Loading...
HomeMy WebLinkAbout2025-02-26 - Agenda Packet Historic Preservation Commission and Planning Commission Meeting Agenda Rancho Cucamonga Civic Center COUNCIL CHAMBERS February 26, 2025 10500 Civic Center Drive Rancho Cucamonga, CA 91730 7:00 PM A. CALL TO ORDER AND PLEDGE OF ALLEGIANCE ROLL CALL: Chairman Morales Vice Chairman Boling Commissioner Dopp Commissioner Daniels Commissioner Diaz B. PUBLIC COMMUNICATIONS This is the time and place for the general public to address the Planning/Historic Commission (“Planning Commission”) on any Consent Calendar item or any item not listed on the agenda that is within the Commission’s subject matter jurisdiction. The Planning Commission may not discuss any issue not included on the agenda, but may set the matter for discussion during a subsequent meeting. C. CONSENT CALENDAR C1. Consideration to adopt Regular Meeting Minutes of February 12th, 2025. D. PUBLIC HEARINGS D1. ENVIRONMENTAL ASSESSMENT, TENTATIVE PARCEL MAP, DESIGN REVIEW, CONDITIONAL USE PERMIT AND TREE REMOVAL PERMIT– LING YEN MOUNTAIN TEMPLE – A request to subdivide approximately 77.39 acres of land into 4 numbered lots including site plan and design review for the development of eight buildings for the operation of a Buddhist Temple for the purposes of worship, living quarters, and related administrative or support uses on certain property located near the northeast corner of DeCliff Drive and Ambleside Place. The Project site consists of portions of four parcels; APNs: 0226-061-47, 0226-061-73, 0226-061-74, and 0226-061-76. Primary Case File No. DRC2021-00187. Environmental review of the project has been conducted consistent with California Environmental Quality Act (CEQA) Guidelines Section 15183(a). E. GENERAL BUSINESS E1. Finding of General Plan Conformity for Real Property Acquisition of Approximately 122 Acres Located East of West Cucamonga Truck Trail (Big Tree Road), generally north of Via Verde Street and Skyline Road Rancho Cucamonga area in unincorporated San Bernardino County; APNs: Portion of 0200- 051-48 and 0200-051-49. F. DIRECTOR ANNOUNCEMENTS G. COMMISSION ANNOUNCEMENTS H. ADJOURNMENT TO ADDRESS THE PLANNING COMMISSION The Planning Commission encourages free expression of all points of view. To allow all persons to speak, given the length of the agenda, please keep your remarks brief. If others have already expressed your position, you may simply indicate that you agree with a previous speaker. If appropriate, a spokesperson may present the views of your entire group. To encourage all views and promote courtesy to others, the audience should refrain from clapping, booing or shouts of approval or disagreement from the audience. If you need special assistance or accommodations to participate in this meeting, please contact the City Clerk's office at (909) 477-2700. Notification of 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility. Listening devices are available for the hearing impaired. The public may address the Planning Commission on any agenda item. To address the Planning Commission, please come forward to the podium. State your name for the record and speak into the microphone. After speaking, please complete a speaker card located next to the speaker’s podium. It is important to list your name, address (optional) and the agenda item letter your comments refer to. Comments are generally limited to 3 minutes per individual. If you wish to speak concerning an item not on the agenda, you may do so under “Public Communications.” As an alternative to participating in the meeting you may submit comments in writing to Elizabeth.Thornhill@cityofrc.us by 12:00 PM on the date of the meeting. Written comments will be distributed to the Commissioners and included in the record. AVAILABILITY OF STAFF REPORTS Copies of the staff reports or other documentation to each agenda item are available at www.CityofRC.us. APPEALS Any interested party who disagrees with the City Planning Commission decision may appeal the Commission’s decision to the City Council within 10 calendar days. Any appeal filed must be directed to the City Clerk’s Office and must be accompanied by a fee of $3,526 for all decisions of the Commission. (Fees are established and governed by the City Council). Please turn off all cell phones while the meeting is in session. I, Elizabeth Thornhill, Executive Assistant of the City of Rancho Cucamonga, or my designee, hereby certify that a true, accurate copy of the foregoing agenda was posted Seventy-Two (72) hours prior to the meeting per Government Code 54954.2 at 10500 Civic Center Drive, Rancho Cucamonga, California and on the City's website. HPC/PC MINUTES – February 12, 2025 Page 1 of 4 2 8 3 1 Historic Preservation Commission and Planning Commission Agenda February 12, 2025 Draft Minutes Rancho Cucamonga, CA 91730 7:00 p.m. The regular joint meeting of the Historic Preservation Commission and Planning Commission was held on February 12, 2025. The meeting was called to order by Chairman Morales at 7:00 p.m. A. Roll Call Planning Commission present: Chairman Morales, Vice Chairman Boling, Commissioner Dopp, Commissioner Daniels and Commissioner Diaz. Staff Present: Katherine Reed, Assistant City Attorney; Jennifer Nakamura, Planning Director; Bond Mendez, Associate Planner; Sophia Serafin, Assistant Planner; Sean McPherson, Principal Planner; Ulises Benavente, Associate Engineer; Elizabeth Thornhill, Executive Assistant. B. Public Communications Chairman Morales opened the public communications. Hearing no comments from the public, Chairman Morales closed the public communications. C. Consent Calendar C1. Consideration to adopt Regular Meeting Minutes of January 22, 2025. Motion: Moved by Commissioner Diaz; seconded by Vice Chairman Boling. Motion carried 5-0 approved the minutes as presented. D1. CONDITIONAL USE PERMIT – VERIZON WIRELESS – A request to construct a 55-foot-tall stealth wireless telecommunication facility within the Flood Control/Utility Corridor (FC/UC) Zone and the General Open Space and Facilities General Plan land use designation, located midblock on the south side of Baseline Road between Rochester Avenue and Day Creek Boulevard at 12107 Baseline Road; APN 1090-331-02. This item is exempt from the requirements of the California Environmental Act (CEQA) and the City’s CEQA guidelines under CEQA Section 15303 – New Construction or Conversion of Small Structures (DRC2024-00057). Assistant Planners Sophia Serafin presented a PowerPoint presentation (copy on file). Chairman Morales opened the public hearing. Applicant Balderas was in attendance and available to answer questions.    Page 3 HPC/PC MINUTES – February 12, 2025 Page 2 of 4 2 8 3 1 No comments from the public, Chairman Morales closed the public hearing. Commissioner Daniels asked staff if the first public comment shown in the staff report specified a reason for not supporting. Assistant Planner Serafin confirmed they did not elaborate. Commissioner Dopp stated that it is unusual to find a tower in the middle of an empty space. Commented that he liked the design, and it is zoned appropriately. Commissioner Daniels expressed that the tower sticking up looks terrible. Would have preferred to see a Palm Tree instead. Commissioner Diaz concurred with Commissioner Daniels that it will look weird and said it will remain to be seen. Expressed concerns with security and transients. She asked if there will be a light source. Assistant Planner Serafina answered there is no proposed lighting in the area. She mentioned that to prevent unauthorized access, fencing will be installed around it and there is existing fencing along Base Line to restrict access to the entire Edison property. Commissioner Diaz asked if other carriers will be allowed to attach to the tower. Applicant Balderas confirmed. Vice Chairman Boling stated he has seen what artificial palm trees look like in residential neighborhoods and he would scratch artificial palms off the list. He expressed his support for the design noting that he likes how it is positioned along the corridor with the vineyards and pays homage to our heritage. Chairman Morales stated it is a fresh design and creative idea. He suggested to place a sign on the fencing near the sidewalk, providing a brief history of what the tower represents. Motion: Moved by Commissioner Dopp; seconded by Vice Chairman Boling to adopt Resolution 2025-001, Conditional Use Permit DRC2024-00057. Motion carried 4-1-0. Commissioner Daniels opposed. D2. TENTATIVE TRACT MAP AND DESIGN REVIEW – AVIGNON RESERVE - A request for site plan and architectural review of 18 multi-family units and a tentative map for condominium purposes located on approximately 1.3 acres of land within the Medium (M) Residential zone, located on the northwest corner of Arrow Route and Manola Place; APNs: 0207-201-24, -10, -11. This item is exempt from the requirements of the California Environmental Quality Act (CEQA) under CEQA Section 15332 (Infill Development Projects) (SUBTT20775, Design Review DRC2023-00131). Associate Planner Bond Mendez presented a PowerPoint presentation (copy on file). Chairman Morales opened the public hearing. Applicant Chau was in attendance and available to answer questions. Ernie (no last name indicated), designer for the adjacent property, asked where the opening between the two parcels located.    Page 4 HPC/PC MINUTES – February 12, 2025 Page 3 of 4 2 8 3 1 Applicant Chau responded that the western adjacent neighbor does not have a project submitted at this time. However, they previously approached them regarding cooperation about a shared driveway. They were agreeable to that, and plans were revised for the shared driveway. Alvin Shih, adjacent property owner, stated there has been no written agreement about the shared driveway and that it has only been verbal. He has not seen any plans and requests that they both connect. Chairman Morales closed the public hearing Commissioner Dopp requested clarification on the appearance of the west end of the property. Associate Planner Mendez provided background on the conversations staff had with the fire district, applicant and adjacent property owners. Planning Director Nakamura stated when the property owner to the west is ready to develop, they will need to collaborate with the property owner present tonight on any future connection. Our hope is that Mr. Chau and his group remain open to those possibilities. She said we will continue to work toward this common objective. Commissioner Dopp expressed his thanks to the applicant for coming in. He said he liked the multiple roof angles, rather than the simple top approach, and likes the grass area in the front because it creates the opportunity for the residents to come together as a community. He also mentioned regarding equity that the Commissioners are glad to see condos for sale that offer lower price points for entry level opportunities. Commissioner Daniels concurred with Dopp. He expressed he liked the colors and the way it looks. He understands the driveway situation and hopes the adjacent property owner to the west does work with the applicant to incorporate the shared driveway. Commissioner Diaz expressed she likes the project and that it brings affordable housing to the area. She said the applicant achieved making it concurrent with the neighborhood. Vice Chairman Boling stated it fits within the neighborhood. Expressed concerns with parking. He said although it does meet the minimum parking requirements established by the development code, he strongly encourages the adjacent property owner to think about the future use of his property. He said the enhanced value that could come from a partnership with his neighbor as it pertains to amenities and use of the site for future residents. Chairman Morales thanked the applicant for looking at the General Plan and seeing the city’s vision and what we had in mind. He expressed the project has a good design and development for that site. He does see the possibilities of the neighboring property working together to address their concerns. He said the project will provide much needed housing units for the city. Motion: Moved by Vice Chairman Boling; seconded by Commissioner Diaz to adopt Resolution 2025-002, Tentative Tract Map SUBTT20775 and Resolution 2025-003 Design Review DRC2023-00131. Motion carried 5-0.    Page 5 HPC/PC MINUTES – February 12, 2025 Page 4 of 4 2 8 3 1 E. Director Announcements Planning Director Nakamura announced the next meeting will be in two weeks, February 26th. F. Commission Announcements - None G. Adjournment Motion: Moved by Commissioner Diaz, seconded by Vice Chairman Boling to adjoin the meeting. Hearing no objections, Chairman Morales adjourned the meeting at 7:48 p.m. Respectfully submitted, Elizabeth Thornhill, Executive Assistant Planning Department Approved:    Page 6 DATE:February 26, 2025 TO:Chairman and Members of the Planning Commission FROM:Jennifer Nakamura, CNU-A, Planning Director INITIATED BY:Kirt Coury, Contract Planner SUBJECT:ENVIRONMENTAL ASSESSMENT, TENTATIVE PARCEL MAP, DESIGN REVIEW, CONDITIONAL USE PERMIT AND TREE REMOVAL PERMIT– LING YEN MOUNTAIN TEMPLE – A request to subdivide approximately 77.39 acres of land into 4 numbered lots including site plan and design review for the development of eight buildings for the operation of a Buddhist Temple for the purposes of worship, living quarters, and related administrative or support uses on certain property located near the northeast corner of DeCliff Drive and Ambleside Place. The Project site consists of portions of four parcels; APNs: 0226-061-47, 0226-061-73, 0226-061-74, and 0226-061-76. Primary Case File No. DRC2021-00187. Environmental review of the project has been conducted consistent with California Environmental Quality Act (CEQA) Guidelines Section 15183(a). RECOMMENDATION: Staff recommends that the Planning Commission adopt the resolutions of approval for Tentative Parcel Map SUBTPM19720, Design Review DRC2021-00187, Conditional Use Permit DRC2021- 00188, and Tree Removal Permit DRC2021-00189, subject to the attached Conditions of Approval. BACKGROUND: Ling Yen Mountain Temple currently operates out of an existing structure built in 1990 totaling approximate 6,600 square feet located on property addressed at 13938 Decliff Drive, wherein the Temple has been in operation since approximately 2005. The Temple had previously proposed an expansion project most recently around 2015 when the project area was under the jurisdiction of unincorporated San Bernardino County. This process with the County was never completed, and in November 2020 the subject project area was annexed into the City of Rancho Cucamonga and zoned to be included within the Etiwanda Heights Neighborhood Conservation Plan (EHNCP). Thus, the developer submitted the subject development application to the City in June 2021 proposing the current expansion project. ANALYSIS: Site Characteristics The total project site area is roughly 77.39 gross acres, however, the buildable project site totals approximately 35.1 acres (as noted in Figure 1 – Aerial Photo). The project site is bound by vacant land to the north and west, vacant land and a utility easement to the south, and Dawnridge Drive, Enright ranch, Cucamonga Valley Water District tank reservoir, and vacant land to the east. Additionally, several unimproved access roads traverse the Project site and provide access to surrounding properties and facilities owned by Los Angeles Department of Water and Power (LADWP), Cucamonga Valley Water District (CVWD), and San Bernardino County Flood Control District. The site is relatively steep in areas with onsite elevations ranging from 1,740 to 1,975 feet above mean sea level.   Page 7 Page 2 of 10 2 7 3 7 Figure 1: Aerial Map The Project site is partially developed with an approximate 6,600-square foot (SF) temple facility which was originally built as a single-family residence. Existing improvements include the aforementioned existing 6,600 square foot structure, an associated driveway and parking lot in the northwest portion of the Project site. The existing temple facility also includes ornamental trees, an 8-foot-high wall, and a private access road. Staff notes that this structure is proposed to remain. The Project site has a General Plan land use designation of Rural Open Space (OS) and General Open Space and Facilities (OS). The proposed Project is also within the Etiwanda Heights Neighborhood Conservation Plan (EHNCP). Within the EHNCP, the Project site is in the Rural/Conservation area and under the Rural (R) regulating zone. The existing land use, General Plan, and Zoning designations for the project site and adjacent properties are as follows: Land Use General Plan Zoning Site Existing Buddhist Temple Facility Rural Open Space (OS) and General Open Space and Facilities (OS) Etiwanda Heights Neighborhood Conservation Plan (EHNCP) North Rural Rural Open Space (OS) and Etiwanda Heights Neighborhood    Page 8 Page 3 of 10 2 7 3 7 Undeveloped Land General Open Space and Facilities (OS) Conservation Plan (EHNCP) South Undeveloped Land and Residential Neighborhood General Open Space and Facilities (OS) followed by Suburban Neighborhood Very Low (N) Flood Control Utility Corridor (R- FC/UC) with Equestrian Overlay and Hillside Overlay per Ordinance 628 within the Etiwanda Heights Neighborhood Conservation Plan followed by Very Low Residential – Etiwanda Highlands 14000 (VL – EH 14000) West Rural Undeveloped Land Rural Open Space (OS) and General Open Space and Facilities (OS) Open Space (R-OS) and Flood Control Utility Corridor (R- FC/UC) with Equestrian Overlay and Hillside Overlay East Undeveloped Land, a Water Tank, and Enright Ranch Rural Open Space (OS) and General Open Space and Facilities (OS) Open Space (R-OS), Flood Control Utility Corridor (R- FC/UC), and Hillside Residential (R-H) with Equestrian Overlay and Hillside Overlay Project Design and Layout The applicant proposes to subdivide the 77.39 acre project site into four new parcels. Parcel three (consisting of 35.1 acres) of the proposed parcel map proposes to include the expansion of the existing temple facility. The project applicant is proposing to develop eight buildings which would result in a total building area 93,003 square feet as well as associated project improvements. The buildings would be developed close to one another and near the center of the project site adjacent to Dawnridge Drive and DeCliff Drive as a clustered development primarily used for assembly purposes.    Page 9 Page 4 of 10 2 7 3 7 Figure 2: Project Site Plan Generally, the proposed project comprises three buildings for worship and assembly, two buildings for ancillary administrative and support uses, and three buildings for group residences. The proposed project would also include associated infrastructure and improvements such as landscaping, hardscape elements, plazas, parking lots, fuel modification, open space, roadways, and utility and stormwater improvements. The various eight buildings proposed are described in further detail below: Building 1: Gate Building 1 is envisioned as the front entry gate for the proposed Project. The 23-foot-high gate would provide pedestrian access from Decliff Drive, serving as the primary entry point into the Project site. The design of the gate does not support occupancy. Building 2: Administration, Visitor Center, Classroom, and Library Building 2 would be developed for administration and supportive uses with a total building area of 19,074 SF. The building would be located east of Building 1 adjacent to Dawnridge Drive. The building would be two stories tall with a height of 27 feet and 3 inches. The first floor would have a building area of 5,951 SF and would include three classrooms for studying Buddhist teachings    Page 10 Page 5 of 10 2 7 3 7 and philosophies. The second floor would be 13,123 SF and would include an administrative room, offices, and a visitor center. Building 3: Buddha Hall Building 3 would be developed as a worship hall for special assembly uses (not open to the public except during certain ceremonies) and would have a total building area of 20,000 SF. The proposed building would be located in the center of all the proposed buildings. The building would be one story with a height of 49 feet and 10 inches. The building would also include two storage areas, each with an area of 1,600 SF, and the main Buddha Hall would have an area of 16,800 SF. Additionally, the Buddha Hall would have a maximum capacity of 500 people during events. Building 4: Dining Hall Building 4 would be developed for administration and supportive uses, specifically as a kitchen and dining hall, with a total building area of 19,654 SF. The building would be located east of Building 3 and adjacent to Dawnridge Drive. The building would be one story with a height of 28 feet and 10 inches. The building would also be separated into an upper-level dining hall with a building area of 12,412 SF and a lower-level kitchen with an area of 7,242 SF. Additionally, the upper-level dining hall would have a maximum capacity of 500 people. Building 5: Nuns Living Court Building 5 would be one of two living courts for female monastic residents developed for group residential uses. The nun’s living court would have a total building area of 4,900 SF and would be located west of Building 3. The building would be one story and have a height of 22 feet and 3 inches. The building would also include four common sleeping areas, shared showers, a reading room, and a lavatory. There will be an outdoor courtyard accessible via exterior hallways. Additionally, the building would have a maximum capacity of 10 people. Building 6: Nuns Living Court Building 6 would be developed identical to Building 5 as a nun’s living court for group residential use. This building would be located south of Building 5. Building 7: Chanting, Wellness, and Memorial Hall Building 7 would be developed as a worship hall for assembly uses, would have a total building area of 19,575 SF, and would be located north of Building 3. The building would be one story and have a height of 50 feet. Building 7 would include a Chanting Hall in the center portion of the building with an area of 14,375 SF, a Wellness Hall in the east portion with an area of 2,600 SF, and a Memorial Hall in the west portion with an area of 2,600 SF. The Wellness and Memorial Hall’s would be open to guests, whereas the Chanting Hall would be used for daily services by monastic residents and for follower retreats. Additionally, the building would have a maximum occupancy of 500 people during retreats. Each hall would be used for a separate type of worship and assembly purpose. Building 8: Monk’s Living Court Building 8 would be developed as a residential living court for monks with a total building area of    Page 11 Page 6 of 10 2 7 3 7 4,900 SF, located northeast of Building 3. The building would be one story and have a height of 21 feet. The building would also have the same interior and exterior amenities as the nun’s living court with a maximum capacity of 10 people (refer to Figure 7 for elevations). Architecture and Site Design Theme The proposed Project’s use of landscaping, building layout, finish materials, and accenting on the Project site would create a quality architectural presence. Buildings would utilize muted and neutral color schemes with surrounding courtyards and gardens to create a tranquil and peaceful atmosphere. Finish materials for the buildings will include white and medium grey stucco finish, cultured stone accents at the lower level of the Building 2 tower, reddish brown and black metal column covers, dark grey concrete tile roofs, and enhanced concrete within the courtyard hardscape areas. All of the buildings have similar architectural elements as shown in Figure 3 below at various scales based on the building size. Additionally, the proposed buildings would be setback from the existing and proposed private roadways. The front building setback for the Project would be approximately 127 feet from DeCliff Drive; 37 feet from Dawnridge Drive; and 103 feet from the northern private road. Figure 3: Color Image of Proposed Architecture The proposed Project complies with the applicable development standards for the EHNCP as shown in the table below: Development Standard Required Proposed Complies? Building Height Maximum 50 feet Buildings 1-, 2, and 4- 8 are below 50 feet: Building 3: 50 feet YES Structures must be clustered into a campus-like environment that is as compact as possible Clustered Campus-Like Environment Clustered Campus-Like Environment YES    Page 12 Page 7 of 10 2 7 3 7 Parking Development of the proposed Project would provide seven parking facilities throughout the Project site and would include a total of 449 parking stalls. It should be noted that a parking analysis has been included in the Compliance Memorandum (EPD Solutions, 2024) prepared for the project which is permitted to determine sufficient parking for places of assembly pursuant to Development Code Section 17.64.050-1. The parking analysis determined that a maximum parking demand of 402 parking spaces would be required for the site at peak time (i.e. Lunar New Year, occurring once per calendar year). As can be determined, the Project exceeds the noted maximum number of parking spaces determined for the Project. Fences and Walls The proposed Project would include the construction of a new 8-foot-high screening wall along the perimeter of all proposed buildings within the clustered development of the Project site. Additionally, a low wall with a height of 3 foot and 6 inches is proposed within the clustered development and 8-foot-high wall. The low wall would surround the Veda and Buddha Halls, both plazas, and the entrance to the Chanting Hall. Landscaping The proposed Project would install new landscaping, gardens, and hardscaping throughout the site that would cover approximately 497,844 SF (11.42 acres), of the total Project site, as shown in Figure 10, Landscaping Plan. Landscaping would be situated throughout the Project site including around buildings, parking areas, and along private roadways. In general, the Project’s landscape design would enhance and support the proposed architecture through the use of trees, shrubs, ground covers, and appropriate hardscape elements, with the goal of reinforcing and emphasizing the architectural hierarchy while accommodating outdoor uses of the site. Landscaping would also be arranged to screen and direct views as appropriate; provide shade for parking areas; incorporate applicable water conservation and fire protection measures; and generally, beautify the site while conforming to applicable City requirements. The Project design incorporates a 100-foot minimum fuel modification zone around the Project site, consistent with applicable requirements, to reduce risks associated with wildland fires. Additionally, three types of landscaping and planting zones would be incorporated throughout the Project site based on distance to buildings, slopes, and detention basins.    Page 13 Page 8 of 10 2 7 3 7 Figure 4: Overall Campus Image Related Entitlements As noted, the Project involves the processing of multiple entitlements. In addition to the processing of a Design Review for the construction and expansion of proposed structures and facilities, the application also involves a request to approve a Tentative Parcel Map to reconfigure the subject properties into four new parcels, a Conditional Use Permit for the operation of a Buddhist Temple for the purposes of worship, living quarters, and related administrative or support uses, and a Tree Removal Permit to allow the removal of 46 heritage trees which are necessary to accommodate the construction of the proposed buildings and related road and utility infrastructure. Resolutions further describing each of these entitlements are included as exhibits to this staff report. Notably, regarding the tree removal permit, staff notes that the Project applicant proposes to plant 52 replacement trees in accordance with the City’s tree removal and replacement regulations. Neighborhood Meeting The applicant hosted a neighborhood meeting at the existing Buddhist Temple located at 13938 DeCliff Drive, at 6:00 p.m. on October 10, 2023. The developer sent notices advertising the neighborhood meeting to property owners within 660 feet of the Project site. Approximately 40 community members attended the meeting along with the applicant’s team and the Project planner. The applicant’s team presented the Project and opened the meeting to questions. Various questions were related to traffic and parking, with additional comments on building size, drainage, architecture, and general operations. The major concern was how the Project would impact traffic in the immediate area. The applicant responded that access to the Project site would be provided via the buildout of Dawnridge Drive from the current terminus of Colonbero Road. In addition to providing primary access to the proposed Project, Dawnridge Drive would continue to provide access to the adjacent Cucamonga Valley Water District water tanks. A secondary access point would be provided via Ambleside Place to Colonbero Road for emergency access.    