HomeMy WebLinkAbout2023-05-10 - Agenda PacketHistoric Preservation Commission
and
Planning Commission Agenda
Rancho Cucamonga Civic Center
COUNCIL CHAMBERS
May 10, 2023
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
7:00 p.m.
A. CALL TO ORDER AND PLEDGE OF ALLEGIANCE
Roll Call: Chair Dopp
Vice Chair Morales
Commissioner Williams
Commissioner Boling
Commissioner Daniels
B. PUBLIC COMMUNICATIONS
This is the time and place for the general public to address the Planning/Historic Commission (“Planning
Commission”) on any Consent Calendar item or any item not listed on the agenda that is within the
Commission’s subject matter jurisdiction. The Planning Commission may not discuss any issue not included
on the agenda, but may set the matter for discussion during a subsequent meeting.
C. PUBLIC HEARINGS None
D. GENERAL BUSINESS
D1. Consideration of the City of Rancho Cucamonga Capital Improvement Program for Fiscal Year 2023/24.
E. DIRECTOR ANNOUNCEMENTS
F. COMMISSION ANNOUNCEMENTS
G. ADJOURNMENT
TO ADDRESS THE PLANNING COMMISSION
The Planning Commission encourages free expression of all points of view. To allow all persons to speak,
given the length of the agenda, please keep your remarks brief. If others have already expressed your
position, you may simply indicate that you agree with a previous speaker. If appropriate, a spokesperson may
present the views of your entire group. To encourage all views and promote courtesy to others, the audience
should refrain from clapping, booing or shouts of approval or disagreement from the audience.
If you need special assistance or accommodations to participate in this meeting, please contact the City
Clerk's office at (909) 4772700. Notification of 48 hours prior to the meeting will enable the City to make
reasonable arrangements to ensure accessibility. Listening devices are available for the hearing impaired.
The public may address the Planning Commission on any agenda item. To address the Planning
Commission, please come forward to the podium. State your name for the record and speak into the
microphone. After speaking, please complete a speaker card located next to the speaker’s podium. It is
important to list your name, address (optional) and the agenda item letter your comments refer to. Comments
are generally limited to 5 minutes per individual.
If you wish to speak concerning an item not on the agenda, you may do so under “Public Communications.”
As an alternative to participating in the meeting you may submit comments in writing to
Elizabeth.Thornhill@cityofrc.us by 12:00 PM on the date of the meeting. Written comments will be distributed
to the Commissioners and included in the record.
AVAILABILITY OF STAFF REPORTS
Copies of the staff reports or other documentation to each agenda item are available at www.CityofRC.us.
APPEALS
Any interested party who disagrees with the City Planning Commission decision may appeal the
Commission’s decision to the City Council within 10 calendar days. Any appeal filed must be directed to the
City Clerk’s Office and must be accompanied by a fee of $3,365 for all decisions of the Commission. (Fees
are established and governed by the City Council).
Please turn off all cell phones while the meeting is in session.
I, Elizabeth Thornhill, Executive Assistant of the City of Rancho Cucamonga, or my designee, hereby
certify that a true, accurate copy of the foregoing agenda was posted on May 4 , 2023, seventytwo
(72) hours prior to the meeting per Government Code 54954.2 at 10500 Civic Center Drive.
th
Historic Preservation Commissionand Planning Commission AgendaRancho Cucamonga Civic CenterCOUNCIL CHAMBERSMay 10, 202310500 Civic Center DriveRancho Cucamonga, CA 917307:00 p.m.A. CALL TO ORDER AND PLEDGE OF ALLEGIANCE Roll Call: Chair Dopp Vice Chair Morales Commissioner Williams Commissioner Boling Commissioner DanielsB. PUBLIC COMMUNICATIONSThis is the time and place for the general public to address the Planning/Historic Commission (“PlanningCommission”) on any Consent Calendar item or any item not listed on the agenda that is within theCommission’s subject matter jurisdiction. The Planning Commission may not discuss any issue not includedon the agenda, but may set the matter for discussion during a subsequent meeting.C. PUBLIC HEARINGS NoneD. GENERAL BUSINESSD1. Consideration of the City of Rancho Cucamonga Capital Improvement Program for Fiscal Year 2023/24.E. DIRECTOR ANNOUNCEMENTSF. COMMISSION ANNOUNCEMENTSG. ADJOURNMENT TO ADDRESS THE PLANNING COMMISSION
The Planning Commission encourages free expression of all points of view. To allow all persons to speak,
given the length of the agenda, please keep your remarks brief. If others have already expressed your
position, you may simply indicate that you agree with a previous speaker. If appropriate, a spokesperson may
present the views of your entire group. To encourage all views and promote courtesy to others, the audience
should refrain from clapping, booing or shouts of approval or disagreement from the audience.
If you need special assistance or accommodations to participate in this meeting, please contact the City
Clerk's office at (909) 4772700. Notification of 48 hours prior to the meeting will enable the City to make
reasonable arrangements to ensure accessibility. Listening devices are available for the hearing impaired.
The public may address the Planning Commission on any agenda item. To address the Planning
Commission, please come forward to the podium. State your name for the record and speak into the
microphone. After speaking, please complete a speaker card located next to the speaker’s podium. It is
important to list your name, address (optional) and the agenda item letter your comments refer to. Comments
are generally limited to 5 minutes per individual.
If you wish to speak concerning an item not on the agenda, you may do so under “Public Communications.”
As an alternative to participating in the meeting you may submit comments in writing to
Elizabeth.Thornhill@cityofrc.us by 12:00 PM on the date of the meeting. Written comments will be distributed
to the Commissioners and included in the record.
AVAILABILITY OF STAFF REPORTS
Copies of the staff reports or other documentation to each agenda item are available at www.CityofRC.us.
APPEALS
Any interested party who disagrees with the City Planning Commission decision may appeal the
Commission’s decision to the City Council within 10 calendar days. Any appeal filed must be directed to the
City Clerk’s Office and must be accompanied by a fee of $3,365 for all decisions of the Commission. (Fees
are established and governed by the City Council).
Please turn off all cell phones while the meeting is in session.
I, Elizabeth Thornhill, Executive Assistant of the City of Rancho Cucamonga, or my designee, hereby
certify that a true, accurate copy of the foregoing agenda was posted on May 4 , 2023, seventytwo
(72) hours prior to the meeting per Government Code 54954.2 at 10500 Civic Center Drive.
th
Page 1
1
7
9
2
DATE:May 10, 2023
TO:Chairman and Members of the Planning Commission
FROM:Matt Marquez, Director of Planning and Economic Development
INITIATED BY: Jason C. Welday, Director of Engineering Services/City Engineer
Justine Garcia, Deputy Director of Engineering Services
Deborah Allen, Management Analyst I
SUBJECT:Consideration of the City of Rancho Cucamonga Capital Improvement Program
for Fiscal Year 2023/24.
RECOMMENDATION:
Staff recommends that the Planning Commission adopt Resolution No. 23-11 which finds the Capital
Improvement Program for Fiscal Year 2023/24, in conformity with the adopted General Plan.
BACKGROUND:
Government Code Section 65401 (Exhibit A) requires that the City Council adopt a Capital Improvement Program
(CIP) outlining the anticipated capital improvement projects for the upcoming fiscal year. Furthermore, Planning
Commission is required to find the CIP (Index attached with General Plan references as Exhibit B) is in
accordance with the General Plan. The CIP document includes a General Plan Policy section that evidences the
specific policy references found in the General Plan. The CIP is a vital piece of the City’s annual budget as it
dictates major capital expenditures obligated in any given year. The CIP consists of a multi-year plan for citywide
infrastructure improvements. Each year, the City budgets for funded projects which will occur during said fiscal
year. The list of projects contained in the CIP addresses both the City’s long and short-term capital needs. It
identifies projects that reflect the desires of the community, as well as projects that serve operational and
maintenance needs.
ANALYSIS:
The CIP Summary Index has been categorized by corresponding Departments and project names are in
alphabetical order within each section. Draft individual project sheets include a short summary, cost, and year
funded and can be viewed in Exhibit C. The Resolution (Exhibit D) will find the Capital Improvement Program for
Fiscal Year 2023/24, in conformity with the adopted General Plan.
FISCAL IMPACT:
Projects are funded from a variety of sources including Development Impact Fees, Measure I, Gas Tax, and
state grants. The CIP for Fiscal Year 2023-24 proposes 57 projects, totaling just over $165,600,000 to be
executed in the upcoming fiscal year. In addition, there are 19 projects totaling just over $47,100,000 identified
in future years.
COUNCIL MISSION / VISION / VALUE(S) ADDRESSED:
The City’s Engineering staff works with all Departments within the City to develop and implement an economically
feasible CIP that embodies the City’s public infrastructure needs. This item addresses the City Council’s vision
Page 3
Page 2
1
7
9
2
for the City by ensuring the construction of high-quality public improvements that promote a world-class
community and also support the City Council’s Core Value of promoting and enhancing a safe and healthy
community for all.
EXHIBITS:
Exhibit A - Government Code 65401
Exhibit B - Fiscal Year 2023/2024 Capital Improvement Program Summary Index
Exhibit C - Draft CIP Project Sheets
Exhibit D - Draft Resolution 23-11 of Approval for Finding the Capital Improvement Program for Fiscal Year
2023/24 in Conformity with the Adopted General Plan
Page 4
Exhibit A
Government Code
65401. If a general plan or part thereof has been adopted, within such time as may be
fixed by the legislative body, each county or city officer, department, board, or
commission, and each governmental body, commission, or board, including the
governing body of any special district or school district, whose jurisdiction lies wholly
or partially within the county or city, whose functions include recommending, preparing
plans for, or constructing, major public works, shall submit to the official agency, as
designated by the respective county board of supervisors or city council, a list of the
proposed public works recommended for planning, initiation or construction during the
ensuing fiscal year. The official agency receiving the list of proposed public works shall
list and classify all such recommendations and shall prepare a coordinated program of
proposed public works for the ensuing fiscal year. Such coordinated program shall be
submitted to the county or city planning agency for review and report to said official
agency as to conformity with the adopted general plan or part thereof.
Page 5
No. GP PM Project
Type Project Prior Year
Funding
Fiscal Year
2023/24
Fiscal Year
2024/25
Fiscal Year
2025/26
Fiscal Year
2026/27
Fiscal Year
2027/28
Future
Years
Total Project
Cost Entity Fund Division Object JL
1
PF-1.1
PF-4.1
Veronica
Fincher Facilities
Animal Center Veterinary
Floor Replacement -$ 60,000$ -$ -$ -$ -$ -$ 60,000$ 1 025 001 5602
-$ 60,000$ -$ -$ -$ -$ -$ 60,000$
2
PF-1.1
PF-4.1
Veronica
Fincher Facilities
Animal Center Office
Reconfigure 30,000$ 200,000$ -$ -$ -$ -$ -$ 230,000$ 1 125 104 5602
30,000$ 200,000$ -$ -$ -$ -$ -$ 230,000$
30,000$ 260,000$ -$ -$ -$ -$ -$ 290,000$
No. PM Project
Type Project Prior Year
Funding
Fiscal Year
2023/24
Fiscal Year
2024/25
Fiscal Year
2025/26
Fiscal Year
2026/27
Fiscal Year
2027/28
Future
Years
Total Project
Cost Entity Fund Division Object JL
1
OS-2.2
OS-2.3
Mike
Parmer Miscellaneous
Cucamonga Canyon
Trailhead -$ 1,623,890$ -$ -$ -$ -$ -$ 1,623,890$ 1 275 208 5650 2091275-0
80,000$ -$ -$ -$ -$ -$ -$ 80,000$ 1 120 401 5650 2091120-0
60,000$ -$ -$ -$ -$ -$ -$ 60,000$ 3 288 501 5650 2091288-0
140,000$ 1,623,890$ -$ -$ -$ -$ -$ 1,763,890$
2
LC-3.3
LC-6.6
Mike
Parmer Facilities
Cultural Center Courtyard
Redesign 380,723$ 3,218,800$ -$ -$ -$ -$ -$ 3,599,523$ 1 025 001 5650 1894025-0
380,723$ 3,218,800$ -$ -$ -$ -$ -$ 3,599,523$
3
PF-1.1
PF-1.4
Mike
Parmer Facilities
RCPD Facility Improvement
and Modernization -$ 100,000$ -$ -$ -$ -$ -$ 100,000$ 1 017 701 5650 1348017-0
-$ 100,000$ -$ -$ -$ -$ -$ 100,000$
4 S-1.8
Mike
Parmer Miscellaneous
Wildfire Early Detection
System -$ 1,900,000$ -$ -$ -$ -$ -$ 1,900,000$ 1 274 208 5650 2122274-0
-$ 1,900,000$ -$ -$ -$ -$ -$ 1,900,000$
520,723$ 6,842,690$ -$ -$ -$ -$ -$ 7,363,413$
No. PM Project
Type Project Prior Year
Funding
Fiscal Year
2023/24
Fiscal Year
2024/25
Fiscal Year
2025/26
Fiscal Year
2026/27
Fiscal Year
2027/28
Future
Years
Total Project
Cost Entity Fund Division Object JL
1 OS-1.3
Jennifer
Hunt-
Gracia
Parks &
Recreation
Beryl Park East Inclusive
Playground 17,480$ 22,520$ -$ -$ -$ -$ -$ 40,000$ 1 141 303 5607
12,170$ 9,870$ -$ -$ -$ -$ -$ 22,040$ 1 120 401 5607
-$ 772,690$ -$ -$ -$ -$ -$ 772,690$ 1 119 401 5607
-$ 286,750$ -$ -$ -$ -$ -$ 286,750$ 1 274 208 5607
-$ 35,000$ -$ -$ -$ -$ -$ 35,000$ 1 174 303 5607
29,650$ 1,126,830$ -$ -$ -$ -$ -$ 1,156,480$
2
PF-1.1
PF-1.4
Ryan
Samples Facilities
RC Family Resource Center
Rehabilitation -$ -$ 775,000$ -$ -$ -$ -$ 775,000$ 1 275 208 5650 2107275-0
77,500$ 77,500$
-$ -$ 852,500$ -$ -$ -$ -$ 852,500$
29,650$ 1,126,830$ 852,500$ -$ -$ -$ -$ 2,008,980$
CAPITAL IMPROVEMENT PROGRAM - FISCAL YEAR 2023/24
CMO
Project Total:
Community Services Total:
Project Total:
Animal Services
Project Total:
Project Total:
Project Total:
Project Total:
CMO Totals:
Project Total:
Community Services
Animal Center Totals:
Project Total:
Page 1 of 7Exhibit B
Page 6
No. PM Project
Type Project Prior Year
Funding
Fiscal Year
2023/24
Fiscal Year
2024/25
Fiscal Year
2025/26
Fiscal Year
2026/27
Fiscal Year
2027/28
Future
Years
Total Project
Cost Entity Fund Division Object JL
1 MA-2.2
Justin
Pope Streets 6th Street at BNSF 54,000$ 280,000$ -$ -$ 1,653,000$ -$ -$ 1,987,000$ 1 124 303 5650 1839124-0
-$ -$ 1,000,000$ 1,000,000$ Unknown
-$ 125,000$ -$ -$ -$ -$ 125,000$ 1 705 303 5650 1839705-0
