Loading...
HomeMy WebLinkAboutCO 2025-145 - GIS Surveyors IncPSA with professional liability insurance (Design) Last Revised: 01/11/2018 Page 1 AGREEMENT FOR DESIGN PROFESSIONAL SERVICES THIS AGREEMENT is made and entered into this 4th day of September, 2025, by and between the City of Rancho Cucamonga, a municipal corporation and the Rancho Cucamonga Fire Protection District (“City”) and GIS Surveyors Inc., a California Corporation (“Consultant”). RECITALS A.City has heretofore issued its request for proposals to perform the following design professional services: on-call survey and mapping services (“the Project”). B.Consultant has submitted a proposal to perform the professional services described in Recital “A”, above, necessary to complete the Project. C.City desires to engage Consultant to complete the Project in the manner set forth and more fully described herein. D.Consultant represents that it is fully qualified and licensed under the laws of the State of California to perform the services contemplated by this Agreement in a good and professional manner. AGREEMENT NOW, THEREFORE, in consideration of performance by the parties of the mutual promises, covenants, and conditions herein contained, the parties hereto agree as follows: 1.Consultant’s Services. 1.1 Scope and Level of Services. Subject to the terms and conditions set forth in this Agreement, City hereby engages Consultant to perform all technical and design professional services described in Recitals “A” and “B” above, including, but not limited to on-call survey and mapping services all as more fully set forth in the R equest for Statement of Qualifications, attached hereto as Exhibit “A” and Consultant’s proposal, dated January 13, 2025 attached hereto as Exhibit “B”, and incorporated by reference herein. The nature, scope, and level of the services required to be performed by Consultant are set forth in the Scope of Work and are referred to herein as “the Services.” In the event of any inconsistencies between the Scope of Work and this Agreement, the terms and provisions of this Agreement shall control. 1.2 Revisions to Scope of Work. Upon request of the City, the Consultant will promptly meet with City staff to discuss any revisions to the Project desired by the City. Consultant agrees that the Scope of Work may be amended based upon said meetings, and, by amendment to this Agreement, the parties may agree on a revision or revisions to Consultant’s compensation based thereon. A revision pursuant to this Section that does not increase the total cost payable to Consultant by more than ten City of Rancho Cucamonga CONTRACT NUMBER 2025-145 Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PSA with professional liability insurance (Design) Last Revised: 01/11/2018 Page 2 percent (10%) of the total compensation specified in Section 3, may be approved in writing by the City’s City Manager without amendment. 1.3 Time for Performance. Consultant shall perform all services under this Agreement in a timely, regular basis consistent with industry standards for professional skill and care, and in accordance with any schedule of performance set forth in the Scope of Work, or as set forth in a “Schedule of Performance”. 1.4 Standard of Care. As a material inducement to City to enter into this Agreement, Consultant hereby represents that it has the experience necessary to undertake the services to be provided. In light of such status and experience, Consultant hereby covenants that it shall follow the customary professional standards in performing the Services. 1.5 Familiarity with Services. By executing this Agreement, Consultant represents that, to the extent required by the standard of practice, Consultant (a) has investigated and considered the scope of services to be performed, (b) has carefully considered how the services should be performed, and (c) understands the facilities, difficulties and restrictions attending performance of the services under this Agreement. Consultant represents that Consultant, to the extent required by the standard of practice, has investigated any areas of work, as applicable, and is reasonably acquainted with the conditions therein. Should Consultant discover any latent or unknown conditions, which will materially affect the performance of services, Consultant shall immediately inform City of such fact and shall not proceed except at Consultant’s risk until written instructions are received from the City Representative. 2. Term of Agreement. The term of this Agreement shall be three (3) years and shall become effective as of the date of the mutual execution by way of both parties’ signature (the “Effective Date”). No work shall be conducted; service or goods will not be provided until this Agreement has been executed and requirements have been fulfilled. Parties to this Agreement shall have the option to renew in one (1) year increments to a total of two (2) years, unless sooner terminated as provided in Section 14 herein. Options to renew are contingent upon the City Manager’s approval, subject to pricing review, and in accordance to all Terms and Conditions stated herein unless otherwise provided in writing by the City. 3. Compensation. 3.1 Compensation. City shall compensate Consultant as set forth in Exhibit A, provided, however, that full, total and complete amount payable to Consultant shall not exceed $200,000 (per year), including all out of pocket expenses, unless additional compensation is approved by the City Council. City shall not withhold any federal, state or other taxes, or other deductions. However, City shall withhold not more than ten percent (10%) of any invoice amount pending receipt of any deliverables reflected in Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PSA with professional liability insurance (Design) Last Revised: 01/11/2018 Page 3 such invoice. Under no circumstance shall Consultant be entitled to compensation for services not yet satisfactorily performed. The parties further agree that compensation may be adjusted in accordance with Section 1.2 to reflect subsequent changes to the Scope of Services. City shall compensate Consultant for any authorized extra services as set forth in Exhibit A. 4. Method of Payment. 4.1 Invoices. Consultant shall submit to City monthly invoices for the Services performed pursuant to this Agreement. The invoices shall describe in detail the Services rendered during the period and shall separately describe any authorized extra services. Any invoice claiming compensation for extra services shall include appropriate documentation of prior authorization of such services. All invoices shall be remitted to the City of Rancho Cucamonga, California. 4.2 City shall review such invoices and notify Consultant in writing within ten (10) business days of any disputed amounts. 4.3 City shall pay all undisputed portions of the invoice within thirty (30) calendar days after receipt of the invoice up to the not-to-exceed amounts set forth in Section 3. 4.4 All records, invoices, time cards, cost control sheets and other records maintained by Consultant relating to services hereunder shall be available for review and audit by the City. 5. Representatives. 5.1 City Representative. For the purposes of this Agreement, the contract administrator and City’s representative shall be Marlena Perez, Principal Engineer or such other person as designated in writing by the City (“City Representative”). It shall be Consultant’s responsibility to assure that the City Representative is kept informed of the progress of the performance of the services, and Consultant shall refer any decisions that must be made by City to the City Representative. Unless otherwise specified herein, any approval of City required hereunder shall mean the approval of the City Representative. 5.2 Consultant Representative. For the purposes of this Agreement, is Dennis Rose, Principal hereby designated as the principal and representative of Consultant authorized to act in its behalf with respect to the services specified herein and make all decisions in connection therewith (“Consultant’s Representative”). It is expressly understood that the experience, knowledge, capability and reputation of the Consultant’s Representative were a substantial inducement for City to enter into this Agreement. Therefore, the Consultant’s Representative shall be responsible during the term of this Agreement for directing all activities of Consultant and devoting sufficient time to personally supervise the services hereunder. Consultant may not change the Responsible Principal without the prior written approval of City. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PSA with professional liability insurance (Design) Last Revised: 01/11/2018 Page 4 6. Consultant’s Personnel. 6.1 All Services shall be performed by Consultant or under Consultant’s direct supervision, and all personnel shall possess the qualifications, permits, and licenses required by State and local law to perform such Services, including, without limitation, a City business license as required by the City’s Municipal Code. 6.2 Consultant shall be solely responsible for the satisfactory work performance of all personnel engaged in performing the Services and compliance with the standard of care set forth in Section 1.4. 6.3 Consultant shall be responsible for payment of all employees’ and subcontractors’ wages and benefits, and shall comply with all requirements pertaining to employer’s liability, workers’ compensation, unemployment insurance, and Social Security. By its execution of this Agreement, Consultant certifies that it is aware of the provisions of Section 3700 of the California Labor Code that require every employer to be insured against liability for Worker's Compensation or to undertake self-insurance in accordance with the provisions of that Code, and agrees to comply with such provisions before commencing the performance of the Services. 6.4 Consultant shall indemnify, defend and hold harmless City and its elected officials, officers and employees, servants, designated volunteers, and agents serving as independent contractors in the role of City officials, from any and all liability, damages, claims, costs and expenses of any nature to the extent arising from Consultant’s violations of personnel practices and/or any violation of the California Labor Code. City shall have the right to offset against the amount of any fees due to Consultant under this Agreement any amount due to City from Consultant as a result of Cons ultant’s failure to promptly pay to City any reimbursement or indemnification arising under this Section 6. 7. Ownership of Work Product. 7.1 Ownership. All documents, ideas, concepts, electronic files, drawings, photographs and any and all other writings, including drafts thereof, prepared, created or provided by Consultant in the course of performing the Services, including any and all intellectual and proprietary rights arising from the creation of the same (collectively, “Work Product”), are considered to be “works made for hire” for the benefit of the City. Upon payment being made, and provided Consultant is not in breach of this Agreement, all Work Product shall be and remain the property of City without restriction or limitation upon its use or dissemination by City. Basic survey notes, sketches, charts, computations and similar data prepared or obtained by Consultant under this Agreement shall, upon request, be made available to City. None of the Work Product shall be the subject of any common law or statutory copyright or copyright application by Consultant. In the event of the return of any of the Work Product to Consultant or its representative, Consultant shall be responsible for its safe return to City. Under no circumstances shall Consultant fail to deliver any draft or final designs, plans, drawings, reports or specifications to City upon written demand by City for their delivery, notwithstanding any disputes between Consultant and City concerning payment, Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PSA with professional liability insurance (Design) Last Revised: 01/11/2018 Page 5 performance of the contract, or otherwise. This covenant shall survive the termination of this Agreement. City’s reuse of the Work Product for any purpose other than the Project, shall be at City’s sole risk. 7.2. Assignment of Intellectual Property Interests: Upon execution of this Agreement and to the extent not otherwise conveyed to City by Section 7.1, above, the Consultant shall be deemed to grant and assign to City, and shall require all of its subcontractors to assign to City, all ownership rights, and all common law and statutory copyrights, trademarks, and other intellectual and proprietary property rights relating to the Work Product and the Project itself, and Consultant shall disclaim and retain no rights whatsoever as to any of the Work Product, to the maximum extent permitted by law. City shall be entitled to utilize the Work Product for any and all purposes, including but not limited to constructing, using, maintaining, altering, adding to, restoring, rebuilding and publicizing the Project or any aspect of the Project. 7.3 Title to Intellectual Property. Consultant warrants and represents that it has secured all necessary licenses, consents or approvals to use any instrumentality, thing or component as to which any intellectual property right exists, including computer software, used in the rendering of the Services and the production of the Work Product and/or materials produced under this Agreement, and that City has full legal title to and the right to reproduce any of the Work Product. Consultant shall defend, indemnify and hold City, and its elected officials, officers, employees, servants, attorneys, designated volunteers, and agents serving as independent contractors in the role of City officials, harmless from any loss, claim or liability in any way related to a claim that City’s use is violating federal, state or local laws, or any contractual provisions, relating to trade names, licenses, franchises, patents or other means of protecting intellectual property rights and/or interests in products or inventions. Consultant shall bear all costs arising from the use of patented, copyrighted, trade secret or trademarked documents, materials, software, equipment, devices or processes used or incorporated in the Services and materials produced under this Agreement. In the event City’s use of any of the Work Product is held to constitute an infringement and any use thereof is enjoined, Consultant, at its expense, shall: (a) secure for City the right to continue using the Work Product by suspension of any injunction or by procuring a license or licenses for City; or (b) modify the Work Product so that it becomes non- infringing. This covenant shall survive the termination of this Agreement. 8. Status as Independent Contractor. Consultant is, and shall at all times remain as to City, a wholly independent contractor. Consultant shall have no power to incur any debt, obligation, or liability on behalf of City or otherwise act as an agent of City. Neither City nor any of its agents shall have control over the conduct of Consultant or any of Consultant’s employees, except as set forth in this Agreement. Consultant shall not, at any time, or in any manner, represent that it or any of its officers, agents or employees are in any manner employees of City. Consultant shall pay all required taxes on amounts paid to Consultant under this Agreement, and to defend, indemnify and hold City harmless from any and all taxes, assessments, penalties, and interest asserted against City by reason of the independent contractor relationship created by this Agreement. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PSA with professional liability insurance (Design) Last Revised: 01/11/2018 Page 6 Consultant shall fully comply with the workers’ compensation law regarding Consultant and Consultant’s employees. 9. Confidentiality. Consultant may have access to financial, accounting, statistical, and personnel data of individuals and City employees. Consultant covenants that all data, documents, discussion, or other information developed or received by Consultant or provided for performance of this Agreement are confidential and shall not be disclosed by Consultant without prior written authorization by City. City shall grant such authorization if applicable law requires disclosure. All City data shall be returned to City upon the termination of this Agreement. Consultant’s covenant under this Section shall survive the termination of this Agreement. This provision shall not apply to information in whatever form that is in the public domain, nor shall it restrict the Consultant from giving notices required by law or complying with an order to provide information or data when such an order is issued by a court, administrative agency or other legitimate authority, or if disclosure is otherwise permitted by law and reasonably necessary for the Consultant to defend itself from any legal action or claim. 10. Conflict of Interest. 10.1 Consultant covenants that it presently has no interest and shall not acquire any interest, direct or indirect, which may be affected by the Services, or which would conflict in any manner with the performance of the Services. Consultant further covenants that, in performance of this Agreement, no person having any such interest shall be employed by it. Furthermore, Consultant shall avoid the appearance of having any interest, which would conflict in any manner with the performance of the Services. Consultant shall not accept any employment or representation during the term of this Agreement which is or may likely make Consultant “financially interested” (as provided in California Government Code §§1090 and 87100) in any decision made by City on any matter in connection with which Consultant has been retained. 10.2 Consultant further represents that it has not employed or retained any person or entity, other than a bona fide employee working exclusively for Consultant, to solicit or obtain this Agreement. Consultant has not paid or agreed to pay any person or entity, other than a bona fide employee working exclusively for Consultant, any fee, commission, gift, percentage, or any other consideration contingent upon the execution of this Agreement. Upon any breach or violation of this warranty, City shall have the right, at its sole and absolute discretion, to terminate this Agreement without further liability, or to deduct from any sums payable to Consultant hereunder the full amount or value of any such fee, commission, percentage or gift. 10.3 Consultant has no knowledge that any officer or employee of City has any interest, whether contractual, noncontractual, financial, proprietary, or otherwise, in this transaction or in the business of Consultant, and that if any such interest comes to the knowledge of Consultant at any time during the term of this Agreement, Consultant shall immediately make a complete, written disclosure of such interest to City, even if such interest would not be deemed a prohibited “conflict of interest” under applicable laws as described in subsection 10.1. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PSA with professional liability insurance (Design) Last Revised: 01/11/2018 Page 7 11. Indemnification. 11.1 Design Professional Services. To the fullest extent permitted by law, the Consultant shall, at its sole cost and expense, indemnify, defend, and hold harmless the City, its elected officials, officers, attorneys, agents, employees, designated volunteers, successors, assigns and those City agents serving as independent contractors in the role of City officials (collectively “Indemnitees” in this Section 11.0), from and against any and all damages, costs, expenses, liabilities, claims, demands, causes of action, proceedings, judgments, penalties, liens, stop notices, and losses of any nature whatsoever, including fees of accountants and other professionals, and all costs associated therewith, and reimbursement of attorneys’ fees and costs of defense (collectively “Claims”), whether actual, alleged or threatened, to the extent arising out of, pertaining to, or relating to, in whole or in part, the negligence, recklessness or willful misconduct of the Consultant, and/or its officers, agents, servants, employees, subcontractors, contractors or their officers, agents, servants or employees (or any entity or individual for which or whom the Consultant shall bear legal liability) in the performance of design professional services under this Agreement by a “design professional,” as the term is defined in California Civil Code § 2782.8(c). The indemnification obligation herein shall not in any way be limited by the insurance obligations contained in this Agreement. Notwithstanding the foregoing and as required by Civil Code § 2782.8(a), in no event shall the cost to defend the Indemnitees that is charged to Consultant exceed Consultant’s proportionate percentage of fault. 