Loading...
HomeMy WebLinkAbout06-17 - Agenda Packet If you need special assistance or accommodations to participate in this meeting, please contact the Planning Department at (909) 477-2750. Notification of 48 hours prior to the meeting will enable the City to make reasonable arrangements to ensure accessibility. Listening devices are available for the hearing impaired. JUNE 17, 2025- 6:00 P.M. DESIGN REVIEW COMMITTEE MEETING AGENDA RAINS ROOM CITY HALL 10500 Civic Center Drive Rancho Cucamonga, CA 91730 A. Call to Order Roll Call: Vice Chairman Al Boling Commissioner James Daniels B. Public Communications This is the time and place for the general public to address the Committee on any item listed or not listed on the agenda. The Committee may not discuss any issue not included on the agenda but set the matter for a subsequent meeting. C. Consent Calendar C1. Consideration to adopt Meeting Minutes of June 3rd, 2025. D. Project Review Items D1. ZONING MAP AMENDMENT, MASTER PLAN, DEVELOPMENT AGREEMENT, TENTATIVE MAP, DESIGN REVIEW AND CONDITIONAL USE PERMIT - To allow for the development and operation of five buildings totaling 1,775,098 square feet within approximately 3,513,101 gross square feet in lot size on certain property bounded by Arrow Route to the north, BNSF/Metrolink Railway to the south, Yellow Wood Road/Juneberry Drive and industrial land use to the east and west; APNs: 0229-121-35, 0229-131-19, 0229-121-33, 0229-121-34. Primary Case File No. DRC2021-00485. E. Adjournment The Design Review Committee has adopted Administrative Regulations that set an 11:00 p.m. adjournment time. If items go beyond that time, they shall be heard only with the consent of the Committee. I, Elizabeth Thornhill, Executive Assistant of the City of Rancho Cucamonga, or my designee, hereby certify that a true, accurate copy of the foregoing agenda was posted seventy-two (72) hours prior to the meeting per Government Code 54954.2 at 10500 Civic Center Drive, Rancho Cucamonga, California and on the City’s website. Design Review Committee Meeting Agenda June 3, 2025 DRAFT MINUTES Rancho Cucamonga, CA 91730 New Time: 6:00 p.m. A. Call to Order The meeting of the Design Review Committee held on June 3, 2025. The meeting was called to order by Sean McPherson, Staff Coordinator, at 6:00 p.m. Design Review Committee members present: Vice Chairman Boling and Commissioner Daniels Staff Present: Sophia Serafin, Assistant Planner B. Public Communications Staff Coordinator opened the public communication and after noting there were no public comments, closed public communications. C. Consent Calendar C1. Consideration to adopt Meeting Minutes of May 20, 2025. Item C1. Motion carried 2-0 vote as presented. D. Project Review Items D1. ENVIRONMENTAL ASSESSMENT, TENTATIVE MAP, & DESIGN REVIEW – HAMILTON LAND DEVELOPMENT – A request to subdivide 1.02 acres of land into 19 numbered lots and 1 lettered lot including site plan and design review of 19 single-family, detached residential units with 1 unit set aside for Very Low affordable housing for a site located between 19th Street and Hamilton Street in the Medium Residential (M) zone at 10295 19th Street; APN: 1076-121-17 (Tentative Tract Map SUBTT20761 and Design Review DRC2024-00249). The project qualifies as a Class 32 exemption under State CEQA Guidelines Section 15332 – Infill Development Projects. Staff presented the item to the Design Review Committee. The applicant, Matt Hamilton, was present and no members of the public were in attendance. Both Committee Members provided their concerns on the project and the applicant’s utilization of State Density Bonus Law, with very limited questions for both staff and the applicant. Committee Member provided comments on the lack of affordability in comparison to the number of waivers requested, parking issues, lack of open space, the sidewalk being only on one side of the development, how the vehicular gate can be allowed, if they need to have a public street, limited landscaping, and repetitive design. Committee Member voiced concerns of the site being too small to accommodate 19 units, lack of parking, legality of waivers requested, limited enhancements to corner units, and the need for a ratio of single- and two-story units. Committee