Page 14 Page 9 of 10 2 7 3 7 Design Review Committee The Project was reviewed by the Design Review Committee (DRC – Daniels and Boling) on May 21, 2024. Staff presented the item to the Design Review Committee. Following staff’s presentation, members of the applicant’s team, including their architect, provided additional background and detail on the Project. Following the presentation discussion ensued over various aspects of the Project. The Committee had questions for staff relating to the proposed use and location relative to the General Plan Land Use designation. Staff answered the questions including background of the City’s General Plan update, approval of EHNCP with chronological reference, and discussions about the area and setting. The Committee also raised questions about proposed on-site parking and peak events. The applicant stated that they have a parking study to ensure adequate on-site parking. The Committee additionally asked questions relating to the Project landscaping and lighting. The applicant outlined the environmental setting and layout and described the experience the guests will encounter when visiting the site. The applicant also provided pictures of similar settings for the Committee’s reference. The Committee recommended that the Project be forwarded to the Planning Commission for their review. Public Art Places of worship are exempt from the City’s Public Art requirement, pursuant to Section 17.124.020.B.7 of the Development Code. Environmental Assessment Planning staff has determined that the Project meets the requirements as set forth in CEQA Guidelines Section 15183(a), which mandates that projects which are consistent with the development density established by existing zoning, community plan, or general plan policies for which an EIR was certified shall not require additional environmental review, except as might be necessary to examine whether there are project-specific significant effects which are peculiar to the project or its site. The General Plan and the analysis within the certified General Plan EIR is applicable to the proposed Project and is used to provide basis for use of the Section 15183 CEQA streamlining provision. In addition, the EHNCP and the analysis within the EHNCP certified EIR is applicable to the proposed Project and is used to provide basis for the additional and supplemental evaluation. The EHNCP implements the General Plan for the portion of the planning area the Project site is located within, and thus, is incorporated into the General Plan. A project is consistent with the EHNCP and General Plan if the development density does not exceed what was contemplated and analyzed for the parcel(s) under the EHNCP EIR and General Plan EIR and complies with the associated standards applicable to that development density. The Project implements the EHNCP and General Plan Update and facilitates the development of the undeveloped portion of the EHNCP and General Plan consistent with the maximum unit count, Land Use designations, and allowed densities. Correspondence This item was advertised as a public hearing with a regular legal advertisement in the Inland Valley Daily Bulletin newspaper on February 14, 2025, the property was posted on February 13, 2025, and notices were mailed to 35 property owners within a 660-foot radius of the Project site on February 12, 2025. To date, Staff has not received any comments from the public.    Page 15 Page 10 of 10 2 7 3 7 FISCAL IMPACT: The Project site currently is assessed an annual property tax. A percentage of this annual tax is shared with the City. The proposed lot subdivision and development will increase the value of the Project site when constructed and the City’s annual share of the property tax will increase accordingly. The Project proponent also will be responsible for paying one-time impact fees. These fees are intended to address the increased demand for City services due to the proposed Project. The following types of services that these impact fees would support include the following: library services, transportation infrastructure, drainage infrastructure, animal services, police, parks, and community and recreation services. COUNCIL MISSION / VISION / VALUE(S) ADDRESSED: The Project supports several City Council core values including providing and nurturing a high quality of life for all and building and preserving a family-oriented atmosphere. The proposed Project will allow for the expansion of an existing religious institution to the benefit of the community. Further, the Project meets all relevant development standards thus effectuating the goals and vision of the Etiwanda Heights Neighborhood and Conversation Plan as desired by the City Council. EXHIBITS: Exhibit A – Project Plans Exhibit B – DRC Comments and Minutes Dated May 21, 2024 Exhibit C – CEQA 15183 Memorandum Exhibit D – Tentative Parcel Map SUBTPM19720 Draft Resolution 2025-005 with COA Exhibit E – Design Review DRC2021-00187 Draft Resolution 2025-006 with COA Exhibit F – Conditional Use Permit DRC2021-00188 Draft Resolution 2025-007 with COA Exhibit G – Tree Removal Permit DRC2021-00189 Draft Resolution 2025-008 with COA    Page 16 EXHIBIT A Due to file size, this attachment can be accessed through the following link: Project Plans    Page 17 DESIGN REVIEW COMMENTS May 21, 2024 7:00 p.m. Kirt Coury, Contract Planner LOCATED AT 13938 DECLIFF DRIVE – LING YEN MOUNTAIN TEMPLE – A request for a Tentative Parcel Map, Design Review, Tree Removal Permit and Conditional Use Permit to allow for the development of eight buildings for the operation of a Buddhist Temple for the purposes of worship, living quarters, and related administrative or support uses on certain property located at the northeast corner of DeCliff Drive and Ambleside Place. The Project site consists of portions of four parcels; APNs: 0226-061-47, 0226-061-73, 0226-061-74, and 0226- 061-76. Primary Case File No. DRC2021-00187. Site Characteristics: The project site totals approximately 35.1 acres and is bound by vacant land to the north and west, vacant land and a utility easement to the south, and Dawnridge Drive, Enright ranch, Cucamonga Valley Water District tank reservoir, and vacant land to the east. Additionally, several unimproved access roads traverse the Project site and provide access to surrounding properties and facilities owned by LADWP, Cucamonga Valley Water District (CVWD), and San Bernardino County Flood Control District. The site is relatively steep in areas with onsite elevations ranging from 1,740 to 1,975 feet above mean sea level. Figure 1: Aerial Photo Including Project Proposed Campus and Boundaries Exhibit B    Page 18 DRC COMMENTS DR DRC2021-00187 – LING YEN MOUNTAIN TEMPLE May 21, 2024 Page 2 The Project site is partially developed with a 6,800-square foot (SF) temple facility and associated driveway and parking lot in the northwest portion of the Project site. The existing temple facility also includes ornamental trees, an 8-foot-high wall, and a private access road. The Project site has an existing General Plan land use designation of Rural Open Space (OS) and General Open Space and Facilities (OS). The proposed Project is also within the Etiwanda Heights Neighborhood Conservation Specific Plan (EHNC-SP). Within the EHNC-SP, the Project site is in the Rural/Conservation area and under the Rural (R) regulating zone. The existing land use, General Plan, and Zoning designations for the project site and adjacent properties are as follows: Land Use General Plan Zoning Site Existing Buddhist Temple Facility Rural Open Space (OS) and General Open Space and Facilities (OS) Etiwanda Heights Neighborhood Conservation Specific Plan (EHNC-SP) North Rural Undeveloped Land Rural Open Space (OS) and General Open Space and Facilities (OS) Etiwanda Heights Neighborhood Conservation Specific Plan (EHNC-SP) South Undeveloped Land and Residential Neighborhood General Open Space and Facilities (OS) followed by Suburban Neighborhood Very Low (N) Flood Control Utility Corridor (R- FC/UC) with Equestrian Overlay and Hillside Overlay per Ordinance 628 within the Etiwanda Heights Neighborhood Conservation Plan followed by Very Low Residential – Etiwanda Highlands 14000 (VL – EH 14000) West Rural Undeveloped Land Rural Open Space (OS) and General Open Space and Facilities (OS) Open Space (R-OS) and Flood Control Utility Corridor (R- FC/UC) with Equestrian Overlay and Hillside Overlay East Undeveloped Land, a Water Tank, and Enright Ranch Rural Open Space (OS) and General Open Space and Facilities (OS) Open Space (R-OS), Flood Control Utility Corridor (R- FC/UC), and Hillside Residential (R-H) with Equestrian Overlay and Hillside Overlay Project Overview: The applicant proposes to subdivide the project site into four new parcels to accommodate the construction of eight buildings totaling a cumulative 93,313 square feet on a 35.1-acre Project site. The proposed development footprint would encompass approximately 11.5 acres of the overall Project site as all eight buildings would be developed close to one another and near the center of the Project site adjacent to Dawnridge Drive and DeCliff Drive as a clustered development primarily used for assembly purposes.    Page 19 DRC COMMENTS DR DRC2021-00187 – LING YEN MOUNTAIN TEMPLE May 21, 2024 Page 3 Figure 2: Project Site Plan Generally, the proposed project comprises three buildings for worship and assembly, two buildings for ancillary administrative and support uses, and three buildings for group residences. The proposed project would also include associated infrastructure and improvements such as landscaping, hardscape elements, water features, plazas, parking lots, fuel modification, open space, roadways, and utility and stormwater improvements. The various eight buildings proposed are described in further detail below: Building 1: Veda Hall and Maitreya Hall Building 1 would be developed as a worship center used primarily by tourists with a total building area of 1,050 SF located at the south portion of the clustered development. The building would be one story tall and have a height of 24 feet and 7 inches. Additionally, the building would have an occupancy capacity of 28.    Page 20 DRC COMMENTS DR DRC2021-00187 – LING YEN MOUNTAIN TEMPLE May 21, 2024 Page 4 Figure 3: Building 1 Elevations Building 2: Administration, Visitor Center, Classroom, and Library Building 2 would be developed for administration and supportive uses with a total building area of 18,334 SF located east of Building 1 adjacent to Dawnridge Drive. The building would be two stories with a height of 27 feet and 3 inches. The first floor would have a building area of 5,715 SF and would include three classrooms for studying Buddhist teachings and philosophies. The second floor would be 12,583 SF and would include an administrative room, offices, and a visitor center. Figure 4: Building 2 Elevations Building 3: Buddha Hall Building 3 would be developed as a worship hall for special assembly uses (not open to the public except during certain ceremonies) with a total building area of 20,000 SF located in the center of all the proposed buildings. The building would be one story with a height of 49 feet and 10 inches. The building would also include two storage areas, each with an area of 1,600 SF, and the main Buddha Hall would be 16,800 SF. Additionally, the Buddha Hall would have a maximum capacity of 500 people during events.    Page 21 DRC COMMENTS DR DRC2021-00187 – LING YEN MOUNTAIN TEMPLE May 21, 2024 Page 5 Figure 5: Building 3 Elevations Building 4: Dining Hall Building 4 would be developed for administration and supportive uses, specifically as a kitchen and dining hall, with a total building area of 19,654 SF located east of Building 3 and adjacent to Dawnridge Drive. The building would be one story with a height of 28 feet and 10 inches. The building would also be separated into an upper level, dining hall with a building area of 12,412 SF and a lower-level kitchen with an area of 7,242 SF. Additionally, the upper level or dining hall would have a maximum capacity of 500 people. Figure 6: Building 4 Elevations Building 5: Nuns Living Court Building 5 would be one of two living courts for female monastic residents developed for group residential uses. The nun’s living court would have a total building area of 4,900 SF located west of Building 3 (near the parking area). The building would be one story and have a height of 22 feet and 3 inches. The building would also include four common sleeping areas, shared    Page 22 DRC COMMENTS DR DRC2021-00187 – LING YEN MOUNTAIN TEMPLE May 21, 2024 Page 6 showers, a reading room, and a lavatory. There will be an outdoor courtyard accessible via exterior hallways. Additionally, the building would have a maximum capacity of 10 people. Figure 7: Buildings 5, 6 & 8 Elevations Building 6: Nuns Living Court Building 6 would be developed identical to Building 5 as a nun’s living court for group residential use. This building would be located south of Building 5. Building 7: Chanting, Wellness, and Memorial Hall Building 7 would be developed as a worship hall for assembly uses with a total building area of 19,575 SF located north of Building 3. The building would be one story and have a height of 50 feet. Building 7 would include a Chanting Hall in the center portion of the building with an area of 14,375 SF, a Wellness Hall in the east portion with an area of 2,600 SF, and a Memorial Hall in the west portion with an area of 2,600 SF. The Wellness and Memorial Hall’s would be open to guests, whereas the Chanting Hall would be used for daily services by monastic residents and for follower retreats. Additionally, the building would have a maximum occupancy of 500 people during retreats. Each hall would be used for a separate type of worship and assembly purpose.    Page 23 DRC COMMENTS DR DRC2021-00187 – LING YEN MOUNTAIN TEMPLE May 21, 2024 Page 7 Figure 8: Building 7 Elevations Building 8: Monk’s Living Court Building 8 would be developed as a residential living court for monks with a total building area of 4,900 SF located northeast of Building 3. The building would be one story and have a height of 20 feet and 11 inches. The building would also have the same interior and exterior amenities as the nun’s living court with a maximum capacity of 10 people (see Figure 7). Architecture and Site Design Theme The proposed Project’s use of landscaping, building layout, finish materials, and accenting on the Project site would create a quality architectural presence. Buildings would utilize muted and neutral color schemes with surrounding courtyards and gardens to create a tranquil and peaceful atmosphere. Finish materials for the buildings will include white and medium grey stucco finish, cultured stone accents at the lower level of the Building 2 tower, reddish brown and black metal column covers, dark grey concrete tile roofs, and enhanced concrete within the courtyard hardscape areas. Additionally, the proposed buildings would be setback from the existing and proposed private roadways. The front building setback for the Project would be approximately 127 feet and 6 inches from DeCliff Drive; 37 feet from Dawnridge Drive; and 103 feet and 4 inches from the northern private road. The proposed project complies with the applicable development standards for the EHNC-SP as shown in the table below:    Page 24 DRC COMMENTS DR DRC2021-00187 – LING YEN MOUNTAIN TEMPLE May 21, 2024 Page 8 Parking: Development of the proposed Project would provide seven parking facilities throughout the Project site and would include a total of 449 parking stalls. It should be noted that a Parking Study has been prepared for the project (prepared by Ganddini Traffic Consultants). The parking study determined that a maximum parking demand of 402 parking spaces would be required for the site at peak time (Chinese New Year, occurring once per calendar year). As can be determined, the project exceeds the noted maximum number of parking spaces determined for the project. Fences and Walls: The proposed Project would include the construction of a new 8-foot-high screening wall along the perimeter of all proposed buildings within the clustered development of the Project site. Additionally, a low wall with a height of 3 foot and 6 inches is proposed within the clustered development and 8-foot-high wall. The low wall would surround the Veda and Buddha Halls, both plazas, and the entrance to the Chanting Hall. Landscaping: The proposed Project would install new landscaping, gardens, and hardscaping throughout the site that would cover approximately 497,844 SF (11.42 acres), of the total Project site, as shown in Figure 10, Landscaping Plan. Landscaping would be situated throughout the Project site including around buildings, parking areas, and along private roadways. Additionally, two ponds are proposed on the east and west side of the Veda and Maitreya Hall. In general, the Project’s landscape design would enhance and support the proposed architecture through the use of trees, shrubs, ground covers, and appropriate hardscape elements, with the goal of reinforcing and emphasizing the architectural hierarchy while accommodating outdoor uses of the site. Landscaping would also be arranged to screen and direct views as appropriate; provide shade for parking areas; incorporate applicable water conservation and fire protection measures; and generally, beautify the site while conforming to applicable City requirements. The Project design incorporates a 100-foot minimum fuel modification zone around the Project site, consistent with applicable requirements, to reduce risks associated with wildland fires. Additionally, three types of landscaping and planting zones would be incorporated throughout the project site based on distance to buildings, slopes, and detention basins. Development Standard Required Proposed Complies? Building Height Maximum 50 feet Buildings 1-6, and 8 are below 50 feet: Building 7: 50 feet YES Structures must be clustered into a campus-like environment that is as compact as possible Clustered Campus-Like Environment Clustered Campus-Like Environment YES    Page 25 DRC COMMENTS DR DRC2021-00187 – LING YEN MOUNTAIN TEMPLE May 21, 2024 Page 9 Figure 9: Landscape Plan    Page 26 DRC COMMENTS DR DRC2021-00187 – LING YEN MOUNTAIN TEMPLE May 21, 2024 Page 10 Figure 10: Overall Campus Image 1. Staff Recommendation: Staff requests that the Design Review Committee consider the design (building architecture, site planning, etc.) of the proposed project and recommend the selected action below to the Planning Director / Planning Commission: ☐Recommend approval of the design of the project as proposed by the applicant. ☐Recommend approval with modifications to the design of the project by incorporating revisions requested by the Committee. Follow-up review by the Committee is not required. The revisions shall be verified by staff prior to review and action by the Planning Director / Planning Commission. ☐Recommend denial of the design of the project as proposed by the applicant. Design Review Committee Action Staff Planner: Kirt Coury, Contract Planner Members Present: Staff Coordinator: Sean McPherson, Principal Planner Attachment: Exhibit A: Project Plans    Page 27 Design Review Committee Meeting Agenda May 21, 2024 FINAL MINUTES Rancho Cucamonga, CA 91730 New Time: 6:00 p.m. A. Call to Order The meeting of the Design Review Committee held on May 21, 2024. The meeting was called to order by Sean McPherson, Staff Coordinator, at 6:00 p.m. Design Review Committee members present: Commissioner James Daniels and Commissioner Melissa Diaz. Staff Present: Adam Pisarkiewicz, Senior Planner. B. Public Communications Staff Coordinator opened the public communication and after noting there were no public comments, closed public communications. C. Consent Calendar C1. Consideration to adopt Meeting Minutes of April 16, 2024. C2. Consideration to adopt Meeting Minutes of May 7, 2024. Item C1. Motion carried 2-0 vote. Item C2. Motion carried 2-0 vote. D. Project Review Items D1. LOCATED AT 13938 DECLIFF DRIVE – LING YEN MOUNTAIN TEMPLE – A request for a Tentative Parcel Map, Design Review, Tree Removal Permit and Conditional Use Permit to allow for the development of eight buildings for the operation of a Buddhist Temple for the purposes of worship, living quarters, and related administrative or support uses on certain property located at the northeast corner of DeCliff Drive and Ambleside Place. The Project site consists of portions of four parcels; APNs: 0226-061-47, 0226-061-73, 0226-061-74, and 0226-061-76. Primary Case File No. DRC2021-00187. Staff presented the item to the Design Review Committee. Following the staff’s presentation, members of the applicant’s team (Vicky Chang), including their architect (Eric Chen; CDA Architects), provided additional background and detail on the project. Following the presentation discussion ensued over various aspects of the project. Prior to providing comments on the project presented, Committee members asked if any comments offered by the Design Review Committee will need to be reviewed by the City Attorney, as the project involved a religious institution and therefore may be protected under State law. Staff responded that they will consult with the City Attorney for direction prior to any scheduled public hearing. Staff further reminded the Committee that the Design Review Committee offers non-binding recommendations to the Planning Commission, therefore any recommendations may be subject to change.    Page 28 The Committee was complimentary of the project plan, architecture, and layout and was accepting of the proposed project. The Committee further expressed their appreciation of the proposed project development as the design appeared to be respectful of the area and land. The Committee had questions for staff relating to the proposed use and location relative to the General Plan Land Use designation. Staff answered the questions including background of the City’s General Plan update, approval of area Specific Plans with chronological reference, and discussions about the area and setting. The Committee also raised mild concerns about proposed on-site parking and peak events. The applicant stated that they have a parking study to ensure adequate on-site parking. The Committee additionally asked questions relating to the project landscaping and lighting. The applicant outlined the environmental setting and layout and described the experience the guests will encounter when visiting the site. The applicant also provided pictures of similar settings for the Committee’s reference. The Committee recommended that the project be forwarded to the Planning Commission for their review. The Committee took the following action: Recommend approval to PC. 2-0 Vote. E. Adjournment Principal Planner Sean McPherson adjourned the meeting at 8:00 p.m. Respectfully submitted, Elizabeth Thornhill, Executive Assistant    Page 29 EXHIBIT C Due to file size, this attachment can be accessed through the following link: CEQA 15183 Memorandum    Page 30 RESOLUTION NO. 2025-005 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING TENTATIVE PARCEL MAP SUBTPM19720, A REQUEST TO SUBDIVIDE 77.39 ACRES OF LAND INTO 4 PARCELS INCLUDING SITE PLAN (CONSISTING OF 35.1 ACRES) AND DESIGN REVIEW FOR THE DEVELOPMENT OF EIGHT BUILDINGS FOR THE EXPANSION AND CONTINUED OPERATION OF A BUDDHIST TEMPLE FOR THE PRUPOSES OF WORSHIP, LIVING QUARTERS, AND RELATED ADMINISTRATIVE OR SUPPORT USES ON CERTAIN PROPERTY LOCATED AT THE NORTHEAST CORNER OF DECLIFF DRIVE AND AMBLESIDE PLACE IN THE ETIWANDA HEIGHTS NEIGHBORHOOD CONSERVATION PLAN (EHNCP), AND MAKING FINDINGS IN SUPPORT THEREOF. THE PROJECT SITE CONSISTS OF PORTIONS OF FOUR PARCELS; APNS: 0226-061-47, 0226-061-73, 0226-061-74, AND 0226-061- 76. A.Recitals. 1.Ling Yen Mountain Temple filed an application for the approval of Tentative Parcel Map SUBTP19720, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Tentative Parcel Map request is referred to as "the application." 2.On the 26th day of February 2025, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on said application and concluded said hearing on that date. 3.All legal prerequisites prior to the adoption of this Resolution have occurred. B.Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1.This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2.Based upon the substantial evidence presented to this Commission during the above-referenced meeting on February 26, 2025, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a.The application is a proposed expansion to an existing temple located to a mostly undeveloped site located at 13938 DeCliff Drive; and Exhibit D   Page 31 PLANNING COMMISSION RESOLUTION NO. 2025-005 TENTATIVE PARCEL MAP SUBTPM19720 February 26, 2025 Page 2 b. The project site is made up of four parcels of land. Parcel three (consisting of 35.1 acres) of SUBTPM19720 proposes to include the expansion of the existing temple facility. The project applicant is proposing to develop eight buildings which would result in a total building area of 93,003 square feet as well as associated project improvements, including, but not limited to driveways and private access roadways, and utility infrastructure connection and expansion along Dawnridge Drive, Ambleside Place, and DeCliff Drive. Improvements have been conditioned to be installed as a part of the related Design Review Conditions of Approval (DRC2021- 00187); and c. The existing land uses on, and General Plan land use and zoning designations for, the project site and the surrounding properties (relative to the above- noted parcel) are as follows: Land Use General Plan Zoning Site Existing Buddhist Temple Facility Rural Open Space (OS) and General Open Space and Facilities (OS) Etiwanda Heights Neighborhood Conservation Plan (EHNCP) North Rural Undeveloped Land Rural Open Space (OS) and General Open Space and Facilities (OS) Etiwanda Heights Neighborhood Conservation Plan (EHNCP) Sout h Undeveloped Land and Residential Neighborhood General Open Space and Facilities (OS) followed by Suburban Neighborhood Very Low (N) Flood Control Utility Corridor (R-FC/UC) with Equestrian Overlay and Hillside Overlay per Ordinance 628 within Etiwanda Heights Neighborhood Conservation Plan followed by Very Low Residential – Etiwanda Highlands (14000 (VL-HC 14000) West Rural Undeveloped Land Rural Open Space (OS) and General Open Space and Facilities (OS) Open Space (R-OS) and Flood Control Utility Corridor (R-FC/UC) with Equestrian Overlay and Hillside Overlay East Undeveloped Land, a Water Tank, and Enright Ranch Rural Open Space (OS) and General Open Space and Facilities (OS) Open Space (R-OS) and Flood Control Utility Corridor (R-FC/UC) with Equestrian Overlay and Hillside Overlay d. The property is currently improved with an existing structure built in 1990 at a time when the subject property was under the jurisdiction of unincorporated San Bernardino County which totals approximately 6,600 square feet and which the applicant is currently using for office hours, group worship, and prayer services throughout the week; and    Page 32 PLANNING COMMISSION RESOLUTION NO. 2025-005 TENTATIVE PARCEL MAP SUBTPM19720 February 26, 2025 Page 3 e. The subject property was annexed from the County of San Bernardino into the City of Rancho Cucamonga in November 2020 and assigned a zoning designation within the Etiwanda Heights Neighborhood Conservation Plan (EHNCP); and f. The subject tentative map is related to Design Review DRC2021-00187 for the expansion of the existing temple facility as the project applicant is proposing to develop eight buildings which would result in a total building area of 93,003 square feet as well as associated project improvements, Conditional Use Permit DRC2021-00188 which permits an assembly use for the temple, and a Tree Removal Permit DRC2021- 00189 related to the proposed removal of 46 trees and the proposed replacement of 52 trees; and g. Tentative Parcel Map SUBTPM19720 is for the subdivision of approximately 77.39-acres of land into four parcels. Parcel three is 35.1 acres and proposes to include the expansion of the existing temple facility. Parcel three will included the develop of eight buildings within a campus environment and setting. The remaining parcels will remain undeveloped. 