54,000$ 405,000$ -$ -$ 2,653,000$ -$ -$ 3,112,000$
2 MA-3.1
Justine
Garcia Streets 6th Street Cycle Track 341,370$ 146,850$ -$ -$ -$ -$ -$ 488,220$ 1 198 303 5650 2005198-0
-$ -$ 100,000$ -$ 100,000$ 1 177 303 5650 2005177-0
341,370$ 146,850$ 100,000$ -$ -$ -$ -$ 588,220$
3 MA-5.4
Baldwin
Ngai Traffic
Advance Traffic Management
System-Phase 2 1,012,400$ 6,260,500$ -$ -$ -$ -$ -$ 7,272,900$ 1 124 303 5650 2004124-0
48,400$ -$ -$ -$ -$ -$ -$ 48,400$ 1 025 001 5650 2004025-0
-$ 64,300$ -$ -$ -$ -$ -$ 64,300$ 1 711 303 5650 2004711-0
-$ 64,300$ -$ -$ -$ -$ -$ 64,300$ 3 288 501 5650 2004288-0
1,060,800$ 6,389,100$ -$ -$ -$ -$ -$ 7,449,900$
4 MA-2.2
Romeo
David Streets
Almond Street Extension
Street Improvements 100,000$ 565,000$ -$ -$ -$ -$ -$ 665,000$ 1 198 303 5650 2101198-0
100,000$ 565,000$ -$ -$ -$ -$ -$ 665,000$
5 OS-2.4
Romeo
David Streets Almond Trail Improvements 272,000$ -$ -$ -$ -$ -$ -$ 272,000$ 1 130 303 5650 2110130-0
272,000$ -$ -$ -$ -$ -$ -$ 272,000$
6 PF-7.3
Trina
Valdez
Municipal
Utilities
Arbor Substation- Redesign
and Storage 300,000$ -$ -$ -$ -$ -$ -$ 300,000$ 1 705 303 5650 2106705-0
300,000$ -$ -$ -$ -$ -$ -$ 300,000$
7 PF-1.4
Baldwin
Ngai Traffic
Banyan Street Pavement
Rehabilitation 1,440,000$ -$ -$ -$ -$ -$ -$ 1,440,000$ 1 177 303 5650 2033177-0
1,440,000$ -$ -$ -$ -$ -$ -$ 1,440,000$
8 PF-1.4
Romeo
David Streets
Base Line Road- Pavement
Rehabilitation 900,000$ -$ -$ -$ -$ -$ -$ 900,000$ 1 179 303 5650 2097179-0
900,000$ -$ -$ -$ -$ -$ -$ 900,000$
9 PF-1.4
Justine
Garcia Miscellaneous
Cherry Avenue Lot-Site
Securing and Preparation 380,000$ -$ -$ -$ -$ -$ -$ 380,000$ 1 025 001 5600 N/A
380,000$ -$ -$ -$ -$ -$ -$ 380,000$
10
MA-2.1
MA-2.3
Krystal
Lai Streets Civic Center Crosswalk -$ 132,500$ -$ -$ -$ -$ -$ 132,500$ 1 198 303 5650 2123198-0
-$ 132,500$ -$ -$ -$ -$ -$ 132,500$
11
OS-2.1
MA-3.1
Cesar
Guevara Facilities Cucamonga Creek Bike Trail -$ 86,590$ -$ -$ -$ -$ -$ 86,590$ 1 105 208 5650 1533105-0
-$ 84,420$ -$ -$ -$ -$ -$ 84,420$ 1 214 303 5650 1533214-0
-$ 171,010$ -$ -$ -$ -$ -$ 171,010$
12
OS-2.1
MA-3.1
Justin
Pope
Parks &
Recreation Day Creek Channel Bike Trail 18,002$ 309,000$ -$ -$ -$ -$ -$ 327,002$ 1 105 208 5650 2014105-0
81,000$ 322,000$ -$ -$ -$ -$ -$ 403,000$ 1 214 303 5650 2014214-0
99,002$ 631,000$ -$ -$ -$ -$ -$ 730,002$
13 PF-1.4
Romeo
David Streets
Etiwanda Avenue- Pavement
Rehabilitation 50,000$ -$ -$ -$ -$ -$ -$ 50,000$ 1 177 303 5650 2007177-0
-$ 2,950,000$ -$ -$ -$ -$ -$ 2,950,000$ 1 179 303 5650 2007179-0
50,000$ 2,950,000$ -$ -$ -$ -$ -$ 3,000,000$
14
MA-2.7
MA-3.2
Justin
Pope Streets
Etiwanda East Side
Widening -$ 5,000$ -$ -$ -$ -$ -$ 5,000$ 1 177 303 5650 2002177-0
208,000$ 215,000$ -$ -$ 700,000$ -$ 1,123,000$ 1 124 303 5650 2002124-0
208,000$ 220,000$ -$ -$ 700,000$ -$ -$ 1,128,000$
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Engineering Services
Project Total:
Page 2 of 7
Page 7
15 MA-4.5
Justin
Pope Streets Etiwanda Grade Separation 28,000,000$ 47,150,000$ -$ -$ -$ -$ -$ 75,150,000$ 1 181 303 5650 1922181-0
-$ 55,000,000$ -$ -$ -$ -$ -$ 55,000,000$
Grant
Opportunity
28,000,000$ 102,150,000$ -$ -$ -$ -$ -$ 130,150,000$
16
MA-2.1
MA-2.3
Cesar
Guevara Streets Haven Avenue Sidewalk -$ 212,200$ -$ -$ -$ -$ -$ 212,200$ 1 214 303 5650 1864214-0
-$ 198,810$ -$ 198,810$ 1 105 208 5650 1864105-0
-$ 411,010$ -$ -$ -$ -$ -$ 411,010$
17 OS-2.4
Justin
Pope
Parks &
Recreation
Heritage Park Bridge
Replacements 108,110$ -$ -$ -$ -$ -$ -$ 108,110$ 1 848 303 5650 1963848-0
150,000$ 880,000$ -$ -$ -$ -$ -$ 1,030,000$ 1 847 303 5650 1963847-0
170,000$ 880,000$ -$ -$ -$ -$ -$ 1,050,000$ 3 288 501 5650 1963288-0
428,110$ 1,760,000$ -$ -$ -$ -$ -$ 2,188,110$
18 MA-2.3
Baldwin
Ngai Streets
Hermosa Avenue Corridor
Improvements -$ 35,000$ 284,000$ -$ -$ -$ -$ 319,000$ 1 174 303 5650 2124174-0
-$ 35,000$ 284,000$ -$ -$ -$ -$ 319,000$
19 PF-1.4
Romeo
David Streets
Hermosa Avenue Pavement
Rehabiliation: Foothill-
Church 607,500$ -$ -$ -$ -$ -$ -$ 607,500$ 1 179 303 5650 2075174-0
607,500$ -$ -$ -$ -$ -$ -$ 607,500$
20 PF-1.4
Romeo
David Streets
Hermosa Avenue Pavement
Rehabiliation: Wilson to NCL 550,000$ -$ -$ -$ -$ -$ -$ 550,000$ 1 179 303 5650 2075174-0
550,000$ -$ -$ -$ -$ -$ -$ 550,000$
21
MA-2.7
MA-3.2
Romeo
David Streets
Hermosa Avenue- Street
Widening/Arte 50,000$ -$ -$ -$ -$ -$ -$ 50,000$ 1 179 303 5650 1976174-0
370,000$ -$ -$ -$ -$ -$ -$ 370,000$ 1 198 303 5650 1976198-0
420,000$ -$ -$ -$ -$ -$ -$ 420,000$
22 PF-1.4
Romeo
David Streets
Highland Avenue- Pavement
Rehabilitation 40,000$ -$ -$ -$ -$ -$ -$ 40,000$ 1 174 303 5650 2104174-0
-$ 845,000$ 845,000$ 1 179 303 5650 2104179-0
40,000$ 845,000$ -$ -$ -$ -$ -$ 885,000$
23 MA-3.2
Baldwin
Ngai Traffic
HSIP Traffic Signal
lModification at Various
Locations 264,400$ -$ -$ -$ -$ -$ -$ 264,400$ 1 124 303 5650 2079124-0
453,000$ -$ -$ -$ -$ -$ -$ 453,000$ 1 174 303 5650 2079174-0
717,400$ -$ -$ -$ -$ -$ -$ 717,400$
24 PF-1.4
Romeo
David Streets
Lemon Avenue-Pavement
Rehabilitation 645,000$ -$ -$ -$ -$ -$ -$ 645,000$ 1 177 303 5650 2098177-0
645,000$ -$ -$ -$ -$ -$ -$ 645,000$
25 PF-1.4
Romeo
David Streets Local Street Overlay -$ 2,960,000$ -$ -$ -$ -$ -$ 2,960,000$ 1 174 303 5650 1022174-0
-$ 1,190,000$ -$ -$ -$ -$ -$ 1,190,000$ 1 177 303 5650 1022177-0
-$ 4,150,000$ -$ -$ -$ -$ -$ 4,150,000$
26 PF-1.4
Romeo
David Streets Local Street Slurry Seal -$ 550,000$ -$ -$ -$ -$ -$ 550,000$ 1 177 303 5650 1022177-0
-$ 550,000$ -$ -$ -$ -$ -$ 550,000$
27 PF-1.4
Romeo
David Streets
Milliken Avenue Pavement
Rehabilitation 35,000$ -$ -$ -$ -$ -$ -$ 35,000$ 1 174 303 5650 2100174-0
-$ 1,250,000$ -$ -$ -$ -$ -$ 1,250,000$ 1 179 303 5650 2100179-0
35,000$ 1,250,000$ -$ -$ -$ -$ -$ 1,285,000$
28 PF-1.4 Streets
Pecan Avenue Street
Improvements -$ -$ -$ -$ 10,000$ 883,000$ -$ 893,000$ 1 204 314 5650 2038204-0
-$ -$ -$ -$ 10,000$ 883,000$ -$ 893,000$
29
PF-7.1
PF-7.2 Fred Lyn Municipal Utilities
RC Fiber Extension-
Amethyst Avenue -$ 10,000$ 70,000$ -$ -$ -$ -$ 80,000$ 1 711 303 5650 2096705-0
-$ -$ 80,000$ -$ -$ -$ -$ 80,000$ 3 288 501 5650 2095288-0
-$ 10,000$ 150,000$ -$ -$ -$ -$ 160,000$
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Page 3 of 7
Page 8
30 RC-7.1
Deborah
Allen
Municipal
Utilities
RCMU EV Charging Station
Hub -$ 207,660$ -$ -$ -$ -$ -$ 207,660$ 1 275 208 5650 2095275-0
-$ 842,340$ -$ -$ -$ -$ -$ 842,340$ 1 705 303 5650 2095705-0
-$ 1,050,000$ -$ -$ -$ -$ -$ 1,050,000$
31
PF-7.1
PF-7.2 Fred Lyn Municipal Utilities
RCMU Line Extension
Design: Etiwanda North 10,000$ 1,300,000$ 2,000,000$ -$ -$ -$ -$ 3,310,000$ 1 705 303 5650 2064705-0
10,000$ 1,300,000$ 2,000,000$ -$ -$ -$ -$ 3,310,000$
32 PF-1.4
Romeo
David Streets
West Foothill Boulevard
Street Improvements 12,500$ -$ -$ -$ -$ -$ -$ 12,500$ 1 001 307 5650 1964001-0
277,000$ 2,400,000$ -$ -$ -$ -$ -$ 2,677,000$ 1 198 303 5650 1964198-0
289,500$ 2,400,000$ -$ -$ -$ -$ -$ 2,689,500$
33 PF-1.4
Cesar
Guevara Streets
Whittram Avenue Street
Improvements -$ -$ -$ -$ 21,000$ 323,000$ -$ 344,000$ 1 204 314 5650 2032204-0
-$ -$ -$ -$ 21,000$ 323,000$ -$ 344,000$
36,947,682$ 127,521,470$ 2,534,000$ -$ 3,384,000$ 1,206,000$ -$ 171,593,152$
No. PM Project
Type Project Prior Year
Funding
Fiscal Year
2023/24
Fiscal Year
2024/25
Fiscal Year
2025/26
Fiscal Year
2026/27
Fiscal Year
2027/28
Future
Years
Total Project
Cost Entity Fund Division Object JL
1
PF-1.1
PF-1.4
Darci
Vogel Facilities
Amethyst Station 171-
Rebuild 401,460$ -$ -$ 18,885,310$ -$ -$ -$ 19,286,770$ 3 288 501 5650 2090288-0
-$ -$ -$ 100,000$ -$ -$ -$ 100,000$ 1 290 603 5650 2090290-0
2 PF-1.1 Ty Harris Facilities
Banyan Station 175- ADA
Improvements 58,290$ 553,300$ -$ -$ -$ -$ -$ 611,590$ 3 288 501 5650 2111288-0
459,750$ 553,300$ -$ 18,985,310$ -$ -$ -$ 19,998,360$
3 PF-1.1 Ty Harris Facilities
Day Creek Station 173- ADA
Improvements 55,090$ 438,370$ -$ -$ -$ -$ -$ 493,460$ 3 288 501 5650 2093288-0
55,090$ 438,370$ -$ -$ -$ -$ -$ 493,460$
5 PF-1.1 Ty Harris Facilities
Jersey Station 174- ADA
Improvements 55,090$ -$ -$ -$ -$ -$ -$ 55,090$ 3 288 501 5650 2092288-0
-$ 647,920$ -$ -$ -$ -$ -$ 647,920$ 1 282 501 5650 2092282-0
55,090$ 647,920$ -$ -$ -$ -$ -$ 703,010$
6
PF-1.1
PF-1.4
Darci
Vogel Facilities Town Center Station 178 22,006,800$ -$ -$ -$ -$ -$ -$ 22,006,800$ 3 288 501 5650 1645288-0
472,010$ -$ -$ -$ -$ -$ -$ 472,010$ 1 025 001 5650 1645025-0
63,610$ -$ 63,610$ 1 290 603 5650 1645290-0
-$ 3,200,000$ -$ -$ -$ -$ -$ 3,200,000$
Grant
Opportunity
22,542,420$ 3,200,000$ -$ -$ -$ -$ -$ 25,742,420$
23,112,350$ 4,839,590$ -$ 18,985,310$ -$ -$ -$ 46,937,250$
No. PM Project
Type Project Prior Year
Funding
Fiscal Year
2023/24
Fiscal Year
2024/25
Fiscal Year
2025/26
Fiscal Year
2026/27
Fiscal Year
2027/28
Future
Years
Total Project
Cost Entity Fund Division Object JL
1
PF-1.1
PF-1.4
Wess
Garcia Facilities
Archibald Library
Replacement Project 75,000$ 11,870,000$ -$ -$ -$ -$ -$ 11,945,000$ 1 329 601 5650 2114329-0
75,000$ 11,870,000$ -$ -$ -$ -$ -$ 11,945,000$
2 PF-1.1
Wess
Garcia Facilities
Paul A. Biane Library
Infrastructure Project 145,000$ 425,000$ 325,000$ 305,000$ -$ -$ -$ 1,200,000$ 1 329 601 5650 2115329-0
145,000$ 425,000$ 325,000$ 305,000$ -$ -$ -$ 1,200,000$
3
PF-1.1
PF-3.1
Wess
Garcia Facilities Second Story and Beyond 5,800,000$ -$ -$ -$ -$ -$ -$ 5,800,000$ 1 329 601 5650 1867329-0
400,000$ -$ -$ -$ -$ -$ -$ 400,000$ 1 025 001 5650 1867025-0
2,000,000$ -$ -$ -$ -$ -$ -$ 2,000,000$ 1 329 601 5650 1867329-0
1,000,000$ -$ -$ -$ -$ -$ -$ 1,000,000$ 1 275 208 5650 1867275-0
9,200,000$ -$ -$ -$ -$ -$ -$ 9,200,000$
9,420,000$ 12,295,000$ 325,000$ 305,000$ -$ -$ -$ 22,345,000$
No. PM Project
Type Project Prior Year
Funding
Fiscal Year
2023/24
Fiscal Year
2024/25
Fiscal Year
2025/26
Fiscal Year
2026/27
Fiscal Year
2027/28
Future
Years
Total Project
Cost Entity Fund Division Object JL
1 S-1.8
Karen
Hunt Miscellaneous ALPR Cameras -$ 293,300$ -$ -$ -$ -$ -$ 293,300$ 017 701 5603
-$ 293,300$ -$ -$ -$ -$ -$ 293,300$ Project Total:
Project Total:
Library Services Total:
Project Total:
Project Total:
Library Services
Project Total:
Fire District Totals:
Police Department
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Engineering Services Totals:
Fire District
Project Total:
Page 4 of 7
Page 9
-$ 293,300$ -$ -$ -$ -$ -$ 293,300$
No. PM Project
Type Project Prior Year
Funding
Fiscal Year
2023/24
Fiscal Year
2024/25
Fiscal Year
2025/26
Fiscal Year
2026/27
Fiscal Year
2027/28
Future
Years
Total Project
Cost Entity Fund Division Object JL
1 PF-1.1
Richard
Favela Facilities
Above Ground Diesel Tank
Replacement -$ 140,000$ -$ -$ -$ -$ -$ 140,000$ 1 712 001 5603 0
-$ 140,000$ -$ -$ -$ -$ -$ 140,000$
2 PF-1.1
Jeff
Benson
Parks &
Recreation
Beryl Park East - Tennis
Court LED Light
Replacement 69,000$ -$ -$ -$ -$ -$ -$ 69,000$ 1 141 303 5607 0
69,000$ -$ -$ -$ -$ -$ -$ 69,000$
3 PF-1.1
Neil
Plummer Facilities
Beryl Park Soccer Field LED
Sports Lighting Upgrade -$ 152,000$ 152,000$ 152,000$ 152,000$ -$ -$ 608,000$ 1 141 303 5607 0
-$ 152,000$ $152,000 $152,000 $152,000 $- $- $608,000
4 PF-1.1
Neil
Plummer Facilities City Hall Roofing Repairs 1,379,580$ -$ -$ -$ -$ -$ 1,379,580$ 1 025 001 5602 0
-$ 1,379,580$ -$ -$ -$ -$ -$ $1,379,580
5 PF-1.1
Neil
Plummer Facilities City Hall - Waterproofing $54,500 $1,758,830 $0 $0 $0 0 0 1,813,330$ 1 025 001 5602 0
54,500$ 1,758,830$ -$ -$ -$ -$ -$ 1,813,330$
6 PF-1.4
Richard
Favela Facilities Citywide Concrete Repair 1,975,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ 1,000,000$ -$ 6,975,000$ 1 001 xxx 5650 1991001-0
500,000$ 100,000$ 100,000$ 100,000$ 100,000$ 100,000$ 1,000,000$ 1 177 303 5650 1991177-0
425,000$ 425,000$ 425,000$ 425,000$ 425,000$ 425,000$ 2,550,000$ 1 198 303 5650 1991198-0
2,900,000$ 1,525,000$ 1,525,000$ 1,525,000$ 1,525,000$ 1,525,000$ -$ 10,525,000$
7 PF-1.1
Neil
Plummer Facilities
Civic Center - HVAC Plant
Replacement 2,300,000$ 100,000$ -$ -$ -$ -$ -$ 2,400,000$ 1 025 303 5650 1978025-0
2,300,000$ 100,000$ -$ -$ -$ $- $- $2,400,000
8 PF-1.1
Neil
Plummer Facilities
Council Chambers -
Carpeting & Seating
Replacement 7,000$ 132,500$ -$ -$ -$ -$ -$ 139,500$ 1 025 303 5602 0
7,000$ 132,500$ -$ -$ -$ $- $- $139,500
Project Total:
Project Total:
Project Total:
Public Works
Project Total:
Police Department Totals:
Project Total:
Project Total:
Project Total:
Project Total:
Page 5 of 7
Page 10
9 PF-1.4
Neil
Plummer Facilities
Day Creek Park Baseball
Fields LED Sports Lighting
Upgrade -$ 384,000$ -$ -$ -$ -$ -$ 384,000$ 1 140 303 5607 0
-$ 384,000$ -$ -$ -$ $- $- $384,000
10 OS-2.1
Richard
Favela
Parks &
Recreation
Heritage Park - Pedestrian
Trail 151,740$ 95,000$ -$ -$ -$ -$ -$ 246,740$ 1 848 303 5607 1848848-0
151,740$ 95,000$ -$ -$ -$ -$ -$ 246,740$
11
RC-2.5
RC-2.6
Jeff
Benson Miscellaneous
LMD 1 Drought Tolerant
Landscaping 50,000$ 50,000$ -$ -$ -$ -$ -$ 100,000$ 1 141 303 5650 2056141-0
50,000$ 50,000$ -$ -$ -$ -$ -$ 100,000$
12
OS-1.5
PF-1.1
Jeff
Benson
Parks &
Recreation
LMD 2 Park Upgrades RIRE
Grant 40,000$ 210,000$ -$ -$ -$ -$ -$ 250,000$ 1 131 303 5650 2102131-0
40,000$ 210,000$ -$ -$ -$ -$ -$ 250,000$
13
OS-1.5
PF-1.1
Jeff
Benson
Parks &
Recreation
LMD 2 Paseo Lighting
Retrofits 567,550$ 250,000$ 224,000$ 140,890$ -$ -$ -$ 1,182,440$ 1 131 303 5650 1716131-0
567,550$ 250,000$ 224,000$ 140,890$ -$ -$ -$ 1,182,440$
14
RC-2.5
RC-2.6
Jeff
Benson Miscellaneous
LMD 2 Victoria Water
Conservation/Landscape
Renovation 1,561,030$ 1,215,000$ 1,150,000$ 1,150,000$ 1,891,773$ 883,200$ -$ 7,851,003$ 1 131 303 5650 1787131-0
1,561,030$ 1,215,000$ 1,150,000$ 1,150,000$ 1,891,773$ 883,200$ -$ 7,851,003$
15
RC-2.5
RC-2.6
Jeff
Benson Miscellaneous
LMD 4R Vista Water
conservation/ Landscape
Renovation 1,004,010$ 838,000$ 883,200$ 883,200$ 883,200$ -$ -$ 4,491,610$ 1 134 303 5650 1787134-0
1,004,010$ 838,000$ 883,200$ 883,200$ 883,200$ -$ -$ 4,491,610$
16
RC-2.5
RC-2.6
Jeff
Benson Miscellaneous
LMD 6- Drought Tolerant
Landscaping 50,000$ 50,000$ -$ -$ -$ -$ -$ 100,000$ 1 136 303 5650 2056136-0
50,000$ 50,000$ -$ -$ -$ -$ -$ 100,000$
17
OS-1.5
PF-1.4
Neil
Plummer Facilities
PD85 LED Sports Lighting
Upgrade -$ 384,000$ 335,000$ 420,000$ 464,000$ 192,000$ 192,000$ 1,987,000$ 1 848 303 5607 0
-$ 384,000$ 335,000$ 420,000$ 464,000$ 192,000$ 192,000$ 1,987,000$
18 PF-1.1
Neil
Plummer Facilities
Police Department Bullet
Resistant Glass
Replacement 141,520$ 60,000$ -$ -$ -$ -$ -$ 201,520$ 1 017 001 5602 0
141,520$ 60,000$ $- $- $- $- $- $201,520
19
OS-2.6
PF1.4
Jeff
Benson Facilities Red Hill Lake Modernization -$ 1,000,000$ -$ -$ -$ -$ -$ 1,000,000$ 1 025 001 5650 2130025-0
-$ 600,000$ -$ -$ -$ -$ -$ 600,000$ 1 847 303 5650 2130847-0
-$ 200,000$ -$ -$ -$ -$ -$ 200,000$ 1 848 303 5650 2130848-0
-$ 1,800,000$ -$ -$ -$ -$ -$ 1,800,000$
20
OS-1.5
PF-1.4
Neil
Plummer Facilities
Red Hill Park Soccer Field
LED Sports Lighting