Member also expressed that while the design of an individual unit was sufficient, repeating the same design for the entirety of the development was too monotonous. It was suggested that minimal changes be made to each unit for some variety in window placement and other accent details. Also stated was increased contrast in the two-color options would be better. The applicant responded that they believed the cohesive design was a better option for this size development and that he would consider the minor detail changes for each unit. The Committee Members also agreed that there was a lack of amenities in the open space area and asked if the developer would be providing any. The applicant responded that he has seen with previous projects that the amenities would not be utilized and that residents would rather be in their own backyards. The applicant also addressed the parking concerns by stating that households with more than two cars would not be purchasing these homes and that the HOA would uphold the requirement to park within the garages. The Committee Members expressed that visitors would create a strain on the adjacent school and parking lot in addition to the surrounding streets which allow for street parking. They also noted that the HOA could technically be run solely by the residents, which could lead to them park illegally in the drive aisle as there would not be enforcement. Despite concerns with the project, it was recommended the item move forward to the full Planning Commission with a recommendation of approval as proposed by the applicant due to the nature of the project being a State Density Bonus Law application. Recommended approval to PC. 2-0 Vote. E. Adjournment Principal Planner McPherson adjourned the meeting at 7:00 p.m. Respectfully submitted, ___________________________ Elizabeth Thornhill, Executive Assistant DESIGN REVIEW COMMENTS June 17, 2025 6:00 p.m. Kirt Coury, Contract Planner ZONING MAP AMENDMENT, MASTER PLAN, DEVELOPMENT AGREEMENT, TENTATIVE MAP, DESIGN REVIEW AND CONDITIONAL USE PERMIT - To allow for the development and operation of five buildings totaling 1,775,098 square feet within approximately 3,513,101 gross square feet in lot size on certain property bounded by Arrow Route to the north, BNSF/Metrolink Railway to the south, Yellow Wood Road/Juneberry Drive and industrial land use to the east and west; APNs: 0229-121-35, 0229-131-19, 0229-121-33, 0229-121-34. Primary Case File No. DRC2021-00485. Site Characteristics: The project site totals approximately 94 acres and will be comprised of five parcels after processing a new Tentative Parcel Map (SUBTPM20488) which is included in the application. The site is located east of I-15, south of Arrow Route, west of Etiwanda Avenue, and north of an BNSF/Metrolink Railroad Corridor. The subject property was most recently occupied by CMC Metals, a steel products manufacturing facility, which has since been vacated and demolished. The existing land use, General Plan, and Zoning designations for the project site and adjacent properties are as follows: Land Use General Plan Zoning Site Industrial Neo-Industrial Employment District (NE) west & Industrial Employment District (IE) east Neo-Industrial Employment District (NE) west & Industrial Employment District (IE) east North Industrial Neo-Industrial Employment District (NE) Neo-Industrial Employment District (NE) South Industrial Warehouse Industrial Employment District Industrial Employment (IE) West Industrial Industrial Employment District Industrial Employment (IE) East Industrial Industrial Employment District Industrial Employment (IE) Project Overview: The applicant is proposing to redevelop the project site that was previously operated as a steel products manufacturing facility into a modern Class A warehouse development. The proposed project would include the construction, use, and maintenance of five (5) new buildings for warehouse space, office space, loading docks for truck trailers, and include 968 automobile parking spaces and 444 truck trailer parking spaces. The proposed project would also include water quality basins, utility infrastructure, exterior lighting and signage, and approximately nine percent landscape coverage overall. Vehicle access to the project