HomeMy WebLinkAbout02-250 - Resolutions RESOLUTION NO. 02-250
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, ADOPTING THE FIVE-
YEAR CAPITAL IMPROVEMENT PROGRAM FOR FISCAL
YEARS 2002/03 THROUGH 2006/07 AND TWENTY-YEAR
TRANSPORTATION PLAN BEGINNING IN FISCAL YEAR
2002/03 FOR THE EXPENDITURE OF MEASURE 'S" FUNDS
On Wednesday, September 18, 2002, on motion by Councilmember Paul Biane,
seconded by Councilmember Grace Curatalo, and carried, the City Council of the City of
Rancho Cucamonga, County of San Bernardino, finds as follows:
WHEREAS, San Bernardino County voters approved passage of Measure "I" in
November, 1989 authorizing San Bernardino Associated Governments, acting as the San
Bernardino County Transportation Authority, to impose a one-half of one percent retail
transactions and use tax applicable in the incorporated and unincorporated territory of the
County of San Bernardino; and
WHEREAS, revenue from the tax can only be used for transportation
improvement and traffic management programs authorized in the Expenditure Plans set forth in
Ordinance No. 89-1 of Authority; and
WHEREAS, Expenditure plans of the Ordinance requires each local jurisdiction
receiving revenue from the tax to expend those funds pursuant to a Five-Year Capital
Improvement Program and Twenty-Year Transportation Plan adopted by resolution of the local
jurisdiction, and
WHEREAS, Expenditure Plans of the Ordinance also require that each local
jurisdiction annually adopt and update the Five and Twenty-Year plans.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
Rancho Cucamonga, State of California, hereby adopts the Measure "I" Five-Year Capital
Improvement Program and Twenty-Year Transportation Plan, a copy of which is attached to this
resolution.
Please see the following page
for formal adoption,certification and signatures
Resolution No. 02-250
Page 2 of 7
PASSED, APPROVED, AND ADOPTED this 181h day of September 2002.
AYES: Alexander, Biane, Curatalo, Dutton, Williams
NOES: None
ABSENT: None
ABSTAINED: None
William J. A"
xander, M yor
ATTEST:
Kathryn L. Scott, Deputy City Clerk
I, KATHRYN L. SCOTT, DEPUTY CITY CLERK of the City of Rancho
Cucamonga, California, do hereby certify that the foregoing Resolution was duly passed,
approved and adopted by the City Council of the City of Rancho Cucamonga, California, at a
Regular Meeting of said City Council held on the 18`h day of September 2002.
Executed this 1 gth day of September 2002, at Rancho Cucamonga, California.
Kathryn L. Scott,Deputy City Clerk
CITY OF RANCHO CUCAMONGA
MEASURE I FIVE YEAR PLAN 2002/07
YEAR STREET & LIMITS IMPROVEMENT Cost Estimate $
02/03 6th St - Archibald to Hermosa Pavement Rehabilitation 165,000
8th St - Grove to Baker Pavement Rehabilitation 1,000
ADA Corrective Measures- City Wide Intersection ramps and driveway modifications 110,000
Amethyst St- 19th to Hillside Pavement Rehabilitation 1,000
Arrow Rte - Grove to Baker Pavement Rehabilitation and widening 2,000
Banyan - E/O Milliken to Rochester Widen north side 460,000
Banyan - Sapphire to Carnelian Pavement Rehabilitation 20,000
Base Line Rd - Vineyard to Hellman Pavement Rehabilitation 2,000
Beryl St - Cielito to 19th Pavement Rehabilitation 105,000
Carnelian St - Vivero to N/O Base Line Pavement Rehabilitation 160,000
East Banyan to N/O 23rd Widen west side 580,000
Etiwanda - 6th to Arrow Street widening and pavement rehabilitation 20,000
Grove Av - 8th to Foothill Pavement Rehabilitation 418,000
Hermosa Av- N/O Church to N/O Base Line _ Pavement Rehabilitation, widening, and Storm Drain 522,000
Hermosa Av- N/O Base Line to N/O RXR _ Pavement Rehabilitation, widening, and Storm Drain 621,000_
Lemon Av -Beryl to Archibald Pavement Rehabilitation 296,000
Local Streets - City Wide Pavement Rehabilitation 210,000
Milliken Av- 4th to 7th Pavement Rehabilitation and widening 433,000
Milliken Av- Banyan to Wilson Construct west roadbed of divided arterial street 500,000
FY 02/03 Total 4,626,000
03/04 ADA Corrective Measures - City Wide Intersection ramps and driveway modifications 100,000
Base Line Rd- West City Limits to Carnelian Pavement Rehabilitation 200,000
Haven Av- Baseline to Highland Ph 1 Widen west side, pavement rehabilitation, &storm drain 500,000
Hermosa Av- Foothill to Effen Widen 300,000
Local Streets - City Wide Pavement Rehabilitation 400,000
FY 03/04 Total 1,500,000 y
0
04/05 ADA Corrective Measures- City Wide Intersection ramps and driveway modifications 100,000 c:
Etiwanda Av- Foothill to Baseline Ph 1 Street widening and widening of 1-15 underpass 100,000 0
Haven Av - Baseline to Highland Ph 2 Widen west side, pavement rehabilitation, &storm drain 500,000 Z
Hermosa Av- Highland to Banyan Widen and pavement rehabilitation 350,000 co P
Local Streets - City Wide Pavement Rehabilitation 400,000 m
W N
Wilson Av-Amethyst to Haven Design street widening and pavement rehabilitation 100,000 ory
cn
V O
Page 1 of 2
� C
vCD
CITY OF RANCHO CUCAMONGA m o
p C
MEASURE I FIVE YEAR PLAN 2002/07 0 0.
