Loading...
HomeMy WebLinkAbout2024-12-17 - Agenda Packet If you need special assistance or accommodations to participate in this meeting, please contact the Planning Department at (909) 477-2750. Notification of 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility. Listening devices are available for the hearing impaired. DECEMBER 17, 2024- 6:00 P.M. DESIGN REVIEW COMMITTEE MEETING AGENDA RAINS ROOM CITY HALL 10500 Civic Center Drive Rancho Cucamonga, CA 91730 A. Call to Order Roll Call: Vice Chairman Al Boling Commissioner James Daniels B. Public Communications This is the time and place for the general public to address the Committee on any item listed or not listed on the agenda. The Committee may not discuss any issue not included on the agenda but set the matter for a subsequent meeting. C. Consent Calendar C1. Consideration to adopt Meeting Minutes of October 1, 2024. D. Project Review Items D1. ENVIRONEMTANL ASSESSMENT, DEVELOPMENT AGREEMENT, TENTATIVE PARCEL MAP, DESIGN REVIEW, CONDITIONAL USE PERMIT, AND CERTIFICATE OF APPROPRIATENESS - CP LOGISTICS VINEYARD LLC – A request subdivide land for the development of three (3) concrete tilt-up industrial buildings totaling approximately 982,096, square feet on approximately 45.96 net acres bound by Vineyard Avenue to the east, 9th Street to the north, Baker Avenue to the west, and the BNSF railroad line to the south, and the rehabilitation of the Baker House, a historic landmark located at 8803 Baker Avenue; APN: 0207-27-125, -27, -39, -40, -89, -93, -94, -96, -97. E. Adjournment The Design Review Committee has adopted Administrative Regulations that set an 11:00 p.m. adjournment time. If items go beyond that time, they shall be heard only with the consent of the Committee. I, Elizabeth Thornhill, Executive Assistant of the City of Rancho Cucamonga, or my designee, hereby certify that a true, accurate copy of the foregoing agenda was posted seventy-two (72) hours prior to the meeting per Government Code 54954.2 at 10500 Civic Center Drive, Rancho Cucamonga, California and on the City’s website. Design Review Committee Meeting Agenda October 1, 2024 DRAFT MINUTES Rancho Cucamonga, CA 91730 New Time: 6:00 p.m. A. Call to Order The meeting of the Design Review Committee held on October 1, 2024. The meeting was called to order by Sean McPherson, Staff Coordinator, at 6:00 p.m. Design Review Committee members present: Vice Chairman Boling and Commissioner Diaz Staff Present: Tabe van der Zwaag, Associate Planner B. Public Communications Staff Coordinator opened the public communication and after noting there were no public comments, closed public communications. C. Consent Calendar C1. Consideration to adopt Meeting Minutes of September 17, 2024. Item C1. Motion carried 2-0 vote. D. Project Review Items D1. ENVIRONMENTAL ASSESSMENT, TENTATIVE MAP, DESIGN REVIEW & VARIANCE – GRAND PACIFIC COMMUNITIES – A request to subdivide approximately 1.7 acres of land into 8 numbered and 4 lettered lots including site plan and design review of 8 duplexes (16 units total), and a variance to reduce the required streetscape setback for a site located between 19th and Hamilton Streets east of Hermosa Avenue in the Medium Residential (M) Zone; APN: 1076-121-03 (Tentative Tract Map SUBTT20662, Design Review DRC2023- 00363, and Variance DRC2024-00300). The project qualifies as a Class 32 exemption under State CEQA Guidelines Section 15332 – Infill Development Projects. Staff presented the item. Committee members asked a number of questions regarding WQMP facilities, wall height, street width, and requirements for completing sidewalks. Additional questions from committee members included landscaping, specifically that the applicant consider a tree type that does not drop pods, the placement of mailboxes, the placement of solar and location of trash cans. Committee Members complimented the design. Committee Member Boling inquired about the need for crosswalks and crossing guards, considering the new proposed street included within the project design would terminate right in front of an elementary school. Committee Members recommended that the applicant contact the school district and City engineering department for requirements on crosswalks and crossing guards. Committee members voted to move the item forward to the full Planning Commission with the motion that the applicant consider flashing beacons in any potential crosswalk and coordinate with the school district on the need for crossing guards and any other requirements the school district may desire. The motion also included that the applicant consider revising the landscape plan as well as incorporate a dog relief station within the WQMP area. The Committee took the following action: Recommend approval to PC. 2-0 Vote. D2. ENVIRONMENTAL ASSESSMENT, DESIGN REVIEW AND CONDITIONAL USE PERMIT – GORRE ARCHITECHTS FOR CAL BOX - A request for site plan and architectural review of 45,993 square foot addition to an existing 98,406 square foot industrial building and a Conditional Use Permit to operate a manufacturing use over 50,000 square feet located on approximately 7.7 acres of land within Mixed Employment 2 (ME2) Zone, located on the east side of Toronto Avenue where it terminates into the BNSF/Metrolink right of way; APN: 0209- 401-05. (Design Review DRC2023-00379 and Conditional Use Permit DRC2024-00288). The project qualifies as a Class 32 exemption under State CEQA Guidelines Section 15332 – Infill Development Projects. Staff presented the item. Committee members asked general questions related to nonconforming setbacks and the project’s compliance with other standards. Committee members asked the applicant questions about the history of their business in Rancho Cucamonga and about business operations related to the proposed addition. Committee members noted that the plan set did not include colored renderings which would have been helpful in their review. Particularly since this is an addition to an existing building, colored renderings would be helpful to distinguish the existing structure from the new addition. Staff responded that these items will be addressed prior to the item going to the Planning Commission. The Committee took the following action: Recommend approval to PC. 2-0 Vote. E. Adjournment Principal Planner Sean McPherson adjourned the meeting at 7:45 p.m. Respectfully submitted, ___________________________ Elizabeth Thornhill, Executive Assistant DESIGN REVIEW COMMENTS December 17, 2024 6:00 p.m. Sean McPherson, AICP, Senior Planner Jared Knight, Assistant Planner ENVIRONEMTANL ASSESSMENT, DEVELOPMENT AGREEMENT, TENTATIVE PARCEL MAP, DESIGN REVIEW, CONDITIONAL USE PERMIT, AND CERTIFICATE OF APPROPRIATENESS - CP LOGISTICS VINEYARD LLC – A request subdivide land for the development of three (3) concrete tilt-up industrial buildings totaling approximately 982,096, square feet on approximately 45.96 net acres bound by Vineyard Avenue to the east, 9th Street to the north, Baker Avenue to the west, and the BNSF railroad line to the south, and the rehabilitation of the Baker House, a historic landmark located at 8803 Baker Avenue; APN: 0207-27-125, -27, -39, -40, -89, -93, -94, -96, -97. Site Characteristics: The project site totals approximately 45.96 acres and is comprised of nine adjacent parcels (APN: 020727125, -27, -39, -40, -89, -93, -94, -96, -97), generally located between Baker Avenue to the West, the Cucamonga Channel and Vineyard Avenue to the east, 9th Street to the North and the AT and SF Railroad to the South. A rail spur running east and west borders the property to the south parallel to 9th Street. The project site has been previously developed with a commercial industrial building but is currently vacant, save for an existing cell phone tower west of Vineyard Avenue along the project’s southern property line, which will remain. The project site also includes a vacant home (hereinafter referred to as the “Baker House”) on the west side of the site at 8803 Baker Avenue. The Baker House is designated as a local historic landmark. The majority of the project site is covered with low-lying vegetation consisting of grasses and weeds. Background and Land Use Context: Notably, the project was deemed complete on June 16, 2021, prior to the adoption of current zoning standards. As such, the project has been analyzed in accordance with standards in place at the time the application was deemed complete when the project site was located within the General Industrial zone (GI) and within the General Industrial General Plan land use designation. The General Plan currently designates the project site as Neo-Industrial Employment District, and it is currently zoned as Neo-Industrial (NI). The site is surrounded by various uses including commercial industrial uses to the north and east and residential uses to the north, northwest and west. The existing General Plan and Zoning designations for the project site and adjacent properties are as follows: Land Use General Plan Zoning Site Vacant Neo-Industrial Employment District Neo-Industrial (NI) North Industrial Warehousing Neo-Industrial Employment District Industrial Employment (IE) Commercial Retail Neo Industrial Employment District Neo-Industrial (NI) Single-Family Neighborhood Center Neighborhood General 3 DRC COMMENTS DESIGN REVIEW DRC2019-00742 – CP LOGISTICS VINEYARD, LLC. December 17, 2024 Page 2 Residential Suburban Neighborhood Low Limited (NG3L) Medium Residential South Residential (City of Ontario) Private School (City of Ontario) Residential Low Density Residential West Single Family Residential Traditional Neighborhood Low/Medium Residential (LM) East Flood Control Channel General Open Space and Facilities Flood