site would be provided by new public roadway connections from existing Arrow Route and Yellow Wood Road/Juneberry Drive, in addition to four new public roads to be constructed as part of the proposed project. A new public “Street A” will be constructed west of the Project and will connect to Arrow Route. New public “Street B” will run east to west along the southern property lines of Buildings 1-3, “Street C” will run east to west along the southern property line of DRC COMMENTS DRC2021-00485 – BTC III ARROW ROUTE CC LP Page 2 Buildings 4 and 5, and new streets “D” and “E” will run along the northern and eastern boundaries of Building 5. Project Site Plan Truck circulation would travel East/West along Arrow Route, to a new Public Street “A.” A secondary roadway connection from Arrow Route will be through the existing Yellow Wood Road/Juneberry Drive. Both access points allow for simultaneous right and left turns in and out of the Property. Staff notes that pursuant to Development Code Section 17.36.040.D.9.a.ii, industrial projects shall also provide access to at least two arterials. Thus, an additional connection of the Project site to Etiwanda Avenue via an extension of Whittram Avenue has been included as part of the project description. Staff notes that details of the new roadway network will be discussed at the full Planning Commission as part of the applicant’s request for a master plan and Development Agreement. Truck courts for each of the three buildings will be secured through manual gate access and the project will be required to comply with all on-site queueing requirements to prevent on-street truck queueing. Electrical conduit will be installed to accommodate future tenant requests for electric gates and site security guard shacks. Screening between neighboring parcels will be installed through eight (8) foot screen walls painted to match the building architecture, and all utility structures will be screened by landscape. The Project is also proposing an optional alternative as indicated below: o Parcel 2: Eliminate all of Building 2 and use for automobile parking (397 spaces). DRC COMMENTS DRC2021-00485 – BTC III ARROW ROUTE CC LP Page 3 o Parcel 5: Reduce Building 5 footprint from 510,129 to 364,100 square feet and convert approximately 6.6 acres of the parcel for use as truck trailer parking (187 parking spaces). Alternative Optional Site Plan As part of the proposed alternative site plan, the applicant is also proposing to construct tilt-up concrete screen walls to screen the proposed alternative truck parking for Parcel 5. These tilt-up concrete screen walls will be required to be designed to appear the same as the proposed surrounding buildings in articulation, color and material. The table below provides a breakdown of the maximum number of buildings proposed by square footage for warehouse area, office area and mezzanine area: Project Data Proposed Use Warehouse Area Office Area Mezz Area* G.F.A. Building 1 Industrial 90,223 SF 7,000 SF 3,000 SF 87,223 SF DRC COMMENTS DRC2021-00485 – BTC III ARROW ROUTE CC LP Page 4 Warehouse Building 2 Industrial Warehouse or Auto Parking Lot 81,929 SF or none 5,000 SF or none 3,000 SF or none 78,929 SF or none Building 3 Industrial Warehouse 70,637 SF 5,000 SF 3,000 SF 67,637 SF Building 4 Industrial Warehouse 1,022,180 SF 30,000 SF 20,000 SF 1,002,180 SF Building 5 Industrial Warehouse or combination of warehouse/trailer parking 510,129 SF or 364,100 SF 10,000 SF 10,000 SF 500,129 or 354,100 SF *Mezzanine areas may be used for office space. To consider a conservative worst-case scenario, the project has included parking based on the mezzanine area as usable office space. The proposed industrial warehouse buildings meet the City’s architectural design standards. The buildings would be constructed of concrete tilt-up panels with reveal lines (that create an aesthetic reveal between two panels), with multiple gray paint tones, vision glass, and spandrel glass to provide a modern aesthetic. Offices will be located at one or more corners of the buildings that will feature more extensive glass work, tiles, metal canopies, and aluminum storefront framing with tempered glazing at all doors. Buildings will range in height from 39 feet six inches for