3. Based upon the substantial evidence presented to this Commission during the above-referenced meeting and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The tentative parcel map is consistent with the General Plan, Development Code, and any applicable specific plans. The proposed parcel map will subdivide the project site into four parcels. Parcel three, as previously noted, will include the development of eight buildings as well as associated project improvements, and is consistent with the General Plan land use designations and the Etiwanda Heights Neighborhood Conservation Plan (EHNCP) zoning designation, which allow for the expansion and development of the proposed temple worship facility; and b. The design or improvements of the tentative parcel map will be consistent with the General Plan, Development Code, and applicable Specific Plan. Additionally, the proposed expansion and development of the project site complies with all of the related development standards including building setbacks, lot coverage, height, parking, and design; and c. The site is physically suitable for the type of development proposed. The project site is well suited for the proposed expansion and development as it is located in a Specific Plan and is bordered by sites similarly zoned for hillside developments and open space; and    Page 33 PLANNING COMMISSION RESOLUTION NO. 2025-005 TENTATIVE PARCEL MAP SUBTPM19720 February 26, 2025 Page 4 d. The design of the tentative parcel map is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat. The General Plan Update (GPU) Environmental Impact Review (EIR) considered implementation of Specific Plans, such as the EHNCP. The EHNCP implements the GPU for the portion of the Planning Area where the project site is located. Environmental review and analysis associated with the streamlined Consistency Analysis and Checklist pursuant to the California Environmental Quality Act (CEQA) has demonstrated that the project would not have a significant impact on the environment; and e. The tentative tract map is not likely to cause serious public health problems. The subdivision and expansion of the project site is not expected to cause serious public health issues, as the proposed tentative parcel map is for the subdivision of the site into four parcels with only parcel three designated for the development of an assembly use/temple worship project. As noted, a streamlined Consistency Analysis and Checklist pursuant to the California Environmental Quality Act (CEQA) has demonstrated that the project would not have a significant impact on the environment; and f. The design of the tentative tract map will not conflict with any easement acquired by the public at large, now of record, for access through or use of the property within the proposed parcels. The subject project does not contain any easements that would limit access to or use of the project site. 4. The City of Rancho Cucamonga adopted a comprehensive update to the City's General Plan (GP) and certified a Program Environmental Impact Report (EIR) (SCH No. 2021050261) on December 15, 2021. Pursuant to Section 15183(c) of the State CEQA Guidelines, "if an impact is not peculiar to the parcel or to the project, has been addressed as a significant effect in the prior EIR, or can be substantially mitigated by the imposition of uniformly applied development policies or standards ... then an additional ElR need not be prepared for the project solely on the basis of that impact." The 35.1- acre property (Parcel 3) is designated by the City's General Plan land use designation and the Etiwanda Heights Neighborhood Conservation Plan (EHNCP) zoning designation, which allows for the expansion and development of the proposed temple worship facility. Therefore, no subsequent or supplemental EIR is required for the proposed project. To demonstrate that no subsequent EIR or environmental review is required, a CEQA Section 15183 Compliance Memorandum dated January 202, was prepared by an environmental consultant hired by the City (EPD Solutions, 2024) (Exhibit D - CEQA Section 15183 Compliance Memorandum). Staff evaluated this memorandum and concluded that the project is within the scope of the EIR adopted and certified as part of the City's GP on December 15, 2021, upon the project's compliance with all conditions of approval. The project will not have any significant effects not discussed in the GP EIR, nor have more severe effects than previously analyzed, and that additional or different mitigation measures are not required to reduce the impacts of the project to a level of less than significant. The proposed project involves the involves the subdivision of 77.39 acres of land into four parcels, with parcel three proposed for the expansion and development of the existing temple worship facility. Staff finds that there is no substantial evidence that the project will have a significant effect on the environment.    Page 34 PLANNING COMMISSION RESOLUTION NO. 2025-005 TENTATIVE PARCEL MAP SUBTPM19720 February 26, 2025 Page 5 5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth in the Conditions of Approval, attached hereto and incorporated herein by this reference. 6. The Secretary to this Commission shall certify the adoption of this Resolution. APPROVED AND ADOPTED THIS 26TH DAY OF FEBRUARY 2025. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: Tony Morales, Chairman ATTEST: Jennifer Nakamura, Secretary I, Jennifer Nakamura, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 26th day of February 2025, by the following vote-to-wit: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSENT: COMMISSIONERS: ABSTAIN: COMMISSIONERS:    Page 35 Conditions of Approval Community Development Department Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Please be advised of the following Special Conditions The project shall comply with all relevant mitigation measures related to the certified Environmental Impact Reports for both the General Plan Update 2020 and the Etiwanda Heights Neighborhood Conservation Plan and standard General Plan conditions of approval as identified by the Ling Yen Mountain Temple Project CEQA Analysis an related mitigation monitoring and reporting program as prepared by EPD Solutions dated January 2025. 1. If the operation of the facility causes adverse effects upon the adjacent land uses, the Conditional Use Permit shall be brought before the Planning Director for consideration and possible termination of use if the issues cannot be rectified. 2. The facility shall comply with the performance standards for noise and vibrations outlined in Development Code Chapter 17.66 (Performance Standards) and light glare outlined in Development Code Chapter 17.58 (Outdoor Lighting Standards). All activities shall not create any noise that would exceed an exterior noise level of 60 dB during the hours of 10:00 p.m. to 7:00 a.m. unless otherwise specified in the in Chapter 17.66. 3. Standard Conditions of Approval The applicant shall sign the Statement of Agreement and Acceptance of Conditions of Approval provided by the Planning Department. The signed Statement of Agreement and Acceptance of Conditions of Approval shall be returned to the Planning Department prior to the submittal of grading/construction plans for plan check, request for a business license, and/or commencement of the approved activity. 4. www.CityofRC.us Printed: 2/20/2025    Page 36 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval The applicant shall indemnify, protect, defend, and hold harmless, the City, and/or any of its officials , officers, employees, agents, departments, agencies, those City agents serving as independent contractors in the role of City officials and instrumentalities thereof (collectively “Indemnitees”), from any and all claims, demands, lawsuits, writs of mandamus, and other actions and proceedings (whether legal, equitable, declaratory, administrative or adjudicatory in nature ), and alternative dispute resolutions procedures (including, but not limited to, arbitrations, mediations, and other such procedures ) (collectively “Actions”), brought against the City, and/or any of its officials, officers, employees, agents, departments, agencies, and instrumentalities thereof, that challenge, attack, or seek to modify, set aside, void, or annul, the action of, or any permit or approval issued by, the City and /or any of its officials, officers, employees, agents, departments, agencies, and instrumentalities thereof (including actions approved by the voters of the City ), for or concerning the project, whether such actions are brought under the California Environmental Quality Act (CEQA), State Planning and Zoning Law, the Subdivisions Map Act, Code of Civil Procedure Section 1085 or 1094.5, or any other state, federal, or local statute, law, ordinance, rule, regulation, or any decision of a competent jurisdiction. This indemnification provision expressly includes losses, judgments, costs, and expenses (including, without limitation, attorneys’ fees or court costs) in any manner arising out of or incident to this approval, the Planning Director’s actions, the Planning Commission’s actions, and/or the City Council’s actions , related entitlements, or the City’s environmental review thereof. The Applicant shall pay and satisfy any judgment, award or decree that may be rendered against City or the other Indemnitees in any such suit , action, or other legal proceeding. It is expressly agreed that the City shall have the right to approve , which approval will not be unreasonably withheld, the legal counsel providing the City’s defense, and that the applicant shall reimburse City for any costs and expenses directly and necessarily incurred by the City in the course of the defense. City shall promptly notify the applicant of any Action brought and City shall cooperate with applicant in the defense of the Action. In the event such a legal action is filed challenging the City’s determinations herein or the issuance of the approval, the City shall estimate its expenses for the litigation. The Applicant shall deposit said amount with the City or, at the discretion of the City, enter into an agreement with the City to pay such expenses as they become due. 5. Approval of Tentative Parcel Map No. SUBTPM19720 is granted subject to the approval of Design Review No. DRC2021-00187, Conditional Use Permit No. DRC2021-00188 and Tree Removal Permit No. DRC2021-00189. 6. Any approval shall expire if Building Permits are not issued or approved use has not commenced within 2 years from the date of approval or a time extension has been granted. 7. www.CityofRC.us Page 2 of 11Printed: 2/20/2025    Page 37 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval Any modification or intensification of the approved use, including but not limited to, revisions in the operations of the business including changes to the operating days /hours; change in the location on -site or within the building of the use /activity that is approved by this Conditional Use Permit; improvements including new building construction; and/or other modifications /intensification beyond what is specifically approved by this Conditional Use Permit, shall require the review and approval by the Planning Director prior to submittal of documents for plan check /occupancy, construction, commencement of the activity , and/or issuance of a business license. The Planning Director may determine that modifications or intensifications of use require the submittal of an application to modify this Conditional Use Permit for review by the City. 8. This tentative parcel map shall expire, unless extended by the Planning Commission, unless a complete final map is filed with the Engineering Services Department within 3 years from the date of the approval. 9. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community, Specific Plans and /or Master Plans in effect at the time of Building Permit issuance. 10. The site shall be developed and maintained in accordance with the approved plans which include Site Plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Department, the conditions contained herein, the Development Code regulations and the Etiwanda Heights Neighborhood Conservations Plan. 11. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and approved by the Planning Director and Police Department (909-477-2800 ) prior to the issuance of Building Permits . Such plan shall indicate style, illumination, location, height, and method of shielding so as not to adversely affect adjacent properties . 12. Occupancy of the facilities shall not commence until such time as all California Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Services Department to show compliance. The buildings shall be inspected for compliance and final acceptance granted prior to occupancy. 13. Trash receptacle(s) are required and shall meet City standards. The final design, locations, and the number of trash receptacles shall be subject to Planning Director review and approval prior to the issuance of Building Permits. 14. A detailed landscape and irrigation plan, shall be prepared by a licensed landscape architect and submitted for Planning Director review and approval prior to the issuance of Building Permits for the development or prior final map approval in the case of a custom lot subdivision. For development occurring in the Very High Fire Hazard Severity Zone, the landscape plans will also be reviewed by Fire Construction Services. 15. All tree planting shall comply with development code requirements, including, but not limited to tree replacement requirements related to the associated tree removal permit. 16. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls.17. www.CityofRC.us Page 3 of 11Printed: 2/20/2025    Page 38 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval Tree maintenance criteria shall be developed and submitted for Planning Director review and approval prior to issuance of Building Permits. These criteria shall encourage the natural growth characteristics of the selected tree species. 18. All walls shall be provided with decorative treatment. If located in public maintenance areas, the design shall be coordinated with the Engineering Services Department. 19. Landscaping and irrigation shall be designed to conserve water through the principles of water efficient landscaping per Development Code Chapter 17.82. 20. All parking lot landscape islands shall have a minimum outside dimension of 6 feet.21. All parking spaces shall be 9 feet wide by 17 feet long with a required 1-foot overhang (e.g., over a curb stop). 22. Plans for any security gates shall be submitted for the Planning Director, City Engineer, and Rancho Cucamonga Fire Protection District review and approval prior to issuance of Building Permits. For residential development, private gated entrances shall provide adequate turn -around space in front of the gate and a separate visitor lane with call box to avoid cars stacking into the public right-of-way. 23. All parking spaces shall be double striped per City standards and all driveway aisles, entrances, and exits shall be striped per City standards. No parking shall be permitted on unpaved areas. 24. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided throughout the development to connect dwellings /units/buildings with open spaces /plazas/ recreational uses. 25. Any proposed signage shall be reviewed under separate permit, shall comply with applicable provisions of the Rancho Cucamonga sign code, and shall be reviewed and approved prior to installation. 26. All roof appurtenances, including air conditioners and other roof mounted equipment and /or projections shall be screened from all sides and the sound shall be buffered from adjacent properties and streets as required by the Planning Department. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the Planning Director. Any roof -mounted mechanical equipment and /or ductwork, that projects vertically more than 18 inches above the roof or roof parapet, shall be screened by an architecturally designed enclosure which exhibits a permanent nature with the building design and is detailed consistent with the building. Any roof -mounted mechanical equipment and /or ductwork, that projects vertically less than 18 inches above the roof or roof parapet shall be painted consistent with the color scheme of the building. Details shall be included in building plans. 27. Copies of the signed Planning Commission Resolution of Approval or Approval Letter, Conditions of Approval, and all environmental mitigations shall be included on the plans (full size). The sheet (s) are for information only to all parties involved in the construction /grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 28. www.CityofRC.us Page 4 of 11Printed: 2/20/2025    Page 39 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval For non-residential development, property owners are responsible for the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas within the public right -of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition, and shall receive regular pruning, fertilizing, mowing, and trimming. Any damaged, dead, diseased, or decaying plant material shall be replaced within 30 days from the date of damage. 29. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be included in the required landscape plans and shall be subject to Planning Director review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Services Department. 30. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination and in conformance with Building and Safety Services Department standards, the Municipal Code and the Rancho Cucamonga Fire Department (RCFD) Standards. 31. All Double Detector Checks (DDC) and Fire Department Connections (FDC) required and/or proposed shall be installed at locations that are not within direct view or line -of-sight of the main entrance. The specific locations of each DDC and FDC shall require the review and approval of the Planning Department and Fire Construction Services /Fire Department. All Double Detector Checks (DDC) and Fire Department Connections (FDC) shall be screened behind a 4-foot high block wall. These walls shall be constructed of similar material used on-site to match the building. 32. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For single -family residential developments, transformers shall be placed in underground vaults. 33. Engineering Services Department Standard Conditions of Approval www.CityofRC.us Page 5 of 11Printed: 2/20/2025    Page 40 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval Prior to building permit, the applicant is responsible for the improvement of all streets providing public access to the site.The applicant shall submit plans for review and approval of the City Engineer showing improvements in compliance with the City 's design standards or as otherwise approved by the City Engineer: a. Dawnridge Drive, a public street, shall be improved providing full width (40-feet) road improvements along the site frontage and connecting to existing improvements to the South. b. Decliff Drive, a public street, shall be improved providing full width (40-feet) road improvements along the site frontage and connecting to Dawnridge Drive to the East and Wardman Bullock Road to the West. c. All public infrastructure shall be kept within public right -of-way. Applicant shall be responsible for the dedication of any additional right -of-way easement (irrevocable offer) required to accommodate such infrastructure within the right -of-way, such as curb ramps and sidewalks. If deemed necessary during the design review, the offer of dedication shall be submitted and recorded prior to building permit . d. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and interconnect conduit shall be installed to the satisfaction of the City Engineer. e. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public street improvements, prior to issuance of Building Permits. f. Prior to any work being performed in public right -of-way, fees shall be paid and a construction permit shall be obtained from the Engineering Services Department in addition to any other permits required. 1. Private Streets and Access Road : Private streets and access roads proposed in the preliminary grading plans shall be made part of the on-site grading plans. a. Plans shall be submitted for review and approval of the City Engineer prior to building permit. b. Private streets shall be improved to a minimum of 26-feet width of all weather surface or as required by the Fire Department, whichever more restrictive. c. The design shall incorporate public street design standards, modifications shall be clearly identified and require approval by the City Engineer. d. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the private streets and access roads: N-S and E-W providing access to the existing building. 2. Fire Prevention / New Construction Unit Standard Conditions of Approval www.CityofRC.us Page 6 of 11Printed: 2/20/2025    Page 41 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Fire Prevention / New Construction Unit Standard Conditions of Approval To ensure continued Fire District use of and access to, and maintenance as needed, of the fire access / fire lane and fire water mains, a reciprocal agreement between property owners and the Fire District is required. The agreement is required to be recorded with the San Bernardino County Recorder. A site plan showing the location of the fire access / fire lane and fire water mains is required to be included with the agreement. The agreement is required to be reviewed and approved by the Fire District prior to recording. Proof of recordation is required to be submitted to the Fire District. A template of this agreement has been uploaded to the Documents section. 1. Required alarm systems and supervision systems are required to be in accordance with Fire District Standard 9-5. The Standard has been uploaded to the Documents section. 2. Combustible construction materials, including combustible roofing materials, are prohibited from being onsite prior to a water supply system in accordance with Fire District Standard 5-10 being provided in accordance with Fire District Standard 33-1. Copies of the Standards have been uploaded to the Documents section of this project in the Online Permit Center. 3. Fire sprinklers are required to be installed in accordance with Fire District Standard 9-3. The Standard has been uploaded to the Documents section. 4. Plans for the alarm and /or supervision (monitoring) system are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 5. When radio signal strength testing determines that emergency responder communication coverage will require an in-building system to meet the requirements of the Fire Code, plans for the system are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 6. Plans for the private, onsite fire underground water infrastructure are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 7. Plans for the public, offsite fire underground water infrastructure are required to be submitted separately and issued a separate permit. Plans are required to be submitted prior to or concurrently with the plans submitted to the Water District. Submit all plans to the Building Department for routing to the Fire District. 8. Plans for the automatic fire sprinkler system are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 9. Plans for the temporary emergency vehicle access and /or hydrants are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 10. Emergency responder communication coverage in accordance with Fire District Standard 5-12 is required for the building (s) included in this project. A radio signal strength test of the public safety radio communication system conducted in accordance with the requirements of the 2022 California Fire Code is required to be submitted. Where existing radio signal strength does not meet the requirements of the Fire Code, a separate submittal for an emergency responder communication coverage system is required. 11. www.CityofRC.us Page 7 of 11Printed: 2/20/2025    Page 42 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Fire Prevention / New Construction Unit Standard Conditions of Approval A new public hydrant is required to be installed within 15-50 feet of the Fire Department Connection (FDC) and in accordance with Fire District Standard 5-10. 12. The new connection to the public water main requires the submittal of public, off -site fire underground plans that conform to the standards of the water purveyor and Fire District Standard 5-10. 13. Public and private fire service water mains, public and private hydrants, water control valves, fire sprinkler risers, fire department connections (FDCs), and other fire protection water related devices and equipment are required to be provided, designed, and installed in accordance with Fire District Standard 5-10. The Standard has been uploaded to the Documents section. 14. Temporary fire apparatus access (fire lanes) and temporary fire hydrants, if needed, are required to be in accordance with Fire District Standard 33-2. The Standard has been uploaded to the Documents section. 15. Gates installed across a residential emergency vehicle access road (fire lane) are required to be in accordance with Standard 5-3. The Standard has been uploaded to the Documents section. 16. Fire extinguishers are required in accordance with Section 906 of the California Fire Code. Consult with the Fire Inspector for the correct type, size, and exact installation locations. 17. Fire flow information for this project is obtained from the Cucamonga Valley Water District (CVWD). CVWD can be reached at 909-944-6000 or custserv@cvwdwater.com. 18. Fire flow is required to be in accordance with Appendix B of the California Fire Code. The Fire District has adopted the appendix without local amendments except that the minimum fire flow for commercial buildings shall not be less than 1500 gpm. Proof of the availability of the required fire flow must be provided to the Fire District in the form of a letter or written report dated within the past 12 months. 19. Street address and unit /suite signage for commercial and industrial buildings are required to be in accordance with Fire District Standard 5-8. The Standard has been uploaded to the Documents section. 20. Fire apparatus access roads and emergency vehicle access is required to be identified with signs and/or other approved makings in accordance with Fire District Standard 5-1. A copy of the Standard has been uploaded to the Documents section. 21. Street address and building identification signage for multi -unit residential buildings are required to be in accordance with Fire District Standard 5-7. The Standard has been uploaded to the Documents section. 22. Identification of fire protection systems and components, fire alarm systems and components, and equipment and devices associated with fire and life safety systems is required to be in accordance with Fire District Standards 5-5 and 5-10. The Standards have been uploaded to the Documents section. 23. Grading Section Standard Conditions of Approval www.CityofRC.us Page 8 of 11Printed: 2/20/2025    Page 43 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval The applicant shall provide a grading agreement and grading bond for all cut and fill combined exceeding 5,000 cubic yards prior to issuance of a grading permit. The grading agreement and bond shall be approved by the Engineering Services Department. 1. Prior to issuance of a wall permit, on engineered combination garden /retaining walls along the property boundary the structural calculations for the wall shall assume a level toe /heel at the adjacent off-site property (i.e. a manufactured slope is not present). This shall be shown in the typical sections of the grading and drainage plan. 2. A drainage study showing a 100-year, AMC 3 design storm event for on -site drainage shall be prepared and submitted to the Engineering Services Department for review and approval for on -site storm water drainage prior to issuance of a grading permit. The plan and report shall contain water surface profile gradient calculations for all storm drain pipes 12-inches and larger in diameter. All reports shall be wet signed and sealed by the Engineer of Record. In addition, the project specific drainage study shall provide inlet calculations showing the proper sizing of the water quality management plan storm water flows into the proposed structural storm water treatment devices. 3. Flow lines steeper than 6 percent could be erosive. The applicant shall provide hard lined gutters and swales where concentrated flows exceed 3fps, and anywhere that flow lines exceed 10 percent. This shall be shown on the grading and drainage plan prior to issuance of a grading permit. 4. A review of the conceptual grading and drainage plan and the preliminary water quality management plan shows that it is the intent of the engineer of record to drain the surface storm water flows to a retention basin. The basin shall be designed to accept multiple storm events (100-year storm event and Antecedent Moisture Condition 3) using the methodology outlined in the current adopted San Bernardino County Hydrology Manual. 