HomeMy WebLinkAbout01-242 - Resolutions RESOLUTION NO. 01-242 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, ADOPTING THE FIVE- YEAR CAPITAL IMPROVEMENT PROGRAM FOR FISCAL YEARS 2001/02 THROUGH 2005/06 AND TWENTY-YEAR TRANSPORTATION PLAN BEGINNING IN FISCAL YEAR 2001/02 FOR THE EXPENDITURE OF MEASURE "I" FUNDS On Wednesday, November 7, 2001, on motion by Diane Williams, seconded by Grace Curatalo, and carried, the City Council of the City of Rancho Cucamonga, County of San Bernardino, finds as follows: WHEREAS, San Bernardino County voters approved passage of Measure "I" in November, 1989 authorizing San Bernardino Associated Governments, acting as the San Bernardino County Transportation Authority, to impose a one-half of one percent retail transactions and use tax applicable in the incorporated and unincorporated territory of the County of San Bernardino; and WHEREAS, revenue from the tax can only be used for transportation improvement and traffic management programs authorized in the Expenditure Plans set forth in Ordinance No. 89-1 of Authority; and WHEREAS, Expenditure plans of the Ordinance requires each local jurisdiction receiving revenue from the tax to expend those funds pursuant to a Five-Year Capital Improvement Program and Twenty-Year Transportation Plan adopted by resolution of the local jurisdiction, and WHEREAS, Expenditure Plans of the Ordinance also require that each local jurisdiction annually adopt and update the Five and Twenty-Year plans. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Rancho Cucamonga, State of California, hereby adopts the Measure "I" Five-Year Capital Improvement Program and Twenty-Year Transportation Plan, a copy of which is attached to this resolution. Please see the following page for formal adoption,certification and signatures Resolution No. 01-242 Page 2 of 6 PASSED, APPROVED, AND ADOPTED this 7'h day of November 2001. AYES: Alexander, Biane, Curatalo, Dutton, Williams NOES: None ABSENT: None ABSTAINED: None William J. xander, Ma or ATTEST: ra J. AdanWCMC, City Clerk I, DEBRA J. ADAMS, CITY CLERK of the City of Rancho Cucamonga, California, do hereby certify that the foregoing Resolution was duly passed, approved and adopted by the City Council of the City of Rancho Cucamonga, California, at a Regular Meeting of said City Council held on the 7th day of November 2001. Executed this 8th day of November 2001, at Rancho Cucamonga, California. Debra J. Adams, C, City Clerk CITY OF RANCHO CUCAMONGA MEASURE 1 FIVE YEAR PLAN 2001106 YEAR STREET&LIMITS IMPROVEMENT Cost Estimate $ 01/02 6th St-Archibald to Hermosa Pavement Rehabilitation 162,000 6th St-Haven to Milliken Pavement Rehabilitation 2,000 6th St-Milliken to Hyssop Pavement Rehabilitation 2,000 Bth St-Grove to Baker Pavement Rehabilitation 63,000 ADA Corrective Measures-City Wide Intersection rams and driveway modifications 209,000 Amethyst St-19th to Hillside Pavement Rehabilitation 366,000 Arrow Rte-Grove to Baker Pavement Rehabilitation and widening 850,000 Arrow Rte at Hellman Av Remove cross utter and replace with storm drain 2,000 Base Line Rd-West City Limits to Carnelian Pavement Rehabilitation 10,000 Base Line Rd-Vineyard to Hellman Pavement Rehabilitation 138,000 Beryl St-Cielito to 19th Pavement Rehabilitation 99,000 Carnelian St-Vivero to WO Base Line Pavement Rehabilitation and Storm Drain 157,000 Foothill BI-Vineyard to Haven Construct median island&bridge widening 2,000 Grove Av-8th to Foothill Pavement Rehabilitation 10,000 Hellman Av at 9th St Repair east side of intersection 2,000 Hermosa Av-N/0 Foothill to Effen Widen 10,000 Hermosa Av-N/O Church to N/0 Base Line Pavement Rehabilitation,widening,and Storm Drain 532,000 