Loading...
HomeMy WebLinkAbout04-293 - Resolutions (2)RESOLUTION NO.04-293 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, ESTABLISHING A NEW, COMPREHENSIVE FEE SCHEDULE APPLICABLE TO VARIOUS BUILDING AND SAFETY, PLANNING, AND RELATED MUNICIPAL SERVICES A. RECITALS. (i) The City Council has heretofore established fees and charges for the provision of municipal services provided by the City's Building and Safety and Planning Departments. Costs to the City for providing these services have increased since those fees and charges were last established. (ii) The California Government Code allows the City to establish fees and charges for municipal services, provided such fees and charges do not exceed the estimated reasonable cost to the City in providing the service to which the fee or charge applies. (iii) The City of Rancho Cucamonga has heretofore conducted a thoroughgoing and comprehensive study to determine actual costs to the City in providing the various municipal services for which the various fees and charges set forth herein apply. (iv) All data indicating the estimated or actual cost to provide each service forwhich the fees and charges set forth herein apply, was made available to the public at least ten (10) days prior to the date of the public hearing referred to in Recital (v), below. (v) On September 15, 2004, the City Council conducted and concluded a duly noticed public hearing as required by law concerning the fees and charges proposed to be adopted in this Resolution. (vi) All legal prerequisites to the adoption of this Resolution have occurred. B. RESOLUTION. NOW, THEREFORE, the City Council of the City of Rancho Cucamonga hereby finds and resolves as follows: 1. All facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based on the staff reports, fee study, data and oral comments presented to this City Council at the public hearing identified in Recital (v), above, the City Council hereby finds and determines that the fees and charges set forth in Exhibit "A," attached hereto, and incorporated by reference herein, do not exceed the estimated reasonable cost of providing the service for which the fee or charge be levied. Resolution No. 04-293 Page 2 of 28 3. Subject to the provisions of Section 4, below, the fees and charges set forth in Exhibit "A" are hereby approved and adopted as the fees and charges applicable to the respective services listed therein, and shall take immediate effect, except as hereinafter provided. In accordance with California Government Code Section 66017, those fees and charges set forth in Exhibit "A" that constitute "a fee or charge ... upon a development project... which applies to the filing, accepting, reviewing, approving, or issuing of an application, permit, or entitlement to use" shall become effective and payable sixty (60) days from the date of adoption of this Resolution. 4. Each fee and charge set forth in Exhibit "A" shall be adjusted annually commencing October 1, 2005, and each year thereafter, without further action of the City Council, in proportion to the percentage change in the Consumer Price Index, All Urban Consumers, for the Los Angeles-- Anaheim-- Riverside statistical area, during the 12-month period ending on December 31 st of the immediately preceding year. If the Consumer Price Index is discontinued, then the replacement index in use and accepted as the industry and business standard for Southern California, as determined by the City Council, shall be utilized. 5. The City Clerk shall certify to the adoption of this Resolution. Please see the following page for formal adoption, certification and signatures Resolution No. O4-2S3 Page 3 of 28 PASSED, APPROVED, AND ADOPTED this 15 th day of September 2004. AYES: Alexander, Gutierrez, Howdyshell, Kurth, Williams NOES: None ABSENT: None Debra J. Adarng, CMC, City Clerk |,DEBRA J.ADAMS,CITY CLERK of the City of Rancho Cucamonga,California, dO hereby certify that the foregoing R8SO|Ubon was duly p8SS8d' approved and adopted by the City Council of the City of Rancho Cucamonga, California, at a Regular Meeting of said City Council held OOthe 15"'day ofSeptember 2004. Executed thiS16 thday of September 2004.at Rancho Cucamonga, California. D6bra J. Adami,,CUC, City Clerk Resolution No. 04-293 Page 4 of 28 EXHIBIT "A" September 1, 2004 Resolution No. 04-293 Page 5 of 28 Rancho Cucamonga - Building Fee Schedule Consolidated Schedule of New Construction Fees (All Construction Types) Construction Types: Construction Types: Construction Types: 1 FR, II FR II 1-HR, III 1-HR, V 1-HR 11 td, III N, IV, V N Base Cost @ Cost for Each Base Cost @ Cost for Each Base Cost @ Cost for Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 s.f. * Size 100 s.f. * Size 100 s;.f. A-1 Theater 1,000 $2,673 _ $12.64 $2,219 ---$2,639 $10.49 W n.a. 5,000 $3,179 $16.64 $13.81 _n.a. n.a. n.a. 10,000 $4,011 $9.27 $3,329 $7.69 n.a. n.a. 20,000 $4,938 $5.32 $4,098 $4.42 n.a. n.a. 50,000 $6,535 $5.83 _ $5,425 _ $4 8_3 n.a. n.a. 100,000 $9,460 $5.83 $7,840 $4.83 n.a. n.a. A-2 Church 1,000 ��-- - $3,596 �- $15.43 $2,996 $12.87 $2,397 $10.30 5,000 $4,213- $20.58 $3,511 $17.14 $2,809 $13.70 10,000 $5,242 $12.28 $4,368 $10.24 $3,494 $8.20 20,000 $6,470 $5.70 $5,392 $4.74 $4,314 $3.79 50,000 $8,180 $6.30 $6,815 $5.25 $5,450 $4.20 100,000 $11,330 $6.30 $9,440 $5.25 $7,550 $4.20 A-2.1 Auditorium 1,000 $2,901 $12.69 $2,407 _ $10.53 $1,_943 $_8.51 5,000 $3,408 $17.00 $2,829 $14.11 $2,284 j11.39 10,000 $4,258 $9.90 $3.534 $8.22 $2,853 $6.63 20,000 $5,248 $4.76 $4,356 $3.95 $3,516 $3.18 50,000 $6,675 $5.25 $5,540 $4.36 $4,470 $3.52 100,000 $9,300 $5.25 $7,720 $4.36 $65,230 '53.52 A-2.1 Restaurant 1,000 $4,637 $21.97 $3,864 $18.31 $3,091 a.'14.65 5,000 $5,516 $28.29 $4,597 $23.57 $3,677 3,'18.86 10,000 $6,930 $16.26 $5,775 $13.55 $4,620 ;,10.84 20,000 $8,556 $9.56 $7,130 $7 97 $5,704 $6.37 50,000 $11,425 $10.45 _ $9 520 $8 72 _ $7,615 $6.97 100,000 $16,650 $10.45 $13,880 $8 72 $11,109 $6.97 A-3 Small Assembly Buildings 100 $2,407 $109.53 $2,006 $91.26 $1,605 73.01 500 $2 815 $131 30 $2,371 $109.41 $1,897 (1137.53 1,000 $3,502 $80.56 $2,918 $67.15 $2,335 $53.71 2,000 $4,307 $35.77 $3,590 $29.81 _ $2,872 $23.85 5,000 $5.381 $39 45 $4,484 $32.88 $3,587 $26.30 10,000 $7,353 $39.45 $6,128 $32 88 $4,902 $26.30 B Banks 1,000 - $3,344 - - -___.- $16.68 .