HomeMy WebLinkAbout01-242 - Resolutions RESOLUTION NO. 01-242
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, ADOPTING THE FIVE-
YEAR CAPITAL IMPROVEMENT PROGRAM FOR FISCAL
YEARS 2001/02 THROUGH 2005/06 AND TWENTY-YEAR
TRANSPORTATION PLAN BEGINNING IN FISCAL YEAR
2001/02 FOR THE EXPENDITURE OF MEASURE "I" FUNDS
On Wednesday, November 7, 2001, on motion by Diane Williams, seconded by
Grace Curatalo, and carried, the City Council of the City of Rancho Cucamonga, County of San
Bernardino, finds as follows:
WHEREAS, San Bernardino County voters approved passage of Measure "I" in
November, 1989 authorizing San Bernardino Associated Governments, acting as the San
Bernardino County Transportation Authority, to impose a one-half of one percent retail
transactions and use tax applicable in the incorporated and unincorporated territory of the
County of San Bernardino; and
WHEREAS, revenue from the tax can only be used for transportation
improvement and traffic management programs authorized in the Expenditure Plans set forth in
Ordinance No. 89-1 of Authority; and
WHEREAS, Expenditure plans of the Ordinance requires each local jurisdiction
receiving revenue from the tax to expend those funds pursuant to a Five-Year Capital
Improvement Program and Twenty-Year Transportation Plan adopted by resolution of the local
jurisdiction, and
WHEREAS, Expenditure Plans of the Ordinance also require that each local
jurisdiction annually adopt and update the Five and Twenty-Year plans.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
Rancho Cucamonga, State of California, hereby adopts the Measure "I" Five-Year Capital
Improvement Program and Twenty-Year Transportation Plan, a copy of which is attached to this
resolution.
Please see the following page
for formal adoption,certification and signatures
Resolution No. 01-242
Page 2 of 6
PASSED, APPROVED, AND ADOPTED this 7'h day of November 2001.
AYES: Alexander, Biane, Curatalo, Dutton, Williams
NOES: None
ABSENT: None
ABSTAINED: None
William J. xander, Ma or
ATTEST:
ra J. AdanWCMC, City Clerk
I, DEBRA J. ADAMS, CITY CLERK of the City of Rancho Cucamonga,
California, do hereby certify that the foregoing Resolution was duly passed, approved and
adopted by the City Council of the City of Rancho Cucamonga, California, at a Regular Meeting
of said City Council held on the 7th day of November 2001.
Executed this 8th day of November 2001, at Rancho Cucamonga, California.
Debra J. Adams, C, City Clerk
CITY OF RANCHO CUCAMONGA
MEASURE 1 FIVE YEAR PLAN 2001106
YEAR STREET&LIMITS IMPROVEMENT Cost Estimate $
01/02 6th St-Archibald to Hermosa Pavement Rehabilitation 162,000
6th St-Haven to Milliken Pavement Rehabilitation 2,000
6th St-Milliken to Hyssop Pavement Rehabilitation 2,000
Bth St-Grove to Baker Pavement Rehabilitation 63,000
ADA Corrective Measures-City Wide Intersection rams and driveway modifications 209,000
Amethyst St-19th to Hillside Pavement Rehabilitation 366,000
Arrow Rte-Grove to Baker Pavement Rehabilitation and widening 850,000
Arrow Rte at Hellman Av Remove cross utter and replace with storm drain 2,000
Base Line Rd-West City Limits to Carnelian Pavement Rehabilitation 10,000
Base Line Rd-Vineyard to Hellman Pavement Rehabilitation 138,000
Beryl St-Cielito to 19th Pavement Rehabilitation 99,000
Carnelian St-Vivero to WO Base Line Pavement Rehabilitation and Storm Drain 157,000
Foothill BI-Vineyard to Haven Construct median island&bridge widening 2,000
Grove Av-8th to Foothill Pavement Rehabilitation 10,000
Hellman Av at 9th St Repair east side of intersection 2,000
Hermosa Av-N/0 Foothill to Effen Widen 10,000
Hermosa Av-N/O Church to N/0 Base Line Pavement Rehabilitation,widening,and Storm Drain 532,000