Control Utility Corridor (FC/UC) Commercial Retail Neo-Industrial Employment District Neo-Industrial (NI) Project Overview: The applicant proposes to subdivide the project site into four new parcels and construct three new industrial warehouse buildings totaling a cumulative 982,096 square feet in size. Parcel 1 proposes an area of approximately 28 acres with street frontage along 9th street and Vineyard Avenue and will be improved with Building 1 totaling 611,574 square feet. Parcel 2 proposes an area of approximately 6 acres and will be improved with Building 2 totaling 107,541 square feet. Parcel 3 proposes an area of approximately 12 acres and will be improved by Building 3, totaling 262,981 square feet with street frontage along Baker Avenue. Parcel 4 proposes an area of approximately an acre and is currently improved with the historic Baker House addressed 8803 Baker Avenue. Various off-site street improvements are also proposed as part of the project, including but not limited to the installation of a new traffic signal at Baker Avenue and 8th Street. Figure 1: Site Plan Building 1 will have an office area not to exceed 4,000 square feet and a maximum height of 40 DRC COMMENTS DESIGN REVIEW DRC2019-00742 – CP LOGISTICS VINEYARD, LLC. December 17, 2024 Page 3 feet. Building 2 will have office areas on the first and second floor, both not to exceed 2,000 square feet, and a maximum height of 36 feet. Building 3 will have office areas on the first floor not to exceed 2,500 square feet and on the second floor not to exceed 2,000 square feet, and a maximum height of 36 feet. The historic Baker House is proposed to be renovated to accommodate civic/recreational uses. This renovation involves proposed exterior changes to the façade of the building, for which the applicant has requested the approval of a Certificate of Appropriateness, which is included with the development application. See the section below regarding the Certificate of Appropriateness relative to the Design Review Committee’s purview. Vehicular access to the site will be provided by a total of 5 driveways; two located along the Vineyard Avenue frontage of the project, one located along 9th Street, and two located off of Baker Avenue. Notably, truck access will be prohibited at the Baker Avenue driveways, and trucks exiting the project using the 9th Street driveway will be limited to right turns only. Staff notes that the project is being developed on a speculative basis and that no tenants for any buildings have yet been identified. Architecture: The proposed industrial warehouse buildings meet the City’s architectural standards. Each building provides well-defined articulation and a varied use of architectural features creating an attractive aesthetic. For example, the facades facing 9th Street, Vineyard Avenue, and Baker Avenue feature concrete tilt-up façades punctuated with panel joints, reveals, and windows. The northern and southern façades of Building 2, visible from a commercial center to the north and 8th Street to the south, are similarly embellished. Figure 2: Elevation Excerpt The street-facing corners of Buildings 1 and 2 feature office tower elements consisting of insulated vision glass and spandrel glass, with a metal canopy. Building 2 features a similar office tower element for its office space located on the western side of the building and replicates it visually on the eastern side to create symmetry. The project provides a visually consistent color pallet, which includes “Pure White Field Color” (Sherwin Williams SW 7005), “Online” (Sherwin Williams SW 7072), and “Network Gray” (Sherwin Williams SW 7073). The majority of the project site will be secured with an 8’ high tube steel fence. 8’ tilt-up concrete screen walls will be used to screen parking from view. Additionally, a combination retaining wall and 8’ concrete tilt-up screen wall will be constructed to better screen the project from view of the residential units on the northwestern corner of the project site. As previously noted, the proposed project was deemed complete on June 16, 2021 prior to the adoption of current code standards. As such, staff notes that the project meets or exceeds all development standards which were in place at the time the project was deemed complete as DRC COMMENTS DESIGN REVIEW DRC2019-00742 – CP LOGISTICS VINEYARD, LLC. December 17, 2024 Page 4 shown in the table below: Parking and Landscaping: Pursuant to Development Code Section 17.64.050, 17.64.090 and Table 17.64.050-1, auto parking for warehouse/storage uses is based on a tiered ratio as illustrated in the table below. In addition, office areas require parking at 1 stall per 250 square feet. Further, the development code requires 1 trailer loading stall for each dock door proposed. As such, the proposed project is required to provide 188 auto parking stalls and 94 trailer loading stalls for Building 1, 62 auto parking stalls and 12 trailer loading stalls for Building 2, and 105 auto parking stalls and 28 trailer stalls for Building 3. The table below demonstrates the project’s compliance with all parking standards: Parking Ratio Required Parking Provided Parking Complies? Warehouse/storage and office 1 per 1,000 sf for the first 20,000 sf; 1 per 2,000 sf for Building 1: 188 Building 1: 192; YES Development Standard Required Proposed Complies? Building Height Maximum 35 feet (at front setback) and 75 feet (1-foot increment from the front setback line) Building 1: 40 feet; Building 2: 36 feet; Building 3: 36 feet YES Floor Area Ratio (FAR) 40% - 60% Building 1: 49.47%; Building 2: 42.59%; Building 3: 51.21% YES Front Building Setback 25 feet (9th Street); 25 feet (Baker Ave) Building 1: ~269 feet (9th Street); Building 3: ~150 feet (Baker Ave) YES Street Side Setback 35 feet (Vineyard Ave) Building 1: ~166 feet; YES Average Depth of Landscape 35 feet (Vineyard Ave); 25 feet (9th Street); 25 feet (Baker Ave) 43.71 feet (Vineyard Ave); 37.8 feet (9th Street); 42.61 feet (Baker Ave) YES Parking Setback 20 feet (Vineyard Ave); 15 feet (9th Street); 15 feet (Baker Ave) ~39 feet (Vineyard Ave); ~28 feet (9th Street); ~45 feet (Baker Ave) YES Interior Side Yard Setback Min. 5 feet Building 1: ~136 feet; Building 2: ~45 feet; Building 3: ~56 feet both sides YES Rear Yard Setback Min. 0 feet Building 1: ~185 feet Building 2: ~40 feet Building 3: ~26 Feet YES Open Space/Landscape Standards 10% 11.9% YES DRC COMMENTS DESIGN REVIEW DRC2019-00742 – CP LOGISTICS VINEYARD, LLC. December 17, 2024 Page 5 the next 20,000 sf, and 1 per 4,000 sf for remaining sf Office requires 1 per 250 sf stalls; Building 2: 62 stalls; Building 3: 105 stalls Building 2: 62; Building 3: 108 Trailer Loading Stalls 1 per loading dock Building 1: 94; Building 2: 12; Building 3: 28 Building 1: 126; Building 2: 12; Building 3: 30 YES The project also meets all relevant landscape standards, as noted in the table above. Further, the project will result in the planting of 482 new trees, including a total of 32 new street trees along the Vineyard, Baker and 9th frontages. Tentative Parcel Map 20173: As mentioned, the project includes a request to approve a Tentative Parcel Map to consolidate the nine existing parcels within the project area and subdivide them into four new lots, Parcel 1, Parcel 2, Parcel 3, and Parcel 4. Staff has reviewed the Tentative Parcel Map and has determined that it complies with the relevant development standards. Certificate of Appropriateness regarding Baker House: As previously mentioned, the project includes an application for a Certificate of Appropriateness related to improvements proposed to the Baker House located 8803 Baker Avenue. The Baker House was constructed in 1952 and was designated a historic landmark by the city in 2014. Per Historic Preservation Commission Resolution 14-01 as approved on April 23rd, 2014, the Baker House represents one of the few surviving examples of the Folk Architecture style in the city. As it relates to this project, the Baker House will be subdivided and dedicated to the City and the structure will be renovated and repurposed for City use. The dedication and future City use of the Baker House are related to the project’s subject Development Agreement and will be discussed in full at such time that the application is scheduled for public hearings. As it relates to proposed changes to the Baker House itself, the exterior of the Baker House is to be renovated so as to maintain the structure’s character defining features. Specifically, existing mortar is to be reviewed and repointed as structurally required. The existing concrete sills will be repaired and maintained. The front and rear entrances will be installed with new doors. Existing roofing will be removed, evaluated, and replaced as structurally necessary, while maintaining the existing materials and style. The existing concrete front porch will be maintained, except for the removal of steps on the eastern side to be replaced with an ADA-compliant ramp. Currently the Baker House features aluminum-frame window inserts set into the original wooden frames. The applicant has requested to install new aluminum window inserts into the original wooden framing should installing the windows directly into the original frame prove unfeasible. Staff notes that any such changes to the historic structure will be required to be deemed appropriate as part of the applicant’s request for a Certificate of Appropriateness which will be reviewed before the full Planning Commission. DRC COMMENTS DESIGN REVIEW DRC2019-00742 – CP LOGISTICS VINEYARD, LLC. December 17, 2024 Page 6 Figure 2: Baker House Additional Entitlements: Lastly, staff notes that the project application also includes a request