5. Private sewer, water, and storm drain improvements will be designed per the latest adopted California Plumbing Code. Private storm drain improvements shall be shown on the grading and drainage plan. 6. Reciprocal access easements for all parcels and maintenance agreements ensuring joint maintenance of all storm water quality structural /treatment devices and best management practices (BMP) as provided for in the project’s Storm Water Quality Management Plan, shall be provided for by CC &R’s or deeds and shall be recorded prior to the approval of the Water Quality Management Plan. Said CC &R’s and/or deeds shall be included in the project site specific Storm Water Quality Management Plan (WQMP) document prior to approval of the WQMP document and recording of the Memorandum of Agreement of Storm Water Quality Management Plan . 7. The applicant shall prepare or amend existing CC &R’s as needed to clarify how maintenance responsibilities will be shared between the newly created parcels and the remaining existing parcels of Parcel Map No. 19720 prior to issuance of a grading permit. The grading and drainage plan and the CC&Rs shall address shared access to streets, private storm drains, storm water treatment devices , surface drainage and maintenance of common areas, including landscaping within public rights -of-way and Best Management Practices identified in the WQMP. 8. www.CityofRC.us Page 9 of 11Printed: 2/20/2025    Page 44 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval Prior to the issuance of a building permit or Engineering Services Department issued right of way permit, the applicant shall submit, for review and approval of the City Engineer, a final project specific water quality management plan (WQMP) for review and approval, and shall have said document recorded with the San Bernardino County Recorder's Office. a. The WQMP shall include copy of the site specific infiltration report and provide design guidelines for site storm water treatment devices and best management practices (BMP). b. Applicant shall submit the City of Rancho Cucamonga’s “Memorandum of Agreement of Storm Water Quality Management Plan” for review and approval by the Engineering Services. The memorandum shall be recorded with the County Recorder’s Office . 9. Prior to issuance of a grading permit and approval of the project specific water quality management plan all private storm water catch basin inlets shall include insert filters to capture those pollutants of concern as addressed in the in the final project -specific water quality management plan (WQMP). At a minimum catch basin insert filters to capture trash and other floating debris. All catch basin insert filters shall be maintained on a regular basis as described in the “Inspection and Maintenance Responsibility for Post Construction BMP” section of the final project-specific water quality management plan. 10. Prior to grading permit, the applicant shall submit a project specific hydraulics and hydrology report. The report shall provide for acceptance of existing off -site storm water drainage flows and safely convey those flows through or around the project site. If existing off -site storm water drainage flows mix with any on-site storm water drainage flows, then the off -site storm water drainage flows shall be treated with the on-site storm water drainage flows for storm water quality purposes, prior to discharging the storm water drainage flows from the project site. 11. Grading and design is subject to the most current version of the California Green Building Standards Code: a. Prior to issuance of grading permit, applicant shall demonstrate compliance with Section 5.106.5.2 (Clean Air Vehicle) by showing designated parking for clean air vehicles on the precise grading plans. b. Prior to issuance of grading permit, applicant shall demonstrate compliance with Section 5.106.5.3 (Electrical Vehicles) by showing designated parking for electric vehicles (EV), charging stations and parking areas shall be clearly identified, location of conduits shall be shown on the plans for utility conflict review. 12. www.CityofRC.us Page 10 of 11Printed: 2/20/2025    Page 45 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval Prior to issuance of a grading permit the precise grading and drainage plan shall follow the format provided in the City of Rancho Cucamonga handout “Information for Grading Plans and Permit”: a. Applicant shall submit plans for review and approval of the City Engineer in compliance with the conceptual grading exhibits and the current California building Code, City Grading Standards, and local policies. b. Grading plans shall show accessibility path from the public right -of-way and the accessibility parking stalls to the building doors in conformance with the current adopted California Building Code and the Americans with Disabilities Act. All accessibility ramps shall show sufficient detail including gradients , elevations, and dimensions in compliance with the current adopted California Building Code. c. A project specific geotechnical reports shall be submitted. The geotechnical report shall provide site specific grading and infiltration recommendations. The geotechnical engineer shall sign /certify the grading plans. 13. www.CityofRC.us Page 11 of 11Printed: 2/20/2025    Page 46 RESOLUTION NO. 2025-006 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DESIGN REVIEW DRC2021-00187 FOR THE EXPANSION AND OPERATION OF A BUDDHIST TEMPLE INCLUDING THE DEVELOPMENT OF EIGHT BUILDINGS FOR THE PURPOSES OF WORSHIP, LIVING QUARTERS, AND RELATED ADMINISTRATIVE OR SUPPORT USES ON CERTAIN PROPERTY LOCATED AT THE NORTHEAST CORNER OF DECLIFF DRIVE AND AMBLESIDE PLACE IN THE ETIWANDA HEIGHTS NEIGHBORHOOD CONSERVATION PLAN (EHNCP), AND MAKING FINDINGS IN SUPPORT THEREOF. THE PROJECT SITE CONSISTS OF PORTIONS OF FOUR PARCELS; APNS: 0226-061-47, 0226-061-73, 0226-061-74, AND 0226-061- 76. A.Recitals. 1.Ling Yen Mountain Temple filed an application for the approval of Design Review DRC2021-00187, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Conditional Use Permit request is referred to as "the application." 2.On the 26th day of February 2025, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on said application and concluded said hearing on that date. 3.All legal prerequisites prior to the adoption of this Resolution have occurred. B.Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1.This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2.Based upon the substantial evidence presented to this Commission during the above-referenced meeting on February 26, 2025, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a.The application is a proposed expansion to an existing temple including the development of eight buildings for the purposes of worship, living quarters, and related administrative or support uses for property located on a mostly undeveloped site located at 13938 DeCliff Drive; and Exhibit E    Page 47 PLANNING COMMISSION RESOLUTION NO. 2025-006 Design Review DRC2021-00187 February 26, 2025 Page 2 b. The project site is generally located at the northeast corner of DeCliff Drive and Ambleside Place. The project site is rectangularly shaped and is currently developed with an existing temple worship facility near the northwest central portion of the site. c. The existing land uses on, and General Plan land use and zoning designations for, the project site and the surrounding properties (relative to the above- noted parcel) are as follows: Land Use General Plan Zoning Site Existing Buddhist Temple Facility Rural Open Space (OS) and General Open Space and Facilities (OS) Etiwanda Heights Neighborhood Conservation Plan (EHNCP) North Rural Undeveloped Land Rural Open Space (OS) and General Open Space and Facilities (OS) Etiwanda Heights Neighborhood Conservation Plan (EHNCP) Sout h Undeveloped Land and Residential Neighborhood General Open Space and Facilities (OS) followed by Suburban Neighborhood Very Low (N) Flood Control Utility Corridor (R-FC/UC) with Equestrian Overlay and Hillside Overlay per Ordinance 628 within Etiwanda Heights Neighborhood Conservation Plan followed by Very Low Residential – Etiwanda Highlands (14000 (VL-HC 14000) West Rural Undeveloped Land Rural Open Space (OS) and General Open Space and Facilities (OS) Open Space (R-OS) and Flood Control Utility Corridor (R-FC/UC) with Equestrian Overlay and Hillside Overlay East Undeveloped Land, a Water Tank, and Enright Ranch Rural Open Space (OS) and General Open Space and Facilities (OS) Open Space (R-OS) and Flood Control Utility Corridor (R-FC/UC) with Equestrian Overlay and Hillside Overlay d. The property is currently improved with an existing structure built in 1990 at a time when the subject property was under the jurisdiction of unincorporated San Bernardino County which totals approximately 6,600 square feet and which the applicant is currently using for office hours, group worship, and prayer services throughout the week; and e. The subject property was annexed from the County of San Bernardino into the City of Rancho Cucamonga in November 2020 and assigned a zoning designation within the Etiwanda Heights Neighborhood Conservation Plan (EHNCP); and    Page 48 PLANNING COMMISSION RESOLUTION NO. 2025-006 Design Review DRC2021-00187 February 26, 2025 Page 3 f. This application is in conjunction with Tentative Tract Map SUBTPM19720, for the subdivision of 77.39 acres of land into four parcels, Conditional Use Permit DRC2021-00188 for the development of eight buildings which would result in a total building area of 93,003 square feet as well as associated project improvements, including, but not limited to driveways and private access roadways, and utility infrastructure connection and expansion along Dawnridge Drive, Ambleside Place, and DecCliff Drive, and Tree Removal Permit DRC2021-00189 for the removal of 46 non-native Eucalyptus and native western sycamore trees. g. The application proposes the development of eight buildings which would result in a total building area of 93,003 square feet as well as associated project improvements, including, but not limited to driveways and private access roadways, and utility infrastructure connection and expansion along Dawnridge Drive, Ambleside Place, and DeCliff Drive. Improvements have been conditioned to be installed as a part of the related Design Review Conditions of Approval (DRC2021-00187); and h. Buildings will utilize muted and neutral color schemes with surrounding courtyards and gardens to create a tranquil and peaceful atmosphere. Finish materials for the buildings will include white and medium grey stucco finish, cultured stone accents at the lower level of the Building 2 tower, reddish brown and black metal column covers, dark grey concrete tile roofs, and enhanced concrete within the courtyard hardscape areas; and i. The proposed project complies with the applicable development standards for the EHNCP as shown in the table below: Development Standard Required Proposed Complies? Building Height Maximum 50 feet Buildings 1, 2, and 4-8 are below 50 feet: Building 3: 50 feet Yes Structures must be clustered into a campus- like environment that is as compact as possible Clustered Campus- Like Environment Clustered Campus- Like Environment Yes j. Development of the proposed Project would provide seven parking facilities throughout the Project site and would include a total of 449 parking stalls. A Parking Study has been prepared for the project (prepared by Ganddini Traffic Consultants). The parking study determined that a maximum parking demand of 402 parking spaces would be required for the site at peak time (i.e. Chinese New Year, occurring once per calendar year). Therefore, the project exceeds the noted maximum number of parking spaces determined for the project.    Page 49 PLANNING COMMISSION RESOLUTION NO. 2025-006 Design Review DRC2021-00187 February 26, 2025 Page 4 3. Based upon the substantial evidence presented to this Commission during the above-referenced meeting and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. The proposed development is in accord with the General Plan. The General Plan land use designation is Rural Open Space (OS) and General Open Space and Facilities (OS). The project is also located within the Etiwanda Heights Neighborhood Conservation Plan (EHNCP). The total project site area is approximately 77.39 gross acres. SUBTPM proposes to subdivide the project site into four parcels. Parcel three (consisting of 35.1 acres) of the proposed parcel map proposes to include the expansion of the existing temple facility. The project applicant is proposing to develop eight buildings which would result in a total building area 93,003 square feet as well as associated project improvements; and b. The proposed use is in accord with the objectives of the Development Code, and the purposes of the Etiwanda Heights Neighborhood Conservation Plan (EHNCP) in which the site is located. The proposed project is consistent with Section 5.9.4F of the EHNCP, which establishes criteria specific to assembly uses within the subject regulating zone of the EHNCP; and c. The proposed use complies with each of the applicable provisions and development standards of the Etiwanda Heights Neighborhood Conservation Plan (EHNCP) and Development Code. Upon approval of the requested Conditional Use Permit, the project is compliant with permitted uses within the subject zone and upon review by staff has been found to be compliant with all relevant development standards; and d. The proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. The project has been reviewed to be compliant with all relevant development standards, including Fire Department regulations, and is not anticipated to be detrimental to the public health, safety or welfare. Further, the project, and the proposed use thereof, is required to comply with all relevant development standards which regulate the proposed use of the site; and    Page 50 PLANNING COMMISSION RESOLUTION NO. 2025-006 Design Review DRC2021-00187 February 26, 2025 Page 5 4. The City of Rancho Cucamonga adopted a comprehensive update to the City's General Plan (GP) and certified a Program Environmental Impact Report (EIR) (SCH No. 2021050261) on December 15, 2021. Pursuant to Section 15183(c) of the State CEQA Guidelines, "if an impact is not peculiar to the parcel or to the project, has been addressed as a significant effect in the prior EIR, or can be substantially mitigated by the imposition of uniformly applied development policies or standards ... then an additional ElR need not be prepared for the project solely on the basis of that impact." The 35.1- acre property (Parcel 3) is designated by the City's General Plan land use designation and the Etiwanda Heights Neighborhood Conservation Plan (EHNCP) zoning designation, which allows for the expansion and development of the proposed temple worship facility. Therefore, no subsequent or supplemental EIR is required for the proposed project. To demonstrate that no subsequent EIR or environmental review is required, a CEQA Section 15183 Compliance Memorandum dated January 202, was prepared by an environmental consultant hired by the City (EPD Solutions, 2024) (Exhibit D - CEQA Section 15183 Compliance Memorandum). Staff evaluated this memorandum and concluded that the project is within the scope of the EIR adopted and certified as part of the City's GP on December 15, 2021, upon the project's compliance with all conditions of approval. The project will not have any significant effects not discussed in the GP EIR, nor have more severe effects than previously analyzed, and that additional or different mitigation measures are not required to reduce the impacts of the project to a level of less than significant. The proposed project involves the involves the subdivision of 77.39 acres of land into four parcels, with parcel three proposed for the expansion and development of the existing temple worship facility. Staff finds that there is no substantial evidence that the project will have a significant effect on the environment. 5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth in the Conditions of Approval, attached hereto and incorporated herein by this reference. 6. The Secretary to this Commission shall certify the adoption of this Resolution. APPROVED AND ADOPTED THIS 26TH DAY OF FEBRUARY 2025. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: Tony Morales, Chairman    Page 51 PLANNING COMMISSION RESOLUTION NO. 2025-006 Design Review DRC2021-00187 February 26, 2025 Page 6 ATTEST: Jennifer Nakamura, Secretary I, Jennifer Nakamura, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 26th day of February 2025, by the following vote-to-wit: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSENT: COMMISSIONERS: ABSTAIN: COMMISSIONERS:    Page 52 Conditions of Approval Community Development Department Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Please be advised of the following Special Conditions The project shall comply with all relevant mitigation measures related to the certified Environmental Impact Reports for both the General Plan Update 2020 and the Etiwanda Heights Neighborhood Conservation Plan and standard General Plan conditions of approval as identified by the Ling Yen Mountain Temple Project CEQA Analysis an related mitigation monitoring and reporting program as prepared by EPD Solutions dated January 2025. 1. If the operation of the facility causes adverse effects upon the adjacent land uses, the Conditional Use Permit shall be brought before the Planning Director for consideration and possible termination of use if the issues cannot be rectified. 2. The facility shall comply with the performance standards for noise and vibrations outlined in Development Code Chapter 17.66 (Performance Standards) and light glare outlined in Development Code Chapter 17.58 (Outdoor Lighting Standards). All activities shall not create any noise that would exceed an exterior noise level of 60 dB during the hours of 10:00 p.m. to 7:00 a.m. unless otherwise specified in the in Chapter 17.66. 3. Standard Conditions of Approval The applicant shall sign the Statement of Agreement and Acceptance of Conditions of Approval provided by the Planning Department. The signed Statement of Agreement and Acceptance of Conditions of Approval shall be returned to the Planning Department prior to the submittal of grading/construction plans for plan check, request for a business license, and/or commencement of the approved activity. 4. www.CityofRC.us Printed: 2/20/2025    Page 53 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval The applicant shall indemnify, protect, defend, and hold harmless, the City, and/or any of its officials , officers, employees, agents, departments, agencies, those City agents serving as independent contractors in the role of City officials and instrumentalities thereof (collectively “Indemnitees”), from any and all claims, demands, lawsuits, writs of mandamus, and other actions and proceedings (whether legal, equitable, declaratory, administrative or adjudicatory in nature ), and alternative dispute resolutions procedures (including, but not limited to, arbitrations, mediations, and other such procedures ) (collectively “Actions”), brought against the City, and/or any of its officials, officers, employees, agents, departments, agencies, and instrumentalities thereof, that challenge, attack, or seek to modify, set aside, void, or annul, the action of, or any permit or approval issued by, the City and /or any of its officials, officers, employees, agents, departments, agencies, and instrumentalities thereof (including actions approved by the voters of the City ), for or concerning the project, whether such actions are brought under the California Environmental Quality Act (CEQA), State Planning and Zoning Law, the Subdivisions Map Act, Code of Civil Procedure Section 1085 or 1094.5, or any other state, federal, or local statute, law, ordinance, rule, regulation, or any decision of a competent jurisdiction. This indemnification provision expressly includes losses, judgments, costs, and expenses (including, without limitation, attorneys’ fees or court costs) in any manner arising out of or incident to this approval, the Planning Director’s actions, the Planning Commission’s actions, and/or the City Council’s actions , related entitlements, or the City’s environmental review thereof. The Applicant shall pay and satisfy any judgment, award or decree that may be rendered against City or the other Indemnitees in any such suit , action, or other legal proceeding. It is expressly agreed that the City shall have the right to approve , which approval will not be unreasonably withheld, the legal counsel providing the City’s defense, and that the applicant shall reimburse City for any costs and expenses directly and necessarily incurred by the City in the course of the defense. City shall promptly notify the applicant of any Action brought and City shall cooperate with applicant in the defense of the Action. In the event such a legal action is filed challenging the City’s determinations herein or the issuance of the approval, the City shall estimate its expenses for the litigation. The Applicant shall deposit said amount with the City or, at the discretion of the City, enter into an agreement with the City to pay such expenses as they become due. 5. Approval of Tentative Parcel Map No. SUBTPM19720 is granted subject to the approval of Design Review No. DRC2021-00187, Conditional Use Permit No. DRC2021-00188 and Tree Removal Permit No. DRC2021-00189. 6. Any approval shall expire if Building Permits are not issued or approved use has not commenced within 2 years from the date of approval or a time extension has been granted. 7. www.CityofRC.us Page 2 of 11Printed: 2/20/2025    Page 54 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval Any modification or intensification of the approved use, including but not limited to, revisions in the operations of the business including changes to the operating days /hours; change in the location on -site or within the building of the use /activity that is approved by this Conditional Use Permit; improvements including new building construction; and/or other modifications /intensification beyond what is specifically approved by this Conditional Use Permit, shall require the review and approval by the Planning Director prior to submittal of documents for plan check /occupancy, construction, commencement of the activity , and/or issuance of a business license. The Planning Director may determine that modifications or intensifications of use require the submittal of an application to modify this Conditional Use Permit for review by the City. 8. This tentative parcel map shall expire, unless extended by the Planning Commission, unless a complete final map is filed with the Engineering Services Department within 3 years from the date of the approval. 9. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community, Specific Plans and /or Master Plans in effect at the time of Building Permit issuance. 10. The site shall be developed and maintained in accordance with the approved plans which include Site Plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Department, the conditions contained herein, the Development Code regulations and the Etiwanda Heights Neighborhood Conservations Plan. 11. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and approved by the Planning Director and Police Department (909-477-2800 ) prior to the issuance of Building Permits . Such plan shall indicate style, illumination, location, height, and method of shielding so as not to adversely affect adjacent properties . 12. Occupancy of the facilities shall not commence until such time as all California Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Services Department to show compliance. The buildings shall be inspected for compliance and final acceptance granted prior to occupancy. 13. Trash receptacle(s) are required and shall meet City standards. The final design, locations, and the number of trash receptacles shall be subject to Planning Director review and approval prior to the issuance of Building Permits. 14. A detailed landscape and irrigation plan, shall be prepared by a licensed landscape architect and submitted for Planning Director review and approval prior to the issuance of Building Permits for the development or prior final map approval in the case of a custom lot subdivision. For development occurring in the Very High Fire Hazard Severity Zone, the landscape plans will also be reviewed by Fire Construction Services. 15. All tree planting shall comply with development code requirements, including, but not limited to tree replacement requirements related to the associated tree removal permit. 16. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls.17. www.CityofRC.us Page 3 of 11Printed: 2/20/2025    Page 55 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval Tree maintenance criteria shall be developed and submitted for Planning Director review and approval prior to issuance of Building Permits. These criteria shall encourage the natural growth characteristics of the selected tree species. 18. All walls shall be provided with decorative treatment. If located in public maintenance areas, the design shall be coordinated with the Engineering Services Department. 19. Landscaping and irrigation shall be designed to conserve water through the principles of water efficient landscaping per Development Code Chapter 17.82. 20. All parking lot landscape islands shall have a minimum outside dimension of 6 feet.21. All parking spaces shall be 9 feet wide by 17 feet long with a required 1-foot overhang (e.g., over a curb stop). 22. Plans for any security gates shall be submitted for the Planning Director, City Engineer, and Rancho Cucamonga Fire Protection District review and approval prior to issuance of Building Permits. For residential development, private gated entrances shall provide adequate turn -around space in front of the gate and a separate visitor lane with call box to avoid cars stacking into the public right-of-way. 23. All parking spaces shall be double striped per City standards and all driveway aisles, entrances, and exits shall be striped per City standards. No parking shall be permitted on unpaved areas. 24. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided throughout the development to connect dwellings /units/buildings with open spaces /plazas/ recreational uses. 25. Any proposed signage shall be reviewed under separate permit, shall comply with applicable provisions of the Rancho Cucamonga sign code, and shall be reviewed and approved prior to installation. 26. All roof appurtenances, including air conditioners and other roof mounted equipment and /or projections shall be screened from all sides and the sound shall be buffered from adjacent properties and streets as required by the Planning Department. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the Planning Director. Any roof -mounted mechanical equipment and /or ductwork, that projects vertically more than 18 inches above the roof or roof parapet, shall be screened by an architecturally designed enclosure which exhibits a permanent nature with the building design and is detailed consistent with the building. Any roof -mounted mechanical equipment and /or ductwork, that projects vertically less than 18 inches above the roof or roof parapet shall be painted consistent with the color scheme of the building. Details shall be included in building plans. 27. Copies of the signed Planning Commission Resolution of Approval or Approval Letter, Conditions of Approval, and all environmental mitigations shall be included on the plans (full size). The sheet (s) are for information only to all parties involved in the construction /grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 28. www.CityofRC.us Page 4 of 11Printed: 2/20/2025    Page 56 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval For non-residential development, property owners are responsible for the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas within the public right -of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition, and shall receive regular pruning, fertilizing, mowing, and trimming. Any damaged, dead, diseased, or decaying plant material shall be replaced within 30 days from the date of damage. 29. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be included in the required landscape plans and shall be subject to Planning Director review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Services Department. 30. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination and in conformance with Building and Safety Services Department standards, the Municipal Code and the Rancho Cucamonga Fire Department (RCFD) Standards. 31. All Double Detector Checks (DDC) and Fire Department Connections (FDC) required and/or proposed shall be installed at locations that are not within direct view or line -of-sight of the main entrance. The specific locations of each DDC and FDC shall require the review and approval of the Planning Department and Fire Construction Services /Fire Department. All Double Detector Checks (DDC) and Fire Department Connections (FDC) shall be screened behind a 4-foot high block wall. These walls shall be constructed of similar material used on-site to match the building. 32. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For single -family residential developments, transformers shall be placed in underground vaults. 33. Engineering Services Department Standard Conditions of Approval www.CityofRC.us Page 5 of 11Printed: 2/20/2025    Page 57 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval Prior to building permit, the applicant is responsible for the improvement of all streets providing public access to the site.The applicant shall submit plans for review and approval of the City Engineer showing improvements in compliance with the City 's design standards or as otherwise approved by the City Engineer: a. Dawnridge Drive, a public street, shall be improved providing full width (40-feet) road improvements along the site frontage and connecting to existing improvements to the South. b. Decliff Drive, a public street, shall be improved providing full width (40-feet) road improvements along the site frontage and connecting to Dawnridge Drive to the East and Wardman Bullock Road to the West. c. All public infrastructure shall be kept within public right -of-way. Applicant shall be responsible for the dedication of any additional right -of-way easement (irrevocable offer) required to accommodate such infrastructure within the right -of-way, such as curb ramps and sidewalks. If deemed necessary during the design review, the offer of dedication shall be submitted and recorded prior to building permit . d. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and interconnect conduit shall be installed to the satisfaction of the City Engineer. e. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public street improvements, prior to issuance of Building Permits. f. Prior to any work being performed in public right -of-way, fees shall be paid and a construction permit shall be obtained from the Engineering Services Department in addition to any other permits required. 1. Private Streets and Access Road : Private streets and access roads proposed in the preliminary grading plans shall be made part of the on-site grading plans. a. Plans shall be submitted for review and approval of the City Engineer prior to building permit. b. Private streets shall be improved to a minimum of 26-feet width of all weather surface or as required by the Fire Department, whichever more restrictive. c. The design shall incorporate public street design standards, modifications shall be clearly identified and require approval by the City Engineer. d. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the private streets and access roads: N-S and E-W providing access to the existing building. 2. Fire Prevention / New Construction Unit Standard Conditions of Approval www.CityofRC.us Page 6 of 11Printed: 2/20/2025    Page 58 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Fire Prevention / New Construction Unit Standard Conditions of Approval To ensure continued Fire District use of and access to, and maintenance as needed, of the fire access / fire lane and fire water mains, a reciprocal agreement between property owners and the Fire District is required. The agreement is required to be recorded with the San Bernardino County Recorder. A site plan showing the location of the fire access / fire lane and fire water mains is required to be included with the agreement. The agreement is required to be reviewed and approved by the Fire District prior to recording. Proof of recordation is required to be submitted to the Fire District. A template of this agreement has been uploaded to the Documents section. 1. Required alarm systems and supervision systems are required to be in accordance with Fire District Standard 9-5. The Standard has been uploaded to the Documents section. 2. Combustible construction materials, including combustible roofing materials, are prohibited from being onsite prior to a water supply system in accordance with Fire District Standard 5-10 being provided in accordance with Fire District Standard 33-1. Copies of the Standards have been uploaded to the Documents section of this project in the Online Permit Center. 3. Fire sprinklers are required to be installed in accordance with Fire District Standard 9-3. The Standard has been uploaded to the Documents section. 4. Plans for the alarm and /or supervision (monitoring) system are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 5. When radio signal strength testing determines that emergency responder communication coverage will require an in-building system to meet the requirements of the Fire Code, plans for the system are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 6. Plans for the private, onsite fire underground water infrastructure are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 7. Plans for the public, offsite fire underground water infrastructure are required to be submitted separately and issued a separate permit. Plans are required to be submitted prior to or concurrently with the plans submitted to the Water District. Submit all plans to the Building Department for routing to the Fire District. 8. Plans for the automatic fire sprinkler system are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 9. Plans for the temporary emergency vehicle access and /or hydrants are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 10. Emergency responder communication coverage in accordance with Fire District Standard 5-12 is required for the building (s) included in this project. A radio signal strength test of the public safety radio communication system conducted in accordance with the requirements of the 2022 California Fire Code is required to be submitted. Where existing radio signal strength does not meet the requirements of the Fire Code, a separate submittal for an emergency responder communication coverage system is required. 11. www.CityofRC.us Page 7 of 11Printed: 2/20/2025    Page 59 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Fire Prevention / New Construction Unit Standard Conditions of Approval A new public hydrant is required to be installed within 15-50 feet of the Fire Department Connection (FDC) and in accordance with Fire District Standard 5-10. 12. The new connection to the public water main requires the submittal of public, off -site fire underground plans that conform to the standards of the water purveyor and Fire District Standard 5-10. 13. Public and private fire service water mains, public and private hydrants, water control valves, fire sprinkler risers, fire department connections (FDCs), and other fire protection water related devices and equipment are required to be provided, designed, and installed in accordance with Fire District Standard 5-10. The Standard has been uploaded to the Documents section. 14. Temporary fire apparatus access (fire lanes) and temporary fire hydrants, if needed, are required to be in accordance with Fire District Standard 33-2. The Standard has been uploaded to the Documents section. 15. Gates installed across a residential emergency vehicle access road (fire lane) are required to be in accordance with Standard 5-3. The Standard has been uploaded to the Documents section. 16. Fire extinguishers are required in accordance with Section 906 of the California Fire Code. Consult with the Fire Inspector for the correct type, size, and exact installation locations. 17. Fire flow information for this project is obtained from the Cucamonga Valley Water District (CVWD). CVWD can be reached at 909-944-6000 or custserv@cvwdwater.com. 18. Fire flow is required to be in accordance with Appendix B of the California Fire Code. The Fire District has adopted the appendix without local amendments except that the minimum fire flow for commercial buildings shall not be less than 1500 gpm. Proof of the availability of the required fire flow must be provided to the Fire District in the form of a letter or written report dated within the past 12 months. 19. Street address and unit /suite signage for commercial and industrial buildings are required to be in accordance with Fire District Standard 5-8. The Standard has been uploaded to the Documents section. 20. Fire apparatus access roads and emergency vehicle access is required to be identified with signs and/or other approved makings in accordance with Fire District Standard 5-1. A copy of the Standard has been uploaded to the Documents section. 21. Street address and building identification signage for multi -unit residential buildings are required to be in accordance with Fire District Standard 5-7. The Standard has been uploaded to the Documents section. 22. Identification of fire protection systems and components, fire alarm systems and components, and equipment and devices associated with fire and life safety systems is required to be in accordance with Fire District Standards 5-5 and 5-10. The Standards have been uploaded to the Documents section. 23. Grading Section Standard Conditions of Approval www.CityofRC.us Page 8 of 11Printed: 2/20/2025    Page 60 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval The applicant shall provide a grading agreement and grading bond for all cut and fill combined exceeding 5,000 cubic yards prior to issuance of a grading permit. The grading agreement and bond shall be approved by the Engineering Services Department. 1. Prior to issuance of a wall permit, on engineered combination garden /retaining walls along the property boundary the structural calculations for the wall shall assume a level toe /heel at the adjacent off-site property (i.e. a manufactured slope is not present). This shall be shown in the typical sections of the grading and drainage plan. 2. A drainage study showing a 100-year, AMC 3 design storm event for on -site drainage shall be prepared and submitted to the Engineering Services Department for review and approval for on -site storm water drainage prior to issuance of a grading permit. The plan and report shall contain water surface profile gradient calculations for all storm drain pipes 12-inches and larger in diameter. All reports shall be wet signed and sealed by the Engineer of Record. In addition, the project specific drainage study shall provide inlet calculations showing the proper sizing of the water quality management plan storm water flows into the proposed structural storm water treatment devices. 3. Flow lines steeper than 6 percent could be erosive. The applicant shall provide hard lined gutters and swales where concentrated flows exceed 3fps, and anywhere that flow lines exceed 10 percent. This shall be shown on the grading and drainage plan prior to issuance of a grading permit. 4. A review of the conceptual grading and drainage plan and the preliminary water quality management plan shows that it is the intent of the engineer of record to drain the surface storm water flows to a retention basin. The basin shall be designed to accept multiple storm events (100-year storm event and Antecedent Moisture Condition 3) using the methodology outlined in the current adopted San Bernardino County Hydrology Manual. 5. Private sewer, water, and storm drain improvements will be designed per the latest adopted California Plumbing Code. Private storm drain improvements shall be shown on the grading and drainage plan. 6. Reciprocal access easements for all parcels and maintenance agreements ensuring joint maintenance of all storm water quality structural /treatment devices and best management practices (BMP) as provided for in the project’s Storm Water Quality Management Plan, shall be provided for by CC &R’s or deeds and shall be recorded prior to the approval of the Water Quality Management Plan. Said CC &R’s and/or deeds shall be included in the project site specific Storm Water Quality Management Plan (WQMP) document prior to approval of the WQMP document and recording of the Memorandum of Agreement of Storm Water Quality Management Plan . 7. The applicant shall prepare or amend existing CC &R’s as needed to clarify how maintenance responsibilities will be shared between the newly created parcels and the remaining existing parcels of Parcel Map No. 19720 prior to issuance of a grading permit. The grading and drainage plan and the CC&Rs shall address shared access to streets, private storm drains, storm water treatment devices , surface drainage and maintenance of common areas, including landscaping within public rights -of-way and Best Management Practices identified in the WQMP. 8. www.CityofRC.us Page 9 of 11Printed: 2/20/2025    Page 61 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval Prior to the issuance of a building permit or Engineering Services Department issued right of way permit, the applicant shall submit, for review and approval of the City Engineer, a final project specific water quality management plan (WQMP) for review and approval, and shall have said document recorded with the San Bernardino County Recorder's Office. a. The WQMP shall include copy of the site specific infiltration report and provide design guidelines for site storm water treatment devices and best management practices (BMP). b. Applicant shall submit the City of Rancho Cucamonga’s “Memorandum of Agreement of Storm Water Quality Management Plan” for review and approval by the Engineering Services. The memorandum shall be recorded with the County Recorder’s Office . 9. Prior to issuance of a grading permit and approval of the project specific water quality management plan all private storm water catch basin inlets shall include insert filters to capture those pollutants of concern as addressed in the in the final project -specific water quality management plan (WQMP). At a minimum catch basin insert filters to capture trash and other floating debris. All catch basin insert filters shall be maintained on a regular basis as described in the “Inspection and Maintenance Responsibility for Post Construction BMP” section of the final project-specific water quality management plan. 10. Prior to grading permit, the applicant shall submit a project specific hydraulics and hydrology report. The report shall provide for acceptance of existing off -site storm water drainage flows and safely convey those flows through or around the project site. If existing off -site storm water drainage flows mix with any on-site storm water drainage flows, then the off -site storm water drainage flows shall be treated with the on-site storm water drainage flows for storm water quality purposes, prior to discharging the storm water drainage flows from the project site. 11. Grading and design is subject to the most current version of the California Green Building Standards Code: a. Prior to issuance of grading permit, applicant shall demonstrate compliance with Section 5.106.5.2 (Clean Air Vehicle) by showing designated parking for clean air vehicles on the precise grading plans. b. Prior to issuance of grading permit, applicant shall demonstrate compliance with Section 5.106.5.3 (Electrical Vehicles) by showing designated parking for electric vehicles (EV), charging stations and parking areas shall be clearly identified, location of conduits shall be shown on the plans for utility conflict review. 12. www.CityofRC.us Page 10 of 11Printed: 2/20/2025    Page 62 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval Prior to issuance of a grading permit the precise grading and drainage plan shall follow the format provided in the City of Rancho Cucamonga handout “Information for Grading Plans and Permit”: a. Applicant shall submit plans for review and approval of the City Engineer in compliance with the conceptual grading exhibits and the current California building Code, City Grading Standards, and local policies. b. Grading plans shall show accessibility path from the public right -of-way and the accessibility parking stalls to the building doors in conformance with the current adopted California Building Code and the Americans with Disabilities Act. All accessibility ramps shall show sufficient detail including gradients , elevations, and dimensions in compliance with the current adopted California Building Code. c. A project specific geotechnical reports shall be submitted. The geotechnical report shall provide site specific grading and infiltration recommendations. The geotechnical engineer shall sign /certify the grading plans. 13. www.CityofRC.us Page 11 of 11Printed: 2/20/2025    Page 63 RESOLUTION NO. 2025-007 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING CONDITIONAL USE PERMIT DRC2021-00188 FOR THE EXPANSION AND OPERATION OF A BUDDHIST TEMPLE INCLUDING THE DEVELOPMENT OF EIGHT BUILDINGS FOR THE PURPOSES OF WORSHIP, LIVING QUARTERS, AND RELATED ADMINISTRATIVE OR SUPPORT USES ON CERTAIN PROPERTY LOCATED AT THE NORTHEAST CORNER OF DECLIFF DRIVE AND AMBLESIDE PLACE IN THE ETIWANDA HEIGHTS NEIGHBORHOOD CONSERVATION PLAN (EHNCP), AND MAKING FINDINGS IN SUPPORT THEREOF. THE PROJECT SITE CONSISTS OF PORTIONS OF FOUR PARCELS; APNS: 0226-061-47, 0226-061-73, 0226-061-74, AND 0226-061- 76. A.Recitals. 1.Ling Yen Mountain Temple filed an application for the approval of Conditional Use Permit DRC2021-00188, as described in the title of this Resolution. Hereinafter in this Resolution, the subject Conditional Use Permit request is referred to as "the application." 2.On the 26th day of February 2025, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on said application and concluded said hearing on that date. 3.All legal prerequisites prior to the adoption of this Resolution have occurred. B.Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1.This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2.Based upon the substantial evidence presented to this Commission during the above-referenced meeting on February 26, 2025, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a) The application is a proposed expansion to an existing temple including the development of eight buildings for the purposes of worship, living quarters, and related administrative or support uses for property located on a mostly undeveloped site located at 13938 DeCliff Drive; and Exhibit F    Page 64 PLANNING COMMISSION RESOLUTION NO. 2025-007 CUP DRC2021-00188 – Ling Yen Mountain Temple February 26, 2025 b) The existing land uses on, and General Plan land use and zoning designations for, the project site and the surrounding properties (relative to the above- noted parcel) are as follows: Land Use General Plan Zoning Site Existing Buddhist Temple Facility Rural Open Space (OS) and General Open Space and Facilities (OS) Etiwanda Heights Neighborhood Conservation Plan (EHNCP) North Rural Undeveloped Land Rural Open Space (OS) and General Open Space and Facilities (OS) Etiwanda Heights Neighborhood Conservation Plan (EHNCP) South Undeveloped Land and Residential Neighborhood General Open Space and Facilities (OS) followed by Suburban Neighborhood Very Low (N) Flood Control Utility Corridor (R-FC/UC) with Equestrian Overlay and Hillside Overlay per Ordinance 628 within Etiwanda Heights Neighborhood Conservation Plan followed by Very Low Residential – Etiwanda Highlands (14000 (VL-HC 14000) West Rural Undeveloped Land Rural Open Space (OS) and General Open Space and Facilities (OS) Open Space (R-OS) and Flood Control Utility Corridor (R-FC/UC) with Equestrian Overlay and Hillside Overlay East Undeveloped Land, a Water Tank, and Enright Ranch Rural Open Space (OS) and General Open Space and Facilities (OS) Open Space (R-OS) and Flood Control Utility Corridor (R-FC/UC) with Equestrian Overlay and Hillside Overlay c) The property is currently improved with an existing structure built in 1990 at a time when the subject property was under the jurisdiction of unincorporated San Bernardino County which totals approximately 6,600 square feet and which the applicant is currently using for office hours, group worship, and prayer services throughout the week; and d) The subject property was annexed from the County of San Bernardino into the City of Rancho Cucamonga in November 2020 and assigned a zoning designation within the Etiwanda Heights Neighborhood Conservation Plan (EHNCP); and e) The application proposes the development of eight buildings which would result in a total building area of 93,003 square feet as well as associated project improvements, including, but not limited to driveways and private access roadways, and utility infrastructure connection and expansion along Dawnridge Drive, Ambleside Place, and DeCliff Drive. Improvements have been conditioned to be installed as a part of the related Design Review Conditions of Approval (DRC2021-00187); and f) This application is in conjunction with Tentative Tract Map SUBTPM19720, for the subdivision of 77.39 acres of land into four parcels, Design Review DRC2021-00187, and Tree Removal Permit DRC2021-00189 for the removal of 46 non-native Eucalyptus and native western sycamore trees    Page 65 PLANNING COMMISSION RESOLUTION NO. 2025-007 CUP DRC2021-00188 – Ling Yen Mountain Temple February 26, 2025 3. Based upon the substantial evidence presented to this Commission during the above-referenced meeting and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a) The proposed use is in accord with the General Plan land use designation. Only limited types of development which are characterized by the limited presence of buildings and other development are permitted within open space land use designations. The project is consistent with this in that the design of the project involves a cluster of buildings in a campus- like setting which comprises the expansion of an existing facility which has been in operation since approximately 2005. Notably, while the area to be developed totals approximately 35 acres, the balance of the total approximate site size of 77 acres will remain natural and undeveloped; and b) The proposed use is consistent with the objectives of the Development Code, and the purposes of the Etiwanda Heights Neighborhood Conservation Plan (EHNCP) in which the site is located. The proposed Project is consistent with Section 5.9.4.F of the EHNCP, which establishes criteria specific to assembly uses within the subject regulating zone of the EHNCP; and c) The site is physically suitable for the type of development proposed. The project is compliant with all relevant development standards and has been reviewed by staff to be consistent with all relevant standards related to access and public safety. The project site is well suited for the proposed expansion and development as it is located in a Specific Plan and is bordered by sites similarly zoned for hillside developments and open space; and d) The proposed use complies with each of the applicable provisions of the Etiwanda Heights Neighborhood Conservation Plan (EHNCP) and Development Code and is compatible with neighboring properties. Upon approval of the requested Conditional Use Permit, the proposed use is compliant with permitted uses within the subject zone; and e) The proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. The project has been reviewed to be compliant with all relevant development standards, including Fire Department regulations, and is not anticipated to be detrimental to the public health, safety or welfare. Further, the project, and the proposed use thereof, is required to comply with all relevant development standards which regulate the proposed use of the site; and f) The area is already adequately served by existing fire stations, and no new or altered facilities would be needed to serve the allowed land uses with the EHNCP area. As presented, Project-related impacts to Public Services including fire, police, schools, libraries, and parks, would be less than significant with conformance to GPU policies. Therefore, Project impacts related to public services are less than significant    Page 66 PLANNING COMMISSION RESOLUTION NO. 2025-007 CUP DRC2021-00188 – Ling Yen Mountain Temple February 26, 2025 g) The design of the proposed Project is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat. The General Plan Update (GPU) Environmental Impact Review (EIR) considered implementation of Specific Plans, such as the EHNCP. The EHNCP implements the GPU for the portion of the Planning Area where the project site is located. Environmental review and analysis associated with the streamlined Consistency Analysis and Checklist pursuant to the California Environmental Quality Act (CEQA) has demonstrated that the project would not have a significant impact on the environment 4. The City of Rancho Cucamonga adopted a comprehensive update to the City's General Plan (GP) and certified a Program Environmental Impact Report (EIR) (SCH No. 2021050261) on December 15, 2021. Pursuant to Section 15183(c) of the State CEQA Guidelines, "if an impact is not peculiar to the parcel or to the project, has been addressed as a significant effect in the prior EIR, or can be substantially mitigated by the imposition of uniformly applied development policies or standards ... then an additional ElR need not be prepared for the project solely on the basis of that impact." The 35.1-acre property (Parcel 3) is designated by the City's General Plan land use designation and the Etiwanda Heights Neighborhood Conservation Plan (EHNC-SP) zoning designation, which allows for the expansion and development of the proposed temple worship facility. Therefore, no subsequent or supplemental EIR is required for the proposed project. To demonstrate that no subsequent EIR or environmental review is required, a CEQA Section 15183 Compliance Memorandum dated January 202, was prepared by an environmental consultant hired by the City (EPD Solutions, 2024) (Exhibit D - CEQA Section 15183 Compliance Memorandum). Staff evaluated this memorandum and concluded that the project is within the scope of the EIR adopted and certified as part of the City's GP on December 15, 2021, upon the project's compliance with all conditions of approval. The project will not have any significant effects not discussed in the GP EIR, nor have more severe effects than previously analyzed, and that additional or different mitigation measures are not required to reduce the impacts of the project to a level of less than significant. The proposed project involves the involves the subdivision of 77.39 acres of land into four parcels, with parcel three proposed for the expansion and development of the existing temple worship facility. Staff finds that there is no substantial evidence that the project will have a significant effect on the environment. 5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth in the Conditions of Approval, attached hereto and incorporated herein by this reference. 6. The Secretary to this Commission shall certify the adoption of this Resolution. APPROVED AND ADOPTED THIS 26TH DAY OF FEBRUARY 2025. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: Tony Morales, Chairman    Page 67 PLANNING COMMISSION RESOLUTION NO. 2025-007 CUP DRC2021-00188 – Ling Yen Mountain Temple February 26, 2025 ATTEST: Jennifer Nakamura, Secretary I, Jennifer Nakamura, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 26th day of February 2025, by the following vote-to-wit: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSENT: COMMISSIONERS: ABSTAIN: COMMISSIONERS:    Page 68 Conditions of Approval Community Development Department Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Please be advised of the following Special Conditions The project shall comply with all relevant mitigation measures related to the certified Environmental Impact Reports for both the General Plan Update 2020 and the Etiwanda Heights Neighborhood Conservation Plan and standard General Plan conditions of approval as identified by the Ling Yen Mountain Temple Project CEQA Analysis an related mitigation monitoring and reporting program as prepared by EPD Solutions dated January 2025. 1. If the operation of the facility causes adverse effects upon the adjacent land uses, the Conditional Use Permit shall be brought before the Planning Director for consideration and possible termination of use if the issues cannot be rectified. 2. The facility shall comply with the performance standards for noise and vibrations outlined in Development Code Chapter 17.66 (Performance Standards) and light glare outlined in Development Code Chapter 17.58 (Outdoor Lighting Standards). All activities shall not create any noise that would exceed an exterior noise level of 60 dB during the hours of 10:00 p.m. to 7:00 a.m. unless otherwise specified in the in Chapter 17.66. 3. Standard Conditions of Approval The applicant shall sign the Statement of Agreement and Acceptance of Conditions of Approval provided by the Planning Department. The signed Statement of Agreement and Acceptance of Conditions of Approval shall be returned to the Planning Department prior to the submittal of grading/construction plans for plan check, request for a business license, and/or commencement of the approved activity. 