11.2 Other Indemnities. With respect to claims and liabilities which do not arise in connection with the performance of professional services by a “design professional”, as that term is defined in California Civil Code Section 2782.8(c), including, but not limited to, those claims and liabilities normally covered by commercial general and/or automobile liability insurance, and to the maximum extent permitted by law, Consultant shall, at its sole cost and expense, protect, defend, hold harmless and indemnify the Indemnitees from and against any and all damages, costs, expenses, liabilities, claims, demands, causes of action, proceedings, judgments, penalties, liens, stop notices, and losses of any nature whatsoever, including fees of accountants, attorneys and other professionals, and all costs associated therewith, and the payment of all consequential damages (collectively “Damages”), in law or equity, whether actual, alleged or threatened, which arise out of, pertain to, or relate to the acts or omissions of Consultant, its officers, agents, servants, employees, subcontractors, materialmen, suppliers, or contractors, or their officers, agents, servants or employees (or any entity or individual for which or whom Consultant shall bear legal liability) in the performance of this Agreement, except to the extent the Damages arise from the active or sole negligence or willful misconduct of any of the Indemnitees, as determined by final arbitration or court decision or by the agreement of the Parties. Consultant shall defend the Indemnitees in any action or actions filed in connection with any Damages with counsel of the Indemnitees’ choice, and shall pay all costs and expenses, including all attorneys’ fees and experts’ costs as they are actually incurred in connection with such defense. Consultant shall reimburse the Indemnitees for any and all legal expenses and costs Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PSA with professional liability insurance (Design) Last Revised: 01/11/2018 Page 8 incurred by the Indemnitees in connection therewith. The indemnification obligation herein shall not in any way be limited by the insurance obligations contained in this Agreement. . 11.3 Nonwaiver of Rights. Indemnitees do not, and shall not, waive any rights that they may possess against Consultant because of the acceptance by City, or the deposit with City, of any insurance policy or certificate required pursuant to this Agreement. 11.4 Waiver of Right of Subrogation. Except as otherwise expressly provided in this Agreement, Consultant, on behalf of itself and all parties claiming under or through it, hereby waives all rights of subrogation against the Indemnitees, while acting within the scope of their duties, from all claims, losses and liabilities arising out of or incident to activities or operations performed by or on behalf of the Consultant. 11.5 Survival. The provisions of this Section 11 shall survive the termination of the Agreement and are in addition to any other rights or remedies which Indemnitees may have under the law. Payment is not required as a condition precedent to an Indemnitee’s right to recover under this indemnity provision, and an entry of judgment against Consultant shall be conclusive in favor of the Indemnitee’s right to recover under this indemnity provision. 12. Insurance. 12.1 Liability Insurance. Consultant shall procure and maintain in full force and effect for the duration of this Agreement, insurance against claims for injuries to persons or damages to property which may arise from or in connection with the performance of the services hereunder by Consultant, and/or its agents, representatives, employees and subcontractors. 12.2 Minimum Scope of Insurance. Unless otherwise approved by City, coverage shall be at least as broad as: (1) Insurance Services Office Commercial General Liability coverage (occurrence form CG 0001). (2) Insurance Services Office form number CA 0001 (Ed. 1/87) covering Automobile Liability, code 1 (any auto). (3) Worker’s Compensation insurance as required by the State of California, and Employer’s Liability Insurance. (4) Professional Liability insurance in a form approved by the City, having an extended reporting period of not less than three (3) years after completion of the Services which shall provide protection against claims of professional negligence arising out of Consultant’s performance of the Services and otherwise complying with all applicable Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PSA with professional liability insurance (Design) Last Revised: 01/11/2018 Page 9 less than: provisions of this Section 12. The policy shall be endorsed to include contractual liability to the extent insurable. 12.3 Minimum Limits of Insurance. Consultant shall maintain limits no (1) Commercial General Liability: $2,000,000 per occurrence for bodily injury, personal injury and property damage. Commercial General Liability Insurance with a general aggregate limit shall apply separately to this Agreement or the general limit shall be twice the required occurrence limit. (2) Automobile Liability: $2,000,000 per accident for bodily injury and property damage. (3) Employer’s Liability: $1,000,000 per accident and in the aggregate for bodily injury or disease and Workers’ Compensation Insurance in the amount required by law. (4) Professional Liability: $1,000,000 per claim/aggregate. (5) The Insurance obligations under this agreement shall be the greater of (i) the Insurance coverages and limits carried by the Contractor; or (ii) the minimum insurance requirements shown in this Agreement. Any insurance proceeds in excess of the specified limits and coverage required which are applicable to a given loss, shall be available to the City. No representation is made that the minimum insurance requirements of this Agreement are sufficient to cover the obligations of the Contractor under this Agreement. 12.4 Deductibles and Self-Insured Retentions. Any deductibles or self- insured retentions must be declared to and approved by the City and shall not reduce the limits of coverage. City reserves the right to obtain a full certified copy of any required insurance policy and endorsements. 12.5 Other Insurance Provisions. (1) The commercial general liability and automobile liability policies are to contain the following provisions on a separate additionally insured endorsement naming the City, its officers, officials, employees, designated volunteers and agents serving as independent contractors in the role of City officials as additional insureds as respects: liability arising out of activities performed by or on behalf of Consultant; products and completed operations of Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PSA with professional liability insurance (Design) Last Revised: 01/11/2018 Page 10 Consultant; premises owned, occupied or used by Consultant; and/or automobiles owned, leased, hired or borrowed by Consultant. The coverage shall contain no limitations on the scope of protection afforded to City, its officers, officials, employees, designated volunteers or agents serving as independent contractors in the role of City officials which are not also limitations applicable to the named insured. (2) For any claims related to this Agreement, Consultant’s insurance coverage shall be primary insurance as respects City, its officers, officials, employees, designated volunteers and agents serving as independent contractors in the role of City or officials. Any insurance or self- insurance maintained by City, its officers, officials, employees, designated volunteers or agents serving as independent contractors in the role of City officials shall be excess of Consultant’s insurance and shall not contribute with it. (3) Consultant’s insurance shall apply separately to each insured against whom claim is made or suit is brought, except with respect to the limits of the insurer’s liability. (4) Each insurance policy required by this clause shall be endorsed to state that coverage shall not be canceled except after 30 days prior written notice by first class mail has been given to City (ten (10) days prior written notice for non- payment of premium). Consultant shall provide thirty (30) days written notice to City prior to implementation of a reduction of limits or material change of insurance coverage as specified herein. (5) Each insurance policy, required by this clause shall expressly waive the insurer’s right of subrogation against City and its elected officials, officers, employees, servants, attorneys, designated volunteers, and agents serving as independent contractors in the role of City officials. (6) Each policy shall be issued by an insurance company approved in writing by City, which is admitted and licensed to do business in the State of California and which is rated A:VII or better according to the most recent A.M. Best Co. Rating Guide. (7) Each policy shall specify that any failure to comply with reporting or other provisions of the required policy, including Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PSA with professional liability insurance (Design) Last Revised: 01/11/2018 Page 11 breaches of warranty, shall not affect the coverage required to be provided. (8) Each policy shall specify that any and all costs of adjusting and/or defending any claim against any insured, including court costs and attorneys' fees, shall be paid in addition to and shall not deplete any policy limits. (9) Contractor shall provide any and all other required insurance, endorsements, or exclusions as required by the City in any request for proposals applicable to this Agreement. 12.6 Evidence of coverage. Prior to commencing performance under this Agreement, the Consultant shall furnish the City with certificates and original endorsements, or copies of each required policy, effecting and evidencing the insurance coverage required by this Agreement including (1) Additional Insured Endorsement(s), (2) Worker’s Compensation waiver of subrogation endorsement, and (3) General liability declarations or endorsement page listing all policy endorsements. The endorsements shall be signed by a person authorized by the insurer(s) to bind coverage on its behalf. All endorsements or policies shall be received and approved by the City before Consultant commences performance. If performance of this Agreement shall extend beyond one year, Consultant shall provide City with the required policies or endorsements evidencing renewal of the required policies of insurance prior to the expiration of any required policies of insurance. 12.7 Contractor agrees to include in all contracts with all subcontractors performing work pursuant to this Agreement, the same requirements and provisions of this Agreement including the indemnity and insurance requirements to the extent they apply to the scope of any such subcontractor’s work. Contractor shall require its subcontractors to be bound to Contractor and City in the same manner and to the same extent as Contractor is bound to City pursuant to this Agreement, and to require each of its subcontractors to include these same provisions in its contract with any sub- subcontractor. 13. Cooperation. In the event any claim or action is brought against City relating to Consultant’s performance or services rendered under this Agreement, Consultant shall render any reasonable assistance and cooperation that City might require. City shall compensate Consultant for any litigation support services in an amount to be agreed upon by the parties. 14. Termination. City shall have the right to terminate this Agreement at any time for any or no reason on not less than ten (10) days prior written notice to Consultant. In the event City exercises its right to terminate this Agreement, City shall pay Consultant for any services satisfactorily rendered prior to the effective date of the termination, provided Consultant is not then in breach of this Agreement. Consultant shall have no other claim against City by reason of such termination, including any claim Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PSA with professional liability insurance (Design) Last Revised: 01/11/2018 Page 12 for compensation. City may terminate for cause following a default remaining uncured more than five (5) business days after service of a notice to cure on the breaching party. Consultant may terminate this Agreement for cause upon giving the City ten (10) business days prior written notice for any of the following: (1) uncured breach by the City of any material term of this Agreement, including but not limited to Payment Terms; (2) material changes in the conditions under which this Agreement was entered into, coupled with the failure of the parties to reach accord on the fees and charges for any Additional Services required because of such changes. 15. Notices. Any notices, bills, invoices, or reports authorized or required by this Agreement shall be in writing and shall be deemed received on (a) the day of delivery if delivered by hand or overnight courier service during Consultant’s and City’s regular business hours; or (b) on the third business day following deposit in the United States mail, postage prepaid, to the addresses set forth in this Section, or to such other addresses as the parties may, from time to time, designate in writing pursuant to the provisions of this Section. If to City: City of Rancho Cucamonga Engineering Services Department 10500 Civic Center Drive Rancho Cucamonga, CA 91730 Attn: Marlena Perez, Principal Engineer If to Consultant: GIS Surveyors, Inc 10911 Technology Place San Diego, CA 92127 Attn: Dennis Rose, Principal 16. Non-Discrimination and Equal Employment Opportunity. In the performance of this Agreement, Consultant shall not discriminate against any employee, subcontractor, or applicant for employment because of race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition, or sexual orientation. Consultant will take affirmative action to ensure that subcontractors and applicants are employed, and that employees are treated during employment, without regard to their race, color, creed, religion, sex, marital status, national origin, ancestry, age, physical or mental handicap, medical condition, or sexual orientation. 17. Assignment and Subcontracting. Consultant shall not assign or transfer any interest in this Agreement or subcontract the performance of any of Consultant’s obligations hereunder without City’s prior written consent. Except as provided herein, any attempt by Consultant to so assign, transfer, or subcontract any rights, duties, or obligations arising hereunder shall be null, void and of no effect. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PSA with professional liability insurance (Design) Last Revised: 01/11/2018 Page 13 18 Compliance with Laws. Consultant shall comply with all applicable federal, state and local laws, ordinances, codes and regulations in force at the time Consultant performs the Services. Consultant is aware of the requirements of California Labor Code Section 1720, et seq., and 1770, et seq., as well as California Code of Regulations, Title 8, Section 16000, et seq., (“Prevailing Wage Laws”), which require the payment of prevailing wage rates and the performance of other requirements on “public works” and “maintenance” projects. If the Services are being performed as part of an applicable “public works” or “maintenance” project, as defined by the Prevailing Wage Laws, and if the total compensation is $1,000 or more, Consultant agrees to fully comply with such Prevailing Wage Laws. The applicable prevailing wage rate determinations can be found at http://www.dir.ca.gov/dlsr/DPreWageDetermination.htm Consultant shall make copies of the prevailing rates of per diem wages for each craft, classification or type of worker needed to execute the Services available to interested parties upon request, and shall post copies at the Consultant’s principal place of business and at the Project site. Consultant shall defend, indemnify and hold the City, its elected officials, officers, employees and agents free and harmless from any claim or liability arising out of any failure or alleged failure to comply with the Prevailing Wage Laws. 19. Non-Waiver of Terms, Rights and Remedies. Waiver by either party of any one or more of the conditions of performance under this Agreement shall not be a waiver of any other condition of performance under this Agreement. In no event shall the making by City of any payment to Consultant constitute or be construed as a waiver by City of any breach of covenant, or any default which may then exist on the part of Consultant, and the making of any such payment by City shall in no way impair or prejudice any right or remedy available to City with regard to such breach or default. 20. Attorney’s Fees. In the event that either party to this Agreement shall commence any legal action or proceeding to enforce or interpret the provisions of this Agreement, the prevailing party in such action or proceeding shall be entitled to recover its costs of suit, including reasonable attorney’s fees and costs of experts. 21. Exhibits; Precedence. All documents referenced as exhibits in this Agreement are hereby incorporated in this Agreement. In the event of any material discrepancy between the express provisions of this Agreement and the provisions of any document incorporated herein by reference, the provisions of this Agreement shall prevail. 22. Applicable Law and Venue. The validity, interpretation, and performance of this Agreement shall be controlled by and construed under the laws of the State of California. Venue for any action relating to this Agreement shall be in the San Bernardino County Superior Court. 23. Construction. In the event of any asserted ambiguity in, or dispute regarding the interpretation of any matter herein, the interpretation of this Agreement shall not be resolved by any rules of interpretation providing for interpretation against the party who causes the uncertainty to exist or against the party who drafted the Agreement or who drafted that portion of the Agreement. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PSA with professional liability insurance (Design) Last Revised: 01/11/2018 Page 14 24. Entire Agreement. This Agreement consists of this document, and any other documents, attachments and/or exhibits referenced herein and attached hereto, each of which is incorporated herein by such reference, and the same represents the entire and integrated agreement between Consultant and City. This Agreement supersedes all prior oral or written negotiations, representations or agreements. This Agreement may not be amended, nor any provision or breach hereof waived, except in a writing signed by the parties which expressly refers to this Agreement. IN WITNESS WHEREOF, the parties, through their respective authorized representatives, have executed this Agreement as of the date first written above. Consultant Name: GIS Surveyors By: ______________________________ Name Mickey O’Neil Date ______________________________ Title City of Rancho Cucamonga By:________________________________ Name Date _________________________________ Title By: ______________________________ Name Date ______________________________ Title (Two signatures required if corporation) Rancho Cucamonga Fire Protection District By:________________________________ Name Date _________________________________ Title Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1 9/9/2025 | 7:53 AM PDT Chief Operating Officer Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B Mayor/President 9/16/2025 | 8:55 PM PDT 9/16/2025 | 9:44 PM PDT Fire Chief PSA with professional liability insurance (Design) Last Revised: 01/11/2018 Page 15 EXHIBIT A REQUEST FOR STATEMENT OF QUALIFICATIONS Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PSA with professional liability insurance (Design) Last Revised: 01/11/2018 Page 16 EXHIBIT B CONSULTANT PROPOSAL Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B STATEMENT OF QUALIFICATIONS #24/25-501 City of Rancho Cucamonga Various On-Call Services 5.1 Survey and Mapping Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 2 Table of Contents 1. Cover Letter .......................................................................................................................... 3 2. Executive Summary .............................................................................................................. 4 3. Firm Experience/Qualifications ............................................................................................. 5 4. Third-Party/Subcontractors ................................................................................................. 14 5. Staff Resumes and Organization Chart ................................................................................ 14 6. Project Management Approach ........................................................................................... 