-._---- $2,787 ------- -- --- $13.90 - -- -- -- $2,229 ------ -- $11.12 5,000 $4,011 $20 88 $3,343 $17.41 $2,674 - - $13.92 10,000 $5,055 $11.61 $4,213 $9.67 13,370 $7.74 20,000 $6,216 $7.13 $5,180 $5.95 $4,144 $4.75 _ 50,000 $8.355 $7.77 $6,965 -_ . . _____. - ____ $6.47 $5,570 $5.18 100,000 $12,240 $7.77 $10,2001 $6.47 $8,160 _- $5.18 B Laundromat 100 $2,992 $143.86 $2,493 $119.89 $1,995 $95.91 500 $3,567 $179.79 $2,973 $149.82 $2,378 $119.86 1,000 _. $4,466 _ $102.12 -_- $3,722 $85.10 $2,978 __--------- -_ $68.08 2,000 $5A88 $55.71 $4,573 _ $46.42 -- -.. _ $3,658 _-____-- . __--_ _ _ $37.14 5,000 $7,159 $61.10 $5,966 $50.91 $4,773 _ _-_-- $40.73 10,000 $10,214 $61.10 $8,511 $50 91 $6,809 $40.73 Resolution No. 04-293 Page 6 of 28 Rancho Cucamonga - Building Fee Schedule Consolidated Schedule of New Construction Fees (All Construction Types) Construction Types: Construction Types: Construction Types: I FR, 11 FR II 1-HR, III 1-HR, V 1-HR It N, Ill N, IV, V N Base Cost @ Cost for Each Base Cost @ Cost for Each Base Cost @ Cost for Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 s.f. * Size 100 s.f. * Size 100 s.f. * B Medical Office 1,000 $4,293 $21.32 $3,578 $17.76 $2,862 $14.21 5,000 $5, 146 $27.58 $4,288 $23,00 $3,431 $18.39 10,000 $6,525 $15.07 $5,438 $12.54 $4,350 $10.04 20,000 $8,032 $9.56 $6,692 $7.96 $5,354 $6.37 50,000 $10,900 $10.42 $9,080 $8.70 $7,265 $6.95 100,000 $16,'110 $10,42 $13,430 $8.70 $10,740 $6.951 B Offices 1,000 $6,954 $64.95 $5,795 $54.12 $4,636 $43.30 5,000_ $9,552 $_26.94 $7,960 $22.46 $6,368 $17,96 10,000 $10,899 $16.45 $9,083 $13.69 $7,266 $10.96 20,000 $12,544 $7.49 $10,452 $6.24 $8,362 $4.99 50,000 _ $14,790 $7.68 $12,325 _ $6.41 $9,860 100,000 $18,630 $7,68 $15,530 $6.41 $12,420 $5.12 B Office Tenant Improvements 500 $1,22.0 $17.13 $1,016 $14.26 $813 $11.41 2,500 $1582 $13.40 $1,302 $11.16 $1,041 $8.93 5,000 $1,897 $7.60 $1,581 $6,35 $1,265 $5.07 10,000 $2,277 $5.10 $1,898 $4.25 $1,518 $3,40 25,000 $3,043 $5,41 $2,535 $4.52 $2,028 $3.61 50,000 $4,395 $5.41 $3,665 $4.52 $2,930 $3.61 B High Rise Offices 1,000 $3,180 $9.64 $2,640 $8.01 $2,131 $6.46 5,000 $3,566 $13.72 $2,960 $11.38 $2,389 $9.20 10,000 $4,252 $10.34 $3,529 $8 59 $2,849 $6.93 20,000 $5,206 $1.10 $4,388 $0.91 $3,542 $0.73 50,000 $5,615 $1.43 $4,660 $1.18 $3,760 $0.96 100,000 $6,330 $1.43 $5,250 $1.18 $4,240 $0.96 E-3 Daycare 100 $3,095 $127.49 $2,579 $106.23 $2,063 $84.99 500 $3,605 $153.70 $3,004 $128.10 $2,403 $102.47 1,000 $4,373 $104_79 $3,644 $87.33 $2,915 $69,8_6 2,000 $5,421 $39.98 $4,518 $33.31 $3,614 $26.65 5,000 $6,621 $44.15 $5,517 $36.78 $4,414 F29.43 10,000 $8,828 $4415 $7,356 $36.78 $5,885 $29.43 E-2 Preschool School 500 $3,003 $19.68 $2,503 $16.41 $2,002 $13.12 2,500 -- --- $3,397 ----- - - - $22 63 - - - -- $2,831 $18.85 $2,265 $15.08 5,000 ---- $3,963 --- - ------ $19.81 --- -------------- $3,302 $16,52 - - $2,642 $13.21 10,000 $4,953 $2.88 $4,128_ $2.40 $3,302 $1.9_2 25,000 $5,385 $3.36 $4,488 $2.81 $3,590 $2.24 50,000 $6,225 $3.36 $5,190 $2.81 $4,150 $2.24 F-1 Industrial 1,000 $4,490 $20.01 $3,741 $16.67 $_2._993 $13.34 5,000 $5,290 $25.06 $4,408 $20.90 $3,527 $16,71 10,000 $6,543 $15 73 $5,453 $13.09 $4,362 $10.48 20,000 --� $8,116 $8.20 $6,762 $6.84 - -� $5,410 -- $5A7 50,000 $10,575 $8.97 $8,815 $7.47 $7,050 $5.98 100,000 $15,0601 $8.971 $12,550 $7.47 $10,040 $5.98 Resolution No. 04-293 Page 7 of 28 Rancho Cucamonga - Building Fee Schedule Consolidated Schedule of New Construction Fees (All Construction Types) Construction Types: Construction Types: Construction Types: 1 FIR, II FR 111-HR, III 1-HR, V 1-HR If N, III N, IV, V N Base Cost @ Cost for Each Base Cost @ Cost for Each Base Cost @ Cost for Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 s.f. * Size 100 s.f. * Size 100 s.f. * F-1 Woodworking 500 - -- $3,962 ----- $33.22 - ---- $3,301 - -- - -- $27.68 -------------- $2,641 ------ $22.15 2,500 - --- ---- $4,626 $42.48 -- -- - $3,855 $35.40 $3,084 -- -- -- $28.32 $5,688 $27.10 $4,740 $22.58 $3,792 $18.06 -----5,000 10,000 --- -- $7,043 $11.63 $5,869 $9.69 $4,695 _ $_7.75 25,000 - --- - -- $8,788 $12.85 - $7,323 $10.71 -- $5,858 - $8.57 50,000 $12,000 $12.85 $10,000 $10.71 $8,0001 --------- $8.57 F-1 Industrial / Manufacturing 2,000 _ $6,309 $16.28 $5,257 $13.57 $4,206 $_10.85 10,000 $7,611 $21.45 $6,343 $17.87 $5,074 $14.30 20,000 _ $9,756 $11.34 $8,130 $_9.45 $6,504 $7.56 40,000 $12,024 $8.16 $10,020 $6.80 $8,016 $5.44 100,000 $16,920 $8.88 $14,100 $7.40 $11,280 $5.92 200,000 $25,800 $8.88 $21,500 $7.40 $17,200 $5.92 F-2 Industrial / Manufacturing 2,000 $6,309 $16.28 $5,257 $13.57 $4,206 $10.85 10,000 $7,611 $21.45 $6,343 $17.87 $5,074 $14.30 20,000 -- $9,756 $11.34 $8,130 $9.45 - ---------------- - $6,504 $7.56 40,000 1 $12,024 - _ $8.16 $10,020 $6.80 _ _$8,016 $5.44 100,000 $16,920 $8.88 $14,100 $7.40 $11,280 200,000 $25,800 $8.88 $21,500 $7.40 $17,200 $5.92 S-2 Warehouse 5,000 $4,173 $4.33 $3,477 $3.60 $2,782 $2.88 25,000 $5,038 $5.45 $4,198 $4.53 $3,358 $3.63 50,000 $6,400 $2.98 $5,330 $2.50 $4,265 $1.99 100,000 $7,890 $2.12 $6,580 $1.76 $5,260 $1.41 250,000 $11,075 $2.27 $9,225 $1.89 $7,375 $1.51 500,000 $16,7501 $2.27 $13,950 $1.89 $11,150 $1.51 H-2 Moderate Explosion Hazards 200 $4,769 $94.43 $3.974 $78.69 $3,179 $62.95 1,000 $5,524 $129.61 $4,603 $107 99 $3,683 $86.40 2,000 $6,820 $80.14 $5,683 $66.80 $4,547 $53.43 4,000 --- - ---- ----- $8,423 - -- $29 70 --- $7,019 - - $24.75 - -- ---- $5,615 - - -- $19.80 10,000_ $10,205 $33.37 $8,504 $27.82 $6,803 -- -- - $22.25 20,000 $13,542 $33.37 $11,286 $27.82 $9,028 $22.25 H-4 Repair Garage 1,000 $4,844 $23.16 $4,037 $19.31 -$25.40 $3,229 $15.44 _ 5,000 $5,771 $30 49 $4,809 $3,847 $20.32 10,000 $7,295 $16.93 _ $6,079 $1411 $4,863 $11.29 20,000 $8,988 $10,14 $7,490 $8.45 $5 992 $6.76 50,000 _ $12,030 $11.10 $10,025 ------------ $9.25 _ $8,020 $7.40 100,000 $17,580 $11.101 $14,650 $9.25 $11,720 $7.40 Resolution No. 04-293 Page 8 of 28 Rancho Cucamonga - Building Fee Schedule Consolidated Schedule of New Construction Fees (All Construction Types) Construction Types: Construction Types: Construction Types: I FIR, 11 FIR II 1-HR, III 1-HR, V 1-HR It N, III N, IV, V N Base Cost @ Cost for Each Base Cost @ Cost for Each Base Cost @ Cost for Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 s.f. * Size 100 s.f. * Size 100 s.f. * 1-2 Nursing Home /Assisted Living / 1,000 $4.065 $17.26 $3,387 $14.38 $2,710 $11.51 5,000 $4,755 $22.74 $3,963 $18.95 $3,170 $15.16 10,000 $5,892 $14.04 $4,910 $11.70 $3,928 $9.36 20,000 $7,296 $6 60 $6,080 $5 50 $4,864 $4.40 50,000 $9,275 $7.27 $7,730 $6 06 $6,185 $4.85 100,000 $12,910 $7.27 $10,760 $6.06 $8,610 $4.85 M Stores (Retail) 1,000 $3,661 _ $16.12 $3,051 $13.43 $2,441 $10.74 5,000 $4,306 $20.42 $3,588 $17.02 $2,871 $13.61 10,000 -- --- ----- $5,327 --- - ------ $12.55 ---- -- $4,439 - - $10.47 - - - $3,551 ---..