000 $0 $0 $0 $0 $30,000 Impact on Operations: None C16 Project Number: 1L Key: 1927 Object: 5650 Public Works Services Department-Warehouse Expansion Project Location: I l 1 U City Corporate Yard j (--- PROJECT OtL CATION 7. a r; z� Est.Construction Start/End: 07/2016-06/2017 IT CIIY� COR TEYARD L�^—� i Project Status: y Design/Construction Department: Public Works Services ........ >> Project Manager: '+� Ty Quaintance 'I--- F Description: Design and construction of an additional warehouse(approximately 13,500 square feet) Justification: To expand the ever growing demand for storage for all City departments.This will also allow for permanent placement of the Kitten Nursey in the existing warehouse. PWSD workshops,currently operating outside in storage containers,are exposed to the environment. Once relocated to the new warehouse,staff can use the workshops in all weather conditions. Project Cost Estimate($j: Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $170,000 $0 $0 $0 $0 $170,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $1,700,000 $0 $0 $0 $1,700,000 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $0 $170,000 $1,700,000 $0 $0 $0 $1,870,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Capital Reserve(025) $0 $170,000 $1,700,000 $0 $0 $0 $1,870,000 Total Costs: $0 $170,000 $1,700,000 $0 $0 $0 $1,870,000 Impact on Operations: None C17 Project Number: JL Key: 1896 Object: 5650 Rancho Cucamonga Family Sports Center- Relocation Project Location: Parking Lot G at the Epicenter FOO I IIILL 15LVD c'I c 8 A.WAY MILLCNNIUM_C.T Est.Construction Start/End: 01/2017-12/2017 =RANCNOCZUCAMONG A(+'..sT SPORTSCOrAPLEX Project Status: Construction PR ECT LOCATION RC ANIMAL ARE 6 ADOPTION C NTER / Department: L Community Services/Parks ARROW ROUTE a' N W S Project Manager: _ Nettie Nielsen ( / Description: This project will provide the design,construction and construction management for the relocation of the existing Rancho Cucamonga Family Sports Center. Justification: Need to relocate existing facility and programs due to loss of existing building use. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $1,350,000 $0 $0 $0 $0 $0 $1,350,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $11,425,000 $0 $0 $o $o $11,425,000 Inspection&Administration $0 $525,000 $0 $0 $0 $0 $525,000 Contingency $0 $1,250,000 $0 $0 $0 $0 $1,250,000 Total Costs: $1,350,000 $13,200,000 $0 $0 $0 $0 $14,550,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Capital Reserve(025) $0 $2,500,000 $0 $p $0 $0 $2,500,000 Park Development(120) $1,350,000 $2,700,000 $0 $0 $0 $0 $4,050,000 Citywide Infrastructure(198) $0 $7,000,000 $0 $0 $0 $0 $7,000,000 Recreation Fund Reserve(250) $0 $250,000 $0 $0 $0 $0 $250,000 Equip/Vehicle Replacement(712) $0 $750,000 $0 $0 $0 $0 $750,000 Total Costs: $1,350,000 $13,200,000 $0 $0 $0 $0 $14,550,000 Impact on Operations: This project will ultimately require maintenance of a new facility,as well as new landscape and irrigation. C18 Project Number: JL Key: 1894 Object: 5650 Victoria Gardens Cultural Center-Courtyard Redesign Project Location: �G,�� 12505 Cultural Center Drive sicv '" m '�� o U Q CIILTl7RAL..LNTFR D y ll VICTORIA( A CI T RAL CENTER w �y+ PAU I�NE LIBRA I I 'z'• W cnNni NQRTF.i_F.}AINS'.BEET � Est.Design Start/End: TBD W ? a G � W 2 Pro ect Status: z VERSAILLLS�".1=C Y �1I—� CMEfiYll'S Design ( I� _ VIC.(ORIA-R 'u N Department: � PROJECT LOCATIO Community Services/Parks m Y W W Project Manager: a � J Nettie Nielsen Description: This project will be done in conjunction with Victoria Gardens to develop a design for the Cultural Center Courtyard. Justification: Provide enhancements to the existing courtyard to make the space more inviting for the public and rental opportunities. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $o $0 Design/Plan Review $25,060 $120,000 $0 $0 $0 $0 $145,060 Right-of-Way $0 $0 $0 $0 $o $o $o Construction $0 $0 $0 $0 $0 $400,000 $400,000 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $o $o Total Costs: $25,060 $120,000 $o $0 $0 $400,000 $545,060 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Capital Reserve(025) $20,000 $120,000 $0 $0 $0 So $140,000 CFD 2003-01 Cultural Center(615) $5,060 $0 $0 $0 $0 $0 $5,060 Unknown $0 $0 $0 $0 $0 $400,000 $400,000 Total Costs: $25,060 $120,000 $o $0 $0 $400,000 $545,060 Impact on Operations: This project will ultimately require additional maintenance as well as new landscape and irrigation. C19 Project Number: JL Key: 1890 Object: 5650 Victoria Gardens Cultural Center- Exterior Joint Replacement, Roofing and Painting Project Location: u + I l___!1 , Cultural Arts Center � I ( u � 6 CHURCH ST u w --R c ❑ CULTU Est.Construction Start/End: "- El 07/2016-06/2017 F Project Status: RO T1 O W Design/Construction Department: VICT�a s� PWS/Eng/CSD o m� Project Manager: FOOTHILL BWO T.Quaintance/1 Dyer/C Mitchell I a F Description: Remove and replace exterior building joints and make repairs to the existing roofing system at the Victoria Gardens Cultural Center. Paint entire exterior of building. Justification: Need for repairs is based on the recommendations from 2015 roofing survey. Exterior of building has not been repainted since facility opened in 2006. Exterior paint is showing signs of deterioration. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $0 $0 $0 $0 $0 $0 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $500,000 $0 $0 $0 $0 $500,000 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $0 $500,000 $0 $0 $0 $0 $500,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Capital Reserve(025) $0 $500,000 $0 $0 $0 $0 $500,000 Total Costs: $0 $500,000 $0 $0 $0 $0 $500,000 Impact on Operations: None C 20 Miscellaneous f Miscellaneous projects are the capital undertakings that do not qualify for classification into the other project categories. These are often one-time projects that are prompted by factors such as: - State or Federal Mandates - Community Health and Safety Issues -Council Goals and Priorities -Regional Needs Assessments - Interagency Agreements - External Funding Arrangements These projects may or may not have maintenance obligations and they are typically funded from a variety of special funding sources;they are rarely funded via the General Fund. Proiect List& FY 2016-17 Expenditures Sources of Funding for FY 2016-17 $200,000 $16,000 1 ADA Ramps @ Various Locations $ 200,000 $46,600 2 Arrow Rte from Bear Gulch-w/o $ 724,360 Archibald- Utility Underground 3 Base Line Rd from Carnelian to $ 559,570 Vineyard- Utility Underground 4 Bus Stop Pads cb Various Locations $ 62,600 5 PE Trail above VPL Tunnel fencing $ 98,000 $1,283,930 $ 1,644,530 ■Underground Utilities ■Ped Grant Measure I ■AB2766 D Project Number: 800-2015-13 JI-Key: 1150 Object: 5650 ADA Ramps at Various Locations Project Location: J r-1 I PROJECT LOCATION Various locations City Wide HiL 511 E q ti BANYAN Oil 0 f Est.Construction Start/End: -T a 02/2017-04/2017 �c Et AIL MA5F,L-INF RM Project Status: N Design/Construction Department: R AR -117F Engineering I E SkY-BLVD IR tAFTROLI 4KS TATION I Project Manager: Curt Billings Description: Construct ADA compliant ramps at various locations citywide.Locations for ramp installations come from the ADA Transition Plan, which is updated annually. This capital project encompasses all ADA compliance issues that cannot be incorporated into other improvement projects,but which must still be addressed in a timely fashion. Justification: Meets the City's ongoing commitment to install ADA ramps where they are missing and required by law. Project Cost Estimate Expenditure/Category Prior Years 2016/17 2017/18 2018/19 2019/20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $0 $0 $0 $0 $o $0 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $287,790 $180,000 $0 $0 $0 $0 $467,790 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $20,000 $0 $0 $0 $0 $20,000 Total Costs: $287,790 $200,000 $0 $0 $0 $0 $487,790 Project Funding: Funding Source Prior Years 2016/17 2017/18 2018/19 2019 20 TBD TOTAL Measure I Fund(177) $287,790 $200,000 $0 $0 $0 $0 $487,790 Total Costs: $287,790 $200,000 $0 $0 $0 $0 $487,790 Impact on Operations: None D 1 Project Number: 800-2010-12 JL Key: 1777 Object: 5650 Arrow Route from Bear Gulch to West of Archibald Avenue- Utility Underground Project Location: (Z�� )YE Arrow Route from Bear Gulch to _ rrnLL BLvo west of Archibald Avenue TIMBERLINE LN PROJECT LOCATION A(;,�fr+iRE ST w CONIFER LN Q (yl � Z O IQ CH`ECSEA CT Cj n r d N n C Est.Construction Start/End: 4 9 / ;$ X o :n v 04/2017-09/2017 Z 'g Y g = r e pEV23N ST�c Project Status: BEAR GULCH PLACE RTa7� CP.LACER:S. W Design ELEMENTARY PaCERIST J F W I o Q• KONO:C CST. CK73N7SCTI S.T V j KrSN'oZI7=5 g Z w w w Y Department: J.l a Q Q I l_. J _R19N:f_ST= -�.JJJ hltiANI,vS7 Engineering BEAR GULCH PARK CR1LLER 0 may° C;l.1LLE VEJI.a(3� —X Q Project Manager: Jerry Dyer Description: This project will underground a stretch of existing overhead utilities along Arrow Route from Bear Gulch to west of Archibald Avenue. Justification: The removal of the overhead utilities,by placing them underground,improves the aesthetic appearance of the area. This project will be constructed by Edison with City oversight using Rule 20A funds and City Undergrounding funds Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $20,000 $0 $0 $0 $0 $20,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $626,690 $0 $0 $0 $0 $626,690 Inspection&Administration $0 $15,000 $0 $0 $0 $0 $15,000 Contingency $0 $62,670 $0 $0 $0 $0 $62,670 Total Costs: $0 $724,360 $0 $0 $0 $0 $724,360 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Underground Utilities(129) $0 $724,360 $0 $0 $0 $0 $724,360 Total Costs: $0 $724,360 $0 $0 $0 $0 $724,360 Impact on Operations: None D2 Project Number: 800-2010-13 JL Key: 1776 Object: 5650 Base Line Road from Carnelian Street to Archibald Avenue- Utility Underground Project Location: o.`•y0 ZI_—I( Base Line Road from Carnelian n LA VINEs_r 'S a�— rL.I1 VINE ST! w Street to Vineyard Avenue •L W 1 �PA,x_ CARNELIAN PROJECT I.00ATI ELEMENTARY LA GWANOE,r FW -- � ' I � N �_ cLtiaefr DR FW 1 Fa-. w > > ALTA LOMA Q �, n 5 ? HIGH a ;n LS3P.t17 IOPAITA,p,� Est.Construction Start/End: S_ 2 a = �_J I ? 04/2017-09/2017 f" ! �l y _ 4 iNYU Project Status: z Design ^J Fuc IA,L7CDERA i H y __ a Z,yJA.pJ.R9_S Department: ! � Sa 'a a w >, Engineering i a v. lA a CAL'ur.W-CTj Z P >, n 'DEL--P.R '_,d `9{f• y CALLE.DEL.P AD a Project Manager: S �2 ANADi CTI ( r Jerry Dyer Description: This project will underground a stretch of existing overhead utilities along Base Line Road from Carnelian Street to Vineyard Avenue. Justification: The removal of the overhead utilities,by placing them underground,improves the aesthetic appearance of the area. This project will be constructed by Edison with City oversight using Rule 20A funds and City Undergrounding funds. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $o $o $o $o $o $o Design/Plan Review $0 $5,000 $0 $0 $0 $0 $5,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $491,420 $0 $0 $o $o $491,420 Inspection&Administration $0 $15,000 $0 $0 $0 $0 $15,000 Contingency $0 $48,150 $0 $0 $0 $0 $48,150 Total Costs: $0 $559,570 $0 $0 $0 $0 $559,570 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Underground Utilities(129) $0 $559,570 $0 $0 $0 $0 $559,570 Total Costs: $0 $559,570 $0 $0 $0 $0 $559,570 Impact on Operations: None D3 Project Number: 800-2014-07 J L Key: 1823 Object: 5650 Bus Stop Pads at Various Locations Project Location: Various locations throughout the ✓[dp i Ciro I�� City including stops on Arrow �# #� -+ "M� � `tJ �• w" Route, Hellman Avenue, 9th Street, Haven Avenue, Foothill Boulevard, and Day Creek VOINRim ' r � .0 me«{�T° W er�»'M i wry Boulevard }�cscm F�Rt�3E U 1.0,NSA d Est.Construction Start/End: 1 �pp "i ( I�:if n'rc -' Irl t— �( tA 09/2016-11/2016 a Project Status: - Design/Construction Department: Engineering � "•^°' -_�•- � _ Project Manager: a, Curt Billings Description: Constructs 9 bus pads at various locations throughout the City. Justification: Provides ADA improvements to existing public transportation stops that are currently used by over 300 riders each day. The improvements may increase ADA ridership,resulting in less vehicle trips and reduced CO2 emissions. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $o $0 $0 $o Design/Plan Review $0 So So $o $o $0 $0 Right-of-way $0 $0 So $o $0 $0 $o Construction $93,240 $52,400 $0 $0 $0 $0 $145,640 Inspection&Administration $0 $5,000 $0 $0 $0 $0 $5,000 Contingency $0 $5,200 $0 $0 $0 $0 $5,200 Total Costs: $93,240 $62,600 $0 $0 $0 $o $155,840 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Gas Tax R&T 7360 Fund(174) $18,640 $0 $0 $0 $0 $0 $18,640 AB 2766 Air Quai impry Fund(105) $0 $16,000 $0 $0 $0 $0 $16,000 Ped Grant/Art3 Fund(214) $74,600 $46,600 $0 $0 $0 $0 $121,200 Total Costs: 593,240 $62,600 $0 $0 $0 $0 $155,840 Impact on Operations: None D4 Project Number: JL Key: Object: 5607 Pacific Electric Trail above Victoria Park Lane Tunnel - Fencing Project Location: YINDROWS PART Pacific Electric Trail at Victoria �_V Park lane ¢ryr RIA PARjC IN _^� Nm z Y } W W W�K Est.Construction Start/End: FD 07/2016-06/2017 PACIFIC ELLC TRIC'TRAfI FIRE STATION Project Status: »> Design/Construction P R 6JE�T L C Department: BASE LINE RD Public Works Services Project Manager: Dean Rodia �"'-- Description: Replace the dilapidated chain link fence that runs along the north side and south side of the PE Trail above the Victoria Park Lane Tunnel. Justification: This fence is needed to keep the public from accessing or falling onto the road surface below. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $0 $0 $0 $0 $0 $0 Right-of-way $0 $o $0 $0 $0 $0 $0 Construction $o $98,000 $0 $0 $0 $0 $98,000 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $o $0 $o $o Total Costs: $0 $98,000 $0 $0 $0 $0 $98,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL LIVID 2(131) $0 $98,000 $0 $0 $0 $0 $98,000 Total Costs: $0 $98,000 $0 $0 $0 $0 $98,000 Impact on Operations: None D5 Municipal Utility W 9 A-L1 _i ob�-_ .—L=11 Zio +'-`. Ir - The Rancho Cucamonga Municipal Utility(RC1v1U)was formed by the City Council in 2001. RCIviU served its first customers in 2003 and finished construction of the Victoria Arbors substation in 2004. Currently,RCMU services over 900 customers in its service area. Annually,more than 78,000 megawatt-hours of electricity are distributed to our customers via 20 circuit miles of wire spread across the roughly 4-square miles of service territory. RCMU's historical peak demand is 17.5 megawatts,set in August 2011. RCMU capital projects are related to the maintenance,expansion and improvement of the RCMU distribution system. RCMU's distribution system was designed to minimize maintenance and operating costs and ensure maximum reliability of service. Project List & FY 2016-17 Expenditures Sources of Funding for FY 2016-17 1 Arrow Rte: Bear Gulch to Arrow- $ 88,500 Fiber Conduit 2 City Fiber Optics Improvements $ 100,000 3 Commercial Smart Meter $ 375,000 Replacement 4 Day Creek Blvd and Base Line Rd- $ 200,000 Line Extension 5 Foothill Blvd at Spruce Ave-Line $ 153,000 Extension $941,500 6 Haven Ave at 6th St- St light $ 25,000 installation $ 941,500 A Municipal Utility E Project Number: 1L Key: 1947 Object: 5650 Arrow Route from Bear Gulch to West of Archibald Avenue- Fiber Optic Conduit Project Location: %// J� II !1 II �J�z L �L�uU t f �� Arrow Route from Bear Gulch j JULJ U Place to West of Archibald Avenue AL B vc o 7F n nn I U T .n u� I CI�i�O07j AT10 a �st_J i �— Est.Construction Start/End: z _ 07/2017-01/2018 > ��—� W.R7Et Q Z r F Project Status: w Design 9Tti:5.T = ; L C a Department: CO z� Engineering ••s`: �LJLJ a Project Manager: � � t Fred Lyn ,TW S Description: In conjunction with Engineering's undergrounding of existing overhead utilitites along Arrow Route from Bear Gulch Place to west of Archibald Avenue, RCMU will place fiber conduit to tie into the existing fiber interconnection on Archibald Avenue and Arrow Route. Justification: The removal of the overhead utilities by placing them underground through Edison Rule 20A program and City undergrounding funds will allow for RCMU to place new fiber conduit when the trench is open so that the City does not have to spend money on the excavation and trench cost. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 2020 21 TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $2,500 $0 $0 $0 $0 $2,500 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $86,000 $0 $0 $0 $0 $86,000 Inspection&Administration $0 $o $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $0 $88,500 $0 $0 $0 $0 $88,500 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 2020 21 TOTAL Municipal Utility(Fund 705) $0 $88,500 $0 $0 $0 $0 $88,500 Total Costs: $0 $88,500 $0 $0 $0 $0 $88,500 Impact on Operations: The potential to bring high speed broadband as a commodity will provide additional revenue opportunity to RCMU. Having an existing underground utility project to piggyback on would save the City a lot of money.... E1 Project Number: JL Key: 1910 Object: 5650 City Fiber Optic Improvements Project Location: -- � Various locations throughout the City where existing fiber optics a FA.EJfiIGELE:CA- 7.FtAIL. geJF116:ELE.C•TRtC TRAIL conduits are located p`v w 'I E SST`ZI N M" It L•'E.- Est.Construction Start/End: J TBDLu � a P E 0� Project Status: Design m 9d•I Department: t Engineering * v r z N Q 1 q Project Manager: gTNtgT z Fred Lyn N Description: Completion of the Fiber Optic master plan by Magellan Advisors by July 2016 will evaluate and recommend the City's next steps in utilizing the existing fiber optics system towards providing municipal broadband to commercial and industrial areas. Justification: Now is the time to consider laying the groundwork regarding Broadband opportunities and RCMU. Providing fiber optics broadband to commercial customers is a business opportunity that we are missing because we have not been systemic enough in our approach over the past few years. Completing a report on all our dark fiber so we can start looking at how we could monetize that asset and selling broadband as a commodity would fit well with the Smart City initiative,as well as promote a high tech economy and economic development within the City. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $o $0 $0 $0 $0 $0 Design/Plan Review $85,000 $0 $0 $0 $0 $0 $85,000 Right-of-Way $0 $0 $0 $0 $0 So $0 Construction $0 $50,000 $0 $0 $0 $0 $50,000 Inspection&Administration $0 $50,000 $0 $0 $0 $0 $50,000 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $85,000 $100,000 $0 $0 $0 $0 $185,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Municipal Utility(Fund 705) $85,000 $100,000 $o $0 $0 $0 $185,000 Total Costs: $85,000 $100,000 $0 $0 $0 $0 $185,000 Impact on Operations: The potential to bring in high speed broadband as a commodity will provide additional revenue to RCMU. E2 Project Number: JL Key: 1938 Object: 5650 Commercial Smart Meter Replacement Project Location: }oeta I%W-- PRE Various locations throughout the a�,F, ss a q FlREaS A� RCMU Service Area where electric meters are located Est.Construction Start/End: 7/1/16-6/30/16 � P[IY�C 0 TT Project Status: F,RE 9TA Design IA ul(-K T i i EMPEt r1KE5�iM !QE „ Department: i s Engineering y ---- — EPIRE KES 40 -C V RS Project Manager: tk Fred Lyn Description: Approximately 600 old commercial electric meters will be replaced with new 2 way ERT"smart"meters in which RCMU has the ability to pick up reads via a handheld mobile collector radio pack. Justification: The meter technology that is being currently used is over 10 years old.Though there is nothing wrong with the existing meters,it still requires a that a meter technician go out and probe the meter to download the data.A significant amount of time and labor is involved in this effort.A lot of utilities are switching over to this new AM[(2 way meter)for the ease of meter reading.Utilizing this new method could potentially save RCMU money in metering reading expenditures. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $0 $0 $0 $0 $0 $0 Right-of-Way $0 $0 $o $0 $0 $0 $0 Construction $0 $375,000 $0 $0 $0 $0 $375,000 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $0 $375,000 $0 $0 $0 $0 $375,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Municipal Utility(Fund 705) $0 $375,000 $0 $0 $0 $0 $375,000 Total Costs: $0 $375,000 $0 $0 $0 $0 $375,000 Impact on Operations: The potential to bring meter reading in house will reduce expenditures on existing contract meter reading services. E3 Project Number: A Key: 1917 Object: 5650 Day Creek Boulevard and Base Line Road -Line Extension Project Location: j u -- (� RCMU Electric Line Extension-Day Creek Boulevard and Base Line r Road N w LU PACIFIC ELECTRIC TRAIL J r Q Est.Construction Start/End: PROJECT LOCATION 01/2016-03/2016 ) Project Status: y Construction U BASE LINE RD Department: Engineering FProject Manager: Y red Lyn �f Description: Distribution Line Extension to service a new planned commercial development on the NWC of Day Creek Boulevard and Baseline Road with RCMU electricity. Justification: Line extension is needed to extend power service to a new commercial development shopping center.The City paid SCE exit fees for the right to service any load associated with a newly constructed facility that has never been interconnected with Edison;this falls under that category. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017118 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $10,000 $0 $0 $0 $0 $0 $10,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $200,000 $0 $0 $0 $0 $200,000 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $10,000 $200,000 $0 $0 $0 $0 $210,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Municipal Utility(Fund 705) $10,000 $200,000 $0 $0 $0 $0 $210,000 Total Costs: $10,000 $200,000 $0 $0 $0 $0 $210,000 Impact on Operations: The increased electricity load will provide additional revenue to RCMU. E4 Project Number: JL Key: 1946 Object: 5650 Foothill Blvd at Spruce Avenue-Line Extension Project Location: Foothill Boulevard and Spruce N � Avenue tco[v Est.Construction Start/End: 07/2016-08/2016 Project Status: A� Design/Construction JTFR OR Department: Engineering ROJECT LOCATION w Project Manager: Fred Ly n n Description: Distribution Line Extension to service two new commercial developments on Foothill Boulevard just southwest of Spruce Avenue. Justification: Line extension is needed to extend power service to this new commercial development.The City paid SCE exit fees for the right to service any load associated with a newly constructed facility that has never been interconnected with Edison;this falls under that category. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $o $0 $o $0 $0 $0 $0 Design/Plan Review $0 $3,000 $0 $0 $0 $0 $3,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $150,000 $0 $0 $0 $0 $150,000 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $0 $153,000 $o $0 $0 $0 $153,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Municipal Utility(Fund 705) $0 $153,000 $0 $0 $0 $0 $153,000 Total Costs: $0 $153,000 $0 $0 $0 $0 $153,000 Impact on Operations: The increased electricity load will provide additional revenue to RCMU. E5 Project Number: 1L Key: 1948 Object: 5650 Haven Avenue at Sixth Street-Street Light Installation Project Location: Haven Avenue at Sixth Street �77h:s1� � eraPiv I N a Est.Construction Start/End: 07/2016-08/2016 Project Status: Design/Construction EMPIRE c PKUJ CT LOCAT N Department: 1 J Engineering Project Manager: F� Fred Lyn LZ Description: Installation of 3 new streetlights as part of the new planned Residence Inn's street improvements. Justification: 3 new streetlights will need to be installed as part of the Street Improvements required for the planned Residence Inn on the corner of Haven Ave and Sixth Street.RCMU is the electricity provider to this site. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $0 $0 $o $0 $0 $0 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $25,000 $0 $0 $0 $0 $25,000 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $0 $25,000 $0 $o $0 $0 $25,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Municipal Utility(Fund 705) $0 $25,000 $0 $0 $0 $0 $25,000 Total Costs: $0 $25,000 $0 $0 $0 $0 $25,000 Impact on Operations: The increased electricity load will provide additional revenue to RCMU. E6 Pa rks WL p: Any capital project that is located in,on,or adjacent to a park or community center facility is classified as a Park Project.These include the construction of new park facilities,as well as the expansion or rehabilitation of existing park facilities. Improvements include playing fields,play ground equipment,park landscaping,other miscellaneous recreational amenities,restroom facilities and parking lot improvements. Many of these projects require ongoing maintenance,and all field rehabilitation projects and renovations are performed on an annual or bi-annual basis due to extensive wear from local league play. The majority of Park Projects are funded via the Park Development Fund(120),which is collected via residential development fees (i.e.new single family,town home,condo and senior housing). Some projects qualify for grants and Special District funds. Project List& FY 2016-17 Expenditures Sources of Funding for FY 2016-17 1 Central Park- Phase II Design Study $ 250,000 $135,000 2 Central Park- Replace Rubberized $ 80,000 $140,000 Surface 3 Central Park-Trail Head Improv. $ 25,000 4 Etiwanda Creek Park-Ph II $ 300,000 5 LMD 4R Parks-Lighting Retrofits $ 135,000 6 Victoria Arbors Park-Replace $ 140,000 $655,000 Rubberized Playground Surface $ 930,000 Park Development ■LMD 2 LMD 4R F Project Number: JL Key: 1660 Object: 5650 Central Park Phase II Design Study Project Location: 11200 Base Line Road - �� _ �LPROJECIT LOCATIIOO�N� I>A F.IFIC EL EC INIC lNA1L Est.Design Start/End: ��" / — 07/2016-02/2017 �V Project Status: Design RMTF 'NE RD l a LJ S Department: a Community Services CzCD�L�— gc;=� �JA.k µKW AYProject Manager: ( `c / J i^ /� ^ Nettie Nielsen Description: This project will include the design of phase II of Central Park. Justification: There is approximately 70 acres of undeveloped parkland at Central Park. The prior Master Plan needs to be updated taking into consideration the loss of the Redevelopment Agency,construction costs and ongoing maintenance and programming costs of any future improvements. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $o Design/Plan Review $0 $250,000 $0 $0 $0 $0 $250,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 So $0 $0 $0 $0 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total costs: $0 $250,000 $0 $0 $0 $o $250,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Park Development(120) $0 $250,000 $0 $0 $0 $0 $250,000 Total Costs: $0 $250,000 $0 $0 $0 $0 $250,000 Impact on Operations: Completion of this project could possibly add new amenities to the City's inventory which will require operational expenditures for maintenance,staffing,overhead and utilities. F1 Project Number: 1L Key: Object: 5607 Central Park- Replace Rubberized Playground Surface Project Location: �/ ����I i_J�--� `i NWC Base Line Road and Milliken / �J� �' Avenue / �� JUIZ Laow PACIFIC ELLCIRIC TRAIL i� Est.Construction Start/End: ENTRAL PARK 07/2016-06/2017 Protect Status: BASE LINO RD Design/Construction R ROJEC LOCATION Fro, N Department. � � �--�f C Public Works Services ��aKWAY Wyss Project Manager: Dean Rodia Description: Replace the entire rubberized playground surface. Justification: Due to constant use, the existing playground surface needs to be replaced. Also the existing playground surface is not in compliance with NPRA and State requirements. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $0 $0 $0 $0 $0 $0 Right-of-way $0 $0 $0 $0 $0 $0 $0 Construction $0 $80,000 $0 $0 $0 $0 $80,000 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $0 $80,000 $0 $0 $0 $0 $80,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Park Development(120) $0 $80,000 $0 $0 $0 $0 $80,000 Total Costs: $0 $80,000 $0 $0 $0 $0 $80,000 Impact on Operations: New rubberized surface will require less maintenance. F2 Project Number: JL Key: 1871 Object: S650 Central Park-Trail Head Improvements Project Location: U Z- 11200 ivirl,_11 Base Line Road < r PED A n `�+ ��� Pµw�u1�� s�ENisva`ISU 2 GARLf 1 z� JIs ,JNE3.T_L� 'r ' Y .PRTRKrA¢T f � � UARI:DIt: PROJECT-LOCATION — PACIFIC ELECTRIC TRAIL l N,ORTHVIEW:DR1 j (" Est.Construction Start/End: 08/2016-01/2017 RANCHO CUCAMONGA CENT � RAL PARK a z � Project Status: a \- �1\ M(uA�R—�< is Construction g!Cn'LMT(J�S KDS�V MNUKBLI F_IE IR"D OR�hVG CzFI C golIm+iC STO NLa Department: Community Services � icl /l Z- ��aytilK.fySNPro ect Manager: Nettie Nielsen JE _ �`R9—.X Description: This project will provide the next phase of development for Central Park,which will include the design for a less than five acre area north of the interior road,between the PE Trail and the Community Center. Included will be an area for outdoor fitness equipment for trail and resident's use at the park site,as well as potential parking and restroom facilities for both park and trail users. Justification: Responds to requests from residents for further improvements to Central Park and provides ADA accessibility between the Community Center and the PE Trail. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $35,000 $25,000 $0 $0 $0 $0 $60,000 Right-of-Way $0 $0 $0 $o $0 $0 $0 Construction $0 $0 $2,200,500 $0 $0 $0 $2,200,500 Inspection&Administration $0 $0 $37,500 $0 $0 $0 $37,500 Contingency $o $0 $250,000 $0 $0 $0 $250,000 Total Costs: $35,000 $25,000 $2,488,000 $0 $0 $0 $2,548,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Park Development(120) $35,000 $25,000 $2,488,000 $0 $0 $0 $2,548,000 Total Costs: $35,000 $25,000 $2,488,000 $0 $0 $0 $2,548,000 Impact on Operations: This project, will require maintenance such as cleaning and replacing any damaged portions of the equipment,as well as landscape irrigation and maintenance as needed. F3 Project Number: J L Key: 1664 Object: 5650 Etiwanda Creek Park-Phase II Project Location: _ (U I�-�. 5939 East Avenue _ ETIWANDA COLONY ELEMENTARY CA EARLY n SUMMIT M7ERM_DIATE JVNIOR H'.311 Z Est.Design Start/End: a eaNYaN 10/2016-01/2016 [ sa�n� (n z� wwlu<mlHTcr sl+asTA. 1 A Project Status: g/ O �J 'tea WILU MAGI f C,T Design /IA—IA.T PROJECT LOCATION YGSUM OR Department: K '�—ZZ:Z Community Services/Parks =AHAI!a Hn.yU ''HICKASAW It -F1L:KA,�CAW_ISU Project Manager: — Nettie Nielsen Description: This project involves the initial design of park expansion,which may include additional athletic/recreation multi-use fields,tennis courts,a 10,000-15,000 square foot community building,storage/maintenance facility and additional parking. Justification: The City Council identified this project as a goal for FY2007-08. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $50,000 $0 $0 $0 $0 $50,000 Design/Plan Review $159,230 $250,000 $0 $0 $0 $0 $409,230 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $0 $0 $0 $5,380,000 $5,380,000 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $159,230 $300,000 $0 $0 $0 $5,380,000 $5,839,230 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Park Development(120) $159,230 $300,000 $0 $0 $0 $5,380,000 $5,839,230 Total Costs: $159,230 $300,000 $0 $0 $0 $5,380,000 $5,839,230 Impact on Operations: Completion of this project will possibly add a new facility to the City's inventory which will require operational extenditures for maintenance,staffing, overhead and utilities. Initial estimates place the cost of maintaining two addional fields at$300,000-$450,000 per year. F4 Project Number: JL Key: 1858 Object: 5650 LMD 4R Parks- Lighting Retrofits Phase III Project Location: LMD 4R J� c FIRA27N i�`�} PAGIFI +FIEG'�:ZL:TRAIL �17 ll �`—BFiS E=L-IN E=RD— Est.Construction Start/End: 07/2016-06/2017 �-UR.CM ST � ' .CATLO Project Status: \ N-4 4,UJ Design/Construction -etyo z . h Department: Public Works Services Um y F ` EN1oR� ARROW=R-I Project Manager: y pp gg pp (� FIRE STATION Dean Rodia �l �`� i� JEALr=BLYU lr. I l —7 Description: Retrofitting the current Vandalia Pumpkin style walkway lights with an induction kit. Phase I replaced the lighting in Spruce Park, Coyote Park and part of Milliken Park plus replaced the lighting in most of the paseos. Phase 11 replaced the lighting in paseeo TV14 and part of Milliken Park. Justification: This is phase 3 of the 3 phase Induction Lighting Replacement Project in LMD#4. This will complete the project with about a 30%- 40% reduction in electricity use and reduced maintenance costs. Phase III will replace the lighting at Mountain View Park and Ralph Lewis Park along with finishing the replacement of lighting at Milliken Park. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TED TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $0 $0 $0 $0 $0 $0 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $300,000 $135,000 $0 $0 $0 $0 $435,000 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $o Total Costs: $300,000 $135,000 $0 $0 $0 $0 $435,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL LMD#4(134) $300,000 $135,000 $0 $0 $0 $0 $435,000 Total Costs: $300,000 $135,000 $0 $0 $0 $0 $435,000 Impact on Operations: 30%to 40%reduction in electricity usage and reduced maintenance costs. F5 Project Number: JL Key: Object: 5607 Victoria Arbors Park- Replace Rubberized Playground Surface Project Location: A&-Z f U — U 1 f Victoria Arbors Park(LIVID 2) U Ic Y 5 _ Est.Construction Start/End: U 07/2016-06/2017 0 (� Project Status: Design/Construction VI CT RIAARBORS PARK Department: Ec— Public Works Services a 4 CHURCH ST O Project Manager: Dean Rodia } Description: Replace the entire rubberized playground surface. Justification: Due to constant use, the existing playground surface needs to be replaced. Also, the existing playground surface is not in compliance with NPRA and State requirements. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $0 $0 $0 $0 $0 $0 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $140,000 $0 $0 $0 $0 $140,000 Inspection&Administration $0 $0 $0 $0 $0 $0 $0 Contingency $0 $0 $0 $0 $0 $0 $0 Total Costs: $0 $140,000 $0 $0 $0 $0 $140,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL LIVID#2(131) $0 $140,000 $0 $0 $0 $0 $140,000 Total Costs: $0 $140,000 $0 $0 $0 $0 $140,000 Impact on Operations: New rubberized surface will require less maintenance. F6 Railroad Crossing Railroad Crossings are extremely expensive and infrequent projects,requiring large funding commitments, lengthy construction schedules and inevitably causing some inconvenience to the local community during the construction period.They are,however, also one of the best ways to ensure the safety of drivers,pedestrians and rail users by providing two separate crossings,thereby minimizing the possibility of train versus automobile,or train versus pedestrian accidents. Railroad Crossings are identified in the City's General Plan document,and they are also frequently illustrated in regional planning documents held by the County of San Bernardino, SANBAG and Caltrans. Project List& FY 2016-17 Expenditures Sources of Funding for FY 2016-17 $75,000 1 Arrow Rte @ Railroad Spur-New $ 75,000 Concrete Panels 2 Hellman Ave @ Metrolink Tracks- $ 1,050,000 Widen Crossing $ 1,125,000 $1,050,000 ■Transportation ■Gas Tax R&T 7360 G Project Number: 800-2016-11 JL Key: 1819 Object: 5650 Arrow Route at Railroad Spur-New Concrete Panels Project Location: Arrow Route at Railroad Spur west 4 a of Milliken Avenue � 1 rI Q D IJ �Z F_0LT,NCL) BLyD- N w a a y_��t�nL- y/ 4 t t tPuCt ENN1UM-C.T ENT E :DR PRO ECT LOCAT106N Est.Construction Start End: v 01/2017-02/2017 a �`— K' T Project Status: >I a PUtI.II"MAN Design/Construction Il Y ;,z-----Tac0MA7,DR w Q Department: Diu J R5E11'f3CV.D FIRE-STATIO -----�" n Engineering s > 174 a Project Manager: d = $ s_T� Romeo David f/� �l Description: Replace existing uneven rubber panels to concrete panels. Justification: The existing rubber panels are uneven and damaged due to heavy traffic used. Replacing with concrete panels will give a smoother and safer for vehicles. Project Cost Estimate($): Expend iture/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $o $0 $0 $0 Design/Plan Review $0 $0 So $o $o $o $o Right-of-Way $0 $o $0 $o $0 $0 $0 Construction $0 $60,000 $o $0 $0 $0 $60,000 Inspection&Administration $0 $9,000 $0 $0 $0 $0 $9,000 Contingency $0 $6,000 $0 $0 $0 $0 $6,000 Total Costs: So $75,000 $0 So $0 $o $75,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Gas Tax RT7360 Fund(174) $0 $75,000 $0 $0 $0 $o $75,000 Total Costs: $0 $75,000 $o $0 $o $o $75,000 Impact on Operations: Uneven rubber creates damage along the edges of the existing asphalt pavement. This project will reduce maintenance for asphalt replacement. G1 Project Number: 800-2016-06 X Key: 1847 Object: 5650 Heilman Avenue at Metrolink Tracks-Widen Crossing Project Location: Hellman Avenue at Metrolink a f wL_JL z 2 Tracks(8th Street) 2 U L;L,-Li—�'J w7w I�. 17AI'ER:ST 0=�=> RRRN �4_C ? < -AUE (ON _71 T LAIILR�S-AI PC u Cif > —FRIA T--S.T.— 3=3 <- (,AL:L:E- EZIAR --,-RC-FAMILY RESOURCE-CENTER 1111TJ Est.Construction Start/End: 'z L 1 7L > 09/2016-05/2017 ILI < X I � 9M —9 -H:S 3-<-2 Project Status: z JERSEYzBI2VD Design/Construction _VFFR0N.BLVD coz Department: Engineering T Project Manager: i PROJE( Romeo David 7TH-ST] ;T LOCA ION r-7-Tti:s.ir' 0 EDELWLISIl I k >!:.-> II �,T Description: Construction of traffic signal and widen the road at the Metrolink tracks. Justification: This project will improve the traffic flows,circulation and pedestrian safety due to a new traffic signal,wider road and sidewalks. In addition to the below costs for the street right-of-way improvements the Railroad and SANBAG are contributing an estimated$2.5 million towards the necessary railroad improvements required with the widening at the tracks. Project Cost Estimate($): Expenditure/Category Prior Years 2016/17 2017/18 2018/19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $o $0 $0 $0 $0 Design/Plan Review $0 $50,000 $o $0 $0 $o $50,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $800,000 $0 $0 $0 $0 $800,000 Inspection&Administration $0 $120,000 $0 $0 $o $0 $120,000 Contingency $0 $80,000 $0 $0 $0 $0 $80,000 Total Costs: $0 $1,050,000 $0 $0 $o $o $1,050,000 Project Funding: Funding Source Prior Years 2016/17 2017/18 2018/19 2019/20 TBD TOTAL Transportation Fund(124) $0 $1,050,000 $0 $0 $0 $0 $1,050,000 Total Costs: $o $1,050,000 $0 $0 $0 $o $1,050,000 Impact on Operations: The City will be responsible to pay for the cost of electricity and maintenance. The estimated cost of electricity and maintenance for a traffic signal is$2,500 per year. In addition,the street widening,sidewalks and new pavement will mean less routine maintenance like pothole repairs, weed abatement and crack seal, thus freeing up maintenance crews to attend to other needed areas. G 2 Streets am Streets projects are the most common type of project undertaken by the City. The City receives annual funding from gasoline sales taxes for use on resurfacing projects for local arterial and residential streets in order to extend pavement life and improve driving conditions.Besides street rehabilitation projects,the City also undertakes many widening and extension projects as need dictates via new development,community needs and the City's General Plan. Project List& FY 2016-17 Expenditures Project List& FY 2016-17 Expenditures 1 6th St:Milliken to Charles Smith- $ 35,000 16 Jersey Blvd:Haven to Rochester-Pavement $ 50,000 Pavement Rehab Rehab 2 9th St:Grove to Hellman-Pavement Rehab $ 300,000 17 Local Street Pavement Rehabilitation @ $ 900,000 Various Locations 3 Arrow Rte along the s/s 500'to 1,300'e/o I- $ 5,000 18 Rochester Ave:Base Line to Banyan- $ 50,000 15 freeway-Widening Pavement Rehab 4 Base Line Rd @ 1-15 Interchange $ 5,210,920 19 Rochester Ave:Foothill Blvd-Base Line Rd- $ 610,000 Pavement Rehabilitation 5 Base Line Rd:Milliken to w/o Day Creek $ 900,000 20 San Bernardino Rd:Carnelian to Archibald- $ 400,000 Blvd-Pavement Rehab Pavement Rehab 6 Carnelian St:Lemon Ave to Wilson Ave- $ 468,000 21 San Bernardino Rd:Grove to Foothill- $ 104,000 Pavement Rehabilitation Pavement Rehab 7 Church St from Pepper to Hellman- $ 200,000 22 Youngs Canyon Rd:Koch Place to Cherry $ 50,000 Pavement Rehab Ave-Street Extension 8 East Ave:Chickasaw,west side,north 370'- $ 110,000 Widen and Sidewalk $ 11,329,920 9 Etiwanda Ave:6th St to Arrow Rte-Street $ 450,000 Widening Improvement Sources of Funding for FY 2016-17 10 Foothill Blvd across SCE Corridor West of $ 145,000 Day Crk Channel-Sidewalk Improvements $5,091,000 $sso,000 $1,299,000 11 Foothill Blvd:Haven to Milliken-Pavement $ 50,000 Rehab 12 Haven Ave:Foothill to Base Line- $ 50,000 Pavement Rehab0 13 Hellman Ave:San Bernardino Rd to Base $ 357,000 $19,920 $3,870,000 Line Rd-Pavement Rehab imoo 14 Hermosa Ave:Arrow to Foothill-Pavement $ 35,000 $50,000 $200,000 $250,000 Rehab 15 Hillside Rd:Archibald to Haven-Pavement $ 850,000 ■Transportation ■Gas Tax R&T 7360 Rehab Measure 1 ■Citywide Infrastructure ■Fire Protection Capital ■AD 88-2 ■SAFETEA(Federal) ■Prop 1B-SLPP(state) H Project Number: 800-2016-15 JL Key: 1930 Object: 5650 6th St from Milliken Ave to Charles Smith Ave- Pavement Rehabilitation Project Location: s 6th Steet from Milliken Avenue to Charles Smith Avenue NtSY.f'_Sji3Y_T(R d' �C)AYTC)N,Uf< ti K - n _ r-iTH dT Est.Construction Start/End: PROJECT LOCATION r 08/2017-10/2017 J � s Project Status: o a Design Department: Engineering ti'' �<i W Y �i Project Manager: Curt Billings Description: This project involves localized asphalt removal and replacement, crack sealing, asphalt rubber hot mix overlay, video detection signal upgrades,ADA ramp upgrades,utility adjustments and pavement striping. Justification: This project will restore the existing road surface to a substantially new condition,extending pavement life,use and rideability. The project is using asphalt rubber and is approved for a CalRecycle rebate. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 5o 5o $0 $0 $0 $0 Design/Plan Review $0 $35,000 $o $0 $0 $0 $35,000 Right-of-Way $0 $o $0 $0 $0 $0 $0 Construction $0 So $270,000 $0 $0 $0 5270,000 Inspection&Administration $0 $0 $5,000 $0 $0 $0 $5,000 Contingency $0 $0 $25,000 $0 $0 $0 $25,000 Total Costs: $0 $35,000 $300,000 $0 $0 $0 $335,000 Project Funding: Funding Source Prior Year 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Gas Tax R&T 7360 Fund(174) $0 $35,000 $300,000 $0 $0 $o $335,000 Total Costs: $0 $35,000 $300,000 $0 $0 $0 $335,000 Impact on Operations: Reduction of routine maintenance activities for pothole repair, weed abatement and crack seal, thus freeing up maintenance crews for other needed areas. H1 Project Number: 800-2015-09 JL Key: 1904 Object: 5650 9th Street from Grove Avenue to Hellman Avenue- Pavement Rehabilitation Project Location: 9th Street from Grove Avenue to pPG 4y�'� I� (1 0 L/ Uc--a Hellman Avenue �� aN��u > 1ENa BEAR GULCH P.rAt p Q l\ z ELEtrTARY� � ���- .� W I )N>t c,TI.ST > } BEAR c,tXPARK —�Ldl(—F CAL F Jr�n r _ co cc > Est.Construction Start/End: w L.c- ? JS Ard1GS 06/2017-08/2017 ELEtAENTARY �s 0 s -- 2 iY OWCN:gT Project Status: 4 y CHAFF'E;S f� Design/Construction 0 t,7A�N=S. (1� c?: Department: Engineering PROJECT LOCATION % Project Manager: % a-TH:ST' Romeo David i w Description: This project involves cold planing,localized asphalt removal and replacement,crack sealing,asphalt rubber hot mix overlay,traffic signal loop replacement,utility valves and manhole adjustments and pavement striping. Justification: This project will restore the existing road surface to a substantially new condition,extending pavement life,use and rideability. In addition,the project is using asphalt rubber and is approved for a CalRecycle rebate. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $o $0 SO Design/Plan Review $25,000 $0 $0 $0 $0 $0 $25,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $266,000 $0 $0 $0 $0 $266,000 Inspection&Administration $0 $7,500 $0 $0 $0 $0 $7,500 Contingency $0 $26,500 $0 $0 $0 $0 $26,500 Total Costs: $25,000 $300,000 $0 $0 $0 $0 $325,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Gas Tax R&T 7360 Fund(174) $25,000 $0 $0 $0 $0 $0 $25,000 Measure I Fund(177) $0 $300,000 $0 $0 $0 $0 $300,000 Total Costs: $25,000 $300,000 $0 $0 $0 $0 $325,000 Impact on Operations: Less routine maintenance like pothole repairs,weed abatement and crack seal,thus freeing up maintenance crews to attend to other needed areas. H2 Project Number: 800-2015-14 J L Key: 1907 Object: 5650 Arrow Route along the South side 500'to 1300' east of the Interstate 1-15 freeway-widening Project Location: ,L — F I I.JKSEF I) I ..=2=VFRSA4-tgs•ST Arrow Route along the South side I s�AFr:r�l<msr �, w to 1300' east of the I-15 free CRLIc¢I�.s.� freewa —W 4 z ur a a J hliL-kE NNIUM��T � EPICENTE SPORTS C 1PLEX O Est.Construction Start/End: (I • r RANCHOCVCAM NGA ADU TS�ORTSCOMPLEX �n TBD 1 rK:ftFNNY-nR RC ANIMAL CARE&ADOPTION ENTER Project Status: n atzROw rrcti _—=_ " �o— J / Q Design � 3 w w Department: -STATION�� F L Engineering ,74 PROJECT LOCATION 1 v I Project Manager: Curt Billings > Description: This project involves 800 feet of asphalt pavement widening and striping. Justification: This project will improve traffic circulation and safety with the addition of a second lane and paved shoulders. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $o $0 $o $0 $o $o Design/Plan Review $0 $5,000 $0 $0 $0 $0 $5,000 Right-of-Way $0 $0 50 $0 $0 $0 $0 Construction $0 $o $265,000 $o $0 $268,000 $533,000 Inspection&Administration $0 50 $10,000 $0 $0 $5,000 $15,000 Contingency $0 $0 $25,000 $0 $0 $27,000 $52,000 Total Costs: $0 $5,000 $300,000 $o $0 $300,000 $605,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Gas Tax R&T 7360 Fund(174) $0 $5,000 $o $0 $o $0 $5,000 Unknown $0 $0 $300,000 $0 $0 $300,000 $600,000 Total Costs: $0 $5,000 $300,000 $0 $0 $300,000 $605,000 Impact on Operations: None. H3 Project Number: 800-2007-21 JL Key: 1361 Object: 5650 Base Line Road at 1-15 Interchange Project Location: , Base Line Road at the 1-15 Freeway As14 ;• i ELEMCMARY "�� �� (��'rnnirnun�� i+'j //� Est.Construction Start/End: , 10/2014-08/2016 E-L�INE RD� A P - Project Status: Construction .r7 /i l / si i ,t '� —`PROJECT J +` Department: �^�(��3r—� ,. �/ f` LOCATION Engineering k �J Project Manager. Jason Welday Description: Construction of a modification to the on and off ramps for the 1-15 Freeway at Base Line Road. Justification: Due to the current and projected congestion of the streets around the interchange,it is necessary to improve access to and from the 1-15 freeway at Base Line Road. Up to 50 percent of the project costs are eligible for reimbursement through Federal funds. Project Cost Estimate($); Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $1,089,550 $0 $0 50 $0 $0 $1,089,550 Design/Plan Review $5,687,151 $0 So $0 So $0 $5,687,151 Right-of-Way $7,135,962 $0 $0 $0 $0 SO $7,135,962 Construction $32,930,047 $5,210,920 $0 $0 $0 $0 $38,140,967 Total Costs: $46,842,710 $5,210,920 $0 $0 $0 $0 $52,053,630 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Transportation(124) $2,860,207 $100,000 $0 $o $0 $o $2 960 207 RDA(660) $10,137,690 $0 $0 $0 $0 $0 $10,137,690 Tax Allocation Bonds $29,851,545 So So So $0 So $29,851,545 City Infrastructure(198) $299,774 $o $0 $0 $0 $0 $299,774 General Fund(001) $18,996 $0 $0 50 $0 $0 $18,996 RDA(650) $3,771 $0 $0 $0 $0 SO $3,771 Subtotal City Budget Costs: $43,171,983 $100,000 $0 SO $0 $0 $43,271,983 IMD/BDP(Federal) $1,179,835 $0 $0 $0 $0 5o $1,179,835 SAFETEA-LU(Federal)(209) $1,510,809 $5,091,000 $0 $0 5o $0 $6,601,809 Prop-iB-SLPP(State)(211) $980,083 $19,920 $0 $0 $0 $0 $1,000,003 Subtotal Other Costs: $3,670,727 $5,110,920 So $0 $0 $0 $8,781,647 Grand Total Costs: $46,842,710 $5,210,920 $0 $0 $0 $0 $52,053,630 Impact on Operations: City is expected to take over maintenance of the landscaping within the interchange. Area of landscaping has not yet been determined. H4 i Project Number: 800-2015-07 J L Key: 1880 Object: 5650 Base Line Road from Milliken Avenue to w/o Day Creek Boulevard - Pavement Rehabilitation Project Location: — --_,/ >� )I JL-(u l�l "� Base Line Road from Milliken ���� �� KENYI—N`—PAS' K l� 0 �[�1��} � Avenue to w/o Day Creek `c�`� IW �� 1✓ cJ w�l —. 1 m Boulevard t - NCHOCVGAMO GA r �1 V 5 30 '(P� {Kt / J� HIGH (�-� i� �YYINl}RGYKS G i� lt_/u V lJ 1llliiiS1 S�} +tENTAR{ P}.IQHT (i. VIC.IT'ORI'A^:PARK-_L"N--.�.��(�'�-� RTEN1ARY�jIQ}7'�1 �� JLjf - 1 VINTAGE f( � PACIFIC-ELNE�1 :L RA C E=S 1',,TION uU Est.Construction Start/End: _ 09/2016-10/2016 J� ?�A K 00 'CHO GVCAM ONGA G NA ((://NTRAL PARK 'RD Project Status: �DU Design/Construction -1 N 10 �D � 1 - GGO OTE ANYON PA K l� ~� IUD L RRA V 5 A VI TOR ARB L MENI Department: S R N I'y� 5 C'A OS/ 7AIN V _ P J Engineering �]—�� C ��. !<,U tiJl—I PI _ YI E YV;PAn�1 �YOEN A PAR I MIL IKENP RK R ECTT , 111 'O \COYO7EG NYON Gv Project Manager: l� y(qc�✓ I``�O� O L MENTARY Romeo David Description: This project involves cold planing,localized asphalt removal and replacement,crack sealing,asphalt rubber hot mix overlay,traffic signal loop replacement,utility valves and manhole adjustments and pavement striping. Justification: This project will restore the existing road surface to a substantially new condition,extending pavement life,use and rideability. In addition,the project is using asphalt rubber and is approved for a Cal Recycle rebate. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $o $0 $0 $o $o Design/Plan Review $30,000 $p $o $0 $0 $O $30,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $805,000 $0 $0 $0 $0 $805,000 Inspection&Administration $0 $15,000 $0 $0 $0 $o $15,000 Contingency $0 $80,000 $0 $0 $0 $o $80,000 Total Costs: $30,000 $900,000 $0 $0 $o $0 $930,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Measure I Fund(177) $30,000 $900,000 $0 $0 $0 $0 $930,000 Total Costs: $30,000 $900,000 $0 $0 $0 $0 $930,000 Impact on Operations: Less routine maintenance like pothole repairs,weed abatement and crack seal,thus freeing up maintenance crews to attend to other needed areas. H5 Project Number: 800-2016-14 1L Key: 1722 Object: 5650 Carnelian Street from Lemon Avenue to Wilson Avenue -Pavement Rehabilitation Project Location: Carnelian Street from Lemon Avenue to Wilson Avenue x� y Wu-Nave r �TTiFRS.W.�n Est.Construction Start/End: PROJECT LOCATION 09/2016—10/2016 �� , ,tift:�E �; ,-sr r� W I a �_.-_BQNtiON.y.r_m - j Project Status: 7 � �v SAS �( � ('Acr.Fr.r_r_wnlr Design/Construction --- i �JJ � —�= �y ( b I a.rUnE fT Ut.Departmen Engineering —_ L �_yw_.�.�F•nr,nvj Project Manager: • ftA? E xr 3 Romeo David K--.FftsvS5 Description: This project involves cold planing,localized asphalt removal and replacement,crack sealing,asphalt rubber hot mix overlay,traffic signal loop replacement,utility valves and manhole adjustments and pavement striping. Justification: This project was re-budget due to Traffic Signal installation at Banyan Street and will pave after signal is finished.This project will restore the existing road surface to a substantially new condition, extending pavement life, use and rideability. In addition,the project is using asphalt rubber and is approved for a CalRecycle rebate. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $0 $0 $0 $0 $0 $0 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $400,000 $0 $0 $0 $0 $400,000 Inspection&Administration $0 $28,000 $0 $0 $0 $0 $28,000 Contingency $0 $40,000 $0 $0 $0 $0 $40,000 Total Costs: $0 $468,000 $0 $0 $0 $0 $468,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Measure I Fund(177) $0 $468,000 $0 $0 $0 $0 $468,000 Total Costs: $0 $468,000 $0 $0 $0 $0 $468,000 Impact on Operations: Less routine maintenance like pothole repairs,weed abatement and crack seal,thus freeing up maintenance crews to attend to other needed areas. H6 Project Number: 800-2015-10 JL Key: 1906 Object: 5650 Church Street from Pepper Street to Hellman Avenue- Pavement Rehabilitation Project Location: U afCa�\i 16UNYJIJG+j Ri Chruch Street from Pepper Street 011 to Hellman Avenue _ _J 4 R J CJ i =�^ T —�/'� PROJEC —SOGAT ION 'L"EWY.175G]c'F� I Est.Construction Start/End: 4 _ 1 K 06/2017-08/2017 N ? P Lw �C 1Fi'WfiT \g—vtW�4T ~ 6 Project Status: Design/Construction Department: ��J i y JJ ly Engineeringf� a� _ l\ 1N —?_�z snw_yT I2 Project Manager: F .A T � !Y15GrlN4KritN2S_rLC;__`_ a "•FIR Romeo David E STA 12_ 1( I I IiBAR3T�W.'DRv./J Description: This project involves cold planing,localized asphalt removal and replacement,crack sealing,asphalt rubber hot mix overlay,traffic signal loop replacement,utility valves and manhole adjustments and pavement striping. Justification: This project will restore the existing road surface to a substantially new condition,extending pavement life,use and rideability. In addition,the project is using asphalt rubber and is approved for a CalRecycle rebate. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES So $0 $0 $0 $0 $o $0 Design/Plan Review $25,000 $0 $0 $0 $0 $o $25,000 Right-of-Way $o $o $0 $0 $0 $o $0 Construction $0 $175,000 $0 $0 $0 So S175,000 Inspection&Administration $0 $7,500 $0 $0 $0 $o $7,500 Contingency 50 $17,500 $0 $0 $o $0 $nsoo Total Costs: $25,000 $200,000 $0 $0 $0 $0 $225,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Gas Tax R&T 7360 Fund(174) $25,000 So $0 $0 $o $0 $25,000 Measure I Fund(177) $0 $200,000 $0 $0 $0 $0 $200,000 Total Costs: $25,000 $200,000 $0 $0 $0 $0 $225,000 Impact on Operations: Less routine maintenance like pothole repairs,weed abatement and crack seal,thus freeing up maintenance crews to attend to other needed areas. H7 I Project Number: 800-2016-16 1L Key: 1931 Object: 5650 East Ave from Chickasaw Rd to 370 ft north -Street Widening and Sidewalk Improvements Project Location: — W.IbS.II:ANE East Avenue from Chickasaw Road to 370 feet north, alongthe west ` r (1 LU side. lC���� 4 Vaf� fiyR rjkq ���Z FIRE STATIONj���Z �LAREN'A`•DR�—Q 176 Q j --rsRo.s,i w U; w RANCHO E L.Df{ HDU-�X�z j ETfELEME G:ARY ETIWAI[DA 4,REEK Ct7fdMUNITY PARK IELEh1ENTARYEst.Construction Start/End: TIWAEARLY SU I.MIT INTERh1ED ATE 05/2017-06/2017 SPECIALV ED JUNIOR HIGH (� _ � i tE:FtR r,�T Y J �j SH IVC-DR 4 0- Project Status: I 1 C a PROJECT 1OCATION i J Design/Construction z WINDSSAR GR -i%•V� a o Z -,—lJ ST C 'r Department: GYPSUM nR C. =RD-� Engineering 11CR0KFF _ { �� NICKP:. W R W Project Manager: a 1 210 Curt Billings r---- —a— r—-- z—`.,`iy t�i FISHER=GR�i.. Description: This project will install 310 feet of sidewalk and street widening improvements along the west side to close a gap between two existing sections of sidewalk. Justification: The sidewalk and widening improvements will improve pedestrian and vehicle circulation. Project Cost Estimate($}: Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $o $0 $0 $0 $0 Design/Plan Review $o $5,000 $0 $0 $0 $0 $5,000 Right-of-Way $0 $0 $0 $0 $0 $o $o Construction $0 $93,000 $0 $0 $0 $0 $93,000 Inspection&Administration $0 $3,000 $0 $0 $0 $0 $3,000 Contingency $0 $9,000 $0 $0 $0 $0 $9,000 Total Costs: $0 $110,000 $0 $0 $0 $o $110,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Gas Tax R&T 7360 Fund(174) $0 $55,000 $0 $0 $0 $0 $55,000 City Wide Infastructure Fund(198) $0 $55,000 $o $0 $0 So $55,000 Total Costs: $0 $110,000 $0 $0 $0 $0 $110,000 Impact on Operations: This project will reduce maintenance and weed abatement costs. H8 I Project Number: 800-2010-15 JL Key: 1076 Object: 5650 Etiwanda Avenue from 6th Street to Arrow Route- Street Widening improvements Project Location: Etiwanda Avenue from 6th Street to Arrow Route 6R8S�5! Est.Construction Start/End: P f, ROJECT LOCATION 04/2017-06/2017 A75F R ILR A - i Project Status: � N:DR -- Design/Construction '----••--•---••—•--• Department: - Sr 6TH ST Engineering - r > V h nNxanrs�Nirwr�' w Project Manager: ��+ W c Curt Billings Description: Widen Etiwanda Avenue to two lanes in each direction,from 6th Street to Whittram Avenue including bike lanes from 6th Street to Arrow Route. Justification: Widening Etiwanda Avenue will improve traffic circulation. Project Cost Estimate($): Expenditure/Category Prior Year 2016 17 2017 18 2018 19 2019120 TBD TOTAL Environmental/NPDES $0 $0 $o $0 $o $0 $0 Design/Plan Review $0 $20,000 50 $0 $0 $O $20,000 Right-of-Way $0 $0 $0 $0 $O $0 $0 Construction $0 $390,000 $0 $0 $0 $O $390,000 Inspection&Administration $0 $10,000 $0 $0 $o $o $10,000 Contingency $0 $30,000 $0 $0 $0 $O $30,000 Total Costs: $0 $450,000 $0 $0 $0 $0 $450,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Transportation Fund(124) $0 $450,000 $0 $0 $0 $o $450,000 Total Costs: $0 $450,000 $0 $0 $0 $0 $450,000 Impact on Operations: Reduction of routine maintenance activities for pothole repair, weed abatement and crack seal, thus freeing up maintenance crews for other needed areas. H9 Project Number: 800-2016-10 JL Key: 1826 Object: 5650 Foothill Boulevard across SCE Corridor West of Day Creek Channel -Sidewalk Improvements Project Location: 9�/�0 _ D -Val — CUL-TUR c r_eN�T>R Foothill Boulevard across SCE <9'r u l�J�o �n� Corridor west of Day Creek S�^� :n Uu=i / �. �m� �', NOR rH:htA1NS�TREET-171 w Channel ] ; i- > f �(�C9� c�NQRWiCKlsr I!_U }i IlIET f-EN.SIT ° y c 11 LL1 'iTNFFO-ST =VERSAIEL•ES:ST-� 'ITAFFORII S1" ( J ^MERVIL—Si _ VIJTDRIAZGFIRDENS-I:N� Est.Construction Start/End: w u 01/2017-02/2017 w Fo r Q Project Status: Design/Construction Li MIL-I:ENN1U Ai_Cii � \' Department: 111111%PROJECT LOCATION Engineering 0 v JAMSENNY-DR Project Manager: w Romeo David RROW-RTE Description: This project will install 600 feet of sidewalk to close the gap between two sections of existing sidewalk. Justification: This project was requested by handicap residents using this route everyday.The improvements will improve pedestrian circulation as well as bring the area into ADA compliance. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $10,000 $0 $0 $0 $0 $10,000 Right-of-way $0 $0 $0 $0 $0 $0 $0 Construction $0 $110,000 $0 $0 $0 $0 $110,000 Inspection&Administration $0 $14,000 $0 $o $0 $0 $14,000 Contingency $0 $11,000 $0 $0 $0 $o $11,000 Total Costs: $0 $145,000 S0 $D $0 $0 $145,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL City Wide Infastructure Fund(198) $0 $145,000 $0 $0 $0 $0 $145,000 Total Costs: $0 $145,000 $0 So $o $0 $145,000 Impact on Operations: This project will reduce maintenance and weed abatement costs from General Fund and LIVID 3B. H10 Project Number: 800-2016-09 1L Key: 1932 Object: 5650 Foothill Boulevard from Haven Avenue to Milliken Avenue-Pavement Rehabilitation Project location: Foothill Boulevard - From Haven Avenue to Milliken Avenue }} 1 I of Est.Construction Start/End: ROJE CATION 05/2018-06/2018 CITY HALL i I RCI�OLI CE STATION DR Project Status: 'n Design 1 Department: Engineering ARROW R!E Project Manager: 1 ~ Romeo David Description: This project involves cold planing,localized asphalt removal and replacement,crack sealing,asphalt rubber hot mix overlay,traffic signal loop replacement,utility valves and manhole adjustments and pavement striping. Justification: This project will restore the existing road surface to a substantially new condition,extending pavement life,use and rideability. In addition,the project is using asphalt rubber and is therefore eligible and will be submitted for a CalRecycle rebate. Project Cost Estimate($): Agenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $o $50,000 $0 $0 $0 $o $50,000 Right-of-Way $0 $0 $0 $0 $0 $o $o Construction $0 $0 $805,000 $0 $o $o $805,000 Inspection&Administration $0 $0 $15,000 $0 $0 50 $15,000 Contingency $0 $0 $80,000 $o $o $O $80,000 Total Costs: $0 $50,000 $900,000 $0 $0 $0 $950,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Measure I Fund(177) $0 $50,000 $900,000 $0 $0 $o 5950,000 Total Costs: $o $50,000 $900,000 $0 $o $0 5950,000 Impact on Operations: Less routine maintenance like pothole repairs,weed abatement and crack seal,thus freeing up maintenance crews to attend to other needed areas. H11 Project Number: 800-2016-07 JL Key: 1933 Object: 5650 Haven Avenue from Foothill Boulevard to Base Line Road - Pavement Rehabilitation Project Location: Haven Avenue - From foothill AIL-�`---`�—__ Boulevard to Base Line Road uasl�uveczD `— � a I ll � Z W w Est.Construction Start/End: �CC-- 05/2018-06/2018HURCt-S. Project Status: QJEC PRT` IOCAT1ON Design Department: PUE�] Engineering Q Project Manager: a Romeo David Description: This project involves cold planing,localized asphalt removal and replacement,crack sealing,asphalt rubber hot mix overlay,traffic signal loop replacement,utility valves and manhole adjustments and pavement striping. Justification: This project will restore the existing road surface to a substantially new condition,extending pavement life,use and rideability. In addition,the project is using asphalt rubber and is therefore eligible and will be submitted for a CalRecycle rebate. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $o $0 $0 $o Design/Plan Review $0 $50,000 $o $o $o $o $50,000 Right-of-way $0 $0 $0 $o $o $0 $0 Construction $0 $0 $805,000 $o $o $o $805,000 Inspection&Administration $0 $0 $15,000 $o $0 $0 $15,000 Contingency $0 $o $80,000 $0 $o $0 $80,000 Total Costs: $0 $50,000 $900,000 $0 $0 $0 $950,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Measure I Fund(177) $0 $50,000 $900,000 $o $0 $0 $950,000 Total Costs: $0 $50,000 $900,000 $o $0 $o $950,000 Impact on Operations: Less routine maintenance like pothole repairs,weed abatement and crack seal,thus freeing up maintenance crews to attend to other needed areas. H12 Project Number: 800-2015-11 JL Key: 1905 Object: 5650 Hellman Avenue from San Bernardino Road to Base Line Road -Pavement Rehabilitation Project Location: 4 � I Hellman Avenue from San ���" QL� - 11 I IL (BAS.EILI. NE_RD� Bernardino Road to Base Line Road � Q 3 r�.� LU Est.Construction Start/End: 31 ¢`G 0 06/2017-08/2017 Q��G a7 C HU R H SS LPG Project Status: a ] Construction oLjLiu ,L~ 'FIRE:SITATIO Department: [� 72 Engineering n LCBLV Project Manager: Romeo David > r--�nnnr�l�lnnn nn�r Description: This project involves cold planing,localized asphalt removal and replacement,crack sealing,asphalt rubber hot mix overlay,traffic signal loop replacement,utility valves and manhole adjustments and pavement striping. Justification: This project will restore the existing road surface to a substantially new condition,extending pavement life,use and rideability. In addition,the project is using asphalt rubber and is approved for a CalRecycle rebate. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $25,000 $0 $0 $0 $0 $0 $25,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $o $300,000 $0 $0 $0 $0 $300,000 Inspection&Administration $0 $27,000 $0 $0 $0 $0 $27,000 Contingency $0 $30,000 $0 $0 $0 $0 $30,000 Total Costs: $25,000 $357,000 $0 $0 $0 $0 $382,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Gas Tax R&T 7360 Fund(174) $25,000 $0 $0 $0 $0 $0 $25,000 Measure I Fund(177) $0 $357,000 $0 $0 $0 $0 $357,000 Total Costs: $25,000 $357,000 $0 $0 $o $0 $382,000 Impact on Operations: Less routine maintenance like pothole repairs,weed abatement and crack seal,thus freeing up maintenance crews to attend to other needed areas. H13 Project Number: 800-2016-05 J L Key: 1934 Object: 5650 Hermosa Avenue from Arrow Route to Foothill Boulevard - Pavement Rehabilitation Project location: �� Hermosa Avenue - From Arrow B Route to Foothill Boulevard L BLVD F THILL LVD I a' z i CITY HALL i �RG�'OLIC. Est.Construction Start/End: i CIVIC-CENTER,rER �! 08/2017-09/2017 L—= PROJECT LOCATION Project Status: M LBERRY EAR Y Design SPECIAL ED -R FAMILY-RESOURCE-CENT R OW ROUTE Department: r— Engineering � I Project Manager: �_ CUCAM ELEMENTARYRomeo David I n � Description: n n This project involves cold planing,localized asphalt removal and replacement,crack sealing,asphalt rubber hot mix overlay,traffic signal loop replacement,utility valves and manhole adjustments and pavement striping. Justification: This project will restore the existing road surface to a substantially new condition,extending pavement life,use and rideability. In addition,the project is using asphalt rubber and is approved for a CalRecycle rebate. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $35,000 $0 $0 $0 $0 $35,000 Right-of-way $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $265,000 $0 $0 $0 $265,000 Inspection&Administration $0 $0 $10,000 $0 $0 $0 $10,000 Contingency $0 $0 $25,000 $0 $0 $0 $25,000 Total Costs: $0 $35,000 $300,000 $0 $0 $0 $335,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Measure I Fund(177) $0 $35,000 $300,000 $0 $0 $0 $335,000 Total Costs: $0 $35,000 $300,000 $0 $0 $0 $335,000 Impact on Operations: Less routine maintenance like pothole repairs,weed abatement and crack seal,thus freeing up maintenance crews to attend to other needed areas. H14 i Project Number: 800-2015-06 1L Key: 1879 Object: 5650 Hillside Road from Archibald Avenue to Haven Avenue-Pavement Rehabilitation Project Location: Liu Hillside Road from Archibald ((���� � (S\`J(`--� Avenue to Haven Avenue L_1L_JLJ /) Qiz f �� r Est.Construction Start/End. � � 06/2017-08/2017 C a� Project Status: EJ 3 Construction cc It_ =U a WIISON:AVE-z Department: Engineering _-- OJ CT LOCATION Project Manager: � <� Romeo David Description: This project involves cold planing,localized asphalt removal and replacement,crack sealing,asphalt rubber hot mix overlay,traffic signal loop replacement,utility valves and manhole adjustments and pavement striping. Justification: This project will restore the existing road surface to a substantially new condition,extending pavement life,use and rideability. In addition,the project is using asphalt rubber and is approved for a Cal Recycle rebate. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $25,000 $0 $o $o $0 $0 $25,000 Right-of-Way $0 5o $0 $o $0 $0 $0 Construction $0 $760,000 $0 $0 $0 $0 $760,000 Inspection&Administration $0 $15,000 $0 $0 $o $o $15,000 Contingency $0 $75,000 $0 $0 $0 $o $75,000 Total Costs: $25,000 $850,000 $o $0 $0 $o $875,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Gas Tax R&T 7360 Fund(174) $25,000 $0 $0 $0 $0 $0 $25,000 Measure I Fund(177) $0 $850,000 $0 $o $0 $0 $850,000 Total Costs: $25,000 $850,000 $0 $0 $0 $0 $875,000 Impact on Operations: Less routine maintenance like pothole repairs,weed abatement and crack seal,thus freeing up maintenance crews to attend to other needed areas. H15 Project Number: 800-2016-04 JL Key: 1929 Object: 5650 Jersey Boulevard from Haven Avenue to Rochester Avenue- Pavement Rehabilitation Project Location: CITY HALL - I0 RC POLICE STA'TiON iMIL-t�ENNII)MjLAN PICENT 1 PS PS ORTS C MPLEX Jersey Boulevard - From Haven IC=CEN. DR��\ �j`—��(l Avenue to Rochester Avenue �,// \ S� �) GU CAMONGA AD T S,, ORTS COMPIE Y .. � i'IK:BE R O {�� AL CARE R ADOPTION CENTER �i#RR.Qw RTE—� dk J "I'IMA�NCR=y� PROJECT LOCATIO l�—^_ J N Est.Construction Start/End: s I o y 08/2017-09/2017 =w w 174 0 — Project Status: ,w METROUINK-S-TATION FF a..:s Design �j=P:CA'CIA Siw `rj r�_ C1AY-TON:�R n ;� 3 �7TH:ST' _ r EM PIRE LAKES GOLF COUR Department: y' r Engineering i A G C Y Z g > x -- Manager. w "' J �IF- Project ii Y Romeo David ��� Description: This project involves cold planing,localized asphalt removal and replacement,crack sealing,asphalt rubber hot mix overlay,traffic signal loop replacement,utility valves and manhole adjustments and pavement striping. Justification: This project will restore the existing road surface to a substantially new condition,extending pavement life,use and rideability. In addition,the project is using asphalt rubber and is approved for a CalRecycie rebate. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $50,000 $0 $0 $0 $0 $50,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $490,000 $0 $0 $0 $490,000 Inspection&Administration $0 $0 $10,000 $0 $0 $0 $10,000 Contingency $0 $0 $50,000 $0 $0 $0 $50,000 Total Costs: $0 $50,000 $550,000 $0 $0 $0 $600,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Gas Tax R&T 7360 Fund(174) $0 $50,000 $0 $0 $0 $0 $50,000 Unknown $0 $0 $550,000 $0 $0 $0 $550,000 Total Costs: $0 $50,000 $550,000 $0 $0 $0 $600,000 Impact on Operations: Less routine maintenance like pothole repairs,weed abatement and crack seal,thus freeing up maintenance crews to attend to other needed areas. H16 Project Number: 800-2016-03 JL Key: 1022 Object: 5650 Local Street Pavement Rehabilitation at Various Locations Project Location: r—i Various Locations ! I Est.Construction Start/End: za 5/2017—7/2017 P^�. IG tl E'Lki {I t it �Lt(:Tk12 RA T Project Status: Design/Construction Department: / itti Engineering d -.— - R_ OJEC.T_-OC TION Project Manager: Romeo David 9 Description: This project involves slurry seals and overlays. Justification: This project if a slurry seal will seal the street thus extending the pavement life and if a pavement overlay will restore the existing road surface to a substantially new condition,extending pavement life,use and rideability. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $o $0 $o $o $p $o Design/Plan Review $30,000 $50,000 $0 $0 $0 $0 $80,000 Right-of-Way $0 $o $0 $p $p $0 $0 Construction $1,060,000 $727,000 $0 $0 $o $o $1,787,000 Inspection&Administration $50,000 $50,000 $0 $0 $o $0 $100,000 Contingency $110,000 $73,000 $0 $0 $p $0 $183,000 Total Costs: $1,250,000 $900,000 $p $0 $p $0 $2,150,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL General Fund(001) $400,000 $0 $0 $o $0 $0 $400,000 Gas Tax R&T 7360 Fund(174) $850,000 $850,000 $0 $0 $0 $0 $1,700,000 Infrastructure Fund(198) $175,000 $50,000 $0 $0 $0 $0 $225,000 Total Costs: $1,425,000 $900,000 $o $o $o $0 $2,325,000 Impact on Operations: Less routine maintenance like pothole repairs,weed abatement and crack seal,thus freeing up maintenance crews to attend to other needed areas. H17 Project Number: 800-2016-02 JL Key: 1935 Object: 5650 Rochester Avenue from Base Line Road to Banyan Street- Pavement Rehabilitation Project Location: , AFIRE S'TATIbN ! ((! r vua n t 175111 :RDFST A UREECK PAR. L.uO D N "SP CIA Q ED BAN ANrSi 'Rochester Avenue-From Base Lined o l�r � MENr�'Rv—�— Road to Banyan Street CU 1— S � �.-,--- EttTA ;- = 1� �3CRV npp_ IAFI:UH � _S 1tl.4f rye, —y 5 �ill'ttRRYL+i � t l��HI GHLAND-AVE. G �hA�RK:D2Est.Construction Start/End: 4J 08/2017-09/2017 OW a ` _ 2 T=JC On1 C� � Kt RK PROJE FIgyaNmnG YT Q-1 RA CHO CVCAIA- GA y-+fie_ Pro Project Status _ �, < 2OVE 5 PA W HIGH WINDRO S `/(- A"MIA'ST / 2 /f 4g t\�\{"�'{�� 'X-a ELEMENT R1� \\"/ Design �fl Lw NCSROWARti K V L 11 �K f�ARLTON'P LIGHTF OT VIr_7 C5FaA-PA,RK:I. ELEr�€N�ARv �1 er4i -11—'t- -/F �� VINTE.U'E A:RK a .S AIRM TWA�1 n \ AV i 'r�7 11L'f3 E,`WA Department: �( i�]�}� j �{ ADD- �� t � f INTEhM CI4l r�"1) MLI IXT �SJI:A R �� PACIFI2;-t CP P7RIC-7 Il nMWIi=CT oj,Xti4=WR �I-E.ir�'�.• '+ 1 ( ii Ir-1f-� Engineeringn MDIFuc,ImA'nR7 — _ G"" UrtW Uli~—t FIRE STATIC, APE �; �� �q�7�—/ �� 1i3 `��ZJLJ FL MEN %LEw�•GMMlh M7x eE n _? 8 �61 ��}� cF e.—Ill--Project Manager: ,,, � r lj n FSYCSF�LINF�RU; ��� Romeo David ( �� 700 I m— Description: This project involves cold planing,localized asphalt removal and replacement,crack sealing,asphalt rubber hot mix overlay,traffic signal loop replacement,utility valves and manhole adjustments and pavement striping. Justification: This project will restore the existing road surface to a substantially new condition,extending pavement life,use and rideability. in addition,the project is using asphalt rubber and is therefore eligible and will be submitted for a CaiRecycle rebate. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 5o $o $0 $0 $0 $0 Design/Plan Review $0 $50,000 $0 $0 $0 $0 $50,000 Right-of-Way $0 $0 $o $0 $o $0 $0 Construction $0 $0 $805,000 $0 $0 $0 $805,000 Inspection&Administration $0 $0 $15,000 $0 $0 $0 $15,000 Contingency $0 $0 $80,000 $0 50 $0 $80,000 Total Costs: $0 $50,000 $900,000 $0 $0 $0 $950,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Measure I Fund(177) $0 $50,000 $900,000 $0 $0 $0 $950,000 Total Costs: $0 $50,000 $900,000 $0 $0 $0 $950,000 Impact on Operations: Less routine maintenance like pothole repairs,weed abatement and crack seal,thus freeing up maintenance crews to attend to other needed areas. H18 Project Number: 800-2012-26 1L Key: 1821 Object: 5650 Rochester Avenue from Foothill Boulevard to Base Line Road - Pavement Rehabilitation vu v Project Location: �v� � ����L — =J 1=— J(([_u � �j RA'SF'L-IN RD Rochester Avenue from Foothill Boulevad to Base Line Road � �1j , �: / 00 O _ I COYOTE ANY NPARK ' V C/ 1-1 C,AnUN IN VIE PA a a Est.Construction Start/End: UU w 08/2016-10 2016 LEE / nQ � 'EAVENUE�P� ARKWES.�TIGR_EEN PARKS—"�1 _ � L MILLI KEN PARK Project Status: �� ❑ Design/Construction \ gC� �\ RALP I M.LE WI PARK Department: ` PARK Department: Engineering PROD CT LOCATION VICTORIA=CARD �a G J —FOO'THIL'L'.B.L'VD w � �;' w Project Manager: Curt Billings Description: This project involves cold planning and localized asphalt removal and replacement,crack sealing,asphalt pavement overlay,traffic signal video detection,ADA ramp reconstruction,utility valve and manhole cover adjustments and pavement striping. Justification: This project will restore the existing road surface to a substantially new condition,extending pavement life,use and rideability. The project is using asphalt rubber and is approved for a CalRecycle rebate. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $o $0 $0 $D $0 $0 Design/Plan Review $8,605 $0 $0 $0 $0 $0 $8,605 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $540,000 $0 $0 $0 $0 $540,000 Inspection&Administration $0 $10,000 $0 $0 $0 $0 $10,000 Contingency $0 $60,000 $0 $0 $0 $0 $60,000 Total Costs: $8,605 $610,000 $0 $0 $0 $0 $618,605 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Measure I Fund(177) $8,605 $610,000 $0 $0 $0 $0 $618,605 Total costs: $8,605 $610,000 $0 $o $0 $0 $618,605 Impact on Operations: Reduced street maintenance costs for pothole repairs and crack seal,thus freeing up maintenance crews to attend to other needed areas. H19 Project Number: 800-2014-09 JL Key: 1877 Object: 5650 San Bernardino Road from Carnelian Street to Archibald Avenue-Pavement Rehabilitation Project Location: I 7�� I "/ ` , -11 ( (� \�a I =Y.E .^J��� San Bernardino Road from - ���niurcy133r�w Carnelian Street to Archibald P < I> AvenueEll �N 3GN31J U 4 y—I O L •I(�kYf,V-Ft Ir "12.11ttacR Est.Construction Start/End: 06/2017-08/2017 —,; � ^� i- g \\\ NA IAF.tPN:Y�4I I Q Pro 3 al Imo ;- K-5Mw.- - Project Status: p j cl u2ra sr 4 z Construction I' a �� v=estntiaxr ��hrx�wmvcm �� ,-- raouu��uwr� a y Department: PROJECT LOCATI`ON" Engineering �� �� � .� CONIFErR�tN l l �� �a':FtEY$EA CT 3 Project Manager. Romeo David Description: This project involves cold planing,localized asphalt removal and replacement,crack sealing,asphalt rubber hot mix overlay,traffic signal loop replacement,utility valves and manhole adjustments,and pavement striping. Justification: This project will restore the existing road surface to a substantially new condition,extending pavement life,use and rideability. The project is using asphalt rubber and is approved for a CalRecycle rebate. Project Cost Estimate($j: Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 2020 21 TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $20,000 $0 $0 $0 $0 $0 $20,000 Right-of-Way $0 $0 $0 $0 $0 $0 $o Construction $0 $350,000 $0 $0 $0 $0 $350,000 Inspection&Administration $0 $15,000 $0 $0 $0 $0 $15,000 Contingency $0 $35,000 $0 $0 $0 $0 $35,000 Total Costs: $20,000 $400,000 $0 $o $0 $0 $420,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 2020 21 TOTAL Gas Tax R&T 7360 Fund(174) $20,000 $200,000 $0 $0 $0 $0 $220,000 Fire Protection Capital Fund(288) $0 $200,000 $0 $0 $0 $0 $200,000 Total Costs: $20,000 $400,000 $0 $0 $0 $o $420,000 Impact on Operations: Less routine maintenance like pothole repairs,weed abatement and crack seal,thus freeing up maintenance crews to attend to other needed areas. H 20 Project Number: 800-2015-08 1L Key: 1903 Object: 5650 San Bernardino Road from Grove Avenue to Foothill Boulevard - Pavement Rehabilitation Project Location: San Bernardino Road from Grove ? �� RE'o:,,rL �✓ 0 Avenue to Foothill Boulevard PROJECT LOCATION _ Est.Construction Start/End: FOOTHILLBLVD 06/2017-08/2017 c SAN BERNARDINO RD 4:r ems. 5 _ Y NICt/ELiNI DR Project Status: -VF`G� T. rl HILL.11 Constructionv.<QP�.e�Oc G, ;a (GA8RIEL O 5 Department: g y �Engineering �AVFN,U�VEJAR � � i Y C --�—»9 A FrFFCS_VV RTC` Project Manager: --11*--T—�F-1� Romeo David t Description: This project involves cold planing,localized asphalt removal and replacement,crack sealing,asphalt rubber hot mix overlay,traffic signal loop replacement,utility valves and manhole adjustments,and pavement striping. Justification: This project will restore the existing road surface to a substantially new condition,extending pavement life,use and rideability.The project is using asphalt rubber and is approved for a CalRecycle rebate. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 2020 21 TOTAL Environmental/NPDES $0 $o $0 $0 $0 $0 $0 Design/Plan Review $0 $0 $0 $0 $0 $0 $0 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $80,000 $0 $0 $0 $0 $80,000 Inspection&Administration $0 $16,000 $0 $0 $0 $0 $16,000 Contingency $0 $8,000 $0 $0 $0 $0 $8,000 Total Costs: $0 $104,000 $0 $0 $0 $0 $104,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 2020 21 TOTAL Gas Tax R&T 7360 Fund(174) $0 $104,000 $0 $0 $0 $0 $104,000 Total Costs: $0 $104,000 $0 $0 $0 $0 $104,000 Impact on Operations: Less routine maintenance like pothole repairs,weed abatement and crack seal,thus freeing up maintenance crews to attend to other needed areas. H21 Project Number: 800-2012-22 J L Key: 1601 Object: 5650 Youngs Canyon Road -Extension from Koch Place to Cherry Avenue ProYoungtCanyonR Youngs Canyon Road-Koch Place to Cherry Avenue _� E ��rWIL'S�ON,-AVE — ItLA.REL-IRGE;OR ��FROS Dt R zO b a LEG`CY PAARRfK�IL-� Est.Construction Start/End: RANCHO SUMMIT{PARK,�C 31 41 EPMERD:UI' �j To be determined ETI4YA1NDA REEK COMMUNITY PARK L J )�J ��}t HE NDERSOHcaR ��i GO/CN�E�OV E"P�ARK�'� � BANYAN.S7�� Project Status: II TF=FiR I1' ti a Design z vR W 6 z J CASSIA ST 0 GYPSUM DR Department: Engineering PROJECT LOCATION ICKA'SAW RD Project Manager: EISHER:DR Curt Billings n n 'Wl�IdE$ToN'E-Pu JO,RDAN�CT Description: The extension of Youngs Canyon Road between Koch Place and Cherry Avenue will construct a 4lane road across a flood control basin and master plan its extension to Cherry Avenue. Justification: This extension of Youngs Canyon Road will construct 1,100 foot segment across an existing flood control basin enabling future development east of the the basin to complete the remaining 400 foot extension to Cherry Avenue.When completed the new road will relieve traffic congestion on Wilson Avenue to the north. Project Cost Estimate($}: Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 2020 TBD TOTAL Environmental/NPDES $0 $0 $100,000 $0 $0 $0 $100,000 Design/Plan Review $249,166 $50,000 $70,000 $0 $0 $0 $369,166 Right-of-Way $0 $0 $50,000 $0 $0 $0 $50,000 Construction $0 $0 $2,600,000 $0 $0 $0 $2,600,000 Inspection&Administration $0 $0 $50,000 $0 $0 $0 $50,000 Contingency $0 $0 $280,000 $0 $0 $0 $280,000 Total Costs: $249,166 $50,000 $3,150,000 $0 $0 $0 $3,449,166 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 2020 TBD TOTAL AD 88-2 Etiw/Highlnd Impry(813) $249,166 $50,000 $3,150,000 $0 $0 $0 $3,449,166 Total Costs: $249,166 $50,000 $3,150,000 $0 $0 $0 $3,449,166 Impact on Operations: Adds 1,100 feet of roadway to the City's street maintenance program.A more detailed cost estimate will be available after the preliminary design phase is complete. H 22 Traff ic ------v Projects included in this section are typically those that will promote safe and efficient traffic circulation per State and local design standards. Planned projects include two new signals, and upgrades at three intersections,synchronization at three freeway interchanges, and preparation of an ITS master plan. Traffic Projects are typically funded via Transportation Development Funds (124), Measure 1 (177), Gas Tax Funds(170, 172, and 174),Street Lighting Districts and some grant funding. Project List& FY 2016-17 Expenditures 1 6th @ Rochester-Traffic Signal $ 513,000 Installation 2 Archibald Ave @ Victoria- Traffic $ 551,500 Signal Installation 3 Base Line Rd @ Lion St- Pedestrian $ 80,000 Hybrid Beacon Sources of Funding for FY 2016-17 4 East @ Miller-Traffic Signal $ 524,000 Installation $20,000$80,000 $112,810 5 Freeway &Arterial Signal $ 320,000 Synchronization @ Various Intersections 6 Intelligent Transportation System $ 100,000 $2,733,690 Upgrade- Citywide 7 Milliken @ 5th-Traffic Signal $ 469,000 Installation 8 Milliken Ave Traffic Signals @ $ 54,000 ■AB2766 Air Quality ■Transportation Millenium Ct&Vintage Dr- Upgrade Lft Turn Phases SLID 4 ■Infrastructure 9 Rochester @ Jersey-Traffic Signal $ 315,000 Installation 10 Terra Vista Parkway @ Spruce- Sfty $ 20,000 Lghtg Installation $ 2,946,500 I Project Number: JL Key: 1939 6th Street at Rochester Avenue-Traffic Si nal Installation Object: 5650 Project Location: e Sixth Street and Rochester Avenue r -gLyp FIRE-STAZIC3N u� 1/4 C PRO. LOCATION �M E TRJ L•I NK-S TATI ON Est.Construction Start/End: 3/2017—6/2017 IIInn�II� EMPIRE LAKES GOLF COUR SE_J Project Status: 67H=S rr Design/Construction !ST Department: w Engineering : �1 I,: �Y! 1 W �J I Project Manager: Q EIAP RE LAKES GOLF CO SE 9 Jason Welday �� f z Description: The scope of work to be performed in general consists of,but is not limited to,installation of traffic signals,fiberoptic interconnect and related equipment at Sixth Street and Rochester Avenue. Justification: The installation of traffic signals will improve traffic safety and reduce traffic congestion. Project Cost Estimate($�: Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $o $o $0 $o Design/Plan Review $0 $30,000 $0 $0 $0 $0 $30,000 Right-of-Way $0 So $0 $o $0 $o So Construction $0 $430,000 $0 $0 $0 $0 $430,000 Inspection&Administration $0 $10,000 $0 $o $0 $o $10,000 Contingency $0 $43,000 $0 $0 $0 $0 $43,000 Total Costs: $0 $513,000 $0 $o $0 $0 $513,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Transportation(124) So $513,000 $0 $0 50 $0 $513,000 Total Costs: $0 $513,000 $0 $0 $0 $0 $513,000 Impact on Operations: The City will be responsible to pay for the cost of electricity and maintenance.The estimated cost of electricity and maintenance for a traffic signal is$2,500 per year. II Project Number: J L Key: 1510 Object: 5650 Archibald Avenue at Victoria Street-Traffic Signal Installation Project Location: Archibald Avenue at Victoriay� Street 19TH STREET IL_L_— �II � ROiJE T L C�TIOQN I q Est.Construction Start/End: > a 3/2017—6/2017 s w Project Status: Design/Construction w a ccr < JLLI Department: ¢ — Engineering Project Manager: PACIFIC EI.EC.TRIC TRAtL Jason Welday Description: The scope of work to be performed in general consists of,but is not limited to,installation of traffic signals,fiberoptic interconnect and related equipment at Archibald Avenue at Victoria Street. Justification: The installation of traffic signals will improve traffic safety and reduce traffic congestion. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $30,000 $0 $0 $0 $0 $30,000 Right-of-Way $0 $0 $0 $o $o $o $o Construction $0 $465,000 $0 $0 $0 $0 $465,000 Inspection&Administration $0 $10,000 $0 $0 $0 $0 $10,000 Contingency $0 $46,500 $0 $0 $0 $0 $46,500 Total Costs: $0 $551,500 $0 $0 $0 $o $sslsoo Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Transportation(124) $0 $551,500 $0 $0 $0 $0 $551,500 Total Costs: $0 $551,500 $0 $0 $o $0 $551,500 Impact on Operations: The City will be responsible to pay for the cost of electricity and maintenance.The estimated cost of electricity and maintenance for a traffic signal is$2,500 per year. 12 Project Number: 800-2015-24 1L Key: 1921 Object: 5650 Base Line Road at Lion Street- Pedestrian Hybrid Beacon (HAWK) Installation ProBase ct Road a Base Line Road at Lion Street LLIrJ + RORFRf)S ST PROJECT LOCATION N `l BASE LINE RD / Est.Construction Start/End: 10/2016—11/2016 LIONS PARK Project Status: SPUR OR w car Construction m �c c � aJ Department: s y�Yy Engineering ALDER^aT '� a z Q 4 Project Manager: Jason Welday / z Description: The scope of work to be performed in general consists of,but is not limited to,installation of a pedestrian hybrid beacon(HAWK) and related equipment at Base Line Road and Lion Street. Justification: The project will improve pedestrian safety. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 SO $0 $0 Design/Plan Review $20,000 $0 $0 $0 $0 $o $20,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $80,000 $0 $0 $0 $o $80,000 Inspection&Administration $0 $0 $0 $0 $0 $0 $o Contingency $0 $o $0 $0 $0 $O $O Total Costs: $20,000 $80,000 $0 $0 $O $o $100,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Citywide Infrastructure Impry(198) $20,000 $80,000 $0 $0 $0 50 $100,000 Total Costs: $20,000 $80,000 $0 $0 $0 So 5100,000 Impact on Operations: The City will be responsible for the cost of electricity and maintenance. The estimated cost of electricty and maintenance for a pedestrian hybrid beacon is$1,500 per year. 13 Project Number: JL Key: 1888 Object: 5650 East Avenue at Miller Avenue-Traffic Signal Installation Project Location: / East Avenue at Miller Avenue �NIVFR.OAKAR i PROJECT LOCATION i MALVASIA WAY FIRFS ONF OR 1 Lr < i Est.Construction Start/End: 9 LOIRL VAI.L FV DR L GIRL.VAU FxnR PAUAIRA OR 3/2017—6/2017 ; tdILLLR AVE 0 : Project Status; 1 Design/Construction C.ASAY°T^ i i i .Y. 1 Department: i svt-vnNe/<cT LAMRRvsc��,t i Engineering TOR i D VIAVENETO OI< Project Manager: x � 'CARET CT COR7EZ C C R Jason Welday T� < r---�`}I i Description: The scope of work to be performed in general consists of,but is not limited to,installation of traffic signals,fiber optic interconnect and related equipment at East Avenue at Miller Avenue. Justification: The installation of traffic signals will improve traffic safety and reduce traffic congestion. Project Cost Estimate($}; Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $30,000 $0 $0 $0 $0 $30,000 Right-of-Way $0 $0 $0 $o $o $0 $o Construction $0 $440,000 $0 $0 $0 $0 $440,000 Inspection&Administration $0 $10,000 $0 $0 $0 $0 $10,000 Contingency $0 $44,000 $0 $0 $0 $0 $44,000 Total Costs: $0 $524,000 $0 $o $0 $0 $524,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Transportation(124) $0 $524,000 $0 $0 $0 $0 $524,000 TotaICosts: $0 $524,000 $0 $0 $0 $0 $524,000 Impact on Operations: The City will be responsible to pay for the cost of electricity and maintenance.The estimated cost of electricity and maintenance for a traffic signal is$2,500 per year. 14 Project Number: 800-2015-16 JL Key: 1900 Freeway and Arterial Signal Synchronization Phase I Object: 5650 Project Location: SR-210 at Haven Avenue; 1-15 at Base Line Road; and 1-15 at Foothill Boulevard --I vt IC-T ^K- Est.Construction Start/End: _.—CATTI 1/2017-6/2017 All Project Status: Ll f(3 Construction CH:St Department: Engineering NIf R. Project Manager: Jason Welday Description: The scope of work to be performed in general consists of,but is not limited to,installation of traffic signal communication systems on City local arterials and State Route,Interstate on-ramps and off-ramps and updated coordination timing along the local arterials. Justification: The project will Provide communication and coordination to enable monitoring,re-timing and coordination of the City's traffic signals with the State Route and Interstate for improved traffic flow and safety. These improvements equate to reduced fuel consumption and vehicle emissions. Project Cost Estimate Expenditure/Category Prior Years 2016/17 2017/18 2018/19 2019/20 TBD TOTAL Environmental/NPDES $0 $o so $0 $o $0 $0 Design/Plan Review $85,000 $o $0 $0 $0 $0 $85,000 Right-of-Way so $ o $0 $0 so $0 $0 Construction $0 $290,000 $0 $0 $0 $0 $290,000 Inspection&Administration $0 $o $0 $0 $0 $0 $o Contingency $0 $30,000 $0 $0 $0 $0 $30,000 Total Costs: $85,000 $320,000 $0 $0 $o $0 $405,000 Project Funding: Funding Source Prior Years 2016/17 2017/18 2018/19 2019 20 TED TOTAL AB 2766 Air Quality lmprvmnt Fund(105) $12,000 $112,810 $0 $0 $o $0 $124,810 Transportation(124) $73,000 $207,190 $0 $o $0 $0 $280,190 Total Costs: $85,000 $320,000 50 $o $0 $0 $405,000 Impact on Operations: Communication and coordination with the State Route and Interstate with City Streets will improve maintenance staff efficiencies and reduce related costs. These systems will also provide substantial improvements in system-wide signal timing and coordination,improving operational efficiencies,while also resulting in fewer citizen complaints. 15 Project Number: 800-2012-17 JL Key: 1831 Object: 5650 Intelligent Transportation System Upgrade-Citywide Project Location: City-Wide T -41 11)-RD Hit,SIDE RD Wlt SON-AVC-111 EEL,',AVE ic I anANYAN.sq > Est.Construction Start/End: —1210 TBD E3. G l SFVIN RD 4rFlFf(-TRC AIL Project Status: Design 'Milli bER Ai 0. Department: Z owr Engineering ERSEY-BWO WM-S-T Project Manager: Jason Welday Description: Construct conduit, fiberoptic cable, and networking devices to connect the City's traffic signals into the City's Intelligent Transportation System. Justification: Implementation of this project will improve monitoring,retiming and coordination of the City's traffic signal system. Project Cost Estimate Expenditure/Category Prior Years 2016/17 2017/18 2018/19 2019/20 TBD TOTAL Consultant Services $315,000 $0 $0 $0 $o $0 $315,000 Staff Training $595 $0 $0 $0 $0 $ o $595 Design/Equipment Specifications $0 $0 $0 $0 $0 $0 $0 Procurement/Construction $351,056 $100,000 $500,000 $500,000 $500,000 $5,433,350 $7,384,406 System Testing and Integration $o $0 $0 $0 $0 $0 $0 Contingency $0 $o $0 $0 $0 $0 $o Total Costs: $666,651 $100,000 $500,000 $500,000 $500,000 $5,433,350 $7,700,001 Project Funding: Funding Source Prior Years 2016/17 2017/18 2018/19 2019/20 TBD TOTAL Transportation(124) $666,651 $100,000 $500,000 $500,000 $500,000 $5,433,350 $7,700,001 Total Costs: $666,651 $100,000 $500,000 $500,000 $500,000 $5,433,350 $7,700,001 Impact on Operations: Development of the City's ITS will improve maintenance,staff efficiencies and reduce related costs. These system upgrades will also provide substantial improvements in system-wide signal timing and coordination, improving operational efficiencies,while also resulting in fewer citizen complaints. 16 Project Number: J L Key: 1940 Object: 5650 Milliken Avenue at 5th Street-Traffic Signal Installation Project Location: Milliken Avenue at 5th Street EMPIRE LAKES GOLF COURSE J N z ATH y , I Est.Construction Start/End: 3/2017—6/2017 z Project Status: i Design/Construction EMPIRE LAKES GOLF COURSE M I x Ia. Department: Engineering russron.vlsrAAg PR ECT LOCATION Project Manager: Jason Welday "4TH srt•• _ _.. __ _ _ _ _ _ _ _ _ r — Description: The scope of work to be performed in general consists of,but is not limited to,installation of traffic signals,fiber optic interconnect and related equipment at Milliken Avenue at 5th Street. Justification: The installation of traffic signals will improve traffic safety and reduce traffic congestion. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $30,000 $0 $0 $0 $0 $30,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $390,000 $0 $o $0 $0 $390,000 Inspection&Administration $0 $10,000 $0 $0 $0 $0 $10,000 Contingency $0 $39,000 $0 $0 $0 $0 $39,000 Total Costs: $0 $469,000 $0 $0 $0 $0 $469,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Transportation(124) $0 $469,000 $0 $0 $0 $0 $469,000 Total Costs: $0 $469,000 $0 $0 $0 $0 $469,000 Impact on Operations: The City will be responsible to pay for the cost of electricity and maintenance.The estimated cost of electricity and maintenance for a traffic signal is$2,500 per year. 17 Project Number: 800-2014-06 JL Key: 1875 Object: 5650 Milliken Avenue Upgrade Left Turn Phases Project Location: , I ( ."• NYA W Milliken Avenue at Millenium UA N-7 I "�J - r= Court; and Milliken Avenue at Vintage Drive. SS" i ��TA� N �1 210 —HI' I NfJ-AVE— =tli(sHLMN -AV 4� i1CTO R��A'-P RK,N� Est.Construction Start/End: 3J an41Fl ae FIRC s,A'r7jlo 'r.LEC•d21C el62At =-:"�I PAEI 12/2016—2/2017 v ' 'L CATI PROJEC ON. g — B 5 -UIN�,_ —, —Jtr_q Project Status: Design/Construction 1 � C HU Rf H-S+T Department: la s r o � Engineering Project Manager: w CIW C-CENTER K Jason Welday —Inl— n�— � Description: The scope of work to be performed in general consists of,but is not limited to,removing protected-permissive left turn phasing and replacing with flashing yellow arrow left turn phasing for the traffic signals on Milliken Avenue. Justification: The project will improve safety and efficiency for vehicles and pedestrians by providing flashing yellow arrow left turn vehicle movements. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $o $0 $0 $0 $0 $o $0 Design/Plan Review $25,000 $5,000 $0 $0 $0 $0 $30,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $86,000 $40,000 $0 $0 $0 $0 $126,000 Inspection&Administration $5,000 $5,000 $0 $0 $0 $0 $10,000 Contingency $9,000 $4,000 $0 $0 $0 $0 $13,000 Total Costs: $125,000 $54,000 $0 $o $0 $0 $179,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Transportation(124) $125,000 $54,000 $0 $0 $0 $0 $179,000 Total Costs: $125,000 $54,000 $0 $o $o $0 $179,000 Impact on Operations: After installation and configuration of the protected left turn traffic signal equipment, no additional impacts on operations will be present. 18 Project Number: JL Key: 1941 Object: 5650 Rochester Avenue at Jersey Boulevard -Traffic Signal Installation Project location: — � Rochester Avenue at Jersey Boulevard ���i ARROw_R.TE SEY'OIVD FIRESTATION�-��--�`�` II F Est.Construction Start/End: A,/ J % 3/2017-6/2017 f (((( MET ROU S'TAF ON Project Status: ( ROJE T%LOCATiO J I i Design/Construction �E ?IRE LAKES GOLF GM JU UL ' 1 NTH=Sd `pr1 R Department: h� e:Tws Engineering y. J Y• _ 4 Project Manager: - a EMPI E LAKES GOLF COURSE_J z Jason Welday < Description: The scope of work to be performed in general consists of,but is not limited to,installation of traffic signals,fiber optic interconnect and related equipment at Rochester Avenue at Jersey Boulevard. Justification: The installation of traffic signals will reduce traffic congestion. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $30,000 $0 $0 $0 $0 $30,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $o $250,000 $0 $0 $0 $0 $250,000 Inspection&Administration $0 $10,000 $0 $0 $0 $0 $10,000 Contingency $0 $25,000 $0 $0 $0 $0 $25,000 Total Costs: $0 $315,000 $0 $0 $0 $0 $315,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Transportation(124) $0 $315,000 $0 $0 $0 $0 $315,000 Total Costs: $0 $315,000 $0 $0 $0 $0 $315,000 Impact on Operations: The City will be responsible to pay for the cost of electricity and maintenance.The estimated cost of electricity and maintenance for a traffic signal is$2,500 per year. 19 Project Number: 800-2015-17 JL Key: 1902 Terra Vista at Spruce-Safety Lighting Installation Object: 5650 Project Location: BASE LINE Terra Vista Parkway at Spruce f �-- Avenue I- U U������ J U �s. YEBRl"= g COV O TETE...V.l PARK c-:: Est.Construction Start/End:TBD ,---- JJ� Project Status: f g SPRUG AVE E`PAR Design Department: WEST GREENWAY PARK Y._ I Engineering PROJECT LOCATION Project Manager: \�,\� LPN M.LEWIS PAR� �-� Jason Welday � Description: The scope of work to be performed in general consists of,but is not limited to,installing safety lighting at the existing all-way Stop- controlled intersection. Justification: The project will upgrade the lighting for vehicles and pedestrians by enhancing the visibility at the intersection. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $p $o So $o $o Design/Plan Review $0 $20,000 So $0 $0 $0 $20,000 Right-of-Way $0 $o So So So 50 SO Construction $0 $0 $100,000 $0 $0 $0 $100,000 Inspection&Administration $0 $0 $p $0 $O $0 $0 Contingency $0 $0 $10,000 $O 50 $0 $10,000 Total costs: 50 $20,000 $110,000 $O $0 $0 $130,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL SLD 4(154) $0 $20,000 $110,000 $0 $0 50 $130,000 Total Costs: $0 $20,000 $110,000 $0 SO SO $130,000 Impact on Operations: The project will increase the cost for electrical service,and maintenance to replace lamps will occur approximately every 5 years. 1 10 Future & Unfunded bi W. Projects included in this section are those that have been identified as being a priority project, but lack dedicated funding for the upcoming fiscal year. Projects designated as 'Unfunded' could be waiting on grant approval, or perhaps until new special fund monies become available. Projects showing dedicated funding sources, but which are slated to occur in future fiscal years have mostly likely been delayed due to issues with the future funding of operating expenses. We have included this section to illustrate those priority projects that did not make it into the FY 2016/17 budget for either of these reasons. Staff is actively pursuing grant or other fundraising opportunities for several of the projects in this section. Project List& FY 2016-17 Expenditures Project List& FY 2016-17 Expenditures 1 6th St @ BNSF Spur Crossing W/O $ 16,953,000 17 LMD 2-Pasco Lighting Repair and $ 150,000 Etiwanda Ave Replace 2 9th St along north side w/o Vineyard Ave- $ 115,800 18 Paul A.Biane Library-Second Floor $ 4,250,000 Grade Separation Rancho KIDS Project 3 Archibald Ave from Church to Palo Alto- $ 1,215,000 19 Rochester Ave&Arrow Rte n/e corner- $ 414,000 Storm Drain Street Widening 4 Distribution System Automation-Switch to $ 250,000 20 Victoria Gardens Cultural Center-Loading $ 200,000 RCMU Service Area Bay 5 Epicenter-Hardscape Prkg Lots B&C $ 66,000 Planter Islands $ 83,325,300 6 Etiwanda Ave Grade Separation a $ 40,000,000 Metrolink Tracks 7 Etiwanda Ave Line Extension from Arrow- $ 602,500 Sources of Funding for FY 2016-17 Foothill 8 Fire District-Central Station 178 $ 9,000,000 $9,000,000 9 Foothill Blvd:Grove Ave-San Bernardino $ 4,630,000 $150000 $90,800 $189,000 Rd-Widening , $25,000 10 Foothill Blvd: San Bernardino Rd-Vineyard $ 300,000 $25,000 Ave-Median Landscape $852,500 11 Haven Ave from Banyan to Wilson-Sidwalk $ 264,000 $895,000 Improvements 12 Haven Ave from Wilson to Vivienda- $ 150,000 Community Trail $72,098,000 13 Hermosa Ave:Banyan-Wilson-Pavement $ 260,000 ■Unknown ■LIVID 2 Rehab Municipal Utility ■Gas Tax R&T 7360 14 Hermosa Ave:Alta Loma Basin to Wilson- $ 2,245,000 ■Citywide Infrastructure ■Safe Rte to School Storm Drain :Fire Capital Projects ■Capital Reserve ■TDA Article 3 15 Lemon Ave:Archibald to Haven-Pavement $ 560,000 Rehab 16 Lemon Ave:Haven to 1,300"west-Storm $ 1,700,000 Drain J Project Number: 800-2015-18 J L Key: 1839 6th Street at BNSF Spur Crossing west of Etiwanda Avenue Object: 5650 Project Location: -FI 6th Street at the BNSF spur track, ?� m PROJECT bOCATION L west of Etiwanda Avenue. N u RAILRO FF J w �It > :lJ y Dm-WN:DR z r w � > —I 7.1N=ST-j Est.Construction Start/End: To be determined = n sr` 6TH ST y s 6.TH-ST a \ r Project Status: z w Design ISAN:t.1ARINO:ST w a a dJ j a Department: s _ST a Engineering 1 z GI�ISSIONWIST(AT/& v5 � Project Manager: 1� f 4TH ST Curt Billings U Description: Prepare preliminary design drawings and cost estimates for a grade crossing at 6th Street and the BNSF Railroad Spur. Justification: This project, if constructed, would complete 6th Street, between Santa Anita Avenue and Etiwanda Avenue,and provide better traffic circulation for the area. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $o $o $0 $0 $0 $0 $0 Design/Plan Review $74,360 $0 $0 $0 $0 $960,000 $1,034,360 Right-of-Way $0 $0 $0 $o $0 $893,000 $893,000 Construction $0 $0 $0 $0 $0 $12,100,000 $12,100,000 Inspection&Administration $0 $0 $0 $0 $0 $1,200,000 $1,200,000 Contingency $0 $0 $0 $0 $0 $1,800,000 $1,800,000 Total Costs: $74,360 $0 $0 $0 $0 $16,953,000 $17,027,360 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Unknown $0 $0 $0 $0 $0 $16,953,000 $16,953,000 Transportation Fund(124) $74,360 $0 $0 $0 $0 $0 $74,360 Total Costs: $74,360 $0 $0 $0 $0 $16,953,000 $17,027,360 Impact on Operations: None at this time. J1 i Project Number: 800-2012-20 1L Key: 1808 9th St, North side, West of Vineyard Ave-Sidewalk improvements Object: 5650 Project Location: �G`�`G 9th St, North side, From 100 ft. �Y\C�4� UJ j 'a L JILJIL west of Vineyard Ave. to 800 ft. �� a west of Vineyard Ave. ! W a BEAR GULCH }� m z EL MENT BEAR G LGH PAR' K ¢ (� Ui"RR�R,(C u r Est.Construction Start/End: 01/2018-02/201AMIGA 8 F--�1 E'LEMENTAENTARY'�1 CITY COFtPgR.ATE'IY;dRD Project Status: U Design �] t Department: Engineering PROJECT LOCATION i Project Manager: '� TH:ST: g �S IF Curt Billings i Description: Project to construct 700'of sidewalk on the north side of 9th St. Justification: To provide students a safe and direct route walking to school.The poject goal is to reduce the need for bus services and its benefits are measured by student surveys taken before and after the project. The City was awarded a federal Safe Routes To School grant to fund 75%of the construction costs. Project Cost Estimate($): Expenditure/Cateeory Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $o $0 $o $0 $o $o Design/Plan Review $7,850 $o $0 $0 $0 $0 $7,850 Right-of-Way $0 $0 $0 $0 $0 $o $o Construction $0 $0 $103,000 $0 $0 $0 $103,000 Inspection&Administration $0 $0 $2,300 $0 $o $0 $2,300 Contingency $0 $0 $10,500 $0 $0 $O $10,500 Total Costs: $7,850 $o $115,800 $o $o $0 $123,650 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Citywide Infrastructure(198) $7,850 $0 $25,000 $0 $0 $0 $32,850 Safe Route School Fund(234) $0 $0 $90,800 $0 $0 $0 $90,800 Total Costs: $7,850 $o $115,800 $o $0 $0 $123,650 Impact on Operations: Reduction in parkway maintenance costs J2 Project Number: 800-2012-14 1L Key: 1805 Object: 5650 Archibald Avenue from Church Street to Palo Alto Street-Storm Drain Project Location: i A<:NOLIA ST } Archibald Avenue from Church ] Street to Palo Alto Street 4 yf K 2 Qi BALSA ST PROJECT LOCATION (� - Est.Construction Start/End: Ql FNW000 sr To be determined �� f CA NULLWO.0 Sr 4 Project Status: _ a 5 - o Design 4 - 4; 4 m Y E'N S T J U Y LYl CT 4 4 Department: Engineering ----J a GHUftCH ST s Project Manager: Romeo David LAN�sr��aT Description: Construct a Master Planned Storm Drain,install catch basins,manholes,and laterals. Justification: This project will improve drainage within the area. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $o $0 $0 $0 Design/Plan Review $0 $0 $0 $0 $0 $35,000 $35,000 Right-of-Way $o $0 $0 $0 $0 $0 $0 Construction $0 $0 $0 $0 $0 $1,000,000 $1,000,000 Inspection&Administration $0 $0 $0 $0 $0 $80,000 $80,000 Contingency $0 $0 $0 $0 $0 $100,000 $100,000 Total Costs: $0 $0 $0 $0 $o $1,215,000 $1,215,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Unknown $0 $0 $0 $0 $o $1,215,000 $1,215,000 Total Costs: $0 $0 $0 $0 $0 $1,215,000 $1,215,000 Impact on Operations: Less routine maintenance,potholes,sand bags for storm water protection and storm water cleanup,thus freeing up maintenance crews to attend to other needed areas. J3 Project Number: 1L Key: 1916 Object: 5650 Distribution System Automation Project Location: P� II G vier Various key RCMU Switch ,r � �� 4 � w a t locations in RCMU Service Area \\ �r,F,F El.@fTR�I.=TR N \ „ vvv:� Tf Est.Construction Start/End: V v V A �v Avg TBD JEC'F'L0G' TION \ ,\\\; Project Status: _ \ Design/Construction ai �a Vv ���` VVv v A v`' �A � , Department: \V.` Engineering 6TH-S Q Project Manager: i Fred Lyn — rH ar a Description: Deployment of remotely and/or automatically controlled devices within RCMU's Distribution System. Justification: Placement of automated equipment in key asset infrastructure within RCMU's distribution system would allow for improvement in system reliability and efficiency in quickly identifying outages.The ability to remotely monitor distribution system conditions and and possibly control switches would reduce customer outage duration and improve restoration time.A SCADA system with a communication network such as wireless or existing fiber optic will be required. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $o $0 Design/Plan Review $0 $0 $50,000 $0 $0 $0 $50,000 Right-of-way $o $0 $o $0 $0 $o $o Construction $0 $0 $100,000 $0 $0 $0 $100,000 Inspection&Administration $0 $o $0 $0 $0 $0 $0 Contingency $0 $0 $100,000 $0 $0 $0 $100,000 Total Costs: $0 $0 $250,000 $0 $0 $0 $250,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Municipal Utility(Fund 705) $0 $0 $250,000 $0 $0 $0 $250,000 Total Costs: $0 $0 $250,000 $0 $0 $0 $250,000 Impact on Operations: The increased reliability will provide better customer service in identifying potential outages and restoring power as quickly as possibly in RCMU's service area. J4 Project Number: 800-2016-22 1L Key: Epicenter- Hardscape Parking Lot B and C Planter Islands Object: 5650 Project Location: , iiF Rvit s� v C DR A.ARDENS LN Epicenter Parking Lots B and C i t1 � Est.Construction Start/End: TBD ��RANGHO GVGAfdO7/"OI A DVITSPIRTSG111PL" } / Project Status: �9EaNYgR i Design/Construction JtOJ Department: GAL 0-CA QN---�--- � ; 'j Engineering i= s Project Manager: Curt Billings _ RyEy VLVD E Erv, Description: Replace landscaping at the planter islands parking lot with 60%decomposed granite and 40%rockscape in Lots B and C. Justification: Solar Photovoltaic Sytems were installed at Parking Lots B and C in FY 15/16.This project will replace landscaped planter islands in parking lots with hardscaping that is compatible with the solar canopies. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 So $0 $0 $0 Design/Plan Review $0 $0 $o $0 $O $5,000 $5,000 Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $0 $0 $0 $56,000 $60,000 Inspection&Administration $o $0 $0 $o $o $o $O Contingency $0 $0 So $0 $O $5,000 $5,000 Total Costs: $0 $0 $0 $0 $0 $66,000 $70,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL To be determined $0 $0 $0 $o $0 $66,000 $66,000 Total Costs: $0 $0 $0 $0 $o $66,000 $66,000 Impact on Operations: None J5 Project Number: 800-2015-25 JL Key: 1922 Etiwanda Avenue-Grade Separation at Metrolink Tracks Object: 5650 Project Location: Etiwanda Avenue from 6th Street —Q ARRO.W-R-rF to Arrow Route x �� w r, w ;n 2 z —s—, PROJECT LOCATION II wHITTRA...... -- V.t Est.Construction Start/End: aTSF Rnu.Rono Q a To be determined � z Project Status: Design Jw ."." a Department: s ri O ,7 Engineering s n c:In=s=r a } a r o : Project Manager: a Curt Billings :S.� y w Description: Prepare preliminary design drawings for a future grade separation on Etiwanda Avenue at the Metrolink Railroad Crossing south of Whitram Avenue. Justification: This project will improve safety and traffic circulation on Etiwanda Avenue. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $O Design/Plan Review $337,000 $0 $0 $0 $0 $1,000,000 $1,337,000 Right-of-Way $1,335,000 $0 $0 $0 SO $3,500,000 $4,835,000 Construction $0 $0 So $p $0 $32,000,000 $32,000,000 Inspection&Administration $0 $0 $0 Sp $O $500,000 $500,000 Contingency So $o $0 $o $0 $3,000,000 $3,000,000 Total Costs: $1,672,000 $0 $0 $o $o $40,000,000 $41,672,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 �_ 2019 20 TBD TOTAL Transportation Fund(124) $337,000 $0 $0 $0 $0 $0 $337,000 Infrastructure Fund(198) $1,335,000 $0 $0 $o $0 $0 $1,335,000 Unknown $0 $0 $0 $0 So $40,000,000 $40,000,000 Total Costs: $1,672,000 $0 $0 $0 $0 $40,000,000 $41,672,000 Impact on Operations: Added maintenance costs for a new bridge will be determined during design phase. J6 Project Number: JL Key: 1885 Etiwanda Avenue- Line Extension Object: 5650 Project Location: Etiwanda Avenue Electric Line Extension - from Arrow Route to FOO[HILL BLVD Foothill Boulevard �; r t,H�STNti.T.AVL 1� IVY A C Est.Construction Start/End: TBD PROJECT LOCATION Project Status: Design 'a Department: a 0 z Engineering F w ARROW RTF Project Manager: Fred Lyn Description: Distribution Line Extension east of the 1-15 freeway to service vacant parcels on the corner of Foothill Boulevard and Etiwanda Avenue with RCMU electricity. Justification: Line extension is needed to extend power service on Etiwanda Avenue to service vacant parcels on the corner Etiwanda Avenue and Foothill Boulevard. The City paid SCE exit fees for the right to service any load associated with a newly constructed facility or undeveloped parcels that has never been interconnected with Edison;this falls under that category. Project Cost Estimate($j: Expenditure/Category Prior Years 2016 17 2017 18 2018 19 _�_ 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $0 Design/Plan Review $0 $0 $0 $0 $0 52,500 $2,500 Right-of-Way $0 $0 $0 $p $O $o SO Construction $o $0 $0 $0 $o $500,000 $500,000 Inspection&Administration $o $o $0 $o $0 $0 $0 Contingency $0 $0 $0 $0 $o $100,000 $100,000 Total Costs: $D $o $o $0 $0 $602,500 $602,500 Project funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Municipal Utility(Fund 705) $0 $0 $0 $0 $0 $602,500 $602,500 Total Costs: $0 $0 $0 $0 $0 $602,500 $602,500 Impact on Operations: The increased electricity load will provide additional revenue to RCMU. J7 Project Number: JL Key: 1645 Fire District-Central Station 178) Object: 5650 Project Location: IL South Side of Town Drive, E/O BASE"EINE-RD Haven Avenue Z., r"L —�rUAL-O?AI-T .S.T A (0,06 EUEM EN TA!F'Y" Est.Construction Start/End: GROVE ST UTH MUSS Unknown NUDDLE AMiATA DR Z Project Status: > Negotiating Purchase and Sale 0 COYOTE CANYON F1 PI�FNT'ARY Of Property Department: T=Z Fire Protection District PR E L iLGISZT to Project Manager: UJ>—FOOT 1t:L79t:VD------------ Chief Mike Costello/Pamela Pane Z LU Description: Acquisition of property for a future fire station. Justification: This station will serve the center of the Rancho Cucamonga community. It will provide the area with emergency services for fire suppression and life safety. The project will be proposed to begin when the population and call volume trigger the need. Project Cost Estimate Expenditure/Category Prior Years 2016/17 2017/18 2018/19 2019/20 TBD TOTAL Environmental/NPDES $0 $o $o $ o $0 $o $0 Design/Plan Review $0 $o $o $0 $0 $1,000,000 $1,000,000 Land Acquisition $3,320,000 $0 $0 $0 $o $0 $3,320,000 Construction $0 $0 $0 $0 $0 $8,000,000 $8,000,000 Inspection&Administration $o $0 $o $o $0 $o $0 Contingency $50,000 $0 $0 $0 $0 $0 $50,000 Total Costs: $3,370,000 $0 $0 $o $0 $9,000,000 $12,370,000 Project Funding: Funding Source Prior Years 2016/17 2017/18 2018/19 2019/20 TBD TOTAL Fire Capital Projects(288) $3,370,000 $0 $0 $o $0 $9,000,000 $12,370,000 Total Costs: $3,370,000 $0 $0 $o $0 $9,000,000 $12,370,000 Impact on Operations: Annual station operations and maintenance costs will depend on the station size and staffing costs at the time of construction. Designs with greater active/passive energy conservation and greater xeriscape will cost less to operate. Capital equipment purchase of an engine. J 8 Project Number: 1L Key: 1189 Foothill Boulevard from Grove Avenue to San Bernardino Road -Widening with Median5island including Landscaped Median to Vineyard Avenue Project Location: v // i �\ I 1 RF�:MILLDR tr\ ' / S� Foothill Boulevard from Grove "JP // A"uL'�N Avenue to San Bernardino Road, including landscaped median to Vineyard Avenue aRA�PROJECT LOCATION Est.Construction Start/End: --�r uLunriRriw2sin '—-- a TBD FO(STHit",L-BLVp 1 .ttgn a 3 41CkELlN I UR Project Status: Design v\Z E��GjR`G n ST()NLY HILL nR 61, KNOLLWOUu nR Department: %ALSRILL U, z OI C15�W \ APPLEY/OOD D Engineering � w _s n n _VENISA:GPIAR�Q G J s Y 6 u g C s Project Manager: ��-- AfiR'C5W'R7E Curt Billings Description: This project is the last phase of the multi phased Foothill Boulevard street and bridge improvements and includes right-of-way acquisition,utility relocation,street widening,storm drain and landscape improvements. Justification: This project will provide increased traffic and pedestrian circulation including safety and visual enhancements. The project is identified in the City's General Plan and the Foothill Boulevard Specific Plan. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $p SO $0 $O Design/Plan Review $3,096,000 $0 $0 $0 $0 $30,000 $3,126,000 Right-of-Way $713,000 $0 $0 $0 $o 5141,000 $854,000 Construction $9,884,000 $0 $0 $0 $0 $4,059,000 $13,943,000 Inspection&Administration $613,000 $0 So $0 $0 $0 $613,000 Contingency $1,289,000 $0 $0 $0 $0 $400,000 $1,689,000 Total Costs: $15,595,000 $0 $0 $0 $0 $4,630,000 $20,225,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL RDA-2001 TAB(650) $3,504,000 $0 $0 $o $0 $O $3,504,000 RDA-2004 TAB(660) $11,684,000 $0 $o $p $0 $0 $11,684,000 Transportation Fund(124) $407,000 $0 $0 $0 $0 $0 $407,000 Unknown $0 $o $0 $0 $0 $4,630,000 $4,630,000 Total Costs: $15,595,000 $0 $0 $0 $0 $4,630,000 $20,225,000 Impact on Operations: This project adds one mile of additional landscape maintenance costs along Foothill Boulevard,as well as some additional street lights into SLD 1. 19 Project Number: 800-2015-03 JL Key: 1908 Object: 5650 Foothill Boulevard from San Bernardino Road to Vineyard Avenue• Median Landscape Project Location: Foothill Boulevard from San Bernardino Road to Vineyard Avenue pZ' QP J RED HILL COUNTRY CLUB Est.Construction Start/End: TBD .�• T L,t7CAT�ON�� Project Status: FOUTtlILL BLVD Design a Department: Engineering Project Manager: Curt Billings j Description: Install median landscape improvements consistant with the Foothill Boulevard Specific Plan, from San Bernardino Road to Vineyard Avenue. Justification: Improvements to the unimproved median will beautify as well as reduce weed abatement and dust control. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $o $0 $o $o $O $0 $0 Design/Plan Review $0 $0 $0 $o $o $o $o Right-of-Way $0 $o $0 $0 $o $o $o Construction $0 $0 $o $o $0 $265,000 $265,000 Inspection&Administration $0 $0 $0 $0 $0 $10,000 $10,000 Contingency $0 $o $0 $o $o $25,000 $25,000 Total Costs: $0 $0 $0 $0 $0 $300,000 $300,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Unknown $0 $0 $0 $0 $o $300,000 $300,000 Total Costs: $0 $0 $0 $0 $0 $300,000 $300,000 Impact on Operations: Cost savings from reduced weed abatement, however, this stretch will add water costs, along with routine maintenance of the median. 1 10 Project Number: 800-2013-32 JL Key: 1864 Object: 5650 Haven Avenue from Banyan Street to Wilson Avenue along the East side-Sidewalk Project Location: I East side of Haven Avenue from l-UM i HIL-LSIDE.Ro Banyan Street to Wilson Avenue LPROJECT LOCATION PL -J Ui WItSOWAVE io Est.Construction Start/End: 01/2017-03/2017 Project Status: EIRE STATION Design175 111111 ST Department: Engineering Project Manager: oUU Curt Billings PIPUUl r� Description: The Proposed sidewalk along east side of Haven Avenue will fill a gap where sidewalks are missing and provide improved ADA access to Chaffey College. Justification: This project is part of the City Master Plan.The improvements will improve pedestrian circulation and ADA compliance. Project Cost Estimate Ex2enditure/Category Prior Years 2016/17 2017/18 2018/19 2019/20 TBD TOTAL Environmental/NPDES $o $0 $0 $0 $o $o $0 Design/Plan Review $3,950 $o $0 so $o $0 $3,950 Right-of-Way $0 $0 $0 $o $0 $0 $o Construction $0 $0 $230,000 $0 $0 $0 $230,000 Inspection&Administration $0 $0 $11,000 $o $0 $0 $11,000 Contingency $0 $0 $23,000 $0 $0 $0 $23,000 Total Costs: $3,950 $0 $264,000 $o $0 $0 $267,950 Project Funding: Funding Source Prior Years 2016/17 2017/18 2018/19 2019/20 TBD TOTAL Gas Tax R&T 7360 Fund(174) $3,950 $0 $75,000 $0 so $0 $78,950 Ped Grant/Art3 Fund(214) $0 $0 $189,000 $0 $0 $0 $189,000 -------------- Total Costs: $3,950 $0 $264,000 $0 $o $o $267,950 Impact on Operations: None. Project Number: 800-2016-08 1L Key: 1829 Haven Avenue from Wilson Avenue to Vivienda Street- Comm unit Trail Object: 5650 West side Project Location: t Haven Avenue - From Wilson J 11 ; Avenue to Vivienda Street, west E AN�_ -�� side � `"`-\.\ C_. II NDAaT V,VIENDA 4t PUR Ct r--PROJECT LOCATION Est.Construction Start/End: TBD naLsiuF an Project Status: n�y Design <D ( ERRLEf.Ts —ELN I ,:o Department: APRI DR Engineering Project Manager: Romeo David i — wIL.5PN AVE CNAFFEY Description: Construction of an equestrian trail on Haven Avenue, west side. Project includes installation of 2 rail PVC fence, installation of decomposed granite and installation of mow curbs. Justification: This stretch will complete and connect missing sections of the existing community trail on the west side of Haven Avenue as part of the trail master plan.It will also improve the appearance of the west side of Haven Avenue. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $0 $O Design/Plan Review $o $0 $0 $0 $0 $10,000 $10,000 Right-of-Way $o $o $0 $o $o $o $o Construction $0 $0 $0 $0 $0 $100,000 $100,000 Inspection&Administration $0 $0 $0 $0 $0 $30,000 $30,000 Contingency $0 $0 $0 $a $o $10,000 $10,000 Total costs: $o $0 $0 $0 $o $150,000 $150,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Unknown $0 $0 $0 $0 S0 $150,000 $150,000 Total Costs: $0 $0 $0 $0 $0 $150,000 $150,000 Impact on Operations: This stretch will add an additional quarter mile to the City's trail inventory, requiring trash removal, weed abatement,and routine maintenance. J12 Project Number: 800-2012-29 JL Key: 1815 Object: 5650 Hermosa Avenue from Banyan Street to Wilson Avenue- Pavement Rehabilitation Project Location: Hermosa Avenue from Banyan 1 f � r.,�N.re:r:Cr Street to Wilson Avenue �xr 1 e 1 N ° WILSON AVE �- a a s J � � HERMOSA w IK y 4w j ,aI EMENTARY (`_ a• rt z rAAN71NliA,(jq�� q� ONW00 COTTr WAY s ��• h Est.Construction Start/End: y Y 08/2018-10/2018 1(311CUENSTJ J r --_ SAN L HI-L 7ER. - 'UHA1 W C Q �"T. t w-'NITA C.R--�-,.� I �ool Project Status: KF RMYUUU CT Design W c _uDi C g � T fit I i w' z a a �90lITMRIU. J Department: c_o�Asr— Engineering a x P T LOCATION �f3A YA T Project Manager: e > > _ Curt Billings � 1� � � u9NrAy_57 nW7 J i r Description: This project involves cold planning and localized asphalt removal and replacement,crack sealing,asphalt pavement overlay,traffic signal loop replacement,utility valve and manhole cover adjustments,and pavement striping. Justification: This project will restore the existing road surface to a substantially new condition,extending pavement life,use and rideability. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $o $0 $o $o $o So Design/Plan Review $10,000 $0 $10,000 $0 S0 $O $20,000 Right-of-Way $0 $0 $0 $0 So So $o Construction $0 $0 $220,000 $0 $o $o $220,000 Inspection&Administration $0 $o $10,000 $o $o $0 $10,000 Contingency $0 $0 $20,000 $p $o $O $20,000 Total costs: $10,000 $0 $260,000 $o $o $o $270,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 _�_ 2019 20 TBD TOTAL Gas Tax RT7360(174) $10,000 $0 $260,000 $p $o $o S270,000 Total Costs: $10,000 $0 $260,000 $o So $o $270,000 Impact on Operations: Reduced street maintenance costs for pothole repairs and crack seal,thus freeing up maintenance crews to attend to other needed areas. J13 Project Number: 800-2012-28 1L Key: 1810 Object: 5650 Hermosa Avenue from the Alta Loma Basin to Wilson Avenue-Storm Drain Im rovements Project Location: �Hermosa Avenue from the Alta //�� I w-FLoma Basin to Wilson Avenue — c � I 1 — WILSON AVE �^'�--1` a WW�FT, J Q HERMOSA WcI ' I m LEMENTARY J Q G COTTONWOOD WAY v ;S• ti �. ? i� Est.Construction Start/End: } I ;.,��_III✓I Jy'I' '' TBD Q -IAtai tA,llf p]I KIFItN1/V0q `�('T�-\ Project Status: {r �• �' r1(:Ti CtfA Design Department: ALTA LOMA BASIN ALTA LOMA BASIN Engineering I m PROJECT LOCATION Project Manager: l FSEIN1YAN_S r __4= Curt Billings Hrii ry�r ( 49 Description: Construct a master planned storm drain, install mainline, catch basins and manholes. The entire street from the Alta Basin to Wilson Avenue will be resurfaced upon completion(see Hermosa rehabilitation project JL 1815). Justification: This project will improve drainage and extend pavement life,use,and rideability.Also,during rain events it will provide improved pedestrian access to the Hermosa Intermediate School at Wilson Avenue and Hermosa Avenue. Project Cost Estimate{$): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $o $o $0 $o $° So So Design/Plan Review $10,000 $0 $0 $° $o $o $10,000 Right-of-Way $0 $0 $0 $0 $o $° $o Construction $0 $0 $0 $0 $o $2,000,000 $2,000,000 Inspection&Administration $o $0 $0 $0 $o $45,000 $45,000 Contingency $0 $0 $0 $0 $o 5200,000 $200,000 Total Costs: $10,000 $0 $o So $o S2,245,000 $2,255,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Drainage General Fund(112) $10,000 $0 $0 $o $° $0 $10,000 Unknown $0 $0 $0 $o $0 $2,245,000 $2,245,000 Total Costs: $10,000 $o So $0 $0 $2,245,000 $2,255,000 Impact on Operations: Elimination of storm water protection costs for placing sand bags and cleanup, and a reduction of street repair maintenace costs for pothole and crack repairs,thus freeing up maintenance crews for other areas. J14 Project Number: 800-2012-24 JL Key: 1793 0 bject: Lemon Avenue from Archibald Avenue to Haven Avenue- Pavement Rehabilitation5650 Project Location: Lemon Avenue from Archibald Avenue to Haven Avenue sfii AN D—RE A S D 5 Z > PROJECT LOCATION Est.Construction Start/End: 08/2018-10/2018 �ueE —.T Ln-7 ,0RIAOR 7, ij < z �< < Project Status: 3 0 < Design > Z - Department: A (Engineering J I-AUDAR09J, L L. A.UR VINEYARD Project Manager: JUNIORHIGH IIAUAT.Wry-4 Curt Billings til Ff AND-AVV Description: This project involves cold planning and localized asphalt removal and replacement,crack sealing,asphalt pavement overlay,traffic signal loop replacement,utility valve and manhole cover adjustments,and pavement striping. Justification: This project will restore the existing road surface to a substantially new condition,extending pavement life,use and ricleability. Project Cost Estimate Expenditure/Category Prior Years 2016/17 2017/18 .2018/19 2019/20 TBD TOTAL Environmental/NPDES so $0 $0 $0 $0 $0 $0 Design/Plan Review $10,000 $0 $0 so $0 $o $10'o00 Right-of-Way $o $0 $0 so $o $0 $0 Construction $0 $0 $500,000 $0 $0 $0 $500,000 Inspection&Administration $0 $0 $10,000 $0 $0 $o $10,000 Contingency $0 $0 $50,000 so $0 $0 $50,000 Total Costs: $10,000 $0 $560,000 $0 so $0 $570,000 Project Funding: Funding Source Prior Years 2016/17 2017/18 2018/19 2019/20 TBD TOTAL Prop 42 Fund(190) $10,000 $0 $o $0 $o $0 $10,000 Gas Tax R&T 7360 Fund(174) $0 $0 $560,000 $0 $o $0 $560,000 Total Costs: $10,000 $o $560,000 $o $o $0 $570,000 Impact on Operations: Reduced street maintenance costs for pothole repairs and crack seal,thus freeing up maintenance crews to attend to other needed areas. J 15 Project Number: 800-2011-08 JL Key: 1791 Lemon Avenue from Haven Avenue to 1,300 feet west-Storm Drain impObject: 5650 rovements Project Location: 1 } IL f t w Lemon Avenue from Haven ---� z—t�ANYAN:S—T—Q Avenue to 1300 feet west. v 1\ Q Q Q J LU Z m W S 1 Q G = > Q f--o Y Q jLU Q LU � K W Z In W > - Q Est.Construction Start/End: �--° uwY s = TBD �� z gf , u> gQ;x ANF., r I �YT Q>• Q ANCE -lT>Q� R � 1a - VAESPYNZA WPfOjeCt Status: C-f15DYDesign PROJECTLOCATION LU cog[<.o s1r F W < LU VINEYARD aN Department: Q o y JUNIOR HIGH /tP Engineering m x C a c HIGHI ANn•AVF Project Manager: Curt Billings FINCHAVE % 1- FI NCHA.VF Description: Construct a master planned storm drain,install mainline,catch basins and manholes.The entire street from Archibald Avenue to Haven Avenue will be resurfaced upon completion(see Lemon rehabilitation project JL 1793). Justification: This project will improve drainage and extend pavement life,use and rideability.Also,during rain events it will provide improved pedestrian access. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $o $0 $0 $0 50 $o $o Design/Plan Review $2,000 So $0 $0 $o $o $2,000 Right-of-Way $0 $0 $0 $p $0 $0 SO Construction $0 $0 $0 $0 $o $1,520,000 51,520,000 Inspection&Administration $o So $0 $0 $0 $10,000 $10,000 Contingency $0 $0 $0 $0 $0 $170,000 $170,000 Total Costs: $2,000 $0 $o $o So $1,700,000 51,702,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Drainage General Fund(112) $2,000 $0 $0 $0 $0 $0 $2,000 Unknown $0 $0 $o $0 $0 $1,700,000 $1,700,000 Total Costs: $2,000 $0 $0 $o $o $1,700,000 $1,702,000 Impact on Operations: Elimination of storm water protection costs for placing sand bags and cleanup, and a reduction of street repair maintenace costs for pothole and crack repairs,thus freeing up maintenance crews for other areas. J16 Project Number: JL Key: 1716 Object: 5650 Project Location: / 8 - L � p9 LMD2(Victoria)Area I1 I211) rill >AV F ON PAR \\ TN Pn lucj IA GR< E3 RA�`ti" V Cr-)RI-A- AR .AN- W ARK - K'l- VI T G R dI T E T.I � - pg27FtC�l•E.@:T RI_nR ViL FIR I17� / <'� C �+-'m`» q u �_ry�€LI;t:NA PARK cl.G� ACi FIG F Est.Construction Start End: N,C FI�J U AMONGA CENT ALTA nRKi� TBD , ASE!L'-I N� RD �040 U r Project Status' TE G:ANYp SPgRK 1 "NTA. ,� c CT to R A S-RAR ' RK '"-a.. �.. Ci rd OU IN Design ~ f :E AVENUE.PgRICWE 'f'GR ENWG�YP RK ii '"} MILLIKEN/PARK C ¢.r;---"�./ It Y L Department: ,,, j `RAL'PM.M'L-EIN pA`K• "-.s' �':-a2�y \;.� Public Works Services = '� m � < ` G c --� . : W P� ROJ,ECT-LOGAT a a�Project Manager: z Dean Rodia )VI i/ y`RA CHo jVC gMON aA ADU LT S pRT$,C L lVIC=CF -rERinRN EX Description: This project will repair,replace and upgrade paseo lighting within LIVID 2. The project will be sites VW2,VW6 and VW7. Justification: The decline of Paseo lighting is a hazard to public safety. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 So $o $o $o $o $o Design/Plan Review $10,000 So $o $o $o $o $10,000 Right-of-Way $0 $0 $0 $0 SO $0 $0 Construction $0 $0 $0 $0 $0 $135,000 $135,000 Inspection&Administration $0 $o $0 $0 $0 $0 $0 Contingency $o $o $o $0 $0 $15,000 $15,000 Total Costs: $10,000 $0 $0 $o $o $150,000 $160,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL LMD 2 Victoria(131) $10,000 $0 $o $o $o $150,000 $160,000 Total Costs: $10,000 $0 $o $0 $o $150,000 $160,000 Impact on Operations: When completed,this project will have a positive impact upon ongoing operations by lessening the failure rate of light poles thereby increasing the maintenance intervals and allowing staff time to be utilized elsewhere.The use of LEDs will cut current electric consumption by half. J17 Project Number: JL Key: 1867 Paul A. Biane Library-Second Floor Rancho KIDS Project Object: 5650 Project Location: _5 FXstLV 12505 Cultural Center Drive H-R12LS.k�< > Wl LU HOR F-wT�M T1JL_r 0 < JNJ VICTORIA I fAR NS CULT L CENT'ER PAULIBIANE LIB RY ,Z. LN RIff AIWX E RAP 11/2015-10/2016 Est.Construction Start/End: �QUTH M AINSTRI: L PRIC JEC4 LO ON z > Project Status: VLR] iSA11 I construction in progress _J— 4 L: S ST Department: RIA GAIRLDNS LN Library UJ Project Manager: UJ Brian Sternberg Description: Rancho KIDS is a project that will build out the second floor of the Paul A.Biane Library at Victoria Gardens. Rancho KIDS is envisioned as an interactive children's museum combined with traditional library services to create a new type of learning experience. Design and cost estimates of the second floor has been established as a City Council goal for FY 2014-15. Justification: Demand for library services in the community continues to increase,particularly for the ages 0-7. Rancho KIDS is being designed to provide a new,unique service model that will combine the features of interactive children's museum exhibits with traditional library services. Rancho KIDS should also be a regional draw that will provide additional visitors to both the Victoria Gardens Shopping District and the Lewis Family Playhouse. Project Cost Estimate Expenditure/Category Prior Years 2016/17 2017/18 2018/19 2019/20 TBD TOTAL Environmental/NPDES $0 $0 $ o $0 $0 $0 $0 Design/Plan Review $250,000 $o $0 $0 $0 $750,000 $1,000,000 Right-of-Way $o $0 $0 $0 $0 $0 $o Construction $2,400,000 $o $0 $0 $0 $3,500,000 $5,900,000 Inspection&Administration $0 $o $0 $0 $0 so $0 Contingency $0 $0 $0 $0 $0 $0 $o Total Costs: $2,650,000 $0 $o $0 so $4,250,000 $6,900,000 Project Funding: Funding Source Prior Years 2016/17 2017/18 2018/19 2019 20 TBD TOTAL Library Capital Fund(329) $2,650,000 $0 $0 $0 $0 $0 $2,650,000 Unknown $0 $0 $0 $0 $0 $4,250,000 $4,250,000 TotalCosts: $2,650,000 $0 $0 $0 $0 $4,250,000 $6,900,000 Impact on Operations: Feasibility study projects an approximate$300,000 per year cost for operations and maintenance. (The project is designed to be revenue-generating.) J 18 Project Number: 800-2016-18 1L Key: Object: 5650 Rochester Avenue and Arrow Route, North East Corner-Street Widening and Sidewalk Project Location: W M1ICRYIu-D.fl w L Rochester Ave and Arrow Rte, a Y � North East Corner - Street ------------- Widening and Sidewalk ¢ .>J.. Improvements ` .a`� o � Lt.1i['I=FNNIII MI=C:r EPICENTER'S PS PORTS COMPLEX RANCHO CUCAMONGA ADULT SPORTS COMPLEX Est.Construction Start/End: LI TBD I JACK=BENNY_Dft RC ANIrv1AL CARER ADOPTIO CENT lX Project Status: w RROW-RTE-- �,- Design/Construction cc W PROJECT LOCATION Department: Engineering 174 n p l 7 IJj ro V Project Manager: Curt Billings N �81T%-S-7 Description: This project will install 500 linear feet of street widening aimprovements,relocate 2 utility poles,underground utilites,install street lighting,and upgrade a traffic signal with video detection. Justification: The sidewalk and widening improvements will improve pedestrian and vehicle circulation. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $0 $0 $0 $2,000 $2,000 Design/Plan Review $0 So $o $0 $o $o $o Right-of-Way $0 $0 $0 $0 $0 $0 $0 Construction $0 $0 $0 $0 $0 $238,000 $238,000 Inspection&Administration $0 $0 $0 $0 $0 $150,000 $150,000 Contingency $0 $0 $0 $0 $0 $24,000 $24,000 Total Costs: $0 $0 $0 $o $o $414,000 $414,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 _� 2018 19 2019 20 TBD TOTAL Unknown $0 $0 $0 $0 $o $414,000 $414,000 Total Costs: $0 $0 $0 $0 $0 $414,000 $414,000 Impact on Operations: This project will reduce maintenance and weed abatement costs and increase lighting costs. 1 19 Project Number: JL Key: 1895 Victoria Gardens Cultural Center- Loading Bav Object: 5650 Project Location: J L �. C N 12505 Cultural Center Drive CHURCH S T o srcvc c,r 5 ,` > WIL�U HUR SELWAY �i 4 I- U VICTC)RIA ri �gRDEN*UUTU�L CE TES R Q z PAU L�BIANE LIBRAI L �/ �/ CANOPY L111R.11.1-MA111- FETI ' Est.Construction Start/End: TBD SUTIi'h:AINSTRGtl�-C =�`-- 'w �� f 1-- V Protect Status: VEItSAILLFS-_4,=U__C Q-_VFRSAII:ES•ST / (:I It RVIL S C:l Design/Construction VICTORIA�'AR � 'PROJECT LOCATI Department: o Community Services/Parks Y W W s Project Manager: <' o .? Nettie Nielsen / r Description: This project involves the design to cover a portion of the Service/Loading Bay at the Victoria Gardens Cultural Center. Justification: Project will provide covered area for theater construction projects. Project Cost Estimate($): Expenditure/Category Prior Years 2016 17 2017 18 �_ 2018 19 2019 20 TBD TOTAL Environmental/NPDES $0 $0 $o $o $O So $o Design/Plan Review $0 $0 525,000 $o $o $o S25,000 Right-of-Way $0 50 $O $0 $0 $0 $0 Construction $0 $0 $150,000 $0 $0 $0 $150,000 Inspection&Administration $0 $0 $0 $0 $O $O SO Contingency $0 50 $° So $° $° $o Total Costs: $o $o $175,000 $0 $0 $0 $175,000 Project Funding: Funding Source Prior Years 2016 17 2017 18 2018 L9 201 20 - — TBD TOTAL Capital Reserve(025) $O $0 $25,000 $0 $0 $0 $25,000 Unknown $0 $0 $175,000 $0 $0 $0 $175,000 Total costs; $0 $0 $200,000 $0 50 $0 $200,000 Impact on Operations: Improvements will require maintenance of the structure and added light fixtures,as well as minimal electric cost for light useage. J 20 General Plan Policies Fiscal Year 2ol6J2017 Capital Improvement Program B IFICATION �ANCHO CUCAMONGA Action Type Z m General Plan Policy m rn n o >, v R O O Implementation Action(s) E a w o ` cn a-- in W a. a u',. a` CM- Continue to provide pedestrian amenities on sidewalks on major 3.11 O streets that are key pedestrian routes, including the provision of benches,shade trees,and trash cans. Identify key pedestrian travel corridors citywide, and prepare a Citywide Pedestrian Circulation Study to determine pedestrian amenity needs, capital and operating funding sources, and a phased implementation program. Develop a program for gradually installing public amenities A B such as streetlights, benches, trash containers, art, drinking fountains, ENG PL C D 5 landscaping, etc. that will enhance the pedestrian environment and encourage increased use of transit. Use both the CIP process and other funding sources, including a program whereby businesses or residents may sponsor street furniture and/or landscaped areas. CM Continue to require that the siting and architectural design of new 312 O development promote safety, pedestrian-friendly design, and access to transit facilities. Develop standards to be applied to development projects along transit PL ENG 1 4 corridors that require transit and pedestrian accessibility. Establish a number of bike hubs in the City (centralized locations CM- O with convenient bike parking for trip destinations or transfer to 3.13 other transportation modes), at key transit nodes, and at commercial nodes. Conduct a study to determine the best locations for bike hubs in the City, and develop a plan, wayfinding program, and implementation process for ENG PL, RD A' B' 4 providing bike hubs that provide secure bicycle lockers, bike racks, and C, D connections to transit at key locations in the City. CM- O Enhance pedestrian and bicycle access to local and regional 3.14 transit,including facilitating connections to transit. Same action as identified for CM-3.7. ENG PL 1 4 CM- Coordinate the provision of the non-motorized networks (bicycle 3.15 O and pedestrian) with adjacent jurisdictions to maximize sub- regional connectivity. Same action as identified for CM-3.7. ENG PL A, E, F 4 CM- O Establish fixed-route local circulator bus service connecting major 3.16 activity centers.. Explore development of a fixed-route local circulator bus system, station ENG PL A, E, H 5 location, and funding mechanisms. Continue to Implement traffic management and traffic signal CM-4.1 O operations measures along the arterial roadway to minimize delay and congestion for all modes,without adversely impacting transit, bicycles,and pedestrians. Appendix A:Implementation Plan RANCHO CUCAMONGA GENERAL PLAN A-25 Action Ty pe 3 General Plan Policy U m W c Of c ° in 7a Implementation Action(s) N tm >+ v O O a a � 'c ao a` vai o w c o PL,AS, A B Same actions as identified for RC-4.1 to