for a Conditional Use Permit to allow “wholesale, storage and distribution” uses within the proposed buildings, and a Development Agreement. These applications will be described in full at such time that the application is presented to the full Planning Commission. Neighborhood Meetings: The applicant has hosted two neighborhood meetings related to this project. The first neighborhood meeting was held on April 22, 2022. At this meeting, the primary concern expressed by residents and attendees was truck traffic related to the proposed project given the close proximity to adjacent residential. In response to these concerns, the applicant modified the project to prohibit truck ingress and egress at the Baker Avenue driveways. Further, the applicant also further modified the project to limit truck turns from the 9th Street driveway to “right only,” so as to avoid trucks traveling through the existing residential neighborhood to the west. The second neighborhood meeting was held on August 8, 2024. Again, concerns were raised related to traffic and truck trips. Other general comments included concerns over proposed tenants of the buildings and hours of operation, and the extension of the City’s fiber optic cable network. One resident expressed concern over wall height between their adjacent residential property to the north and the project site, requesting a 10-foot wall to serve as screening. The applicant agreed that this could be accomplished and would be willing to construct a 10-foot tall wall at this location. Staff Comments Major/Secondary Issues: The following broad design issues will be the focus of Committee discussion regarding the project: DRC COMMENTS DESIGN REVIEW DRC2019-00742 – CP LOGISTICS VINEYARD, LLC. December 17, 2024 Page 7 1. All materials used in the renovation of the Baker House shall be consistent with character defining features and character defining themes, and consistent with Secretary of the Interior Standards for Rehabilitation of Historic Structures. Specifically, materials used in windows to be replaced shall be consistent with material historically associated with the building’s architectural theme. 2. Regarding the request for a wall height increase to 10-feet, staff notes that this would require the approval of a Minor Exception. Thus, staff proposes to add a condition of approval on the project such that any Minor Exception for wall height increase be approved prior to the issuance of building permits. Policy Issues: The following items are a matter of Planning Commission policy or development code requirements and should be incorporated into the project design without discussion: 3. All Double Detector Checks (DDC) and Fire Department Connections (FDC) required and/or proposed shall be installed at locations that are not within direct view or line-of-sight of the office corner of the building. The specific locations of each DDC and FDC shall require the review and approval of the Planning Department and Fire Construction Services/Fire Department. All Double Detector Checks (DDC) and Fire Department Connections (FDC) screened behind a 4-foot-high wall. For this project, these walls shall be constructed of poured in-place concrete with design elements incorporated to match the building. 4. Decorative paving shall be provided at each vehicle entrance to the site, behind the public right-of-way. These decoratively paved areas shall extend from the front property line to the building setback line and have a width equal to that of the driveway. 5. Downspouts shall not be visible from the exterior on any elevations of the building. All downspouts shall be routed through the interior of the building walls. Staff Recommendation: Staff requests that the Design Review Committee consider the design (building architecture, site planning, etc.) of the proposed project and recommend the selected action below to the Planning Director / Planning Commission: ☐X Recommend approval of the design of the project as proposed by the applicant. ☐Recommend approval with modifications to the design of the project by incorporating revisions requested by the Committee. Follow-up review by the Committee is not required. The revisions shall be verified by staff prior to review and action by the Planning Director / Planning Commission. ☐Recommend conditional approval of the design of the project by incorporating revisions requested by the Committee. Follow-up review by the Committee is not required. The revisions shall be Conditions of Approval and verified by staff during plan check after review and action by the Planning Director / Planning Commission. ☐Recommend revisions to the design of the project by incorporating revisions requested by DRC COMMENTS DESIGN REVIEW DRC2019-00742 – CP LOGISTICS VINEYARD, LLC. December 17, 2024 Page 8 the Committee. Follow-up review by the Committee is required prior to review and action by the Planning Director / Planning Commission. ☐Recommend denial of the design of the project as proposed by the applicant. Staff Planner: Sean McPherson, Principal Planner/Jared Knight, Assistant Planner Staff Coordinator: Jennifer Nakamura, Deputy Planning Director Exhibit A - Project Plans Exhibit B - Baker House Architectural Assessment Master Site Plan 0-DAB-A1.0 6#$7.#6+10 1((+%+#.75'10.; 8+%+0+6;/#2 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL IC E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-25 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 SITE 2412'46;190'4 #&&4'551(6*'2412'46; #55'5514ž52#4%'.07/$'45 #22.+%#06ž54'24'5'06#6+8' <10+0) HPA INC. 18831 BARDEEN AVE. SUITE 100 IRVINE, CA 92612 TEL:(949)862-2107 CONTACT: CELIO COSIO GENERAL PLAN DESIGNATION: NE0-INDUSTRIAL EMPLOYMENT DISTRICT ZONING: NEO-INDUSTRIAL (NI) SPECIFIC PLAN: N/A TBD CP LOGISTICS VINEYARD LLC 2442 DUPONT DRIVE, IRVINE, CA 92612 TEL: 949-296-2989 CONTACT: MICHAEL SIZEMORE .')#.&'5%4+26+10 SEE CIVIL PLANS FOR FULL DESCRIPTION PARCEL 1: 0207-271-25, PARCEL 2: 0207-271-27, PARCEL 3: 0207-271-94, PARCEL 4: 0207-271-97, PARCEL 5A: 0207-271-39, PARCEL 5B: 0207-271-40, PARCEL 6: 0207-271-89, PARCEL 7: 0207-271-96, PARCEL 8: 0207-271-93 5+6'2.#0-';016'5 5+6'.')'0& Exhibit A 0-DAB-A1.1 OFFICIAL USE ONLY Owner: Project: Consultants: 2TQLGEV0WODGT 4GXKUKQP &CVG &TCYPD[ 6KVNG 5JGGV  %%  HCZ VGN GOCKNJRC"JRCTEJUEQO  KTXKPGEC DCTFGGPCXGPWGÄUVG JRCKPE %KXKN 5VTWEVWTCN /GEJCPKECN 2NWODKPI 'NGEVTKECN .CPFUECRG 5QKNU'PIKPGGT (KTG2TQVGEVKQP 4CPEJQ%WECOQPIC%# 6* 8+0';#4& &72106&4+8' +48+0'%# 6GNÄÄ 6*+'0'5'0) Ä Ä Ä )4'))'.'%64+% *706'4 Ä Ä 59%VJ5VCPF8KPG[CTF#XG %2.1)+56+%58+0';#4&..% / #0)01;. +%'0 5 '&#4 %* + 6 ' % 6 5 6 # 6 ' 1(%#.+(1 4 0+# &#6' 4'0'9#. ÄÄ %Ä 4'8+5+10 4'8+5+10 Building 1 - Site Plan 1-DAB-A1.1 6#$7.#6+10 1((+%+#.75'10.; 8+%+0+6;/#2 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL IC E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-25 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 SITE 2412'46;190'4 #&&4'551(6*'2412'46; #55'5514ž52#4%'.07/$'45 #22.+%#06ž54'24'5'06#6+8' <10+0) HPA INC. 18831 BARDEEN AVE. SUITE 100 IRVINE, CA 92612 TEL:(949)862-2107 CONTACT: CELIO COSIO GENERAL NEO-INDUSTRIAL EMPLOYMENT DISTRICT ZONING: NEO-INDUSTRIAL (NI) SPECIFIC PLAN: N/A TBD CP LOGISTICS VINEYARD LLC 2442 DUPONT DRIVE, IRVINE, CA 92612 TEL:949-296-2989 CONTACT: MICHAEL SIZEMORE .')#.&'5%4+26+10 SEE CIVIL PLANS FOR FULL DESCRIPTION PARCEL 1: 0207-271-25, PARCEL 2: 0207-271-27, PARCEL 3: 0207-271-94, PARCEL 4: 0207-271-97, PARCEL 5A: 0207-271-39, PARCEL 5B: 0207-271-40, PARCEL 6: 0207-271-89, PARCEL 7: 0207-271-96, PARCEL 8: 0207-271-93 5+6'2.#0-';016'5 5+6'.')'0& Bldg 1-Floor Plan 1-DAB-A2.1 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL IC E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-23 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 -';016'5Ä(.1142.#0 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL I C E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-23 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 Bldg 1 - Elevations 1-DAB-A3.1 -';016'5Ä'.'8#6+105 %1.145%*'&Ä'.'8#6+105 ).#<+0).')'0& Bldg 1 - Roof Plan 1-DAB-A4.1 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL I C E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-23 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 Bldg 2-Site Plan 2-DAB-A1.1 6CDWNCVKQP 1((+%+#.75'10.; 8+%+0+6;/#2 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL IC E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-25 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 SITE 2412'46;190'4 #&&4'551(6*'2412'46; #55'5514ž52#4%'.07/$'45 #22.+%#06ž54'24'5'06#6+8' <10+0) HPA INC. 18831 BARDEEN AVE. SUITE 100 IRVINE, CA 92612 TEL:(949)862-2107 CONTACT: CELIO COSIO GENERAL PLAN DESIGNATION: NEO-INDUSTRIAL EMPLOYMENT DISTRICT ZONING: NEO-INDUSTRIAL (NI) SPECIFIC PLAN: N/A TBD CP LOGISTICS VINEYARD LLC 2442 DUPONT DRIVE, IRVINE, CA 92612 TEL:949-296-2989 CONTACT: MICHAEL SIZEMORE .')#.&'5%4+26+10 SEE CIVIL PLANS FOR FULL DESCRIPTION PARCEL 1: 0207-271-25, PARCEL 2: 0207-271-27, PARCEL 3: 0207-271-94, PARCEL 4: 0207-271-97, PARCEL 5A: 0207-271-39, PARCEL 5B: 0207-271-40, PARCEL 6: 0207-271-89, PARCEL 7: 0207-271-96, PARCEL 8: 0207-271-93 5+6'.')'0&5+6'2.#0-';016'5 Bldg 2-Floor Plan 2-DAB-A2.1 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL IC E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-23 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 -';016'5Ä(.1142.#0 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL I C E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-23 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 Bldg 2-Elevations 2-DAB-A3.1 -';016'5Ä'.'8#6+105 %1.145%*'&Ä'.'8#6+105 ).