Buildings 1-3, 49 feet six inches for Building 4, and 47 feet for Building 5. The project also provides an attractive and varied color pallet to break up the expanse of the façade which includes “Zircon” (Sherwin Williams SW 7667), “March Wind” (SW 7668), “Gray Shingle” (SW 7670), “Peppercorn” (SW 7674), and “Distance” (6243). Aerial Image of Buildings From Corner of Arrow Route and Yellow Wood Drive DRC COMMENTS DRC2021-00485 – BTC III ARROW ROUTE CC LP Page 5 Rendering of Building 4 As noted in the title of this report, the applicant has also applied for a Master Plan. Pursuant to Development Code Section 17.22.020, an applicant may establish site-specific development standards upon the approval of a Master Plan (a full discussion of the Master Plan request will be included in the Planning Commission staff report at a later date). The table below outlines that the project complies with the applicable development standards for the Neo-Industrial and Industrial Employment zones. Those site-specific development standards relative to architecture and site planning for which the applicant requests to establish via the approval of the Master Plan are indicated accordingly: Development Standard Required Proposed Complies? Building Height Maximum 35 feet (at front setback) and 75 feet (1-foot increment from the front setback line) Building 1: 39.5 feet Building 2: 39.5 feet Building 3: 39.5 feet MP Request* Floor Area Ratio (FAR) 40-60% Building: 50.5% YES Front Building Setback 45 feet (Arrow Route); 25 feet (Yellowwood Road/Juneberry Drive) 25 feet (New Collector Streets) Buildings 1, 2, 3: 45 feet Building 4: 26 feet minimum Building 5: 26 feet minimum YES Street Side Setback 25 Feet (Street A) All Buildings: 25 feet minimum YES Average Depth of Landscape Arrow Route: 45 feet, Yellow Wood Road/Juneberry Drive and Streets A thru E: 25 feet Arrow Route: 45 feet, Yellow Wood Road/Juneberry Drive ~4 feet) MP request* Parking Setback Arrow Route: 25 feet, Yellow Wood Arrow Route: 25 feet, Yellow Wood Road/Juneberry YES* DRC COMMENTS DRC2021-00485 – BTC III ARROW ROUTE CC LP Page 6 *The project applicant has requested to establish site specific development standards through the request of approval of a Master Plan. Pursuant to Development Code Section 17.64.050, 17.64.090 and Table 17.64.050-1, auto parking for warehouse/storage uses is based on a tiered ratio as illustrated in the table below. In addition, office areas require parking at 1 stall per 250 square feet. Further, the development code requires 1 trailer loading stall for each dock door proposed. As such, the proposed project is required to provide 918 auto parking stalls and 223 trailer loading stalls. The table below demonstrates the project’s compliance with all parking standards: Parking Ratio Required Parking Provided Parking Complies? Warehouse/storage and office 1 per 1,000 sf for the first 20,000 sf; 1 per 2,000 sf for the next 20,000 sf, and 1 per 40,000 sf for remaining sf Office requires 1 per 250 sf Building: 918 stalls Building: 922 YES Trailer Loading Stalls 1 per loading dock Building: 223 Building: 424 YES Landscaping would be provided in accordance with the RCMC Chapter 17.56, Landscaping Standards. In total the project site would be developed with approximately eight acres of landscape or other pervious surface area. The entire project site would be maintained with an automatic irrigation system. The proposed project would remove 168 existing trees from the project site. Pursuant to tree replacement requirements found in RCMC Section 17.56.050(K)(2), the proposed project would include planting of approximately 895 replacement trees, including twenty-five 48-inch box, fifty- one 36-inch box and eight hundred and nineteen 24-inch box trees. Trees planted by the proposed project would achieve at least 35 percent shade coverage within off-street automobile parking areas. Staff Comments Major/Secondary Issues: The following broad design issues will be the focus of Committee discussion regarding the project: None. Road/Juneberry Drive and Streets A thru E: 15 feet Drive and Streets A thru E: 15 feet Interior Side Yard Setback Min. 5 feet Building: 38’ YES Rear Yard Setback Min. 0 feet Building: 66 feet YES Open Space/Landscape Standards 