Upgrade -$ 152,000$ 192,000$ 192,000$ 192,000$ 192,000$ 920,000$ 1 848 303 5607 0
-$ -$ 152,000$ 192,000$ 192,000$ 192,000$ 192,000$ $920,000
21 OS-1.3
Jeff
Benson
Parks &
Recreation
Replace Playground
Surfacing -$ 143,750$ -$ -$ -$ -$ -$ 143,750$ 1 134 303 5607 0
-$ 143,750$ -$ -$ -$ -$ -$ 143,750$
22
OS-1.5
PF-1.4
Neil
Plummer Facilities
Stadium LED Sports
Lighting Conversion and
Lazer Grading -$ 1,254,000$ -$ -$ -$ -$ -$ 1,254,000$ 1 025 303 5650 2131025-0
289,530$ 1,254,000$ -$ -$ -$ $- $- $1,543,530
23 PF-1.4
Richard
Favela Traffic Traffic Signal Modification 376,000$ 200,000$ 220,000$ 242,000$ 266,200$ 266,200$ -$ 1,570,400$ 1 174 303 5650 2035174-0
376,000$ 200,000$ 220,000$ 242,000$ 266,200$ 266,200$ -$ 1,570,400$
24 PF-1.4
Richard
Favela Traffic
TS Signal Battery Backup
Replacement 502,500$ 140,250$ 127,500$ 154,275$ 170,000$ 170,000$ -$ 1,264,525$ 1 174 303 5650 1980174-0
600,000$ 165,000$ 181,500$ 165,000$ 200,000$ 200,000$ -$ 1,511,500$ 1 712 303 5650 1980174-0
1,102,500$ 305,250$ 309,000$ 319,275$ 370,000$ 370,000$ -$ 2,776,025$
10,664,380$ 12,426,910$ 4,950,200$ 5,024,365$ 5,744,173$ 3,428,400$ 384,000$ 42,622,428$
80,724,785$ 165,605,790$ 8,661,700$ 24,314,675$ 9,128,173$ 4,634,400$ 384,000$ 293,453,523$
47,122,948$
CITYWIDE TOTALS
Project Total:
Public Works Totals:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Project Total:
Page 6 of 7
Page 11
Page 7 of 7
Page 12
CAPITAL
2023
IMPROVEMENT
2024
T e l : ( 9 0 9 ) 4 7 7 - 2 7 4 0
F a x : ( 9 0 9 ) 4 7 7 - 2 7 4 1
1 0 5 0 0 C i v i c C e n t e r D r i v e ,
R a n c h o C u c a m o n g a , C A 9 1 7 3 0 W W W . C I T Y O F R C . U S
ENGINEERING SERVICES DEPARTMENT
CITY OF RANCHO CUCAMONGA
PROGRAM
Exhibit C
Page 13
CIP 2023
2024
A N I M A L S E R V I C E S
2
Page 14
JL Key GL Object
5602
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2024 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Capital Reserve Fund (025)60,000$
-$
-$
-$
-$
Total Funding:60,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 60,000 $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ - $ - $ - $ - $ -
Total Costs:60,000$ -$ -$ -$ -$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:-$ $ - -$ -$ -$
Animal Center Veterinary Floor Replacement
Replace floors in vet tech, x-ray, surgery, and isolation areas with same epoxy
coated floors used in other animal housing areas.
The floors in these rooms were not replaced during the 2017 make over and
have worn through creating uneven surfaces and inability to properly clean
and disinfect.
PROJECT FUNDING*
Animal Care Services Veronica Fincher
Facilities
District 4
Relentless pursuit of improvement
Animal Center
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$-
$-
$ 60,000
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$-
$-
$-
$-
TOTAL PROJECT
COST*
$-
$-
$-
$-
$ 60,000
PLACE PHOTO HERE
3
Page 15
JL Key GL Object
5602
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q2 2024 CY Q4 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Animal Center Impact Fee
(125)220,000$
-$
-$
-$
-$
Total Funding:220,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 200,000 $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ - $ - $ - $ - $ -
Total Costs:200,000$ -$ -$ -$ -$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:-$ $ - -$ -$ -$
Animal Center Office Reconfigure
This project will reconfigure the Animal Center's (AC) staff office areas. This is
the second phase of the AC makeover completed in 2017.
The reconfiguration project will allow for more efficient use of the office
spaces including increasing the number of work spaces available and adding a
volunteer area and conference room.
PROJECT FUNDING*
Animal Care Services Veronica Fincher
Facilities
District 4
Relentless pursuit of improvement
$-
$ 20,000
$-
$-
$ 200,000
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Animal Center
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$-
$-
$-
$-
TOTAL PROJECT
COST*
$-
$-
$ 220,000
PLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HERE
1
Page 16
CIP 2023
2024
C I T Y M A N A G E R ' S O F F I C E
2
Page 17
JL Key GL Object
2091 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2024 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Federal Grants Fund (275)1,623,890$
Park Development Fund
(120)80,000$
Fire Capital Projects (288)60,000$
‐$
‐$
Total Funding: 1,763,890$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $ 160,000 $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $ 1,219,910 $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $ 243,980 $‐ $‐ $‐ $‐
Total Costs:1,623,890$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $ 1,000 $ 1,100 $ 1,210 $ 1,331 $ 1,464
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:1,000$ $ 1,100 1,210$ 1,331$ 1,464$
Cucamonga Canyon Trailhead
A trailhead located on a 5.25 acre piece of property near Cucamonga Canyon.
Amenities to include monument, benches, shade structure, water fountain,
and storage.
The site is ideal as a base of operations for public safety during emergencies,
as well as the Cucamonga Foothill Preservation Alliance, who provides
volunteer services for Cucamonga Canyon. The Fire District acquired the
property from the County in Dec. 2021 and is is required to improve and
develop within 24 months.
PROJECT FUNDING*
City Manager's Office Mike Parmer
Parks & Recreation
District 4
Promoting and enhancing a safe and healthy community for all
$ 80,000
$ 220,000
$‐
$‐
$ 1,219,910
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Skyline Road / Almond Street
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$1,221
$‐
$1,221
TOTAL PROJECT
COST*
$‐
$ 243,980
$ 1,763,890
3
Page 18
JL Key GL Object
1894 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2023 TBD
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Capital Reserve Fund (025)3,599,523$
‐$
‐$
‐$
‐$
Total Funding: 3,599,523$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $ 98,800 $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $ 2,600,000 $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $ 520,000 $‐ $‐ $‐ $‐
Total Costs:3,218,800$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $ 40,000 $ 40,000 $ 40,000 $ 40,000 $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:40,000$ $ 40,000 40,000$ 40,000$ ‐$
Cultural Center Courtyard Redesign
The Courtyard redesign will take a primarily passive, outdoor space with
little shade/seating and redesign it to encourage greater pedestrian access
and use.
The improvements will reduce staff time for event set up and take down,
and improve flow and continuity with the rest of Victoria Gardens. The
redesign project will open up new opportunities for rentals and increase
ticket sales at the Lewis Family Playhouse.
PROJECT FUNDING*
City Manager's Office Mike Parmer
Facilities
District 4
Promoting and enhancing a safe and healthy community for all
12505 Cultural Center Drive
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$‐
$ 520,000
$ 3,569,582
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$34,000
$‐
$34,000
TOTAL PROJECT
COST*
$ 25,000
$ 424,582
$‐
$‐
$ 2,600,000
4
Page 19
JL Key GL Object
1348 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2024 CY Q2 2026
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Law Enforcement Reserve
(017)100,000$
‐$
‐$
‐$
‐$
Total Funding:100,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $ 100,000 $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:100,000$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$ 100,000
$‐
$‐
$‐
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$‐
$‐
$ 100,000
RCPD Facility Improvement and Modernization
This project will be a multi‐year effort to assess, plan, and construct projects
that will improve and modernize the main RC Police Station.
The current Police Station was constructed in the 1980s and is in need of
upgrading to accommodate changes in operations that have occurred
throughout the years since the facility was first built. The station's
maintenance plan also needs to be assessed to better understand the
necessary repairs for a structure of its age.
PROJECT FUNDING*
City Manager's Office Mike Parmer
Facilities
District 4
Intentionally embracing and anticipating the future
10510 Civic Center Drive
5
Page 20
JL Key GL Object
2122 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2023 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
State Grants Fund (274)1,900,000$
$ -
$ -
$ -
$ -
Total Funding: 1,900,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 1,900,000 $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ - $ - $ - $ - $ -
Total Costs:1,900,000$ $ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ -
$ -
$ -
$ 1,900,000
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ -
$ -
$ 1,900,000
Wildfire Early Detection System
Installation of a 30-camera unit, early wildfire detection system along the
City’s northern boundary. Includes a 6-year subscription and license, cell data
access, and training for staff.
The system will provide rapid detection, reporting, and response to wildfires.
The project is being considered for federal earmark funding which will provide
for initial construction as well as ongoing training, maintenance, and
implementation.
PROJECT FUNDING*
City Manager's Office Mike Parmer
Miscellaneous
District 4
Promoting and enhancing a safe and healthy community for all
Northern Wildland Urban Interface
6
Page 21
CIP 2023
2024
C O M M U N I T Y S E R V I C E S
7
Page 22
JL Key GL Object
5607
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2023 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
LMD 1‐Capital Rplcmt (141)40,000$
Park Development Fund
(120)22,040$
Park Fund (119)772,690$
State Grants Fund (274)286,750$
Gas Tax R&T 7360 Fund
(174)35,000$
Total Funding:1,156,480$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $32,390 $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $ 998,120 $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $96,320 $‐ $‐ $‐ $‐
Total Costs:1,126,830$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $2,500 $ 2,500 $ 2,500 $ 2,500 $ 2,500
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:2,500$ $ 2,500 2,500$ 2,500$ 2,500$
Beryl Park East Inclusive Playground
Replacement playground at Beryl Park East with, inclusive playground
equipment. Project will also include an upgraded crosswalk with Rectangular
Rapid Flashing Beacon (RRFB).
These playgrounds are among the oldest in the City and are in need of
updating to meet current equipment and playground concept standards.
Further, the playground will be designed to be allow access to children of all
abilities. The City anticipates receiving $286,742 in reimbursable State Prop
68 grant funds.
PROJECT FUNDING*
Community Services Jennifer Hunt Gracia
Parks & Recreation
District 4
Promoting and enhancing a safe and healthy community for all
$‐
$ 62,040
$‐
$‐
$ 998,120
*Includes Prior & Future Years
IMPACT ON OPERATIONS
6524 Beryl Street
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$2,500
$‐
$2,500
TOTAL PROJECT
COST*
$‐
$ 96,320
$ 1,156,480
8
Page 23
JL Key GL Object
2107 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
23/24 Q2 2024 24/25 Q2 2025
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Federal Grants Fund (275)775,000$
Capital Reserve Fund (025)75,500$
‐$
‐$
‐$
Total Funding:850,500$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $ 32,500 $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $ 675,000 $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $ 67,500 $‐ $‐ $‐
Total Costs:32,500$ 742,500$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
RC Family Resource Center Rehabilitation
Replacement of the HVAC systems and flooring, installation of lighting for
energy efficiency and safety, community kitchen improvements, new
painting, restroom improvements.
Beyond the impacts of the pandemic and loss of services, there is a very real
danger the community may lose this valued resource due to the
deterioration of the building and its systems.
PROJECT FUNDING*
Community Services Jennifer Hunt Gracia
Facilities
District 4
Promoting and enhancing a safe and healthy community for all
9791 Arrow Route
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 75,500
$ 67,500
$ 850,500
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$ 32,500
$‐
$‐
$ 675,000
9
Page 24
CIP 2023
2024
E N G I N E E R I N G
10
Page 25
JL Key GL Object
1839 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2026 CY Q4 2027
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Transportation Fund (124)1,987,000$
Other (Not Listed)1,000,000$
Municipal Utility (705)125,000$
‐$
‐$
Total Funding: 3,112,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $ 105,000 $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $ 300,000 $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $ 2,230,000 $‐
Inspection & Administration $‐ $‐ $‐ $ 200,000 $‐
Contingency $‐ $‐ $‐ $ 223,000 $‐
Total Costs:405,000$ ‐$ ‐$ 2,653,000$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $ 1,000
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ 1,000$
6th Street at BNSF Spur Crossing
This project involves constructing an at grade crossing at 6th street and the
BNSF Railroad Spur.
The project completes the 6th Street roadway between Milliken Avenue and
Etiwanda Avenue. It will improve traffic circulation, movement of goods, and
emergency response in the area.
PROJECT FUNDING*
Engineering Services Justin Pope
Streets
District 4
To build on our success as a world class community, to create an equitable,
sustainable, and vibrant city, rich in opportunity for all to thrive.
6th Street between I‐15 Freeway and Etiwanda Avenue
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 200,000
$ 223,000
$ 3,112,000
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$ 159,000
$‐
$ 300,000
$ 2,230,000
11
Page 26
JL Key GL Object
2005 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q4 2023 CY Q1 2025
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Infrastructure Fund (198)488,220$
Measure I Fund (177)1,000,000$
-$
-$
-$
Total Funding:1,488,220$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 146,850 $ 1,000,000 $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ - $ - $ - $ - $ -
Total Costs:146,850$ 1,000,000$ -$ -$ -$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ 4,000 $ 8,000 $ 8,000 $ 8,000
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:-$ $ 4,000 8,000$ 8,000$ 8,000$
6th Street Cycle Track
Construction of a Class 4 Bike Lane (Cycle Track) on both north & south sides
of 6th Street. Contains both delineator buffers and raised bike lanes and will
include repaving.