YEAR ISTREET& LIMITS IMPROVEMENT Cost Estimate $ 7z
FY 04/05 Total 1,550,000 0
05/06_Archibald Av- S/O Banyan to Hillside Design street widening and pavement rehabilitation 70,000 0
Etiwanda Av- Foothill to Baseline Ph 2 Street widening and pavement rehabilitation 800,000 N
Haven Av- Baseline to Highland Ph 4 Widen west side, pavement rehabilitation, & storm drain 500,000 0
Local Streets - City Wide Pavement Rehabilitation 400,000
Wilson Av- Amethyst to Haven Street widening and pavement rehabilitation 300,000
FY 05/06 Total 2,070,000
06/07 Archibald Av- S/O Banyan to Hillside Acquire right of way 50,000
Etiwanda Av- Foothill to Baseline Ph 3 Street widening and pavement rehabilitation 500,000
Haven Av- Baseline to Highland Ph 5 Widen west side, pavement rehabilitation, & storm drain 500,000
Haven Av- Baseline to Highland East side Pavement Rehabilitation 380,000
Local Streets - City Wide Pavement Rehabilitation 400,000
Wilson Av-Amethyst to Haven Street widening and pavement rehabilitation 300,000
_ Wilson Av- Haven to Canistel Street widening and pavement rehabilitation 350,000
FY 06/07 Total 2,480,000
i Five Year Total 12,226,000
Measure I Revenue Estimate (5 Yrs.) 9,243,946
Contact: Barrye R. Hanson, Senior Civil Engineer 909) 477-2740 Ext, 4065
Page 2 of 2
Resolution No. 02-250
Page 5 of 7
City of Rancho Cucamonga
MEASURE I FIVE YEAR CAPITAL IMPROVEMENT PLAN
EXPENDITURE STRATEGY
2002/2003
The City currently has a Measure I fund balance of$4,780,000. The FY 2002/03 budget
contains projects totaling $4,626,000, leaving a balance of$154,000 at the end of the year. It is
estimated that we will accrue and additional revenue of$1,600,000 during the year leaving a
balance of$1,754,000. These funds will be budgeted in the FY 2003/04. It has been the City's
policy to budget funds based upon accrued funds rather than an anticipated amount resulting in
a year ending fund balance of the past year's accruals.
The City intents to expend its Measure I funds generally as shown on our 20 year plan
(attached). However, at present, we show funds being accumulated over several years for one
large project, the Haven Avenue widening and storm drain project extending from Base Line
Road to the 210 Freeway ($500,000 per year for a total of$2,000,000 in four years). These
funds could be reallocated in any given year depending upon a change in priorities.
Resolution No. 02-250
Page 6 of 7
CITY OF RANCHO CUCAMONGA
20 YEAR LOCAL MEASURE I TRANSPORTATION PLAN
The 20 Year Local Measure I Transportation Plan for the expenditure of Measure I funds will
use the City's General Plan Circulation Element as a basis (copy attached). It is anticipated that
the funds will be allocated in the following manner:
Percent Type of Improvement
30 Maintenance, Rehabilitation and Repair of Existing Roadways
10 Traffic Signal Improvements
20 Street Widening
10 Intersection Improvements
10 Railroad Crossing Improvements
20 Slurry and Chip Seal of Existing Streets
------ -------------
1_.: _` I �'-•-•-----•-•-..._r_�,_•ami:.�_..._._._._._._._._._._.-�
I Figure III-3
CIRCULATION PLAN
FROPOSEO
------ ' _� LOCATION
+ COLLECTOR —
:I SECONDARY ------
'-,j MAJOR ARTERIAL .......
MAJOR
RI DIVIDEDART
..........
_ - '•• -. f 0 EXISTING INTERCHANGE
c
i f0 PROPOSED INTERCHANGE
�a ALL
- @ FREEWAY INTERCHANGE
FREEWAY TO FREEWAY,NO LOCAL ACCE.E
tiV1 / I I GRADE SEPARATION
.Ylvh • INTERSECTION FOR
Ll
POSSIBLE WIDENING
_ _ I «•, ® SPECIAL BOULEVARD
SPECIAL DESIGN
�� �'• -__ L_=_I SPECIAL IMPACT STUDY ZONE_
! f Y
Iw.Y r
I r
•� - .M Y..-.. I�.Irllrr. .N1MN.N.«r
I IN \ rC+
a I �
i _ I Z
i (D O
1 y I v N
CITY OF RANCHO CUCAMONGA
-_ V O