10% 9% (project-wide) MP Request* DRC COMMENTS DRC2021-00485 – BTC III ARROW ROUTE CC LP Page 7 Policy Issues: The following items are a matter of Planning Commission policy or development code requirements and should be incorporated into the project design without discussion: 1. Decorative paving shall be provided at each vehicle entrance to each of the new sites/properties, behind the public right-of-way. New public intersections are not to be considered “entrances to the site” for the purposes of this policy issue. These decoratively paved areas shall extend from the front property line to the building setback line and have a width equal to that of the driveway. 2. Downspouts shall not be visible from the exterior on any elevations of the building. All downspouts shall be routed through the interior of the building walls. 3. Pursuant to 17.64.100.C, the applicant shall confirm prior to public hearing that the entrance gate to all industrial properties shall be a minimum of 135 feet from the public-right-of-way. Staff Recommendation: Staff requests that the Design Review Committee consider the design (building architecture, site planning, etc.) of the proposed project and recommend the selected action below: ☐ Recommend Moving the Item Forward to the Full Planning Commission as proposed by the applicant. ☐ Recommend Moving Forward with Modifications to the design of the project by incorporating revisions requested by the Committee. Follow-up review by the Committee is not required. The revisions shall be verified by staff prior to review and action by the Planning Director / Planning Commission. ☐ Recommend Conditional Support: of the design of the project by incorporating revisions requested by the Committee. Follow-up review by the Committee is not required. The revisions shall be Conditions of Approval and verified by staff during plan check after review and action by the Planning Director / Planning Commission. ☐ Recommend Further Consultation with Staff of the design of the project as proposed by the applicant. Staff Planner: Kirt Coury, Contract Planner Staff Coordinator: Sean McPherson, Principal Planner Attachments: Exhibit A - Tentative Parcel Map Exhibit B - Alternate Site Plan Exhibit C - Project Plans Exhibit A Alternative Site Plan DAB-A1.0S Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. 4675 MacArthur Court, Suite 625 Newport Beach, CA 92660 tel: (949) 892-4900 21549 MW 03/13/2025 TH E S E D R A W I N G S A R E N O T I N T E N D E D F O R B I D D I N G , S H O P D R A W I N G S , O R C O N S T R U C T I O N P U R P O S E S . T H E C O N T R A C T O R S H A L L A S S U M E F U L L R E S P O N S I B I L I T Y F O R A L L B I D S M A D E F R O M T H E S E D R A W I N G S CAUTION: IF THIS SHEET IS NOT 30"X42" IT IS A REDUCED PRINT ARROW COMMERCE CENTER ARROW RTE. & YELLOW WOOD RD. RANCHO CUCAMONGA, CA 91739 Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: - THIENES ENGINEERING - - - HUNTER LANDSCAPE - - BTC III ARROW ROUTE CC LP VICINITY MAP PROJECT INFORMATION SITE Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. 4675 MacArthur Court, Suite 625 Newport Beach, CA 92660 tel: (949) 892-4900 21549 MW 03/13/2025 CAUTION: IF THIS SHEET IS NOT 30"X42" IT IS A REDUCED PRINT ARROW COMMERCE CENTER ARROW RTE. & YELLOW WOOD RD. RANCHO CUCAMONGA, CA 91739 Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: - THIENES ENGINEERING - - - HUNTER LANDSCAPE - - BTC III ARROW ROUTE CC LP SCREEN WALL 5-DAB-A4.1 KEY NOTES COLOR LEGEND KEYMAP Owner: Project: Consultants: Project Number: Revision: Date: Drawn by: Title: Sheet: fax: 949 863 0851 tel: 949 863 1770 email: hpa@hparchs.com 92612 irvine, ca 18831 bardeen avenue, - ste. #100 hpa, inc. 4675 MacArthur Court, Suite 625 Newport Beach, CA 92660 tel: (949) 892-4900 21549 MW 03/13/2025 CAUTION: IF THIS SHEET IS NOT 30"X42" IT IS A REDUCED PRINT ARROW COMMERCE CENTER ARROW RTE. & YELLOW WOOD RD. RANCHO CUCAMONGA, CA 91739 Civil: Structural: Mechanical: Plumbing: Electrical: Landscape: Soils Engineer: Fire Protection: - THIENES ENGINEERING - - - HUNTER LANDSCAPE - - BTC III ARROW ROUTE CC LP SCREEN WALL 5-DAB-A4.2 KEYMAP KEY NOTES COLOR LEGEND EXHIBIT C Due to file size, this attachment can be accessed through the following link: Project Plans