----- -- -- $8.37 20,000 $6.582 $5.96 $5,486 $4.96 $4,388 - ------ _ $3.97 50,000 $8,370 $6.58 $6,975 $5.47 $5,580 $4.38 100,000 $11,660 $6.58 $9,710 $5.47 $7,770 $4.38 M Retail Tenant Improvements 200 $1,220 $42.79 $1,016 $35.66 $813 $28.53 1,000 $1,562 _$33.46 $1,302 $27.87 $1,041 __- $22.30 2,000 $1,896 $19.04 $1,580 $15.87 $1,264 $12.69 4,000 $2,277 $12.70 $1,898 $10.59 $1,518 $8.47 10,000 $3,039 $13.59 $2,533 $11.33 $2,026 $9.06 20,000 $4,398 $13.59 $3,666 $11.33 $2,932 R-1 Apartment Bldg 1,000 $8,123 $59.08 $6,770 $49.24 $5,416 $39.39 5,000 $10,487 $33 57 _ $8,739 $27.98 $6,991 $22.38 10,000 $12,165 $22 75 $10,138 $18 94 $8,110 $15.16 20,000 $14,440 $9 77 $12,032 $8.14 $9,626 $6.51 50,000 $17,370 $10 30 $14,475 $8 57 $11,580 $6.86 100,000 $22,520 $10.30 $18,760 $8.57 $15,010 $6.86 R-1 Hotels & Motels 1,000 $5,801 $24.62 $4,834 $20.52 $3,867 $16.42 5,000 $6,786 $31.98 $5,655 $26.66 $4,524 $21.32 10,000 $8,385 $20.29 $6,988 $16.90 $5,590 $13.52 20,000 - -- - - - $10,414 - --- - $9.89 - . $8,678 - - --. $8 24 - -- $6,942 - ----- $6.5 9 50,000 $13,380 $10 84 $11,150 $9.02 $8,920 - $7.22 100,000 $18,800 $10 84 $15,660 $9.02 $12,530 $7.22 R-3 Dwellings -Custom, Models, 1,000 n.a. n.a. n.a, n.a. $1,556 $46.03 2,000 n.a. n.a. n.a. n.a. $2,017 - $8.76 3,000 n.a. n.a. n.a, n.a. $2,104 $47.14 4,000 n.a. ____n.a. n.a. n.a. $2,576 $16.44 5,000 n.a, n.a. n.a. n.a. $22740 $20.16 10,000 n.a. n.a. n_.a. n.a. $20.16 R-3 Dwellings- Production Phase 1,000 n.a. n.a. n.a. n.a. $965 $19.73 2,000 n.a. n.a. n.a. n.a. $1,162 $5.47 3,000 n.a. n.a. n.a. n.a. $1,217 $9.87 4,000 n.a. n.a. n.a. __$_3_,7_4.__8.. $1,315 _.._-__- $8.78 5,000 n.a. n.a. n.a. n.a. $1,403 $7,46 10,000 n.a. n.a. n.a. $1,776 $7.46 Resolution No. 04-293 Page 9 of 28 Rancho Cucamonga - Building Fee Schedule Consolidated Schedule of New Construction Fees (All Construction Types) Construction Types: Construction Types: Construction Types: I FR, II FR II 1-HR, III 1-HR, V 1-HR If N, III N, IV, V N Base Cost @ Cost for Each Base Cost @ Cost for Each Base Cost @ Cost for Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 s.f. * Size 100 s.f. * Size 100 s.f. R- 2.1, Group Care, Non-Amb. (6+) 250 $3,070 $51.72 $2,559 $43.10 n.a. n.a. _ 1,250 _ $3,588 v$63.90 _ $2,990 _ $53.25 _ _n.a. n.a. 2,500 $4,386 $42.31 $3,655 $35.25 n.a. _ n.a. 5,000 $5,444 $18.55 $4,537 $15.46 n.a. n.a. 12,500 $6,835 $20.40 $5,696 $16.99 n.a. n.a. 25,000 $9,385 $20.40 $7,820 $16.99F n.a. n.a. R-2.2 & Group Care, Ambulatory (6+) 250 $3,397 $55.99 $2,830 $46.65,264 $37.33 1.250 $3,957 $69.50 $3,297 $57.92,638 $46.33 2,500 _ $4,825 $46,07 $4,021 $38.38,217 $30.71 5,000 $5,977 $18.09 $4,981 $15.08,985 $12.06 12,500 $7,334 $20.03 $6,111 $16.69 .889 $13.35 25,000 $9,838 $20.03 $8,198 $16.69,558 $13.35 R-2.1.1, Group Care, Non-Amb. (1-5) 300 _.---------- --- $3,836 -- -- - $54.99 - - - ---- $3,197 - $45.83 - - - $2,558 - $36.66 --- - 1,500 $4,496 $70.24 $3,747 $58.52 $2,998 $46.82 3,000 $5,550 $43.64 $4,625 $36.36 $3,700 $29.09 6000 $6,859 $19.59 $5.716 $16.33 $4,573 $13.06 _ 15,000 $8,622 $21.64 $7,185 $18.02 $5,748 $14.42 30,000 $11,868 $21.64 $9,888 $18.02 $7,911 $14.42 R-2.2.1 & Group Care, Non-Amb. (1-5) 300 $4,170 $57.35 $3,475 $47.79 $2,780 $38.23 1.500 $4,858 $76.25 $4,048 _ _$63.53 $3,239 $50.83 3,000 _._ $6,002 _-_-_- $46.94 _ _--._.-_ ___ $5,001 __.__- _.___._.__ $39 11 _______ $4,001 $31.29 6,000 $7,410 $19.00 $6,175 $15.83 $4,940 $12.66 15,000 $9,120 $21.16 $7,599 $17.64 $6,080 $14.11 30.000 $12,294 $21,16 $10,245 $17.64 $8,196 $14.11 S-3 Motor Vehicle Fuel Dispensing 200 $3,449 $70.94 $2,874 $59.12 $2,299 $47.29 __ 1,000 $4,017 $92.35 $3,347 $76.95 _ $2,678 $61.56 2,000 $4,940 $57.77 _ $4,117 $48.14 - $3,293 $38.51 4,000 -- -- $6,096 - - -- -- - $21 94 --- . - - - - $5,080 -- -- -- $18.27 - --- $4,064 - _ ------ 1 $14.62 1111,111 --- - 10,000 $7,412 $24.52 $6,176 $20.44 $4,941 -- $16.35 20,000 $9,864 $24 52 $8,220 $20.44 $6,576 $16.35 S-1 Mini Storage 1,000 $3,878 $15.93 $3,231 $13.27 $2,585 $10.61 5,000 $4,515 $20.03 $3,762 $16.68 $3,010 $13.35 10,000 $5,516 $13.24 $4,596 $11.04 $3,677 $8.83 20,000 $6,840 $5.40 $5,700 $4.50 $4,560 $3.60 50,000 $8,460 $5.98 $7,050 $4.98 $5,640 $3.98 100,000 $11,450 $5.98 $9,540 $4.98 $7,630 $3.98 S-1 Moderate Hazard Storage 1,000 $4,226 _ $18.78 $3,521 $115.65 $2,817 $12.52 5,000 $4,977 $23.28 $4,148 $19.41 $3,318 $15.52 10,000 $6,141 $14.77 $5,118 $12,30 $4,094 $9.84 20,000 $7,618 $7.59 $6,348 $6.32 $5,078 $5.06 50,000 $9,895 $8.29 $8,245 $6.91 $6,595 $5.53 100,000 $14,040 $8.29 $11,700 $6.91 $9,360 $5.53 S-3 Repair Garage 200 $3,204 $69.55 $2,670 $57,97 $2,136 $46,37 1,000 $3,761 $85.09 $3,134 $70.90 $2,507 $56.72 2,000 $4,611 $54.67 $3,843 $45.56 $3,074 $36A5 4,000 $5,705 $24.35 $4,754 $20.28 $3,803 $16.23 Resolution No. 04-293 Page 10 of 28 Rancho Cucamonga - Building Fee Schedule Consolidated Schedule of New Construction Fees (All Construction Types) Construction Types: Construction Types: Construction Types: I FIR, II FIR II 1-HR, III 1-HR, V 1-HR II N, III N, IV, V N Base Cost @ Cost for Each Base Cost @ Cost for Each Base Cost @ Cost for Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 s.f. * Size 100 s.f. * Size 100 s.f. * 10,000 $7,166 $25.74 $5,971 $22.29 $4,777 $17.83 20,000 $9,840 $26.74 $8,200 $22.29 $6,5601 $17.83 S-3 Parking Garage 1,000 $4,856 $22.66 $4,047 $18.89 $3,237 $15.11 5,000 --� $5,763 $28.73 $4,802_ ----$5,999 $23.94 - $3,842 $19.15 10,000 - - $7,199 -- - -- $17.11 ----- -- - ----- $14.27 ---- _ $4,799 .__ ..-- ----- --- $11.41 --------------- 20,000 $8,910 $9.93 $7,426 $8.26 $5,940 . ----- $6.62 50 000 $11,890 $10.78 - $9,905 - $ $8.99 --- $7,925 $ - $7.1-6 100 000 $17,280 $10.78 $14,400 $8.99 $11,520 $7,19 0 Fire Stations 1,000 ---------------- $5,035 -------------- $26,40 ----- $4,196 -- --- $21.99 $3,357 ------------ $17.60 -------- 5,000 $6,091 _ $33.88 $5,076 $28.25_ $4,061 $22.59 10,000 $7,785 $18.07 $6,488 $15.04 $5,190 $12.04 20,000 $9,592 $.13.11 $7,992 $10.93 $6,394 50,000 $13,525 $14.21 $11,270 $11.84 $9,015 $9.47 100,000 $20,630 $14.21 $17,190 $11.84 $13,750 $9.47 0 Public Building -Office 1,000 $4,857 $22.82 $4,048 $19.01 $3,238 $15.21 5,000 $5,770 $ 9 44 $4,808 $24.54 $3,847 $19.63 10,000 $7,242 $17.08 $6,035 $14 23 $4,828 $11.38 20,000 $8,950 $10.02 $7,458 $8.36 $5,966 $6.68 50,000 $11,955 $16,93 $9,965 $9.09 $7,970 $7.28 100,000 $17,420 $iO.93r $14,510 $9.09 $11,610 $7.28 0 Public Buildings -Police 1,000 $4,857 $22.82 $4,048 $19.01 $3,238 $15.21 5,000 $5,770 $29.44 $4,808 $24 54 $3,847 _ $19.63 10,000 - $7,242 ----- $17.08 - -- - $6,035 -- - ------ $14.23 - -- - - $4,828 - ----- - $11.38 - - 20,000 $8,950 _ $10.02 _ $7,45_8 __ $8 36 $.5,966 - ---- $6.68 50,000 $11,955 $10.93 $9,965 _$9.09 __ $7,970 $7.28 100,000 $17,420 $10,93 $14,510 $9.09 $11,610 $7.28 0 Public Buildings - Recreation 1,000 $3,886 $18.26 $3,238 $15.21 $2.591 $12.16 5,000 $4,616 $23.56 $3,847 $19.63 $3,077 $15.70 10,000 $5,794 $13.66 _ $4.828 $11.38 _ _._. $3,862 _ _ $9.10 20,000 $7,160 $8.02 $5,966 $6.68 $4,772 _-.