#<+0).')'0& Building 2 - Roof Plan 2-DAB-A4.1 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL I C E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-23 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 Building 3-Site Plan 3-DAB-A1.1 6#$7.#6+10 1((+%+#.75'10.; 8+%+0+6;/#2 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL IC E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-25 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 SITE 2412'46;190'4 #&&4'551(6*'2412'46; #55'5514ž52#4%'.07/$'45 #22.+%#06ž54'24'5'06#6+8' <10+0) HPA INC. 18831 BARDEEN AVE. SUITE 100 IRVINE, CA 92612 TEL:(949)862-2107 CONTACT: CELIO COSIO GENERAL PLAN DESIGNATION: NEO-INDUSTRIAL EMPLOYMENT DISTRICT ZONING: NEO-INDUSTRIAL (NI) SPECIFIC PLAN: N/A T.B.D. CP LOGISTICS VINEYARD LLC 2442 DUPONT AVE IRVINE, CA 92612 TEL: 949-296-2989 CONTACT: MICHAEL SIZEMORE .')#.&'5%4+26+10 SEE CIVIL PLANS FOR FULL DESCRIPTION 5+6'2.#0-';016'5 5+6'.')'0& PARCEL 1: 0207-271-25, PARCEL 2: 0207-271-27, PARCEL 3: 0207-271-94, PARCEL 4: 0207-271-97, PARCEL 5A: 0207-271-39, PARCEL 5B: 0207-271-40, PARCEL 6: 0207-271-89, PARCEL 7: 0207-271-96, PARCEL 8: 0207-271-93 Bldg 3 - Floor Plan 3-DAB-A2.1 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL IC E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-23 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 -';016'5Ä(.1142.#0 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL IC E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-25 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 Bldg 3-Elevation 3-DAB-A3.1 -';016'5Ä'.'8#6+105 %1.145%*'&Ä'.'8#6+105 ).#<+0).')'0& Roof Plan 3-DAB-A4.1 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL I C E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-25 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 AVG. DEPTH OF EX-1.0 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL IC E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-23 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 TOTAL FRONTAGE (LF) OF LANDSCAPE REQUIRED TO ACHIEVE 25' AVERAGE DEPTH OF LANDSCAPE SETBACK: TOTAL LANDSCAPE AREA REQUIRED TO ACHIEVE 25' AVERAGE DEPTH OF LANDSCAPE SETBACK: TOTAL LANDSCAPE AREA PROVIDED, AS SHOWN ON PLAN ABOVE: TOTAL AVERAGE DEPTH OF LANDSCAPE SETBACK PROVIDED: (TOTAL LANDSCAPE AREA PROVIDED / TOTAL FRONTAGE (LF) OF LANDSCAPE REQUIRED) (TOTAL FRONTAGE (LF) OF LANDSCAPE REQUIRED x 25' AVERAGE DEPTH OF LANDSCAPE REQUIRED) 13,994 S.F./328.4' = 42.61' 328.4' X 25' = 8,210 S.F. 156.83' + 31' + 31.16' + 109.41= 328.4' TOTAL FRONTAGE (LF) OF LANDSCAPE REQUIRED TO ACHIEVE 25' AVERAGE DEPTH OF LANDSCAPE SETBACK: TOTAL LANDSCAPE AREA REQUIRED TO ACHIEVE 25' AVERAGE DEPTH OF LANDSCAPE SETBACK: TOTAL LANDSCAPE AREA PROVIDED, AS SHOWN ON PLAN ABOVE: TOTAL AVERAGE DEPTH OF LANDSCAPE SETBACK PROVIDED: (TOTAL LANDSCAPE AREA PROVIDED / TOTAL FRONTAGE (LF) OF LANDSCAPE REQUIRED) (TOTAL FRONTAGE (LF) OF LANDSCAPE REQUIRED x 25' AVERAGE DEPTH OF LANDSCAPE REQUIRED) 32,472 S.F./859' = 37.80' 3,220 S.F. + 29,252 S.F. = 32,472 S.F. 859' X 25' = 21,475 S.F. 73' + 786' = 859' AVERAGE DEPTH OF LANDSCAPE ALONG BAKER AVENUE AVERAGE DEPTH OF LANDSCAPE ALONG E 9TH STREET TOTAL FRONTAGE (LF) OF LANDSCAPE REQUIRED TO ACHIEVE 35' AVERAGE DEPTH OF LANDSCAPE SETBACK: TOTAL LANDSCAPE AREA REQUIRED TO ACHIEVE 35' AVERAGE DEPTH OF LANDSCAPE SETBACK: TOTAL LANDSCAPE AREA PROVIDED, AS SHOWN ON PLAN ABOVE: TOTAL AVERAGE DEPTH OF LANDSCAPE SETBACK PROVIDED: (TOTAL LANDSCAPE AREA PROVIDED / TOTAL FRONTAGE (LF) OF LANDSCAPE REQUIRED) (TOTAL FRONTAGE (LF) OF LANDSCAPE REQUIRED x 35' AVERAGE DEPTH OF LANDSCAPE REQUIRED) 17,528 S.F./401.00' = 43.71' 8,132 S.F. + 6,521 S.F. + 2,875 S.F. = 17,528 S.F. 401.00' X 35' = 14,035 S.F. 56.83' + 142.75' + 201.42' = 401.00' AVERAGE DEPTH OF LANDSCAPE ALONG VINEYARD AVE LANDSCAPE SETBACK (BY STREET) 6,464 S.F. + 1,395 S.F. + 1,321 + 4,814 S.F. = 13,994 S.F. EXISTING OVERHEAD EX-2.0 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL IC E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-23 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 .')'0& UTILITY PROPERTY LINE R 3 0 ' R30' R15' R15' R30 ' R 3 0 ' R40' R 4 0 ' R3 0 ' R 3 0 ' R 1 0 ' R10' R30' R 3 0 ' R20 ' R 2 0 ' R 4 6 ' R 2 0 ' R80' R 8 0 ' PROPERTY LINE PROPERTY LINE PROPERTY LINE PR O P E R T Y L I N E PROPERTY LINE PROPERTY LINE PR O P E R T Y L I N E P R O P E R T Y L I N E EXISTING CELL TOWER TO REMAIN HISTORICAL BLDG. TO REMAIN NET: 21,865 SF (0.501 AC) 370'55'186'-11"10'109'-2" 67 5 ' - 3 " 61 ' - 9 " 34 ' - 1 0 " 39 ' - 1 0 " 26'26'26'26' 75'-2" 26' 56'56'-7" 35 ' 18 6 ' 26 ' 40 ' 40 ' 1027'-11"109'43'-2"94'-10" 61 0 ' 17 5 ' 13 ' - 1 " 23 9 ' - 1 1 " 28 ' - 3 " 5' 5' 5' - 3 " 80 ' 65 ' 26 ' 26 ' 40 ' 26 ' DR I V E W A Y 40 ' DR I V E W A Y 40' DRIVEWAY 26 ' DR I V E W A Y 26 ' DR I V E W A Y 26 ' 26' 40 ' 26' 40'26' 26 ' PR O P E R T Y L I N E PR O P E R T Y L I N E 40' 40' B EX-3.0 25'-11"26'-2" 460' 21 4 ' R 6 6 ' R6 6 ' R 3 0 ' R29 ' - 6 " R29 ' - 6 " R20 ' R15' R15' R22 ' R 2 0 ' R1 2 ' - 4 " R126' R20' R20' R20' FIRE ACCESS PLAN EX-3.0 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL IC E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-25 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 241,'%6+0(14/#6+10%1&'#0#.;5+5 #..19#$.'#4'#%#.%7.#6+10 CODE ANALYSIS BASED ON 2022 CBC NOTICE SIGN LOCATIONS EX-4.0 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL IC E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-25 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 .#4)'016+(+%#6+105+)0 DESIGN REVIEW FOR THREE BUILDINGS TOTALING 982,096 SQ. FT. ON 45.96 ACRES For information Contact City of Rancho Cucamonga's Planning Department 10500 Civic Center Drive (909) 477-2750 CP LOGISTICS VINEYARD LLC Applicant: FILE NO.: DRC 2019-00742 Public Hearing NOTICE OF FILING .#4)'016+(+%#6+105+)0'.'8#6+10 SITE WALL & FENCE PLAN EX-5.0 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL IC E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-23 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 5+6'2.#0-';016'5.')'0& Setback vs. T.O.P Height EX-6.0 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL IC E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-23 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 SITE SECTION EX-7.0 -';/#2 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL IC E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-23 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 SITE CIRCULATION EX-8.0 .')'0& Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL IC E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-23 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 Line of Sight EX-9.0 Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: 18411 C.C. 12/07/20 fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: Rancho Cucamonga, CA 9TH & VINEYARD 2442 DUPONT DRIVE IRVINE, CA 92612 Tel: 949-296-2989 THIENES ENG. - - - GREGG ELECTRIC HUNTER - - SWC 9th St. and Vineyard Ave. CP LOGISTICS VINEYARD LLC M ANGNOYL I C E N S E D A R CH I T E C T S T A T E OF C A L I F O R NIA DATE RENEWAL 3-31-23 C-29451 REVISION 1 12/07/20 REVISION 2 10/21/22 – · · · · – · · – · · · · -';/#2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.5 1.0 0.3 1.1 0.2 0.6 0.1 0.4 0.1 0.4 0.1 0.4 0.1 0.4 0.2 0.6 0.2 1.0 0.2 0.7 0.1 0.5 0.1 0.4 0.1 0.4 0.1 0.4 0.1 0.4 0.2 0.7 0.2 0.9 0.2 0.5 0.2 0.4 2.1 3.2 3.3 2.2 1.3 1.2 1.3 1.5 1.6 1.6 1.8 2.1 3.1 3.0 1.9 1.6 1.9 2.9 2.8 1.7 1.5 2.0 2.9 2.6 1.6 1.5 2.1 2.9 2.5 1.6 1.5 2.1 2.8 2.3 1.5 1.5 2.2 2.8 2.2 1.5 1.5 2.3 2.7 2.0 1.4 1.5 2.3 2.7 1.8 1.1 1.1 1.1 1.1 1.1 1.1 1.0 1.1 1.3 1.4 1.9 1.9 2.3 2.3 2.2 2.1 1.9 1.7 1.8 2.1 2.4 2.4 2.6 2.9 3.8 3.7 2.7 2.5 2.7 3.7 3.5 2.6 2.5 2.8 3.8 3.3 2.5 2.5 2.8 3.8 3.2 2.5 2.5 2.9 3.9 3.1 2.5 2.5 3.0 3.9 3.0 2.5 2.5 3.2 3.9 2.9 2.5 2.5 3.2 3.8 2.6 1.6 1.9 1.8 1.6 1.7 1.5 1.7 1.7 1.4 1.7 2.0 3.3 3.5 1.9 1.6 1.5 1.5 1.7 1.9 2.3 2.9 3.0 3.1 2.7 2.4 2.3 2.2 1.9 2.0 1.9 2.0 2.0 1.9 1.9 1.9 2.0 2.0 1.9 1.9 1.9 2.0 1.9 1.9 1.9 1.9 2.0 1.9 1.9 1.9 1.9 2.0 1.9 1.9 1.9 1.9 2.0 1.9 1.9 1.9 2.0 2.1 1.8 2.5 4.0 3.8 2.6 2.3 2.4 3.4 3.8 2.4 2.1 2.1 3.5 3.6 1.5 1.2 1.1 1.2 1.5 1.9 2.4 3.0 3.3 3.1 2.5 2.0 1.6 1.4 1.4 1.4 1.3 1.2 1.2 1.3 1.4 1.3 1.2 1.2 1.3 1.4 1.3 1.2 1.3 1.3 1.3 1.3 1.2 1.3 1.3 1.3 1.3 1.2 1.3 1.3 1.3 1.3 1.2 1.3 1.4 1.3 1.3 1.3 1.4 1.5 1.7 2.1 2.7 2.7 2.2 1.9 2.1 2.6 2.7 2.1 1.9 1.8 2.4 2.4 1.5 1.3 1.2 1.4 1.6 2.0 2.4 3.0 3.2 2.9 2.3 1.8 1.4 1.1 1.1 1.1 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.1 1.2 1.4 1.4 1.7 1.8 1.7 1.4 1.4 1.4 1.6 1.7 1.4 1.5 1.8 2.3 1.9 1.8 1.5 1.6 1.8 1.9 2.1 2.3 2.5 2.7 2.5 2.2 1.8 1.4 1.3 1.2 1.2 1.2 1.1 1.1 1.2 1.2 1.1 1.1 1.1 1.1 1.1 1.2 1.1 1.1 1.1 1.2 1.2 1.1 1.1 1.2 1.2 1.1 1.1 1.1 1.2 1.1 1.1 1.1 1.2 1.1 1.2 1.2 1.3 1.5 1.8 1.9 2.5 2.2 2.0 1.9 1.9 2.1 2.2 1.9 1.6 1.6 1.7 2.4 2.6 1.8 1.7 1.8 1.9 2.0 2.1 2.3 2.5 2.5 2.3 2.2 2.0 1.7 1.4 1.5 1.6 1.4 1.3 1.5 1.5 1.4 1.3 1.5 1.5 1.4 1.3 1.5 1.5 1.4 1.4 1.5 1.5 1.3 1.4 1.5 1.5 1.3 1.4 1.5 1.5 1.3 1.4 1.5 1.5 1.3 1.5 1.6 1.7 1.8 2.3 2.9 3.9 3.3 2.5 2.4 3.0 3.7 3.4 2.4 1.7 1.7 2.0 3.7 3.9 1.8 1.6 1.8 1.9 2.2 2.2 2.4 2.5 2.3 2.4 2.4 2.6 2.2 2.0 2.2 2.3 2.0 1.9 2.2 2.3 2.0 1.9 2.2 2.3 2.0 1.9 2.3 2.3 1.9 2.0 2.3 2.3 1.9 2.0 2.3 2.2 1.9 2.0 2.3 2.2 1.9 2.0 2.4 2.1 1.9 2.1 2.4 2.2 2.1 2.5 2.0 3.8 2.6 1.7 1.7 1.9 3.0 3.4 1.8 1.6 1.7 1.9 2.3 2.7 3.4 3.5 2.7 2.7 3.2 4.0 3.1 2.7 3.1 3.6 2.8 2.6 3.2 3.6 2.8 2.6 3.2 3.5 2.7 2.6 3.3 3.4 2.7 2.7 3.4 3.3 2.6 2.7 3.5 3.2 2.6 2.8 3.6 3.1 2.6 2.9 3.6 3.1 2.6 2.9 3.6 2.9 2.5 2.8 3.2 3.9 2.8 1.9 1.7 1.7 2.1 2.0 1.7 1.7 1.7 1.8 2.2 2.5 3.1 2.5 1.9 1.9 1.9 2.0 1.6 1.7 1.6 1.5 1.5 1.8 1.9 2.8 2.3 1.9 1.9 1.8 2.2 2.2 1.4 1.5 1.6 1.6 2.6 2.8 3.4 2.5 1.8 1.8 2.0 3.3 3.6 1.4 1.4 1.6 1.8 3.3 3.3 3.8 2.7 1.7 1.6 2.0 3.4 3.6 1.4 1.3 1.5 1.8 2.6 2.8 