These improvements are part of a regional project being led by SBCTA &
funded by a Caltrans Active Transportation Program grant. The project will
further the City's goals of building infrastructure to improve connectivity &
promote alternative modes of travel. The budget outlined is for the City's
share of the total project cost plus road rehab.
PROJECT FUNDING*
Engineering Services Justine Garcia
Streets
District 4
Promoting and enhancing a safe and healthy community for all
6th Street from Haven Avenue to Rochester Avenue
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$-
$-
$ 1,488,220
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$7,000
$-
$-
$7,000
TOTAL PROJECT
COST*
$-
$ 341,370
$-
$-
$ 1,146,850
PLACE PHOTO HERE
12
Page 27
JL Key GL Object
2004 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2024 CY Q4 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Transportation Fund (124)7,272,900$
Capital Reserve Fund (025)48,400$
Fiber Optic Network (711)64,300$
Fire Capital Projects (288)64,300$
‐$
Total Funding: 7,449,900$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $ 5,128,600 $‐ $‐ $‐ $‐
Inspection & Administration $ 500,000 $‐ $‐ $‐ $‐
Contingency $ 760,500 $‐ $‐ $‐ $‐
Total Costs:6,389,100$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ 70,000 $ 70,000 $ 70,000 $ 70,000 $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $ 472,500
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:70,000$ $ 70,000 70,000$ 70,000$ 472,500$
Advanced Traffic Management System‐ Phase 2
Installation of CCTV and VDS cameras, fiber optic communication, upgrading
and integrating traffic signals with the Traffic Management Center located at
City Hall, and implementing coordination timing. Milliken Avenue from 4th
Street to Grizzly Drive, 19th Street from Sapphire Street to Haven Avenue,
Arrow Route from Grove Avenue to East Avenue, Rochester Avenue from Base
Line Road to Banyan Street, and Day Creek Boulevard from Base Line Road to
Wilson Avenue
Implementation of this project will enable real time reactivity and improve
monitoring, retiming and coordination of the City's traffic signal system as a
part of a multiphase project to implement the Traffic Signals Communication
Masterplan adopted in 2018
PROJECT FUNDING*
Engineering Services TBD
Traffic
District 4
Intentionally embracing and anticipating the future
$‐
$ 1,000,000
$‐
$‐
$ 5,189,400
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Milliken Ave, 19th St, Arrow Rt, Rochester Ave, Day Creek Blvd
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$56,000
$‐
$‐
$56,000
TOTAL PROJECT
COST*
$ 500,000
$ 760,500
$ 7,449,900
13
Page 28
JL Key GL Object
2101 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q4 2023 CY Q1 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Infrastructure Fund (198)665,000$
‐$
‐$
‐$
‐$
Total Funding:665,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $ 60,000 $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $ 420,000 $‐ $‐ $‐ $‐
Inspection & Administration $ 43,000 $‐ $‐ $‐ $‐
Contingency $ 42,000 $‐ $‐ $‐ $‐
Total Costs:565,000$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
Almond Street Extension Street Improvement
The Almond Street Extension project includes constructing improvements to
complete the connection of Almond Street between Carnelian Street and Via
Verde.
Completion of these improvements would provide an additional east‐west
street connection north of SR‐210, improving traffic circulation and public
safety access in support of he goals of the General Plan.
PROJECT FUNDING*
Engineering Services Romeo David
Streets
District 4
Promoting and enhancing a safe and healthy community for all
Almond Street from Carnelian Street to east of Via Verde
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 43,000
$ 42,000
$ 665,000
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$ 100,000
$ 60,000
$‐
$‐
$ 420,000
14
Page 29
JL Key GL Object
2110 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q2 2023 CY Q3 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
LMD 1 (130)272,000$
‐$
‐$
‐$
‐$
Total Funding:272,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Northwest corner of Gooseneck Road and Almond Street
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$ 10,000
$ 22,000
$ 272,000
$‐
$ 20,000
$‐
$‐
$ 220,000
Almond Trail Improvements
Re‐Grade existing eroded trail surface, construct concrete swale, construct
low water Arizona crossing and ungrouted cobble rocks swale and inlet
drainage.
Almond Trail is currently closed resulting from storms that have eroded the
trail surface. Repairs are necessary to re‐open the trail. This project would
reduce maintenance requirements for the Almond Trail improvements
PROJECT FUNDING*
Engineering Services Romeo David
Parks & Recreation
District 4
Promoting and enhancing a safe and healthy community for all
15
Page 30
JL Key GL Object
2106 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q2 2023 CY Q2 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Municipal Utility (705)300,000$
‐$
‐$
‐$
‐$
Total Funding:300,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
District 4
Intentionally embracing and anticipating the future
8273 Rochester Avenue
Arbor Substation Exterior Redesign & Storage Improvements
As RCMU continues to grow, the need for equipment storage in order to be
able to continue to provide reliable electrical service has expanded.
PROJECT FUNDING*
Engineering Services Trina Valdez
Municipal Utilities
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$‐
$‐
$ 300,000
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$‐
$ 300,000
$‐
$‐
Modifies RCMU's Arbors electric substation exterior parking area to include
additional equipment storage that is enclosed within the secured substation
fencing.
16
Page 31
JL Key GL Object
2033 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q2 2023 CY Q3 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Measure I Fund (177)1,440,000$
‐$
‐$
‐$
‐$
Total Funding: 1,440,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
Banyan Street Pavement Rehabilitation
This project includes localized asphalt removal and replacement, asphalt
rubber hot mix overlay, utility valves and manhole adjustments, pavement
striping and curb ramps.
This project will restore the existing road surface to new condition and help
extending the pavement life, use and rideability. Also, this proposed
improvements will reduce costs for pavement maintenance. The current
Pavement Condition Index is 48 and 66
PROJECT FUNDING*
Engineering Services Cesar Guevara
Traffic
District 4
Relentless pursuit of improvement
Banyan Street from Haven Avenue to Rochester Avenue
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 100,000
$ 150,000
$ 1,440,000
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$ 190,000
$‐
$‐
$ 1,000,000
17
Page 32
JL Key GL Object
2097 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q2 2023 CY Q4 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Road Maintenance & Rehab
(179)900,000$
‐$
‐$
‐$
‐$
Total Funding:900,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
$‐
$ 700,000
TOTAL PROJECT
COST*
$‐
5‐YEAR PROJECT COST ESTIMATES
$ 70,000
$‐
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 60,000
$ 70,000
$ 900,000
Average Annual
Impact
$‐
$‐
$‐
$‐
Base Line Road Pavement Rehabilitation
Asphalt rubber hot mix overlay,cold planing, crack sealing, utility adjustment,
video detection, green bike lane striping and curb ramps upgrade.
This project will restore the existing road surface to a substantially new
condition, extending pavement life, use and rideability. Current Pavemement
Condition is 55.
PROJECT FUNDING*
Engineering Services Romeo David
Streets
District 4
Promoting and enhancing a safe and healthy community for all
Base Line Road, from Day Creek Boulevard to I‐15 FWY
Project
Description
Justification
18
Page 33
JL Key GL Object
5600
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q4 2023 CY Q2 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Capital Reserve Fund (025)380,000$
-$
-$
-$
-$
Total Funding:380,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ - $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ - $ - $ - $ - $ -
Total Costs:-$ -$ -$ -$ -$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:-$ $ - -$ -$ -$
Cherry Avenue Lot - Site Securing and Preparation
The project will include a boundary survey, clearing, and fencing of a 3.37 acre
vacant parcel to prepare for future construction of a project that is to be
determined.
This vacant parcel was purchased from Caltrans in 2020 as a part of a public
auction. The unique piece of land is anticipated to be developed to support
the furthering of General Plan and Council Goals in ancitipation of future
development in the directly surrounding area.
PROJECT FUNDING*
Engineering Services Justine Garcia
Miscellaneous
District 4
Intentionally embracing and anticipating the future
$-
$-
$-
$ 380,000
$-
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Cherry Avenue @ I-15
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$-
$-
$-
$-
TOTAL PROJECT
COST*
$-
$-
$ 380,000
PLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HERE
19
Page 34
JL Key GL Object
5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2023 CY Q4 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Infrastructure Fund (198)123,000$
‐$
‐$
‐$
‐$
Total Funding:123,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Civic Center Drive
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$4,200
$ 11,600
$ 132,500
$‐
$‐
$‐
$‐
$ 116,700
Civic Center Crosswalk
This project will construct ramps, crosswalk, and refuge island improvements
at Civic Center Drive connecting City Hall and Civic Center Plaza.
This project will provide pedestrians a safe and accessible path from City Hall
and the Courthouse to the Civic Center Plaza. Such improvement will promote
a more comfortable walking enviroment in the areas around City Hall, the
County Courthouse, and adjacent commercial sites per the General Plan.
PROJECT FUNDING*
Engineering Services Krystal Lai
Streets
District 4
Promoting and enhancing a safe and healthy community for all
20
Page 35
JL Key GL Object
1533 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q2 2024 CY Q4 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
AB 2766 Air Qual Imprv Fund
(105)86,590$
Ped Grant/Art3 Fund (214)84,420$
-$
-$
-$
Total Funding:171,010$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ 10,000 $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 161,010 $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ - $ - $ - $ - $ -
Total Costs:171,010$ -$ -$ -$ -$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:-$ $ - -$ -$ -$
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$-
$-
$-
$-
TOTAL PROJECT
COST*
$-
$ 10,000
$-
$-
$ 161,010
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$-
$-
$ 171,010
Cucamonga Creek Bike Trail
This project involves slurry seal coating, striping and new signage along the
existing Cucomanga Creek Channel trail.
This project will enhance pedestrian and bicyclists safety by restoring the
existing bike trail to new condition and extending the pavement life.
PROJECT FUNDING*
Engineering Services Cesar Guevara
Facilities
District 4
Promoting and enhancing a safe and healthy community for all
Cucamonga ChannelPLACE PHOTO HEREPLACE PHOTO HERE
21
Page 36
JL Key GL Object
2014 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q4 2023 CY Q4 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
AB 2766 Air Qual Imprv Fund
(105)327,000$
Ped Grant/Art3 Fund (214)403,000$
‐$
‐$
‐$
Total Funding:730,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ ‐ $ ‐ $ ‐ $ ‐ $ ‐
Design/Plan Review $ ‐ $ ‐ $ ‐ $ ‐ $ ‐
Design/Build $ ‐ $ ‐ $ ‐ $ ‐ $ ‐
Right‐of‐Way $ ‐ $ ‐ $ ‐ $ ‐ $ ‐
Construction $ 516,800 $ ‐ $ ‐ $ ‐ $ ‐
Inspection & Administration $ 50,000 $ ‐ $ ‐ $ ‐ $ ‐
Contingency $ 67,000 $ ‐ $ ‐ $ ‐ $ ‐
Total Costs:633,800$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ ‐ $ ‐ $ ‐ $ ‐ $ ‐
Operations & Maintenance $ ‐ $ 2,500 $ 2,500 $ 2,500 $ 2,500
Debt Service $ ‐ $ ‐ $ ‐ $ ‐ $ ‐
Total Costs:‐$ $ 2,500 2,500$ 2,500$ 2,500$
Day Creek Channel Bike Trail
ADA accesible paved trail for pedestrians and bicyclists with signalized crossing
at Church St. and access path to the Sports Arena for special events and
recreational use.
Enhances quality of life by providing a designated path for walking, biking and
rolling for both recreational and commuting purposes.
PROJECT FUNDING*
Engineering Services Justin Pope
Parks & Recreation
District 4
Promoting and enhancing a safe and healthy community for all
Day Creek Channel from Jack Benny Drive to Base Line Road
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 50,000
$ 67,000
$ 730,000
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ ‐
$ 1,875
$ ‐
$ 1,500
TOTAL PROJECT
COST*
$ ‐
$ 15,200
$ ‐
$ 81,000
$ 516,800
22
Page 37
JL Key GL Object
2007 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2024 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Measure I Fund (177)50,000$
Road Maintenance & Rehab
(179)2,950,000$
‐$
‐$
‐$
Total Funding: 3,000,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $ 2,550,000 $‐ $‐ $‐ $‐
Inspection & Administration $ 145,000 $‐ $‐ $‐ $‐
Contingency $ 255,000 $‐ $‐ $‐ $‐
Total Costs:2,950,000$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Etiwanda Avenue from Foothill Boulevard to Wilson Avenue
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$ 145,000
$ 255,000
$ 3,000,000
$‐
$‐
$ 50,000
$‐
$ 2,550,000
Etiwanda Avenue Pavement Rehabilitation
Asphalt rubber hot mix overlay,cold planing, crack sealing, utility adjustment,
video detection, green bike lane striping and curb ramps upgrade.
This project will restore the existing road surface to a substantially new
condition, extending pavement life, use and rideability. Current Pavemement
Condition is 69.
PROJECT FUNDING*
Engineering Services Romeo David
Streets
District 4
Promoting and enhancing a safe and healthy community for all
23
Page 38
JL Key GL Object
2002 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2026 CY Q4 2027
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Measure I Fund (177)5,000$
Transportation Fund (124)1,123,000$
‐$
‐$
‐$
Total Funding: 1,128,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $ 10,000 $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $ 205,000 $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $ 559,000 $‐
Inspection & Administration $‐ $‐ $‐ $ 85,000 $‐
Contingency $‐ $‐ $‐ $ 56,000 $‐
Total Costs:215,000$ ‐$ ‐$ 700,000$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $ 2,000
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ 2,000$
Etiwanda East Side Widening
This project involves street widening on the east side of Etiwanda Avenue
including curb & gutter, sidewalk, street lights, utility relocations, and
pavement rehabilitation.
This project will enhance pedestrian and vehicular safety by completing the
missing section of northbound vehicle lane, adjacent sidewalk and street
lighting.
PROJECT FUNDING*
Engineering Services Justin Pope
Streets
District 4
To build on our success as a world class community, to create an equitable,
sustainable, and vibrant city, rich in opportunity for all to thrive.
Etiwanda Avenue between Whittram Avenue and Arrow Route
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 85,000
$ 56,000
$ 1,128,000
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$ 10,000
$‐
$ 418,000
$ 559,000
24
Page 39
JL Key GL Object
1922 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2023 CY Q4 2027
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
SB1‐TCEP (181)75,150,000$
Grant Opportunity 55,000,000$
‐$
‐$
‐$
Total Funding:130,150,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $ 650,000 $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $ 21,000,000 $‐ $‐ $‐ $‐
Construction $ 62,500,000 $‐ $‐ $‐ $‐
Inspection & Administration $ 10,000,000 $‐ $‐ $‐ $‐
Contingency $ 8,000,000 $‐ $‐ $‐ $‐
Total Costs:102,150,000$ ‐$‐$‐$‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $ 10,000
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$‐$10,000$
Etiwanda Grade Separation
Provides an elevated 1,015' long, four‐lane roadway crossing over the SCRRA/BNSF
railroad with pedestrian and bicycle paths, and new access roads to existing
businesses.
The bridge and roadway widening will improve safety and traffic circulation by
eliminating the at‐grade crossing, which is expected to see significant increases in
vehicular traffic and train activity by the year 2040. The reduced delays are expected
to stimulate economic activity in the area while also decreasing emissions from
idling vehicles.
PROJECT FUNDING*
Engineering Services Justin Pope
Streets
District 4
To build on our success as a world class community, to create an equitable,
sustainable, and vibrant city, rich in opportunity for all to thrive.
$‐
$ 6,650,000
$‐
$ 43,000,000
$ 62,500,000
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Etiwanda Avenue, approximately between Whittram Avenue and Napa
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$ 10,000,000
$ 8,000,000
$ 130,150,000
25
Page 40
JL Key GL Object
1864 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2024 CY Q4 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Ped Grant/Art3 Fund (214)212,200$
AB 2766 Air Qual Imprv
Fund (105)198,810$
‐$
‐$
‐$
Total Funding:411,010$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $ 5,000 $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $ 406,010 $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:411,010$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $ 1,000 $ 1,000 $ 1,000 $ 1,000 $ 1,000
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:1,000$ $ 1,000 1,000$ 1,000$ 1,000$
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Haven Avenue from Wilson Avenue to Banyan Avenue
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$800
$‐
$800
TOTAL PROJECT
COST*
$‐
$‐
$ 411,010
$‐
$5,000
$‐
$‐
$ 406,010
Haven Avenue Sidewalk
This project involves construction of sidewalk along the east side of Haven
Avenue, in front of Chaffey College.
This project will enhance bicycle and pedestrian access, improve safety, and
encourage walking/bicycling.
PROJECT FUNDING*
Engineering Services Cesar Guevara
Streets
District 4
Promoting and enhancing a safe and healthy community for all
26
Page 41
JL Key GL Object
1963 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2024 CY Q4 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
PD 85 Redemption Fund
(848)108,110$
PD 85‐Capital Rplcmt (847)1,030,000$
Fire Capital Projects (288)1,050,000$
‐$
‐$
Total Funding: 2,188,110$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $ 1,510,000 $‐ $‐ $‐
Inspection & Administration $‐ $ 100,000 $‐ $‐ $‐
Contingency $‐ $ 150,000 $‐ $‐ $‐
Total Costs:‐$ 1,760,000$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Heritage Park, Southwest Corner of Hillside Road and Beryl Street
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$ 100,000
$ 150,000
$ 2,188,110
$ 103,110
$ 325,000
$‐
$‐
$ 1,510,000
Heritage Park Bridge Replacements
Construct new multi‐use bridge to replace the vehicular, pedestrian, and
equestrian bridges that span Demens Creek Channel to the equestrian arenas
in Heritage Community Park.
