HomeMy WebLinkAbout2023-042 - Resolution RESOLUTION NO.2023-042
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO
CUCAMONGA, STATE OF CALIFORNIA, ADOPTING THE PROJECTS
FOR THE ROAD MAINTENANCE AND REHABILITATION PROGRAM
FOR FISCAL YEAR 2023/24 FOR THE EXPENDITURE OF ROAD
MAINTENANCE AND REHABILITATION ACCOUNT (RMRA) FUNDS
WHEREAS, Senate Bill 1 (SB1), the Road Repair and Accountability Act of 2017 (Chapter 5,
Statues of 2017) was passed by the Legislature and Signed into law by the Governor in April 2017 to
address the significant multi-modal transportation funding shortfalls statewide;
WHEREAS, SB1 includes accountability and transparency provisions that will ensure the residents
of our City are aware of the projects proposed for funding in our community and which projects have been
completed each fiscal year; and
WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal year
funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB1, which must
include a description and the location of each proposed project, a proposed schedule for the project's
completion, and the estimated useful life of the improvement; and
WHEREAS,the City,will receive an estimated $4,310,000 in RMRA funding in Fiscal Year 2023/24
from S61; and
WHEREAS, this is the sixth year in which the City is receiving S61 funding and will enable the City
to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and
replacing aging bridges, and increasing access and mobility options for the traveling public that would not
have otherwise been possible without SB1; and
WHEREAS, the City used a Pavement Management System to develop the S131 project list to
ensure revenues are being used on the most high-priority and cost-effective projects that also meet the
community's priorities for transportation investment; and
WHEREAS, the funding from SB1 will help the City maintain and rehabilitate two (4) major arterial
roadways in the City this year and similar projects into the future; and
WHEREAS,the 2018 California Statewide Local Streets and Roads Needs Assessment found that
the City's streets and roads are in good condition and this revenue will help us increase the overall quality
of our road system and over the next decade will maintain our streets and roads in a good condition; and
WHEREAS, the SB1 project list and overall investment in our local streets and roads infrastructure
with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using
cutting-edge technology, materials and practices, will have significant positive co-benefits statewide.
Resolution No. 2023-042 - Page 1 of 3
NOW, THEREFORE IT IS HEREBY RESOLVED, ORDERED AND FOUND by the City Council of
the City of Rancho Cucamonga, State of California, as follows:
1. The foregoing recitals are true and correct.
2. The following list of proposed projects will be funded in-part or solely with Fiscal Year 2023/24
Road Maintenance and Rehabilitation Account revenues:
Project 1:
Highland Avenue Pavement Rehabilitation —Archibald Avenue to Amethyst Street (JL 2104)
This project includes cold planing, localized asphalt removal and replacement, crack sealing,
asphalt rubber hot mix overlay, ADA ramp upgrades, traffic signal video detection, thermoplastic
green bike lane, utility adjustments and pavement striping for approximately 0.30 mile of roadway.
The estimated useful life of this roadway is 20 years and construction is anticipated to start in
October 2023.
Project 2:
Highland Avenue Pavement Rehabilitation —Carnelian Street to West End (JL 2104)
This project includes cold planing, localized asphalt removal and replacement, crack sealing,
asphalt rubber hot mix overlay, ADA ramp upgrades, traffic signal video detection, thermoplastic
green bike lane, utility adjustments and pavement striping for approximately 0.80 mile of roadway.
The estimated useful life of this roadway is 20 years and construction is anticipated to start in
October 2023.
Project 3:
Etiwanda Avenue Pavement Rehabilitation — Foothill Boulevard to Wilson Avenue (JL 2007)
This project includes cold planing, localized asphalt removal and replacement, crack sealing,
asphalt rubber hot mix overlay, ADA ramp upgrades, traffic signal video detection, thermoplastic
green bike lane, utility adjustments and pavement striping for approximately 3.0 miles of roadway.
The estimated useful life of this roadway is 20 years and construction is anticipated to start in May
2024.
Project 4:
Milliken Avenue Pavement Rehabilitation — Base Line Road to Banyan Street (JL 2100)
This project includes cold planing, localized asphalt removal and replacement, crack sealing,
asphalt rubber hot mix overlay, ADA ramp upgrades, traffic signal video detection, thermoplastic
green bike lane, utility adjustments and pavement striping for approximately 1.50 miles of roadway.
The estimated useful life of this roadway is 20 years and construction is anticipated to start in May
2024.
Resolution No. 2023-042- Page 2 of 3
PASSED, APPROVED, and ADOPTED this 17th day of May, 2023.
L
L. Denni Michael, M or
ATTEST:
J ice C. Reynolds, CWy Clerk
STATE OF CALIFORNIA )
COUNTY OF SAN BERNARDINO ) ss
CITY OF RANCHO CUCAMONGA )
I, Janice C. Reynolds, City Clerk of the City of Rancho Cucamonga, do hereby certify that the
foregoing Resolution was duly passed, approved, and adopted by the City Council of the City of
Rancho Cucamonga, at a Regular Meeting of said Council held on the 17th day of May, 2023.
AYES: Hutchison, Kennedy, Michael, Scott, Stickler
NOES: None
ABSENT: None
ABSTAINED: None
Executed this 18th day of May 2023, at Rancho Cucamonga, California.
ice C. Reynolds, City Clerk
Resolution No. 2023-042- Page 3 of 3