___ $5.34 50,000 49,565 $8.73 $7,970 $7.28 $6,375 $5.83 100,000 $13,930 $8.73 $11,610 $7 28 $9,290 $5.83 0 Public Buildings - Miscellaneous 1,000 $4,786 $22.68 $3,988 $18.90_ $3,190 $15.12 5,000 - $5,693 $29.35 ---- - $4,744 $24.44 -- - - $3,795 - -- -- 7 $19.56 ----- 10,000 $7,160 $16.82 $5,966 $14.02 $4,773 $11.21 20,000 $8,842 $10.03 _ $7,368 $8.36 $5,894 ---_-_ $6.69 _ -_--__._--- 50,000 $11,850 $10.92 $9,875 $9.11 $7,900 $7.28 100,000 $17,310 $10 92 $14,430 $9.11 $11,540 $7.28 A-3 Library / Museum 1,000 $4,122 $18.88 $3,435 $15.73 $2,748 $12.58 5,000 $4,878 _ -_. __.-__ $24.89 - $4,065 $20.75 $3,252 $16.61 10,000 $6,122 $14.40 $5,102 $12.00 $4,082 $9.60 20,000 $7,562 $8.03 $6,302 $6.69 $5,042 $5.36 50,000 $9,970 __- $8.78 -$8,310 $7.32 $6,650 __.---_.----._ $5.86 100,000 $14,360 $8.78 $11,970 -..._�._ $7.32 $9,580 $5.86 Resolution No. 04-293 Page 11 of 28 Rancho Cucamonga - Building Fee Schedule Consolidated Schedule of New Construction Fees (All Construction Types) Construction Types: Construction Types: Construction Types: I FIR, 11 FIR 11 1-HR, III 1-HR, V 1-HR II N, III N, IV, V N Base Cost @ Cost for Each Base Cost @ Cost for Each Base Cost @ Cost for Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 s.f. * Size 100 s.f. * Size 100 s.f. * A-3 Bowling Alley 1,000 -- ---- $3,950 - $18.57 - --- - $3,291 - ..._ . - --- $15.48 - -- $2,633 ---___ . _. __.--- $12.39 5,000 $4,693 $24.63 - $3,911 _ $-20 53 _ $3,129 - -- --- _ $16_.43 10,000 $5,924 $13.80 $4,937 $11.49 $3,950 $9.18 20,000 $7,304 $8.04 $6,086 $6 70 $4,868 $5.36 50,000 $9,715 $8.79 $8,095 $7.33 _ $6,475 _ $5.87 100,000 $14,110 $8.79 $11,760 $7.33 $9,410 $5.87 U-1 Agricultural Building 1,000 $4,520 $20.80 $3,766 $17,33 $3,013 $-13.86 5,000 $5,352 $27.31 $4,460 $22.77 $3,56_8 $18.21 10,000 $6,717 --____-- $15.63 - ------ _-- $5,598 _-- - _- ____ $13.02 ._..-______ . _. $4,478 _-_..._ .. ---_-_-_ $10.42 __---.---__-� 20,000 $8,280 $8.53 $6,900 __ -------- $710 ._.. __..__ $5,520 $5.68 50 000 _ $1_0,840 $9.34 $9,030 �$12,930 $7.80_ $7_,225 $6.23 100,000 $15,510 $9.34 $7 80 $10,340 $6.23 Resolution No. 04-293 Page 12 of 28 Rancho Cucamonga - Building Fee Schedule Consolidated Schedule of New Construction Fees (All Construction Types) Construction Types: Construction Types: Construction Types: I FR, II FIR 111-HR, III 1-HR, V 1-HR 11 N, III N, IV, V N Base Cost @ Cost for Each Base Cost @ Cost for Each Base Cost @ Cost for Each UBC Project Size Threshold Additional Threshold Additional Threshold Additional Class UBC Occupancy Type Threshold Size 100 s.f. * Size 100 s.f. * Size 100 s.f. SHELL BUILDINGS 0 All Shell Buildings 1,000 - $4,030 $18.74 $3,358 $15.61 $2.686 $12.49 5,000 $4,779 $24 90 $3,983 $20.75 $3,186 $16.60 10,000 $6.024 $14.04 $5,020 $11.70 $4,016 $9.36 20,000 $7,428 $8.04 $6,190 $6.70 $4,952 $5.36 50,000 $9,840 $8.80 - $8,200 $7.34 $6,560 100,000 $14,240 $8.80 $11,870 $7.34 $9,500 $5.88 B Medical Offices 1,000 $3,653 $17.50 $3,044 $14.58 $2,435 $11.66 5,000 $4,353 $21 57 - _ $3,627 $17.98 _ $2,902 $14.39 10,000 $5,431 $13.03 $4,526 $10.86 $3,621 $8.69 20,000 $6,734 $7.97 $5,612 $6.64 $4,490 $5.32 -$5.77 50,000 $9,125 $8.65 $7,605 $721 $6,085 100,000 $13,450 $8.65 $11,210 $7.21 $8,970 $5.77 B Office Building 1,000_ $3,966 $18.41 �$23.80 $3,305 _ $15.34 $2,644 $12.28 5,000 $4,702 $3,919 $19.83 $3,135 $15.86 10,000 $5,892 $13.94 $4,910 $11.62 $3,928 $9.30 20,000 $7,286 $8 01 $6,072 $6.68 $4,858 $5.34 50,000 $9,690 $8.74 $8,075 $7.29 $6,460 $5.84 100,000 $14,060 $8.74 $11,720 $7.29 $9,380 $5.84 A-2.1 Restaurant 1,000 $4,398 $22.57 $3,665 $18.81 $2,932 $15,04 5,000 - $5,301 - - - - -- $29.33 - --- $4,417 -- --- $24.44 --- - - $3,534 $19.55 10,000 $6,767 $15.73 $5,639 $1311 $4,511 - $10.49 20,000 $8,340 $11.07 $6,950 $9.22 $5,560 _ $7.37 �$8.02 50,000 $11,660 $12.00 $9,715 $10.01 $7,770 100,000 $17,660 $12.00 $14,720 $10.01 $11,780 $8.02 M Store 1,000 $3,570 $17.46 $2,975 $14.55 $2,380 $11.63 5,000 $4,268 -_ ___- $21.96 _..-- ---- $3,557 --____ _... __-.---- $18.31 --------. $2,845 $14.66 10,000 - - $5,366 - $12.66 ---- -- $4,472 $10 54 - -- $3,578 - -- $8.42 20,000 _-__-- $6,632 - --- $7 99 ----.--_-- $5,526 $6.66 --_-- $4,420 -.-----_ $5.33 _-.__-_-- 50,000 $9,030 $8.68 $7,525 $7.23 $6,020 $5.78 100,000 $13,370 $8.68 $11,140 $7.23 $8,910 $5.78 0 Lab / R&D 1,000 $3,442 $17.29 $2,868 $14,40 $2,294 $11.52 5,000 $4,133 $22.02 $3,444 $18.36 $2,755 $14,70 10,000 $5,234 $1218 $4,362 $1014 $3,490 $8.10 20,000 $6,452 $7.99 $5,376 $6.66 $4,300 $5.33 50,000 $8,850 $8.70 $7,3751 -------------- $7.25 $5,900 $5.80 100,000 $13,200 $8.70 $11,000 $7.25 $8,800 $5.80 Each additional 100 square feet, or portion thereof, up to the next highest project size threshold. NOTE: Each fee set forth in this table shall be adjusted annually in October each year and it is based on the percentage change of the Consumer Price Index (CPI) for the L.A. - Anaheim - Riverside areas. Resolution No. 04-293 Page 13 of 28 Rancho Cucamonga - Building Fee Schedule FEE SCHEDULE FOR MISCELLANEOUS ITEMS Building & Safety Department Total Work Item Time Fee $ 110 Standard Hourly Rate Cellular Tower with Equipment Shelter 13.50 ------------ Awning or Canopy _ 0.75 $ 82 Balcony addition 0.75 Carport __ 0.75 $ 82 Carport (with Calcs) 2.00 $ 219 Change of Occupancy 12.50 $ 1,370 Close Existing Openings 1.50 $ 164 Interiorwall 1.50 $ 164 Exterior wall 1.50 $ 164 Commercial Coach (per unit) 2.50 $ 274 Compliance Inspections/Reinspections -- -- -1.00 - ------ - -- -. $_ 110 Covered Porch 0.7_ $ 82 Deck (wood) ------------ 0.75 ------- ------- - $ 82 Deck (wood) (with Calcs) 2.50 $ 274 Demolition Demolition - Multi Family/Commercial 1.00 $ 110 Pre -Demolition Inspection (first hour) Pre -Demolition Insp. (each add'I hour) Door 0_._00 $ New door (non structural) _ 1.25 $ 13_7 New door (structural shear wall/masonry) 1.25 _ $ 137 Duplication Processing Application 0.25 $ 27 Fence or Freestanding Wall (non -masonry) 125 $ 137 8 - 10 feet in height 1.50 _ $ 164 Each additional 100 If 1.50 $ 164 Over 10 feet in height 1.50 $ 164 Over 10 feet in height (with Calcs) 1.50 Each additional 100 If _ 1.50 $ 164 Fence or Freestanding Wall (masonry) -------- 1.25 ---- $ 137 Masonry, (6-8 feet high) Each additional 100 If 1.25 $ 137 Masonry, Special Design (6-10' high) 1.50 $ 164 Each additional 100 If 1.25 $' 137 Masonry, Special Design (over 10' high) _ 1.50 $ 164 Each additional 100 1f _ 1.50 $ 164 Fireplace 1.25 $ 137 Masonry 1.25 $ 137 Masonry (with Calcs) 1.25 _ $ 137 Pre -Fabricated / Metal 1.25 $ 137 Flag pole (over 30 feet in height) 1.25 $ 137 Garage (detached) 1.50 $ 164 Wood frame up to 1,000 s.f. 2.00 $ 219 Masonry up to 1,000 s.f. 2.50 $_ 274 > 1,000 S.f. 3.75 $ 4 11 Grading (Cut and Fill) _ 2.00 $ 219 0-50 Cubic Yards (Cut and Fill) 2.50 $ 274_ 51-100 CY 7.50 $ - ---822 Each Add'I 100 CY or portion thereof 2.00 $ 219 1,000 CY (minimum) 8.00 _$ . 