RC-4.5. ENG ENG, C, E, 3 CM, BS,PW, FIN G, I Encourage development of transit-oriented and infill development, PS-12.3 0 and encourage a mix of uses that foster walking and alternative transportation. Same action as identified for RC-4.4. PL ENG A, 1 3 Provide enhanced bicycling and walking infrastructure,and support PS-12.4 0 public transit, including public bus service, the Metrolink, and the potential for Bus Rapid Transit(BRT). Same action as identified for RC-4.4. PL ENG A, 1 3 Provide green building incentives, assess green building techniques as a formal stage of project review,and develop a green PS-12.5 O building ordinance or program that addresses both new and existing buildings.Adaptation strategies will also Include increased water efficiency In buildings. Same actions as identified for RC-6.1 to RC-6.4 PL ENG A, I, K 4 Encourage efforts to reduce waste generation and re-use and PS-12.6 0 support increased recycling and composting opportunities with a focus on large commercial and industrial waste producers. Same action as identified for PF-7.1. ENG PL A 3 PS-12.7 0 0 Support tree planting, planting more vegetation (including native and drought-resistant planting),and preservation of open space. Same actions as identified for RC-1.1, RC-8.1 to RC-8.7. PL ENG, N, A, 1 4 PW PS-12.8 0 Develop green procurement plans and ensure energy savings In City operations and maintenance. Same actions as identified for RC-5.1 to RC-5.3. AS CM, FIN, A,B, C, 4 PW E, K Develop energy- or climate change-themed publications and workshops,facilitating energy audits for residents,and establishing PS-12.9 0 partnerships to reduce greenhouse gas emissions. Increase public awareness about climate change, and encourage residents and businesses to become involved in activities and lifestyle changes that help reduce greenhouse gas emissions. Same action as identified for RC-5.1. CM ENG A, K 4 Consider the compatibility of proposed land uses with the noise environment when preparing or revising community and/or specific PS-13.1 O plans and when reviewing development proposals. The contour map depicting future noise levels(Figure PS-10)should be used by the City as a guide to land use/noise compatibility. Appendix A:Implementation Plan RANCHO CUCAMONGA GENERAL PLAN A-57 DRAINACTE amolilL J �ANCHO CUCAMONGA Action r* Type c, General Plan Policy 3 > d 5 C. m o m c c •- to tM T V O O Implementation Action(s) E CL a C = o no. a` Cl) 0.. ) m Complete intersection capacity improvements, coordinate traffic signals utilizing Intelligent Transportation Systems (ITS), and improve striping and signage. Striping shall maximize room for bike lanes where feasible and consistent with the Bicycle Plan. Modernize traffic signal equipment as necessary, and continue to update traffic signal timing and ENG PW A, D 3 synchronization plans to optimize traffic flow along the key arterial corridors, taking into account the needs of transit, bicyclists, and pedestrians as well. Invest in the communications infrastructure necessary to operate a Citywide traffic signal control system. Continue to design and operate arterials and intersections for the CM-4.2 O safe operation of all modes, including transit, bicyclists, and pedestrians. Same action as identified for CM-4.1. ENG A, D 3 CM-43 O Continue to implement Intelligent Transportation System Measures and advanced traffic management technologies where appropriate. Same action as identified for CM-4.1. ENG PW A, �, 3 Maintain the City's transportation infrastructure in good condition; CM-4.4 O O develop and maintain adequate funding sources for it's ongoing maintenance and upkeep. Continue to implement and follow the schedule for resurfacing streets ENG A, D, and streets improvements per the CIP. E F 4 Continue to require that new development participates in the cost of CM-5.1 O transportation mitigation and Improvements necessitated by new development,including non-automobile solutions. Require payment of Traffic Impact Fees as approved by the City Council, used to finance specific improvements made necessary by new development. The relationship between the fees, the cost of the ENG PL D 4 improvements, and new development has been established in fee analyses approved by the City Council. These fees shall be reviewed from time to time and adjusted as needed. Require evaluation of potential traffic and transportation impacts CM-5.2 O associated with new development prior to project approval, and require adequate mitigation measures, including non-automobile solutions,prior to,or concurrent with,project development. Require applicants to prepare traffic and transportation impact assessments consistent with adopted City guidelines and standards. Continue to require sidewalks, pedestrian paths, and connections to be ENG D 4 provided as part of new development projects to improve and enhance access between neighborhoods, and from neighborhoods to schools, parks, trails, commercial centers, and other activity centers. Appendix A:Implementation Plan A-26 RANCHO CUCAMONGA GENERAL PLAN Action Ty pe m General Plan Policy c d > O v d aN N 3 y O N W a U) 0 O O 0 o a Implementation Action(s) E 3 _ o a a rn a (n U. o_ Explore the Feasibility of Extending Local Transit Service Explore the possibility of extending to adjacent jurisdictions in cooperation with such jurisdictions who could also participate in funding, if beneficial to the City. Work with Regional Transit Operators(Omnitrans) Develop the optimum coordination and integration of bus transit services between the local City circulator system and the regional service. Consult with Omnitrans to establish and maintain transit hubs at CM-3.4 0 victoria Gardens, Chaffey College, the Metrolink Station, and other locations as appropriate to facilitate use of transit and transfers between transit services. Same action as identified for CM-3.1. ENG PL A 4 Consider and evaluate the possible relocation of the Metrolink CM-3.5 0 Station to Haven Avenue to provide improved connections to transit and to support planned transit-oriented land uses along Haven Avenue. Work with Metrolink and Southern California Regional Rail Authority (SCRRA) to study the feasibility of moving the Metrolink Station from its ENG, current location to Haven Avenue. Explore options for alternative funding PL RD E, F 6 from sources other than the General Fund, such as grants, and specifically grants that promote transit-oriented development. In addition to requiring private development to provide transit amenities, consult with regional transit operators to provide CM-3.6 0 attractive and convenient bus stops, including shadetweather protection, seats, transit information, and bus shelters as appropriate. Same action as identified for CM-3.1. Also, develop a program, with identified funding sources, for providing amenities at bus stops in the ENG PL D 4 City. Continue to develop and maintain a citywide bicycle network of off- street bike paths, on-street bike lanes, and bike streets to provide CM-3.7 0 0 connections between neighborhoods, schools, parks, civic center/facilities, recreational facilities, and major commercial centers. Appendix A:Implementation Plan A-23 RANCHO CUCAMONGA GENERAL PLAN Action T pe a, General Plan Palley 3 ' m on. L Gs = d O fn Ix _ N ?, t� O O Implementation Action(s) a o 0 a° a` cn n to Of ti a. Implement the Bicycle Plan pursuant to Figure CM-6. Update the City's Bicycle Circulation Plan in a format suitable for obtaining public funding. Develop the planning, implementation, and design details of the bicycle facility and amenity elements of the Community Mobility Chapter, including the setting of implementation priorities and the identification of both capital and operating funding sources. Implementation should focus on adding a north-south trail along either Deer Creek or Cucamonga Creek as a first priority. Update the City's Trails Implementation Plan to maintain consistency A, D, with the General Plan. ENG PL E F 1 4 Review City ordinances to ensure that an adequate mechanism exists to manage the use of trails only by authorized categories of users. Implementation of the Bicycle Plan may require traffic signalization at the crossing of bike paths with arterial roadways to facilitate the safe crossing of those arterials by bicyclists and pedestrians. Signals should be convenient to bicyclists with accessible push-buttons to activate the signal. Provide traffic control push button devices at convenient locations for bicyclists at signalized intersections on the identified Bicycle Network. CM-3.8 p p Continue to encourage the provision of bicycle facilities, such as bicycle lockers and secure bike parking,,throughout the City. Identify existing locations where bicycle lockers and secure bicycle parking could be provided at key locations throughout put the City, and develop a funding and implementation plan. Encouragelrequire the provision of bicycle lockers and secure bike parking for major development projects, as defined in the Development PL ENG A, D, Code. E, F, H 4 Modify the Development Code to require provision of bicycle parking spaces, bicycle lockers,and, as appropriate, showers for bicycle riders at new buildings providing significant employment, at transit stations, in the commercial districts, and at recreational destinations in the City. Identify and Implement .a dedicated funding "source, for CM-3.9 !O. implementation and cotnpl'etiort,af the Bicycle Network as identified In the Bicycle Plan. Same action as identified for CM-3.7. ENG E, F 4 CM- ® Continue to'complete the installation of sidewalks and require new 3.10 development to provide sidewalks., Use the CIP to identify a schedule for installing new and replacement sidewalks throughout the City, placing priority on installing missing ENG B' C, 4 sidewalks near schools and activity centers, and replacing sidewalks that D, have been identified as hazardous to public safety. Appendix A:Implementation Plan A-24 RANCHO CUCAMONGA GENERAL PLAN FACILITIES IRK, NCHO CUCAMONGA Action Type d General Plan Policy 3 > °Q Z ,d m aNi cm G >, o o m 4) Implementation Action(s) E CL a w o a- a` co a` in � ti a` Expand recreation and cultural attractions to enhance ED-2.3 O tourismlvisitor potential and to boost sales and transient occupancy tax. Develop brochures or links from the City's web site to showcase the various recreational and cultural venues to attract visitors to the City. Enhancement of cultural amenities, including regional entertainment RD CS A 7 options, recreation, and historic preservation, will help to embellish the City's reputation as a destination for a wide range of visitors. Expand lodging choices in the City through the recruitment and ED-2.4 O placement of full-service hotels that will complement the existing select-service hotel portfolio. Review and update marketing strategies (land surveys, infrastructure availability, and modes of transportation) to solicit the development of a RD PL A, G 4 full-service lodging facility. Make sure that zoning regulations can accommodate a full-service hotel at desired locations. ED-3.1 O O Continue to make public safety a priority. Use the annual budgeting process to allocate funding for public safety services, equipment, and facilities commensurate with the City's service CM PD, FD A 6 objectives. ED-3.2 O Provide community and cultural amenities. Same action as identified for ED-2.3. CS CM, RD A 4 ED-3.3 O Maintain a healthy fiscal balance. Use the annual budgeting process to check that revenues from all CM AS, FIN A, G 1 sources continue to more than match projected spending. ED-3,4 O O Improve internal circulation for all modes of transportation, consistent with the concept of"Complete Streets". Same action as identified for LU-3.1 to 3.8. ENG PL K' G' 4 ED-3.5 O Facilitate development of additional local and regional entertainment venues. Focus a special economic development team on the task of working towards attracting developers and investors interested in responding to RD PL A, G 6 local and regional demand for new entertainment options. ED-3.6 O Leverage the City's quality of life amenities to attract more knowledge-based workers. Expand the Economic Development Strategy to market Rancho Cucamonga's civic assets, including parks, recreation and community RD PL, CS A, G 4 enrichment facilities and programs,trails, and quality school districts. Appendix A:Implementation Plan A-30 RANCHO CUCAMONGA GENERAL PLAN Action Ty pe Z 3 General Plan Policy y c m CL L j y _ :3 y DEtm C C y V) O O °1 Implementation Action(s) E CL a y o a- a v` °i a` v) W Li a` RC-8.7 O O Support protection of natural habitat areas for ecological, educational,and other scientific study purposes. Same action as identified for RC-8.3. PL ENG A, 1 4 PF-1.1 O Continue to implement high-quality standards for new public facilities and improvements to existing buildings. Design and build all City buildings to serve as a model for quality architectural treatment and green building design in all new and PL ENG A, B, C 5 remodeled civic facilities. PF-1.2 O Promote community facilities as focal points for gatherings,events, and celebrations. Maintain all public facilities and buildings to address the needs of the various neighborhoods within the City. Advertise the availability of civic PW CS, LIB A, B, C 3 facilities to community groups. PF-1.3 O Locate new community facilities in neighborhoods and centers where they will serve populations with the greatest needs. Review and assess the needs for the location of community facilities as CS ENG, PL A 6 neighborhoods evolve. PF-1.4 O O Maintain public facilities and optimize their usefulness during their lifespan. Continue with proper maintenance programming and funding levels for CS, LIB, existing public facilities. PW AC A, B, C 4 PF-1.5 O O Continue to Incorporate low-maintenance features into public facilities consistent with the City's sustainability plan. Replace features of public facilities with lower maintenance types as part PL, CS, of the on-going maintenance program. PW BS A, B, C 3 PF-1.6 O Maintain multi-functional, flexible, and complementary space at community facilities. Same action as identified for PF-1.2. CS PW A, B, C 3 Maximize public facility use by sharing with nonprofit organizations,school districts,and community organizations.Look PF-1.7 O for opportunities to create joint-use community space at facilities owned by private organizations such as faith-based groups and service clubs. Same action as identified for CS-2.5. CS A 4 Consult with local school districts to enhance the development of PF-2.1 O O joint-use agreements,allowing for optimum use of school facilities, to provide broad community benefits such as public safety and education. Continue and expand joint use of facilities to achieve even greater CS SD A, K 5 optimization of school facilities to service the entire community. Appendix A:Implementation Plan A-44 RANCHO CUCAMONGA GENERAL PLAN MISC LLANLOUS IrItt, NCHO (CIUCAMONGA Action Ty pe Z 3 General Plan Policy jCL ayi a� O oa Empemenaoncos) w o0 a a cn Continue to provide a safe and efficient street system In the City,to CM-1.1 O support mobility goals, all transportation modes, and the goals of Managing the hand Use, Community Design, and Historic Resources Chapter. Add the intersection improvements listed below to the Capital Improvement Program (CIP) or appropriate equivalents identified and approved by the City Engineer in the future that would offset the identified impacts; implement the improvements as funding becomes available. Prepare a report on the need for the improvements and their relationship to the impacts caused by new development in Rancho Cucamonga. ■ Work with Caltrans and SANBAG to implement a new freeway interchange at 1-15 and Arrow Highway. ■ Complete Wilson Avenue between Milliken Avenue and Day Creek Boulevard. ENG A, D, 1 7 ■ Complete Rochester Avenue between Banyan Street and Wilson Avenue. ■ Pursue Federal funds for a grade separation of the SPRR at Etiwanda Avenue. ■ Complete storm drain and widening of Hellman Avenue from Foothill Boulevard to Cucamonga Creek. ■ Complete Wilson Avenue from East Avenue to Wardman Bullock. ■ Improve the Base Line Road at 1-15 Freeway Interchange. ■ Complete Youngs Canyon from Cherry Avenue to Banyan Street. Provide an integrated network of roadways that provides for CM-1.2 O convenient automobile, transit, bicycle, and pedestrian circulation movement around the City. Same actions as identified for CM-2.1 and CM-3.7. ENG PL A, D, 1 4 Complete the circulation system by constructing new roadway CM-1.3 O facilities and freeway interchanges pursuant to the Circulation Plan (Figure CM-2). Identify in the CIP future projects and new roadways based on available funding. ENG PL A, D, I 4 CM-1.4 O O Provide access for seniors and those with physical disabilities in all elements of the transportation system. Continue to operate the Silver Fox Express. Consult with Omnitrans regarding providing ACCESS transportation services. A, E. Require that all new future transportation facilities have appropriate and ENG CS F, H, I 4 adequate access for seniors and people with physical disabilities. Appendix A:Implementation Plan RANCHO CUCAMONGA GENERAL PLAN A-19 Action Type 3 General Plan Policy U Q i y - 3 m m C1 o d C c .y co 2 0 0 5 °' a) Implementation Actions) E a N o °0- a` ui a` cn W Li a` Implement street design standards per this General Plan, except that modified standards may be applied where appropriate on CM-1.5 O arterial corridors relating to transit,bicycle facilities,sidewalks,and on-street parking to be context sensitive to adjacent land uses and districts, and to all roadway users, including transit, bicycles, and pedestrians. Integrate into the CIP process the planning of modified standards for Foothill Boulevard to accommodate BRT and for other arterials as ENG PL A, D, 1 4 appropriate to reflect the bikeway plan and pedestrian improvements necessary to support Mixed Use districts. CM-1.6 O Pursue a railroad grade separation at Etiwanda Avenue and the BNSF Railway line. Grade separations currently exist at Haven and Milliken Avenues. Due to truck traffic associated with the southeast industrial area, the City ENG PL A, E, 1 4 supports creating a railroad grade separation at Etiwanda Avenue and the BNSF Railway line. CM-2.1 O O Facilitate bicycling and walking citywide. Implement the Bicycle Master Plan included in the Community Mobility Chapter. Require that pedestrian facilities and connections be provided as part of all development projects, with an emphasis on connections within Mixed Use districts. Implement all bicycling and walking policies and Mobility ENG PL, RD A, D, 1 4 Element components. Preparation and distribute bike route maps and bike facilities information. Publish and make readily available pedestrian route maps and pedestrian facilities information. Encourage all feasible measures to reduce total vehicle miles CM-2.2 O traveled by automobiles, including enhanced transit access and land use approaches that provide compact and focused development along major transit corridors. Same actions as identified for LU-2.1, LU-5.4, LU-5.6, and CM-2.1. ENG PL A, D, 1 4 CM-2.3 O Support the use of hybrid,electric,and lowlzero emission vehicles. Continue to maintain the Green Team Sustainability Action Matrix that identifies current and proposed efforts that procure vehicles that includes providing gas-efficient vehicles. CM PL,AS, A, E, F 7 Amend the Development Code as appropriate to accommodate alternative fuel service stations and charging facilities. CM-2.4 O Replace City vehicles with energy-efficient and alternative fuel source models when replacing vehicles or adding to the City's fleet. Appendix A:Implementation Plan A-20 RANCHO CUCAMONGA GENERAL PLAN Action k Ty pe B d General Plan Policy c d C O O w � t� CL Implementation Action(s) E a (A `O ° (L cn 0- cn a M Li a` Explore the Feasibility of Extending Local Transit Service Explore the possibility of extending to adjacent jurisdictions in cooperation with such jurisdictions who could also participate in funding, if beneficial to the City. Work with Regional Transit Operators(Omnitrans) Develop the optimum coordination and integration of bus transit services between the local City circulator system and the regional service. Consult with Omnitrans to establish and maintain transit hubs at CM-3.4 O Victoria Gardens, Chaffey College, the Metrolink Station,and other locations as appropriate to facilitate use of transit and transfers between transit services. Same action as identified for CM-3.1. ENG PL A 4 Consider and evaluate the possible relocation of the Metrolink CM-3.5 O Station to Haven Avenue to provide improved connections to transit and to support planned transit-oriented land uses along Haven Avenue. Work with Metrolink and Southern California Regional Rail Authority (SCRRA) to study the feasibility of moving the Metrolink Station from its ENG, current location to Haven Avenue. Explore options for alternative funding PL RD E, F 6 from sources other than the General Fund, such as grants, and specifically grants that promote transit-oriented development. In addition to requiring private development to provide transit amenities, consult with regional transit operators to provide CM-3.6 O attractive and convenient bus stops, including shadetweather protection, seats, transit Information, and bus shelters as appropriate. Same action as identified for CM-3.1. Also, develop a program, with identified funding sources, for providing amenities at bus stops in the ENG PL D 4 City. Continue to develop and maintain a citywide bicycle network of off- street bike paths, on-street bike lanes, and bike streets to provide CM-3.7 O O connections between neighborhoods, schools, parks, civic center/facilities, recreational facilities, and major commercial centers. Appendix A:implementation Plan A-23 RANCHO CUCAMONGA GENERAL PLAN Action ,, T e 3 ,General Plan Policy. o L B N co VI N o Q Implementation Action(s) a C ` o a. a cn a` in LL a. Implement the Bicycle Plan pursuant to Figure CM-6. Update the City's Bicycle Circulation Plan in a format suitable for obtaining public funding. Develop the planning, implementation, and design details of the bicycle facility and amenity elements of the Community Mobility Chapter, including the setting of implementation priorities and the identification of both capital and operating funding sources. Implementation should focus on adding a north-south trail along either Deer Creek or Cucamonga Creek as a first priority. Update the City's Trails Implementation Plan to maintain consistency A, D, with the General Plan. ENG PL E F I 4 Review City ordinances to ensure that an adequate mechanism exists to manage the use of trails only by authorized categories of users. Implementation of the Bicycle Plan may require traffic signalization at the crossing of bike paths with arterial roadways to facilitate the safe crossing of those arterials by bicyclists and pedestrians. Signals should be convenient to bicyclists with accessible push-buttons to activate the signal. Provide traffic control push button devices at convenient locations for bicyclists at signalized intersections on the identified Bicycle Network. CM-3.8 I O p Continue to encourage the provision of bicycle facilities, such as bicycle lockers and secure bike parking,jtliroaghout the City. Identify existing locations where bicycle lockers and secure bicycle parking could be provided at key locations throughout put the City, and develop a funding and implementation plan. Encourage/require the provision of bicycle lockers and secure bike parking for major development projects, as defined in the Development PL ENG A, D, Code. E, F, H 4 Modify the Development Code to require provision of bicycle parking spaces, bicycle lockers, and, as appropriate, showers for bicycle riders at new buildings providing significant employment, at transit stations, in the commercial districts, and at recreational destinations in the City. Identify and . implement a dedicated funding `,,'source for CM-3.9 O implementation and completion of the Bicycle Network as identified in the Bicycle Plan. Same action as identified for CM-3.7. ENG E, F 4 CM- Continue to�coniplete the,instaliat�on of s�dewaiks grid,require new` Q. 3'10 deve,lopinehtto:providesidevualks a .. Use the CIP to identify a schedule for installing new and replacement sidewalks throughout the City, placing priority on installing missing B, C, sidewalks near schools and activity centers, and replacing sidewalks that ENG D 4 have been identified as hazardous to public safety. Appendix A:Implementation Plan A-24 RANCHO CUCAMONGA GENERAL PLAN Action Type d General Plan Policy > a L S W c Cn N A V O O Implementation Action(s) E a w c `o a. a a ` cn ` Un W ti a-- Strategize with Foundation members to increase the range of CS A, H involvement in Foundation events. Provide a comprehensive, interconnected off-road trail system that CS-6.1 O provides alternative mobility choices throughout the entire City and increases connectivity. Continue to implement the principles of the Trails Implementation Plan. PL CS ENG A, 1 4 Connect trails in Rancho Cucamonga to trails in the San Bernardino CS-6.2 O National Forest and other hillside open space areas. These trails shall include trailheads with vehicle parking and other amenities. Coordinate with Federal and State agencies to facilitate funding and CS acquisition of trail connections from the City to the San Bernardino PL ENG A 5 National Forest. Connect new trails with the North Etiwanda Preserve. CS-6.3 O Continue to incorporate, where feasible, regional and community trails along utility corridors and drainage channels. Continue to make trail connections within the City on existing public- CS, agency owned properties. PL ENG A 5 Continue to maintain and pursue the development of planned trails CS-6.4 O and facilities for equestrian use within the Equestrian/Rural Area designation. Continue to ensure that trails accommodate equestrian users through details outlined in the Trails Implementation Plan within north Alta Loma PL ENG C, B 4 and Etiwanda. Improve existing trails by removing barriers,applying sustainability CS-6.5 O concepts, improving safety and function, and providing access to adjacent trails. Continue to program funding into the CIP for the improvements to ENG PL, BS A 4 deficient equestrian trails, as outlined in the Trails Implementation Plan. Require new development to provide access to adjacent trails and CS-6.6 O provide appropriate trail amenities (e.g., benches, drinking fountains, hitching posts, bike stands, and other amenities)for all new projects located adjacent to regional or community trails. Require new development projects adjacent to Regional or Community PL ENG A, K 4 Trails to provide access to and amenities for trails. CS-6 7 O Continue to credit pubiicaily