The existing timber‐framed bridges are approaching the end of their service
lives and need to be replaced to maintain access to the equestrian facilities,
trails, and Fire District emergency response staging area.
PROJECT FUNDING*
Engineering Services Justin Pope
Parks & Recreation
District 4
Promoting and enhancing a safe and healthy community for all
27
Page 42
JL Key GL Object
2124 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2024 CY Q4 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Gas Tax R&T 7360 Fund
(174)319,000$
‐$
‐$
‐$
‐$
Total Funding:319,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $ 35,000 $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $ 245,000 $‐ $‐ $‐
Inspection & Administration $‐ $ 10,200 $‐ $‐ $‐
Contingency $‐ $ 28,800 $‐ $‐ $‐
Total Costs:35,000$ 284,000$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $ 20,000
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ 20,000$
Hermosa Avenue Corridor Improvements
This project will reduce the four lanes road to one lane in each direction along
Hermosa Avenue from Base Line Road to I‐210. Additional countermeasures
will be implemented.
This project will enhance the existing pedestrian and bicyclist facilities to
create a safer and walkable enviroment for the surrounding communities.
Project limits and scope were defined with findings from a corridor safety
analysis conducted.
PROJECT FUNDING*
Engineering Services Baldwin Ngai
Streets
District 4
Actively seeking and respectfully considering all public input
Hermosa Avenue from Base Line Road to I‐210
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 10,200
$ 28,800
$ 319,000
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$ 35,000
$‐
$‐
$ 245,000
28
Page 43
JL Key GL Object
2075 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q2 2023 CY Q3 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Road Maintenance & Rehab
(179)607,500$
‐$
‐$
‐$
‐$
Total Funding:607,500$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$ 45,000
$‐
$‐
$ 450,000
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 67,500
$ 45,000
$ 607,500
Hermosa Avenue Pavement Rehabiliation
Asphalt rubber hot mix overlay, cold planing, crack sealing, utility adjustment,
green bike lane striping and curb ramps upgrade.
This project will restore the existing road surface to a substantially new
condition, extending pavement life, use and rideability. Current Pavemement
Condition is 55.
PROJECT FUNDING*
Engineering Services Romeo David
Streets
District 4
Promoting and enhancing a safe and healthy community for all
Hermosa Avenue from Foothill Boulevard to Church Street
29
Page 44
JL Key GL Object
2099 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q2 2023 CY Q3 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Road Maintenance & Rehab
(179)550,000$
‐$
‐$
‐$
‐$
Total Funding:550,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
Hermosa Avenue Pavement Rehabilitation
Asphalt rubber hot mix overlay, cold planing, crack sealing, utility adjustment,
striping and curb and curb ramps upgrade.
This project will restore the existing road surface to a substantially new
condition, extending pavement life, use and rideability. Current Pavemement
Condition is 44.
PROJECT FUNDING*
Engineering Services Romeo David
Streets
District 4
Promoting and enhancing a safe and healthy community for all
$‐
$ 50,000
$‐
$‐
$ 400,000
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Hermosa Avenue, from Wilson Avenue to North City Limit
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$ 60,000
$ 40,000
$ 550,000
30
Page 45
JL Key GL Object
1976 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q2 2023 CY Q3 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Road Maintenance & Rehab
(179)50,000$
Infrastructure Fund (198)370,000$
‐$
‐$
‐$
Total Funding:420,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$ 50,000
$‐
$‐
$ 300,000
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 40,000
$ 30,000
$ 420,000
Hermosa Avenue Street Widening/Arte
Street widening including pavement, curb and gutter, sidewalk, and roadway
striping. Widening to be funded by Arte under an agreement with the city.
This project will improve the traffic circulation, pedestrian safety due to wider
road and sidewalks and will add additional parking along the curbside.
PROJECT FUNDING*
Engineering Services Romeo David
Streets
District 4
Promoting and enhancing a safe and healthy community for all
Hermosa Avenue North of Foothill Boulevard to Norwick Street
31
Page 46
JL Key GL Object
2104 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2024 CY Q3 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Road Maintenance & Rehab
(179)845,000$
Gas Tax R&T 7360 Fund
(174)40,000$
‐$
‐$
‐$
Total Funding:885,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $ 700,000 $‐ $‐ $‐ $‐
Inspection & Administration $ 75,000 $‐ $‐ $‐ $‐
Contingency $ 70,000 $‐ $‐ $‐ $‐
Total Costs:845,000$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
Highland Avenue Pavement Rehabilitation
Asphalt rubber hot mix overlay,cold planing, crack sealing, utility adjustment,
video detection, green bike lane striping and curb ramps upgrade.
This project will restore the existing road surface to a substantially new
condition, extending pavement life, use and rideability. Current Pavemement
Condition range from 14 to 38.
PROJECT FUNDING*
Engineering Services Romeo David
Streets
District 4
Promoting and enhancing a safe and healthy community for all
Highland Avenue from Archibald Avenue to Amethyst Avenue and
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 75,000
$ 70,000
$ 885,000
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$ 40,000
$‐
$‐
$ 700,000
32
Page 47
JL Key GL Object
2079 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q2 2023 CY Q3 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Transportation Fund (124)264,400$
Gas Tax R&T 7360 Fund
(174)453,000$
‐$
‐$
‐$
Total Funding:717,400$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $ 105,000
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ 105,000$
District 4
Promoting and enhancing a safe and healthy community for all
Various locations
HSIP Traffic Signal Modifications at Various Locations
The project will improve safety and efficiency for vehicles and pedestrians by
providing flashing yellow arrow left turn vehicle movements as identified in
the Master Plan for transportation projects.
PROJECT FUNDING*
Engineering Services Baldwin Ngai
Traffic
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 46,200
$ 62,517
$ 717,400
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$‐
$‐
$‐
$ 608,683
This project will upgrade 7 signalized intersections including Banyan Street at
East Avenue, Base Line Road at Mountain View Drive South, Millennium Court
at Milliken Avenue, Vintage Drive at Milliken Ave, Church Street at Milliken
Avenue, Terra Vista Parkway West at Church Street, and Base Line Road at
Beryl Streetby installing 4‐section FYA signal heads for protected/permissive
left‐turn controls and improving signal timing.
33
Page 48
JL Key GL Object
2098 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q2 2023 CY Q3 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Measure I Fund (177)645,000$
‐$
‐$
‐$
‐$
Total Funding:645,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
Lemon Avenue Pavement Rehabilitation
This project involves cold planing, localized asphalt removal and replacement,
crack sealing, asphalt rubber hot mix, utility adjustments, pavement striping
and curb ramps.
This project will restore the existing road surface to a substantially new
condition, extending pavement life, use and rideability. Current Pavement
Condition Index is 52 and in some areas as low as 43.
PROJECT FUNDING*
Engineering Services Romeo David
Streets
District 4
Promoting and enhancing a safe and healthy community for all
$‐
$ 80,000
$‐
$‐
$ 450,000
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Lemon Avenue from Haven Avenue to Marbella Drive
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$ 70,000
$ 45,000
$ 645,000
34
Page 49
JL Key GL Object
1022 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2024 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Gas Tax R&T 7360 Fund
(174)3,500,000$
Measure I Fund (177)800,000$
‐$
‐$
‐$
Total Funding: 4,300,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $ 90,000 $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $ 3,500,000 $‐ $‐ $‐ $‐
Inspection & Administration $ 360,000 $‐ $‐ $‐ $‐
Contingency $ 350,000 $‐ $‐ $‐ $‐
Total Costs:4,300,000$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Various Locations
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$ 360,000
$ 350,000
$ 4,300,000
$‐
$ 90,000
$‐
$‐
$ 3,500,000
Local Street Overlay
This project involves cold planing, localized asphalt removal and
replacement, crack sealing, asphalt overlay, utility adjustments, pavement
striping and curb ramps.
This pavement overlay project will restore the existing road surface to a
substantially new condition extending pavement life, use and rideability.
Average Pavement Condition Index for the affected streets is 57.
PROJECT FUNDING*
Engineering Services Romeo David
Streets
District 4
Promoting and enhancing a safe and healthy community for all
35
Page 50
JL Key GL Object
1022 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2024 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Gas Tax R&T 7360 Fund
(174)550,000$
‐$
‐$
‐$
‐$
Total Funding:550,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $ 40,000 $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $ 410,000 $‐ $‐ $‐ $‐
Inspection & Administration $ 59,000 $‐ $‐ $‐ $‐
Contingency $ 41,000 $‐ $‐ $‐ $‐
Total Costs:550,000$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$ 40,000
$‐
$‐
$ 410,000
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 59,000
$ 41,000
$ 550,000
Local Street Slurry Seal
This project involves application of slurry seal to existing pavement surfaces.
This project will seal street pavement extending its operational life. The
current average Pavement Condition Index for the affected streets is 73.
PROJECT FUNDING*
Engineering Services Romeo David
Streets
District 4
Promoting and enhancing a safe and healthy community for all
Various Locations
36
Page 51
JL Key GL Object
2100 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q2 2024 CY Q3 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Gas Tax R&T 7360 Fund
(174)35,000$
Measure I Fund (177)1,250,000$
‐$
‐$
‐$
Total Funding: 1,285,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $ 75,000 $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $ 1,000,000 $‐ $‐ $‐ $‐
Inspection & Administration $ 75,000 $‐ $‐ $‐ $‐
Contingency $ 100,000 $‐ $‐ $‐ $‐
Total Costs:1,250,000$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
Milliken Avenue Pavement Rehabilitation
Asphalt rubber hot mix overlay,cold planing, crack sealing, utility adjustment,
video detection, green bike lane striping and curb ramps upgrade.
This project will restore the existing road surface to a substantially new
condition, extending pavement life, use and rideability. Current Pavemement
Condition is 68.
PROJECT FUNDING*
Engineering Services Romeo David
Streets
District 4
Promoting and enhancing a safe and healthy community for all
Milliken Avenue from Base Line Road to Banyan Street
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 75,000
$ 100,000
$ 1,285,000
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$ 110,000
$‐
$‐
$ 1,000,000
37
Page 52
JL Key GL Object
2038 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2027 CY Q4 2027
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Community Dev Block Grant
(204)893,000$
‐$
‐$
‐$
‐$
Total Funding:893,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $ 10,000 $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $‐ $ 780,000
Inspection & Administration $‐ $‐ $‐ $‐ $ 25,000
Contingency $‐ $‐ $‐ $‐ $ 78,000
Total Costs:‐$ ‐$ ‐$ 10,000$ 883,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
Pecan Avenue Street Improvements
This project is to for rehabilitation of pavement on Pecan Avenue and
involves new curb and gutter, sidewalk, driveways, asphalt pavement, and
overlay.
This project will enhance pedestrian and vehicular safety by restoring
existing road surface to new condition and extending the pavement life use.
PROJECT FUNDING*
Engineering Services Cesar Guevara
Streets
District 4
Providing and nurturing a high quality of life for all
$‐
$ 10,000
$‐
$‐
$ 780,000
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Pecan Avenue from Whittram Avenue to Arrow Route
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$ 25,000
$ 78,000
$ 893,000
38
Page 53
JL Key GL Object
2096
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2025 CY Q2 2025
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Fiber Optic Network (711)80,000$
Fire Capital Projects (288)80,000$
‐$
‐$
‐$
Total Funding:160,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $ 10,000 $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $ 150,000 $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:10,000$ 150,000$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $ 1,000 $ 1,000 $ 1,000
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ 1,000$ 1,000$ 1,000$
RC Fiber Extension Amethyst Avenue
FS 171 is not connected to the City's fiber network. 6,000 LF of fiber to be
installed along Base Line/Amethyst in existing empty fiber conduit and extend
conduit and fiber.
Connecting all City and Fire facilities to the City's fiber optic network will
optimize communication and uniform connectivity.
PROJECT FUNDING*
Engineering Services Fred Lyn
Municipal Utilities
District 4
Relentless pursuit of improvement
$‐
$ 10,000
$‐
$‐
$ 150,000
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Amethyst Avenue ‐ Baseline Road to FS 171
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$1,000
$‐
$1,000
TOTAL PROJECT
COST*
$‐
$‐
$ 160,000
39
Page 54
JL Key GL Object
2095 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2024 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Federal Grants Fund (275)207,660$
Municipal Utility (705)842,340$
-$
-$
-$
Total Funding:1,050,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ 10,000 $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 261,670 $ - $ - $ - $ -
Inspection & Administration $ 10,000 $ - $ - $ - $ -
Contingency $ 50,000 $ - $ - $ - $ -
Total Costs:331,670$ -$ -$ -$ -$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ 29,792 $ 29,792 $ 29,792
Debt Service $ - $ - $ - $ - $ -
Total Costs:-$ $ - 29,792$ 29,792$ 29,792$
RCMU EV Charging Station Hub
With the transition to zero-emission vehicles, RCMU is preparing with
infrastructure. This project addresses the power demand and design
requirements near the Sports Center.
Demand for EV charging will increase in the near future and RCMU is
embracing the electric transportation mantra to support EV demand and
reduce greenhouse gases. Four DC Fast Chargers will be located between the
substation and outdoor basketball court. The State CaleVIP 2.0 funding needs
to be spent by 6/24 and the Federal Grant is through EECBG.
PROJECT FUNDING*
Engineering Services Deborah Allen
Municipal Utilities
District 4
Intentionally embracing and anticipating the future
$ -
$ 60,000
$ -
$ -
$ 930,000
*Includes Prior & Future Years
IMPACT ON OPERATIONS
8303 Rochester Avenue
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ 29,792
$ -
$ 22,344
TOTAL PROJECT
COST*
$ 10,000
$ 50,000
$ 1,050,000
PLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HERE
40
Page 55
JL Key GL Object
2126 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
Q1 2024 Q4 2025
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Municipal Utility (705)3,310,000$
‐$
‐$
‐$
‐$
Total Funding: 3,310,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $ 1,300,000 $ 2,000,000 $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:1,300,000$ 2,000,000$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $ 5,000 $ 10,000 $ 10,000
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ 5,000$ 10,000$ 10,000$
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Etiwanda Avenue ‐ Arrow Route to Church Street
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$8,333
$‐
$8,333
TOTAL PROJECT
COST*
$‐
$‐
$ 3,310,000
$‐
$ 10,000
$‐
$‐
$ 3,300,000
RCMU Line Extension Design: Etiwanda North
2,800' of 12 kV electric distribution & fiber optic line extension to connect
electric distribution & Broadband to new MDU's at Etiwanda/Foothill. Phase 2:
4,500' to Bass Pro.
A new line extension project will be needed in order to serve the new
residential development in the vicinity of Etiwanda Avenue and Foothill Blvd
(First Phase). Seeking Permanent power by Q2 2024. The second phase will
continue on Etiwanda Avenue North to Church Street and West to Bass Pro
Shops to complete a circuit loop feed.
PROJECT FUNDING*
Engineering Services Fred Lyn
Municipal Utilities
District 4
Intentionally embracing and anticipating the future
41
Page 56
JL Key GL Object
1964 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q4 2023 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
General Fund (001)12,500$
Infrastructure Fund (198)2,677,000$
‐$
‐$
‐$
Total Funding: 2,689,500$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $ 2,000,000 $‐ $‐ $‐ $‐
Inspection & Administration $ 200,000 $‐ $‐ $‐ $‐
Contingency $ 200,000 $‐ $‐ $‐ $‐
Total Costs:2,400,000$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
$‐
$ 2,000,000
TOTAL PROJECT
COST*
$‐
5‐YEAR PROJECT COST ESTIMATES
$ 289,500
$‐
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 200,000
$ 200,000
$ 2,689,500
Average Annual
Impact
$‐
$‐
$‐
$‐
West Foothill Boulevard Street Improvements
Construct sidewalks, curb and gutters, Street lights, striping, new asphalt and
realignment of Red Hill Country Club Drive new traffic signal. The current PCI is
41.
Addition of multi use pedestrian/bike sidewalks will improve safety, mobility,
reduction of vehicle miles traveled and New Asphalt Pavement will restore
roadway pavement to new condition and extend pavement service life.
PROJECT FUNDING*
Engineering Services Romeo David
Streets
District 4
Promoting and enhancing a safe and healthy community for all
Foothill Boulevard, from Grove Avenue to San Bernardino Road
Project
Description
Justification
42
Page 57
JL Key GL Object
2032 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2027 CY Q4 2027
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Community Dev Block Grant
(204)344,000$
‐$
‐$
‐$
‐$
Total Funding:344,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $ 21,000 $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $‐ $ 264,000
Inspection & Administration $‐ $‐ $‐ $‐ $ 20,000
Contingency $‐ $‐ $‐ $‐ $ 39,000
Total Costs:‐$ ‐$ ‐$ 21,000$ 323,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
Whittram Avenue Street Improvements
This project involves cold planing and locaclized asphalt removal and
replacement, curb, gutter, sidewalk, striping, and utility relocations.
This project will enhance vehicular safety by restoring existing road surface
to new condition and extending the pavement life use.