4. www.CityofRC.us Printed: 2/20/2025    Page 69 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval The applicant shall indemnify, protect, defend, and hold harmless, the City, and/or any of its officials , officers, employees, agents, departments, agencies, those City agents serving as independent contractors in the role of City officials and instrumentalities thereof (collectively “Indemnitees”), from any and all claims, demands, lawsuits, writs of mandamus, and other actions and proceedings (whether legal, equitable, declaratory, administrative or adjudicatory in nature ), and alternative dispute resolutions procedures (including, but not limited to, arbitrations, mediations, and other such procedures ) (collectively “Actions”), brought against the City, and/or any of its officials, officers, employees, agents, departments, agencies, and instrumentalities thereof, that challenge, attack, or seek to modify, set aside, void, or annul, the action of, or any permit or approval issued by, the City and /or any of its officials, officers, employees, agents, departments, agencies, and instrumentalities thereof (including actions approved by the voters of the City ), for or concerning the project, whether such actions are brought under the California Environmental Quality Act (CEQA), State Planning and Zoning Law, the Subdivisions Map Act, Code of Civil Procedure Section 1085 or 1094.5, or any other state, federal, or local statute, law, ordinance, rule, regulation, or any decision of a competent jurisdiction. This indemnification provision expressly includes losses, judgments, costs, and expenses (including, without limitation, attorneys’ fees or court costs) in any manner arising out of or incident to this approval, the Planning Director’s actions, the Planning Commission’s actions, and/or the City Council’s actions , related entitlements, or the City’s environmental review thereof. The Applicant shall pay and satisfy any judgment, award or decree that may be rendered against City or the other Indemnitees in any such suit , action, or other legal proceeding. It is expressly agreed that the City shall have the right to approve , which approval will not be unreasonably withheld, the legal counsel providing the City’s defense, and that the applicant shall reimburse City for any costs and expenses directly and necessarily incurred by the City in the course of the defense. City shall promptly notify the applicant of any Action brought and City shall cooperate with applicant in the defense of the Action. In the event such a legal action is filed challenging the City’s determinations herein or the issuance of the approval, the City shall estimate its expenses for the litigation. The Applicant shall deposit said amount with the City or, at the discretion of the City, enter into an agreement with the City to pay such expenses as they become due. 5. Approval of Tentative Parcel Map No. SUBTPM19720 is granted subject to the approval of Design Review No. DRC2021-00187, Conditional Use Permit No. DRC2021-00188 and Tree Removal Permit No. DRC2021-00189. 6. Any approval shall expire if Building Permits are not issued or approved use has not commenced within 2 years from the date of approval or a time extension has been granted. 7. www.CityofRC.us Page 2 of 11Printed: 2/20/2025    Page 70 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval Any modification or intensification of the approved use, including but not limited to, revisions in the operations of the business including changes to the operating days /hours; change in the location on -site or within the building of the use /activity that is approved by this Conditional Use Permit; improvements including new building construction; and/or other modifications /intensification beyond what is specifically approved by this Conditional Use Permit, shall require the review and approval by the Planning Director prior to submittal of documents for plan check /occupancy, construction, commencement of the activity , and/or issuance of a business license. The Planning Director may determine that modifications or intensifications of use require the submittal of an application to modify this Conditional Use Permit for review by the City. 8. This tentative parcel map shall expire, unless extended by the Planning Commission, unless a complete final map is filed with the Engineering Services Department within 3 years from the date of the approval. 9. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community, Specific Plans and /or Master Plans in effect at the time of Building Permit issuance. 10. The site shall be developed and maintained in accordance with the approved plans which include Site Plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Department, the conditions contained herein, the Development Code regulations and the Etiwanda Heights Neighborhood Conservations Plan. 11. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and approved by the Planning Director and Police Department (909-477-2800 ) prior to the issuance of Building Permits . Such plan shall indicate style, illumination, location, height, and method of shielding so as not to adversely affect adjacent properties . 12. Occupancy of the facilities shall not commence until such time as all California Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Services Department to show compliance. The buildings shall be inspected for compliance and final acceptance granted prior to occupancy. 13. Trash receptacle(s) are required and shall meet City standards. The final design, locations, and the number of trash receptacles shall be subject to Planning Director review and approval prior to the issuance of Building Permits. 14. A detailed landscape and irrigation plan, shall be prepared by a licensed landscape architect and submitted for Planning Director review and approval prior to the issuance of Building Permits for the development or prior final map approval in the case of a custom lot subdivision. For development occurring in the Very High Fire Hazard Severity Zone, the landscape plans will also be reviewed by Fire Construction Services. 15. All tree planting shall comply with development code requirements, including, but not limited to tree replacement requirements related to the associated tree removal permit. 16. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls.17. www.CityofRC.us Page 3 of 11Printed: 2/20/2025    Page 71 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval Tree maintenance criteria shall be developed and submitted for Planning Director review and approval prior to issuance of Building Permits. These criteria shall encourage the natural growth characteristics of the selected tree species. 18. All walls shall be provided with decorative treatment. If located in public maintenance areas, the design shall be coordinated with the Engineering Services Department. 19. Landscaping and irrigation shall be designed to conserve water through the principles of water efficient landscaping per Development Code Chapter 17.82. 20. All parking lot landscape islands shall have a minimum outside dimension of 6 feet.21. All parking spaces shall be 9 feet wide by 17 feet long with a required 1-foot overhang (e.g., over a curb stop). 22. Plans for any security gates shall be submitted for the Planning Director, City Engineer, and Rancho Cucamonga Fire Protection District review and approval prior to issuance of Building Permits. For residential development, private gated entrances shall provide adequate turn -around space in front of the gate and a separate visitor lane with call box to avoid cars stacking into the public right-of-way. 23. All parking spaces shall be double striped per City standards and all driveway aisles, entrances, and exits shall be striped per City standards. No parking shall be permitted on unpaved areas. 24. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided throughout the development to connect dwellings /units/buildings with open spaces /plazas/ recreational uses. 25. Any proposed signage shall be reviewed under separate permit, shall comply with applicable provisions of the Rancho Cucamonga sign code, and shall be reviewed and approved prior to installation. 26. All roof appurtenances, including air conditioners and other roof mounted equipment and /or projections shall be screened from all sides and the sound shall be buffered from adjacent properties and streets as required by the Planning Department. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the Planning Director. Any roof -mounted mechanical equipment and /or ductwork, that projects vertically more than 18 inches above the roof or roof parapet, shall be screened by an architecturally designed enclosure which exhibits a permanent nature with the building design and is detailed consistent with the building. Any roof -mounted mechanical equipment and /or ductwork, that projects vertically less than 18 inches above the roof or roof parapet shall be painted consistent with the color scheme of the building. Details shall be included in building plans. 27. Copies of the signed Planning Commission Resolution of Approval or Approval Letter, Conditions of Approval, and all environmental mitigations shall be included on the plans (full size). The sheet (s) are for information only to all parties involved in the construction /grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 28. www.CityofRC.us Page 4 of 11Printed: 2/20/2025    Page 72 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval For non-residential development, property owners are responsible for the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas within the public right -of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition, and shall receive regular pruning, fertilizing, mowing, and trimming. Any damaged, dead, diseased, or decaying plant material shall be replaced within 30 days from the date of damage. 29. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be included in the required landscape plans and shall be subject to Planning Director review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Services Department. 30. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination and in conformance with Building and Safety Services Department standards, the Municipal Code and the Rancho Cucamonga Fire Department (RCFD) Standards. 31. All Double Detector Checks (DDC) and Fire Department Connections (FDC) required and/or proposed shall be installed at locations that are not within direct view or line -of-sight of the main entrance. The specific locations of each DDC and FDC shall require the review and approval of the Planning Department and Fire Construction Services /Fire Department. All Double Detector Checks (DDC) and Fire Department Connections (FDC) shall be screened behind a 4-foot high block wall. These walls shall be constructed of similar material used on-site to match the building. 32. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For single -family residential developments, transformers shall be placed in underground vaults. 33. Engineering Services Department Standard Conditions of Approval www.CityofRC.us Page 5 of 11Printed: 2/20/2025    Page 73 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval Prior to building permit, the applicant is responsible for the improvement of all streets providing public access to the site.The applicant shall submit plans for review and approval of the City Engineer showing improvements in compliance with the City 's design standards or as otherwise approved by the City Engineer: a. Dawnridge Drive, a public street, shall be improved providing full width (40-feet) road improvements along the site frontage and connecting to existing improvements to the South. b. Decliff Drive, a public street, shall be improved providing full width (40-feet) road improvements along the site frontage and connecting to Dawnridge Drive to the East and Wardman Bullock Road to the West. c. All public infrastructure shall be kept within public right -of-way. Applicant shall be responsible for the dedication of any additional right -of-way easement (irrevocable offer) required to accommodate such infrastructure within the right -of-way, such as curb ramps and sidewalks. If deemed necessary during the design review, the offer of dedication shall be submitted and recorded prior to building permit . d. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and interconnect conduit shall be installed to the satisfaction of the City Engineer. e. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public street improvements, prior to issuance of Building Permits. f. Prior to any work being performed in public right -of-way, fees shall be paid and a construction permit shall be obtained from the Engineering Services Department in addition to any other permits required. 1. Private Streets and Access Road : Private streets and access roads proposed in the preliminary grading plans shall be made part of the on-site grading plans. a. Plans shall be submitted for review and approval of the City Engineer prior to building permit. b. Private streets shall be improved to a minimum of 26-feet width of all weather surface or as required by the Fire Department, whichever more restrictive. c. The design shall incorporate public street design standards, modifications shall be clearly identified and require approval by the City Engineer. d. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the private streets and access roads: N-S and E-W providing access to the existing building. 2. Fire Prevention / New Construction Unit Standard Conditions of Approval www.CityofRC.us Page 6 of 11Printed: 2/20/2025    Page 74 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Fire Prevention / New Construction Unit Standard Conditions of Approval To ensure continued Fire District use of and access to, and maintenance as needed, of the fire access / fire lane and fire water mains, a reciprocal agreement between property owners and the Fire District is required. The agreement is required to be recorded with the San Bernardino County Recorder. A site plan showing the location of the fire access / fire lane and fire water mains is required to be included with the agreement. The agreement is required to be reviewed and approved by the Fire District prior to recording. Proof of recordation is required to be submitted to the Fire District. A template of this agreement has been uploaded to the Documents section. 1. Required alarm systems and supervision systems are required to be in accordance with Fire District Standard 9-5. The Standard has been uploaded to the Documents section. 2. Combustible construction materials, including combustible roofing materials, are prohibited from being onsite prior to a water supply system in accordance with Fire District Standard 5-10 being provided in accordance with Fire District Standard 33-1. Copies of the Standards have been uploaded to the Documents section of this project in the Online Permit Center. 3. Fire sprinklers are required to be installed in accordance with Fire District Standard 9-3. The Standard has been uploaded to the Documents section. 4. Plans for the alarm and /or supervision (monitoring) system are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 5. When radio signal strength testing determines that emergency responder communication coverage will require an in-building system to meet the requirements of the Fire Code, plans for the system are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 6. Plans for the private, onsite fire underground water infrastructure are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 7. Plans for the public, offsite fire underground water infrastructure are required to be submitted separately and issued a separate permit. Plans are required to be submitted prior to or concurrently with the plans submitted to the Water District. Submit all plans to the Building Department for routing to the Fire District. 8. Plans for the automatic fire sprinkler system are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 9. Plans for the temporary emergency vehicle access and /or hydrants are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 10. Emergency responder communication coverage in accordance with Fire District Standard 5-12 is required for the building (s) included in this project. A radio signal strength test of the public safety radio communication system conducted in accordance with the requirements of the 2022 California Fire Code is required to be submitted. Where existing radio signal strength does not meet the requirements of the Fire Code, a separate submittal for an emergency responder communication coverage system is required. 11. www.CityofRC.us Page 7 of 11Printed: 2/20/2025    Page 75 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Fire Prevention / New Construction Unit Standard Conditions of Approval A new public hydrant is required to be installed within 15-50 feet of the Fire Department Connection (FDC) and in accordance with Fire District Standard 5-10. 12. The new connection to the public water main requires the submittal of public, off -site fire underground plans that conform to the standards of the water purveyor and Fire District Standard 5-10. 13. Public and private fire service water mains, public and private hydrants, water control valves, fire sprinkler risers, fire department connections (FDCs), and other fire protection water related devices and equipment are required to be provided, designed, and installed in accordance with Fire District Standard 5-10. The Standard has been uploaded to the Documents section. 14. Temporary fire apparatus access (fire lanes) and temporary fire hydrants, if needed, are required to be in accordance with Fire District Standard 33-2. The Standard has been uploaded to the Documents section. 15. Gates installed across a residential emergency vehicle access road (fire lane) are required to be in accordance with Standard 5-3. The Standard has been uploaded to the Documents section. 16. Fire extinguishers are required in accordance with Section 906 of the California Fire Code. Consult with the Fire Inspector for the correct type, size, and exact installation locations. 17. Fire flow information for this project is obtained from the Cucamonga Valley Water District (CVWD). CVWD can be reached at 909-944-6000 or custserv@cvwdwater.com. 18. Fire flow is required to be in accordance with Appendix B of the California Fire Code. The Fire District has adopted the appendix without local amendments except that the minimum fire flow for commercial buildings shall not be less than 1500 gpm. Proof of the availability of the required fire flow must be provided to the Fire District in the form of a letter or written report dated within the past 12 months. 19. Street address and unit /suite signage for commercial and industrial buildings are required to be in accordance with Fire District Standard 5-8. The Standard has been uploaded to the Documents section. 20. Fire apparatus access roads and emergency vehicle access is required to be identified with signs and/or other approved makings in accordance with Fire District Standard 5-1. A copy of the Standard has been uploaded to the Documents section. 21. Street address and building identification signage for multi -unit residential buildings are required to be in accordance with Fire District Standard 5-7. The Standard has been uploaded to the Documents section. 22. Identification of fire protection systems and components, fire alarm systems and components, and equipment and devices associated with fire and life safety systems is required to be in accordance with Fire District Standards 5-5 and 5-10. The Standards have been uploaded to the Documents section. 23. Grading Section Standard Conditions of Approval www.CityofRC.us Page 8 of 11Printed: 2/20/2025    Page 76 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval The applicant shall provide a grading agreement and grading bond for all cut and fill combined exceeding 5,000 cubic yards prior to issuance of a grading permit. The grading agreement and bond shall be approved by the Engineering Services Department. 1. Prior to issuance of a wall permit, on engineered combination garden /retaining walls along the property boundary the structural calculations for the wall shall assume a level toe /heel at the adjacent off-site property (i.e. a manufactured slope is not present). This shall be shown in the typical sections of the grading and drainage plan. 2. A drainage study showing a 100-year, AMC 3 design storm event for on -site drainage shall be prepared and submitted to the Engineering Services Department for review and approval for on -site storm water drainage prior to issuance of a grading permit. The plan and report shall contain water surface profile gradient calculations for all storm drain pipes 12-inches and larger in diameter. All reports shall be wet signed and sealed by the Engineer of Record. In addition, the project specific drainage study shall provide inlet calculations showing the proper sizing of the water quality management plan storm water flows into the proposed structural storm water treatment devices. 3. Flow lines steeper than 6 percent could be erosive. The applicant shall provide hard lined gutters and swales where concentrated flows exceed 3fps, and anywhere that flow lines exceed 10 percent. This shall be shown on the grading and drainage plan prior to issuance of a grading permit. 4. A review of the conceptual grading and drainage plan and the preliminary water quality management plan shows that it is the intent of the engineer of record to drain the surface storm water flows to a retention basin. The basin shall be designed to accept multiple storm events (100-year storm event and Antecedent Moisture Condition 3) using the methodology outlined in the current adopted San Bernardino County Hydrology Manual. 5. Private sewer, water, and storm drain improvements will be designed per the latest adopted California Plumbing Code. Private storm drain improvements shall be shown on the grading and drainage plan. 6. Reciprocal access easements for all parcels and maintenance agreements ensuring joint maintenance of all storm water quality structural /treatment devices and best management practices (BMP) as provided for in the project’s Storm Water Quality Management Plan, shall be provided for by CC &R’s or deeds and shall be recorded prior to the approval of the Water Quality Management Plan. Said CC &R’s and/or deeds shall be included in the project site specific Storm Water Quality Management Plan (WQMP) document prior to approval of the WQMP document and recording of the Memorandum of Agreement of Storm Water Quality Management Plan . 7. The applicant shall prepare or amend existing CC &R’s as needed to clarify how maintenance responsibilities will be shared between the newly created parcels and the remaining existing parcels of Parcel Map No. 19720 prior to issuance of a grading permit. The grading and drainage plan and the CC&Rs shall address shared access to streets, private storm drains, storm water treatment devices , surface drainage and maintenance of common areas, including landscaping within public rights -of-way and Best Management Practices identified in the WQMP. 8. www.CityofRC.us Page 9 of 11Printed: 2/20/2025    Page 77 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval Prior to the issuance of a building permit or Engineering Services Department issued right of way permit, the applicant shall submit, for review and approval of the City Engineer, a final project specific water quality management plan (WQMP) for review and approval, and shall have said document recorded with the San Bernardino County Recorder's Office. a. The WQMP shall include copy of the site specific infiltration report and provide design guidelines for site storm water treatment devices and best management practices (BMP). b. Applicant shall submit the City of Rancho Cucamonga’s “Memorandum of Agreement of Storm Water Quality Management Plan” for review and approval by the Engineering Services. The memorandum shall be recorded with the County Recorder’s Office . 9. Prior to issuance of a grading permit and approval of the project specific water quality management plan all private storm water catch basin inlets shall include insert filters to capture those pollutants of concern as addressed in the in the final project -specific water quality management plan (WQMP). At a minimum catch basin insert filters to capture trash and other floating debris. All catch basin insert filters shall be maintained on a regular basis as described in the “Inspection and Maintenance Responsibility for Post Construction BMP” section of the final project-specific water quality management plan. 10. Prior to grading permit, the applicant shall submit a project specific hydraulics and hydrology report. The report shall provide for acceptance of existing off -site storm water drainage flows and safely convey those flows through or around the project site. If existing off -site storm water drainage flows mix with any on-site storm water drainage flows, then the off -site storm water drainage flows shall be treated with the on-site storm water drainage flows for storm water quality purposes, prior to discharging the storm water drainage flows from the project site. 11. Grading and design is subject to the most current version of the California Green Building Standards Code: a. Prior to issuance of grading permit, applicant shall demonstrate compliance with Section 5.106.5.2 (Clean Air Vehicle) by showing designated parking for clean air vehicles on the precise grading plans. b. Prior to issuance of grading permit, applicant shall demonstrate compliance with Section 5.106.5.3 (Electrical Vehicles) by showing designated parking for electric vehicles (EV), charging stations and parking areas shall be clearly identified, location of conduits shall be shown on the plans for utility conflict review. 12. www.CityofRC.us Page 10 of 11Printed: 2/20/2025    Page 78 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval Prior to issuance of a grading permit the precise grading and drainage plan shall follow the format provided in the City of Rancho Cucamonga handout “Information for Grading Plans and Permit”: a. Applicant shall submit plans for review and approval of the City Engineer in compliance with the conceptual grading exhibits and the current California building Code, City Grading Standards, and local policies. b. Grading plans shall show accessibility path from the public right -of-way and the accessibility parking stalls to the building doors in conformance with the current adopted California Building Code and the Americans with Disabilities Act. All accessibility ramps shall show sufficient detail including gradients , elevations, and dimensions in compliance with the current adopted California Building Code. c. A project specific geotechnical reports shall be submitted. The geotechnical report shall provide site specific grading and infiltration recommendations. The geotechnical engineer shall sign /certify the grading plans. 13. www.CityofRC.us Page 11 of 11Printed: 2/20/2025    Page 79 RESOLUTION NO. 2025-008 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING TREE REMOVAL PERMIT DRC2021-00189, A REQUEST TO REMOVE TREES, IN CONJUNCTION WITH EXPANSION AND OPERATION OF A BUDDHIST TEMPLE INCLUDING THE DEVELOPMENT OF EIGHT BUILDINGS FOR THE PURPOSES OF WORSHIP, LIVING QUARTERS, AND RELATED ADMINISTRATIVE OR SUPPORT USES ON CERTAIN PROPERTY LOCATED AT THE NORTHEAST CORNER OF DECLIFF DRIVE AND AMBLESIDE PLACE IN THE ETIWANDA HEIGHTS NEIGHBORHOOD CONSERVATION PLAN (EHNCP), AND MAKING FINDINGS IN SUPPORT THEREOF. THE PROJECT SITE CONSISTS OF PORTIONS OF FOUR PARCELS; APNS: 0226-061-47, 0226-061-73, 0226-061-74, AND 0226-061-76. A.Recitals. 1.Ling Yen Mountain Temple filed an application for Tree Removal Permit DRC2021- 00189 as described in the title of this Resolution. Hereinafter in this Resolution, the subject Tree Removal Permit request is referred to as "the application." 2.On the 26th day of February 2025, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on said application and concluded said hearing on that date. 3.All legal prerequisites prior to the adoption of this Resolution have occurred. B.Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1.This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2.Based upon the substantial evidence presented to this Commission during the above-referenced public hearing on February 26, 2025, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a.The application is a proposed expansion to an existing temple including the development of eight buildings for the purposes of worship, living quarters, and related administrative or support uses for property located on a mostly undeveloped site located at 13938 DeCliff Drive; and b.The project site is generally located at the northeast corner of DeCliff Drive and Ambleside Place. The project site is rectangularly shaped and is currently developed with an existing temple worship facility near the northwest central portion of the site; and c.The existing land uses on, and General Plan land use and zoning designations for, the project site and the surrounding properties (relative to the above-noted parcel) are as follows: Exhibit G   Page 80 PLANNING COMMISSION RESOLUTION NO. 2025-008 TRP DRC2021-00189 – Ling Yen Mountain Temple February 26, 2025 Page 2 d. The property is currently improved with an existing structure built in 1990 at a time when the subject property was under the jurisdiction of unincorporated San Bernardino County which totals approximately 6,600 square feet and which the applicant is currently using for office hours, group worship, and prayer services throughout the week; and e. The subject property was annexed from the County of San Bernardino into the City of Rancho Cucamonga in November 2020 and assigned a zoning designation within the Etiwanda Heights Neighborhood Conservation Plan (EHNCP); and f. This application is in conjunction with Tentative Tract Map SUBTPM19720, for the subdivision of 77.39 acres of land into four parcels, Design Review DRC2021-00187, and Conditional Use Permit DRC2021-00188 for the development of eight buildings which would result in a total building area of 93,003 square feet as well as associated project improvements, including, but not limited to driveways and private access roadways, and utility Land Use General Plan Zoning Site Existing Buddhist Temple Facility Rural Open Space (OS) and General Open Space and Facilities (OS) Etiwanda Heights Neighborhood Conservation Plan (EHNCP) North Rural Undeveloped Land Rural Open Space (OS) and General Open Space and Facilities (OS) Etiwanda Heights Neighborhood Conservation Plan (EHNCP) South Undeveloped Land and Residential Neighborhood General Open Space and Facilities (OS) followed by Suburban Neighborhood Very Low (N) Flood Control Utility Corridor (R-FC/UC) with Equestrian Overlay and Hillside Overlay per Ordinance 628 within Etiwanda Heights Neighborhood Conservation Plan followed by Very Low Residential – Etiwanda Highlands (14000 (VL-HC 14000) West Rural Undeveloped Land Rural Open Space (OS) and General Open Space and Facilities (OS) Open Space (R-OS) and Flood Control Utility Corridor (R-FC/UC) with Equestrian Overlay and Hillside Overlay East Undeveloped Land, a Water Tank, and Enright Ranch Rural Open Space (OS) and General Open Space and Facilities (OS) Open Space (R-OS) and Flood Control Utility Corridor (R-FC/UC) with Equestrian Overlay and Hillside Overlay    Page 81 PLANNING COMMISSION RESOLUTION NO. 2025-008 TRP DRC2021-00189 – Ling Yen Mountain Temple February 26, 2025 Page 3 infrastructure connection and expansion along Dawnridge Drive, Ambleside Place, and DeCliff Drive. g. The applicant is requesting the removal of up to 46 non-native Eucalyptus and native western sycamore trees. A Protected Tree Report (Rico Ramirez, Certified Arborist, June 2023) was submitted that reviews the health and condition of the onsite trees and recommends that the trees be removed due to their health and/or if avoidance is not feasible. The Landscape Plan for the project includes the planting of 52 trees including replacement of heritage and non- heritage trees as well as dead trees on the site, in accordance with relevant Development Code regulations; and 3. Based upon the substantial evidence presented to this Commission during the above-referenced meeting and upon the specific findings of facts set forth in Paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. Every effort has been made to incorporate the tree(s) into the design of the project, and the only appropriate alternative is the removal of the tree. Based on the onsite grades and the location of the trees near the south property line of the project site, preservation of the trees has been determined to infeasible as the location of said trees conflict with proposed buildings as well as roads, driveways and areas permitting ingress and egress for the public and emergency services to and from the site; and b. The trees slated for removal are in conflict with the construction of on-site improvements and cannot be incorporated into the project. The trees stated for removal are located near the south property line of the project site and need to be removed to construct on- site buildings, parking lots, and site improvements, in addition to off-site roadways and utility infrastructure for access and use of the site. The trees stated for removal will be replaced on a minimum one-for-one basis; and c. The removal of the trees will not have a negative impact on the health, safety, or viability of surrounding trees, nor will it negatively impact the aesthetics or general welfare of the surrounding area. The impact on the surrounding area will be minimal with the planting of 52 replacement trees. 4. The City of Rancho Cucamonga adopted a comprehensive update to the City's General Plan (GP) and certified a Program Environmental Impact Report (EIR) (SCH No. 2021050261) on December 15, 2021. Pursuant to Section 15183(c) of the State CEQA Guidelines, "if an impact is not peculiar to the parcel or to the project, has been addressed as a significant effect in the prior EIR, or can be substantially mitigated by the imposition of uniformly applied development policies or standards ... then an additional ElR need not be prepared for the project solely on the basis of that impact." The 35.1-acre property (Parcel 3) is designated by the City's General Plan land use designation and the Etiwanda Heights Neighborhood Conservation Plan (EHNCP) zoning designation, which allows for the expansion and development of the proposed temple worship facility. Therefore, no subsequent or supplemental EIR is required for the proposed project. To demonstrate that no subsequent EIR or environmental review is required, a CEQA Section 15183 Compliance Memorandum dated January 202, was prepared by an environmental consultant hired by the City (EPD Solutions, 2024) (Exhibit D - CEQA Section 15183 Compliance Memorandum). Staff    Page 82 PLANNING COMMISSION RESOLUTION NO. 2025-008 TRP DRC2021-00189 – Ling Yen Mountain Temple February 26, 2025 Page 4 evaluated this memorandum and concluded that the project is within the scope of the EIR adopted and certified as part of the City's GP on December 15, 2021, upon the project's compliance with all conditions of approval. The project will not have any significant effects not discussed in the GP EIR, nor have more severe effects than previously analyzed, and that additional or different mitigation measures are not required to reduce the impacts of the project to a level of less than significant. The proposed project involves the involves the subdivision of 77.39 acres of land into four parcels, with parcel three proposed for the expansion and development of the existing temple worship facility. Staff finds that there is no substantial evidence that the project will have a significant effect on the environment. 5. Based upon the findings and conclusions set forth in Paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth in the Conditions of Approval, attached hereto and incorporated herein by this reference. 6. The Secretary to this Commission shall certify the adoption of this Resolution. APPROVED AND ADOPTED THIS 26TH DAY OF February 2025. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: Tony Morales, Chairman ATTEST: Jennifer Nakamura, Secretary I, Jennifer Nakamura, Secretary of the Planning Commission for the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 26th day of February 2025, by the following vote-to-wit: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSENT: COMMISSIONERS: ABSTAIN: COMMISSIONERS:    Page 83 Conditions of Approval Community Development Department Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Please be advised of the following Special Conditions The project shall comply with all relevant mitigation measures related to the certified Environmental Impact Reports for both the General Plan Update 2020 and the Etiwanda Heights Neighborhood Conservation Plan and standard General Plan conditions of approval as identified by the Ling Yen Mountain Temple Project CEQA Analysis an related mitigation monitoring and reporting program as prepared by EPD Solutions dated January 2025. 1. If the operation of the facility causes adverse effects upon the adjacent land uses, the Conditional Use Permit shall be brought before the Planning Director for consideration and possible termination of use if the issues cannot be rectified. 2. The facility shall comply with the performance standards for noise and vibrations outlined in Development Code Chapter 17.66 (Performance Standards) and light glare outlined in Development Code Chapter 17.58 (Outdoor Lighting Standards). All activities shall not create any noise that would exceed an exterior noise level of 60 dB during the hours of 10:00 p.m. to 7:00 a.m. unless otherwise specified in the in Chapter 17.66. 3. Standard Conditions of Approval The applicant shall sign the Statement of Agreement and Acceptance of Conditions of Approval provided by the Planning Department. The signed Statement of Agreement and Acceptance of Conditions of Approval shall be returned to the Planning Department prior to the submittal of grading/construction plans for plan check, request for a business license, and/or commencement of the approved activity. 4. www.CityofRC.us Printed: 2/20/2025    Page 84 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval The applicant shall indemnify, protect, defend, and hold harmless, the City, and/or any of its officials , officers, employees, agents, departments, agencies, those City agents serving as independent contractors in the role of City officials and instrumentalities thereof (collectively “Indemnitees”), from any and all claims, demands, lawsuits, writs of mandamus, and other actions and proceedings (whether legal, equitable, declaratory, administrative or adjudicatory in nature ), and alternative dispute resolutions procedures (including, but not limited to, arbitrations, mediations, and other such procedures ) (collectively “Actions”), brought against the City, and/or any of its officials, officers, employees, agents, departments, agencies, and instrumentalities thereof, that challenge, attack, or seek to modify, set aside, void, or annul, the action of, or any permit or approval issued by, the City and /or any of its officials, officers, employees, agents, departments, agencies, and instrumentalities thereof (including actions approved by the voters of the City ), for or concerning the project, whether such actions are brought under the California Environmental Quality Act (CEQA), State Planning and Zoning Law, the Subdivisions Map Act, Code of Civil Procedure Section 1085 or 1094.5, or any other state, federal, or local statute, law, ordinance, rule, regulation, or any decision of a competent jurisdiction. This indemnification provision expressly includes losses, judgments, costs, and expenses (including, without limitation, attorneys’ fees or court costs) in any manner arising out of or incident to this approval, the Planning Director’s actions, the Planning Commission’s actions, and/or the City Council’s actions , related entitlements, or the City’s environmental review thereof. The Applicant shall pay and satisfy any judgment, award or decree that may be rendered against City or the other Indemnitees in any such suit , action, or other legal proceeding. It is expressly agreed that the City shall have the right to approve , which approval will not be unreasonably withheld, the legal counsel providing the City’s defense, and that the applicant shall reimburse City for any costs and expenses directly and necessarily incurred by the City in the course of the defense. City shall promptly notify the applicant of any Action brought and City shall cooperate with applicant in the defense of the Action. In the event such a legal action is filed challenging the City’s determinations herein or the issuance of the approval, the City shall estimate its expenses for the litigation. The Applicant shall deposit said amount with the City or, at the discretion of the City, enter into an agreement with the City to pay such expenses as they become due. 5. Approval of Tentative Parcel Map No. SUBTPM19720 is granted subject to the approval of Design Review No. DRC2021-00187, Conditional Use Permit No. DRC2021-00188 and Tree Removal Permit No. DRC2021-00189. 6. Any approval shall expire if Building Permits are not issued or approved use has not commenced within 2 years from the date of approval or a time extension has been granted. 7. www.CityofRC.us Page 2 of 11Printed: 2/20/2025    Page 85 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval Any modification or intensification of the approved use, including but not limited to, revisions in the operations of the business including changes to the operating days /hours; change in the location on -site or within the building of the use /activity that is approved by this Conditional Use Permit; improvements including new building construction; and/or other modifications /intensification beyond what is specifically approved by this Conditional Use Permit, shall require the review and approval by the Planning Director prior to submittal of documents for plan check /occupancy, construction, commencement of the activity , and/or issuance of a business license. The Planning Director may determine that modifications or intensifications of use require the submittal of an application to modify this Conditional Use Permit for review by the City. 8. This tentative parcel map shall expire, unless extended by the Planning Commission, unless a complete final map is filed with the Engineering Services Department within 3 years from the date of the approval. 9. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community, Specific Plans and /or Master Plans in effect at the time of Building Permit issuance. 10. The site shall be developed and maintained in accordance with the approved plans which include Site Plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Department, the conditions contained herein, the Development Code regulations and the Etiwanda Heights Neighborhood Conservations Plan. 11. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and approved by the Planning Director and Police Department (909-477-2800 ) prior to the issuance of Building Permits . Such plan shall indicate style, illumination, location, height, and method of shielding so as not to adversely affect adjacent properties . 12. Occupancy of the facilities shall not commence until such time as all California Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Services Department to show compliance. The buildings shall be inspected for compliance and final acceptance granted prior to occupancy. 13. Trash receptacle(s) are required and shall meet City standards. The final design, locations, and the number of trash receptacles shall be subject to Planning Director review and approval prior to the issuance of Building Permits. 14. A detailed landscape and irrigation plan, shall be prepared by a licensed landscape architect and submitted for Planning Director review and approval prior to the issuance of Building Permits for the development or prior final map approval in the case of a custom lot subdivision. For development occurring in the Very High Fire Hazard Severity Zone, the landscape plans will also be reviewed by Fire Construction Services. 15. All tree planting shall comply with development code requirements, including, but not limited to tree replacement requirements related to the associated tree removal permit. 16. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls.17. www.CityofRC.us Page 3 of 11Printed: 2/20/2025    Page 86 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval Tree maintenance criteria shall be developed and submitted for Planning Director review and approval prior to issuance of Building Permits. These criteria shall encourage the natural growth characteristics of the selected tree species. 18. All walls shall be provided with decorative treatment. If located in public maintenance areas, the design shall be coordinated with the Engineering Services Department. 19. Landscaping and irrigation shall be designed to conserve water through the principles of water efficient landscaping per Development Code Chapter 17.82. 20. All parking lot landscape islands shall have a minimum outside dimension of 6 feet.21. All parking spaces shall be 9 feet wide by 17 feet long with a required 1-foot overhang (e.g., over a curb stop). 22. Plans for any security gates shall be submitted for the Planning Director, City Engineer, and Rancho Cucamonga Fire Protection District review and approval prior to issuance of Building Permits. For residential development, private gated entrances shall provide adequate turn -around space in front of the gate and a separate visitor lane with call box to avoid cars stacking into the public right-of-way. 23. All parking spaces shall be double striped per City standards and all driveway aisles, entrances, and exits shall be striped per City standards. No parking shall be permitted on unpaved areas. 24. Textured pedestrian pathways and textured pavement across circulation aisles shall be provided throughout the development to connect dwellings /units/buildings with open spaces /plazas/ recreational uses. 25. Any proposed signage shall be reviewed under separate permit, shall comply with applicable provisions of the Rancho Cucamonga sign code, and shall be reviewed and approved prior to installation. 26. All roof appurtenances, including air conditioners and other roof mounted equipment and /or projections shall be screened from all sides and the sound shall be buffered from adjacent properties and streets as required by the Planning Department. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the Planning Director. Any roof -mounted mechanical equipment and /or ductwork, that projects vertically more than 18 inches above the roof or roof parapet, shall be screened by an architecturally designed enclosure which exhibits a permanent nature with the building design and is detailed consistent with the building. Any roof -mounted mechanical equipment and /or ductwork, that projects vertically less than 18 inches above the roof or roof parapet shall be painted consistent with the color scheme of the building. Details shall be included in building plans. 27. Copies of the signed Planning Commission Resolution of Approval or Approval Letter, Conditions of Approval, and all environmental mitigations shall be included on the plans (full size). The sheet (s) are for information only to all parties involved in the construction /grading activities and are not required to be wet sealed/stamped by a licensed Engineer/Architect. 28. www.CityofRC.us Page 4 of 11Printed: 2/20/2025    Page 87 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Planning Department Standard Conditions of Approval For non-residential development, property owners are responsible for the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas within the public right -of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition, and shall receive regular pruning, fertilizing, mowing, and trimming. Any damaged, dead, diseased, or decaying plant material shall be replaced within 30 days from the date of damage. 29. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be included in the required landscape plans and shall be subject to Planning Director review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Services Department. 30. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination and in conformance with Building and Safety Services Department standards, the Municipal Code and the Rancho Cucamonga Fire Department (RCFD) Standards. 31. All Double Detector Checks (DDC) and Fire Department Connections (FDC) required and/or proposed shall be installed at locations that are not within direct view or line -of-sight of the main entrance. The specific locations of each DDC and FDC shall require the review and approval of the Planning Department and Fire Construction Services /Fire Department. All Double Detector Checks (DDC) and Fire Department Connections (FDC) shall be screened behind a 4-foot high block wall. These walls shall be constructed of similar material used on-site to match the building. 32. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the Planning Director. For single -family residential developments, transformers shall be placed in underground vaults. 33. Engineering Services Department Standard Conditions of Approval www.CityofRC.us Page 5 of 11Printed: 2/20/2025    Page 88 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Engineering Services Department Standard Conditions of Approval Prior to building permit, the applicant is responsible for the improvement of all streets providing public access to the site.The applicant shall submit plans for review and approval of the City Engineer showing improvements in compliance with the City 's design standards or as otherwise approved by the City Engineer: a. Dawnridge Drive, a public street, shall be improved providing full width (40-feet) road improvements along the site frontage and connecting to existing improvements to the South. b. Decliff Drive, a public street, shall be improved providing full width (40-feet) road improvements along the site frontage and connecting to Dawnridge Drive to the East and Wardman Bullock Road to the West. c. All public infrastructure shall be kept within public right -of-way. Applicant shall be responsible for the dedication of any additional right -of-way easement (irrevocable offer) required to accommodate such infrastructure within the right -of-way, such as curb ramps and sidewalks. If deemed necessary during the design review, the offer of dedication shall be submitted and recorded prior to building permit . d. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and interconnect conduit shall be installed to the satisfaction of the City Engineer. e. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public street improvements, prior to issuance of Building Permits. f. Prior to any work being performed in public right -of-way, fees shall be paid and a construction permit shall be obtained from the Engineering Services Department in addition to any other permits required. 1. Private Streets and Access Road : Private streets and access roads proposed in the preliminary grading plans shall be made part of the on-site grading plans. a. Plans shall be submitted for review and approval of the City Engineer prior to building permit. b. Private streets shall be improved to a minimum of 26-feet width of all weather surface or as required by the Fire Department, whichever more restrictive. c. The design shall incorporate public street design standards, modifications shall be clearly identified and require approval by the City Engineer. d. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the private streets and access roads: N-S and E-W providing access to the existing building. 2. Fire Prevention / New Construction Unit Standard Conditions of Approval www.CityofRC.us Page 6 of 11Printed: 2/20/2025    Page 89 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Fire Prevention / New Construction Unit Standard Conditions of Approval To ensure continued Fire District use of and access to, and maintenance as needed, of the fire access / fire lane and fire water mains, a reciprocal agreement between property owners and the Fire District is required. The agreement is required to be recorded with the San Bernardino County Recorder. A site plan showing the location of the fire access / fire lane and fire water mains is required to be included with the agreement. The agreement is required to be reviewed and approved by the Fire District prior to recording. Proof of recordation is required to be submitted to the Fire District. A template of this agreement has been uploaded to the Documents section. 1. Required alarm systems and supervision systems are required to be in accordance with Fire District Standard 9-5. The Standard has been uploaded to the Documents section. 2. Combustible construction materials, including combustible roofing materials, are prohibited from being onsite prior to a water supply system in accordance with Fire District Standard 5-10 being provided in accordance with Fire District Standard 33-1. Copies of the Standards have been uploaded to the Documents section of this project in the Online Permit Center. 3. Fire sprinklers are required to be installed in accordance with Fire District Standard 9-3. The Standard has been uploaded to the Documents section. 4. Plans for the alarm and /or supervision (monitoring) system are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 5. When radio signal strength testing determines that emergency responder communication coverage will require an in-building system to meet the requirements of the Fire Code, plans for the system are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 6. Plans for the private, onsite fire underground water infrastructure are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 7. Plans for the public, offsite fire underground water infrastructure are required to be submitted separately and issued a separate permit. Plans are required to be submitted prior to or concurrently with the plans submitted to the Water District. Submit all plans to the Building Department for routing to the Fire District. 8. Plans for the automatic fire sprinkler system are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 9. Plans for the temporary emergency vehicle access and /or hydrants are required to be submitted separately and issued a separate permit. Submit all plans to the Building Department for routing to the Fire District. 10. Emergency responder communication coverage in accordance with Fire District Standard 5-12 is required for the building (s) included in this project. A radio signal strength test of the public safety radio communication system conducted in accordance with the requirements of the 2022 California Fire Code is required to be submitted. Where existing radio signal strength does not meet the requirements of the Fire Code, a separate submittal for an emergency responder communication coverage system is required. 11. www.CityofRC.us Page 7 of 11Printed: 2/20/2025    Page 90 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Fire Prevention / New Construction Unit Standard Conditions of Approval A new public hydrant is required to be installed within 15-50 feet of the Fire Department Connection (FDC) and in accordance with Fire District Standard 5-10. 12. The new connection to the public water main requires the submittal of public, off -site fire underground plans that conform to the standards of the water purveyor and Fire District Standard 5-10. 13. Public and private fire service water mains, public and private hydrants, water control valves, fire sprinkler risers, fire department connections (FDCs), and other fire protection water related devices and equipment are required to be provided, designed, and installed in accordance with Fire District Standard 5-10. The Standard has been uploaded to the Documents section. 14. Temporary fire apparatus access (fire lanes) and temporary fire hydrants, if needed, are required to be in accordance with Fire District Standard 33-2. The Standard has been uploaded to the Documents section. 15. Gates installed across a residential emergency vehicle access road (fire lane) are required to be in accordance with Standard 5-3. The Standard has been uploaded to the Documents section. 16. Fire extinguishers are required in accordance with Section 906 of the California Fire Code. Consult with the Fire Inspector for the correct type, size, and exact installation locations. 17. Fire flow information for this project is obtained from the Cucamonga Valley Water District (CVWD). CVWD can be reached at 909-944-6000 or custserv@cvwdwater.com. 18. Fire flow is required to be in accordance with Appendix B of the California Fire Code. The Fire District has adopted the appendix without local amendments except that the minimum fire flow for commercial buildings shall not be less than 1500 gpm. Proof of the availability of the required fire flow must be provided to the Fire District in the form of a letter or written report dated within the past 12 months. 19. Street address and unit /suite signage for commercial and industrial buildings are required to be in accordance with Fire District Standard 5-8. The Standard has been uploaded to the Documents section. 20. Fire apparatus access roads and emergency vehicle access is required to be identified with signs and/or other approved makings in accordance with Fire District Standard 5-1. A copy of the Standard has been uploaded to the Documents section. 