accessible trailway acreage towards meeting parkland dedication standards. Continue to allow parkland credit for trails within development projects, PL ENG A, K 4 subject to adopted criteria. Appendix A:Implementation Plan A-36 RANCHO CUCAMONGA GENERAL PLAN Action Z' Ty pe General Plan Policy c 0 H o d W a c .y T 0 70 o g c Implementation Action(s) E a U) c `o a° a co a in W ti a` Develop a listing of acceptable fire-resistant plant types to be PW, incorporated into new and rehabilitated development sites. PL ENG, A 3 FD Encourage streetscape design and landscaping programs for LU-10.4 O commercial frontages that create vibrant places which support walking,bicycling,transit,and sustainable economic development. Same action as identified for LU-3.4. PL Rp, A 4 Consult with and coordinate with the Santa Fe Railway to develop LU-10.5 O and install a landscape plan for the enhancement of the railroad right-of-way. Inventory and assess the landscaping needs of the rail corridor, and PL ENG, A 6 consult with the rail agency to develop a plan. RD Continue to pursue strategies to reduce long-term operation and LU-10.6 O maintenance costs within the City's Landscape Maintenance Districts and other publicly funded areas. Inventory and prioritize the removal of turf areas within landscape medians to be replaced with plantings that reduce long-term operations PW ENG A 5 and maintenance costs. Continue to Implement and update as necessary the City's Sign LU-11.1 O O Ordinance in order to provide for a reasonable system of review and incentives for well-designed signs throughout the City. Establish a periodic review schedule of all City ordinances that govern aesthetics to determine if industry standards have changed or if other PL RD A, K 4 objectives are desirable that require amendments. Continue to require the undergrounding of utility lines and facilities LU-11.2 O O wherever feasible to minimize the unsightly appearance of overhead utility lines and utility enclosures. Require undergrounding of utilities for new development. Develop a A B strategy and prioritization list for the undergrounding utilities in developed ENG PL C 1 4 areas. LU-11.3 O O Require communication towers to be located and designed to blend with the surrounding environment. Review and update design guidelines for the siting and general appearance of communication towers to facilitate the least amount of PL A 4 visual intrusion. Emphasize use of stealth and architecturally integrated antenna. Ensure that streetscape design along roadways creates a strong LU-12.1 O landscaped edge, provides a coherent high-quality appearance along each route, and enhances the image of adjacent development. Appendix A:Implementation Plan A-13 RANCHO CUCAMONGA GENERAL PLAN Action Tv De 3 > General Plan Policy d " O. 2' a. N O c co N V O O = �' c o Q Implementation Action(s) E _ m 3 :o a a. cn a rn W LL a. PL,AS, A B Same actions as identified for RC-4.1 to RC-4.5. ENG ENG, C, E, 3 CM, BS, G, I PW, FIN Encourage development of transit-oriented and infill development, PS-12.3 O and encourage a mix of uses that foster walking and alternative transportation. Same action as identified for RC-4.4. PL ENG A, 1 3 Provide enhanced bicycling and walking infrastructure,and support PS-12.4 O public transit, including public bus service, the Metrolink, and the potential for Bus Rapid Transit(BRT). Same action as identified for RC-4.4. PL ENG A, 1 3 Provide green building incentives, assess green building techniques as a formal stage of project review,and develop a green PS-12.5 O building ordinance or program that addresses both new and existing buildings.Adaptation strategies will also include increased water efficiency in buildings. Same actions as identified for RC-6.1 to RC-6.4 PL BS ENG A, I, K 4 Encourage efforts to reduce waste generation and re-use and PS-12.6 O support increased recycling and composting opportunities with a focus on large commercial and industrial waste producers. Same action as identified for PF-7.1. ENG PL A 3 PS-12.7 O O Support tree planting, planting more vegetation (including native and drought-resistant planting),and preservation of open space. Same actions as identified for RC-1.1, RC-8.1 to RC-8.7. PL FW' A, 1 4 PS-12.8 O Develop green procurement plans and ensure energy savings in City operations and maintenance, Same actions as identified for RC-5.1 to RC-5.3. AS CM, FIN, A,B, C, 4 PW E, K Develop energy- or climate change-themed publications and workshops,facilitating energy audits for residents,and establishing PS-12.9 O partnerships to reduce greenhouse gas emissions. Increase public awareness about climate change, and encourage residents and businesses to become involved in activities and lifestyle changes that help reduce greenhouse gas emissions. Same action as identified for RC-5.1. CM ENG A, K 4 Consider the compatibility of proposed land uses with the noise environment when preparing or revising community and/or specific PS-13.1 O plans and when reviewing development proposals. The contour map depicting future noise levels(Figure PS-10)should be used by the City as a guide to land use/noise compatibility. Appendix A:Implementation Plan RANCHO CUCAMONGA GENERAL PLAN '4-57 MUNICIPAL UTILITY i IRK,ANCH O CUCAMONGA Action k Ty pe B d 3 General Plan Policy U w ' B o 0 �, c> O O Implementation Action(s) E a w = o O CL 'c 7 C) a a vn a. co w ti a RC-8.7 O O Support protection of natural habitat areas for ecological, educational,and other scientific study purposes. Same action as identified for RC-8.3. PL ENG A, 1 4 PF-1.1 O Continue to implement high-quality standards for new public facilities and improvements to existing buildings. Design and build all City buildings to serve as a model for quality architectural treatment and green building design in all new and PL ENG A, B, C 5 remodeled civic facilities. PF-1.2 O Promote community facilities as focal points for gatherings,events, and celebrations. Maintain all public facilities and buildings to address the needs of the various neighborhoods within the City. Advertise the availability of civic PW CS, LIB A, B, C 3 facilities to community groups. PF-1.3 O Locate new community facilities In neighborhoods and centers where they will serve populations with the greatest needs. Review and assess the needs for the location of community facilities as CS ENG, PL A 6 neighborhoods evolve. PF-1.4 O O Maintain public facilities and optimize their usefulness during their lifespan. Continue with proper maintenance programming and funding levels for PW CS, LIB, A, B, C 4 existing public facilities. AC PF-1.5 O O Continue to incorporate low-maintenance features into public facilities consistent with the City's sustainability plan. Replace features of public facilities with lower maintenance types as part PW PL, CS, A, B, C 3 of the on-going maintenance program. BS PF-1.6 O Maintain multi-functional, flexible, and complementary space at community facilities. Same action as identified for PF-1.2. CS PW A, B, C 3 Maximize public facility use by sharing with nonprofit organizations,school districts,and community organizations. Look PF-1.7 O for opportunities to create joint-use community space at facilities owned by private organizations such as faith-based groups and service clubs. Same action as identified for CS-2.5. CS A 4 Consult with local school districts to enhance the development of PF-2.1 O O joint-use agreements,allowing for optimum use of school facilities, to provide broad community benefits such as public safety and education. Continue and expand joint use of facilities to achieve even greater CS SD A, K 5 optimization of school facilities to service the entire community. Appendix A:Implementation Plan A-44 RANCHO CUCAMONGA GENERAL PLAN Action Type B d d General Plan Policy 3 >_ m ' Oa ' > T V t4 R O O = Y Implementation Action(s) B a H o a° a` ail a` (n W Ui a` Pursue efforts to reduce energy consumption through appropriate RC-4.1 O energy conservation and efficiency measures throughout all segments of the community. As it becomes economically practical, identify sources and replace A B imported, non-renewable energy resources with domestic renewable ENG, energy sources such as solar and wind energy, recycled municipal solid PL CM C, E, 5 waste, and green waste. G Promote the use of renewable energy and alternative energy technology, and support efforts to develop small-scale, distributed energy generation (e.g. solar, wind, cogeneration, and biomass) to RC-4.2 O reduce the amount of electricity drawn from the regional power grid and reduce the use of natural gas, while providing Rancho Cucamonga with a greater degree of energy and economic self- sufficiency. Provided that there would not be a decline in services to City residents or A B undue -tax burden, use of energy efficiency and renewable energy AS, CM, resources will be employed for approving capital and operational ENG PL E, G, I 6 expenditures. RC-4.3 O Encourage the use of solar energy systems in homes and commercial businesses. Establish design criteria for active and passive solar applications within PL ENG, A 5 development proposals. BS Reduce operational energy requirements through sustainable and RC-4.4 O O complementary land use and circulation planning. Support implementation of State mandates regarding energy consumption and greenhouse gas reduction,including AB32 and SB375. Promote land use and circulation patterns that result in multi-purpose automobile trips and that facilitate the use of local and regional transit; continue to advance land use patterns that provide employment and PL ENG A, 1 3 housing opportunities for City residents in a manner that allows for practical options for mobility other than by automobile. Support the development of private sources of sustainable and RC-4.5 O O environmentally friendly energy supplies, provided these are consistent with City aesthetic and public safety goals. Continue to make the recruitment and retention of "green" industries a RD CM, A, G 4 priority in conjunction with economic development strategies. PL Serve as a role model by adopting recognizable standards and Incorporating the use of sustainable strategies for new and existing RC-5.1 O public buildings that maximize occupant health and productivity, minimize operating costs, and provide good environmental stewardship. Appendix A:Implementation Plan A-40 RANCHO CUCAMONGA GENERAL PLAN PARKS �ANCH O CUCAMONGA Action ' Type B 3 General Plan Policy N c m C m CL c c fq 0 0 O O cCL o a Implementation Actions) E _ 3 0 a- a co a- cn U_ 0- Continue to assess that the recreational needs of the City's residents are consistent with the City's parkland standard, and determine possible re- CS PL, ENG A 4 use or conversion of infill sites for recreational uses to serve areas within the City with a disproportionate amount of parkland. Develop parks that contribute to active and healthy lifestyles, and CS-1.2 O allow for a balanced commitment to both organized recreation activities and passive park environments. Move forward with plans to continue to develop Central Park, expand Etiwanda Creek Park, add one new Community park, one new Special CS CM, A 4 Use Facility, and two new Neighborhood parks. Incorporate active and ENG passive facilities into new parks. CS-1.3 O Continue to develop Central Park as envisioned in the Central Park Master Plan. Continue to prioritize implementation of the improvements for Central CS ENG, PL A 4 Park as part of the City's CIP process. CS-1.4 O Pursue developing an outdoor special use facility that includes a multi-field sports complex. Continue to prioritize development of a sports complex and determine CS ENG, A 4 funding mechanisms, including corporate sponsorships/partnerships. RD, PL Continue to require new development to provide needed park CS-1.5 O facilities through the various measures and tools available to the City(e.g.,in-lieu fees and/or land dedication). Continue to make the provision of turn-key park and recreational facilities PL ENG, A, D, I, 4 the first priority over in-lieu fees for new residential development. CS K Pursue and expand joint-use of public lands that are available and CS-1.6 O suitable for recreational purposes, including school district properties and flood control district,water district, and other utility properties. Continue to coordinate with other agencies holding public lands for CS possible joint-use, trail easements, or re-use to serve park/recreation PL ENG A, K 4 particularly with school district properties. Encourage public safety and compatibility with adjacent uses CS-1.7 O through park location and design, including the location of buildings, lighting, parking, public transit, emergency access, and pedestrianibicycle access. Continue to utilize the Recreation Needs and System Recommendation CS PL, ENG A, K 4 Study and the park master plan concept in park planning. CS-1.8 O O Continue to build, renovate, and maintain parks in a manner that is environmentally sustainable. Appendix A:Implementation Plan A-32 RANCHO CUCAMONGA GENERAL PLAN Action ' Type c Y General Plan Policy. U 0 c� 0 0 °i Implementation Action(s) E u w c `0 0- (L a n i a cn W LL a` Continue to provide for maintenance, renovation and new construction of City parks in compliance with City policies, upgrading wastewater ENG CS, PL, A, B, C 4 systems as needed, and as technology evolves, substitute material that PW could reduce maintenance costs and is environmentally friendly. Develop;intermediate sized (10-12 acre) parks with lighted yathletic, CS-1.9 O fieidsand appropriate�`parking to accommodate community sports programs. Update the City's Recreation Needs and Systems Recommendation Study to determine the location for intermediate-sized park sites CS PL, ENG A, B, C 7 specifically developed for athletic field use. This may include joint-use facilities with a school district. Integrate Healthy RC activities, classes, and 'programs with CS-2.1 O recreational services that contribute to the health, 'fitness, and minds of participants. Continue to provide City-sponsored recreational programs and classes at CS CM A, 1 4 recreational centers/parks. CS-2.2 O @ Provide high-qualityCommunity Services programs that are flexible and responsive,,to the community's changing needs. Continue to provide active recreational opportunities through leagues CS CM A, 1 4 and organized sports. Plan and conduct community special events that bring residents CS-2.3 O together to, create an enhanced quality ,of life.and promote" economic development. Plan for community events through the annual budgeting process. CS RD, CM A, 1 4 Continue I to consult with :non-profit sports organizations and CS-2A O recreational,groups to support their offering of diverse recreational programs that complement and supplement those of the City: Continue to serve as a clearinghouse to coordinate among the various CS A, 1 4 sport leagues to make fields and facilities available. Contmue,to make community facilities and park'amenities available, CS-2:5' O for rental by community residents, non-profit groups. and businesses to"meet their recreational and business needs:' Continue to promote the City's various rental facility types by ensuring that a complete summary of locations, facilities, services, fees, and CS A 4 applications are available. Continue broad-based public outreach activities that inform CS-2;6 @' residents of all available Community; Services programs and services, and obtain input from the community`regarding,program and service needs. Appendix A:Implementation Plan A-33 RANCHO CUCAMONGA GENERAL PLAN Action Ty pe d d General Plan Policy U 3 > a=i 2 '= a Zs P �4 N _ 7 d p)Q O a Of rN rn O O Implementation Action(s) aw o o ° a L M m Cl- a cn a vn a U. a` RC-8.7 O O Support protection of natural habitat areas for ecological, educational,and other scientific study purposes. Same action as identified for RC-8.3. PL ENG A, 1 4 PF-1.1 O Continue to implement high-quality standards for new public facilities and improvements to existing buildings. Design and build all City buildings to serve as a model for quality architectural treatment and green building design in all new and PL ENG A, B, C 5 remodeled civic facilities. PF-1.2 O Promote community facilities as focal points for gatherings,events, and celebrations. Maintain all public facilities and buildings to address the needs of the various neighborhoods within the City. Advertise the availability of civic PW CS, LIB A, B, C 3 facilities to community groups. PF-1.3 O Locate new community facilities in neighborhoods and centers where they will serve populations with the greatest needs. Review and assess the needs for the location of community facilities as CS ENG, PL A 6 neighborhoods evolve. PF-1.4 O O Maintain public facilities and optimize their usefulness during their lifespan. Continue with proper maintenance programming and funding levels for PW CS, LIB, A, B, C 4 existing public facilities. AC PF-1.5 O O Continue to incorporate low-maintenance features into public facilities consistent with the City's sustainability plan. Replace features of public facilities with lower maintenance types as part PW PL, CS, A, B, C 3 of the on-going maintenance program. BS PF-1.6 O Maintain multi-functional, flexible, and complementary space at community facilities. Same action as identified for PF-1.2. CS PW A, B, C 3 Maximize public facility use by sharing with nonprofit organizations,school districts,and community organizations. Look PF-17 O for opportunities to create joint-use community space at facilities owned by private organizations such as faith-based groups and service clubs. Same action as identified for CS-2.5. CS A 4 Consult with local school districts to enhance the development of PF-2.1 O O joint-use agreements,allowing for optimum use of school facilities, to provide broad community benefits such as public safety and education. Continue and expand joint use of facilities to achieve even greater CS SD A, K 5 optimization of school facilities to service the entire community. Appendix A:Implementation Plan A-44 RANCHO CUCAMONGA GENERAL PLAN RAILROAD CROSSINGS RANCHO CUCAMONGA Action T e = 3 General Plan Policy a it C1 Implementation Action(s) a. CL Q fN C O o a L = m a a cn a a co W LL ` Continue to provide a safe and efficient street system in the City,to CM-1.1 O support mobility goals, all transportation modes, and the goals of Managing the Land Use, Community Design, and Historic Resources Chapter. Add the intersection improvements listed below to the Capital Improvement Program (CIP) or appropriate equivalents identified and approved by the City Engineer in the future that would offset the identified impacts; implement the improvements as funding becomes available. Prepare a report on the need for the improvements and their relationship to the impacts caused by new development in Rancho Cucamonga. ■ Work with Caltrans and SANBAG to implement a new freeway interchange at 1-15 and Arrow Highway. ■ Complete Wilson Avenue between Milliken Avenue and Day Creek Boulevard. ENG A, D, 1 7 ■ Complete Rochester Avenue between Banyan Street and Wilson Avenue. ■ Pursue Federal funds for a grade separation of the SPRR at Etiwanda Avenue. ■ Complete storm drain and widening of Hellman Avenue from Foothill Boulevard to Cucamonga Creek. ■ Complete Wilson Avenue from East Avenue to Wardman Bullock. ■ Improve the Base Line Road at 1-15 Freeway Interchange. ■ Complete Youngs Canyon from Cherry Avenue to Banyan Street. Provide an integrated network of roadways that provides for CM-1.2 O convenient automobile, transit, bicycle, and pedestrian circulation movement around the City. Same actions as identified for CM-2.1 and CM-3.7. ENG PL A, D, 1 4 Complete the circulation system by constructing new roadway CM-1.3 O facilities and freeway interchanges pursuant to the Circulation Plan (Figure CM-2). Identify in the CIP future projects and new roadways based on available funding. ENG PL A, D, I 4 CM-1.4 O O Provide access for seniors and those with physical disabilities in all elements of the transportation system. Continue to operate the Silver Fox Express. Consult with Omnitrans regarding providing ACCESS transportation services. A, E. Require that all new future transportation facilities have appropriate and ENG CS F, H, I 4 adequate access for seniors and people with physical disabilities. Appendix A:Implementation Plan RANCHO CUCAMONGA GENERAL PLAN A-19 Action Type 3 General Plan Policy c c i 0 O 2 t?' N Implementation Action(s) f0 a rL 0 o a ay c o a a cn a` (n W ii a` Complete intersection capacity improvements, coordinate traffic signals utilizing Intelligent Transportation Systems (ITS), and improve striping and signage. Striping shall maximize room for bike lanes where feasible and consistent with the Bicycle Plan. Modernize traffic signal equipment as necessary, and continue to update traffic signal timing and ENG PW A, D 3 synchronization plans to optimize traffic flow along the key arterial corridors, taking into account the needs of transit, bicyclists, and pedestrians as well. Invest in the communications infrastructure necessary to operate a Citywide traffic signal control system. Continue to design and operate arterials and intersections for the CM-4.2 O safe operation of all modes, including transit, bicyclists, and pedestrians. Same action as identified for CM-4.1. ENG A, D 3 CM-4.3 O Continue to implement Intelligent Transportation System Measures and advanced traffic management technologies where appropriate. Same action as identified for CM-4.1. ENG PW E; D. 3 Maintain the City's transportation Infrastructure in good condition; CM-4.4 O O develop and maintain adequate funding sources for it's ongoing maintenance and upkeep. Continue to implement and follow the schedule for resurfacing streets ENG A' D, 4 and streets improvements per the CIP. E, F Continue to require that new development participates in the cost of CM-5.1 O transportation mitigation and improvements necessitated by new development,including non-automobile solutions. Require payment of Traffic Impact Fees as approved by the City Council, used to finance specific improvements made necessary by new development. The relationship between the fees, the cost of the ENG PL D 4 improvements, and new development has been established in fee analyses approved by the City Council. These fees shall be reviewed from time to time and adjusted as needed. Require evaluation of potential traffic and transportation impacts CM-5.2 O associated with new development prior to project approval, and require adequate mitigation measures, including non-automobile solutions,prior to,or concurrent with,project development. Require applicants to prepare traffic and transportation impact assessments consistent with adopted City guidelines and standards. Continue to require sidewalks, pedestrian paths, and connections to be ENG D 4 provided as part of new development projects to improve and enhance access between neighborhoods, and from neighborhoods to schools, parks,trails, commercial centers, and other activity centers. Appendix A:Implementation Plan A-26 RANCHO CUCAMONGA GENERAL PLAN STREETS r� RA , C HO CUCAMONGA Action Ty pe m General Plan Policy � >_ a, 3 m 0 y _ 41 N >, V O O = �' m Implementation Action(s) E a y c `o_ 0 o ` CL ` <n W a a W a ii a` Continue to provide a safe and efficient street system in the City,to CM-1.1 O support mobility goals, all transportation modes, and the goals of Managing the Land Use, Community Design, and Historic Resources Chapter. Add the intersection improvements listed below to the Capital Improvement Program (CIP) or appropriate equivalents identified and approved by the City Engineer in the future that would offset the identified impacts; implement the improvements as funding becomes available. Prepare a report on the need for the improvements and their relationship to the impacts caused by new development in Rancho Cucamonga. ■ Work with Caltrans and SANBAG to implement a new freeway interchange at 1-15 and Arrow Highway. ■ Complete Wilson Avenue between Milliken Avenue and Day Creek Boulevard. ENG A, D, 1 7 ■ Complete Rochester Avenue between Banyan Street and Wilson Avenue. ■ Pursue Federal funds for a grade separation of the SPRR at Etiwanda Avenue. ■ Complete storm drain and widening of Hellman Avenue from Foothill Boulevard to Cucamonga Creek. ■ Complete Wilson Avenue from East Avenue to Wardman Bullock. ■ Improve the Base Line Road at 1-15 Freeway Interchange. ■ Complete Youngs Canyon from Cherry Avenue to Banyan Street. Provide an integrated network of roadways that provides for CM-1.2 O convenient automobile, transit, bicycle, and pedestrian circulation movement around the City. Same actions as identified for CM-2.1 and CM-3.7. ENG PL A, D, 1 4 Complete the circulation system by constructing new roadway CM-1.3 O facilities and freeway interchanges pursuant to the Circulation Plan (Figure CM-2). Identify in the CIP future projects and new roadways based on available ENG PL A, D, 1 4 funding. CM-1.4 O O Provide access for seniors and those with physical disabilities in all elements of the transportation system. Continue to operate the Silver Fox Express. Consult with Omnitrans regarding providing ACCESS transportation services. ENG CS A, E' 4 Require that all new future transportation facilities have appropriate and F, H, I adequate access for seniors and people with physical disabilities. Appendix A:Implementation Plan RANCHO CUCAMONGA GENERAL PLAN A-19 Action �. T pe = :a d General Plan Policy N 3 > c m u CL w N " y rn= O 5 c v) 1° o CID o Z. 0 o a Implementation Action(s) E a c c `o a a v� a` in ti a` Implement street design standards per this General Plan, except that modified standards may be applied where appropriate on CM-1.5 O arterial corridors relating to transit,bicycle facilities,sidewalks,and on-street parking to be context sensitive to adjacent land uses and districts, and to all roadway users, including transit, bicycles, and pedestrians. Integrate into the CIP process the planning of modified standards for Foothill Boulevard to accommodate BRT and for other arterials as ENG PL A, D, 1 4 appropriate to reflect the bikeway plan and pedestrian improvements necessary to support Mixed Use districts. CM-1.6 O Pursue a railroad grade separation at Etiwanda Avenue and the BNSF Railway Tine. Grade separations currently exist at Haven and Milliken Avenues. Due to truck traffic associated with the southeast industrial area, the City ENG PL A, E, I 4 supports creating a railroad grade separation at Etiwanda Avenue and the BNSF Railway line. CM-2.1 O O Facilitate bicycling and walking citywide. Implement the Bicycle Master Plan included in the Community Mobility Chapter. Require that pedestrian facilities and connections be provided as part of all development projects, with an emphasis on connections within Mixed Use districts. Implement all