2.6 2.0 1.6 1.7 1.7 2.2 2.3 1.4 1.4 1.6 1.8 2.5 2.7 1.9 1.9 1.7 1.8 1.9 2.0 1.6 1.4 1.5 1.7 1.9 3.2 3.3 2.0 1.8 1.6 1.7 1.8 2.1 2.0 1.4 1.5 1.7 1.9 3.4 3.4 2.7 2.0 1.5 1.6 1.8 2.7 3.3 1.4 1.4 1.6 1.8 2.6 2.8 3.7 2.5 1.5 1.5 2.0 3.5 4.0 1.4 1.4 1.5 1.8 2.6 2.7 2.8 2.0 1.5 1.8 1.9 2.4 2.7 1.3 1.4 1.6 1.9 3.3 3.3 2.0 1.8 1.6 1.9 2.1 2.2 1.7 1.2 1.6 1.9 2.1 3.3 3.3 1.9 1.8 1.6 1.7 1.9 2.1 1.6 1.1 2.1 2.4 2.1 2.6 2.7 2.5 1.9 1.4 1.5 1.6 2.1 2.3 2.8 2.6 2.2 2.7 2.8 3.6 2.5 1.4 1.3 1.6 2.2 2.9 3.5 2.7 2.2 3.4 3.4 3.1 2.2 1.4 1.4 1.5 1.8 1.9 2.5 2.4 2.2 3.2 3.3 2.1 1.8 1.4 1.4 1.5 1.5 1.6 2.2 2.0 2.6 2.7 2.0 1.8 1.4 1.4 1.3 1.0 1.1 1.7 1.9 2.7 2.8 2.4 1.9 1.3 1.0 1.6 2.0 3.5 3.5 3.4 2.6 1.4 1.3 1.9 2.1 3.1 3.2 3.6 2.6 1.4 2.1 2.3 2.1 2.6 2.7 4.0 2.3 3.2 2.6 2.2 2.7 2.9 3.6 3.6 1.7 3.1 2.6 2.2 3.6 3.5 2.1 2.7 1.9 2.1 2.4 2.2 3.0 3.2 2.9 2.7 1.7 1.3 1.9 2.0 2.5 2.6 2.4 4.0 2.1 1.1 1.7 1.9 2.7 2.9 2.4 2.4 1.1 1.1 1.9 2.3 3.3 3.3 3.0 2.4 1.4 1.5 2.3 2.2 3.1 2.5 3.5 3.6 1.7 2.5 2.4 2.1 2.6 1.4 1.7 2.9 2.0 3.4 2.5 2.2 2.7 3.9 2.7 2.1 1.0 2.3 2.2 1.9 2.4 3.5 3.9 2.8 1.2 1.3 1.8 1.7 2.1 3.0 2.0 2.3 2.5 2.7 3.2 3.8 3.0 2.6 3.1 3.7 2.9 2.6 3.2 3.7 2.8 2.6 3.3 3.6 2.8 2.7 3.4 3.5 2.7 2.7 3.5 3.4 2.7 2.8 3.6 3.3 2.6 2.8 3.7 3.2 2.6 2.9 3.7 3.1 2.5 2.7 3.2 2.2 2.8 3.3 1.8 1.0 1.4 1.5 2.1 2.8 3.4 3.3 3.3 2.7 2.5 2.5 2.2 2.0 2.2 2.3 2.1 1.9 2.2 2.3 2.0 1.9 2.2 2.3 2.0 2.0 2.2 2.3 2.0 2.0 2.3 2.2 2.0 2.0 2.3 2.2 1.9 2.0 2.3 2.2 1.9 2.1 2.3 2.1 1.8 1.9 1.9 1.8 1.8 1.7 1.2 1.5 1.4 1.9 2.7 3.4 3.5 3.4 2.7 2.2 2.0 1.7 1.5 1.7 1.7 1.6 1.5 1.6 1.7 1.5 1.5 1.6 1.7 1.5 1.5 1.7 1.7 1.5 1.5 1.7 1.7 1.5 1.6 1.7 1.7 1.5 1.6 1.7 1.7 1.5 1.6 1.8 1.7 1.4 1.5 1.5 1.3 1.2 1.6 2.2 2.1 1.9 2.4 3.1 3.2 3.1 2.4 2.0 1.7 1.5 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.3 1.3 1.3 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.4 1.5 1.7 1.8 1.7 1.7 1.7 1.5 1.3 1.0 1.4 2.3 4.0 2.3 2.2 2.2 2.3 2.3 2.0 1.8 1.6 1.5 1.4 1.4 1.3 1.3 1.3 1.4 1.4 1.4 1.3 1.3 1.3 1.4 1.4 1.4 1.4 1.3 1.3 1.4 1.4 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.5 1.7 2.0 2.0 2.0 1.9 1.7 1.3 1.2 2.1 3.9 2.5 1.8 1.8 1.7 1.7 1.7 1.8 1.8 1.7 1.5 1.5 1.6 1.7 1.7 1.6 1.5 1.4 1.5 1.7 1.7 1.7 1.6 1.5 1.6 1.7 1.8 1.8 1.8 1.7 1.8 1.8 1.9 1.8 1.8 1.8 1.6 1.9 2.5 3.3 2.7 1.8 1.9 2.8 2.5 1.3 1.5 1.7 1.9 2.1 2.3 2.3 2.1 1.9 1.9 2.0 2.2 2.3 2.0 1.9 1.8 1.9 2.2 2.3 2.2 2.0 1.9 2.0 2.2 2.4 2.4 2.2 2.2 2.2 2.4 2.5 2.4 2.4 2.4 1.9 1.3 1.4 2.1 1.6 1.7 2.8 2.9 2.2 1.6 1.6 1.8 2.2 2.7 3.2 3.1 2.6 2.3 2.3 2.6 3.1 3.1 2.7 2.3 2.1 2.4 3.0 3.2 3.0 2.4 2.3 2.4 2.9 3.2 3.2 2.8 2.6 2.7 3.2 3.2 3.1 2.8 2.7 2.6 2.1 2.7 4.0 2.2 1.9 1.9 2.4 3.0 3.3 3.2 2.8 2.4 2.4 2.8 3.2 3.3 2.9 2.4 2.2 2.5 3.1 3.4 3.2 2.6 2.3 2.5 3.1 3.3 3.3 2.9 2.8 2.8 3.3 3.3 3.2 2.9 2.9 4.0 1.4 2.2 3.9 3.7 2.3 2.2 2.0 2.2 2.6 3.0 3.0 2.5 2.2 2.2 2.5 3.0 3.0 2.6 2.2 2.1 2.3 2.8 3.0 2.8 2.3 2.2 2.3 2.7 3.1 3.0 2.6 2.5 2.5 2.9 2.9 2.7 2.6 2.7 3.9 1.8 2.6 3.2 2.3 2.0 1.8 1.9 1.9 2.0 2.0 1.8 1.7 1.8 1.9 2.1 2.1 1.9 1.7 1.7 1.8 1.9 2.0 1.9 1.8 1.7 1.8 1.9 2.0 2.0 2.0 1.9 1.9 1.9 1.9 2.0 2.1 2.3 2.4 1.2 2.0 2.2 1.4 1.4 1.4 1.3 1.2 1.2 1.3 1.4 1.4 1.3 1.2 1.1 1.2 1.3 1.4 1.3 1.2 1.2 1.2 1.3 1.4 1.4 1.3 1.3 1.3 1.3 1.3 1.4 1.7 1.7 1.3 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 49 DOCK DOORS 45 DOCK DOORS EXISTING CELL E . 9 t h S T R E E T TOWER TO REMAIN V I N E Y A R D A V E N U E S A N B E R N A R D I N O C O U N T Y EV CHARGING ONLY VA N  EV CH A R G I N G ON L Y EV CH A R G I N G ON L Y CL E A N A I R  VA N 3O O L  E V EV CHARGING ONLY CL E A N A I R  VA N 3O O L  E V EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY EV CHARGING ONLY VA N CLEAN AIR VAN 3OOLEV3L 2   H S 3L 2  5 A 3L2 A 3L2 A 3L24 A 3L24 A 3L24 A 3L24 A 3L 2  4 A 3L 2  4 A 3L 4  4 H S WL24 WL24 WL24 WL24 WL24 WL1  2 WL1  2 WL1  2 WL 2  4 WL24 A WL 2  4 A WL 2  4 A WL 2  4 A WL 2  4 A 3L25 WL 2  4 WL 2  4 WL 2  4 WL 2  4 WL 2  4 WL 2  4 WL 2  4 WL 2  4 WL 2  4 WL24 A WL24 A WL24 A WL24 A WL24 A WL24 A WL24 A WL 2  4 A WL 2  4 A WL 2  4 A WL 2  4 A WL 2  4 A WL 2  4 A WL 2  4 A WL 2  4 A WL 2  4 A WL 2  4 A WL1  2 3L 2   A 3L   5 [ 2 A3L   5 [ 2 A3L   5 [ 2 A3L   5 [ 2 A3L   5 [ 2 A 3L 2   A 3L 2   A 3L   5 [ 2 A 3L   5 [ 2 A 3L 4  4 H S 3L 4  4 H S 3L 4  4 H S 3L 4  4 H S 3L 4  4 H S 3L 4  4 H S 3L 4  4 H S 3L1HS 3L1HS 3L1HS 49 DOCK DOORS 45 DOCK DOORS E . 9 t h S T R E E T B A K E R A V E N U E V I N E Y A R D A V E N U E S A N B E R N A R D I N O C O U N T Y F L O O D C O N T R O L C H A N N E L 28 D O C K D O O R S 12 DOCK DOORS E . 9 t h S T R E E TE . 9 t h S T R E E T Calculation Summary Label CalcType Units Avg Max Min Avg/Min 8th St Illuminance Fc 0.00 0.0 0.0 N.A. 9th St Illuminance Fc 0.00 0.1 0.0 N.A. Baker Street Illuminance Fc 0.00 0.0 0.0 N.A. NEFloodChannel Illuminance Fc 0.00 0.0 0.0 N.A. NeighborsNW Illuminance Fc 0.05 1.1 0.0 N.A. Site Illuminance Fc 2.12 4.0 0.9 2.36 Vineyard Illuminance Fc 0.00 0.0 0.0 N.A. BUG RATINGDESCRI3TIONSYMBOL COM3LIES WITH CAL GREEN 5.1.8 FIXTURE LEGEND B1UOG23L1HS YES TY3E  RSX2LED315KRHS LED CUTOFF WHOUSE SIDE SHIELD ON 22  S4UARE STEEL 3OLE ON 2  HIGH CONC BASE IN AUTO 3ARKING 21 S4UARE STEEL 3OLE ON 4 HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25 MAX OVERALL HEIGHT B2UOG23L14 YES TY3E 4 RSX2LED315KR4 LED CUTOFF ON 22  S4UARE STEEL 3OLE ON 2  HIGH CONC BASE IN AUTO 3ARKING 21 S4UARE STEEL 3OLE ON 4 HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25 MAX OVERALL HEIGHT BUOG3L2YES TY3E  RSX2LED325KR LED CUTOFF ON 22  S4UARE STEEL 3OLE ON 2  HIGH CONC BASE IN AUTO 3ARKING 21 S4UARE STEEL 3OLE ON 4 HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25 MAX OVERALL HEIGHT B1UOG23L2HS YES TY3E  RSX2LED325KRHS LED CUTOFF WHOUSE SIDE SHIELD ON 22  S4UARE STEEL 3OLE ON 2  HIGH CONC BASE IN AUTO 3ARKING 21 S4UARE STEEL 3OLE ON 4 HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25 MAX OVERALL HEIGHT B2UOG3L24 YES TY3E 4 RSX2LED325KR4 LED CUTOFF ON 22  S4UARE STEEL 3OLE ON 2  HIGH CONC BASE IN AUTO 3ARKING 21 S4UARE STEEL 3OLE ON 4 HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25 MAX OVERALL HEIGHT B5UOG3L25 YES TY3E 5 RSX2LED325KR5 LED CUTOFF ON 22  S4UARE STEEL 3OLE ON 2  HIGH CONC BASE IN AUTO 3ARKING 21 S4UARE STEEL 3OLE ON 4 HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25 MAX OVERALL HEIGHT B5UOG3L5 YES TY3E 5 RSX2LED35KR5 LED CUTOFF ON 22  S4UARE STEEL 3OLE ON 2  HIGH CONC BASE IN AUTO 3ARKING 21 S4UARE STEEL 3OLE ON 4 HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25 MAX OVERALL HEIGHT B1UOG3L44HS YES TY3E 4 RSX2LED345KR4HS LED CUTOFF WHOUSE SIDE SHIELD ON 22  S4UARE STEEL 3OLE ON 2  HIGH CONC BASE IN AUTO 3ARKING 21 S4UARE STEEL 3OLE ON 4 HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25 MAX OVERALL HEIGHT BUOGTY3E  RSX2LED325KR LED CUTOFF AT  AFF WL2 B2UOGTY3E 4 RSX2LED325KR4 LED CUTOFF AT  AFF WL24 B2UOG2TY3E  RSX2LED315KR LED CUTOFF AT  AFF WL1 B5UOGYES TWIN TY3E 5 RSX2LED325KR5 LED CUTOFF ON 22  S4UARE STEEL 3OLE ON 2  HIGH CONC BASE IN AUTO 3ARKING 21 S4UARE STEEL 3OLE ON 4 HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25 MAX OVERALL HEIGHT B5UOGYES TWIN TY3E 5 RSX2LED35KR5 LED CUTOFF ON 22  S4UARE STEEL 3OLE ON 2  HIGH CONC BASE IN AUTO 3ARKING 21 S4UARE STEEL 3OLE ON 4 HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25 MAX OVERALL HEIGHT 3L25[2 3L5[2 YES YES YES  SEE ARCHITECTURAL 3LANS FOR ACTUAL 3OLE BASE HEIGHTS B2UOG1TY3E 2 RSX2LED315KR2 LED CUTOFF AT  AFF WL12 YES CAL GREEN BUG TABLE TITLE 3LAN SITE LIGHTING 1ESL1 1 5  SHEET ThHVH GUDZLQJV PXVt QRt EH XVHG IRU FRQVtUXFtLRQ XQtLO DSSURYHG E\ GUHJJ EOHFtULF. ThHVH GUDZLQJV DUH thH H[FOXVLYH SURSHUt\ RI GUHJJ EOHFtULF. ItV DFFHStDQFH FRQVtLtXtHV DQ DJUHHPHQt thDt Lt VhDOO EH tUHDtHG DV D VtULFtO\ FRQILGHQtLDO GRFXPHQt DQG LV tR EH UHtXUQHG XSRQ UHTXHVt DQG LV QRt tR EH FRPPXQLFDtHG GLVFORVHG RU FRSLHG H[FHSt DV H[SUHVVO\ DXthRUL]HG LQ ZULtLQJ E\ GUHJJ EOHFtULF. -OB NO DRAWN BY DATE SCALE REVISION 4252 A4252 B C D E F G H - K         DATE  8 W. EM3ORIA ST. LLF NR. 2142 ENGINEERS CONTRACTORS ONTARIO CA 912 99 98194 E S L EC T R I C A L R E GI STER E D 3 R O F E S S IONAL E N G I N E E R GL E N N D.TASS O N TA TE OF C A L I F O R NIA NO. E154 E[S. 21 3RO-ECT BAKER 9TH ST. RANCHO CUCAMONGACA 9TH VINEYARD BUILDING 1 BY BB          BB 3RELIM REVISED          GRA3HIC SCALE SCALE 1 5  SRXUFHAXtRGHVN5285  25525 5 5 1 12.5.5 SCALE 1 5  SITE LIGHTING 3LAN SCALE N.T.S. KEY 3LAN SCO3E OF WORK SITE LIGHTING STATISTICS SCALE NTS LIGHT 3OLE DETAIL 4  HIGH IN TRK A3RON LED CUTOFF FIXTURE LITHONIA RSX2 25 M A X H T . O V E R A L L HANDHOLE AT 1 S4UARE STEEL 3OLE SEE STRUCTURAL DRAWINGS FOR CONCRETE REBAR ETC... INFORMATION 2  HIGH IN AUTO 3ARKING 21 3 O L E I N TR U C K A3 R O N . . . 