Hermosa Av-Highland to Banyan Pavement Rehabilitation and widening 10,000 Lemon Av-Carnelian to Beryl Pavement Rehabilitation 2,000 Milliken Av-4th to 7th Pavement Rehabilitation and widening - 417,000 Summit Av-Etiwanda to East Av Pavement Rehabilitation 10,000 FY 01102 Total 3,055,000 02103 ADA Corrective Measures-City Wide Intersection ramps and driveway modifications 100,000 Base Line Rd-West City Limits to Camelian Pavement Rehabilitation 200,000 Haven Av-Baseline to Highland Ph 1 Widen west side, pavement rehabilitation,&storm drain 500,000 Hermosa Av-Foothill to Effen Widen 300,000 Local Streets-City Wide Pavement Rehabilitation 400,000 y FY 02/03 Total 1,500,000 0 03/04 ADA Corrective Measures-City Wide Intersection ramps and driveway modifications 100,000 K Etiwanda Av-Foothill to Baseline Ph 1 Street widening and widening of 1-15 under ass 100,000 Haven Av-Baseline to Highland Ph 2 Widen west side, pavement rehabilitation, &storm drain 500,000 p Z Hermosa Av•Highland to Banyan ;Widen and pavement rehabilitation 350,000 0 m o w � O N Page 1 of 2 0) N CITY OF RANCHO CUCAMONGA MEASURE I FIVE YEAR PLAN 2001/06 YEAR STREET&LIMITS IMPROVEMENT Cost Estimate $ Local Streets-City Wide Pavement Rehabilitation 400,000 Wilson Av-Amethyst to Haven Design street widening and pavement rehabilitation 100,000 FY 03/04 Total 1,550,000 04/05 Archibald Av-S/O Banyan to Hillside Design street widening and pavement rehabilitation 70,000 Etiwanda Av-Foothill to Baseline Ph 2 Street widening and pavement rehabilitation 800,000 Haven Av-Baseline to Highland Ph 4 Widen west side, pavement rehabilitation, &storm drain 500,000 Local Streets-City Wide Pavement Rehabilitation 400,000 Wilson Av-Amethyst to Haven Street widening and pavement rehabilitation 300,000 FY 04/05 Total 2,070,000 05/06 Archibald Av-S/O Banyan to Hillside Acquire right of way 50,000 Etiwanda Av-Foothill to Baseline Ph 3 Street widening and pavement rehabilitation 500,000 Haven Av-Baseline to Highland Ph 5 Widen west side,pavement rehabilitation, &storm drain 500,000 Haven Av-Baseline to Highland East side Pavement Rehabilitation 380,000 Local Streets-City Wide Pavement Rehabilitation 400,000 Wilson Av-Amethyst to Haven Street widening and pavement rehabilitation 300,000 Wilson Av-Haven to Canistel Street widening and pavement rehabilitation 350,000 FY 05/06 Total 2,480,000 Five Year Total 10,655,000 Measure I Revenue Estimate(5 Yrs.) 7,694,893 Contact: Barrye R. Hanson, Senior Civil Engineer 909 477-2740 Ext,4065 m N O C_ O -0 Z m O m . CD o A j O N Page 2 of 2 rn N Resolution No. 01-242 Page 5 of 6 20 YEAR LOCAL A TRF.`T AN PORTATION PLAN The 20 Year Local Measure"I"Transportation Plan for the expenditure of Measure"I"funds will use the City's General Plan Circulation Element as a base. It is anticipated that the funds will be allocated in the following manner: TYPE OF IMPROVEMENT PERCENT Maintenance,Rehabilitation and Repair of 30 Existing Roadways Traffic Signal Improvements 10 Street Widening 20 Intersection Improvements 10 Railroad Crossing Improvements 10 Slurry and Chip Seal of Existing Streets 20 (See attached City's General Plan Circulation Element) --------- Figurelll-3 it .�-•-'•-_--___�+ CIRCULATION PLAN ;� °"• Rr' -/ I -------- SECONDARY _-_--- 4i ...�. MAJOR ARTERIAL . Y� -- •�•• I - •••••••_ MAJOR DIVIOEp ARTERIAL ••»••• . '\� __•••_ _ - f 0 EXISTING INTERCHANGE ••~ J O PROPOSED INTERCHANGE _miry tfs 26 OO FREEWAY INTERCHANGE m O CCS sPftw,rr rl6erAr,Not ti.. - •/ I GRADE SEPARATION INTERSECTION FOR t i .. �...« A �..... POSSIBLE WIDENING ® SPECIAL BOULEVARD 6---"1 SPECIAL DESIGN SPECIAL IMPACT STUDY ZONE I„ CD i . 3 O r 1 d 0 O 7 1 t CITY OF RANCHO CUCAMONGA O N O O N O N