877 Each Add'I 1,000 CY or portion thereof 3.00 $ 329 10,000 CY (minimum) 11.00 $ 1,206 Each Add'I 10,000 CY or portion thereof 4.00 $ 438 100,000 CY (minimum) 16.50 $ �1,808 Each Add'I 10,000 CY or portion thereof 10.00 $ 1,096 MAXIMUS, Inc. Resolution No. 04-293 Page 14 of 28 Rancho Cucamonga - Building Fee Schedule FEE SCHEDULE FOR MISCELLANEOUS ITEMS Building & Safety Department Total Work Item Time Fee Private Street Improvement Water & Sewer: 1-10 tract homes 2.00 $ 219 Water & Sewer: 10 or more lots 2 plus 1 hr/5 lot: Water & Sewer: 5 acre retail/commercial 3 00 $ 329 Water & Dewer: 5 acres or more site 3 plus .5 hr/acr Water &Sewer: industrial lot $ 219� Hydrology/hydraulic Report: single custom lot [12.'VO $ 219Hydrology/hydraulic Report: 1-5 ac. Multi. Res. Home _ 0 - $ 548 Hydrology/hydraulic Report: 5 acres or more site _ 5 plus .5hr/acre Hydrology/hydraulic Report: 5 acres comm./industrial LL6.00 $ 658 Hydrology/hydraulic Report:: 5 acres or more commAndus. 6 plus 1 hr/acre Water Quality Management Plan: $ 1 1-5 acres (all development) 3 00 $ 329 More than 5 acres sites 3 plus 1 hr/per 5 a( Lighting pole 1.25 $ 137 each add'I pole 1.25 $ 337 Mobile Home 1.50 $ 164 Partition -Commercial, Interior (up to 30 I.f.) 2.50 $ 274 Additional partition 2.50 _ $ 274_ Partition - Residential, Interior (up to 30 l.f.) 2.50 $ 274 Additional partition 2.50 $ 274 Patio Cover 0.00 $ Wood frame Wood frame (with Calcs) 2.00 $ 219 Metal frame 1.00 $ 110 Other frame 2._50 $ 274 Additional patio 2.25 _ $ 247 Enclosed 5.75 $ 630 Enclosed, wood frame (with Calcs) 6.00 $ 658 Enclosed, metal frame 1._00 $ 110 Enclosed, metal frame (with Calcs) Enclosed, other frame 2.50 $ 274 Additional enclosed patio 2.50 $ 274 Photovoltaic System 5.00 $ 5.48 Pile Foundation 2.25 ____ ___ _ $ 247 Cast in Place Concrete (first 10 piles) 2.25 $ 247 Additional Piles (increments of 10) 1.75 $ 192 Driven (steel, pre -stressed concrete) 1.75 $ 192 Additional Piles (increments of 10) 1,75 _ig2 $ 192 Pre -Plan Inspection (first hour) - Septic 1.25 $ 137 Pre -Plan Inspection (each add'I hour) 1.25 $ 137 Stucco Applications 0.75 $ 82 Additional Stucco Application 0.75 $ 82 Relocated Building (within 25 miles of city offices) 5.50 $ 603 Each additional 10 miles (or portion thereof) - -- - - ---- 4.00 -- -- $__ -- 438 Retaining Wall (concrete or masonry) First 50 If 1.25 $ 137 Additional retaining wall _ 1.2 5 _ _.. 137 Special Design, 3-10' high (up to 50 If) _ 2.50 _$_ $ 274 Additional retaining wall 2.50 $ Special Design, over 10' high (up to 50 If) 4.00 _274 $ 438 Additional retaining wall 4.00 $ 438 Gravity / Crib Wall - First 50 If 3.75 $ 411 Additional Gravity / Crib Wall 3.75 _ $ Gravity / Crib Wall, over 10' high (up to 50 If) 4.00 _411_ $ 438 Additional Gravity / Crib Wall 4.00 $ 438 MAXIMUS, Inc. Resolution No. 04-293 Page 15 of 28 Rancho Cucamonga - Building Fee Schedule FEE SCHEDULE FOR MISCELLANEOUS ITEMS Building & Safety Department Total Work Item Time Fee 0.00 $_ - Remodel - Residential 500 s.f. Single Story 6.75 $ 740 Kitchen 6.25 $ 685 Additional remodel _ 6.50 $ 712 Re -roofing 0.00 $ Tile/Shake - first 100 sf 0.75 $ 82 Each additional 100 sf Comp/Metal - first 100 sf 0.75 $ 82 Each additional 100 sf Roof Structure Replacement 7.00 $ 767 Additional roof structure replacement 7.00 $ 767 Room Addition - First Story 8.50 $ 932 Up to 500 s.f. 4.50 $ 493 Up to 500 s.f. (with Calcs) 9.75 $ 1,069 Additional room addition (over 500 s.f.) i 9.75 $ 1,069 Additional room addition (over 500 s.f. with Calcs) 9.75 $ 1,069 Room Addition - Multi -story _ _ __. _._.. 0.00 __ _.........._.._.___ $ - Up to 500 s.f. 10.00 Up to 500 s.f. (with Calcs) 10.00 $ 1,096 Additional room addition (over 500 s-f.) 10.00 $ 12096 Additional room addition (over 500 s-f. with Calcs) 10.00 $ 1,096 Sauna - steam 2.75 $ 301 Siding 0.75 $ 82 Stone and Brick Veneer (interior or exterior) 0.75 $ 82 All Other 0.75 $ 82 Additional siding 0.75 $ 82 Signs 0.00 $ Permanent _ 0.75 $ 82 Temporary 0.75 $ 82 Directional 0.50 _ $ 55 Each additional Directional Sign 0.50 $ 55 Freeway sign 8.00 $ 877 Freeway sign with Master Plan 8.00 $ 877 Ground / Roof / Projecting Signs 1 50 $ 164 Rework of any existing Ground Sign 1.50 $ 164 Wall/Awning Sign, Non -Electric 1.00 $ 110 Wall, Electric 1.25 _ $ 137 Skylight -- 0.00 -- _- $ Less than 10 sf 3.00 $ 329 Greater than 10 sf or structural 3.00 $ 329 Spa or Hot Tub (Pre -fabricated) 0.75 $ 82 Stairs - First Flight 1.75 $ 192 Each additional flight 1.75 $ 192 Storage Racks 0.00 $ - 0-8' high (up to 100 If) 10.50 $ 1,151 each additional 100 1f 10.50 $ 1,151 over 8' high (up to 100 If) 10.50 $ 1,151 each additional 100 If 10.50 $ 1,151 Swimming Pool / Spa 0.00 $ Vinyl -lined (up to 800 s.f.) 1.25 $ 137 Fiberglass $ 137 Gunite (up to 800 s.f.) - Custom and to establish master 3.50 $ 364 Additional pool (over 800 s.f.) 1.50 $ 164 Commercial pool (up to 800 sf) 3.50 $ 384 Commercial pool (over 800 sf) 3.50 $ 384 MAXIMUS, Inc. Resolution No. 04-293 Page 16 of 28 Rancho Cucamonga - Building Fee Schedule FEE SCHEDULE FOR MISCELLANEOUS ITEMS Building & Safety Department Work Item Temporary Utility Connection or Occupancy Window or Sliding Glass Door Replacement New Window (non structural) New window (structural shear wall/masonry) Bay Window (structural) ALTERNATE METHODS AND MATERIALS Alternate Methods Category 1 (repeats and minimal complexity) Category 2 (moderate complexity) Category 3 (complex issues) Category 4 (highly complex) OTHER MISCELLANEOUS FEES: Additional plan check fee after (2) rechecks After Hours Plan Review Each additional hour After Hours Inspection Each additional hour Reinspection Fee (first 1/2 hour) Each additional 1/2 hour (or portion thereof) Note: the above covers typical miscellaneous items. Unique or complex items will be determined on a case -by -case basis by the Building & Safety official. Work done without a permit will be assessed regular plan check fees and double inspection fees. Total Time Fee 0.50 $ 55 1.25 $ 137 0.75 $ 82 -- -- 0.75 _ _--- $ 82 1.75 $ 192 --_- -_ 192 0.00 $ - 0.00 $ - ----- 1.50 —---------- $ 164 274 --3.00 $ 329 0.00 __ $ - 0.00 $ - $110lhour _ _ 0.00 $ --2.00 — $-- 219 $�^ 110 _1.00 0.00 $ - 2.00 $ 219 1.00 $ 110 0.50 $ 55 NOTE: Each fee set forth in this table shall be adjusted annually in October each year and it is based on the percentage change of the Consumer Price Index (CPI) for the L.A. - Anaheim - Riverside areas. MAXIMUS, Inc. Resolution No. 04-293 Page 17 of 28 Rancho Cucamonga - Building Fee Schedule MECHANICAL, PLUMBING, AND ELECTRICAL