2 2    IN A U T O 3A R K I N G 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.9 0.7 0.5 0.1 0.1 0.3 0.3 0.3 0.2 0.1 0.2 0.3 0.3 0.2 0.1 0.2 0.3 0.3 0.2 0.1 0.2 0.2 0.2 0.2 0.1 0.3 0.5 0.5 1.0 0.4 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.3 1.1 0.3 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.6 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.4 0.6 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.3 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.4 0.2 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.2 0.6 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 1.0 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.7 0.3 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.5 0.3 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.2 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.1 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.4 0.1 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.7 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.9 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.2 0.5 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.1 0.1 0.2 0.4 0.0 1.2 1.1 1.2 1.2 1.2 1.2 1.1 1.1 1.3 1.6 1.9 2.0 1.9 1.9 1.9 2.1 2.0 1.9 1.9 1.9 2.0 1.9 1.5 1.2 1.0 1.0 1.1 1.2 1.4 2.1 1.9 1.6 1.7 1.7 1.9 1.9 1.6 1.6 1.8 2.3 3.1 3.2 2.6 2.6 2.7 3.3 3.2 2.6 2.6 2.7 3.2 3.1 2.2 1.7 1.4 1.4 1.8 2.0 2.1 2.3 2.2 2.0 2.1 2.3 2.5 2.5 2.1 1.9 2.1 2.8 3.5 3.6 3.1 3.0 3.3 3.7 3.7 3.1 3.0 3.2 3.6 3.5 2.8 2.2 1.9 2.0 2.3 2.4 2.2 1.9 2.2 2.0 2.3 2.6 2.9 2.8 2.3 2.1 2.2 2.6 3.4 3.5 3.0 2.9 3.1 3.7 3.7 3.0 2.9 3.1 3.6 3.5 2.8 2.4 2.3 2.4 2.5 2.5 1.9 1.5 1.8 2.0 2.2 2.4 2.6 2.4 2.0 2.1 2.1 2.2 2.5 2.7 2.6 2.6 2.7 2.8 2.8 2.6 2.7 2.6 2.7 2.7 2.6 2.4 2.5 2.5 2.1 2.4 2.0 1.5 1.7 1.9 2.3 2.8 3.4 2.8 2.0 2.0 1.9 2.0 2.2 2.2 2.3 2.3 2.3 2.3 2.4 2.3 2.3 2.3 2.3 2.4 2.5 2.6 3.3 3.5 2.4 2.8 2.2 1.8 1.8 1.8 2.4 3.2 3.6 3.0 1.9 1.2 1.7 1.8 1.9 1.8 2.0 2.1 2.0 1.9 2.1 2.2 2.0 1.9 2.0 2.0 2.0 2.4 2.7 3.1 2.3 3.1 2.2 1.8 2.3 1.2 1.5 1.4 1.5 2.2 2.2 2.1 2.4 2.7 2.4 2.2 2.4 2.7 2.3 2.1 2.3 2.2 1.5 1.0 3.3 2.1 1.8 3.5 1.4 1.5 2.2 2.1 3.3 2.9 2.6 3.0 3.8 3.1 2.7 3.1 3.7 3.0 2.6 3.0 3.2 2.0 1.2 3.7 2.3 1.8 4.0 1.6 1.6 2.0 2.4 1.9 1.7 3.1 1.4 1.5 1.4 2.0 1.9 1.7 2.8 1.5 1.6 1.2 2.1 1.7 1.4 3.1 1.4 1.5 1.4 3.0 1.9 1.4 3.5 1.6 1.6 2.1 3.8 2.2 1.4 2.9 1.3 1.5 2.1 2.5 1.7 1.4 2.5 1.2 1.4 1.4 1.9 1.7 1.4 2.9 1.5 1.6 1.2 2.0 1.7 1.4 3.5 1.6 1.6 1.3 2.6 1.8 1.4 3.0 1.3 1.4 1.9 3.7 2.2 1.4 2.5 1.0 1.2 2.1 2.5 1.8 1.3 2.9 1.2 1.7 2.8 3.3 3.6 2.0 1.3 1.5 3.0 3.8 2.3 1.3 1.4 2.6 3.8 2.7 1.4 1.3 2.2 3.8 3.1 1.6 1.3 1.9 3.9 3.9 3.1 1.9 1.2 3.8 1.5 1.7 2.0 1.9 2.1 1.5 1.3 1.4 1.9 2.1 1.6 1.3 1.3 1.7 2.1 1.8 1.3 1.3 1.6 2.1 1.9 1.4 1.3 1.5 2.0 1.9 2.0 1.5 1.1 3.7 2.5 1.9 2.3 3.2 2.7 1.6 1.2 1.2 1.3 1.3 1.3 1.0 12 DOCK DOORS 10 ' T R U C K O V E R H A N G CLEAN AIR VAN 3OOLEV CLEAN AIR VAN 3OOLEV EV CH A R G I N G ON L Y EV CH A R G I N G ON L Y EV CH A R G I N G ON L Y EV  V A N CH A R G I N G ON L Y EV CH A R G I N G ON L Y EV CH A R G I N G ON L Y CL E A N A I R  VA N 3O O L  E V EV CH A R G I N G ON L Y CL E A N A I R  VA N 3O O L  E V :L24 :L 1  2 :L 1  2 :L 1  2 :L 1  2 :L 1  2 :L2 A :L2 A :L2 A :L 2  4 A 3L25 3L 2  5 [ 2 A3L 2  5 [ 2 A3L 2  5 [ 2 A :L 2  4 A :L 2  4 A :L 2  4 A :L 2  4 A :L 2  4 A :L24 :L24 3L   5 49 DOCK DOORS 45 DOCK DOORS E . 9 t h S T R E E T B A K E R A V E N U E V I N E Y A R D A V E N U E S A N B E R N A R D I N O C O U N T Y F L O O D C O N T R O L C H A N N E L 28 D O C K D O O R S 12 DOCK DOORS E . 9 t h S T R E E TE . 9 t h S T R E E T Calculation Summary Label CalcType Units Avg Max Min Avg/Min Max/Min 8th St Illuminance Fc 0.00 0.0 0.0 N.A.N.A. 9th St Illuminance Fc 0.00 0.1 0.0 N.A.N.A. Baker Street Illuminance Fc 0.00 0.0 0.0 N.A.N.A. NEFloodChannel Illuminance Fc 0.00 0.0 0.0 N.A.N.A. NeighborsNW Illuminance Fc 0.05 1.1 0.0 N.A.N.A. Site Illuminance Fc 2.12 4.0 0.9 2.36 4.44 Vineyard Illuminance Fc 0.00 0.0 0.0 N.A.N.A. BUG RATINGDESCRI3TIONSY0BOL CO03LIES :ITH CAL GREEN 5.10.8 FI;TURE LEGEND B1UOG23L1HS YES TY3E  RS;2LED3150KRHS LED CUTOFF :HOUSE SIDE SHIELD ON 22' S4UARE STEEL 3OLE ON 2' HIGH CONC BASE IN AUTO 3ARKING 21' S4UARE STEEL 3OLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25' 0A; OVERALL HEIGHT B2UOG23L14 YES TY3E 4 RS;2LED3150KR4 LED CUTOFF ON 22' S4UARE STEEL 3OLE ON 2' HIGH CONC BASE IN AUTO 3ARKING 21' S4UARE STEEL 3OLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25' 0A; OVERALL HEIGHT BUOG3L2YES TY3E  RS;2LED3250KR LED CUTOFF ON 22' S4UARE STEEL 3OLE ON 2' HIGH CONC BASE IN AUTO 3ARKING 21' S4UARE STEEL 3OLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25' 0A; OVERALL HEIGHT B1UOG23L2HS YES TY3E  RS;2LED3250KRHS LED CUTOFF :HOUSE SIDE SHIELD ON 22' S4UARE STEEL 3OLE ON 2' HIGH CONC BASE IN AUTO 3ARKING 21' S4UARE STEEL 3OLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25' 0A; OVERALL HEIGHT B2UOG3L24 YES TY3E 4 RS;2LED3250KR4 LED CUTOFF ON 22' S4UARE STEEL 3OLE ON 2' HIGH CONC BASE IN AUTO 3ARKING 21' S4UARE STEEL 3OLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25' 0A; OVERALL HEIGHT B5UOG3L25 YES TY3E 5 RS;2LED3250KR5 LED CUTOFF ON 22' S4UARE STEEL 3OLE ON 2' HIGH CONC BASE IN AUTO 3ARKING 21' S4UARE STEEL 3OLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25' 0A; OVERALL HEIGHT B5UOG3L5 YES TY3E 5 RS;2LED350KR5 LED CUTOFF ON 22' S4UARE STEEL 3OLE ON 2' HIGH CONC BASE IN AUTO 3ARKING 21' S4UARE STEEL 3OLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25' 0A; OVERALL HEIGHT B1UOG3L44HS YES TY3E 4 RS;2LED3450KR4HS LED CUTOFF :HOUSE SIDE SHIELD ON 22' S4UARE STEEL 3OLE ON 2' HIGH CONC BASE IN AUTO 3ARKING 21' S4UARE STEEL 3OLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25' 0A; OVERALL HEIGHT BUOGTY3E  RS;2LED3250KR LED CUTOFF AT 0' AFF :L2 B2UOGTY3E 4 RS;2LED3250KR4 LED CUTOFF AT 0' AFF :L24 B2UOG2TY3E  RS;2LED3150KR LED CUTOFF AT 0' AFF :L1 B5UOGYES T:IN TY3E 5 RS;2LED3250KR5 LED CUTOFF ON 22' S4UARE STEEL 3OLE ON 2' HIGH CONC BASE IN AUTO 3ARKING 21' S4UARE STEEL 3OLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25' 0A; OVERALL HEIGHT B5UOGYES T:IN TY3E 5 RS;2LED350KR5 LED CUTOFF ON 22' S4UARE STEEL 3OLE ON 2' HIGH CONC BASE IN AUTO 3ARKING 21' S4UARE STEEL 3OLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO U3TILT 25' 0A; OVERALL HEIGHT 3L25[2 3L5[2 YES YES YES  SEE ARCHITECTURAL 3LANS FOR ACTUAL 3OLE BASE HEIGHTS B2UOG1TY3E 2 RS;2LED3150KR2 LED CUTOFF AT 0' AFF :L12 YES CAL GREEN BUG TABLE TITLE 3LAN SITE LIGHTING 2ESL1 1 50'0 SHEET ThHVH GUDZLQJV PXVt QRt EH XVHG IRU FRQVtUXFtLRQ XQtLO DSSURYHG E\ GUHJJ EOHFtULF. ThHVH GUDZLQJV DUH thH H[FOXVLYH SURSHUt\ RI GUHJJ EOHFtULF. ItV DFFHStDQFH FRQVtLtXtHV DQ DJUHHPHQt thDt Lt VhDOO EH tUHDtHG DV D VtULFtO\ FRQILGHQtLDO GRFXPHQt DQG LV tR EH UHtXUQHG XSRQ UHTXHVt DQG LV QRt tR EH FRPPXQLFDtHG GLVFORVHG RU FRSLHG H[FHSt DV H[SUHVVO\ DXthRUL]HG LQ ZULtLQJ E\ GUHJJ EOHFtULF. -OB NO DRA:N BY DATE SCALE REVISION 4252 A B C D E F G H - K         DATE  08 :. E03ORIA ST. LLF NR. 201042 ENGINEERS CONTRACTORS ONTARIO CA 912 909 98194 E S L EC T R I C A L R E GI STER E D 3 R O F E S S IONAL E N G I N E E R GL E N N D.TASS O N TA TE OF C A L I F O R NIA NO. E1540 E[S. 0021 3RO-ECT BAKER 9TH ST. RANCHO CUCA0ONGACA 9TH VINEYARD BUILDING 2 BY          BB          4252BB3RELI0 REVISED GRA3HIC SCALE SCALE 1 50'0 SRXUFHAXtRGHVN5285 0 2550 25 50 5 100 12.5.5 SCALE N.T.S. KEY 3LAN SCO3E OF :ORK SCALE 1 50'0 SITE LIGHTING 3LAN SITE LIGHTING STATISTICS SCALE NTS LIGHT 3OLE DETAIL 4'0 HIGH IN TRK A3RON LED CUTOFF FI;TURE LITHONIA RS;2 25 ' 0 A ; H T . O V E R A L L HANDHOLE AT 10' S4UARE STEEL 3OLE SEE STRUCTURAL DRA:INGS FOR CONCRETE REBAR ETC... INFOR0ATION 2' HIGH IN AUTO 3ARKING 21 ' 3 O L E I N TR U C K A3 R O N . . . 2 2 '    IN A U T O 3A R K I N G BUG RATINGDESCRI3TIONSY0BOL CO03LIES :ITH TITLE 24 10.2 E =ONAL LU0ENS CO03LIES :ITH CAL GREEN 5.10.8 FI;TURE LEGEND YESBUOGYES150Z THEREFORE NALED TY3E  RS;2LED3250KR LED CUTOFF AT 0' AFF :ITH NO U3LTILT YESBUOGYES150Z THEREFORE NALED TY3E 4 RS;2LED350KR4 LED CUTOFF AT 0' AFF :ITH NO U3LTILT :L2 :L4 YESB1UOG3L24[2 YES150Z THEREFORE NA T:INLED TY3E 4 RS;2LED3250KR4 CUTOFF ON 21' S4UARE STEEL 3OLE ON 4' HIGH CONC BASE IN TRUCK YARD 22' S4UARE STEEL 3OLE ON A 2' HIGH CONC BASE IN AUTO 3ARKING YESB2UOGYES150Z THEREFORE NALED TY3E 4 RS;2LED3250KR4 LED CUTOFF AT 0' AFF :ITH NO U3LTILT :L24 YESB2UOG23L14 YES150Z THEREFORE NA LED TY3E 4 RS;2LED3150KR4 CUTOFF ON 21' S4UARE STEEL 3OLE ON 4' HIGH CONC BASE IN TRUCK YARD 22' S4UARE STEEL 3OLE ON A 2' HIGH CONC BASE IN AUTO 3ARKING YESB2UOG3L24 YES150Z THEREFORE NA LED TY3E 4 RS;2LED3250KR4 CUTOFF ON 21' S4UARE STEEL 3OLE ON 4' HIGH CONC BASE IN TRUCK YARD 22' S4UARE STEEL 3OLE ON A 2' HIGH CONC BASE IN AUTO 3ARKING YESB2UOG2 YES150Z THEREFORE NALED TY3E  RS;2LED3150KR LED CUTOFF AT 0' AFF :ITH NO U3LTILT :L1 YESBUOGYESLED TY3E 4 RS;2LED3450KR4 LED CUTOFF AT 0' AFF :ITH NO U3LTILT FH 0.4 FVH 182. BH 1450.5 BVH 125.8 UH 0 :L44 YESB1UOG23L1YES150Z THEREFORE NA LED TY3E  RS;2LED3150KR CUTOFF ON 21' S4UARE STEEL 3OLE ON 4' HIGH CONC BASE IN TRUCK YARD 22' S4UARE STEEL 3OLE ON A 2' HIGH CONC BASE IN AUTO 3ARKING YESB2UOG23L15 YES150Z THEREFORE NA LED TY3E 5 RS;2LED3150KR5 CUTOFF ON 21' S4UARE STEEL 3OLE ON 4' HIGH CONC BASE IN TRUCK YARD 22' S4UARE STEEL 3OLE ON A 2' HIGH CONC BASE IN AUTO 3ARKING YESB2UOG23L15[2 YES150Z THEREFORE NA T:INLED TY3E 5 RS;2LED3150KR5 CUTOFF ON 21' S4UARE STEEL 3OLE ON 4' HIGH CONC BASE IN TRUCK YARD 22' S4UARE STEEL 3OLE ON A 2' HIGH CONC BASE IN AUTO 3ARKING YESB2UOG3L2YES150Z THEREFORE NA LED TY3E  RS;2LED3250KR CUTOFF ON 21' S4UARE STEEL 3OLE ON 4' HIGH CONC BASE IN TRUCK YARD 22' S4UARE STEEL 3OLE ON A 2' HIGH CONC BASE IN AUTO 3ARKING YESB2UOG3L25 YES150Z THEREFORE NA LED TY3E 5 RS;2LED3250KR5 CUTOFF ON 21' S4UARE STEEL 3OLE ON 4' HIGH CONC BASE IN TRUCK YARD 22' S4UARE STEEL 3OLE ON A 2' HIGH CONC BASE IN AUTO 3ARKING BUG RATINGDESCRI3TIONSY0BOL CO03LIES :ITH TITLE 24 10.2 E =ONAL LU0ENS CO03LIES :ITH CAL GREEN 5.10.8  SEE ARCHITECTURAL 3LANS FOR ACTUAL 3OLE BASE HEIGHTS  25' 0A; LU0INAIRE HEIGHT RSX2-WL1-2RSX2-WL1-2RSX2-WL1-2RSX2-WL1-2 RSX2-WL2-4 RSX2-WL2-3 RSX2-PL3-5 RSX2-PL2-4 RSX2-PL2-4 RSX2-PL3-5x2 RSX2-PL2-3 RSX2-WL2-3 RSX2-WL2-3 RSX2-WL2-3 RSX2-WL2-3 RSX2-WL2-3 RSX2-WL2-3 RSX2-PL1-4 RSX2-PL1-4 RSX2-PL2-4 RSX2-WL2-4 RSX2-WL2-4 RSX2-WL2-4 RSX2-WL2-4 RSX2-WL2-4 RSX2-PL4-4HS RSX2-PL4-4HS RSX2-PL3-5x2 RSX2-PL2-4 RSX2-WL2-4 RSX2-WL1-2 RSX2-WL1-2 RSX2-WL1-2 RSX2-WL1-2 RSX2-WL1-2 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 1.5 2.5 3.9 3.2 2.0 1.4 1.6 2.3 3.1 2.2 1.4 1.3 1.8 2.9 2.6 1.6 1.3 1.6 2.7 3.1 1.9 1.3 1.4 2.1 3.1 2.2 1.4 1.0 1.0 1.1 1.1 1.2 1.2 1.1 1.8 2.1 2.3 2.2 2.0 1.7 1.6 2.7 3.9 2.6 1.3 1.1 1.8 3.7 3.3 1.6 1.1 1.5 3.1 3.6 1.9 1.1 1.2 2.4 3.8 2.6 1.5 1.3 1.5 1.5 1.7 1.9 1.9 1.2 1.8 2.0 2.1 2.0 1.7 1.3 1.5 1.7 1.7 2.1 2.2 2.2 1.3 1.7 2.1 2.2 2.0 1.6 1.1 