25 Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 3 1. Cover Letter City of Rancho Cucamonga Purchasing Division 10500 Civic Center Drive Rancho Cucamonga, CA 91730 January 13, 2025 Subject: Statement of Qualifications (SOQ) for Various On-Call Services, 5.1 Survey and Mapping Attention: Marlena Perez, Principal Engineer Dear Ms. Perez, GIS Surveyors is delighted to present this SOQ in response to the RFP for Various On-Call Services for discipline 5.1 Survey and Mapping. GIS Surveyors takes pride in being a high-performing Service- Disabled Veteran-Owned Company and Small Business for Public Works (DVBE/SB-PW certification #1753051) recognized by the California Department of General Services. Specializing in geospatial services, we excel in land surveying, GIS, and LiDAR functions, with a n 11-year track record of successfully executing these tasks for various entities, including cities, counties, commercial clients, and investor-owned utilities across California. GIS Surveyors is an employee-owned business. The dedicated contact person for this proposal is Ms. Amy Parker, Proposals Manager, her contact details are below: Address: GIS Surveyors, Inc., HQ Office, 10911 Technology Place, San Diego, CA 92127 Office: (858) 679-1732 Cell: (936) 235-5462 E-mail: aparker@gissurveyors.com Our Proposal provides a comprehensive overview of how GIS Surveyors can assist the City of Rancho Cucamonga in fulfilling its survey and mapping needs. It details the methods we will employ, outlining the expected processes and outcomes. Your thoughtful consideration is valued, and we are ready to address any inquiries you may have regarding our approach. Sincerely, Dennis Rose, PLS – Director of Surveys Office: (858) 679-1732 Cell: (949) 310-1802 E-mail: drose@gissurveyors.com Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 4 2. Executive Summary GIS Surveyors was founded with the vision of seamlessly integrating Land Surveying with Geographic Information Systems (GIS), Utility Locating, and LiDAR services, establishing itself as a comprehensive geospatial solutions provider. Originally operating as Paul Loska Land Surveying, the company was established in 2002 by our CEO Paul Loska. In 2013, it rebranded to expand its scope, offering a full suite of geospatial services under one roof. For this opportunity, GIS Surveyors is proposing on the 5.1 Survey and Mapping discipline. Headquartered in San Diego, California, GIS Surveyors serves clients across the state. A secondary office in Yorba Linda , Orange County, strategically positions us to efficiently manage projects within the City of Rancho Cucamonga service area. With a short travel time of approximately 35 minutes to city facilities, our team can be extremely responsive to survey requests, typically mobilizing a survey crew within 48 hours of receiving notice to proceed. We specialize in boundary surveys, construction staking, topographic surveys, as-built surveys, right-of-way engineering, legal descriptions, and utility research and mapping. GIS Surveyors holds as-needed contracts with various entities, including local municipalities, water districts, utilities, and the federal government. We have provided on-call surveying services to a variety of California municipalities including but not limited to the cities of Buena Park, Escondido, Glendora, Poway, Thousand Oaks, San Diego and Yorba Linda. GIS Surveyors features on the on-call surveying list for approximately 25 Southern California municipalities. A selection of relevant project references in this proposal highlights our versatility and experience. Furthermore, GIS Surveyors has been providing land survey support to various California utility companies since its inception in 2013. We currently hold on-call land surveying contracts with San Diego Gas and Electric, Southern California Gas and Southern California Edison where we have completed hundreds of surveying tasks. With a team of 74 professionals, including 10 survey crews, 3 licensed Professional Land Surveyors (PLS), 4 Land Surveyors in Training (LSIT), and 2 FAA-certified Unmanned Aerial Systems (UAS) pilots, GIS Surveyors is equipped to handle diverse geospatial requirements. This proposal outlines our approach to on-call land surveying, focusing on both project management and technical methodologies. Additionally, it provides an overview of our QA/QC process. GIS Surveyors prioritizes safety above all, boasting a flawless safety record throughout its years of operation. The company empowers all employees with stop work authority, fostering a proactive safety culture that addresses unsafe conditions promptly. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 5 3. Firm Experience/Qualifications Company Information Full Legal Name: Limitless Solutions Group dba GIS Surveyors, Inc. HQ Address: 10911 Technology Place, San Diego, CA 92127 Local Office Address: 22875 Savi Ranch Parkway, Suite A, Yorba Linda, CA 92887 Type of Organization: S-Corporation Date of Company Formation: April 9, 2013 Website: www.gissurveyors.com Representative Projects GIS Surveyors is well versed in providing on-call surveys for a variety of different clients. We have the expertise, experience, and equipment to provide high-quality, efficient services to meet City of Rancho Cucamonga objectives. A list of our on-call contracts, including those with other California municipalities, can be found below: • City of Yorba Linda - On-Call Land Surveying • City of San Diego (Sub to Dudek) - As-Needed Watershed and Resource Consulting • City/County/Port of San Diego - On-Call Survey (Rotational List) • City of San Diego - As-Needed Land Surveying, Mapping and Digitizing Services • City of Lake Forest - As-Needed Surveying, Mapping and Right-of-Way Engineering • City of Stanton - On-Call Land Surveying • City of Buena Park - On-Call Land Surveying • City of Cathedral City - As-Needed Land Surveying • City of Chino Hills - On-Call Land Surveying • City of Hemet - On-Call Land Surveying • City of Escondido - On-Call Land Surveying • City of Thousand Oaks – On-Call Land Surveying • City of Santa Ana Parks and Facilities (Sub to JS&TM) – On-Call Surveying • City of Pacifica Public Works Wastewater Division - On-Call Surveying Services • Santa Ana Watershed Project Authority – On-Call Surveying for the Brine Line • Metropolitan Water District of Southern California - Land Surveying, Mapping, and Aerial Mapping On-Call Services • Rincon Del Diablo Municipal Water District – On-Call Land Surveying • Rainbow Municipal Water District - On-Call Land Surveying • Housing Authority of the City of Los Angeles - On-Call Property Surveys • San Bernardino County Project and Facilities Management – On-Call Surveying • Los Angeles County Public Works Department - On-Call Surveying and Related Services • Los Angeles County (Sub to SALT Landscape Architects) - On-Call Survey and Mapping • Los Angeles County (Sub to Citadel) - On-Call PM/CM/Survey Services • California High Speed Rail Authority (Sub to HKA Engineering and O’Dell Engineering) - Right- of-Way Engineering and Survey Support Services • Southern California Gas (SCG) - On-Call Survey (Pipeline Safety Enhancement Program) • San Diego Gas and Electric (SDG&E) - On-Call Survey Contract • San Diego Gas and Electric (SDG&E) - Major Projects On-Call Mapping • Southern California Edison (SCE) - On-Call Survey • US Army Corps of Engineers - Medical Facilities Architect On-Call Mapping Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 6 GIS Surveyors holds over 25 as-needed surveying contracts with various entities, including local municipalities, water districts, utilities, and the federal government. Relevant project examples are described below: City of Escondido – Dam Monitoring Project Dates: February 2023 to Present (Ongoing) Client: City of Escondido Contact: Julie Procopio, P.E. - City Engineer, jprocopio@escondido.org, 760-839-4001 Location: Escondido, California Value: $119,103.40 Contract Type: On-Call Project Description: GIS Surveyors has been tasked with performing bi-monthly monitoring campaigns at Lake Wohlford Dam and Lake Dixon Dam in the City of Escondido, CA. A Trimble SX10 total station is used to accurately survey the horizontal locations of the monitoring points along the top of each of these dams then a Trimble DiNi digital level is utilized to detect any vertical deformations. Data is compiled & processed in Trimble Business Center and the results added to the City’s spreadsheet. Monitoring is also required within 48hrs of any earthquake felt in the area. Relevance to Scope of Work • Dam Monitoring • Survey Control • Change Detection • QA/QC Key Personnel and Role Dennis Rose, PLS – Professional Land Surveyor Marshall Blackbourn – Survey Manager Napoleon Corpuz, LSIT – Office Operations Manager Gavin McKellar – Field Operations Manager Erik Eilers, LSIT – Project Surveyor Mark Steele – Survey Office Technician Bryan Lambie – Party Chief Anthony Aviles - Chief of Parties Rachel Lambie - Chainman Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 7 City of Glendora – Survey Support for South Hills Bike Park Dates: November 2023 Client: City of Glendora Contact: Maliha Fatima Ansari, PE - Principal Civil Engineer, 626-914-8294, mansari@cityofglendora.org Location: South Hills Bike Park, Glendora, Los Angeles County, California Value: $62,971.00 Contract Type: On-Call Project Description: GIS Surveyors established onsite survey control along with researching record maps and documents, then located boundary monuments for the parcels of land spanning the project location. The 24 parcels in total were in the vicinity of the South Hills Wilderness Area and required accurate data on various tree species across the project site. The record data and found survey monuments were used in the preparation of a survey basemap showing existing parcel lines within the area in question. This data was used to determine if any additional easements are required along the bike path. Additionally, GIS Surveyors conducted a topographic survey captured via aerial photogrammetry, encompassing the entire area of interest. The aerial survey included details for all the existing improvements in the project area along with a detailed topograp hic surface or digital terrain model (DTM) which will aid in the design of future improvements. The aerial data collection was tied to existing survey control with a series of aerial targets and once the data was processed and mapped the field crew returned for a site inspection to augment any missing or inaccurate information. All survey data and office research was reviewed, reduced, and compiled into an AutoCAD Civil 3D DWG file for delivery. This data aids the city to produce a plan as they move this project forward into Phase 2 over the months that followed. Relevance to Scope of Work • Survey Control • Record Research • Locating Boundary Monuments • Topographic Survey • Aerial Data Collection and Processing • Data Processing and Mapping Key Personnel and Role Dennis Rose, PLS – Professional Land Surveyor Napoleon Corpuz, LSIT – Office Operations Manager Gavin McKellar – Field Operations Manager Anthony Aviles - Chief of Parties Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 8 City of Glendora – Survey Support for North Glendora Avenue Improvements Dates: December 2022 Client: City of Glendora Contact: Maliha Fatima Ansari, PE - Principal Civil Engineer, 626-914-8294, mansari@cityofglendora.org Location: North Glendora Avenue (North of Sierra Madre Avenue), Glendora, California Value: $10,960.00 Contract Type: On-Call GIS Surveyors established project control points and performed a ground-based, topographic right- of-way survey for the area along Glendora Avenue north of Sierra Madre Avenue in the city of Glendora, California. This project included topographic and bounda ry surveys along with an analysis of the County of Los Angeles record maps, which together helped to establish the limits of the right - of-way for Glendora Avenue up to the driveway area for 773 N. Glendora Avenue. The survey control was established through a network of GPS observations with reference to Continuous Operating Stations (CORs) and other found survey monuments in and adjacent to the project area. The survey crew then collected sufficient improvements withing the documented limits of the public right-of-way including, but not limited to all existing sidewalks, curb ramps, cross gutters, spandrels, drive approaches, utility boxes, manholes, valves, power poles, traffic signals, cabinets, fire hydrants, trees, signing and striping. Once fieldwork was completed, the survey data was processed, reviewed, and mapped in robust detail with AutoCAD Civil3D format and PDF and in hardcopy format. The deliverable involved a high level of boundary analysis to provide a “best fit” solution of the existing record maps and their relationships to the existing survey monuments found during the field survey. This included resolving the relationship between several different tract and parcel maps along with records of survey and corner records that provided a pedigree for the lines in question. A final map enabled the client to review and complete a comprehensive plan to improve based upon the existing conditions and various owner and city rights in existence at the time of survey. Relevance to Scope of Work • Project Control • Topographic Survey • Right of Way Survey • Boundary Analysis • Corner Records • Office Calculations • Map Deliverables Key Personnel and Role Dennis Rose, PLS – Professional Land Surveyor Napoleon Corpuz, LSIT – Office Operations Manager Gavin McKellar – Field Operations Manager Anthony Aviles - Chief of Parties Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 9 City of Buena Park – Topographic Survey for Ball Road Loop Project Dates: August 2022 Client: City of Buena Park Contact: Jason Tran, EIT - Assistant Engineer, 714-562-3680, jasontran@buenapark.com Location: Intersection of Ball Road and Valley View Street, Buena Park, Orange County, California Value: $9,988.50 Contract Type: On-Call GIS Surveyors was hired to provide a topographic survey at 25-foot intervals and a minimum of 10 feet beyond the existing curb radius including but not limited to CL, EG, TC, FL and BW for the Ball Road Loop Project in the city of Buena Park, California. The topographic mapping included all existing sidewalks, curb ramps, cross gutters, spandrels, drive approaches, utility boxes, manholes, valves, power poles, traffic signals, cabinets, fire hydrants, trees, signing and striping along with various other visible features within the right-of-way. To complete the survey, GIS Surveyors deployed an aerial team to conduct an orthometric survey of the project location, utilizing a combination of aerial imagery and lidar to complete a three - dimensional representation of the project site. Although “boots on the ground” may seem like a more cost-effective method for a small job, this job involved detailing a very busy intersection in Orange County California. By keeping our “boots” out of the right of way, GIS Surveyors could keep our valuable human resources out of harm’s way while still providing a high level of detail across the entire project area. All of this data was tied to the city benchmark and datum through the use of various aerial targets set with survey grade coordinates. Upon completion of the aerial data processing, a field crew was deployed to verify the aerial data on the ground along with providing a full, 360-degree video of the site from ground perspective. This value added item allows for the maximum coverage of all visual details by both the office surveyors and the end client, which saved time in addressing any questions during review. Relevance to Scope of Work • Topographic Survey and Mapping • Orthometric Survey • Setting Aerial Survey Targets • Aerial Data Collection and Processing Key Personnel and Role Dennis Rose, PLS – Professional Land Surveyor Napoleon Corpuz, LSIT – Office Operations Manager Gavin McKellar – Field Operations Manager Erik Eilers, LSIT – Project Surveyor Anthony Aviles - Chief of Parties Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 10 City of Yorba Linda – Equestrian Trail Segment 4 Dates: February 2022 to November 2022 Client: City of Yorba Linda Contact: Regina Hu, PE, QSD – Principal Civil Engineer, rhu@yorbalindaca.gov - 714-961-7174 Location: Yorba Linda, Orange County, California Value: $10,475.00 Contract Type: On-Call Project Description: This project consisted of land records research and boundary surveys to establish the limits of various equestrian easements for the city of Yorba Linda. With the limits of the easements staked in the field, city officials were able to make determinations of encroachments and other factors that have caused the trails to be un-usable over the years. GIS Surveyors conducted record map research to locate the limits of each easement shown on various tract and parcel maps on file with the county of Orange. Once the records research was completed, GIS Surveyors provided the preliminary data to the city for their determination of what easements needed to be staked in the field for review by the city officials. Then GIS Surveyors conducted field surveys to recover and survey various survey monuments shown on the recorded maps to establish a comprehensive base map of all the maps associated with the equestrian trail easements. While the crew was out there, they also surveyed the existing fences and walls that fell along the limits of the easements. The field data was compiled in the office and the results were reflected in the base map with dimensions illustrating the geospatial relationship between the easements and the adjacent or encroaching walls. A final site walk was conducted with the city officials and GIS Surveyors placed wooded stakes at the locations of the easements of concern. This gave the city officials a clear understanding of what issues need to be resolved in order to make the equestrian trail a more viable recreational option for the residents of Yorba Linda. Relevance to Scope of Work • Land Records Research • Boundary Surveys • Construction Staking • Basemapping • Office Calculations Analysis Key Personnel and Role Dennis Rose, PLS – Professional Land Surveyor Napoleon Corpuz, LSIT – Office Operations Manager Gavin McKellar – Field Operations Manager Erik Eilers, LSIT – Project Surveyor Anthony Aviles - Chief of Parties Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 11 Elsinore Valley Municipal Water District (EVMWD) - Annual Dam Survey Dates: October 2020, 2021, 2022, 2023 and 2024 Client: Elsinore Valley Municipal Water District (EVMWD) as a subcontractor to Dudek Contact: Charles Greely, Principal – Dudek - 760-601-3411 - cgreely@dudek.com Location: Lake Elsinore, California Value: $20,000.00 per annum Contract Type: On-Call Project Description: EVMWD owns and operates two water storage dams. These dams are Railroad Canyon Dam and Lee Lake Dam. It is required by the Division of Safety of Dams (DSOD) that both dams are surveyed each year to monitor deformation and other monitoring data that must b e submitted in addition to the survey results. GIS Surveyors was awarded the work to conduct the annual dam monitoring survey with Dudek as the prime in charge of the final engineering reports. GIS Surveyors conducted trigonometric leveling as well as digital level loops to verify both horizontal and vertical values at the highest level of accuracy possible. In the case of the Railroad Canyon Dam, a small boat was utilized to access the spillway to the top of the dam where four existing monuments needed to be measured. After the data was collected it was analyzed in Trimble Business Center for QA/QC and the final data was exported into a tabulated report. The report was reviewed and added as part of the annual dam survey report provided by Dudek to the water district. Relevance to Scope of Work • Dam Monitoring • Elevation survey • Precision leveling • Survey control • Change detection • Data correction • QA/QC Key Personnel and Role Dennis Rose, PLS – Professional Land Surveyor Napoleon Corpuz, LSIT – Office Operations Manager Gavin McKellar – Field Operations Manager Erik Eilers, LSIT – Project Surveyor Anthony Aviles - Chief of Parties Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 12 Santa Margarita Water District 350 Zone Modifications Phases I & II Dates: June 2023 Client: Santa Margarita Water District as a subcontractor to Dudek Contact: Ian Crano, Senior Engineer – Dudek – 760-479-4163 – icrano@dudek.com Location: San Juan Capistrano, California Value: $36,940.95 Contract Type: Lump Sum Project Description: GIS Surveyors was contracted to perform a topographic and boundary/Right- of-Way (ROW) survey of various sites in San Juan Capistrano, CA to enable the design and replacement of approximately 3,300’ of underground water distribution infrastructure. GIS Surveyors conducted record map research with the County of Orange to locate the ROW limits associated with the alignment in question, which consisted primarily of residential streets. GIS Surveyors then conducted field boundary surveys to recover various survey monuments shown on the recorded maps to establish a comprehensive basemap of all ROW lines of interest. GIS Surveyors then conducted a thorough topographic survey within the alignment ROW to collect curb flowlines, back of walk, top of curbs, AC lips, roadway centerlines and curve apexes, driveway depressions, grade breaks, visible surface utilities and vegetation. Addit ionally, gravity flow inverts on manholes and storm drains were collected. The field data was compiled in the office and the results were reflected in the base map with dimensions illustrating the geospatial relationship between the public ROW and the associated topographic features. A final site walk was conducted to ensure that nothing of substance was overlooked. This gave the Client a clear understanding of what issues need to be resolved in order to make infrastructure improvements for the benefit