21. Street address and building identification signage for multi -unit residential buildings are required to be in accordance with Fire District Standard 5-7. The Standard has been uploaded to the Documents section. 22. Identification of fire protection systems and components, fire alarm systems and components, and equipment and devices associated with fire and life safety systems is required to be in accordance with Fire District Standards 5-5 and 5-10. The Standards have been uploaded to the Documents section. 23. Grading Section Standard Conditions of Approval www.CityofRC.us Page 8 of 11Printed: 2/20/2025    Page 91 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval The applicant shall provide a grading agreement and grading bond for all cut and fill combined exceeding 5,000 cubic yards prior to issuance of a grading permit. The grading agreement and bond shall be approved by the Engineering Services Department. 1. Prior to issuance of a wall permit, on engineered combination garden /retaining walls along the property boundary the structural calculations for the wall shall assume a level toe /heel at the adjacent off-site property (i.e. a manufactured slope is not present). This shall be shown in the typical sections of the grading and drainage plan. 2. A drainage study showing a 100-year, AMC 3 design storm event for on -site drainage shall be prepared and submitted to the Engineering Services Department for review and approval for on -site storm water drainage prior to issuance of a grading permit. The plan and report shall contain water surface profile gradient calculations for all storm drain pipes 12-inches and larger in diameter. All reports shall be wet signed and sealed by the Engineer of Record. In addition, the project specific drainage study shall provide inlet calculations showing the proper sizing of the water quality management plan storm water flows into the proposed structural storm water treatment devices. 3. Flow lines steeper than 6 percent could be erosive. The applicant shall provide hard lined gutters and swales where concentrated flows exceed 3fps, and anywhere that flow lines exceed 10 percent. This shall be shown on the grading and drainage plan prior to issuance of a grading permit. 4. A review of the conceptual grading and drainage plan and the preliminary water quality management plan shows that it is the intent of the engineer of record to drain the surface storm water flows to a retention basin. The basin shall be designed to accept multiple storm events (100-year storm event and Antecedent Moisture Condition 3) using the methodology outlined in the current adopted San Bernardino County Hydrology Manual. 5. Private sewer, water, and storm drain improvements will be designed per the latest adopted California Plumbing Code. Private storm drain improvements shall be shown on the grading and drainage plan. 6. Reciprocal access easements for all parcels and maintenance agreements ensuring joint maintenance of all storm water quality structural /treatment devices and best management practices (BMP) as provided for in the project’s Storm Water Quality Management Plan, shall be provided for by CC &R’s or deeds and shall be recorded prior to the approval of the Water Quality Management Plan. Said CC &R’s and/or deeds shall be included in the project site specific Storm Water Quality Management Plan (WQMP) document prior to approval of the WQMP document and recording of the Memorandum of Agreement of Storm Water Quality Management Plan . 7. The applicant shall prepare or amend existing CC &R’s as needed to clarify how maintenance responsibilities will be shared between the newly created parcels and the remaining existing parcels of Parcel Map No. 19720 prior to issuance of a grading permit. The grading and drainage plan and the CC&Rs shall address shared access to streets, private storm drains, storm water treatment devices , surface drainage and maintenance of common areas, including landscaping within public rights -of-way and Best Management Practices identified in the WQMP. 8. www.CityofRC.us Page 9 of 11Printed: 2/20/2025    Page 92 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval Prior to the issuance of a building permit or Engineering Services Department issued right of way permit, the applicant shall submit, for review and approval of the City Engineer, a final project specific water quality management plan (WQMP) for review and approval, and shall have said document recorded with the San Bernardino County Recorder's Office. a. The WQMP shall include copy of the site specific infiltration report and provide design guidelines for site storm water treatment devices and best management practices (BMP). b. Applicant shall submit the City of Rancho Cucamonga’s “Memorandum of Agreement of Storm Water Quality Management Plan” for review and approval by the Engineering Services. The memorandum shall be recorded with the County Recorder’s Office . 9. Prior to issuance of a grading permit and approval of the project specific water quality management plan all private storm water catch basin inlets shall include insert filters to capture those pollutants of concern as addressed in the in the final project -specific water quality management plan (WQMP). At a minimum catch basin insert filters to capture trash and other floating debris. All catch basin insert filters shall be maintained on a regular basis as described in the “Inspection and Maintenance Responsibility for Post Construction BMP” section of the final project-specific water quality management plan. 10. Prior to grading permit, the applicant shall submit a project specific hydraulics and hydrology report. The report shall provide for acceptance of existing off -site storm water drainage flows and safely convey those flows through or around the project site. If existing off -site storm water drainage flows mix with any on-site storm water drainage flows, then the off -site storm water drainage flows shall be treated with the on-site storm water drainage flows for storm water quality purposes, prior to discharging the storm water drainage flows from the project site. 11. Grading and design is subject to the most current version of the California Green Building Standards Code: a. Prior to issuance of grading permit, applicant shall demonstrate compliance with Section 5.106.5.2 (Clean Air Vehicle) by showing designated parking for clean air vehicles on the precise grading plans. b. Prior to issuance of grading permit, applicant shall demonstrate compliance with Section 5.106.5.3 (Electrical Vehicles) by showing designated parking for electric vehicles (EV), charging stations and parking areas shall be clearly identified, location of conduits shall be shown on the plans for utility conflict review. 12. www.CityofRC.us Page 10 of 11Printed: 2/20/2025    Page 93 Project #: DRC2021-00187 DRC2021-00188, DRC2021-00189, SUBTPM19720 Project Name: Ling Yen Mountain Temple Location: 13938 DAWNRIDGE DR - 022606173-0000 Project Type: Design Review Conditional Use Permit, Tentative Parcel Map, Tree Removal Permit ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT: Grading Section Standard Conditions of Approval Prior to issuance of a grading permit the precise grading and drainage plan shall follow the format provided in the City of Rancho Cucamonga handout “Information for Grading Plans and Permit”: a. Applicant shall submit plans for review and approval of the City Engineer in compliance with the conceptual grading exhibits and the current California building Code, City Grading Standards, and local policies. b. Grading plans shall show accessibility path from the public right -of-way and the accessibility parking stalls to the building doors in conformance with the current adopted California Building Code and the Americans with Disabilities Act. All accessibility ramps shall show sufficient detail including gradients , elevations, and dimensions in compliance with the current adopted California Building Code. c. A project specific geotechnical reports shall be submitted. The geotechnical report shall provide site specific grading and infiltration recommendations. The geotechnical engineer shall sign /certify the grading plans. 13. www.CityofRC.us Page 11 of 11Printed: 2/20/2025    Page 94 DATE:February 26, 2025 TO:Chairman and Members of the Planning Commission FROM:Jennifer Nakamura, CNU-A, Planning Director INITIATED BY:Michael Parmer, Engagement and Special Programs Director SUBJECT:Finding of General Plan Conformity for Real Property Acquisition of Approximately 122 Acres Located East of West Cucamonga Truck Trail (Big Tree Road), generally north of Via Verde Street and Skyline Road Rancho Cucamonga area in unincorporated San Bernardino County; APNs: Portion of 0200-051-48 and 0200-051-49. RECOMMENDATION: Staff recommends the Planning Commission adopt a resolution finding that the proposed acquisition of approximately 120 acres of real property, to preserve and protect the natural and cultural resources by offering safe and responsible access to Cucamonga Canyon, is in conformance with the City’s General Plan. BACKGROUND: Nestled in the eastern region of the majestic San Gabriel Mountains, Cucamonga Canyon is a hidden gem that beckons nature lovers and adventure seekers alike. With its cascading waterfalls and inviting pools, this enchanting canyon has become a magnet for visitors from all corners of Southern California. It also provides support to sensitive species in the region and is ecologically significant in terms of habitat diversity, species richness, and its critical position in the watershed. Currently, there is no safe and legal path leading into and out of Cucamonga Canyon. This results in visitors creating their own path, dangerously scaling up and down the steep Canyon rocks to access the pools and waterfalls and damaging a fragile ecosystem, while exposing themselves to injury or death. The City has been actively collaborating with San Bernardino County, San Bernardino Council of Governments, the Cucamonga Valley Water District, the U.S. Forest Service, and its congressional representatives over the last several years to find a proactive solution that provides safe, legal access to Cucamonga Canyon, guided by a comprehensive multi-agency management plan. The Cucamonga Canyon management plan, which was finalized in late 2022, represents a shared vision and a long-term partnership between the City and U.S. Forest Service, signifying a collective effort to protect and sustain this invaluable resource. This plan serves as a blueprint for the proper use of Cucamonga Canyon, outlining improvements necessary to enhance public access, preserve the natural beauty of the Canyon, and ensure the safety of visitors. The project's overarching goal is to preserve and protect the natural and cultural resources of Cucamonga Canyon. In late 2021, the City and Rancho Cucamonga Fire District purchased approximately 5.25 acres (known as Morgan Ranch) located near Cucamonga Canyon in the    Page 95 Page 2 of 4 2 7 3 8 northwest portion of the City. By acquiring the adjacent land for conservation (approximately 122 acres at the foothills of the mountain known as the King Family Trust that leads to a trail that will cut through Kings Trust Property and connect with other U.S. Forestry Service Roads that lead into Cucamonga Canyon), the project aims to create a designated entry point that emphasizes the importance of conservation while offering safe and responsible access to the Canyon. The project will provide a designated fee-based parking area, ensuring that visitors have an area to park without encroaching on sensitive habitats or obstructing the access route. The Cucamonga Canyon trail project represents a significant step towards enhancing the area's environmental sustainability and promoting a greater appreciation for its unique natural features. Real Property Acquisition of Approximately 122 Acres The acquisition of 122 acres of land at the base of the foothills for conservation reflects a commitment to preserving the natural splendor and ecological significance of this breathtaking locale. The trailhead and connector trail will provide a gateway for visitors to immerse themselves in the wonders of Cucamonga Canyon and foster a deep sense of environmental stewardship. The recommendations outlined in the multi-agency management plan in collaboration with the U.S. Forest Service, will ensure the Canyon's ecological integrity once the open space has been acquired. The subject property (the “site”) is a parcel of approximately 122 acres of the 264-acre Kings Ranch Trust property in San Bernardino National Forest for conservation under the Project’s federal funding. However, this part of the project would be limited to purchase of the property, and no physical change would occur. No impacts are anticipated other than minor maintenance activity of the existing connection to the trail leading to the federal access road. The site, located in the City’s Sphere of Influence, has a City of Rancho Cucamonga General Plan Land Use designation of Rural Open Space (OS), and zoning designations of Flood Control/Utility Corridor (FC/UC) and Hillside Residential (HR). The City’s General Plan states the OS designation is established to preserve rural lands and protect natural landforms and landscapes, including conservation areas or preserves, while still allowing limited residential development on privately owned land in some hillside areas depending on slope and other natural factors. Existing land uses include undeveloped open space and hiking trails throughout most of the project area. There are a few single-family houses located near the trailhead as well as community facilities for public education and interpretation of natural habitats and resources. The HR zone designates areas intended to maintain natural open space through protection of natural landforms; minimizing erosion; providing for public safety; protecting water, flora, and fauna resources; and establishing design standards to provide for limited development in harmony with the environment. Allowed density in the HR zone is a maximum of two units per net buildable acre, as determined through the Hillside Development Review process. In addition, the FC/UC zone designates areas necessary for flood control facilities to protect the public health, safety, and general welfare as well as utility corridors in which land uses compatible to both the utility function and surrounding, existing, or proposed land uses are allowed. The Project site is located within a mostly undeveloped area. The surrounding land uses are described in below.    Page 96 Page 3 of 4 2 7 3 8 Direction Existing Land Use General Plan Designation Zone North Vacant Rural Open Space (OS)Hillside Residential (HR) West Vacant Rural Open Space (OS)Hillside Residential (HR) South Vacant Rural Open Space (OS)Hillside Residential (HR) East Vacant General Open Space and Facilities (OS) Flood Control/Utility Corridor (FC/US) ANALYSIS: Finding of General Plan Conformity for Real Property Acquisition Government Code Section 65402(a) requires a City’s planning agency, i.e. Planning Commission, review and report upon whether the location, purpose, and extent of a proposed real property acquisition by the City for public purposes is consistent with the General Plan as described below: a) If a general plan or part thereof has been adopted, no real property shall be acquired by dedication or otherwise for street, square, park or other public purposes, and no real property shall be disposed of, no street shall be vacated or abandoned, and no public building or structure shall be constructed or authorized, if the adopted general plan or part thereof applies thereto, until the location, purpose and extent of such acquisition or disposition, such street vacation or abandonment, or such public building or structure have been submitted to and reported upon by the planning agency as to conformity with said adopted general plan or part thereof. The planning agency shall render its report as to conformity with said adopted general plan or part thereof within forty (40) days after the matter was submitted to it, or such longer period of time as may be designated by the legislative body. The City is in the process of the acquisition of the above detailed site for potential recreation or other public use to be determined at a later date. Staff has reviewed the proposed real property acquisition and has determined that the location, purpose, and the extent of the acquisition conforms with the applicable policies set forth in the City’s General Plan, including: •Open Space (OS)-1 Open Space. A complete, connected network of diverse parks, trails, and rural and natural open space that support a wide variety of recreational, educational and outdoor activities. •OS-2 Trails. A complete, connected network of diverse trails and connected open space that improves access to all areas of the city and encourages non-motorized activities. •OS-2.1 Trail Corridors. Extend, improve and complete the multipurpose trail network, wherever possible, by utilizing existing flood control channel and utility corridor rights-of- way as public trail corridors. •OS-2.2 Connectivity. Connect trails in Rancho Cucamonga to trails in the San Bernardino National Forest and other hillside open space areas. •OS-2.3. Trailheads. Provide trailhead amenities such as parking, restrooms, information boards, and maps. •OS-2.9. Trail and Park Sponsorship. Support the creation of partnerships with organizations to sponsor and maintain green spaces, parks, trails, and community gardens. •Resource Conservation (RC)-1.4 Dark Sky. Limit light pollution from outdoor sources,    Page 97 Page 4 of 4 2 7 3 8 especially in the rural, neighborhood, hillside, and open spaces to maintain darkness for night sky viewing. •RC-1.7 Preservation of Natural Land Features. Preserve significant natural features and incorporate into all developments. Such features may include ridges, rock outcroppings, natural drainage courses, wetland and riparian areas, steep topography, important or landmark trees and views. •RC-3.1 Sensitive Habitat. Encourage the preservation of the integrity of sensitive land resources that have significant native vegetation and/or habitat value such as riparian habitat areas, creek corridors, Riversidean Alluvial Fan Sage Scrub (RAFSS), wetlands, and sensitive wildlife habitat that supports biological resources •RC-3.2 Biological Preserves. Allow and encourage the expansion of sensitive biological preserve areas (e g, North Etiwanda Preserve, Day Creek Preserve, and San Sevaine Preserve) and other important habitat areas with an emphasis on wildlife connectivity between habitats and connectivity to the national forest •RC-3.2 Wildlife Corridors. Encourage the creation, maintenance, and protection of open space areas that provide strategic wildlife corridors and vital connectivity between habitat areas. •Land Use Policy LU-3.4 which promotes “development that is sustainable in its use of land and that limits impacts to natural resources, energy, and air and water quality.” •Economic Development Policy ED-2.3 which encourages the expansion of “recreation and cultural attractions to enhance tourism/visitor potential”. •Community Services Policy CS-1.2 encouraging the development of “parks that contribute to active and healthy lifestyles and allow for a balanced commitment to both organized recreation activities and passive park environments. Environmental Assessment This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA). The project qualifies as a Class 32 exemption under State CEQA Guidelines Section 15325. Section 15325 covers the acquisition, sale or other transfer of land to preserve the existing natural conditions or preserve open space. As previously stated, the acquisition of this land no physical changes to the land are anticipated other than minor maintenance activity of the existing connection to the trail leading to the federal access road. FISCAL IMPACT: There is no direct fiscal impact resulting from this action. The implementation of the trailhead and trails as well as the purchase of the land acquisition are partially offset by grant funding from both the state and federal government. COUNCIL MISSION / VISION / VALUE(S) ADDRESSED: This item supports the City Council’s goal of providing and nurturing a high quality of life for all. EXHIBITS: Exhibit A – Vicinity Map Exhibit B – Aerial Photo of the Subject Site Exhibit C – Draft Resolution of Approval 2025-004    Page 98 VICINITY MAP APN: Portion of 0200-051-48-0000 and 0200-051-49-0000 EXHIBIT A    Page 99 AERIAL PHOTO OF SUBJECT SITE APN: Portion of 0200-051-48-0000 and 0200-051-49-0000 EXHIBIT B    Page 100 RESOLUTION NO. 2025-004 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, FINDING THAT THE PROPOSED ACQUISITION OF 122.09 ACRES OF REAL PROPERTY LOCATED EAST OF WEST CUCAMONGA TRUCK TRAIL (BIG TREE ROAD), NORTH OF VIA VERDE STREET AND SKYLINE ROAD, RANCHO CUCAMONGA AREA IN UNINCORPORATED SAN BERNARDINO COUNTY (APN: PORTION OF 0200-051-48-000 AND 0200-051-49-000) IS IN CONFORMANCE WITH THE CITY’S GENERAL PLAN AND MAKING FINDINGS UNDER THE CALIFORNIA ENVIRONMENTAL QUALITY ACT A. Recitals. 1. The City of Rancho Cucamonga proposes the acquisition of 122 acres of real property as described in the title of this Resolution. Hereinafter in this Resolution, the subject acquisition is referred to as the “proposal." 2. On the 26th day of February 2025, the Planning Commission of the City of Rancho Cucamonga received and considered said proposal on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above- referenced proposal on February 26, 2025, including written and oral staff reports, together with public testimony, this Commission hereby specifically finds as follows: a. The subject property (the “site”) is a parcel of 122 acres located east side of West Cucamonga Truck Trail (Big Tree Road), generally north of Via Verde Street and Skyline Road, Rancho Cucamonga area in unincorporated San Bernardino County. b. The property is located in unincorporated San Bernardino County, within the City of Rancho Cucamonga’s Sphere of Influence and includes portion of parcels 0200-051-48 and 0200- 051-48; approximately 122 acres of the total 294-acre holding. The site is currently undeveloped and includes level to steeply sloping topography. c. The existing Land Use, General Plan and Zoning designations for the project site and adjacent properties are as follows: Direction Existing Land Use General Plan Designation Zoning Designation North Vacant Rural Open Space (OS)Hillside Residential (HR) West Vacant Rural Open Space (OS)Hillside Residential (HR) South Vacant Rural Open Space (OS)Hillside Residential (HR) East Vacant General Open Space and Facilities (OS) Flood Control/Utility Corridor (FC/US) Exhibit E   Page 101 PLANNING COMMISSION RESOLUTION NO. 2025-004 FINDINGS OF GENERAL PLAN CONFORMITY - CITY OF RANCHO CUCAMONGA February 26, 2025 Page 2 d. Government Code Section 65402(a) requires a city’s planning agency, i.e. Planning Commission, review and report upon whether the location, purpose, and extent of a proposed real property acquisition by the city for public purposes is consistent with the General Plan as described below: If a general plan or part thereof has been adopted, no real property shall be acquired by dedication or otherwise for street, square, park or other public purposes, and no real property shall be disposed of, no street shall be vacated or abandoned, and no public building or structure shall be constructed or authorized, if the adopted general plan or part thereof applies thereto, until the location, purpose and extent of such acquisition or disposition, such street vacation or abandonment, or such public building or structure have been submitted to and reported upon by the planning agency as to conformity with said adopted general plan or part thereof. The planning agency shall render its report as to conformity with said adopted general plan or part thereof within forty (40) days after the matter was submitted to it, or such longer period of time as may be designated by the legislative body. e. The City is in the process of the acquisition of the site for potential recreation or other public use to be determined at a later date. f. The location, purpose, and the extent of the acquisition conforms with the applicable policies set forth in the City’s General Plan, including: 1. Open Space (OS)-1 Open Space. A complete, connected network of diverse parks, trails, and rural and natural open space that support a wide variety of recreational, educational and outdoor activities. 2. OS-2 Trails. A complete, connected network of diverse trails and connected open space that improves access to all areas of the city and encourages non-motorized activities. 3. OS-2.1 Trail Corridors. Extend, improve and complete the multipurpose trail network, wherever possible, by utilizing existing flood control channel and utility corridor rights-of-way as public trail corridors. 4. OS-2.2 Connectivity. Connect trails in Rancho Cucamonga to trails in the San Bernardino National Forest and other hillside open space areas. 5. OS-2.3. Trailheads. Provide trailhead amenities such as parking, restrooms, information boards, and maps. 6. OS-2.9. Trail and Park Sponsorship. Support the creation of partnerships with organizations to sponsor and maintain green spaces, parks, trails, and community gardens. 7. Resource Conservation (RC)-1.4 Dark Sky. Limit light pollution from outdoor sources, especially in the rural, neighborhood, hillside, and open spaces to maintain darkness for night sky viewing.    Page 102 PLANNING COMMISSION RESOLUTION NO. 2025-004 FINDINGS OF GENERAL PLAN CONFORMITY - CITY OF RANCHO CUCAMONGA February 26, 2025 Page 3 8. RC-1.7 Preservation of Natural Land Features. Preserve significant natural features and incorporate into all developments. Such features may include ridges, rock outcroppings, natural drainage courses, wetland and riparian areas, steep topography, important or landmark trees and views. 9. RC-3.1 Sensitive Habitat. Encourage the preservation of the integrity of sensitive land resources that have significant native vegetation and/or habitat value such as riparian habitat areas, creek corridors, Riversidean Alluvial Fan Sage Scrub (RAFSS), wetlands, and sensitive wildlife habitat that supports biological resources. 10. RC-3.2 Biological Preserves. Allow and encourage the expansion of sensitive biological preserve areas (e g, North Etiwanda Preserve, Day Creek Preserve, and San Sevaine Preserve) and other important habitat areas with an emphasis on wildlife connectivity between habitats and connectivity to the national forest. 11. RC-3.2 Wildlife Corridors. Encourage the creation, maintenance, and protection of open space areas that provide strategic wildlife corridors and vital connectivity between habitat areas. 12. Land Use Policy LU-3.4 which promotes “development that is sustainable in its use of land and that limits impacts to natural resources, energy, and air and water quality.” 13. Economic Development Policy ED-2.3 which encourages the expansion of “recreation and cultural attractions to enhance tourism/visitor potential”. 14. Community Services Policy CS-1.2 encouraging the development of “parks that contribute to active and healthy lifestyles and allow for a balanced commitment to both organized recreation activities and passive park environments. 15. Land Use Policy LU-3.4 which promotes “development that is sustainable in its use of land and that limits impacts to natural resources, energy, and air and water quality.” 16. Economic Development Policy ED-2.3 which encourages the expansion of “recreation and cultural attractions to enhance tourism/visitor potential”. 3. This project is categorically exempt from the requirements of the California Environmental Quality Act (CEQA). The project qualifies as a Class 32 exemption under State CEQA Guidelines Section 15325. Section 15325 covers the acquisition, sale or other transfer of land to preserve the existing natural conditions or preserve open space.    Page 103 PLANNING COMMISSION RESOLUTION NO. 2025-004 FINDINGS OF GENERAL PLAN CONFORMITY - CITY OF RANCHO CUCAMONGA February 26, 2025 Page 4 4. Based upon the findings set forth in paragraph 2 and 3 above, this Commission hereby determines that the proposed acquisition of the site for potential economic development conforms with the City’s General Plan. 5. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 26TH DAY OF FEBRUARY 2025. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: Tony Morales, Chairman ATTEST: Jennifer Nakamura, Secretary I, Jennifer Nakamura, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 26th day of February 2025, by the following vote-to-wit: AYES: COMMISSIONERS: NOES: COMMISSIONERS: ABSENT: COMMISSIONERS: ABSTAIN: COMMISSIONERS:    Page 104