PROJECT FUNDING*
Engineering Services Cesar Guevara
Streets
District 4
Promoting and enhancing a safe and healthy community for all
Whittram Avenue from Etiwanda Creek to Hickory Avenue
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 20,000
$ 39,000
$ 344,000
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$ 21,000
$‐
$‐
$ 264,000
43
Page 58
CIP 2023
2024
F I R E D I S T R I C T
44
Page 59
JL Key GL Object
2090 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2025 CY Q1 2027
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Fire Capital Projects (288)19,286,770$
Library Fund (290)100,000$
-$
-$
-$
Total Funding:19,386,770$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $100,000 $ - $ -
Design/Plan Review $ - $ - $- $ - $ -
Design/Build $ - $ - $1,952,610 $ - $ -
Right-of-Way $ - $ - $- $ - $ -
Construction $ - $ - $ 14,579,490 $ - $-
Inspection & Administration $ - $ - $700,000 $ - $ -
Contingency $ - $ - $1,653,210 $ - $ -
Total Costs:-$ -$ 18,985,310$ -$ -$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $- $ - $ -
Operations & Maintenance $ - $ - $- $ - $ -
Debt Service $ - $ - $- $ - $ -
Total Costs:-$ $ - -$ -$ -$
Amethyst Station 171 Rebuild
Replacement two-story, 10,000 sq ft fire station utilizing the design-build process. The
project will also incorporate a 24/7 Library Kiosk.
Built in 1974, Fire Station 171 is the oldest station in the city and has increasing
maintenance and repair expenses. It lacks ADA compliance, as well as the functionality
and physical space needed to accommodate the District's diverse and growing workforce.
The station is also unsecured with no fence or gate to prevent public access.
PROJECT FUNDING*
Fire District Darci Vogel
Facilities
District 4
Intentionally embracing and anticipating the future
6627 Amethyst Street
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 700,000
$ 1,653,210
$ 19,386,770
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$-
$-
$-
$-
TOTAL PROJECT
COST*
$ 100,000
$ 401,460
$ 1,952,610
$-
$ 14,579,490
PLACE PHOTO HERE
45
Page 60
JL Key GL Object
2111 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2024 CY Q1 2026
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Fire Capital Projects (288)611,590$
-$
-$
-$
-$
Total Funding:611,590$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ 54,080 $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 403,460 $ - $ - $ - $ -
Inspection & Administration $ 50,000 $ - $ - $ - $ -
Contingency $ 45,760 $ - $ - $ - $ -
Total Costs:553,300$ -$ -$ -$ -$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:-$ $ - -$ -$ -$
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$-
$-
$-
$-
TOTAL PROJECT
COST*
$-
$ 58,290
$ 54,080
$-
$ 403,460
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 50,000
$ 45,760
$ 611,590
Banyan Station 175 ADA Improvements
ADA accessibility improvements to Fire Station 175 restrooms utilizing the
design-build process in coordination with projects at Fire Stations 171, 173,
and 174.
In 1997 and 1998, the City and Fire District completed an initial ADA Self-
Evaluation and Transition Plan to comply with the Americans with Disabilities
Act of 1990. In November 2020, a consultant was hired to complete a
comprehensive ADA Self-Evaluation and Transition Plan update to ensure that
a plan is in place to meet current requirements.
PROJECT FUNDING*
Fire District Ty Harris
Facilities
District 4
Intentionally embracing and anticipating the future
11108 Banyan Street
PLACE PHOTO HEREPLACE PHOTO HERE
46
Page 61
JL Key GL Object
2093 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2024 CY Q1 2026
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Fire Capital Projects (288)493,460$
-$
-$
-$
-$
Total Funding:493,460$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ 41,700 $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 311,360 $ - $ - $ - $ -
Inspection & Administration $ 50,000 $ - $ - $ - $ -
Contingency $ 35,310 $ - $ - $ - $ -
Total Costs:438,370$ -$ -$ -$ -$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:-$ $ - -$ -$ -$
*Includes Prior & Future Years
IMPACT ON OPERATIONS
12270 Firehouse Court
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$-
$-
$-
$-
TOTAL PROJECT
COST*
$ 50,000
$ 35,310
$ 493,460
$-
$ 55,090
$ 41,700
$-
$ 311,360
Day Creek Station 173 ADA Improvements
ADA accessibility improvements to Fire Station 173 restrooms utilizing the
design-build process in coordination with projects at Fire Stations 171, 174,
and 175.
In 1997 and 1998, the City and Fire District completed an initial ADA Self-
Evaluation and Transition Plan to comply with the Americans with Disabilities
Act of 1990. In November 2020, a consultant was hired to complete a
comprehensive ADA Self-Evaluation and Transition Plan update to ensure that
a plan is in place to meet current requirements.
PROJECT FUNDING*
Fire District Ty Harris
Facilities
District 4
Intentionally embracing and anticipating the future
PLACE PHOTO HERE
47
Page 62
JL Key GL Object
2092 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2024 CY Q1 2026
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Fire Capital Projects (288)55,090$
CFD 85-1 (282)647,920$
-$
-$
-$
Total Funding:703,010$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ 64,200 $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 479,360 $ - $ - $ - $ -
Inspection & Administration $ 50,000 $ - $ - $ - $ -
Contingency $ 54,360 $ - $ - $ - $ -
Total Costs:647,920$ -$ -$ -$ -$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:-$ $ - -$ -$ -$
Jersey Station 174 ADA Improvements
ADA accessibility improvements to Fire Station 174 restrooms utilizing the
design-build process in coordination with projects at Fire Stations 171, 173,
and 175.
In 1997 and 1998, the City and Fire District completed an initial ADA Self-
Evaluation and Transition Plan to comply with the Americans with Disabilities
Act of 1990. In November 2020, a consultant was hired to complete a
comprehensive ADA Self-Evaluation and Transition Plan update to ensure that
a plan is in place to meet current requirements.
PROJECT FUNDING*
Fire District Ty Harris
Facilities
District 4
Intentionally embracing and anticipating the future
$-
$ 55,090
$ 64,200
$-
$ 479,360
*Includes Prior & Future Years
IMPACT ON OPERATIONS
11297 Jersey Boulevard
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$-
$-
$-
$-
TOTAL PROJECT
COST*
$ 50,000
$ 54,360
$ 703,010
PLACE PHOTO HERE
48
Page 63
JL Key GL Object
1645 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q4 2022 CY Q2 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Fire Capital Projects (288)22,006,800$
Capital Reserve Fund (025)472,010$
Library Fund (290)63,610$
Grant Opportunity 3,200,000$
-$
Total Funding:25,742,420$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 3,200,000 $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ - $ - $ - $ - $ -
Total Costs:3,200,000$ -$ -$ -$ -$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ 2,116,500 $ 2,169,413 $ 2,223,648 $ 2,279,239 $ 2,336,220
Operations & Maintenance $ 60,000 $ 61,500 $ 63,038 $ 64,613 $ 66,229
Debt Service $ - $ - $ - $ - $ -
Total Costs:2,176,500$ $ 2,230,913 2,286,685$ 2,343,852$ 2,402,449$
Town Center Station 178
A new two-story fire station using a design-build process. The project will also
include Records Storage Building, Library Kiosk and 9/11 Memorial Park.
This station will be centrally located in an area of the city planned for high-
density residential and large-scale office building developments. This
strategic location provides for systemwide draw-down and corresponding
demands for service.
PROJECT FUNDING*
Fire District Darci Vogel
Facilities
District 4
Promoting and enhancing a safe and healthy community for all
10595 Town Center Drive
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 881,480
$ 1,575,870
$ 25,742,420
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ 1,863,585
$55,830
$-
$ 1,919,415
TOTAL PROJECT
COST*
$ 58,610
$ 604,140
$ 1,236,600
$ 3,320,000
$ 18,065,720
PLACE PHOTO HEREPLACE PHOTO HERE
49
Page 64
CIP 2023
2024
L I B R A R Y
50
Page 65
JL Key GL Object
2114 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2024 CY Q1 2026
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Capital Reserve Fund (025)1,500,000$
Library Capital Fund (329)3,501,870$
Community Benefit Proj
(030)1,500,000$
State Grants Fund (274)6,498,130$
‐$
Total Funding:13,000,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $ 10,345,000 $‐ $‐ $‐ $‐
Inspection & Administration $ 584,000 $‐ $‐ $‐ $‐
Contingency $ 941,000 $‐ $‐ $‐ $‐
Total Costs:11,870,000$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
Archibald Library Replacement Project
This project replaces the Archibald Library through the conversion of another
City‐owned property and includes expanded and enhanced programs and
services.
The existing Archibald Library has significant infrastructure challenges, and
consultants have determined that even with site improvements, the property
is ill‐suited to meet the current and future needs of the community. Additional
investments in the current facility would be fiscally irresponsible given the
site’s limited options.
PROJECT FUNDING*
Library Services Wess Garcia
Facilities
District 4
Building and preserving a family‐oriented atmosphere
9161 Base Line Rd,
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 584,000
$ 941,000
$ 13,000,000
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$ 1,130,000
$‐
$‐
$ 10,345,000
51
Page 66
JL Key GL Object
2115 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2023 CY Q1 2026
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Capital Reserve Fund (025)605,670$
State Grants Fund (274)594,330$
‐$
‐$
‐$
Total Funding:1,200,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $ 390,000 $ 290,000 $ 170,340 $‐ $‐
Inspection & Administration $ 35,000 $ 35,000 $ 26,600 $‐ $‐
Contingency $‐ $‐ $ 108,060 $‐ $‐
Total Costs:425,000$ 325,000$ 305,000$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
Paul A. Biane Library Infrastructure Project
The long‐term impact of the Paul A. Biane Library infrastructure project is an
updating and readying of the building for the next 20 years of service.
The project will correct and repair the building to meet future use in a safer,
more accessible, and sustainable way. Key project elements will address the
following: replace HVAC, repair ceiling leaks, replace aging flooring, address
ADA compliance issues, replace aging lighting fixtures, upgrade security
camera system.
PROJECT FUNDING*
Library Services Wess Garcia
Facilities
District 4
Building and preserving a family‐oriented atmosphere
12505 Cultural Center Drive
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 96,600
$ 108,060
$ 1,200,000
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$ 45,000
$‐
$‐
$ 950,340
52
Page 67
JL Key GL Object
1867 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q4 2019 CY Q4 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Library Capital Fund (329)5,800,000$
Capital Reserve Fund (025)400,000$
Library Capital Fund-County
Grant (329)2,000,000$
Federal Grants Fund (275)1,000,000$
$ -
Total Funding: 9,200,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ - $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ 695,775 $ 823,553 $ 852,442 $ 882,407 $ 913,490
Operations & Maintenance $ 268,146 $ 427,398 $ 448,768 $ 471,207 $ 494,767
Debt Service $ - $ - $ - $ - $ -
Total Costs:963,921$ $ 1,250,951 1,301,210$ 1,353,614$ 1,408,257$
*Includes Prior & Future Years
IMPACT ON OPERATIONS
12505 Cultural Center Drive
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ 785,570
$ 372,118
$ -
$ 1,157,688
TOTAL PROJECT
COST*
$ -
$ 600,000
$ 9,200,000
$ -
$ 1,200,660
$ -
$ -
$ 7,399,340
Second Story and Beyond
Second Story and Beyond® is a project that will build out the second floor of
the Paul A. Biane Library at Victoria Gardens.
Second Story and Beyond® is being designed to provide a new, unique service
model that will combine the features of interactive museum exhibits with
traditional library services. It is anticipated to be a regional draw that will
provide additional visitors to both the Victoria Gardens Shopping District and
the Lewis Family Playhouse.
PROJECT FUNDING*
Library Services Wess Garcia
Facilities
District 4
Building and preserving a family-oriented atmosphere
53
Page 68
CIP 2023
2024
P O L I C E D E P A R T M E N T
54
Page 69
JL Key GL Object
5603
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2023 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Law Enforcement Reserve
(017)293,300$
-$
-$
-$
-$
Total Funding:293,300$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 263,300 $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ 30,000 $ - $ - $ - $ -
Total Costs:293,300$ -$ -$ -$ -$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ 13,000 $ 13,000 $ 13,000 $ 13,000 $ 13,000
Debt Service $ - $ - $ - $ - $ -
Total Costs:13,000$ $ 13,000 13,000$ 13,000$ 13,000$
ALPR Cameras
Adding ALPR cameras to three intersections, Baseline Road/Archibald Avenue,
Haven Avenue/Foothill Boulevard, Baseline Road/Milliken Avenue throughout
the City to capture license plates from all directions.
In cooperation with City Council goals to have ALPR cameras in locations that
will help solve criminal activity in the City and to deter suspect and stolen
vehicles.
PROJECT FUNDING*
Police Department Karen Hunt
Miscellaneous
District 4
Promoting and enhancing a safe and healthy community for all
$-
$-
$-
$-
$ 263,300
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Baseline Road/Archibald Avenue, Haven Avenue/Foothill
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$-
$13,000
$-
$13,000
TOTAL PROJECT
COST*
$-
$ 30,000
$ 293,300
PLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HEREPLACE PHOTO HERE
55
Page 70
CIP 2023
2024
P U B L I C W O R K S
56
Page 71
JL Key GL Object
5603
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q2 2023 CY Q4 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Equip/Veh Rplcmt (712)140,000$
$ -
$ -
$ -
$ -
Total Funding:140,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ 12,000 $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 128,000 $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ - $ - $ - $ - $ -
Total Costs:140,000$ $ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ 12,000
$ -
$ -
$ 128,000
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ -
$ -
$ 140,000
Above Ground Diesel Tank Replacement
Remove 10,000-gallon diesel above ground storage tank (AST) at the Public
Works Service Center and replace it with a 2,000 gallon AST.
Due to the decrease in diesel fuel usage, we are no longer purchasing the
volume of fuel necessary to keep the AST full. The inner walls of the AST tank
have developed rust and condensation, contaminating the diesel with
sediment. The City uses an average of 500 gallons of diesel per month.
PROJECT FUNDING*
Public Works Richard Favela
Facilities
District 4
Relentless pursuit of improvement
Public Works Service Center
57
Page 72
JL Key GL Object
5607
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2022 CY Q4 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
LMD 1-Capital Rplcmt (141)69,000$
$ -
$ -
$ -
$ -
Total Funding:69,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ - $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
District 4
Promoting and enhancing a safe and healthy community for all
Beryl Park East - Tennis Courts
Beryl Park East - Tennis Court LED Light Replacement
This project will help reduce energy costs by 30%, reduce maintenance
services, and extend the life of the system. These new lights will improve
visibility during night play and reduce customer concerns.
PROJECT FUNDING*
Public Works Jeff Benson
Parks & Recreation
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ -
$ 9,000
$ 69,000
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ -
$ -
$ -
$ 60,000
Remove and replace all existing light fixtures illuminating the tennis courts
with new LED fixtures.
58
Page 73
JL Key GL Object
5607
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2024 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
LMD 1-Capital Rplcmt (141)608,000$
$ -
$ -
$ -
$ -
Total Funding:608,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 140,000 $ 140,000 $ 140,000 $ 140,000 $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ 12,000 $ 12,000 $ 12,000 $ 12,000 $ -
Total Costs:152,000$ 152,000$ 152,000$ 152,000$ $ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
District 4
Promoting and enhancing a safe and healthy community for all
Beryl Park
Beryl Park Soccer Field LED Sports Lighting Upgrade
The new LED sports lighting fixtures provide better illumination while using
less electricity than the existing sports lighting fixtures.
PROJECT FUNDING*
Public Works Neil Plummer
Facilities
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ -
$ 48,000
$ 608,000
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ -
$ -
$ -
$ 560,000
Remove & replace existing fixtures with new LED sports lighting fixtures for
the eastern pair of 4 soccer fields. The remaining 2 soccer fields will be
upgraded FY 24/25.
59
Page 74
JL Key GL Object
5602
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2024 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Capital Reserve Fund (025)1,379,580$
$ -
$ -
$ -
$ -
Total Funding: 1,379,580$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ 100,000 $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 1,077,080 $ - $ - $ - $ -
Inspection & Administration $ 94,790 $ - $ - $ - $ -
Contingency $ 107,710 $ - $ - $ - $ -
Total Costs:1,379,580$ $ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
City Hall Roofing Repairs
Replace existing SBS roofing and replace existing rubberized asphalt roofing
The existing roofing of the City Hall building has deteriorated and needs to be
replaced.
PROJECT FUNDING*
Public Works Neil Plummer
Facilities
District 4
Promoting and enhancing a safe and healthy community for all
City Hall
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 94,790
$ 107,710
$ 1,379,580
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ 100,000
$ -
$ -
$ 1,077,080
60
Page 75
JL Key GL Object
5602
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2024 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Capital Reserve Fund (025)1,813,330$
$ -
$ -
$ -
$ -
Total Funding: 1,813,330$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ 50,000 $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 1,438,410 $ - $ - $ - $ -
Inspection & Administration $ 126,580 $ - $ - $ - $ -
Contingency $ 143,840 $ - $ - $ - $ -
Total Costs:1,758,830$ $ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
City Hall - Waterproofing
Re-seal existing brick veneer. Remove and replace all sealant joints, backer-
rods, etc.
Exposure to the outside enviroment has caused the sealant for the City Hall
building's brick veneer to deterioate. Likewise, the existing joints on the
outside of City Hall have shrunken and cracked due to exposure to the
environment. This allows water to seep into the building causing damage.