of the residents of San Juan Capistrano. Deliverables were prepared in AutoCAD Civil 3D per the client request, however, GIS Surveyors’ staff have the ability create deliverables in an array of software platforms, including Bentley Microstation suite. Relevance to Scope of Work • Topographic Survey • Boundary/ROW Survey • Basemapping • QA/QC Key Personnel and Role Dennis Rose, PLS – Professional Land Surveyor Marshall Blackbourn – Survey Manager Napoleon Corpuz, LSIT – Office Operations Manager Gavin McKellar – Field Operations Manager Erik Eilers, LSIT – Project Surveyor Anthony Aviles - Chief of Parties Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 13 San Diego Gas and Electric (SDG&E) - Line 1600 Pipeline Replacement Project Dates: December 2018 to August 2024 Client: SDG&E as a subcontractor to Spec Services Contact: Chris Smart - Pipeline Division Manager, csmart@specservices.com, 714-963-8077 Location: Throughout San Diego County, California Value: $3,100,000.00 Contract Type: On-Call Project Description: GIS Surveyors was awarded the work to support Spec Services with their Client, SDG&E. The project involves a 16” natural gas transmission pipeline labeled Line 1600 (L1600) that extends for approximately 45 miles throughout San Diego County. The aim of this program is to either replace the existing natural gas pipeline or hydrotest the gas line for safety compliance. GIS Surveyors is responsible for mapping approximately 33 miles that includes right -of- way determination, easement plotting and staking, utility sweeps, and collecting and providing topographic data. Field survey crews searched for and located control monuments to aid in right-of-way and boundary determination, which allowed for development of plat and legal descriptions for new improvements and easements. With GIS Surveyors’ extensive background in right-of-way determination, easements, and utility surveying the company delivers professional surveying services that provide not only reliable information to the client, but continually deliver within the expedited design schedule set by SDG&E. The quantity of survey work to be completed on a project of this scale can typically take at least one year to complete, but because of GIS Surveyors’ commitment to our clients and professional background, we were able to complete the Phase One survey tasks in almost half the time, as well as managing and completing various change orders beyond the original scope of work. Relevance to Scope of Work • Basemapping • Right-of-way determination • Utility surveying • Construction staking • QA/QC of topographic data and exhibits • Collection of utility appurtenances • Review of easement documents • Easement plotting and staking • Pipeline Safety Enhancement Program (PSEP) standards • Land services support Key Personnel and Role Dennis Rose, PLS – Professional Land Surveyor Erik Eilers, LSIT – Project Surveyor Marshall Blackbourn – Survey Manager Mark Steele – Survey Office Technician Napoleon Corpuz, LSIT – Office Operations Manager Bryan Lambie – Party Chief Gavin McKellar – Field Operations Manager Anthony Aviles - Chief of Parties Brandon Ragone - Utility Locating Manager Rachel Lambie - Chainman Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 14 4. Third-Party/Subcontractors GIS Surveyors can complete the entire scope of work in-house and as a result will not be using any subcontractors. 5. Staff Resumes and Organization Chart Marshall Blackbourn* Survey Manager Dennis Rose, PLS* Director of Surveys/ Professional Land Surveyor KEY * Key Personnel Principal in Charge Primary Point of Contact Survey Office Staff Ryan Forest, PLS – Senior Surveyor Mick Powers, PLS – Senior Surveyor Hank Hanson, LSIT – Project Surveyor Eric Holmes, LSIT – Project Surveyor Erik Eilers, LSIT – Project Surveyor* William Patrick, LSIT – Sr. Survey Office Technician Mason Saitman - Sr. Survey Office Technician Mark Steele – Survey Office Technician*Survey Chainman Dwight Sotto - Chainman Rachel Lambie – Chainman Justis Allen - Chainman Nathan Ziobro - Chainman Andrew McCurdy - Chainman Survey Party Chief Anthony Aviles – Chief of Parties* Bryan Lambie – Party Chief Wayne Cox – Party Chief Chris Allen – Party Chief Tyler Southard – Jr. Party Chief Samuel Greaves - Jr. Party Chief Utility Locators Brandon Ragone – Utility Locating Mgr* Ben Deweese - Utility Designator Napoleon Corpuz, LSIT* Office Operations Manager Gavin McKellar* Field Operations Manager Paul Loska Jr, PE* Director of Operations/ Professional Engineer Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B DENNIS ROSE, PLS Director of Surveys/Professional Land Surveyor Education: Southwest Missouri State University: Computer Info Sys (CIS) Santiago Canyon College: Land Surveying Training Coursework University of California Los Angeles (UCLA): Management Development for Entrepreneurs (MDE) Program Professional Licenses and Certifications: Professional Land Surveyor (PLS) California No. 9045 (2013) CPR First Aid Training Professional Affiliations: California Land Surveyors Association (CLSA) Total Years of Experience: 22 Years with Firm: 9 Relevant Experience City of Yorba Linda, Equestrian Trail Segment 4, Yorba Linda, CA Professional Land Surveyor. Responsible for overseeing and providing professional land surveyor oversight to this project that consisted of land records research and boundary surveys to establish the limits of various equestrian easements for the city of Yorba Linda. City of Buena Park, Ball Road Loop Project, Buena Park, CA Professional Land Surveyor. Responsible for overseeing and providing professional land surveyor oversight to this project that consists of topographic mapping for a waterline replacement project for the City of Buena Park. San Diego Unified Port District, Austal Floating Dry Dock Survey Services (as a subcontractor to Moffatt and Nichol), National City, CA (2022) Professional Land Surveyor. Responsible for providing professional land surveyor oversight and review/sign off on all deliverables for the Austal Floating Dry Dock project. Mr. Rose and his team utilized existing tidal benchmarks and survey control provided by the client to provide topographic survey and utility locating services according to the applicable scope of work and guidelines required for completion of a grading plan for site improvements. San Diego Unified Port District, TAMT, Phase 3 Electrical Survey Services (as a subcontractor to Moffatt and Nichol), San Diego, CA (2021) Professional Land Surveyor. GIS Surveyors’ field crews completed a topo survey at the 10th Avenue Marine Terminal in support of the TAMT Phase 3 project. The scope of work for this project involved a topographic survey along a roughly 100-foot wide corridor centered on the proposed alignment of updated electrical conduits. All surface features were collected and mapped. Mr. Rose provided professional land surveyor oversight, final QA/QC, and was responsible for signing off on all deliverables. On-Call Survey and Mapping Services, SDG&E, San Diego, CA Survey Manager. GIS Surveyors Inc. was awarded an on-call survey and mapping contract with SDG&E Civil Group that covers the entire SDG&E transmission and distribution service territories. Mr. Rose, as Survey Manager, was responsible for managing SAG surveys, GPS Control, construction staking, environmental staking, boundary surveys, topographic surveys and yard staking on various tie lines and other SDG&E facilities. Biography Mr. Rose has over 22 years of experience in the survey industry and is a California licensed Professional Land Surveyor (PLS). As Director of Surveys, Mr. Rose assumes a multifaceted role that spans various crucial responsibilities. His adept leadership involves orchestrating daily business activities with precision and efficiency. Strategic planning is another cornerstone of Mr. Rose's role. His forward-thinking approach contributes to the development of robust strategies that align with the company's overarching goals and industry trends. He has established a framework that fosters operational excellence and complies with industry standards. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B MARSHALL BLACKBOURN Survey Manager Education: B.S. Agricultural Engineering Technology & Business Mississippi State University Starkville, MS Online Certificate – Hydrographic Academy Plymouth University Plymouth, England LS Exam Review Course Santiago Canyon College Orange County, CA Professional Licenses and Certifications: FAA Certified Remote Pilot Operator – Unmanned Aerial Systems (UAS) Total Years of Experience: 18 years Years with the Firm: 4 years Relevant Experience Project Manager - San Diego Gas and Electric (SDG&E) Mobile Home Park Utility Upgrade Program, San Diego and Orange Counties GIS Surveyors provided underground utilities locating and basemapping services, implementing both fixed-wing and drone aerial platforms for photogrammetry collection. Services included project control and flight planning, airborne data acquisition, project site walk and feature verification, and comprehensive basemapping. Marshall managed all aspects of this program. Project Manager - SoCalGas On-Call Surveys, San Diego, Orange and Riverside Counties GIS Surveyors is currently providing basemapping, utility mapping, land services support, construction staking and as-built surveys, while adhering to current PSEP standards. Fixed-wing and drone aerial photogrammetry collection supplements these efforts. Marshall manages all aspects of these on-call surveys, with focus on client satisfaction and data integrity. Survey QA Manager - San Diego Gas and Electric (SDG&E) System Wide LiDAR Mapping, San Diego and Imperial Counties GIS Surveyors is currently provided system wide LiDAR Mapping and PLS- CADD modeling for approximately 2000 miles of transmission lines and 6600 miles of distribution lines for the entire SDG&E overhead network. Services included establishing survey control, QA/QC surveys, LiDAR data verification, GIS asset inventory mapping, PLS CADD modeling, vegetation analysis, project management and QA/QC review and verification of the PLS CADD models. Marshall’s role is primarily focused on managing the collection of survey data for LiDAR data verification and QC. Project Surveyor - Barnard Construction West of Devers Edison Electrical Transmission Line Project, Riverside and San Bernardino Counties GIS Surveyors is provided construction support services for the entire 50- mile alignment. Services include office construction calculations, construction staking for poles, towers, right of way, roadways, construction limits, utility crossings, QA/QC surveys and as-builts. Marshall played a role in boundary and right of way calculations and drafting. Biography Marshall has 18 years of survey experience in the hydrographic survey industry, specializing in Airborne LiDAR and Multibeam Sonar acquisition, processing, QA/QC practices and project management. His professional experience includes the collection, processing, management and delivery of multiple large-scale hydrographic LiDAR projects throughout the world, with coastal zone management and the update of nautical charts as the primary focus. He is highly skilled in generating LiDAR deliverables and products and is well-versed in all aspects of both traditional and modern survey methods, covering both hydrographic and land surveying. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B NAPOLEON CORPUZ, LSIT Office Operations Manager Education: BS, Electrical Engineering Adamson University, Philippines (1989) Professional Licenses and Certifications: Land Surveyor in Training (LSIT) No. 8050 (2010) Total Years of Experience: 23 Years with Firm: 10 Relevant Experience City of Yorba Linda, Equestrian Trail Segment 4, Yorba Linda, CA Office Operations Manager. Responsible for preparing all office deliverables for to establish the limits of various equestrian easements for the city of Yorba Linda. Mr. Corpuz compiled the field data in the office and the results were reflected in a basemap with dimensions illustrating the geospatial relationship between the easements and the adjacent or encroaching walls. City of Buena Park, Ball Road Loop Project, Buena Park, CA Office Operations Manager. This project consists of topographic mapping for a waterline replacement project for the City of Buena Park. Mr. Corpuz was responsible for preparing all office deliverables. All data was compiled into a master CAD file with the rectified orthophoto as a background image. Various Land Surveying Projects, Southern California Office Operations Manager. Responsible for meeting project objectives, scope and roles. Determining and managing resourcing. Managing and tracking project budgets and costs. Preparing project plans, scheduling key milestones and managing the project according to the plan. Providing project reports. Identifying and mitigating project risks and issues. Undertaking survey production tasks and ensuring all office calculations and deliverables are completed on time, on budget and meet client’s expectations in terms of quality. Key clients include SoCalGas, SDG&E, Southern California Edison, Spec Services, Barnard Construction, Cordoba Corp SoCalGas and SDG&E, Pipeline Safety Enhancement Plan (PSEP) Party Chief and Project Surveyor. Nap has responsibility for completing field activities for boundary surveys, easement retracement, utility surveys, topographic surveys, construction staking, layout of bore pits & alignment, structure monitoring, as built surveys for PSEP lines and valve sites. In the office, he was responsible for processing field data and producing surveys for boundary, topographic, GPS control, utility location, client reports and implementing quality control processes. Biography Napoleon (Nap) has over 23 years of progressive office and field surveying experience and holds a Bachelor of Science in Electrical Engineering. He is an accomplished survey professional and is responsible for managing all office operations to ensure deliverables are produced within time, cost, and quality objectives. His survey experience includes commercial, educational, military, industrial, natural gas and electric and land development industries. In addition to his surveying experience Nap’s background includes civil engineering design. He has extensive knowledge in topographic surveys, base mapping, field surveying, GPS control, construction staking, data processing and sag surveys. Nap’s field and office experience gives him a unique ability to work with clients and understand client requests to align field and office staff. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B GAVIN MCKELLAR Chief of Parties/Field Operations Manager Education: BS, Topographic Science University of Glasgow, Scotland, UK (1993) Professional Licenses and Certifications: OSHA 30-Hour Training FAA Certified Remote Pilot Operator – Unmanned Aerial Systems (UAS) 5-Day Utility Locate Training 3-Day GPR Training CPR First Aid Training Total Years of Experience: 30 Years with Firm: 9 Relevant Experience City of Yorba Linda, Equestrian Trail Segment 4, Yorba Linda, CA Chief of Survey Parties. Responsible for conducting the field surveying portion of this project to establish the limits of various equestrian easements for the city of Yorba Linda. Mr. McKellar undertook field surveys to recover and survey various survey monuments shown on the recorded maps to establish a comprehensive basemap of all the maps associated with the equestrian trail easements. Mr. McKellar also surveyed the existing fences and walls that fell along the limits of the easements. City of Buena Park, Ball Road Loop Project, Buena Park, CA Chief of Survey Parties. This project consists of topographic mapping for a waterline replacement project for the City of Buena Park. Mr. McKellar and his field crews were responsible for establishing on-site control points tied to nearby CORS GPS stations using static GPS observations. Aerial targets were then placed on the ground to control the photogrammetric mapping carried out by our trusted partners Aerotech Mapping. Once mapping was complete, field crews performed a QA/QC walk to identify any obscured features and collect any data missed in the aerial survey. All data was compiled into a master CAD file with the rectified orthophoto as a background image. San Diego Unified Port District, National City Marine Terminal (NCMT) Berth 24-11 Rehab Survey Services (as a subcontractor to Moffatt and Nichol), National City, CA (2022) Chief of Survey Parties. Mr. McKellar and his survey crews conducted a ground- based topographic survey as well as a sub-grade utility mark-out at the site in various areas of concern as delineated by the client. Once fieldwork was completed, the survey data was reviewed, reduced, and imported into a CAD base-file (AutoCAD Civil3D format as required). San Diego Unified Port District, TAMT, Phase 3 Electrical Survey Services (as a subcontractor to Moffatt and Nichol), San Diego, CA (2021) Chief of Survey Parties. Responsible for directing and supervising GIS Surveyors’ field crews that completed a topo survey at the 10th Avenue Marine Terminal in support of the TAMT Phase 3 project, as subcontractor to M&N. The scope of work for this project involved a topographic survey along a roughly 100-foot-wide corridor centered on the proposed alignment of updated electrical conduits. All surface features were collected and mapped. Mr. McKellar provided lead direction to assigned field crews and was responsible for ensuring the collected data was accurate and fit for purpose. Biography Mr. McKellar has over 30 years of survey experience, working on small and large- scale projects for private, public, utility and government clients. He is GIS Surveyors’ Field Operations Manager and ensures our crews have up to date training, such as safety, procedures and processes and he is also responsible for scheduling and resourcing of our field crews. Mr. McKellar’s survey experience has allowed him to learn and become proficient in survey hardware and software, GPS and terrestrial measurement methods enabling him to produce high quality GIS or CAD deliverables. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PAUL LOSKA, JR. Director of Operations/Professional Engineer Education: BS, Civil Engineering, University of Idaho, Moscow, ID Professional Licenses and Certifications: Licensed Civil Engineer: • California #90670 • Idaho #P-19549 • Washington #20122793 Total Years of Experience: 8 Years with Firm: 1 Relevant Experience Project Manager, Lariviere Construction, Rathdrum ID • Managed multiple civil-construction public works projects simultaneously. • Responsible for contract review, negotiations and adherence. • Coordinated project team for schedule reviews, change order negotiations, and document compliance. • Responsible for progress payments, schedules, subcontracting, submittals, material orders, and financial reports. • Worked with project superintendents to manage the schedule, production factors, and work quality. • Responsible for client, engineer, and contractor relationship. • Supervised and mentored project engineer team who assisted in project documentation requirements. • Worked with multiple public owners. • In the winter months, lead full project estimates for upcoming work. • Investigated, sought-out, and submitted change orders. Survey Manager, Barnard Construction Company, Indiantown FL • Managed construction layout and survey operations for C44 Reservoir. • Supervised a crew of seven surveyors, eleven GPS rovers, and twenty GPS machine control units. • Coordinated survey operations with superintendents, foreman, and engineers • Used AutoCAD Civil 3D, Trimble Business Center, and Topcon Magnet Field to create GPS machine control models. • Responsible for calculating monthly construction quantities. • Modeled project quantities and layout for dirt-flow analyses using photogrammetry drone surfaces and AutoCAD Civil 3D. Estimator, Barnard Construction Company, Bozeman MT • Performed quantity takeoffs and cost analyses from plans and specifications. • Delivered cost breakdown, sequencing, and CAD support documents to lead estimators for review. • Worked with estimating team to create schedule, proposal documents, and final estimate. • Recruited and managed a list subcontractors for a several portions of work. • Lidated data through proprietary GIS software. • Responded to data inquiries from various groups within the organization. • Tested new projects before release and document training materials. • Imported pronunciations into software and update templates. Biography Paul Loska, Jr. is an experienced Project Manager and licensed Civil Engineer with over 8 years of surveying and engineering experience. Mr. Loska brings expertise in precision surveying, topographic analysis and construction staking. He coordinates with customers and ensures deliverables meet QA/QC standards. His skills in using software such as AutoCAD Civil 3D, Trimble Business Center, and his knowledge of survey instruments, is complemented by his leadership in coordinating complex projects, adherence to specifications, managing subcontractors, and excelling in relationship management. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PAUL LOSKA, JR. Director of Operations/Professional Engineer Field Engineer and Subcontractor Manager, Kewit Infrastructure West Co., Oahu HI • Supported field operations by preparing work plans, dig permits, quantity takeoffs, and material ordering. • Assisted senior engineers with interpreting design drawings, specifications, and survey layout. • Ensured daily quality control in coordination with the client and inspectors. • Aided the superintendent in generating the daily, 3-week, and 120-day schedules. • Coordinated and managed a mason subcontractor who poured thousands of feet of curb, gutter, and sidewalk. • Managed and documented the project aggregate, concrete, and trucking costs. Civil Engineering Intern, Washington Dept. of Natural Resources, Forks WA • Verified construction compliance using survey instruments and design plans. • Designed several fish passable culverts . • Performed hydraulic analysis using ARCGIS to size culverts and design for fish passage. • Complied with Forest Practices and Tribal Biologists permit regulations. Survey Chainman and Draftsman, GIS Surveyors, Inc. Ramona CA • Staked access roads, helicopter pads, and pole sites for several major power line projects in Southern California. • Performed topographic and boundary surveys in the office and field. • Construction staked for North Island Naval Station, Point Loma Submarine Base, Miramar Air station, San Diego Gas and Electric, Par Electric, Warren James, and Southern California Edison. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B ERIK EILERS, LSIT Project Surveyor Education: (BS) Physical Science – University of Maryland, College Park, Maryland (2000) Professional Licenses and Certifications: Land Surveyor in Training (LSIT) No: 9237 (2023) Technical Skills: • ArcGIS 10+ Suite • QA/QC Airborne LiDAR data • Airborne LiDAR bathymetry and Acoustic Survey Planning • Airborne LiDAR Bathymetry data processing • Multibeam Echosounder data processing • Digitizing/Georeferencing • Process documentation • Proposal management • Survey costing and cost analysis • Photoshop • Autodesk Civil 3D • QT Modeler Total Years of Experience: 18 Years with Firm: 8 Relevant Experience San Diego Gas and Electric (SDG&E) Line 1600 Pipeline 43 Mile Replacement Project, San Diego County, California Project Surveyor. GIS Surveyors is currently providing land surveying services for approximately 45 miles of distribution pipeline lines. Mr. Eilers’ main role is to process the survey data collected in the field, perform QA/QC and package weekly deliverables. SoCal Gas Aliso Canyon Gas Storage Project, Orange County, California Project Surveyor. GIS Surveyors is currently providing land surveying services for the storage pipelines above ground. Mr. Eilers’ main role is to process the survey data collected in the field, perform QA/QC and package deliverables for each storage site. SoCal Gas Honor Rancho Ambient Air Monitor Project, Los Angeles County, California Project Surveyor. GIS Surveyors is currently providing land surveying services for the storage pipelines above ground. Mr. Eilers’ main role is to process the survey data collected in the field, perform QA/QC and package deliverables for each site. Cordoba Line 3010 Pipeline Replacement Project, San Diego County, California Project Surveyor. GIS Surveyors is currently providing land surveying services for approximately a mile of distribution pipeline lines. Mr. Eilers’ main role is to process the survey data collected in the field, perform QA/QC and package weekly deliverables. Southwest Gas (SWG) Shadow Mountain Road Project, San Bernardino County, California Chainman. GIS Surveyors was requested to provide survey support for a proposed gas distribution pipeline upgrade that would connect a gas transmission line located around Highway 395 to the City of Helendale along a seven mile stretch of Shadow Mountain Road in rural San Bernardino County, California. Mr. Eilers worked as part of a two-man survey crew to search for existing monuments and set aerial targets for the project. Biography Mr. Eilers has 18 years of experience in the Survey and Geographic Information Systems (GIS) industries. He is currently working as a Project Surveyor at GIS Surveyors’ HQ office in San Diego. Mr. Eilers supports both field and office survey operations for a variety of different clients. Prior to joining GIS Surveyors, Mr. Eilers gained extensive experience planning hydrographic surveys including survey planning of Airborne LiDAR Bathymetry and acoustic surveying methods with ArcGIS. Mr. Eilers recently passed his Land Surveyor in Training exam, a huge step in his career as a Land Surveyor. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B MARK STEELE Survey Technician Professional Licenses and Certifications: Certificate of Completion in CAD Drafting, Career Academy, Redding, CA Autodesk Revit Microsoft A+ certificate MCSA certificate Technical Skills: • Civil 3D (18+ years) • Map 3D (10+ years) • AutoCAD (20+ years) • Revit (4 years) • ArcGIS (6 years) • Bently MicroStation (10+ yrs) • Adobe Creative Suite (10+yrs) • Adobe Illustrator (10+ years) • Layout Design (10+ years) • Web Design (10+ years) Total Years of Experience: 20+ Years with Firm: 2 Relevant Experience San Diego Gas and Electric (SDG&E) Line 1600 Pipeline 43 Mile Replacement Project, San Diego County, California Survey Drafter. GIS Surveyors is currently providing land surveying services for approximately forty-five miles of distribution pipeline lines. Services include establishing survey control and photo control points, right of way survey, topographic survey, utility survey, pothole surveys, project management and QA/QC review. Mr. Steele’s role is primarily focused on survey deliverables, including, plat and legal docs, topographic survey, base mapping, utility mapping and DTM surface modeling. SoCalGas and SDG&E, Pipeline Safety Enhancement Plan (PSEP), Southern California Survey Drafter. Mark has responsibility for completing office activities for boundary surveys, easement retracement, utility surveys, topographic surveys, construction staking, layout of bore pits & alignment, structure monitoring, as built surveys for PSEP lines and valve sites. In the office, his responsibilities include processing field data and producing surveys for boundary, topographic, GPS control, utility location, client reports and implementing quality control processes. Pacific Gas and Electric (PG&E) Underground System Hardening Project, Northern and Central California Survey Drafter. This project involves the undergrounding of 10,000 miles of powerlines to reduce wildfire risk and improve reliability. As Survey Drafter, Mr. Steele is responsible for the management of various survey deliverables including the final survey map preparation, DTM surface model creation and client standard compliance. He also provides guidance and instruction to the office team concerning CAD issues and processes. Biography Mr. Steele has over 20 years of experience and holds multiple certificates in Autodesk and Adobe products. He is an accomplished survey drafter and is responsible for creating DTMs, topographic survey models, bathymetry models, UAV models and topographic survey deliverables. His survey experience includes commercial, educational, military, industrial, natural gas, and electric and land development industries. In addition to his surveying experience Mark’s background includes civil engineering design. He has extensive knowledge in topographic surveys, base mapping, field surveying, GPS control, construction staking, data processing and sag surveys. Mr. Steele’s office experience with multiple software platforms gives him a unique ability to understand client requests and standards. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B ANTHONY AVILES Chief of Parties Education: High School Diploma Barstow High School (1990) Currently studying PPI Land Surveyor in Training (LSIT) preparation course Total Years of Experience: 18 Years with Firm: 5 Relevant Project Experience Southern California Edison, West of Devers Upgrade Project, San Bernardino and Riverside Counties, CA Party Chief. GIS Surveyors provided construction support services for a 220 kV electrical transmission line, for the entire 50-mile alignment that traverses through Riverside and San Bernardino Counties. Mr. Aviles was responsible for conducting boundary surveys, geodetic control, construction staking, QA/QC surveys, as-built surveys, and topographic surveys. San Diego Gas and Electric (SDG&E) Line 1600 Pipeline Replacement Project, San Diego County, California Party Chief. GIS Surveyors is currently providing land surveying services for approximately 45 miles of distribution pipelines. Mr. Aviles’ main role is to is to manage and provide all field services including establishing survey control and photo control points, right-of-way surveys, topographic surveys, utility surveys, pothole surveys, project management and QA/QC review. Another key part of his role is communicating with the client regarding project requirements and providing field progress updates. Los Angeles Department of Power and Water (LADWP), Haskell Canyon to Sylmar Switching Station Transmission Line Conversion Project, Northern Los Angeles County, CA Party Chief. The tasks assigned to GIS Surveyors consisted of land survey and lidar support for the entire 5-year duration of the project. Mr. Aviles was responsible for proving survey field staking for all structures, foundations, conductors, access roads, drainage elements, site work limits and other various project components. Various Electric Projects in Southern California Party Chief. Mr. Aviles was tasked with overseeing a two-man survey crew, managing the maintenance, set up, and operation of Trimble GPS, Trimble S7 Total Station, and other survey equipment for various electric projects including: • SDG&E Mission Control Sub • SDG&E Fire Risk Mitigation Program • SDG&E Artesian Substation Project • SDG&E CNF Decommissioning • SDG&E South Orange County Reliability Enhancement (SOCRE) • SDG&E Strategic Undergrounding (SUG) Project Biography Mr. Aviles is an experienced and knowledgeable land survey Party Chief with 18 years’ experience in providing quality work on numerous, fast-paced, and challenging commercial, industrial, and residential land survey related projects. He possesses strong communication and organizational skills allowing for positive and productive relationships with co-workers, clients, and the general public. Mr. Aviles has experience in coordinating tasks and schedules with office staff, site superintendents, trade foreman and multiple crew members to ensure timely and efficient project deadlines. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B BRANDON RAGONE Utility Locating Manager Education: High School Diploma Professional Licenses and Certifications: Certified HughesNet Installer Total Years of Experience: 10 Years with Firm: 2 Relevant Experience Utility Designator/Chainman, GIS Surveyors Inc., CA • Designates overhead and underground utilities according to ASCE 38-02 standards. • Completes detailed field investigations of all required utilities. • Consults on schedule planning for field operations. • Reviews available record information prior to and during field investigation. • Works with office staff to ensure completeness of data transfer. • Operates geophysical locating technology, including Electro Magnetic (EM), Ground Penetrating Radar (GPR), Acoustic Pipe Locator (APL), CCTV Sewer Camera • Coordinates with clients, utility stakeholders and property stakeholders. • Leads operations in the field for various projects. • Coordinates with any subcontracted vendors of traffic control, hydro- excavation, saw cutting, etc. • Assists with training of new Utility Designators. Utility Technician, UtiliQuest LLC., Red Bluff, CA • Locates public utilities correctly and safely, maintaining integrity of underground utilities includingtelecommunications, power, cable TV, and water to ensure excavator safety and asset protection. • Utilizes utility prints and visual scans along with electromagnetic technology to locate and markunderground utilities. • Uses utility provided maps/prints to assist in identification of underground utilities. • Utilizes effective time management skills to efficiently and accurately locate underground utilities. • Works independently, conducting business from a company vehicle utilizing a computer programsystem for dispatching and auditing purposes. Communications Technician, Valley Industrial Communications, Redding, CA • Consulted with businesses and homeowners regarding CCTV security system needs. • Made recommendations regarding where cameras should be installed according to individual building’sconstruction. • Performed and tested residential installations of CCTV security systems. • Setup RF (Radio Frequency) test fixtures and testing equipment. • Performed remote support, physical equipment and cabling inspections, swap out failed components,testing of copper and fiber cables, handle storage media, and enter troubleshooting commands. • Perform hardware installations – rack / stack. • Perform cable installations (routing, terminating, testing, troubleshooting). Biography Brandon Ragone has 10 years experience working as a telecommunications technician and utility locating professional. He joined GIS Surveyors as a Utility Designator and Chainman and is an integral part of our Northern California survey crew but works throughout the state of California as-needed. His primary role is to locate and designate utilities according to ASCE 38-02 standards as safely, efficiently, and at the highest level of quality to ensure client satisfaction and operational excellence. He also works in a Chainman capacity assisting the Party Chief with field surveys and associated tasks. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 25 6. Project Management Approach GIS Surveyors follows a standard workplan for the execution of all surveying projects. The standardized work plan is essential in maintaining safety, quality, schedule and cost controls for each project and task. The work plan is easily scaled up or down to accommodat e project complexities and duration. The project workflow is outlined in Figure 1 below. Project Scoping Project Planning Kickoff Meeting Project Execution Project Close Out Lessons Learned Figure 1: GIS Surveyors Standard Project Workflow Project Scoping During the Project Scoping phase, GIS Surveyors will work with the City of Rancho Cucamonga to discuss the project scope of services, safety, security, project duration, deliverables, project assumptions and exceptions. Depending on the complexity of the scope of services, a site visit may be warranted along with additional follow-up meetings to finalize the project scope. GIS Surveyors will then prepare a scoping document including schedule and cost estimate for approval by the City. Project Planning Once the project is awarded, the project planning phase is started. GIS Surveyors will develop a tailored Project Execution Plan (PEP) that includes the following information: • Site safety and hazard assessment plan • Quality assurance and control • Communication plan and project reporting • Project schedule • Resource plan and roles and responsibilities • Cost controls • Request for information process • Risk and issue identification The PEP is made up of many components and is used to mitigate potential project difficulties by identifying them early in the project lifecycle. One of the most important components is safety. GIS Surveyors makes safety the top priority and empowers all employees to stop work to address unsafe conditions. Another key piece of the PEP is quality control. GIS Surveyors follows a comprehensive Quality Management Plan for project execution and copies of the plan can be requested by the City of Rancho Cucamonga if needed. The plan establishes the Quality Control (QC) procedures, Quality Assurance Reviews (QA), Document Control and Quality Control Records. The plan will be tailored Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 26 to be specific to the project and will address quality team roles and responsibilities, document control, QC processes and the QA review process complete with checklists to ensure all data has passed set quality criteria. Once the PEP is complete it will be passed to the City of Rancho Cucamonga to review and provide feedback prior to the project kickoff meeting. Project Kickoff Meeting Once the project has been awarded and the PEP has been approved, GIS Surveyors will schedule a project kickoff meeting to review the scope, schedule, and deliverables. The purpose of the kickoff meeting is to formally notify all team members, subconsultants (if applicable), clients and other stakeholders that the project has begun and ensure everyone has a common understanding of the project and their roles. Project Execution The project proceeds by adhering to the PEP; during this phase the survey and related services tasks are undertaken, and the deliverables are sent to the City of Rancho Cucamonga for approval. The planned processes to manage time, cost and quality objectives are put into action and any deviations are tracked and reported to the City of Rancho Cucamonga. If change orders are required, GIS Surveyors will work with the City to define and negotiate the additional services. Throughout project execution, GIS Surveyors will coordinate daily, weekly and/or monthly with all stakeholders as needed to effectively manage assigned tasks and ensure the relevant parties are informed of project progress. The project reporting mechanisms will be actioned per the requirements approved in the PEP. Project Close Out Proper project closeout is an essential final step in the project management process. GIS Surveyors will conduct a project review to ensure the project was completed as scoped and aligns with the City of Rancho Cucamonga’s expectations. To identify and document lessons learned, GIS Surveyors has implemented a close out process called a “Hot Wash”. The term is derived from the military after-action process, where all project participants discuss the project at its completion. The meeting is agnostic of title and position where all participants are free to discuss what worked and what did not, and identify lessons learned along with remedies. The lessons learned are documented and applied to projects moving forward to ensure continual process improvement. GIS Surveyors will complete client expectation and satisfaction surveys as part of the ongoing effort to improve services and processes. Budget Control Estimating and Scheduling GIS Surveyors has a dedicated set of survey personnel who specialize in estimating and scheduling. All our estimators have a strong survey background and use their experience to apply realistic judgement to the effort required to complete a task. Typical factors that a re taken into consideration when creating a cost estimate and corresponding schedule include: • Labor: The cost of human effort expended towards project objectives. • Materials: The cost of resources needed to create products. • Equipment: The cost of buying and maintaining equipment used in project work. • Services: The cost of external work that a company seeks for any given project (vendors, contractors, etc.). Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 27 •Information Technology: Hardware and software requirements. •Facilities: The cost of using specialized equipment, services, or locations. •Contingency costs: Costs added to the project budget to address specific risks. When scheduling, our team considers the project scope then establishes the sequence of tasks. Care is taken to prioritize project tasks and to link task dependencies to determine which tasks can be done simultaneously versus those that are dependent on others. Task dependencies are mapped out in the project schedule to prevent bottlenecks and blocks. Each task on the schedule details the related resources and costs associated with completing it. This allows us to accurately plan the team’s time and keep their workload balanced. Milestones are determined to signal anchors such as project start and end date, the need for budgetary checks, and progress meetings. These milestones focus on the major progress points that must be reached to achieve success. Our estimating team works with the client to offer alternative solutions where possible to reduce costs and increase efficiency. We are also able to compact project schedules by adding additional resources to projects of urgent or emergency nature. Our flexible approach to project coordination and delivery ensures all client objectives are met in terms of cost, quality, and time. Cost Controls In years of managing many projects, GIS Surveyors has learned the best way to create an effective project budget is by using historical data and referencing lessons learned. Creating the project schedule, accurate resourcing, and the hours/cost for those involved is key, the budget will be reviewed by other in-house experts for confirmation. The budget is tracked in real time throughout the course of the project via Unanet ERP system. Any deviations on budget are communicated to the client immediately to ensure they get back on track and an official change order must be implemented. Devising a clear scope document and schedule at the beginning of the project is essential to keeping the project on track in terms of cost, time, and quality. Technical Approach and Understanding of Survey Scope of Work Participate in Field Meeting to Establish Scope and Design Parameters GIS Surveyors cultivates close working relationships with all parties associated with a project to encourage communication, efficiency, and safety awareness. GIS Surveyors’ Project Managers and Surveyors will establish points of contact, budget, scope requirements, safety guidelines, design constraints and other project parameters required to satisfy the specific needs of an assigned task. An onsite kick-off meeting could help address areas of concern while providing a chance for all stakeholders to collaborate and confer with developers, engineers, surveyors, and contractors involved with the City of Rancho Cucamonga project. Record Maps/Research Investigation into existing property boundaries becomes the backbone by which all future improvements will be based. GIS Surveyors personnel are experts at interpreting City, County and Public Land record maps, as well as legal descriptions, deeds, and patents. GIS Surveyors relies on its extensive years of industry experience to assess project requirements and determine what services will meet the needs of the project. Geographic Information Systems (GIS) are utilized to investigate existing land rights, easements, encumbrances, and other records research to develop a parcel layer database with detailed attributes. At this due diligence stage, all title report data will be reviewed and analyzed as required for dividing/merging properties, public and private land Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 28 ownership delineation, easement review, public improvements/encroachments, construction, and recording historic information. The review by our Professional Land Surveyors in this stage ensures that the interpretation of work by others is sound and reliable and then the data can be compiled and relayed to the client in a comprehensive GIS based map for further project development of design parameters. Utility Research Mapping with Plan and Profile Support Additional research during this stage of the project includes investigating existing utility stakeholders in the project location. GIS Surveyors’ Survey Crews and Analysts compile available record information and sub-grade utility locating data into plan and profile drawings, incorporating stationing and depth cover/clearance with manhole and catch basin invert elevations to provide a comprehensive overview of design conflicts. All of the fieldwork needs detailed office review beforehand, so it’s important to start this early in the project. Control and Coordinate System Standards All survey tasks will be tied horizontally to the California Coordinate System of 1983 (NAD83), using the appropriate zone, and vertically to the North American Vertical Datum of 1988 (NAVD88), unless other control coordinates are provided by the City of Rancho Cucamonga. If the City of Rancho Cucamonga requires development of a continually-operating reference network, complete with GPS sensors that can monitor subsidence or deformation, the design of that network would be completed and approved in this stage. Control networks complete with aerial target layout could also be developed in this stage to address the needs of any aerial or unmanned aerial system (UAS) that may need to be utilized during the course of the project. GIS Surveyors will check the accuracy of provided control networks before utilizing it and provide all the necessary field notes, exhibits, plats, documents and Civil 3D/AutoCAD files to memorialize the results in a comprehensive deliverable. Maintenance of a City-wide vertical and horizontal survey monument and benchmark catalog system will be executed through an intuitive GIS application custom tailored to help coordinate the City of Rancho Cucamonga’s surveying functions. Boundary and Right-of-way Surveys After research is complete, a site kick-off meeting and site safety plan is completed prior to starting the control, reconnaissance, and boundary monumentation surveys by our field crews. The field crews are supported by record research data and calculations, then the data is processed and analyzed by experienced survey technicians with final review and QA/QC performed by a Licensed Surveyor (LS). The LS will supervise a control network design that will be utilized to survey boundary monuments and control the project moving forward. Static GPS baselines, Total Station Traverses and Digital Level loop data are used in the adjustment process. GIS Surveyors personnel are experienced in A.L.T.A. surveys along with preparing other maps, exhibits, and reports that can be used to accurately disclose possible encroachments upon boundaries, rights-of-way, easements, environmental limits, and other sensitive areas at the project site. With the field monument survey data, office surveyors generate a variety of base maps incorporating boundary data, record data, topographic data, as-built data, project control, route surveying data and GIS databases along with other available datasets, including aerial orthophotos and underground utility findings. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 29 Topographic and Utility Surveys In most cases, topographic and utility survey data is collected at the same time as the boundary surveys. For longer projects, this step could include an aerial photogrammetric survey and field work by the survey crew would include QC and infill for data obscured by the aircraft. GIS Surveyors carries out small-scale and large-scale topographic and bathymetric surveys using a combination of total station, laser scanner, SONAR, GPS, aerial or mobile LiDAR and UAS technologies that best fit the client’s time and accuracy requirements. If required, aerial and mobile LiDAR surveys are carried out by several trusted subcontractors utilizing Global Navigation Satellite System (GNSS) control, but the data processing, classification and verification by ground survey QA/QC checks are completed in-house along with data infill provided by our in-house static LiDAR scanning procedures. In addition, some underground utilities are located and marked out by trusted subcontractors, but the survey and QA/QC of those marks are carried out in-house. Our in-house utilization of UAS imagery can provide a visual inspection of the utility mark-out for review in the office at a later date. Mapping Services Most mapping services begin once all the field data is collected and GIS Surveyors employs a team of highly skilled draftspersons adept at supplying electronic and paper deliverables for a wide variety of design sets, construction layouts, as-built plans, and exhibits. We utilize the latest versions of industry standard programs such as Civil 3D, PLS-CADD, Microstation, Trimble Business Center and Esri products. In-house GIS application development can also be implemented to provide further data analysis and accuracy assessment products required to satisfy each project’s needs. Easement Legal Description and Plats Preparation As the project progresses into final design stages, further easement perfection services may be required. GIS Surveyors has extensive experience in reviewing and interpreting deeds, record maps, instruments, and transfer documents to plot existing easements as well as preparing documents to establish new easements as necessary while adhering to City, County, State and Fede ral requirements. Once completed, the legal description exhibits can be utilized in property acquisitions, lot line adjustments, Parcel Map Waivers, street vacations/dedications, and court filings. Professional Recording Services If the need for a filed map or professional certification arises, GIS Surveyors is experienced in the execution and filing of Record of Survey maps, Corner Records, Tract Maps, Parcel Maps, street vacations/dedications, lot line adjustments, Parcel Map waivers, and related documents for compliance with the California State Subdivision Map Act requirements and other applicable codes and regulations. Each document will be stamped and signed, as necessary, as acting District Surveyor. Construction Staking As the design stage is completed and moves toward construction, the detailed survey planning from project inception will have established a reliable control network by which all construction requirements can be measured. GIS Surveyors has a vast wealth of experience in all aspects of construction staking including site/work limit staking, environmental staking, structure/footing location staking, rough/final grading and road staking, utility upgrades/new construction, structure deformation monitoring and as-built surveys/certifications. We routinely stake out proposed Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 30 improvements for job walk reviews, providing on-site survey support to re-locate features or collect additional survey data as required by the engineers on the job walk. Streamlined workflows can be established according to the City of Rancho Cucamonga’s needs for on-going reporting on things such as quantity and volume surveys to ensure compliance, measure progress or quantify import and export of materials. Our experienced crews can consult as required to meet needs on -demand with real-time office support as required. As-Built Drawings GIS Surveyors stands ready to complete as-built surveys and drawings shortly after construction, and even during the construction phase of the project. Accurate monitoring of construction sites for various parameters can be provided in clear and concise reporting as required by the project demands. Professional Engineers and Surveyors will review and provide comments for various engineering plans such as but not limited to street improvement plans, storm drain plans, grading plans, Water Quality Management Plans (WQMP), and hydrology reports. GIS Surveyors’ team approach has a proven track record of success in managing, recording, and analyzing complicated data sets and intricate specifications required to make large infrastructure projects a success. Monumentation/Restoration Surveys and Centerline Ties GIS Surveyors’ Survey Crews are regularly asked to conduct monument preservation activities so that monumentation can be reestablished in the event of damage or removal throughout the course of a project. GIS Surveyors ensures that any property corners that may be potentially damaged or destroyed during construction are properly tied out beforehand, so that the corners can be restored following construction, and that Corner Records and/or Records of Survey can be filed pursuant to State law. During this process, as with all deliverables, plan review comments shall be returned to the City of Rancho Cucamonga in an expedient manner. A standard delivery schedule should be no later than 3 weeks for the first plan review and 2 weeks for the second plan review. If a third plan review is needed, it should be revised and delivered in less than 1 week as standard practice. Creative Ideas for Accomplishing Project Objectives Alternative Solutions: Unmanned Aerial Systems - Approach and Utilization Benefits Our team proposes the provision of UAS 4K ortho rectified imagery along with Light Detection and Ranging (LiDAR) capabilities to better aid in data acquisition with dangerous or limited access sites. UAS provide an opportunity to collect aerial data with m inimal mobilization costs, a reduction in aviation liability, and more accurate data capture. These systems can fly lower, slower, and more deliberately to provide higher density data capture on assets, grades and vegetation. GIS Surveyors has a team of FAA Certified UAS Pilots whose primary responsibility is ensuring the safe and efficient operation of unmanned equipment. Furthermore, our UAS fleet meets industry standards to ensure appropriate data security and asset visibility along wit h the appropriate level of aviation insurance. UAS can provide significant cost savings purely based on logistics and it is highly efficient for emergency response, small jobs, as -builts, and response to weather events. UAS data capture is highly effective and can create dense LiDAR datasets for the purposes of 3D parts modelling, virtual reality integration, and as-built condition verification. Alternative Solutions: Terrestrial Scanning Services - Approach and Utilization Benefits Our team proposes the provision of Terrestrial Scanning Services to better aid in data acquisition. GIS Surveyors currently owns and operates the Trimble SX10 Scanning Total Station. This is a fully Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 31 functioning total station with the added advantage of being able to collect high density LiDAR point cloud data and photo panoramas without the need to register subsequent scans. The Trimble SX10 provides the ability to capture point clouds that are more spatially accurate than traditional airborne LiDAR datasets, and at a fraction of the time and expense. This piece of equipment can go wherever the Surveyor can go and can be set up in mere moments to capture scans as desired on assets and infrastructure. All GIS Surveyors’ Survey Crew members are trained and proficient in the use of the Trimble SX10. Following data capture in the field, GIS Surveyors’ office staff begin working on feature coding, ensuring that all data is coded correctly. Deliverables are then generated to coincide with project and client needs, ranging from a simple XYZ point file containing coded points, to a series of paper exhibits containing diagrams and profile views, to a full 3D model containing the entire point cloud. GIS Surveyors has learned that, once the point cloud data has been collected and coded, there is no limit to the extent that the resultant data can be utilized. GIS Surveyors takes safety very seriously and supports the premise that the most successful way of keeping personnel out of harm's way is by keeping a respectful distance from, and limiting the time of exposure to, potentially unsafe conditions. Both alternative solutions proposed herein helps with that premise. Our Needs from the City of Rancho Cucamonga GIS Surveyors will need the following from the City in order to effectively perform the services outlined in this RFP: • A single point of contact to work with our Project Manager on all survey -related requests. • Clear direction with regards to the required scope of work including sketches and other materials that illustrate said scope of work. • Project history or background that can help to develop a broader understanding of everything involved. • Access instructions for locations that may be enclosed in locked gates or other landowner issues. • Schedule expectations and priorities that need to be addressed at the beginning of the project. Quality Assurance Program Overview The objective of our Quality Control (QC) Plan is to ensure the highest levels of quality are being applied and followed for cost control, schedule adherence, services and products being delivered. We will implement and maintain a tailored QC Plan updated to address specific project elements upon assignment of a project or task order. Figure 2 outlines a team methodology for quality control. It shows how the basic concept of Plan - Perform-Control is refined through continual process improvement and staff training. It also outlines the overall quality planning, assurance and control methods that are employed to mitigate risk and deliver acceptable quality levels on overall performance objectives and deliverables. All deliverables will be prepared by one team member and checked by a second qualified team member that has not been involved in the initial preparation of the work. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 32 Copies of our Quality Management Plan can be provided upon request. Figure 2: Quality Control Plan Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B SURVEY AND MAPPING APPROACH #24/25-501 City of Rancho Cucamonga Various On-Call Services 5.1 Survey and Mapping Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 2 Technical Approach to Discipline 5.1 – Survey and Mapping This document describes GIS Surveyors’ general approach to the On-Call Survey and Mapping services requested by the City of Rancho Cucamonga. Participate in Field Meeting to Establish Scope and Design Parameters GIS Surveyors cultivates close working relationships with all parties associated with a project to encourage communication, efficiency, and safety awareness. GIS Surveyors’ Project Managers and Surveyors will establish points of contact, budget, scope requirements, safety guidelines, design constraints and other project parameters required to satisfy the specific needs of an assigned task. An onsite kick-off meeting could help address areas of concern while providing a chance for all stakeholders to collaborate and confer with developers, engineers, surveyors, and contractors involved with the City of Rancho Cucamonga project. Record Maps/Research Investigation into existing property boundaries becomes the backbone by which all future improvements will be based. GIS Surveyors personnel are experts at interpreting City, County and Public Land record maps, as well as legal descriptions, deeds, and patents. GIS Surveyors relies on its extensive years of industry experience to assess project requirements and determine what services will meet the needs of the project. Geographic Information Systems (GIS) are utilized to investigate existing land rights, easements, encumbrances, and other records research to develop a parcel layer database with detailed attributes. At this due diligence stage, all title report data will be reviewed and analyzed as required for dividing/merging properties, public and private land ownership delineation, easement review, public improvements/encroachments, construction, and recording historic information. The review by our Professional Land Surveyors in this stage ensures that the interpretation of work by others is sound and reliable and then the data can be compiled and relayed to the client in a comprehensive GIS based map for further project development of design parameters. Utility Research Mapping with Plan and Profile Support Additional research during this stage of the project includes investigating existing utility stakeholders in the project location. GIS Surveyors’ Survey Crews and Analysts compile available record information and sub-grade utility locating data into plan and profile drawings, incorporating stationing and depth cover/clearance with manhole and catch basin invert elevations to provide a comprehensive overview of design conflicts. All of the fieldwork needs detailed office review beforehand, so it’s important to start this early in the project. Control and Coordinate System Standards All survey tasks will be tied horizontally to the California Coordinate System of 1983 (NAD83), using the appropriate zone, and vertically to the North American Vertical Datum of 1988 (NAVD88), unless other control coordinates are provided by the City of Rancho Cucamonga. If the City of Rancho Cucamonga requires development of a continually-operating reference network, complete with GPS sensors that can monitor subsidence or deformation, the design of that network would be completed and approved in this stage. Control networks complete with aerial target layout could also be developed in this stage to address the needs of any aerial or unmanned aerial system (UAS) that may need to be utilized during the course of the project. GIS Surveyors will check the accuracy of provided control networks before utilizing it and provide all the necessary field notes, exhibits, Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 3 plats, documents and Civil 3D/AutoCAD files to memorialize the results in a comprehensive deliverable. Maintenance of a City-wide vertical and horizontal survey monument and benchmark catalog system will be executed through an intuitive GIS application custom tailored to help coordinate the City of Rancho Cucamonga’s surveying functions. Boundary and Right-of-way Surveys After research is complete, a site kick-off meeting and site safety plan is completed prior to starting the control, reconnaissance, and boundary monumentation surveys by our field crews. The field crews are supported by record research data and calculations, then the data is processed and analyzed by experienced survey technicians with final review and QA/QC performed by a Licensed Surveyor (LS). The LS will supervise a control network design that will be utilized to survey boundary monuments and control the project moving forward. Static GPS baselines, Total Station Traverses and Digital Level loop data are used in the adjustment process. GIS Surveyors personnel are experienced in A.L.T.A. surveys along with preparing other maps, exhibits, and reports that can be used to accurately disclose possible encroachments upon boundaries, rights-of-way, easements, environmental limits, and other sensitive areas at the project site. With the field monument survey data, office surveyors generate a variety of base maps incorporating boundary data, record data, topographic data, as-built data, project control, route surveying data and GIS databases along with other available datasets, including aerial orthophotos and underground utility findings. Topographic and Utility Surveys In most cases, topographic and utility survey data is collected at the same time as the boundary surveys. For longer projects, this step could include an aerial photogrammetric survey and field work by the survey crew would include QC and infill for data obscured by the aircraft. GIS Surveyors carries out small-scale and large-scale topographic and bathymetric surveys using a combination of total station, laser scanner, SONAR, GPS, aerial or mobile LiDAR and UAS technologies that best fit the client’s time and accuracy requirements. If required, aerial and mobile LiDAR surveys are carried out by several trusted subcontractors utilizing Global Navigation Satellite System (GNSS) control, but the data processing, classification and verification by ground survey QA/QC checks are completed in-house along with data infill provided by our in-house static LiDAR scanning procedures. In addition, some underground utilities are located and marked out by trusted subcontractors, but the survey and QA/QC of those marks are carried out in-house. Our in-house utilization of UAS imagery can provide a visual inspection of the utility mark-out for review in the office at a later date. Mapping Services Most mapping services begin once all the field data is collected and GIS Surveyors employs a team of highly skilled draftspersons adept at supplying electronic and paper deliverables for a wide variety of design sets, construction layouts, as-built plans, and exhibits. We utilize the latest versions of industry standard programs such as Civil 3D, PLS-CADD, Microstation, Trimble Business Center and Esri products. In-house GIS application development can also be implemented to provide further data analysis and accuracy assessment products required to satisfy each project’s needs. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 4 Easement Legal Description and Plats Preparation As the project progresses into final design stages, further easement perfection services may be required. GIS Surveyors has extensive experience in reviewing and interpreting deeds, record maps, instruments, and transfer documents to plot existing easements as well as preparing documents to establish new easements as necessary while adhering to City, County, State and Fede ral requirements. Once completed, the legal description exhibits can be utilized in property acquisitions, lot line adjustments, Parcel Map Waivers, street vacations/dedications, and court filings. Professional Recording Services If the need for a filed map or professional certification arises, GIS Surveyors is experienced in the execution and filing of Record of Survey maps, Corner Records, Tract Maps, Parcel Maps, street vacations/dedications, lot line adjustments, Parcel Map waivers, and related documents for compliance with the California State Subdivision Map Act requirements and other applicable codes and regulations. Each document will be stamped and signed, as necessary, as acting District Surveyor. Construction Staking As the design stage is completed and moves toward construction, the detailed survey planning from project inception will have established a reliable control network by which all construction requirements can be measured. GIS Surveyors has a vast wealth of experience in all aspects of construction staking including site/work limit staking, environmental staking, structure/footing location staking, rough/final grading and road staking, utility upgrades/new construction, structure deformation monitoring and as-built surveys/certifications. We routinely stake out proposed improvements for job walk reviews, providing on-site survey support to re-locate features or collect additional survey data as required by the engineers on the job walk. Streamlined workflows c an be established according to the City of Rancho Cucamonga’s needs for on-going reporting on things such as quantity and volume surveys to ensure compliance, measure progress or quantify import and export of materials. Our experienced crews can consult as required to meet needs on-demand with real-time office support as required. As-Built Drawings GIS Surveyors stands ready to complete as-built surveys and drawings shortly after construction, and even during the construction phase of the project. Accurate monitoring of construction sites for various parameters can be provided in clear and concise reporting as required by the project demands. Professional Engineers and Surveyors will review and provide comments for various engineering plans such as but not limited to street improvement plans, storm drain plans, grading plans, Water Quality Management Plans (WQMP), and hydrology reports. GIS Surveyors’ team approach has a proven track record of success in managing, recording, and analyzing complicated data sets and intricate specifications required to make large infrastructure projects a success. Monumentation/Restoration Surveys and Centerline Ties GIS Surveyors’ Survey Crews are regularly asked to conduct monument preservation activities so that monumentation can be reestablished in the event of damage or removal throughout the course of a project. GIS Surveyors ensures that any property corners that may be potentially damaged or destroyed during construction are properly tied out beforehand, so that the corners can be restored following construction, and that Corner Records and/or Records of Survey can be filed pursuant to State law. During this process, as with all deliverables, plan review comments shall be returned to Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 5 the City of Rancho Cucamonga in an expedient manner. A standard delivery schedule should be no later than 3 weeks for the first plan review and 2 weeks for the second plan review. If a third plan review is needed, it should be revised and delivered in less than 1 week as standard practice. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Request for Statement of Qualifications (SOQ) #24/25-501 for Various On-Call Services __________________________________________________________________________________________________ ____________________________________________________________________________________________________________ Page 23 of 30 “EXHIBIT A” CITY OF RANCHO CUCAMONGACONFLICT OF INTEREST/NON-DISCLOSURE STATEMENT It is the policy of the City of Rancho Cucamonga to prevent personal or organizational conflict of interest, or the appearance of such conflict of interest, in the award and administration of City Contracts, including, but not limited to Contracts for Professional Services Agreements (“PSA”) with potential Consultants. I do not have specific knowledge of confidential information regarding SOQ responses received in response to the Request for Statement of Qualifications (SOQ) #24/25-501 Various On-Call Services. I agree not to disclose or otherwise divulge any information pertaining to the contents, status, or ranking of any SOQ response to anyone. I understand the terms and "disclose or otherwise divulge" to include, but are not limited to, verbal conversations, written correspondence, reproduction of any part or any portion of any SOQ response, or removal of same from designated areas. I, the undersigned, hereby certify that the following statements are true and correct and that I understand and agree to be bound by commitments contained herein. ______________________________________ (Print Name) ______________________________________ (Relationship to the City) ______________________________________ (Relationship to the Consultant) ______________________________________ (Signature) ______________________________________ (Date) Exhibits are not to be included in your bid response. All referenced Exhibits must be submitted in Planet Bids system under the Response Types, Exhibits A – G. 01/02/2025 Dennis Rose, PLS None Director of Surveys Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Request for Statement of Qualifications (SOQ) #24/25-501 for Various On-Call Services __________________________________________________________________________________________________ ____________________________________________________________________________________________________________ Page 24 of 30 “EXHIBIT B, PROFESSIONAL SERVICES AGREEMENT EXCEPTIONS SUMMARY” Mark the appropriate choice, below: _____ Vendors accepts the PSA without exception. OR _____ Vendors proposes exceptions to the PSA. Summarize all exceptions on a separate document. Enclose a written summary of each change and title as “Exception Summary”, which shall include the Vendors’ rationale for proposing each such exception. Each exception must be labeled with the Section number in the PSA. Failure to properly reference exceptions in the submitted summary may deem the response as non-responsive. ___________________________________ Signature ___________________________________ Printed Name ___________________________________ Title ___________________________________ Date Exhibits are not to be included in your bid response. All referenced Exhibits must be submitted in Planet Bids system under the Response Types, Exhibits A – G. Dennis Rose, PLS Director of Surveys 01/02/2025 Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Request for Statement of Qualifications (SOQ) #24/25-501 for Various On-Call Services __________________________________________________________________________________________________ ____________________________________________________________________________________________________________ Page 25 of 30 “EXHIBIT C, ACKNOWLEDGMENT OF INSURANCE REQUIREMENTS AND CERTIFICATION OF ABILITY TO PROVIDE AND MAINTAIN COVERAGES SPECIFIED” I, _______________________________ the ______________________________________________ (President, Secretary, Manager, Owner or Representative) of __________________________________________________________________, certify that the (Name of Company, Corporation or Owner) Specifications and General Provisions regarding insurance requirements as stated within the Professional Services Agreement (PSA), for the Purchase Contract designated Request for Statement of Qualifications (“SOQ”) #24/25-501 for Various On-Call Services have been read and understood and that our Vendors is able to provide and maintain the coverage as specified in the PSA. Failure to provide said coverage, upon request to finalize the PSA prior to award shall be enough cause for immediate disqualification of award. Failure to maintain said coverage shall result in termination of the contract. ___________________________________ Signature ___________________________________ Printed Name ___________________________________ Title ___________________________________ Date Exhibits are not to be included in your bid response. All referenced Exhibits must be submitted in Planet Bids system under the Response Types, Exhibits A – G. Dennis Rose, PLS Director of Surveys GIS Surveyors Dennis Rose, PLS Director of Surveys 01/02/2025 Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Request for Statement of Qualifications (SOQ) #24/25-501 for Various On-Call Services __________________________________________________________________________________________________ ____________________________________________________________________________________________________________ Page 26 of 30 “EXHIBIT D” ADDENDUM ACKNOWLEDGEMENT The Consultants hereby acknowledges the following Addenda Number(s) to this SOQ have been received, if any. Consultants understands failure to acknowledge any addenda issued may cause the SOQ response to be considered non-responsive. It is the Consultants’ responsibility to log into the Bid System to identify and download the number of addenda that have been posted. • __________________ • __________________ • __________________ • __________________ ___________________________________ Signature ___________________________________ Printed Name ___________________________________ Title ___________________________________ Date Exhibits are not to be included in your bid response. All referenced Exhibits must be submitted in Planet Bids system under the Response Types, Exhibits A – G. Addendum No. 001 Dennis Rose, PLS Director of Surveys 01/02/2025 Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Request for Statement of Qualifications (SOQ) #24/25-501 for Various On-Call Services __________________________________________________________________________________________________ ____________________________________________________________________________________________________________ Page 27 of 30 “EXHIBIT E DEBARMENT and SUSPENSION CERTIFICATION FORM I certify that neither _____________________________ (Consultant) nor any of its proposed subcontractors are not currently listed on the governmentwide exclusions in the System for Award Management (SAM), in accordance with the guidelines under 2 CFR 200 that implement Executive Orders 12549 (3 CFR part 1986 Comp., p. 189) and 12689 (3 CFR part 1989 Comp., p. 235), and that neither Consultant nor any of its proposed subcontractors are tax delinquent with the State of California. I acknowledge that if Consultants or any of its subcontractors subsequently are placed under suspension or debarment by a local, state or federal government entity, or if Consultants or any of its subcontractors subsequently become delinquent in California taxes, our Proposal will be disqualified. ___________________________________ Signature ___________________________________ Printed Name ___________________________________ Title ___________________________________ Date Exhibits are not to be included in your bid response. All referenced Exhibits must be submitted in Planet Bids system under the Response Types, Exhibits A – G. GIS Surveyors Dennis Rose, PLS Director of Surveys 01/02/2025 Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Request for Statement of Qualifications (SOQ) #24/25-501 for Various On-Call Services __________________________________________________________________________________________________ ____________________________________________________________________________________________________________ Page 28 of 30 “EXHIBIT F, PARTICIPATION CLAUSE” It is hereby understood that other government entities, such as cities, counties, and special/school districts may utilize this RFP response at their option for equipment or services at the RFP response price for a period of ________ days. Said entities shall have the option to participate in any award made because of this solicitation. Any such piggy-back awards will be made independently by each agency, and the city is not an agent, partner or representative of these agencies and is not obligated or liable for any action of debts that may arise out of such independently negotiated piggy-back procurement. Each public agency shall accept sole responsibility of its own order placement and payments of the Vendors. Successful Vendors will extend prices as proposed herein to other governmental agencies, please specify. YES __________ NO _________ Exhibits are not to be included in your bid response. All referenced Exhibits must be submitted in Planet Bids system under the Response Types, Exhibits A – G. 300 Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Request for Statement of Qualifications (SOQ) #24/25-501 for Various On-Call Services __________________________________________________________________________________________________ ____________________________________________________________________________________________________________ Page 29 of 30 “EXHIBIT G” SIGNATURE OF AUTHORITY The undersigned firm declares that he has carefully examined the specifications and read the above terms and conditions, and hereby proposes and agrees, if this SOQ response is accepted, to furnish all material in accordance with the specifications and instructions, in the time and manner therein prescribed for the unit cost amounts set forth in the following SOQ response. THE CONSULTANTS IN SUBMITTING THIS SOQ RESPONSE MUST FILL IN THE FOLLOWING INFORMATION. FAILURE TO DO SO MAY DEEM YOUR SOQ RESPONSE AS NON-RESPONSIVE. Company Name: Address: (Street, Su. # City, State, Zip) Telephone #: Fax #: E-mail address: Web Address: Authorized Representative: (print) Title: Signature: Date: Exhibits are not to be included in your bid response. All referenced Exhibits must be submitted in Planet Bids system under the Response Types, Exhibits A – G. GIS Surveyors 858-679-1732 N/A drose@gissurveyors.com Dennis Rose, PLS Director of Surveys www.gissurveyors.com 10911 Technology PlaceSan DiegoCA 92127 01/02/2025 Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PSA with professional liability insurance (Design) Last Revised: 01/11/2018 Page 16 EXHIBIT B CONSULTANT PROPOSAL Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B STATEMENT OF QUALIFICATIONS #24/25-501 City of Rancho Cucamonga Various On-Call Services 5.1 Survey and Mapping Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B FEE SCHEDULE CITY OF RANCHO CUCAMONGA ON-CALL SURVEY AND MAPPING FISCAL YEARS 2025/26 TO 2029/30 Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B 1 Fee Schedule – City of Rancho Cucamonga Surveying Hourly Rates – Standard Wage Role Rate Three Man Survey Crew $392.00 Two Man Survey Crew $285.00 One Man Survey Crew $232.00 Survey Principal $239.00 Licensed Land Surveyor $232.00 Project Survey Manager $209.00 Project Surveyor $197.00 Senior Survey Technician $170.00 Survey Technician $150.00 CADD Drafter $140.00 Administrative Assistant $95.00 Travel $285.00 Surveying Hourly Rates – Prevailing Wage DIR Number: 2000001573 Role Rate Three Man Survey Crew $596.00 Two Man Survey Crew $423.00 One Man Survey Crew $285.00 Survey Principal $239.00 Licensed Land Surveyor $232.00 Project Survey Manager $209.00 Project Surveyor $197.00 Senior Survey Technician $170.00 Survey Technician $150.00 CADD Drafter $140.00 Administrative Assistant $95.00 Travel (non-prevailing) $285.00 Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B 2 Utility Locating Hourly Rates – Standard Wage Role Rate Locating Technician (one person field crew) $232.00 Two Person Locating Crew (Tech & Flagger) $285.00 Utility Research Technician $140.00 Utility Mapping (as-built plans & locates) $150.00 Travel $285.00 Utility Locating Hourly Rates – Prevailing Wage DIR Number: 2000001573 Role Rate Locating Technician (one person field crew) $285.00 Two Person Locating Crew (Tech & Flagger) $423.00 Utility Research Technician $140.00 Utility Mapping (as-built plans & locates) $150.00 Travel (non-prevailing) $245.00 GIS/Lidar Services Hourly Rates Role Rate GIS/Lidar Principal $239.00 GIS/Lidar Project Manager $209.00 GIS Database Administrator $203.00 Senior GIS Specialist $180.00 GIS Specialist $157.00 GIS/Lidar Analyst $134.00 GIS/Lidar Technician $110.00 Additional Billing Requirements Item Cost Preliminary Title Report (pass-through) $2,250.00/parcel Overtime Multiply the above hourly rates by 1.3x for overtime rates. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 2 Table of Contents 1. Cover Letter .......................................................................................................................... 3 2. Executive Summary .............................................................................................................. 4 3. Firm Experience/Qualifications ............................................................................................. 5 4. Third-Party/Subcontractors ................................................................................................. 14 5. Staff Resumes and Organization Chart ................................................................................ 14 6. Project Management Approach ........................................................................................... 