2.1 1.8 1.8 1.9 2.1 2.2 1.4 2.0 2.8 2.9 2.5 1.8 1.2 2.9 1.9 1.7 1.5 1.6 1.8 1.6 2.4 3.1 3.3 3.0 2.0 1.4 2.5 1.8 1.6 1.5 1.4 1.7 1.7 2.4 3.3 3.5 3.2 2.2 1.9 1.8 1.6 1.5 1.5 1.8 1.6 2.3 3.0 3.3 3.0 2.3 1.4 1.6 1.6 1.4 1.8 2.3 0.9 1.5 2.1 2.9 3.3 3.1 2.6 1.9 1.3 1.1 1.1 1.3 1.4 1.5 2.6 3.5 1.5 2.3 3.8 3.9 3.3 3.0 3.1 2.0 1.3 1.1 1.1 1.3 1.7 3.0 4.0 3.0 3.4 2.9 2.1 1.4 1.2 1.2 1.4 1.7 2.5 3.1 2.2 3.3 2.5 1.9 1.3 1.3 1.3 1.5 1.8 2.5 2.8 2.4 3.0 2.8 2.1 1.5 1.3 1.3 1.5 1.8 3.0 3.1 2.5 3.0 3.6 2.5 1.6 1.3 1.2 1.5 1.9 3.9 3.5 2.3 3.2 3.1 2.3 1.5 1.3 1.3 1.5 1.8 2.9 2.9 2.3 3.4 2.6 2.0 1.4 1.3 1.4 1.5 1.9 2.7 2.5 2.4 3.0 3.0 2.2 1.5 1.3 1.3 1.5 1.9 2.9 2.9 2.5 3.0 3.7 2.5 1.6 1.3 1.2 1.5 2.0 4.0 3.5 2.3 3.3 3.0 2.2 1.5 1.3 1.2 1.5 1.9 3.1 3.0 2.3 3.3 2.6 2.0 1.4 1.2 1.2 1.4 1.9 2.6 2.5 2.4 3.0 3.0 2.2 1.5 1.3 1.2 1.4 1.9 2.7 2.9 2.4 3.0 3.7 2.5 1.6 1.3 1.1 1.2 1.9 3.2 3.8 2.3 3.3 3.0 2.2 1.5 1.2 1.0 1.2 1.9 3.2 3.7 2.3 3.2 2.6 2.0 1.4 1.2 1.0 1.3 1.8 2.6 2.5 2.4 3.0 3.1 2.3 1.5 1.2 1.1 1.4 2.0 2.6 1.9 2.4 3.0 3.6 2.5 1.6 1.2 1.1 1.3 2.0 3.0 2.3 2.2 3.4 2.9 2.2 1.5 1.2 1.1 1.3 2.2 4.0 3.2 2.3 3.2 2.6 2.0 1.4 1.3 1.1 1.3 2.0 3.3 2.7 2.4 3.0 3.1 2.3 1.6 1.4 1.3 1.4 1.8 2.3 1.6 2.4 3.0 3.3 2.3 1.8 1.7 1.7 1.7 1.9 1.9 1.2 2.2 3.4 2.0 2.2 2.3 2.1 1.8 1.2 3.2 3.5 2.3 2.1 2.3 3.2 2.2 2.9 3.0 2.7 1.9 1.3 1.2 1.9 2.1 1.9 2.0 2.3 2.8 2.2 3.1 3.3 3.0 2.0 1.3 1.0 1.8 1.8 1.8 2.0 2.3 2.8 2.0 2.8 3.0 2.8 1.9 1.3 2.0 1.5 1.6 1.7 2.2 3.4 1.5 2.0 2.2 1.9 1.5 1.0 3.5 1.6 1.3 1.4 1.9 3.2 2.2 1.8 2.3 1.4 1.2 1.2 1.7 3.0 4.0 3.3 1.9 1.4 1.7 3.0 3.4 2.2 1.4 1.6 2.7 3.5 2.5 1.5 1.5 2.4 3.5 3.0 2.0 2.2 3.3 3.5 2.4 1.5 1.3 1.1 1.8 1.3 1.2 1.1 1.2 1.3 1.4 1.3 1.1 1.1 1.3 1.4 1.3 1.1 1.1 1.3 1.4 1.5 1.4 1.4 1.4 1.4 1.2 28 D O C K D O O R S B A K E R A V E N U E EV CH A R G I N G ON L Y CL E A N AI R  V A N PO O L  E V 10 ' T R U C K O V E R H A N G N.A.P. NET 412.4 SF 1 AC HISTORICAL BLDG. TO RE0AIN EV CH A R G I N G ON L Y EV CH A R G I N G ON L Y EV CH A R G I N G ON L Y EV CH A R G I N G ON L Y EV CH A R G I N G ON L Y CL E A N AI R  V A N PO O L  E V CL E A N AI R  V A N PO O L  E V EV CH A R G I N G ON L Y EV CH A R G I N G ON L Y EV CH A R G I N G ON L Y EV CH A R G I N G ON L Y EV CH A R G I N G ON L Y EV  V A N CH A R G I N G ON L Y EV  V A N CH A R G I N G ON L Y CL E A N AI R  V A N PO O L  E V CL E A N AI R  V A N PO O L  E V EV CH A R G I N G ON L Y EV CH A R G I N G ON L Y PL24 A PL24 A PL24 A PL44HS A PL44HS A :L 1  2 A :L 1  2 A :L 1  2 A :L 1  2 A :L2 A :L2 A :L2 A :L2 A :L2 A :L2 A :L24 A PL5[2 A PL14 A PL 1  4 A PL 2  4 A PL5[2 A PL 2   :L 1  2 :L 1  2 :L 1  2 :L 1  2 :L24 :L24 :L24 :L24 :L24 :L24 :L2 PL5 A :L 1  2 49 DOCK DOORS 45 DOCK DOORS E . 9 t h S T R E E T B A K E R A V E N U E V I N E Y A R D A V E N U E S A N B E R N A R D I N O C O U N T Y F L O O D C O N T R O L C H A N N E L 28 D O C K D O O R S 12 DOCK DOORS E . 9 t h S T R E E TE . 9 t h S T R E E T Calculation Summary Label CalcType Units Avg Max Min Avg/Min Max/Min 8th St Illuminance Fc 0.00 0.0 0.0 N.A.N.A. 9th St Illuminance Fc 0.00 0.1 0.0 N.A.N.A. Baker Street Illuminance Fc 0.00 0.0 0.0 N.A.N.A. NEFloodChannel Illuminance Fc 0.00 0.0 0.0 N.A.N.A. NeighborsNW Illuminance Fc 0.05 1.1 0.0 N.A.N.A. Site Illuminance Fc 2.12 4.0 0.9 2.36 4.44 Vineyard Illuminance Fc 0.00 0.0 0.0 N.A.N.A. BUG RATINGDESCRIPTIONSY0BOL CO0PLIES :ITH CAL GREEN 5.10.8 FI;TURE LEGEND B1UOG2PL1HS YES TYPE  RS;2LEDP150KRHS LED CUTOFF :HOUSE SIDE SHIELD ON 22' S4UARE STEEL POLE ON 2' HIGH CONC BASE IN AUTO PARKING 21' S4UARE STEEL POLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO UPTILT 25' 0A; OVERALL HEIGHT B2UOG2PL14 YES TYPE 4 RS;2LEDP150KR4 LED CUTOFF ON 22' S4UARE STEEL POLE ON 2' HIGH CONC BASE IN AUTO PARKING 21' S4UARE STEEL POLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO UPTILT 25' 0A; OVERALL HEIGHT BUOGPL2YES TYPE  RS;2LEDP250KR LED CUTOFF ON 22' S4UARE STEEL POLE ON 2' HIGH CONC BASE IN AUTO PARKING 21' S4UARE STEEL POLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO UPTILT 25' 0A; OVERALL HEIGHT B1UOG2PL2HS YES TYPE  RS;2LEDP250KRHS LED CUTOFF :HOUSE SIDE SHIELD ON 22' S4UARE STEEL POLE ON 2' HIGH CONC BASE IN AUTO PARKING 21' S4UARE STEEL POLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO UPTILT 25' 0A; OVERALL HEIGHT B2UOGPL24 YES TYPE 4 RS;2LEDP250KR4 LED CUTOFF ON 22' S4UARE STEEL POLE ON 2' HIGH CONC BASE IN AUTO PARKING 21' S4UARE STEEL POLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO UPTILT 25' 0A; OVERALL HEIGHT B5UOGPL25 YES TYPE 5 RS;2LEDP250KR5 LED CUTOFF ON 22' S4UARE STEEL POLE ON 2' HIGH CONC BASE IN AUTO PARKING 21' S4UARE STEEL POLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO UPTILT 25' 0A; OVERALL HEIGHT B5UOGPL5 YES TYPE 5 RS;2LEDP50KR5 LED CUTOFF ON 22' S4UARE STEEL POLE ON 2' HIGH CONC BASE IN AUTO PARKING 21' S4UARE STEEL POLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO UPTILT 25' 0A; OVERALL HEIGHT B1UOGPL44HS YES TYPE 4 RS;2LEDP450KR4HS LED CUTOFF :HOUSE SIDE SHIELD ON 22' S4UARE STEEL POLE ON 2' HIGH CONC BASE IN AUTO PARKING 21' S4UARE STEEL POLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO UPTILT 25' 0A; OVERALL HEIGHT BUOGTYPE  RS;2LEDP250KR LED CUTOFF AT 0' AFF :L2 B2UOGTYPE 4 RS;2LEDP250KR4 LED CUTOFF AT 0' AFF :L24 B2UOG2TYPE  RS;2LEDP150KR LED CUTOFF AT 0' AFF :L1 B5UOGYES T:IN TYPE 5 RS;2LEDP250KR5 LED CUTOFF ON 22' S4UARE STEEL POLE ON 2' HIGH CONC BASE IN AUTO PARKING 21' S4UARE STEEL POLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO UPTILT 25' 0A; OVERALL HEIGHT B5UOGYES T:IN TYPE 5 RS;2LEDP50KR5 LED CUTOFF ON 22' S4UARE STEEL POLE ON 2' HIGH CONC BASE IN AUTO PARKING 21' S4UARE STEEL POLE ON 4' HIGH CONC BASE IN TRUCK YARD AND NO UPTILT 25' 0A; OVERALL HEIGHT PL25[2 PL5[2 YES YES YES  SEE ARCHITECTURAL PLANS FOR ACTUAL POLE BASE HEIGHTS B2UOG1TYPE 2 RS;2LEDP150KR2 LED CUTOFF AT 0' AFF :L12 YES CAL GREEN BUG TABLE TITLE PLAN SITE LIGHTING ESL1 1 50'0 SHEET ThHVH GUDZLQJV PXVt QRt EH XVHG IRU FRQVtUXFtLRQ XQtLO DSSURYHG E\ GUHJJ EOHFtULF. ThHVH GUDZLQJV DUH thH H[FOXVLYH SURSHUt\ RI GUHJJ EOHFtULF. ItV DFFHStDQFH FRQVtLtXtHV DQ DJUHHPHQt thDt Lt VhDOO EH tUHDtHG DV D VtULFtO\ FRQILGHQtLDO GRFXPHQt DQG LV tR EH UHtXUQHG XSRQ UHTXHVt DQG LV QRt tR EH FRPPXQLFDtHG GLVFORVHG RU FRSLHG H[FHSt DV H[SUHVVO\ DXthRUL]HG LQ ZULtLQJ E\ GUHJJ EOHFtULF. -OB NO DRA:N BY DATE SCALE REVISION 4252 A B C D E F G H - K         DATE  08 :. E0PORIA ST. LLF NR. 201042 ENGINEERS CONTRACTORS ONTARIO CA 912 909 98194 E S L EC T R I C A L R E GI STER E D P R O F E S S IONAL E N G I N E E R GL E N N D.TASS O N TA TE OF C A L I F O R NIA NO. E1540 E[S. 0021 PRO-ECT BAKER 9TH ST. RANCHO CUCA0ONGACA 9TH VINEYARD BUILDING  BY          BB          4252BBPRELI0 REVISED GRAPHIC SCALE SCALE 1 50'0 SRXUFHAXtRGHVN5285 0 2550 25 50 5 100 12.5.5 SCALE N.T.S. KEY PLAN SCOPE OF :ORK SITE LIGHTING STATISTICS SCALE NTS LIGHT POLE DETAIL 4'0 HIGH IN TRK APRON LED CUTOFF FI;TURE LITHONIA RS;2 25 ' 0 A ; H T . O V E R A L L HANDHOLE AT 10' S4UARE STEEL POLE SEE STRUCTURAL DRA:INGS FOR CONCRETE REBAR ETC... INFOR0ATION 2' HIGH IN AUTO PARKING 21 ' P O L E I N TR U C K AP R O N . . . 2 2 '    IN A U T O PA R K I N G SCALE 1 50'0 SITE LIGHTING PLAN Form 5-1 BMP Inspection and Maintenance BMP Responsible Party(ies)Inspection/Maintenance Activities Required Minimum Frequency of Activities Underground Infiltration Chambers Owner The isolator rows shall be inspected for debris and sediment accumulations and maintained by a qualified technician and he/she will properly dispose of all wastes and inspect for standing water. A manhole is installed in order to inspect and maintain the inlet row. All entry into the chamber system must be done per OSHA codes to ensure operator and inspector safety. The isolator rows shall be inspected semi-annually (by October 1st and February 1st) and cleaned by water-flush and vacuum when solids accumulate to 3" depth. Maintenance to be conducted through service contract with the vendor or equally qualified contractor. Drain Inserts Owner Visually inspect for defects and illegal dumping. Notify proper authorities if illegal dumping has occurred. Using an industrial vacuum, the collected materials shall be removed from the filter basket and disposed of properly. Inspect biosorb hydrocarbon boom and replace as necessary. Four times per year or following any rain event that would potentially accumulate a large amount of debris in the system. Replace boom twice per year, at a minimum. Storm Drain Stenciled Message Owner Visually inspect for legibility and replace or repaint as necessary.Annually N1: Education of Property Owners, Tenants and Occupants on Stormwater BMPs Owner Property owner will familiarize him/herself with the educational materials in Attachment ͟͞ĂŶĚƚŚĞĐŽŶƚĞŶƚƐŽĨƚŚĞtYDW͘ Annually (January) for all employees and within 2 months for new hires. N2: Activity Restrictions Owner Activities are restricted to only those for which a BMP has been implemented. The owner shall develop ongoing activity restrictions that include those that have the potential to create adverse impacts on water quality. Activities include, but are not limited to: handling and disposal of contaminants, fertilizer and pesticide application restrictions, litter control and pick-up, and vehicle or equipment repair as well as any other activities that may potentially contribute to water pollution. Ongoing N3: Landscape Management BMPs Owner /ƌƌŝŐĂƚŝŽŶŵƵƐƚďĞĐŽŶƐŝƐƚĞŶƚǁŝƚŚŝƚLJ͛Ɛ Water Conservation Ordinance. Fertilizer and pesticide usage will be consistent with County Management Guidelines for Use of Fertilizers and Pesticides. Ongoing N4: BMP Maintenance Owner BMP maintenance, implementation schedules, and responsible parties are included with each specific BMP narrative. As