PROJECT FUNDING*
Public Works Neil Plummer
Facilities
District 4
Promoting and enhancing a safe and healthy community for all
$ -
$ 104,500
$ -
$ -
$ 1,438,410
*Includes Prior & Future Years
IMPACT ON OPERATIONS
City Hall
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ 126,580
$ 143,840
$ 1,813,330
61
Page 76
JL Key GL Object
1991 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2023 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
General Fund (001)6,975,000$
Measure I Fund (177)1,000,000$
Infrastructure Fund (198)2,550,000$
$ -
$ -
Total Funding: 10,525,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 1,130,000 $ 1,130,000 $ 1,130,000 $ 1,130,000 $ 1,130,000
Inspection & Administration $ 120,000 $ 120,000 $ 120,000 $ 120,000 $ 120,000
Contingency $ 275,000 $ 275,000 $ 275,000 $ 275,000 $ 275,000
Total Costs:1,525,000$ 1,525,000$ 1,525,000$ 1,525,000$ 1,525,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Beryl Street to Hellman Avenue between 210 and Banyan Street
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ 1,018,750
$ 1,625,943
$ 10,525,000
$ -
$ -
$ -
$ -
$ 7,880,307
Citywide Concrete Repair
Remove and replace sections of concrete sidewalks, curb/gutters, and drive
approaches damaged by tree roots.
This project replaces damaged sections of concrete sidewalks, curb/gutters,
and drive approaches which are a potential public safety concern.
PROJECT FUNDING*
Public Works Richard Favela
Streets
District 4
Promoting and enhancing a safe and healthy community for all
62
Page 77
JL Key GL Object
2029 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q4 2023 CY Q4 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Capital Reserve Fund (025)2,400,000$
$ -
$ -
$ -
$ -
Total Funding: 2,400,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ - $ - $ - $ -
Inspection & Administration $ 100,000 $ - $ - $ - $ -
Contingency $ - $ - $ - $ - $ -
Total Costs:100,000$ $ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
Civic Center - HVAC Plant Replacement
Repace all chillers and related pumps which have exceeded their expected
service life.
The new chillers and pumps will be of premium efficiency along with a change
from a constant flow chilled water plant to a variable flow plant
PROJECT FUNDING*
Public Works Neil Plummer
Facilities
District 4
Promoting and enhancing a safe and healthy community for all
City Hall
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 100,000
$ -
$ 2,400,000
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ -
$ -
$ -
$ 2,300,000
63
Page 78
JL Key GL Object
5602
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q4 2023 CY Q3 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Capital Reserve Fund (025)139,500$
$ -
$ -
$ -
$ -
Total Funding:139,500$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ 32,500 $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 100,000 $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ - $ - $ - $ - $ -
Total Costs:132,500$ $ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
$ 39,500
$ -
$ -
$ 100,000
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Average Annual
Impact
$ -
$ -
$ -
$ -
$ -
$ -
$ 139,500
Facilities
District 4
Promoting and enhancing a safe and healthy community for all
Council Chambers - Carpeting & Seating Replacement
$ -
Civic Center
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
TOTAL PROJECT
COST*
Replacement of carpeting and seating in City Council Chambers, plus adjacent
hallways and conference rooms.
The existing carpet and seating in the City Council Chambers and conference
rooms were installed in 1990 and have reached the end of their useful lives.
PROJECT FUNDING*
Public Works Neil Plummer
64
Page 79
JL Key GL Object
5607
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2024 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
LMD 10 (140)384,000$
$ -
$ -
$ -
$ -
Total Funding:384,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 320,000 $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ 64,000 $ - $ - $ - $ -
Total Costs:384,000$ $ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
The new LED sports lighting fixtures provide better illumination while using
less electricity than the existing sports lighting fixtures. To upgrade the sports
lighting fixtures at only one baseball field would result in the soocer field
illuminated by two different types of light.
PROJECT FUNDING*
Public Works Neil Plummer
Facilities
Remove existing sports lighting fixtures and replace with new LED sports
lighting fixtures at two baseball fields (with soccer field overlaid between the
baseball fields).
District 4
Promoting and enhancing a safe and healthy community for all
Day Creek Park
Day Creek Park Baseball Fields LED Sports Lighting Upgrade
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ -
$ 64,000
$ 384,000
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ -
$ -
$ -
$ 320,000
65
Page 80
JL Key GL Object
5607
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q4 2023 CY Q4 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
PD 85 Redemption Fund
(848)246,740$
$ -
$ -
$ -
$ -
Total Funding:246,740$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 85,000 $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ 10,000 $ - $ - $ - $ -
Total Costs:95,000$ $ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ -
$ -
$ -
$ 220,000
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ -
$ 25,000
$ 245,000
Heritage Park - Pedestrian Trail
Replace the remaining portion of damaged sections of asphalt pedestrian trail
within Heritage Park not completed in phase one.
Multiple sections of the existing pedestrian trail are damaged and must be
replaced for the safety of the park users.
PROJECT FUNDING*
Public Works Richard Favela
Parks & Recreation
District 4
To build on our success as a world class community, to create an equitable,
sustainable, and vibrant city, rich in opportunity for all to thrive.
Heritage Park
66
Page 81
JL Key GL Object
2056 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2023 CY Q4 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
LMD 1-Capital Rplcmt (141)100,000$
$ -
$ -
$ -
$ -
Total Funding:100,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ 50,000 $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ - $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ - $ - $ - $ - $ -
Total Costs:50,000$ $ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
LMD 1 Drought Tolerant Landscaping
Survey and conceptual design for drought tolerant landscaping to replace
existing turf based landscaping.
The existing landscaping is turf based and requires a great deal of work (labor,
water, supplies, etc.) to maintain. Drought tolerant landscaping will require
much less work.
PROJECT FUNDING*
Public Works Jeff Benson
Miscellaneous
District 4
Promoting and enhancing a safe and healthy community for all
LMD 1 - Various Parkways & Paseos
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ -
$ -
$ 100,000
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ 100,000
$ -
$ -
$ -
67
Page 82
JL Key GL Object
2102 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q4 2023 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
LMD 2 (131)250,000$
$ -
$ -
$ -
$ -
Total Funding:250,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 210,000 $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ - $ - $ - $ - $ -
Total Costs:210,000$ $ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
LMD 2 Park Upgrades RIRE Grant
City to front costs to improve and enhance LMD 2 parks then will be
reimbursed by State Recreational Infrastructure Revenue Enhancement (RIRE)
Grant program funds. Improvements may include upgraded shade, seating,
etc. that would increase the efficiency, longevity and versatility of park
components and the park themselves. Parks include Ellena and Vintage Park.
Landscape Maintenance District 2 is the sole City Landscape Maintenance
District to meet the qualifications necessary to receive State funds from the
RIRE Grant Program. Matching City funds are not required to install the
improvements.
PROJECT FUNDING*
Public Works Jeff Benson
Parks & Recreation
District 4
Relentless pursuit of improvement
Vintage and Ellena Parks
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ -
$ -
$ 250,000
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ -
$ -
$ -
$ 250,000
68
Page 83
JL Key GL Object
1716 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2023 CY Q4 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
LMD 2 (131)1,182,440$
$ -
$ -
$ -
$ -
Total Funding: 1,182,440$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ 20,000 $ 20,000 $ 20,000 $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 200,000 $ 185,450 $ 109,900 $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ 30,000 $ 18,550 $ 10,990 $ - $ -
Total Costs:250,000$ 224,000$ 140,890$ $ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
LMD 2 Paseo Lighting Retrofits
Replace existing paseo lighting with new LED lighting (poles, fixtures,
foundations, etc.)
The existing paseo lighting poles were wet set into their concrete foundations.
As a result, the poles cannot be removed to replace the existing wiring. A
majority of the lights no longer function. The situation is becoming a safety
concern as 5 of 17 poles in VG-6 and 2 of 4 poles in VG-26 have fallen over.
PROJECT FUNDING*
Public Works Jeff Benson
Parks & Recreation
District 4
Providing and nurturing a high quality of life for all
$ -
$ 115,000
$ -
$ -
$ 952,630
*Includes Prior & Future Years
IMPACT ON OPERATIONS
LMD 2 - Paseos VG-6 and VG-26 (totaling 21 lights)
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ 114,810
$ 1,182,440
69
Page 84
JL Key GL Object
1787 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2023 CY Q4 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
LMD 2 (131)7,851,003$
$ -
$ -
$ -
$ -
Total Funding: 7,851,003$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ 65,000 $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 1,000,000 $ 1,000,000 $ 1,000,000 $ 1,645,020 $ 768,000
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ 150,000 $ 150,000 $ 150,000 $ 246,753 $ 115,200
Total Costs:1,215,000$ 1,150,000$ 1,150,000$ 1,891,773$ 883,200$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
$ 240,030
$ -
$ -
$ 6,735,020
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Average Annual
Impact
$ -
$ -
$ -
$ -
$ -
$ 875,953
$ 7,851,003
This project will reduce water usage and labor costs to irrigate and maintain
landscaping in LMD 2. Demonstrate to public that drought tolerant
landscaping is aesthetically pleasing and easy to maintain.
PROJECT FUNDING*
Public Works Jeff Benson
$ -
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
TOTAL PROJECT
COST*
Miscellaneous
District 4
Promoting and enhancing a safe and healthy community for all
LMD 2 Victoria Water Conservation/Landscape Renovation
Continuation of previous work to remove turf and replace with drought
tolerant landscaping and hardscape. This will be the second large scale
project to replace the landscaping along entire street(s) within LMD 2.
Victoria Park Lane between Fairmont Way and PE Trail
70
Page 85
JL Key GL Object
1787 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2023 CY Q4 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
LMD 4 (134)4,491,610$
$ -
$ -
$ -
$ -
Total Funding: 4,491,610$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ 10,000 $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 720,000 $ 768,000 $ 768,000 $ 768,000 $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ 108,000 $ 115,200 $ 115,200 $ 115,200 $ -
Total Costs:838,000$ 883,200$ 883,200$ 883,200$ $ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
This project will reduce water usage and labor costs to irrigate and maintain
landscaping in LMD 4R. Demonstrate to public that drought tolerant
landscaping is aesthetically pleasing and easy to maintain.
PROJECT FUNDING*
Public Works Jeff Benson
Miscellaneous
Continuation of previous work to remove turf and its replacement with
drought tolerant landscaping and hardscape. This will be the second large
scale project to replace the landscaping along entire street(s) within LMD 4R.
District 4
Promoting and enhancing a safe and healthy community for all
LMD-4 Terra Vista Pkwy between Church Street and Belpine Place
LMD 4R Terra Vista Water Conservation
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ -
$ 494,600
$ 4,491,610
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ 190,960
$ -
$ -
$ 3,806,050
71
Page 86
JL Key GL Object
2056 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2023 CY Q4 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
LMD 6 (136)100,000$
$ -
$ -
$ -
$ -
Total Funding:100,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ 50,000 $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ - $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ - $ - $ - $ - $ -
Total Costs:50,000$ $ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
LMD 6 - Drought Tolerant Landscaping
Survey and conceptual design for drought tolerant landscaping to replace
existing turf based landscaping. Also, some landscaped parkways & medians
are extremely narrow. Irrigating them results in overspray onto adjacent
sidewalks & streets.
The existing landscaping is turf based and requires a great deal of work (labor,
water, supplies, etc.) to maintain. Drought tolerant landscaping will require
much less work.
PROJECT FUNDING*
Public Works Jeff Benson
Miscellaneous
District 4
Promoting and enhancing a safe and healthy community for all
$ -
$ 100,000
$ -
$ -
$ -
*Includes Prior & Future Years
IMPACT ON OPERATIONS
LMD 6 - Various Paseos, Medians and Parkways
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ -
$ 100,000
72
Page 87
JL Key GL Object
5607
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2024 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
PD 85 Redemption Fund
(848)1,987,000$
$ -
$ -
$ -
$ -
Total Funding: 1,987,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 320,000 $ 280,000 $ 350,000 $ 387,000 $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ 64,000 $ 55,000 $ 70,000 $ 77,000 $ -
Total Costs:384,000$ 335,000$ 420,000$ 464,000$ $ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
Facilities
District 4
Promoting and enhancing a safe and healthy community for all
PD 85 LED Sports Lighting Upgrade
Replacement of sports lighting fixtures at the two adult Heritage Park baseball
fields.
Heritage Park
The new LED sports lighting fixtures provide better illumination while using
less electricity than the existing sports lighting fixtures. The six sports fields (2
soccer, 2 softball and 2 baseball) at Red Hill Park will be upgraded in
subsequent FY's.
PROJECT FUNDING*
Public Works Neil Plummer
$ -
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
TOTAL PROJECT
COST*
$ -
$ -
$ -
$ 1,337,000
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Average Annual
Impact
$ -
$ -
$ -
$ -
$ -
$ 266,000
$ 1,603,000
73
Page 88
JL Key GL Object
5602
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2023 CY Q4 2023
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Law Enforcement Reserve
(017)201,520$
$ -
$ -
$ -
$ -
Total Funding:201,520$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 53,300 $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ 6,700 $ - $ - $ - $ -
Total Costs:60,000$ $ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
District 4
Promoting and enhancing a safe and healthy community for all
Police Department building
Police Department Bullet Resistant Glass Replacement
An incident in 2022 has shown the need to improve safety for personnel
working in the Police Department building.
PROJECT FUNDING*
Public Works Neil Plummer
Facilities
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ -
$ 6,700
$ 201,520
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ -
$ -
$ -
$ 194,820
Replace 13 pieces of existing glass with 1 1/8" bullet resistant glass.
74
Page 89
JL Key GL Object
2130
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q2 2023 CY Q4 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
PD 85-Capital Rplcmt (847)200,000$
PD 85 Redemption Fund
(848)600,000$
Capital Reserve Fund (025)1,000,000$
$ -
$ -
Total Funding: 1,800,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ 200,000 $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 1,600,000 $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ - $ - $ - $ - $ -
Total Costs:1,800,000$ $ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
*Includes Prior & Future Years
IMPACT ON OPERATIONS
7484 Vineyard Avenue
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ -
$ 1,800,000
$ -
$ 200,000
$ -
$ -
$ 1,600,000
Red Hill Lake Modernization Project
The Red Hill Park Water Feature will be downsized, receive a new filtration
and water treatment system, and incorporate other aesthetic design
elements.
This project will provide the solution to the inefficiencies of our current water
feature, while also providing an opportunity to incorporate other design
elements, creating a more versatile space and increasing the quality of
visitors' experiences.
PROJECT FUNDING*
Public Works Jeff Benson
Parks & Recreation
District 4
Relentless pursuit of improvement
75
Page 90
JL Key GL Object
5607
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2024 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
PD 85 Redemption Fund
(848)$ 920,000
‐$
‐$
‐$
‐$
Total Funding:$ 920,000
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $ $ 127,000 $ 160,000 $ 160,000 $ 160,000
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $ $ 25,000 $ 32,000 $ 32,000 $ 32,000
Total Costs:$ 152,000$ 192,000$ 192,000$ 192,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:$
‐
$‐ ‐$ ‐$ ‐$
$‐
$‐
$‐
$ 767,000
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Average Annual
Impact
$‐
$‐
$‐
$‐
$‐
$ 153,000
$ 920,000
The new LED sports lighting fixtures provide better illumination while using
less electricity than the existing sports lighting fixtures. Remaining five fields
(1 soccer, 2 softball and 2 baseball) will be upgraded in later FY.
PROJECT FUNDING*
Public Works Neil Plummer
$‐
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
TOTAL PROJECT
COST*
Facilities
District 4
Promoting and enhancing a safe and healthy community for all
Red Hill Park Soccer Field LED Sports Lighting Upgrade
At one of two soccer fields, remove existing sports lighting fixtures and
replace with new LED sports lighting fixtures.
Red HIll Park
‐
‐
‐
76
Page 91
JL Key GL Object
5607
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2023 CY Q4 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
LMD 4 (134)143,750$
$ -
$ -
$ -
$ -
Total Funding:143,750$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 125,000 $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ 18,750 $ - $ - $ - $ -
Total Costs:143,750$ $ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Mountain View Park
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ 18,750
$ 143,750
$ -
$ -
$ -
$ -
$ 125,000
Replace Playground Surfacing
Replace deteriorated rubberized playground surfacing at Rancho Summit Park
with new rubberized playground surfacing and replace the existing sand with
engineered wood fiber.
The existing rubberized playground surfacing has deteriorated. New
rubberized playground surfacing is needed to meet the impact requirements
for playground safety as required by the NRPA Playground Safety Standards.
The situation is becoming a serious issue in providing safe use of the
playground.
PROJECT FUNDING*
Public Works Jeff Benson
Parks & Recreation
District 4
Promoting and enhancing a safe and healthy community for all
77
Page 92
JL Key GL Object
5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
TBD TBD
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Capital Reserve Fund (025)1,254,000$
-$
-$
-$
-$
Total Funding:1,254,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ 40,000 $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 1,100,000 $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ 114,000 $ - $ - $ - $ -
Total Costs:1,254,000$ -$ -$ -$ -$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:-$ $ - -$ -$ -$
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ 40,000
$ -
$ -
$ 1,100,000
District 4
To build on our success as a world class community, to create an equitable,
sustainable, and vibrant city, rich in opportunity for all to thrive.
Epicenter Sports Complex
Stadium LED Sports Lighting Conversion and Lazer Grading
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ -
$ 114,000
$ 1,254,000
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
This project is to comply with the new lighting and field grade standards set by
Major League Baseball for all minor league stadiums. These standards must be
met by 2025 in order to stay in the league.
PROJECT FUNDING*
Public Works Neil Plummer
Miscellaneous
Replace the existing sports lighting system at the stadium with LED fixtures
and also remove the existing turf, lazer grade field, and install new turf.