PERMIT FEES Building & Safety Department CURRENT Fee Types Fee based on a per - minute rate of $ 1.83 ADMINISTRATIVE AND MISC. FEES Travel and Documentation standard $54.90 Travel and Documentation each additional trip) $0.00 Permit Issuance $27.45 Each supplemental permit $0.00 MECHANICAL PERMIT FEES Stand Alone Mechanical Plan Check hour) rate $109.80 Unit Fee Schedule (in addition to issuance fee above): $54.90 For the installation or relocation of each forced -air or gravity -type furnace or burner, including ducts and vents attached to such appliance, up to and including 100,000 Btu/h $54.90 For the installation or relocation or each forced -air or gravity -type furnace or burner, including ducts and vents attached to such appliance over 100,000 Btu/h $54.90 For the installation or relocation of each floor furnace, including vent $54.90 For the installation or relocation of each suspended heater, recessed wall heater or floor -mounted unit heater $54.90 For the installation, relocation or replacement of each appliance vent installed and not included in an appliance permit $54.90 For the repair of alteration of, or addition to each heating appliance, refrigeration unit, cooling unit, absorption unit or each heating, cooling, absorption, or evaporative cooling system, including installation of controls regulated by this code $54.90 For the installation or relocation of each boiler or compressor to and including three horsepower, or each absorption system to and including 100,000 Btu/h $54.90 For the installation or relocation of each boiler or compressor to and including three horsepower to and including 15 horsepower, or each absorptions stem over 100,000 Btu/h and including 500,000 Btu/h $54.90 MAXIMUS, Inc. Resolution No. 04-293 Page 18 of 28 Rancho Cucamonga - Building Fee Schedule MECHANICAL, PLUMBING, AND ELECTRICAL PERMIT FEES Building & Safety Department Fee based on a per - minute CURRENT Fee Types rate of $ 1.83 For the installation or relocation of each boiler or compressor over 15 horsepower to and including 30 horsepower, or each absorption system over 500,000 Btu/h to and including 1,000,000 Btu/h $54.90 For the installation or relocation of each boiler or compressor over 30 horsepower to and including 50 horsepower, or for each absorption system over 1,000,000 Btu/h to and including 1,750,000 Btu/h $54.90 For the installation or relocation of each boiler or refrigeration compressor over 50 horsepower, or each absorption system over 1,750,000 Btu/h $54.90 For each air -handling unit to and including 10,000 cubic feet per minute, including ducts attached thereto $54.90 For each air -handling unit over 10,000 cfm $54.90 For each evaporative cooler other than portable type $54.90 For each ventilation fan connected to a single duct $54.90 For each ventilation system which is not a portion of any heating or air- conditioning system authorized by a permit $54.90 For the installation of each hood which is served by mechanical exhaust, including the ducts for such hood $54.90 For the installation or relocating of each domestic type incinerator $54.90 For the installation or relocation of each commercial industrial -type incinerator $54.90 For each appliance or piece of equipment regulated by this code but not classed in other appliance categories, or for which no other fee is listed in this code $54.90 $0.00 Other Mechanical Inspections(per hour $109.80 MAXIMUS, Inc. Resolution No. 04-293 Page 19 of 28 Rancho Cucamonga - Building Fee Schedule MECHANICAL, PLUMBING, AND ELECTRICAL PERMIT FEES Building & Safety Department CURRENT Fee Types Fee based on a per - minute rate of $ 1.83 PLUMBING / GAS PERMIT FEES Stand Alone Plumbing Plan Check hour) rate $ 109.80 On -Site Sewer and Water Plan Check $ 658.80 Unit Fee Schedule (in addition to issuance fee above): $ 54.90 Each plumbing fixture or trap or set of fixtures on one trap (including water, drainage piping, and back protection therefore) $ 54.90 Each building sewer and each trailer park sewer $ 54.90 Rainwatersystems-per drain inside building) $ 54.90 Each cesspool wherepermitted) $ 54.90 Each private sewage disposal system $ 109.80 Each water heater and/or vent $ 54.90 Each industrial waste pretreatment interceptor including its trap and vent, excepting kitchen -type grease interceptors functioning as fixture traps $ 54.90 Installation, alteration, or repair of water piping and/or water -treating equipment, each $ 54.90 Repair or alteration of drainage or vent piping, each fixture $ 54.90 Each lawn sprinkler system on any one meter, including back flow protection devices $ 54.90 Atmospheric -type vacuum breakers not included in lawn sprinkler system: 1 to 5 $ 54.90 Over 5, each $ 54.90 Each backflow protective device other than atmospheric -type vacuum breakers: 2 inches and smaller $ 54.90 Over 2 inches $ 54.90 Each gas piping system of one to four outlets $ 54.90 Each gas piping system of five or more, per outlet $ 54.90 Swimming pool or spa piping including water heater (not including gas piping) $ 54.90 Other Plumbing and Gas Inspections per hour $ 109.80 MAXIMUS, Inc. Resolution No. 04-293 Page 20 of 28 Rancho Cucamonga - Building Fee Schedule MECHANICAL, PLUMBING, AND ELECTRICAL PERMIT FEES Building & Safety Department CURRENT Fee Types Fee based on a per - minute rate of $ 1.83 ELECTRICAL PERMIT FEES Stand Alone Electrical Plan Check hour) rate $ 109.80 $ 27.45 Carnivals and Circuses: $ - Electric Generators and electrically driven rides, each $ 27.45 Mechanically driven rides and walk-through attractions or displays having electric lighting each $ 27.45 System of area and booth lighting, each $ 27.45 Services: $ 27.45 Services of 600 volts or less and not over 200 amperes in rating, $ 27.45 Services of 600 volts or less and over 200 amperes to 1000 amperes in rating, each $ 27.45 Services over 600 volts or over 1000 in rating, each $ 27.45 Temporary Power Services $ - Temporary service power pole or pedestal including all pole or pedestal -mounted receptacle outlets and appurtenances, each $ 109.80 Temporary distribution system and temporary lighting and receptacle outlets for construction sites, decorative light, Christmas tree lots, firework stands, etc., each $ 109.80 Unit Fee Schedule $ - Receptacle, Switch and Lighting Outlets: for receptacle, switch, lighting or other outlets at which current is used or controlled, except services, feeders/meters. First 20, each $ 27.45 Additional outlets, each $ 27.45 Lighting Fixtures $ 27.45 Lighting Fixtures, sockets or other lamp -holding devices, first 20 ea $ 27.45 Additional fixtures, each $ 27.45 Pole orplatform-mounted lighting fixtures, each $ 27.45 Theatrical type lighting fixtures or