Hermosa Av-Highland to Banyan Pavement Rehabilitation and widening 10,000
Lemon Av-Carnelian to Beryl Pavement Rehabilitation 2,000
Milliken Av-4th to 7th Pavement Rehabilitation and widening - 417,000
Summit Av-Etiwanda to East Av Pavement Rehabilitation 10,000
FY 01102 Total 3,055,000
02103 ADA Corrective Measures-City Wide Intersection ramps and driveway modifications 100,000
Base Line Rd-West City Limits to Camelian Pavement Rehabilitation 200,000
Haven Av-Baseline to Highland Ph 1 Widen west side, pavement rehabilitation,&storm drain 500,000
Hermosa Av-Foothill to Effen Widen 300,000
Local Streets-City Wide Pavement Rehabilitation 400,000 y
FY 02/03 Total 1,500,000 0
03/04 ADA Corrective Measures-City Wide Intersection ramps and driveway modifications 100,000 K
Etiwanda Av-Foothill to Baseline Ph 1 Street widening and widening of 1-15 under ass 100,000
Haven Av-Baseline to Highland Ph 2 Widen west side, pavement rehabilitation, &storm drain 500,000 p Z
Hermosa Av•Highland to Banyan ;Widen and pavement rehabilitation 350,000 0
m o
w �
O N
Page 1 of 2 0) N
CITY OF RANCHO CUCAMONGA
MEASURE I FIVE YEAR PLAN 2001/06
YEAR STREET&LIMITS IMPROVEMENT Cost Estimate $
Local Streets-City Wide Pavement Rehabilitation 400,000
Wilson Av-Amethyst to Haven Design street widening and pavement rehabilitation 100,000
FY 03/04 Total 1,550,000
04/05 Archibald Av-S/O Banyan to Hillside Design street widening and pavement rehabilitation 70,000
Etiwanda Av-Foothill to Baseline Ph 2 Street widening and pavement rehabilitation 800,000
Haven Av-Baseline to Highland Ph 4 Widen west side, pavement rehabilitation, &storm drain 500,000
Local Streets-City Wide Pavement Rehabilitation 400,000
Wilson Av-Amethyst to Haven Street widening and pavement rehabilitation 300,000
FY 04/05 Total 2,070,000
05/06 Archibald Av-S/O Banyan to Hillside Acquire right of way 50,000
Etiwanda Av-Foothill to Baseline Ph 3 Street widening and pavement rehabilitation 500,000
Haven Av-Baseline to Highland Ph 5 Widen west side,pavement rehabilitation, &storm drain 500,000
Haven Av-Baseline to Highland East side Pavement Rehabilitation 380,000
Local Streets-City Wide Pavement Rehabilitation 400,000
Wilson Av-Amethyst to Haven Street widening and pavement rehabilitation 300,000
Wilson Av-Haven to Canistel Street widening and pavement rehabilitation 350,000
FY 05/06 Total 2,480,000
Five Year Total 10,655,000
Measure I Revenue Estimate(5 Yrs.) 7,694,893
Contact: Barrye R. Hanson, Senior Civil Engineer 909 477-2740 Ext,4065
m
N
O
C_
O
-0 Z
m O
m .
CD o
A j
O N
Page 2 of 2 rn N
Resolution No. 01-242
Page 5 of 6
20 YEAR LOCAL A TRF.`T AN PORTATION PLAN
The 20 Year Local Measure"I"Transportation Plan for the expenditure of Measure"I"funds
will use the City's General Plan Circulation Element as a base. It is anticipated that the funds
will be allocated in the following manner:
TYPE OF IMPROVEMENT PERCENT
Maintenance,Rehabilitation and Repair of 30
Existing Roadways
Traffic Signal Improvements 10
Street Widening 20
Intersection Improvements 10
Railroad Crossing Improvements 10
Slurry and Chip Seal of Existing Streets 20
(See attached City's General Plan Circulation Element)
---------
Figurelll-3
it .�-•-'•-_--___�+
CIRCULATION PLAN
;� °"• Rr' -/ I --------
SECONDARY _-_---
4i ...�. MAJOR ARTERIAL .
Y� -- •�•• I - •••••••_
MAJOR DIVIOEp
ARTERIAL ••»••• .
'\� __•••_ _ - f 0 EXISTING INTERCHANGE
••~ J O PROPOSED INTERCHANGE
_miry tfs 26 OO FREEWAY INTERCHANGE
m O CCS sPftw,rr rl6erAr,Not
ti.. - •/ I GRADE SEPARATION
INTERSECTION FOR
t i .. �...« A �..... POSSIBLE WIDENING
® SPECIAL BOULEVARD
6---"1 SPECIAL DESIGN
SPECIAL IMPACT STUDY ZONE I„
CD
i
. 3 O
r 1 d 0
O
7
1 t
CITY OF RANCHO CUCAMONGA O
N
O
O N
O N