PLACE PHOTO HERE
78
Page 93
JL Key GL Object
2035 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2023 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Gas Tax R&T 7360 Fund
(174)1,570,400$
$ -
$ -
$ -
$ -
Total Funding: 1,570,400$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 180,000 $ 200,000 $ 217,800 $ 239,580 $ 239,580
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ 20,000 $ 20,000 $ 24,200 $ 26,620 $ 26,620
Total Costs:200,000$ 220,000$ 242,000$ 266,200$ 266,200$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ -
$ -
$ -
$ 1,415,360
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ -
$ 155,040
$ 1,570,400
Traffic Signal Modification
A continuous project to modify the City's oldest traffic signal cabinets Eng.
Location: Archibald Avenue at 6th Street and Milliken Avenue at 6th Street.
The older traffic signal cabinets range from 27 to 35 years old and must be
modified or updated to meet current standards. Two examples of older
intersections are Archibald Avenue at 6th Street, installed in 1986, and in
1994, Milliken Avenue and 6th Street were installed.
PROJECT FUNDING*
Public Works Richard Favela
Traffic
District 4
Promoting and enhancing a safe and healthy community for all
Multiple Locations Citywide
79
Page 94
JL Key GL Object
1980 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2023 5650
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Gas Tax R&T 7360 Fund
(174)1,264,525$
Equip/Veh Rplcmt (712)1,511,500$
$ -
$ -
$ -
Total Funding: 2,776,025$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 274,725 $ 278,100 $ 287,347 $ 333,000 $ 333,000
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ 30,525 $ 30,900 $ 31,928 $ 37,000 $ 37,000
Total Costs:305,250$ 309,000$ 319,275$ 370,000$ 370,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
TS Signal Battery Backup Replacement
Multi-phase project to replace the BBS for signalized intersections. The BBS
will place intersections in four-way red flash when the intersection
experiences a power outage.
The battery backup systems have reached their service life, are no longer
supported by the manufacturer, and have seriously degraded reliability. The
existing units are no longer repairable and must be replaced with a new
system when they fail.
PROJECT FUNDING*
Public Works Richard Favela
Traffic
District 4
Promoting and enhancing a safe and healthy community for all
$ -
$ -
$ -
$ -
$ 2,525,422
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Multiple Locations Citywide
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ 250,603
$ 2,776,025
80
Page 95
CIP 2023
2024
" P R O J E C T S I N T H E R O U G H "
81
Page 96
No.Department Project Type Project Title Project Description/Location Project
Estimate Notes:
1 Community
Services
Parks &
Recreation Central Park Adventure Playground Additional recreational facilities at
Central Park $ 7,000,000
2 Community
Services Municipal Utilities Central Park Backbone
Infrastructure
Install utility infrastructure in
underdeveloped portion of Central Park $ 5,200,000
3 Community
Services
Parks &
Recreation Etiwanda Creek Park Phase II Park expansion to add recreational
areas at Etiwanda Creek Park $ 6,291,319
$ 18,491,319
No.Department Project Type Project Title Project Description/Location Project
Estimate Notes:
4 Engineering Municipal Utilities RCMU Electric Substation #2 Banyan Street/Deer Creek Channel $ 13,000,000
5 Engineering Municipal Utilities RCMU Line Extension Design:
Etiwanda Heights
Day Creek Boulevard n/o Firehouse
Court to Banyan Street $ 3,025,000
$ 16,025,000
No.Department Project Type Project Title Project Description/Location Project
Estimate Notes:
6 Public Works Facilities Fleet Shop - Rental Space
Remodel front office areas of the old
PW building for rental space, including a
complete remodel of the interior
$ 70,000
7 Public Works Parks &
Recreation
Sports Field Artificial Turf
Conversion
Convert one of the existing
football/soccer field to artificial turf $ 3,600,000
$ 3,600,000
CAPITAL IMPROVEMENT PROGRAM - FISCAL YEAR 2023/24
"PROJECTS IN THE ROUGH"
Department Total:
Department Total:
Department Total:
82
Page 97
JL Key GL Object
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
TBD TBD
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Unknown 7,000,000$
‐$
‐$
‐$
‐$
Total Funding: 7,000,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
*Includes Prior & Future Years
IMPACT ON OPERATIONS
11200 Baseline Road
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$‐
$ 7,000,000
$‐
$‐
$‐
$‐
$ 7,000,000
Central Park Adventure Playground
Adventure area to include parking, event/picnic area, challenge course
equipment, fitness equipment, and restroom.
CP adventure playground area is a P3 opportunity and a planned phase in
the Central Park Master Plan. This project would offer a new type of
playground experience in Rancho Cucamonga.
PROJECT FUNDING*
Community Services Jennifer Hunt Gracia
Parks & Recreation
District 4
Intentionally embracing and anticipating the future
83
Page 98
JL Key GL Object
5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
TBD TBD
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Park Fund (119)5,200,000$
‐$
‐$
‐$
‐$
Total Funding: 5,200,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
Central Park Backbone Infrastructure
Install utility infrastructure in the undeveloped portion of Central Park along
Base Line Road.
Would provide for the foundational infrastructure necessary for construction
of future phases of Central Park.
PROJECT FUNDING*
Community Services Jennifer Hunt Gracia
Municipal Utilities
District 4
Intentionally embracing and anticipating the future
11200 Baseline Road
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$‐
$‐
$ 5,200,000
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$‐
$‐
$‐
$ 5,200,000
84
Page 99
JL Key GL Object
1664 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
TBD TBD
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Park Development Fund
(120)6,291,319$
‐$
‐$
‐$
‐$
Total Funding: 6,291,319$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
$‐
$ 4,720,000
TOTAL PROJECT
COST*
$ 108,889
5‐YEAR PROJECT COST ESTIMATES
$ 634,430
$‐
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 120,000
$ 708,000
$ 6,291,319
Average Annual
Impact
$‐
$‐
$‐
$‐
Etiwanda Creek Park Phase II
Initial design of park expansion, which may include additional
athletic/recreation multi‐use fields, tennis courts, and additional parking.
This project would provide for additional athletic and recreation space for
the City and nearby neighborhoods.
PROJECT FUNDING*
Community Services Jennifer Hunt Gracia
Parks & Recreation
District 4
Intentionally embracing and anticipating the future
5939 East Ave
Project
Description
Justification
85
Page 100
JL Key GL Object
2063 5600
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
TBD TBD
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Municipal Utility (705)13,000,000$
‐$
‐$
‐$
‐$
Total Funding: 13,000,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
RCMU Electric Substation #2
RCMU substation #2 to be interconnected with SCE's existing
transmission/sub‐transmission line and RCMU's existing distribution line.
A second substation is needed in order to provide new electric service to the
Etiwanda Heights area. Interconnection to SCE's transmission/sub‐
transmission lines, in addition to connecting to RCMU's existing distribution
line will ensure electric reliability.
PROJECT FUNDING*
Engineering Services Fred Lyn
Municipal Utilities
District 4
Intentionally embracing and anticipating the future
Banyan Street/Deer Creek Channel
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$‐
$‐
$ 13,000,000
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$ 20,000
$ 50,000
$‐
$ 30,000
$ 12,900,000
86
Page 101
JL Key GL Object
2064 5600
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
TBD TBD
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Municipal Utility (705)3,025,000$
‐$
‐$
‐$
‐$
Total Funding: 3,025,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $‐ $‐ $‐ $‐ $‐
Design/Plan Review $‐ $‐ $‐ $‐ $‐
Design/Build $‐ $‐ $‐ $‐ $‐
Right‐of‐Way $‐ $‐ $‐ $‐ $‐
Construction $‐ $‐ $‐ $‐ $‐
Inspection & Administration $‐ $‐ $‐ $‐ $‐
Contingency $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ ‐$ ‐$ ‐$ ‐$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $‐ $‐ $‐ $‐ $‐
Operations & Maintenance $‐ $‐ $‐ $‐ $‐
Debt Service $‐ $‐ $‐ $‐ $‐
Total Costs:‐$ $‐ ‐$ ‐$ ‐$
RCMU Line Extension Design: Etiwanda Heights
8,500' of new 12 kV electric distribution and fiber optic line extension to
connect RCMU's existing electric distribution & Rancho Broadband to the new
Etiwanda Heights area.
A new line extension project will be needed in order to serve the new
residential development in the Etiwanda Heights area.
PROJECT FUNDING*
Engineering Services Fred Lyn
Municipal Utilities
District 4
Intentionally embracing and anticipating the future
Day Creek Boulevard n/o Firehouse Court to Banyan Street
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$‐
$‐
$ 3,025,000
5‐YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$‐
$‐
$‐
$‐
TOTAL PROJECT
COST*
$‐
$ 25,000
$‐
$‐
$ 3,000,000
87
Page 102
JL Key GL Object
2094 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q3 2025 CY Q1 2027
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Fire Capital Projects (288)64,510$
TBD 1,124,480$
-$
-$
-$
Total Funding:1,188,990$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $- $ - $ -
Design/Plan Review $ - $ - $- $ - $ -
Design/Build $ - $ - $148,000 $ - $ -
Right-of-Way $ - $ - $- $ - $ -
Construction $ - $ - $828,800 $ - $ -
Inspection & Administration $ - $ - $50,000 $ - $ -
Contingency $ - $ - $97,680 $ - $ -
Total Costs:-$ -$ 1,124,480$ -$ -$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $- $ - $ -
Operations & Maintenance $ - $ - $- $ - $ -
Debt Service $ - $ - $- $ - $ -
Total Costs:-$ $ - -$ -$ -$
Day Creek Station 173 Urban Park
An urban park space in the SE corner of the Fire Station 173 property utilizing the design-
build process in coordination with projects at Fire Stations 171, 174, and 175.
Fire Station 173 is located directly adjacent to the decomposed granite path that connects
to the Pacific Electric Trail north of the station. Creation of an urban park will provide a
staging area and rest point for the community, as well as include additional park and
fitness amenities.
PROJECT FUNDING*
Fire District Ty Harris
Facilities
District 4
Promoting and enhancing a safe and healthy community for all
12270 Firehouse Court
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 50,000
$ 97,680
$ 1,188,990
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$-
$-
$-
$-
TOTAL PROJECT
COST*
$-
$ 64,510
$ 148,000
$-
$ 828,800
PLACE PHOTO HERE
88
Page 103
JL Key GL Object
1978 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2024 CY Q4 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Capital Reserve Fund (025)14,590,367$
$ -
$ -
$ -
$ -
Total Funding: 14,590,367$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ 150,000 $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ - $ 12,719,476 $ - $ - $ -
Inspection & Administration $ - $ 934,903 $ - $ - $ -
Contingency $ - $ 635,988 $ - $ - $ -
Total Costs:150,000$ 14,290,367$ $ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
#DIV/0!
#DIV/0!
#DIV/0!
$ -
TOTAL PROJECT
COST*
$ -
$ 300,000
$ -
$ -
$ 12,719,476
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 934,903
$ 635,988
$ 14,590,367
Citywide - HVAC & Lighting Controls
Design and installation of new interior and exterior lighting controls, along
with HVAC controls, for all City buildings.
The current lighting controls for the Civic Center were installed in 1989 and
are obsolete. Replacement parts are no longer available. The same situation
is true for other City facilities. Out-of-date HVAC controls are another
problem for City facilities. Project goal is to standardized HVAC and lighting
controls for all City facilities.
PROJECT FUNDING*
Public Works Neil Plummer
Facilities
District 4
Providing and nurturing a high quality of life for all
City facilities throughout City
89
Page 104
JL Key GL Object
5607
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
CY Q1 2024 CY Q2 2024
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
LMD 7 (137)152,000$
$ -
$ -
$ -
$ -
Total Funding:152,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 127,000 $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ 25,000 $ - $ - $ - $ -
Total Costs:152,000$ $ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
*Includes Prior & Future Years
IMPACT ON OPERATIONS
Etiwanda Creek Park
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ 50,000
$ 304,000
$ -
$ -
$ -
$ -
$ 254,000
Etiwanda Creek Park LED Sports Lighting Upgrade
At the north soccer/football field, remove existing sports lighting fixtures and
replace with new LED sports lighting fixtures.
As shown on the previously completed LED sports lighting upgrade performed
at the south soccer/football field, the new LED sports lighting fixtures provide
better illumination while using less electricity than the existing sports lighting
fixtures.
PROJECT FUNDING*
Public Works Neil Plummer
Facilities
District 4
Promoting and enhancing a safe and healthy community for all
90
Page 105
JL Key GL Object
5602
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Capital Reserve Fund (025)70,000$
$ -
$ -
$ -
$ -
Total Funding:70,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ - $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ - $ - $ -$ -$ -
*Includes Prior & Future Years
IMPACT ON OPERATIONS
9153 9th St.
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ -
$ 70,000
$ -
$ 70,000
$ -
$ -
$ -
Fleet Shop - Rental Space
Remodel front office areas of the old PW building for rental space for
potential tennants, this includes a complete remodel of the interior office
space
PROJECT ON HOLD!!
PROJECT FUNDING*
Public Works Neil Plummer
Facilities
District 4
Promoting and enhancing a safe and healthy community for all
91
Page 106
JL Key GL Object
1927 5650
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
TBD TBD
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
Capital Reserve Fund (025)3,689,530$
$ -
$ -
$ -
$ -
Total Funding: 3,689,530$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ 3,000,000 $ - $ - $ - $ -
Inspection & Administration $ 100,000 $ - $ - $ - $ -
Contingency $ 300,000 $ - $ - $ - $ -
Total Costs:3,400,000$ $ -$ -$ -$ -
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:$ -$ -$ -$ -$ -
PW Warehouse Expansion
Build a new warehouse with the same footprint as the existing warehouse at
the PWSC. This will provide additional storage for all departments
Current warehouse is at full capacity. Many mobile storage containers are
currently being used by all city departments.
PROJECT FUNDING*
Public Works Neil Plummer
Facilities
District 4
Promoting and enhancing a safe and healthy community for all
PWSC
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$ 100,000
$ 300,000
$ 3,689,530
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$ -
$ -
$ -
$ -
TOTAL PROJECT
COST*
$ -
$ 289,530
$ -
$ -
$ 3,000,000
92
Page 107
JL Key GL Object
5607
Council Districts
District 1 District 2 District 3
Project Location
Project Type
Est. Construction Start Est. Construction End
Lead Department Lead Project Manager
Council Goal
Funding Source Amount
LMD 7 (137)3,600,000$
-$
-$
-$
-$
Total Funding:3,600,000$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Environmental/NPDES $ - $ - $ - $ - $ -
Design/Plan Review $ - $ - $ - $ - $ -
Design/Build $ - $ - $ - $ - $ -
Right-of-Way $ - $ - $ - $ - $ -
Construction $ - $ - $ - $ - $ -
Inspection & Administration $ - $ - $ - $ - $ -
Contingency $ - $ - $ - $ - $ -
Total Costs:-$ -$ -$ -$ -$
Expenditure Category 2023/2024 2024/2025 2025/2026 2026/2027 2027/2028
Personnel Services $ - $ - $ - $ - $ -
Operations & Maintenance $ - $ - $ - $ - $ -
Debt Service $ - $ - $ - $ - $ -
Total Costs:-$ $ - -$ -$ -$
5-YEAR PROJECT COST ESTIMATES
Project
Description
Justification
Average Annual
Impact
$-
$-
$-
$-
TOTAL PROJECT
COST*
$-
$ 150,000
$-
$-
$ 3,000,000
*Includes Prior & Future Years
IMPACT ON OPERATIONS
$-
$ 450,000
$ 3,600,000
Sports Field Artificial Turf Conversion
Convert one of the existing football/soccer fields to artificial turf.
This project will help decrease the overall usage of irrigation water at the park
and decrease the amount of annual down time due to scheduled maintenance
and inclement weather.
PROJECT FUNDING*
Public Works Jeff Benson
Parks & Recreation
District 4
Intentionally embracing and anticipating the future
Etiwanda Creek ParkPLACE PHOTO HERE
93
Page 108
RESOLUTION NO. 23-11
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, STATE OF CALIFORNIA, FINDING THE
CAPITAL IMPROVEMENT PROGRAM FOR FISCAL YEAR 2023/24
IN CONFORMITY WITH THE ADOPTED GENERAL PLAN
WHEREAS, pursuant to Sections 65103 (c) and 65401 of the State of California Government
Code, the Planning Commission has reviewed the Capital Improvement Program (CIP) for Fiscal Year
2023/24 as to its consistency with the City of Rancho Cucamonga General Plan; and
WHEREAS, the project is Categorically Exempt (Section 15306-Class 6) from the provisions of
the California Environmental Quality Act (CEQA); and
WHEREAS, the Planning Commission reviewed the analysis and recommendations of
Engineering Services Department staff, contained in their Staff Report dated May 10, 2023.
NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND that the
Planning Commission of the City of Rancho Cucamonga, State of California, finds the Capital
Improvement Program for Fiscal Year 2023/24 in conformity with the adopted General Plan.
APPROVED AND ADOPTED THIS 10TH DAY OF MAY 2023.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
BY:
Bryan Dopp, Chairman
ATTEST:
Matt Marquez, Secretary
I, Matt Marquez, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby
certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the
Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission
held on the 10th day of May 2023, by the following vote-to-wit:
AYES: COMMISSIONERS:
NOES: COMMISSIONERS:
ABSENT: COMMISSIONERS:
ABSTAIN: COMMISSIONERS:
Page 1 of 1
Exhibit D
Page 109