assemblies, each $ 27.45 $ - MAXIMUS, Inc. Resolution No. 04-293 Page 21 of 28 Rancho Cucamonga - Building Fee Schedule MECHANICAL, PLUMBING, AND ELECTRICAL PERMIT FEES Building & Safety Department Fee based on a per - minute CURRENT Fee Types rate of $ 1.83 Residential Appliances $ - For fixed residential appliances or receptacle outlets for same, including wall -mounted electric ovens; counter -mounted cooking tops; electric ranges, self contained room, console, or through -wall air conditioners; space heaters; food waste grinders; dishwashers; washing machines; water heaters; clothes dryers; or other motor - operated appliances not exceeding one horsepower (HP), kilowatt (KW), or kilovolt -ampere (KVA), in rating, each $ 27.45 Non-residential Appliances: non-residential appliances and self- contained factory -wired, non-residential appliances not exceeding one horsepower (HP), kilowatt (KW), or kilovolt -ampere (KVA), in rating including medical and dental devices; food, beverage, and ice cream cabinets; illuminated show cases, drinking fountains, vending machines, laundry machines; or other similar types of equipment, each $ 27.45 Power Apparatus $ - For motors, generators, transformers, rectifiers, synchronous converters, capacitors, industrial heating, air conditioners and heat pumps, cooking or baking equipment and other apparatus, as follows: $ 27.45 Up to and including 1, each $ 27.45 Over 1 and not over 10, each $ 27.45 Over 10 and not over 50, each $ 27.45 Over 50 and not over 100 each $ 27.45 Over 100 each $ 27.45 Busways $ - Trolley and plug -in -type buswa s, each 100 feet or fraction thereof $ 27.45 Signs, Outline Lighting and Marquees $ - Signs, outline lighting systems or marquees supplied from one branch circuit, each $ 27.45 Additional branch circuits within the same sign, outline lighting system or marquee, each $ 27.45 $ MAXIMUS. Inc. Resolution No. 04-293 Page 22 of 28 Rancho Cucamonga - Building Fee Schedule MECHANICAL, PLUMBING, AND ELECTRICAL PERMIT FEES Building & Safety Department CURRENT Fee Types Fee based on a per - minute rate of $ 1.83 Miscellaneous Apparatus, Conduits and Conductors: $ - Electrical apparatus, conduits and conductors for which a permit is required but for which no fee is herein set forth $ 27.45 Other Electrical Inspections(per hour $ 109.80 Each fee set forth in this table shall be adjusted annually in October each year and it is based on the percentage change of the Consumer Price Index (CPI) for the L.A. - Anaheim - Riverside areas. MAXIMUS, Inc. Rancho Cucamonga Fire Fee Schedule POTENTIAL FEE SCHEDULE FOR MISCELLANEOUS FIRE ITEMS Building & Safety Department Total Time Work Item Unit (each) Fee Standard Hourly Rate $110 FIRE -SPECIFIC ITEMS ���--� -- - �- - -- - - - Fire Sprinkler Systems 1-20 Heads _ per floor or system_ 1.3 _ $125 21.100 Heads per floor or system 2.8 $280 10t- 200 Heads per floor or system 3.8 $380 201 - 350 Heads per floor or system 4.3 _ ----,$430 351 + per floor ors stem 5.3 $530 0.0 $0 Fire Sprinkler -Tenant Improvements: 0.0 _ $0 1-4 Heads _ per floor or system 1.3_ � $130 5.20 Heads per floor or system 1.8 5l 80 21.10D Pleads per floor or system 3.3 $330 101- 200 Heads per floor or system 4.3 $430 _ 201-3_50Heads _ per floor or system__ _ 4.3 $43g 351 + per floor or system 5.3 $530 _ Additional Fire Sprinkler Review Items 0.0 $0 Hydraulic Calculation per remote area 1.3 $130 Antifreeze Sytem per system 0.8 $80 D_ry_Pipe _Valve _ --Deluge/Preaction per valve ��� ��0.8��---$80 - ------ ---- - per valve ---------- ------- ---------------- ---- _---------- --------- Fire Cycle per system 0.3 $30 Pressure Reducing Station per valve 0.8 $80 o.o $o Fire Pump: _ 0.0 _ _ $0'_ Fire Pump per pump 2.3 $230 0.0 $0 Water Storage Tank Gravity _ _ _ per tank _ 1.3 _ __ $130_ _ Pressure pertank 03 $3_0_ ____ 0 0 $0 Fire Standpipe System 0.0 $0 Class I, II, III &Article 81 per outlet 1.3 $130 Fire Alarm System 0.0 $0 0-15 Devices' per system 1.3 $130 16 50 Devices per system 1 8 $180 51-100 Devices per system 2.8 $280 701-500 Devices per system 2.8 _ $280 (for each additio_n_al 25 devices_upto_ 1,0_0_ per system 2.8 $280 1001+ _ _ per system 3.3 $330 (for each additional 100 devices) _ _ per system Devices = All Initiating and indicating appliances -----.-------------- -- _... 0.0 _--- _.__ $0 -_. ------ Additional Fire Alarm Review Items ------ -- ----------- 0.0 ------ ------ $0 -------- Dampers each 0.8 $80 Hi / Lo Alarms_ 0,8 $80 _ ____ Low air / temp Alarms ..... ... . ....._ __ _._...__. . ___..__._. ______each each ......--.----- _ ....-_ 0.8 .__------ ._-._._..------ _ $80 Graphic Annunciator Review each 0.8 ------$80 ---.-._.....---__.-..-----__.-- . __ _._.. 0.0 - --- $0 _-- --_-_--_-_ Hazardous activities or uses _ _ _ _ 0.0 _ _ $0 _Installation Permits __ _ 0.0 Clean Agent Gas Systems - - - -._ - . - --- ---_-- ----- each --.- - - .--- --- 2.3 --- -- $230 - - ----- Dry Chemical Systems _ ... ----, - - ---__. .. _.----- . each ....._.. ...._._-----_ .......1 8 -- $180 ---- ------ Wet Chemical/Kitchen Hood each 3.3 $330 Foam Systems _ _ each _ _ 4.3 _ $430 Paint Spray Booth each 2.8 $280 Vehicle Access Gate each 1.3 $130 _ Monitoring each 4.3 $430 Propane Tank (LPG) each 2.3 $230 Above Ground - Flammable/Combustibule Liquid Tank Wor Pipe per site 4.3 $430 MAXIMUS, Inc. Resolution No. 04-293 Page 23 of 28 Resolution No. 04-293 Page 24 of 28 Rancho Cucamonga Fire Fee Schedule POTENTIAL FEE SCHEDULE FOR MISCELLANEOUS FIRE ITEMS Building Sr Safety Department Work Item Unit Total Time (each) Fee Under Ground - Fiammable/Combustibule Liquid Tank Wor Pipe _ _ per site _ _ 4.3 Fuel Dispensing System Complete per site 4.3 $430 High Piled / Rack / Shelf Storage _ _ each 4.3 $430 Smoke Control UFC Article 81 _ each _ 2.8 _ $280 r 9 Smoke Control IBC Chapte each 0,0 $0 Nurse Call 13 $130 Medical Gas Alarms 2.3 $230 Medical Gas level 1 (Hospital) $0 1.36 outlets _ _ _ _group ­--0.0 3.3 $330_ _ each additional 36 group 0.8� $80 Medical Gas Level 2 (Dental w/ oxygen) 0,0 $0 1 36 outlets group 3 3 $330 each addiflonai 36 group _ 0.8 $fl0 _ Medical Gas Level 3 (Dental) _ per system 1.3 _ $130 Refrigerant System each 2.3 $230 Refrigerant Monitoring System ----- each --- -- -----_ 1.3 _ $130 _ _ 0.0 $0 Renewable Permits ------------- 0.0 $0 ---- Aerosol products (a. 1) per permit_ _ 3.3 $330 _Aircraft refueling vehicles (a.2) _ _ _ _ per permit __ ___2.3 _ $2_30 Aircraft repair hanger (a.3) _ per per _- _-.it _. ...._..__ 2.3 ...___ .