described in each BMP listed within this form. N7: Spill Contingency Plan Owner Owner/tenant will have a spill contingency plan, a separate document, based on specific site needs. Ongoing Form 5-1 BMP Inspection and Maintenance BMP Responsible Party(ies)Inspection/Maintenance Activities Required Minimum Frequency of Activities N10: Uniform Fire Code Implementation Owner If applicable, owner will comply with Article 80 of the Uniform Fire Code enforced by the fire protection agency. The facility operators will be educated annually regarding requirements for handling, storage and proper disposal of hazardous substances. Ongoing N11: Litter/Debris Control Program Owner Contract with their landscape maintenance firm to provide this service during regularly schedule maintenance. They are required to implement trash management and litter control procedures in the common areas aimed at reducing pollution of drainage water. Weekly N12: Employee Training Owner The owner will ensure that tenants are also familiar with onsite BMPs and necessary maintenance required of the tenants. Owner will check with City and County at least once a year to obtain new or updated educational materials and provide these materials to tenants. Employees shall be trained to clean up spills and participate in ongoing maintenance. The WQMP requires annual employee training and new hires within 2 months. Annually (January) for all employees and within 2 months for new hires. N13: Housekeeping of Loading Docks Owner Keep all fluids indoors. Clean up spills immediately and keep spills from entering storm drain system. No direct discharges into the storm drain system. Area shall be inspected weekly for proper containment and practices with spills cleaned up immediately and disposed of properly. Ongoing N14: Catch Basin Inspection Program Owner DŽŶƚŚůLJŝŶƐƉĞĐƚŝŽŶďLJƉƌŽƉĞƌƚLJŽǁŶĞƌ͛Ɛ designee. Inspection consists of immediate repair of any deterioration of the structures and maintenance of drain inserts before and after major rain events. Drain insert ŵĂŝŶƚĞŶĂŶĐĞƐŚĂůůďĞƉĞƌŵĂŶƵĨĂĐƚƵƌĞƌ͛Ɛ guidelines. Monthly inspection and maintain as necessary. Form 5-1 BMP Inspection and Maintenance BMP Responsible Party(ies)Inspection/Maintenance Activities Required Minimum Frequency of Activities N15: Vacuum Sweeping of Private Streets and Parking Lots Owner All landscape maintenance contractors will be required to sweep up all landscape cuttings, mowings and fertilizer materials off paved areas weekly and dispose of properly. Parking areas and drive ways will be swept monthly by sweeping contractor. Monthly N17: Comply with all other applicable NPDES permits Owner Will comply with Construction General Permit and Industrial General Permit (may apply for No Exposure Certification/NEC). Ongoing S1: Provide storm drain system stenciling and signage (CASQA New Development BMP Handbook SD-13) Owner ͞EŽƵŵƉŝŶŐʹƌĂŝŶƐƚŽZŝǀĞƌ͟ƐƚĞŶĐŝůƐǁŝůů be applied. Legibility of stencil will be maintained on a yearly basis. Annually (January) S3: Design and construct trash and waste storage areas to reduce pollution introduction (CASQA New Development BMP Handbook SD-32) Owner Paved with an impervious surface, designed not to allow run-on from adjoining areas, designed to divert drainage from adjoining roofs and pavements diverted around the area, screened or walled to prevent off-site transport of trash. Detail to be provided once available. Ongoing S4: Use efficient irrigation systems & landscape design, water conservation, smart controllers, and source control (Statewide Model Landscape Ordinance; CASQA New Development BMP Handbook SD-12) Owner Irrigation systems shall include reducers or shutoff valves triggered by a pressure drop to control water loss in the event of broken sprinkler heads or lines. Timers will be used to avoid over watering and watering cycles and duration shall be adjusted seasonally by the landscape maintenance contractor. The landscaping areas will be grouped with plants that have similar water requirements. Native or drought tolerant species shall also be used where appropriate to reduce excess irrigation runoff and promote surface filtration. Adjust watering cycles and duration seasonally / quarterly (Oct, Jan, Apr, and Jul). *TO BOTTOM OF FLEXIBLE PAVEMENT. FOR UNPAVED INSTALLATIONS WHERE RUTTING FROM VEHICLES MAY OCCUR, INCREASE COVER TO 30". 60" 24" MIN 8.0' MAX 12" MIN100" 12" MIN 12" MIN 9" MIN 9" MIN ISOLATOR ROW END CAP (LOCATION OF ISOLATOR ROW VARIES; SEE PLANS FOR LOCATIONS) NON-WOVEN GEOTEXTILE PER STORMTECH ISOLATOR ROW DETAIL PAVEMENT ADS 601 NON-WOVEN GEOTEXTILE (OR EQUAL) ALL AROUND ANGULAR STONE MC-4500 ENDCAP SEE TABLE OF ACCEPTABLE FILL MATERIAL ANGULAR STONE PER TABLE OF ACCEPTABLE FILL MATERIALS WOVEN SCOUR GEOTEXTILE AT EACH INLET END CAP EXCEPT FOR ISOLATOR ROW S L O P E V A R I E S ( I F A N Y ) WOVEN GEOTEXTILE PER STORMTECH ISOLATOR ROW DETAIL '' ' ' ' ' 523 WEST 6TH STREET, SUITE 1013 LOS ANGELES, CALIFORNIA, 90014 TEL 213-221-1200 Imagining change in historic environments through design, research, and technology Baker House Rehabilitation Exterior Modifications Memo DATE October 29, 2024 PROJECT NUMBER 19170 TO Michael Sizemore PROJECT Baker House Rehabilitation Rancho Cucamonga OF Panattoni Development Company FROM Heather Mangrum, Senior Project Manager CC VIA Email REGARDING Exterior Modifications BACKGROUND On October 26, 2021, Page & Turnbull submitted an Existing Conditions Memo of the Baker House that consisted of visual observations of the building’s exterior and interior. Along with the submission of the memo, three concept options were provided for the future use of the Baker House. On October 18, 2024, John Lesak and Heather Mangrum had a phone conversation discussing the city’s decision to proceed with the third option, referred to in the package as “Shipping Container Village.” The following information addresses how Page & Turnbull intends to modify and repair the exterior of the building based on the existing conditions and the design concept chosen. Walls The graffiti will be removed from the exterior wall surfaces starting first by using mild non-ionic and non-caustic detergents (Figure 1). If more aggressive measures are needed, pH neutral strippers will be applied to remove the graffiti. The mortar appeared to be in good condition at the time of conditions assessment. The exterior walls will be reviewed after the graffiti removal is completed and the mortar will be repointed as required. Exhibit B Baker House Exterior Modifications [19170] Page 2 of 6 PAGE & TURNBULL 523 WEST 6TH STREET, SUITE 1013 LOS ANGELES, CALIFORNIA, 90014 TEL 213-221-1200 Figure 1: Graffiti on exterior wall surfaces to be removed. Windows The aluminum frame windows will be removed. New windows will be installed. The first option is to use the existing wood frames for the new windows. If that is not feasible, new aluminum frame windows will be installed within the wood frames (Figure 2). A new folding wall is proposed in the existing opening at the north elevation off the living room to connect the Great Room with Outdoor Event Space (Figure 3). The existing concrete sills will be repaired where pieces are missing with new concrete (Figure 4). The decorative sills with planter boxes will be preserved (Figure 5). Figure 2: Exterior view of original wood window frame with replacement aluminum window insert. Figure 3: Location of proposed folding door. Baker House Exterior Modifications [19170] Page 3 of 6 PAGE & TURNBULL 523 WEST 6TH STREET, SUITE 1013 LOS ANGELES, CALIFORNIA, 90014 TEL 213-221-1200 Figure 4: Concrete windowsill will be repaired. Figure 5: Sill with integrated planter at southeast will remain. Doors The condition assessment refers to the front door as present and in fair condition. Based on a more recent visit to the site on August 2, 2024, by Heather Mangrum with Page & Turnbull, the door is no longer present (Figure 6). Therefore, a new door will be installed. A new rear door will be installed in the existing opening since it is also no longer present (Figure 7). Figure 6: Location of missing front exterior door. Baker House Exterior Modifications [19170] Page 4 of 6 PAGE & TURNBULL 523 WEST 6TH STREET, SUITE 1013 LOS ANGELES, CALIFORNIA, 90014 TEL 213-221-1200 Figure 7: Location of missing rear exterior door. Roof All existing roofing will be removed down to the original roof structure. Wood structural members will be evaluated and replaced as structurally required (Figure 8). New roof insulation will be installed to provide adequate drainage for the roof. A new roof membrane will be installed over the insulation along with a single ply roofing system. Existing wood fascia that has deteriorated will be replaced in-kind. New flashing will be installed. Baker House Exterior Modifications [19170] Page 5 of 6 PAGE & TURNBULL 523 WEST 6TH STREET, SUITE 1013 LOS ANGELES, CALIFORNIA, 90014 TEL 213-221-1200 Figure 8: Rolled roofing will be removed down to the existing wood structure. Front Porch The concrete steps at the east end of the porch will be removed to provide room for a new ADA compliant ramp (Figure 9). The existing semi-circular steps and concrete porch will remain (Figure 10). Figure 9: Concrete steps at the east end of the front porch to be removed for new ramp. Figure 10: Semi-circular stone/rubble steps at front porch to remain. Stone Piers The existing stone piers to the west of the building will be incorporated into a new fenced in open space (Figure 11). Baker House Exterior Modifications [19170] Page 6 of 6 PAGE & TURNBULL 523 WEST 6TH STREET, SUITE 1013 LOS ANGELES, CALIFORNIA, 90014 TEL 213-221-1200 Figure 11: Concrete and brick piers to be incorporated into the fenced open space.