bicycling and walking policies and Mobility ENG PL, RD A, D, 1 4 Element components. Preparation and distribute bike route maps and bike facilities information. Publish and make readily available pedestrian route maps and pedestrian facilities information. Encourage all feasible measures to reduce total vehicle miles CM-2.2 O traveled by automobiles, including enhanced transit access and land use approaches that provide compact and focused development along major transit corridors. Same actions as identified for LU-2.1, LU-5.4, LU-5.6, and CM-2.1. ENG PL A, D, 1 4 CM-2.3 O Support the use of hybrid,electric,and lowizero emission vehicles. Continue to maintain the Green Team Sustainability Action Matrix that identifies current and proposed efforts that procure vehicles that includes providing gas-efficient vehicles. CM PL,AS, A, E, F 7 Amend the Development Code as appropriate to accommodate PW alternative fuel service stations and charging facilities. CM-2.4 O Replace City vehicles with energy-efficient and alternative fuel source models when replacing vehicles or adding to the City's fleet. Appendix A:Implementation Plan A-20 RANCHO CUCAMONGA GENERAL PLAN Action 211 Ty pe W m General Plan Policy 3 >_ °- Z, ` m = (D rn o N V R O O o c Q Implementation Action(s) E a y o a a cn a. I co W ti a` Complete intersection capacity improvements, coordinate traffic signals utilizing Intelligent Transportation Systems (ITS), and improve striping and signage. Striping shall maximize room for bike lanes where feasible and consistent with the Bicycle Plan. Modernize traffic signal equipment as necessary, and continue to update traffic signal timing and ENG PW A, D 3 synchronization plans to optimize traffic flow along the key arterial corridors, taking into account the needs of transit, bicyclists, and pedestrians as well. Invest in the communications infrastructure necessary to operate a Citywide traffic signal control system. Continue to design and operate arterials and intersections for the CM-4.2 O safe operation of all modes, including transit, bicyclists, and pedestrians. Same action as identified for CM-4.1. ENG A, D 3 CM-4.3 O Continue to implement Intelligent Transportation System Measures and advanced traffic management technologies where appropriate. Same action as identified for CM-4.1. ENG PW A, D, 3 Maintain the City's transportation infrastructure in good condition; CM-4.4 O O develop and maintain adequate funding sources for it's ongoing maintenance and upkeep. Continue to implement and follow the schedule for resurfacing streets ENG A, D, and streets improvements per the CIP. E F 4 Continue to require that new development participates in the cost of CM-5.1 O transportation mitigation and improvements necessitated by new development,including non-automobile solutions. Require payment of Traffic Impact Fees as approved by the City Council, used to finance specific improvements made necessary by new development. The relationship between the fees, the cost of the ENG PL D 4 improvements, and new development has been established in fee analyses approved by the City Council. These fees shall be reviewed from time to time and adjusted as needed. Require evaluation of potential traffic and transportation impacts CM-5.2 O associated with new development prior to project approval, and require adequate mitigation measures, including non-automobile solutions,prior to,or concurrent with,project development. Require applicants to prepare traffic and transportation impact assessments consistent with adopted City guidelines and standards. Continue to require sidewalks, pedestrian paths, and connections to be ENG D 4 provided as part of new development projects to improve and enhance access between neighborhoods, and from neighborhoods to schools, parks,trails, commercial centers, and other activity centers. Appendix A:Implementation Plan A-26 RANCHO CUCAMONGA GENERAL PLAN Action ' Ty pe m 3 General Plan Policy = �, i y O d a' a C .y Cn T U 2 O O Implementation Action(s) E a U) c `o ao a cn a` in � U. a` ED-3.7 O O Support access to local and regional educational resources that provide educational opportunities to local residents and workers. Coordinate with local and regional centers for higher education to RD PL, CM A 4 promote access to and programs for additional educational opportunities. ED-4.1 O Encourage high-quality design for infiil development and continue to support new high quality uses. Same action as identified for LU-5.1 to 5.6. PL RD A, I, K 4 ED-4.2 O Make green building and green business a priority. Same action as identified for LU-7.1 to 7.3. PL RD A, G 3 ED-4.3 O O Improve connectivity between development projects to create a more cohesive atmosphere. Same action as identified for LU-2.3. PL ENG A 5 ED-4.4 O Focus on enhancements to Foothill Boulevard and Haven Avenue. Same action as identified for LU-5.1 to 5.6. PL RD ENG A, I, K 5 ED-4.5 O Review and understand the fiscal, job creation, and economic benefits of new proposed uses in the City's industrial-zoned areas. Focus a special economic development effort on assessing where re-use or conversion of industrial properties to other uses could occur. Identify RD PL A, G 5 potential conflicts in order to develop a strategy for when such conversions could be considered a benefit versus a cost. ED-5.1 O Engage In regional transit planning efforts. Continue to be involved in planning efforts to address regional transportation solutions, particularly those providing transit options. In PL ENG A, K 4 particular, work with Omnitrans in its efforts to establish BRT service in Rancho Cucamonga. ED-5.2 O Continue to capitalize on proximity to Interstate 10, Interstate 15, State Route 210,and the LA/Ontario International Airport. Review and assess the effectiveness of way-finding signage to ensure that the City's accessibility to 1-10, 1-15 and SR-210 from major areas of City commerce hubs is easily ascertained and facilitated. Begin RD PL, ENG A, G 4 programs to improve such signage where it is deficient or confusing. Maximize the benefits of a major airport just outside of the City's borders. Provide adequate park and recreational facilities that meet the City CS-1.1 O standard of 6.0 acres of parkland (including trails and special facilities)for every 1,000 persons. Appendix A:Implementation Plan A-31 RANCHO CUCAMONGA GENERAL PLAN FFIC NCHO RA, CUCAMONGA Action 2:, T pe = a 3 General Plan Policy a d o a� c d o o4, Implementation Action(s) a a o E ay c o L a a a cn a` v) W ti a` CM- Continue to provide pedestrian amenities on sidewalks on major 3.11 O streets that are key pedestrian routes, including the provision of benches,shade trees,and trash cans. Identify key pedestrian travel corridors citywide, and prepare a Citywide Pedestrian Circulation Study to determine pedestrian amenity needs, capital and operating funding sources, and a phased implementation program. Develop a program for gradually installing public amenities A B such as streetlights, benches, trash containers, art, drinking fountains, ENG PL C D 5 landscaping, etc. that will enhance the pedestrian environment and encourage increased use of transit. Use both the CIP process and other funding sources, including a program whereby businesses or residents may sponsor street furniture and/or landscaped areas. CM- Continue to require that the siting and architectural design of new 3.12 O development promote safety, pedestrian-friendly design, and access to transit facilities. Develop standards to be applied to development projects along transit PL ENG I 4 corridors that require transit and pedestrian accessibility. Establish a number of bike hubs in the City (centralized locations CM- O with convenient bike parking for trip destinations or transfer to 3.13 other transportation modes), at key transit nodes, and at commercial nodes. Conduct a study to determine the best locations for bike hubs in the City, and develop a plan, wayfinding program, and implementation process for ENG PL, RD A' B' 4 providing bike hubs that provide secure bicycle lockers, bike racks, and C, D connections to transit at key locations in the City. CM- Enhance pedestrian and bicycle access to local and regional 3.14 transit,including facilitating connections to transit. Same action as identified for CM-3.7. ENG PL I 4 CM- Coordinate the provision of the non-motorized networks (bicycle 3.15 O and pedestrian) with adjacent jurisdictions to maximize sub- regional connectivity. Same action as identified for CM-3.7. ENG PL A, E, F 4 CM- O Establish fixed-route local circulator bus service connecting major 3.16 activity centers. Explore development of a fixed-route local circulator bus system, station ENG PL A, E, H 5 location, and funding mechanisms. Continue to implement traffic management and traffic signal CM-4.1 O operations measures along the arterial roadway to minimize delay and congestion for all modes, without adversely impacting transit, bicycles,and pedestrians. Appendix A:Implementation Plan RANCHO CUCAMONGA GENERAL PLAN A-25 Action �• Ty pe 3 General Plan Policy m d R a. L > _ d c ai a� o c ._ vn Ta Implementation Action(s) `° a a v a E ; d c O a a cn a v� W LL a` Complete intersection capacity improvements, coordinate traffic signals utilizing Intelligent Transportation Systems (ITS), and improve striping and signage. Striping shall maximize room for bike lanes where feasible and consistent with the Bicycle Plan. Modernize traffic signal equipment as necessary, and continue to update traffic signal timing and ENG PW A, D 3 synchronization plans to optimize traffic flow along the key arterial corridors, taking into account the needs of transit, bicyclists, and pedestrians as well. Invest in the communications infrastructure necessary to operate a Citywide traffic signal control system. Continue to design and operate arterlals and Intersections for the CM-4.2 O safe operation of all modes, including transit, bicyclists, and pedestrians. Same action as identified for CM-4.1. ENG A, D 3 CM-4.3 O Continue to implement Intelligent Transportation System Measures and advanced traffic management technologies where appropriate. Same action as identified for CM-4.1. ENG PW E; �, 3 Maintain the City's transportation infrastructure In good condition; CM-4.4 O O develop and maintain adequate funding sources for it's ongoing maintenance and upkeep. Continue to implement and follow the schedule for resurfacing streets A, D, and streets improvements per the CIP. ENG E F 4 Continue to require that new development participates in the cost of CM-5.1 O transportation mitigation and improvements necessitated by new development,including non-automobile solutions. Require payment of Traffic Impact Fees as approved by the City Council, used to finance specific improvements made necessary by new development. The relationship between the fees, the cost of the ENG PL D 4 improvements, and new development has been established in fee analyses approved by the City Council. These fees shall be reviewed from time to time and adjusted as needed. Require evaluation of potential traffic and transportation impacts CM-5.2 O associated with new development prior to project approval, and require adequate mitigation measures, Including non-automobile solutions,prior to,or concurrent with,project development. Require applicants to prepare traffic and transportation impact assessments consistent with adopted City guidelines and standards. Continue to require sidewalks, pedestrian paths, and connections to be ENG D 4 provided as part of new development projects to improve and enhance access between neighborhoods, and from neighborhoods to schools, parks,trails, commercial centers, and other activity centers. Appendix A:Implementation Plan A-26 RANCHO CUCAMONGA GENERAL PLAN FUTURE & UNFUNDED r�- RANCHO CUCAMONGA Action Ty pe m General Plan Policy 3 >= m N = O U d ) TO Q 7 O Q 0 y 0 o a Implementation Action(s) a s o LL Continue to provide a safe and efficient street system in the City,to CM-1.1 O support mobility goals, all transportation modes, and the goals of Managing the Land Use, Community Design, and Historic Resources Chapter. Add the intersection improvements listed below to the Capital Improvement Program (CIP) or appropriate equivalents identified and approved by the City Engineer in the future that would offset the identified impacts; implement the improvements as funding becomes available. Prepare a report on the need for the improvements and their relationship to the impacts caused by new development in Rancho Cucamonga. ■ Work with Caltrans and SANBAG to implement a new freeway interchange at 1-15 and Arrow Highway. ■ Complete Wilson Avenue between Milliken Avenue and Day Creek Boulevard. ENG A, D, 1 7 ■ Complete Rochester Avenue between Banyan Street and Wilson Avenue. ■ Pursue Federal funds for a grade separation of the SPRR at Etiwanda Avenue. • Complete storm drain and widening of Hellman Avenue from Foothill Boulevard to Cucamonga Creek. ■ Complete Wilson Avenue from East Avenue to Wardman Bullock. ■ Improve the Base Line Road at 1-15 Freeway Interchange. ■ Complete Youngs Canyon from Cherry Avenue to Banyan Street. Provide an integrated network of roadways that provides for CM-1.2 O convenient automobile, transit, bicycle, and pedestrian circulation movement around the City. Same actions as identified for CM-2.1 and CM-3.7. ENG PL A, D, 1 4 Complete the circulation system by constructing new roadway CM-1.3 O facilities and freeway interchanges pursuant to the Circulation Plan (Figure CM-2). Identify in the CIP future projects and new roadways based on available funding. ENG PL A, D, I 4 CM-1.4 O O Provide access for seniors and those with physical disabilities in all elements of the transportation system. Continue to operate the Silver Fox Express. Consult with Omnitrans regarding providing ACCESS transportation services. A, E. Require that all new future transportation facilities have appropriate and ENG CS F, H, 1 4 adequate access for seniors and people with physical disabilities. Appendix A:Implementation Plan RANCHO CUCAMONGA GENERAL PLAN A-19 Action Z. T pe = :n 3 > General Plan Policy c a 2 d y ayi rn o � w Q: c •y � CD a. a N Implementation Action(s) E CL CL a o a` �'n ti a` Complete intersection capacity improvements, coordinate traffic signals utilizing Intelligent Transportation Systems (ITS), and improve striping and signage. Striping shall maximize room for bike lanes where feasible and consistent with the Bicycle Plan. Modernize traffic signal equipment as necessary, and continue to update traffic signal timing and ENG PW A, D 3 synchronization plans to optimize traffic flow along the key arterial corridors, taking into account the needs of transit, bicyclists, and pedestrians as well. Invest in the communications infrastructure necessary to operate a Citywide traffic signal control system. Continue to design and operate arterials and Intersections for the CM42 O safe operation of all modes, including transit, bicyclists, and pedestrians. Same action as identified for CM-4.1. ENG A, D 3 CM-4.3 O Continue to implement Intelligent Transportation System Measures and advanced traffic management technologies where appropriate. Same action as identified for CM-4.1. ENG PW E, FD, 3 Maintain the City's transportation infrastructure in good condition; CM-4.4 O O develop and maintain adequate funding sources for it's ongoing maintenance and upkeep. Continue to implement and follow the schedule for resurfacing streets ENG A, D, 4 and streets improvements per the CIP. E, F Continue to require that new development participates in the cost of CM-5.1 O transportation mitigation and improvements necessitated by new development,including non-automobile solutions. Require payment of Traffic Impact Fees as approved by the City Council, used to finance specific improvements made necessary by new development. The relationship between the fees, the cost of the ENG PL D 4 improvements, and new development has been established in fee analyses approved by the City Council. These fees shall be reviewed from time to time and adjusted as needed. Require evaluation of potential traffic and transportation impacts CM-5.2 O associated with new development prior to project approval, and require adequate mitigation measures, including non-automobile solutions,prior to,or concurrent with,project development. Require applicants to prepare traffic and transportation impact assessments consistent with adopted City guidelines and standards. Continue to require sidewalks, pedestrian paths, and connections to be ENG D 4 provided as part of new development projects to improve and enhance access between neighborhoods, and from neighborhoods to schools, parks,trails, commercial centers, and other activity centers. Appendix A:Implementation Plan A-26 RANCHO CUCAMONGA GENERAL PLAN Action Z.' Ty pe Z d 3 General Plan Policy = �, L JT r O d C Q' C •y fn O O m Implementation Action(s) E a w c `O_ a- a` co a` Cn W ti a Continue to assess that the recreational needs of the City's residents are consistent with the City's parkland standard, and determine possible re- CS PL, ENG A 4 use or conversion of infill sites for recreational uses to serve areas within the City with a disproportionate amount of parkland. Develop parks that contribute to active and healthy lifestyles, and CS-1.2 O allow for a balanced commitment to both organized recreation activities and passive park environments. Move forward with plans to continue to develop Central Park, expand Etiwanda Creek Park, add one new Community park, one new Special CS CM, A 4 Use Facility, and two new Neighborhood parks. Incorporate active and ENG passive facilities into new parks. CS-1.3 O Continue to develop Central Park as envisioned in the Central Park Master Plan. Continue to prioritize implementation of the improvements for Central CS ENG, PL A 4 Park as part of the City's CIP process. CS-1.4 O Pursue developing an outdoor special use facility that includes a multi-field sports complex. Continue to prioritize development of a sports complex and determine CS ENG, A 4 funding mechanisms, including corporate sponsorships/partnerships. RD, PL Continue to require new development to provide needed park CS-1.5 O facilities through the various measures and tools available to the City(e.g.,in-lieu fees and/or land dedication). Continue to make the provision of turn-key park and recreational facilities PL ENG, A, D, I, 4 the first priority over in-lieu fees for new residential development. CS K Pursue and expand joint-use of public lands that are available and CS-1.6 O suitable for recreational purposes, including school district properties and flood control district,water district, and other utility properties. Continue to coordinate with other agencies holding public lands for CS possible joint-use, trail easements, or re-use to serve park/recreation PL ENG A, K 4 particularly with school district properties. Encourage public safety and compatibility with adjacent uses CS-1.7 O through park location and design, including the location of buildings, lighting, parking, public transit, emergency access, and pedestrian/bicycle access. Continue to utilize the Recreation Needs and System Recommendation CS PL, ENG A, K 4 Study and the park master plan concept in park planning. CS-1.8 O O Continue to build, renovate,and maintain parks in a manner that is environmentally sustainable. Appendix A:Implementation Plan A-32 RANCHO CUCAMONGA GENERAL PLAN Action T e B $ General Pian Rolicy o m a> O ?+ V co O O 0 o a Implementation Action(s) E c w o a 0- a` in X ti a Continue to provide for maintenance, renovation and new construction of City parks in compliance with City policies, upgrading wastewater CS, PL, systems as needed, and as technology evolves, substitute material that ENG PW A, B, C 4 could reduce maintenance costs and is environmentally friendly. Develop intermediate sized (10-12 acre)'parkswith iighted athletic CS-1.9 O ,f eids�and appropriate parking to'accotnmodate`comn unity sports programs: Update the City's Recreation Needs and Systems Recommendation Study to determine the location for intermediate-sized park sites CS PL, ENG A, B, C 7 specifically developed for athletic field use. This may include joint-use facilities with a school district. Integrate Healthy RC activities, classes, and programs with CS-2.A O recreational services that contribute to the health, fitness, and minds of participants. Continue to provide City-sponsored recreational programs and classes at CS CM A, 1 4 recreational centers/parks. CS-2.2 O p Provide,high-quality Community Services programs that are flexible and responsive to the community's changing needs. Continue to provide active recreational opportunities through leagues CS CM A, 1 4 and organized sports. Plan,and conduct`community,special events�that,,biing`resi"dents CS-2.3 'O 'together to create an enhanced ,;quality of life:and promote'. economic development., Plan for community events through the annual budgeting process. CS RD, CM A, 1 4 Continue to consult':,'With,: non=profit sports organizations and CS-2.4 0: " recreational groups,to support;theiroffermg,,of diverse recreationai 'programsthati comptetnent a"nd supplemen#�thosb"bf the pity . Continue to serve as a clearinghouse to coordinate among the various CS A, I 4 sport leagues to make fields and facilities available. Continue to make,community facilities and park amenities available GCS-2.5 �O for, rental " by communityresidents; ;�non-profit~; gra�lps: and buslnessesI to meet their recreational and:buslness needs." Continue to promote the City's various rental facility types by ensuring that a complete summary of locations, facilities, services, fees, and CS A 4 applications are available. Continue �-broad-based, public outreach activities; that ,inform GS=2.6 O residents" of. all"available Conimunity °Services programs -and services,'and o6tain,input from ity,thi6 commun regarding program and service needs. Appendix A:Implementation Plan RANCHO CUCAMONGA GENERAL PLAN A-33 Action �. T pe = a c 3 General Plan Policy : m °o o' Cl) c (D Implementation Action(s) t4 a °a o a c o a ° U) 0. ii 0- Expand recreation and cultural attractions to enhance ED-2.3 O tourismlvisitor potential and to boost sales and transient occupancy tax. Develop brochures or links from the City's web site to showcase the various recreational and cultural venues to attract visitors to the City. Enhancement of cultural amenities, including regional entertainment RD CS A 7 options, recreation, and historic preservation, will help to embellish the City's reputation as a destination for a wide range of visitors. Expand lodging choices in the City through the recruitment and ED-2.4 O placement of full-service hotels that will complement the existing select-service hotel portfolio. Review and update marketing strategies (land surveys, infrastructure availability, and modes of transportation) to solicit the development of a RD PL A, G 4 full-service lodging facility. Make sure that zoning regulations can accommodate a full-service hotel at desired locations. ED-3.1 O O Continue to make public safety a priority. Use the annual budgeting process to allocate funding for public safety services, equipment, and facilities commensurate with the City's service CM PD, FD A 6 objectives. ED-3.2 O Provide community and cultural amenities. Same action as identified for ED-2.3. CS CM, RD A 4 ED-3.3 O Maintain a healthy fiscal balance. Use the annual budgeting process to check that revenues from all CM AS, FIN A, G 1 sources continue to more than match projected spending. ED-3A O O Improve internal circulation for all modes of transportation, consistent with the concept of"Complete Streets". Same action as identified for LU-3.1 to 3.8. ENG PL A, G, 4 ED-3.5 O Facilitate development of additional local and regional entertainment venues. Focus a special economic development team on the task of working towards attracting developers and investors interested in responding to RD PL A, G 6 local and regional demand for new entertainment options. ED-3.6 O Leverage the City's quality of life amenities to attract more knowledge-based workers. Expand the Economic Development Strategy to market Rancho Cucamonga's civic assets, including parks, recreation and community RD PL, CS A, G 4 enrichment facilities and programs,trails, and quality school districts. Appendix A:Implementation Plan A-30 RANCHO CUCAMONGA GENERAL PLAN Action Z� Ty pe B am General Plan Policy ° 3 >_ GOi d 0 i d y — O Ix _ N T V O O Implementation Action(s) aM a `o ° ° i N n a` Cn a U) X ti 0- PL,AS, A B Same actions as identified for RC-4.1 to RC-4.5. ENG ENG, C, E, 3 CM, BS, G, I PW, FIN Encourage development of transit-oriented and infill development, PS-12.3 O and encourage a mix of uses that foster walking and alternative transportation. Same action as identified for RC-4.4. PL ENG A, 1 3 Provide enhanced bicycling and walking infrastructure,and support PS-12.4 O public transit, including public bus service, the Metrolink, and the potential for Bus Rapid Transit(BRT). Same action as identified for RC-4.4. PL ENG A, 1 3 Provide green building incentives, assess green building techniques as a formal stage of project review,and develop a green PS-12.5 O building ordinance or program that addresses both new and existing buildings.Adaptation strategies will also Include increased water efficiency in buildings. Same actions as identified for RC-6.1 to RC-6.4 PL BNG A, I, K 4 Encourage efforts to reduce waste generation and re-use and PS-12.6 O support increased recycling and composting opportunities with a focus on large commercial and industrial waste producers. Same action as identified for PF-7.1. ENG PL A 3 PS-12.7 O O Support tree planting, planting more vegetation (including native and drought-resistant planting),and preservation of open space. Same actions as identified for RC-1.1, RC-8.1 to RC-8.7. PL ENG, A, 1 4 PS-12.8 O Develop green procurement plans and ensure energy savings in City operations and maintenance. Same actions as identified for RC-5.1 to RC-5.3. AS CM, FIN, A,B, C, 4 PW E, K Develop energy- or climate change-themed publications and workshops,facilitating energy audits for residents,and establishing PS-12.9 O partnerships to reduce greenhouse gas emissions. Increase public awareness about climate change, and encourage residents and businesses to become involved in activities and lifestyle changes that help reduce greenhouse gas emissions. Same action as identified for RC-5.1. CM ENG A, K 4 Consider the compatibility of proposed land uses with the noise environment when preparing or revising community and/or specific PS-13.1 O plans and when reviewing development proposals. The contour map depicting future noise levels(Figure PS-10)should be used by the City as a guide to land use/noise compatibility. Appendix A:Implementation Plan RANCHO CUCAMONGA GENERAL PLAN A-57