__..._. $230 Automobile wrecking yard (a.5) per permit _ _ 2,3 _ $230 Battery system (b.1) per permit 1.3 _ _ _ $130 Candles and open flames in assembly areas(c.t) per permit 1.3 $130 ____Cellulose nitrate film (c.3) _ per permit Cellulose nitrate storage (cA) per permit 1.3 $130 Cellulose fiber storage (c.5) per permit 1.3 $130 Combustible material storage (c.6) per permit 1.3 $130 Compressed gases (c.7) per permit 1.8 $180 Commercial rubbish -handling operetta per permit 2.3 $230 Cryogens (c.9) per permit 2.3 $230 Dry cleaning pier is (d.t) per permit 1.8 $180 Dust producing operations (d.2) per permit 3.3 $330 Exposives or blasting agenst, use or transportation (e.1) per permit 4.3 $430 Fire; manufacture, compound store, s per permit 23 S230 Flammable or combusubule liquids; pipelines; store, handle, use (f.3) per permit 4.3_ $430 _ Fruit npening (f.4) per permit 1.8 $180 Fumigation or thermal insecticide fogg perpermit 1.3 $130 Hazardous materials; store, transport on site, dispense, use, handle (h.1) per permit 4.3 $430 High -piled combustible storage (h.2) per permit $480 Hot -works operations(h.3) _ per permit _____4.8______ 23 Liquefied petroleum gases, store, _ _ _$2_3_0____ use, handle, dispense (1.1) per permit 2.3 $230 Lumber yards (1.3) per permit 1.8 $180 Magnesium working(m.1) per permit 1.8 _ $18_0_ Motor vehicle fuel -dispensing stations --- ---- ----- -._ per permit --_ _ --. _------------ 3.3 $330 Organic coatings (0 2) per permit 2.3 $230 Places of assembly (p.2) per permit 4.3 $430 Radioactive matenais (r 1) per permit 3.3 $330 _ Refrigeration equipment operate (r.2) per permit _ _ 23 _ _ $230_ Repair garages (r 3) per permit 3.8 $380 Spraying or dipping (s.1) _ per permit 3.8 $380 Tire storage (t.2) per permit 2.3 $230 _ _ Wood products(w. 1) per permit 3.3 $330 Activity Permits (Single Event- One Time) _0.0 00 _$0 _ $0 Bowling pin or alley refinishing (b.2) per permit 2.3 $230 _Candles and open flames in assembly per permit _ 1.3 _ $130 _ Carnivals and fairs (c.2) per permit 2.3 $230 Explosive or blasting agents; use, disp per permit 3 3 $330 MAXIMUS. Inc. Resolution No. 04-293 Page 25 of 28 Rancho Cucamonga Fire Fee Schedule POTENTIAL FEE SCHEDULE FOR MISCELLANEOUS FIRE ITEMS Building & Safety Department Total Time Work Item Unit (each) Fee Fireworks; displays (f.2) per permit 2.3 $230 _ Hot work operations (h.3) per permit 2.3 $230 Liquefied petroleum gasses; install co per permit 1.8 $180 Liquid- or gas -fueled vehicles or equipment in assembly buildings (1.2) _ per permit _ 1.8 $180 Mall, covered (m.2) per permit _ _ 6.3 $630 Open burning (o.1) per permit 1.3 $130 Parade floats(p. 1) per permit 1.3 $130 Pyrotechnical special effects material per permit 1.8 $180 Temporary membrane structures, _ tents, and canopies(t.t) per permit 2.3 $230 0.0 $0 Reports 0.0 $0 Life Safety Report _ perhour 0.3....... _...... $30_...... _ Hazardous Material Inventory Statement per hour 0.3 $30 Hazardous Material Management Plan _ per hour 0.3 $30 _ 0.0 $0 Other Fire Fees: 0.0 $0 Hydrants/Underground Fire Service Plan Ch _ each _ _3.3 _ _$330 _ Hydrant Flow Test (existing hydrants) each 1.8 $180 Fire Plans Examiner Special each Reinspection Fee per hour 0.3 $30 Notes: Hours are based on an original review and two resubmittals. It accurately captures the review times for these three review cycles. A fire sprinkler system is defined as the piping down stream of the last control valve excluding auxiliary systems. Multiport standpipe outlets are counted once. The above covers typical fire sevice items. Unique or complex items will be determined on a case -by -case basis by the Building & Safety official. Work done without a permit will be assessed regular plan check fees and double inspection fees. NOTE: Each fee set forth in this table shall be adjusted annually in October each year and it is based on the percentage change of the Consumer Price Index (CPI) for the L.A. - Anaheim - Riverside areas. MAXIMUS, Inc. Resolution No. 04-293 Page 26 of 28 FEE SCHEDULE 1"P�Ximus HELPING GOVERNMENT SERVE THE PEOPLE' ,� � City of Rancho Cucamonga Planning Division Fee Area Fee Tent Tract Map $10,677 CUP $4,737 D/D Review - Res $9,643 D/D Review - Com/Indus $9,286 Initial Study $1,250 Gen Plan Amnd $9,628 Develop Distr Amend $6,651 EIR - Sensitive $4,055 Annexation $7,876 Develop Agreement $9,491 New Specific Plan/Com Plan $8,411 EIR Preparation $24,089 Dev/Design Rev (4 du's or less) $5,411 EIR Review Only $3,142 Hillside Develop Review (5>) $5,362 Hillside Develop Review (<4) $4,887 Landmark Application $2,617 (a) Landmark Alteration $1,531 (a) Mills Act Application $1,076 (a) Minor Develop Review $2,069 Minor Exception $383 Minor Time Extension $431 Mitigation Plan - Simple $474 Preliminary Review $3,976 Sign Permit $70 Temporary Use Permit $112 Temp Use Permit - Model Home $100 Tentative Parcel Map $5,749 Time Extension $431 Uniform Sign Program $1,560 Use Determination $1,467 Variance $1,634 Variance (<4 du's) $1,637 Appeal of city planner decision $1,537 Appeal of a PC decision $1,764 Appeal of a Tract/Parcel Map $1,673 Pre Application review - PC $4,434 Entertainment Permit $3,753 Adult Ent Zoning Permit $1,879 Home Occupation Pemit $101 Large Day Care Permit $432 Public Convenience/Necesssity (ABC) $757 Recycling Facilities Permit $1,965 Status map Application $17 Trail Easement Vacation $4,323 Tree Removal/New Developmenmt $590 Tree Removeable - existing development $401 Land Use Verification Report $68 Street Name Change $3,376 Request to initiate dvl. Code amendment (develi $1,306 ©MAXI M U S. 2004 Resolution No. 04-293 Page 27 of 28 Resolution No. 04-293 Page 28 of 28 Fee Area Fee County Referral $0 CUP - Non Construction $2,014 Government Referral $0 Business License $0 Monthly Status Report $33 Plan Check B-L-G $27 Community Develop Block Grant $0 Long Range Plan Special Projects Counter - General Non -User Fee Activities Grand Total I (a) No fee for residential and small business Applications Those charged as a base fee, plus a per unit or per acre amount, with a maximum set at three times the base fee. Application JiBase Fee lPer Unit Fee Maximum Fee Specific / Community Plan Amendment` $2,866.00 $287.00 per acre 1 $8,598.00 "Should be charged at half rate if filed inconjunction with a General Plan Amendment Deposits Those charged on a time -and -materials basis with a deposit taken up front. Application Deposit Amount Chailege to Environmental Studies $5,000.00 Mitigation Plan (Complex) $1,000.00 Other Application Fees Application Fee On -Site Subdivision sign cash deposit - refundable $500.00 Offf-Site Subdivision sign cash deposit - refundable $500.00 Temporary Use Permit Model Home Restoration Deposit - refundable $5,000.00 Each fee set forth in this table shall be adjusted annually in October each year and it is based on the percentage change of the Consumer Price Index (CPI) for the L.A. - Anaheim - Riverside areas. ©MAXIMUS, 2004