25 Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 3 1. Cover Letter City of Rancho Cucamonga Purchasing Division 10500 Civic Center Drive Rancho Cucamonga, CA 91730 January 13, 2025 Subject: Statement of Qualifications (SOQ) for Various On-Call Services, 5.1 Survey and Mapping Attention: Marlena Perez, Principal Engineer Dear Ms. Perez, GIS Surveyors is delighted to present this SOQ in response to the RFP for Various On-Call Services for discipline 5.1 Survey and Mapping. GIS Surveyors takes pride in being a high-performing Service- Disabled Veteran-Owned Company and Small Business for Public Works (DVBE/SB-PW certification #1753051) recognized by the California Department of General Services. Specializing in geospatial services, we excel in land surveying, GIS, and LiDAR functions, with a n 11-year track record of successfully executing these tasks for various entities, including cities, counties, commercial clients, and investor-owned utilities across California. GIS Surveyors is an employee-owned business. The dedicated contact person for this proposal is Ms. Amy Parker, Proposals Manager, her contact details are below: Address: GIS Surveyors, Inc., HQ Office, 10911 Technology Place, San Diego, CA 92127 Office: (858) 679-1732 Cell: (936) 235-5462 E-mail: aparker@gissurveyors.com Our Proposal provides a comprehensive overview of how GIS Surveyors can assist the City of Rancho Cucamonga in fulfilling its survey and mapping needs. It details the methods we will employ, outlining the expected processes and outcomes. Your thoughtful consideration is valued, and we are ready to address any inquiries you may have regarding our approach. Sincerely, Dennis Rose, PLS – Director of Surveys Office: (858) 679-1732 Cell: (949) 310-1802 E-mail: drose@gissurveyors.com Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 4 2. Executive Summary GIS Surveyors was founded with the vision of seamlessly integrating Land Surveying with Geographic Information Systems (GIS), Utility Locating, and LiDAR services, establishing itself as a comprehensive geospatial solutions provider. Originally operating as Paul Loska Land Surveying, the company was established in 2002 by our CEO Paul Loska. In 2013, it rebranded to expand its scope, offering a full suite of geospatial services under one roof. For this opportunity, GIS Surveyors is proposing on the 5.1 Survey and Mapping discipline. Headquartered in San Diego, California, GIS Surveyors serves clients across the state. A secondary office in Yorba Linda , Orange County, strategically positions us to efficiently manage projects within the City of Rancho Cucamonga service area. With a short travel time of approximately 35 minutes to city facilities, our team can be extremely responsive to survey requests, typically mobilizing a survey crew within 48 hours of receiving notice to proceed. We specialize in boundary surveys, construction staking, topographic surveys, as-built surveys, right-of-way engineering, legal descriptions, and utility research and mapping. GIS Surveyors holds as-needed contracts with various entities, including local municipalities, water districts, utilities, and the federal government. We have provided on-call surveying services to a variety of California municipalities including but not limited to the cities of Buena Park, Escondido, Glendora, Poway, Thousand Oaks, San Diego and Yorba Linda. GIS Surveyors features on the on-call surveying list for approximately 25 Southern California municipalities. A selection of relevant project references in this proposal highlights our versatility and experience. Furthermore, GIS Surveyors has been providing land survey support to various California utility companies since its inception in 2013. We currently hold on-call land surveying contracts with San Diego Gas and Electric, Southern California Gas and Southern California Edison where we have completed hundreds of surveying tasks. With a team of 74 professionals, including 10 survey crews, 3 licensed Professional Land Surveyors (PLS), 4 Land Surveyors in Training (LSIT), and 2 FAA-certified Unmanned Aerial Systems (UAS) pilots, GIS Surveyors is equipped to handle diverse geospatial requirements. This proposal outlines our approach to on-call land surveying, focusing on both project management and technical methodologies. Additionally, it provides an overview of our QA/QC process. GIS Surveyors prioritizes safety above all, boasting a flawless safety record throughout its years of operation. The company empowers all employees with stop work authority, fostering a proactive safety culture that addresses unsafe conditions promptly. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 5 3. Firm Experience/Qualifications Company Information Full Legal Name: Limitless Solutions Group dba GIS Surveyors, Inc. HQ Address: 10911 Technology Place, San Diego, CA 92127 Local Office Address: 22875 Savi Ranch Parkway, Suite A, Yorba Linda, CA 92887 Type of Organization: S-Corporation Date of Company Formation: April 9, 2013 Website: www.gissurveyors.com Representative Projects GIS Surveyors is well versed in providing on-call surveys for a variety of different clients. We have the expertise, experience, and equipment to provide high-quality, efficient services to meet City of Rancho Cucamonga objectives. A list of our on-call contracts, including those with other California municipalities, can be found below: • City of Yorba Linda - On-Call Land Surveying • City of San Diego (Sub to Dudek) - As-Needed Watershed and Resource Consulting • City/County/Port of San Diego - On-Call Survey (Rotational List) • City of San Diego - As-Needed Land Surveying, Mapping and Digitizing Services • City of Lake Forest - As-Needed Surveying, Mapping and Right-of-Way Engineering • City of Stanton - On-Call Land Surveying • City of Buena Park - On-Call Land Surveying • City of Cathedral City - As-Needed Land Surveying • City of Chino Hills - On-Call Land Surveying • City of Hemet - On-Call Land Surveying • City of Escondido - On-Call Land Surveying • City of Thousand Oaks – On-Call Land Surveying • City of Santa Ana Parks and Facilities (Sub to JS&TM) – On-Call Surveying • City of Pacifica Public Works Wastewater Division - On-Call Surveying Services • Santa Ana Watershed Project Authority – On-Call Surveying for the Brine Line • Metropolitan Water District of Southern California - Land Surveying, Mapping, and Aerial Mapping On-Call Services • Rincon Del Diablo Municipal Water District – On-Call Land Surveying • Rainbow Municipal Water District - On-Call Land Surveying • Housing Authority of the City of Los Angeles - On-Call Property Surveys • San Bernardino County Project and Facilities Management – On-Call Surveying • Los Angeles County Public Works Department - On-Call Surveying and Related Services • Los Angeles County (Sub to SALT Landscape Architects) - On-Call Survey and Mapping • Los Angeles County (Sub to Citadel) - On-Call PM/CM/Survey Services • California High Speed Rail Authority (Sub to HKA Engineering and O’Dell Engineering) - Right- of-Way Engineering and Survey Support Services • Southern California Gas (SCG) - On-Call Survey (Pipeline Safety Enhancement Program) • San Diego Gas and Electric (SDG&E) - On-Call Survey Contract • San Diego Gas and Electric (SDG&E) - Major Projects On-Call Mapping • Southern California Edison (SCE) - On-Call Survey • US Army Corps of Engineers - Medical Facilities Architect On-Call Mapping Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 6 GIS Surveyors holds over 25 as-needed surveying contracts with various entities, including local municipalities, water districts, utilities, and the federal government. Relevant project examples are described below: City of Escondido – Dam Monitoring Project Dates: February 2023 to Present (Ongoing) Client: City of Escondido Contact: Julie Procopio, P.E. - City Engineer, jprocopio@escondido.org, 760-839-4001 Location: Escondido, California Value: $119,103.40 Contract Type: On-Call Project Description: GIS Surveyors has been tasked with performing bi-monthly monitoring campaigns at Lake Wohlford Dam and Lake Dixon Dam in the City of Escondido, CA. A Trimble SX10 total station is used to accurately survey the horizontal locations of the monitoring points along the top of each of these dams then a Trimble DiNi digital level is utilized to detect any vertical deformations. Data is compiled & processed in Trimble Business Center and the results added to the City’s spreadsheet. Monitoring is also required within 48hrs of any earthquake felt in the area. Relevance to Scope of Work • Dam Monitoring • Survey Control • Change Detection • QA/QC Key Personnel and Role Dennis Rose, PLS – Professional Land Surveyor Marshall Blackbourn – Survey Manager Napoleon Corpuz, LSIT – Office Operations Manager Gavin McKellar – Field Operations Manager Erik Eilers, LSIT – Project Surveyor Mark Steele – Survey Office Technician Bryan Lambie – Party Chief Anthony Aviles - Chief of Parties Rachel Lambie - Chainman Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 7 City of Glendora – Survey Support for South Hills Bike Park Dates: November 2023 Client: City of Glendora Contact: Maliha Fatima Ansari, PE - Principal Civil Engineer, 626-914-8294, mansari@cityofglendora.org Location: South Hills Bike Park, Glendora, Los Angeles County, California Value: $62,971.00 Contract Type: On-Call Project Description: GIS Surveyors established onsite survey control along with researching record maps and documents, then located boundary monuments for the parcels of land spanning the project location. The 24 parcels in total were in the vicinity of the South Hills Wilderness Area and required accurate data on various tree species across the project site. The record data and found survey monuments were used in the preparation of a survey basemap showing existing parcel lines within the area in question. This data was used to determine if any additional easements are required along the bike path. Additionally, GIS Surveyors conducted a topographic survey captured via aerial photogrammetry, encompassing the entire area of interest. The aerial survey included details for all the existing improvements in the project area along with a detailed topograp hic surface or digital terrain model (DTM) which will aid in the design of future improvements. The aerial data collection was tied to existing survey control with a series of aerial targets and once the data was processed and mapped the field crew returned for a site inspection to augment any missing or inaccurate information. All survey data and office research was reviewed, reduced, and compiled into an AutoCAD Civil 3D DWG file for delivery. This data aids the city to produce a plan as they move this project forward into Phase 2 over the months that followed. Relevance to Scope of Work • Survey Control • Record Research • Locating Boundary Monuments • Topographic Survey • Aerial Data Collection and Processing • Data Processing and Mapping Key Personnel and Role Dennis Rose, PLS – Professional Land Surveyor Napoleon Corpuz, LSIT – Office Operations Manager Gavin McKellar – Field Operations Manager Anthony Aviles - Chief of Parties Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 8 City of Glendora – Survey Support for North Glendora Avenue Improvements Dates: December 2022 Client: City of Glendora Contact: Maliha Fatima Ansari, PE - Principal Civil Engineer, 626-914-8294, mansari@cityofglendora.org Location: North Glendora Avenue (North of Sierra Madre Avenue), Glendora, California Value: $10,960.00 Contract Type: On-Call GIS Surveyors established project control points and performed a ground-based, topographic right- of-way survey for the area along Glendora Avenue north of Sierra Madre Avenue in the city of Glendora, California. This project included topographic and bounda ry surveys along with an analysis of the County of Los Angeles record maps, which together helped to establish the limits of the right - of-way for Glendora Avenue up to the driveway area for 773 N. Glendora Avenue. The survey control was established through a network of GPS observations with reference to Continuous Operating Stations (CORs) and other found survey monuments in and adjacent to the project area. The survey crew then collected sufficient improvements withing the documented limits of the public right-of-way including, but not limited to all existing sidewalks, curb ramps, cross gutters, spandrels, drive approaches, utility boxes, manholes, valves, power poles, traffic signals, cabinets, fire hydrants, trees, signing and striping. Once fieldwork was completed, the survey data was processed, reviewed, and mapped in robust detail with AutoCAD Civil3D format and PDF and in hardcopy format. The deliverable involved a high level of boundary analysis to provide a “best fit” solution of the existing record maps and their relationships to the existing survey monuments found during the field survey. This included resolving the relationship between several different tract and parcel maps along with records of survey and corner records that provided a pedigree for the lines in question. A final map enabled the client to review and complete a comprehensive plan to improve based upon the existing conditions and various owner and city rights in existence at the time of survey. Relevance to Scope of Work • Project Control • Topographic Survey • Right of Way Survey • Boundary Analysis • Corner Records • Office Calculations • Map Deliverables Key Personnel and Role Dennis Rose, PLS – Professional Land Surveyor Napoleon Corpuz, LSIT – Office Operations Manager Gavin McKellar – Field Operations Manager Anthony Aviles - Chief of Parties Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 9 City of Buena Park – Topographic Survey for Ball Road Loop Project Dates: August 2022 Client: City of Buena Park Contact: Jason Tran, EIT - Assistant Engineer, 714-562-3680, jasontran@buenapark.com Location: Intersection of Ball Road and Valley View Street, Buena Park, Orange County, California Value: $9,988.50 Contract Type: On-Call GIS Surveyors was hired to provide a topographic survey at 25-foot intervals and a minimum of 10 feet beyond the existing curb radius including but not limited to CL, EG, TC, FL and BW for the Ball Road Loop Project in the city of Buena Park, California. The topographic mapping included all existing sidewalks, curb ramps, cross gutters, spandrels, drive approaches, utility boxes, manholes, valves, power poles, traffic signals, cabinets, fire hydrants, trees, signing and striping along with various other visible features within the right-of-way. To complete the survey, GIS Surveyors deployed an aerial team to conduct an orthometric survey of the project location, utilizing a combination of aerial imagery and lidar to complete a three - dimensional representation of the project site. Although “boots on the ground” may seem like a more cost-effective method for a small job, this job involved detailing a very busy intersection in Orange County California. By keeping our “boots” out of the right of way, GIS Surveyors could keep our valuable human resources out of harm’s way while still providing a high level of detail across the entire project area. All of this data was tied to the city benchmark and datum through the use of various aerial targets set with survey grade coordinates. Upon completion of the aerial data processing, a field crew was deployed to verify the aerial data on the ground along with providing a full, 360-degree video of the site from ground perspective. This value added item allows for the maximum coverage of all visual details by both the office surveyors and the end client, which saved time in addressing any questions during review. Relevance to Scope of Work • Topographic Survey and Mapping • Orthometric Survey • Setting Aerial Survey Targets • Aerial Data Collection and Processing Key Personnel and Role Dennis Rose, PLS – Professional Land Surveyor Napoleon Corpuz, LSIT – Office Operations Manager Gavin McKellar – Field Operations Manager Erik Eilers, LSIT – Project Surveyor Anthony Aviles - Chief of Parties Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 10 City of Yorba Linda – Equestrian Trail Segment 4 Dates: February 2022 to November 2022 Client: City of Yorba Linda Contact: Regina Hu, PE, QSD – Principal Civil Engineer, rhu@yorbalindaca.gov - 714-961-7174 Location: Yorba Linda, Orange County, California Value: $10,475.00 Contract Type: On-Call Project Description: This project consisted of land records research and boundary surveys to establish the limits of various equestrian easements for the city of Yorba Linda. With the limits of the easements staked in the field, city officials were able to make determinations of encroachments and other factors that have caused the trails to be un-usable over the years. GIS Surveyors conducted record map research to locate the limits of each easement shown on various tract and parcel maps on file with the county of Orange. Once the records research was completed, GIS Surveyors provided the preliminary data to the city for their determination of what easements needed to be staked in the field for review by the city officials. Then GIS Surveyors conducted field surveys to recover and survey various survey monuments shown on the recorded maps to establish a comprehensive base map of all the maps associated with the equestrian trail easements. While the crew was out there, they also surveyed the existing fences and walls that fell along the limits of the easements. The field data was compiled in the office and the results were reflected in the base map with dimensions illustrating the geospatial relationship between the easements and the adjacent or encroaching walls. A final site walk was conducted with the city officials and GIS Surveyors placed wooded stakes at the locations of the easements of concern. This gave the city officials a clear understanding of what issues need to be resolved in order to make the equestrian trail a more viable recreational option for the residents of Yorba Linda. Relevance to Scope of Work • Land Records Research • Boundary Surveys • Construction Staking • Basemapping • Office Calculations Analysis Key Personnel and Role Dennis Rose, PLS – Professional Land Surveyor Napoleon Corpuz, LSIT – Office Operations Manager Gavin McKellar – Field Operations Manager Erik Eilers, LSIT – Project Surveyor Anthony Aviles - Chief of Parties Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 11 Elsinore Valley Municipal Water District (EVMWD) - Annual Dam Survey Dates: October 2020, 2021, 2022, 2023 and 2024 Client: Elsinore Valley Municipal Water District (EVMWD) as a subcontractor to Dudek Contact: Charles Greely, Principal – Dudek - 760-601-3411 - cgreely@dudek.com Location: Lake Elsinore, California Value: $20,000.00 per annum Contract Type: On-Call Project Description: EVMWD owns and operates two water storage dams. These dams are Railroad Canyon Dam and Lee Lake Dam. It is required by the Division of Safety of Dams (DSOD) that both dams are surveyed each year to monitor deformation and other monitoring data that must b e submitted in addition to the survey results. GIS Surveyors was awarded the work to conduct the annual dam monitoring survey with Dudek as the prime in charge of the final engineering reports. GIS Surveyors conducted trigonometric leveling as well as digital level loops to verify both horizontal and vertical values at the highest level of accuracy possible. In the case of the Railroad Canyon Dam, a small boat was utilized to access the spillway to the top of the dam where four existing monuments needed to be measured. After the data was collected it was analyzed in Trimble Business Center for QA/QC and the final data was exported into a tabulated report. The report was reviewed and added as part of the annual dam survey report provided by Dudek to the water district. Relevance to Scope of Work • Dam Monitoring • Elevation survey • Precision leveling • Survey control • Change detection • Data correction • QA/QC Key Personnel and Role Dennis Rose, PLS – Professional Land Surveyor Napoleon Corpuz, LSIT – Office Operations Manager Gavin McKellar – Field Operations Manager Erik Eilers, LSIT – Project Surveyor Anthony Aviles - Chief of Parties Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 12 Santa Margarita Water District 350 Zone Modifications Phases I & II Dates: June 2023 Client: Santa Margarita Water District as a subcontractor to Dudek Contact: Ian Crano, Senior Engineer – Dudek – 760-479-4163 – icrano@dudek.com Location: San Juan Capistrano, California Value: $36,940.95 Contract Type: Lump Sum Project Description: GIS Surveyors was contracted to perform a topographic and boundary/Right- of-Way (ROW) survey of various sites in San Juan Capistrano, CA to enable the design and replacement of approximately 3,300’ of underground water distribution infrastructure. GIS Surveyors conducted record map research with the County of Orange to locate the ROW limits associated with the alignment in question, which consisted primarily of residential streets. GIS Surveyors then conducted field boundary surveys to recover various survey monuments shown on the recorded maps to establish a comprehensive basemap of all ROW lines of interest. GIS Surveyors then conducted a thorough topographic survey within the alignment ROW to collect curb flowlines, back of walk, top of curbs, AC lips, roadway centerlines and curve apexes, driveway depressions, grade breaks, visible surface utilities and vegetation. Addit ionally, gravity flow inverts on manholes and storm drains were collected. The field data was compiled in the office and the results were reflected in the base map with dimensions illustrating the geospatial relationship between the public ROW and the associated topographic features. A final site walk was conducted to ensure that nothing of substance was overlooked. This gave the Client a clear understanding of what issues need to be resolved in order to make infrastructure improvements for the benefit of the residents of San Juan Capistrano. Deliverables were prepared in AutoCAD Civil 3D per the client request, however, GIS Surveyors’ staff have the ability create deliverables in an array of software platforms, including Bentley Microstation suite. Relevance to Scope of Work • Topographic Survey • Boundary/ROW Survey • Basemapping • QA/QC Key Personnel and Role Dennis Rose, PLS – Professional Land Surveyor Marshall Blackbourn – Survey Manager Napoleon Corpuz, LSIT – Office Operations Manager Gavin McKellar – Field Operations Manager Erik Eilers, LSIT – Project Surveyor Anthony Aviles - Chief of Parties Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 13 San Diego Gas and Electric (SDG&E) - Line 1600 Pipeline Replacement Project Dates: December 2018 to August 2024 Client: SDG&E as a subcontractor to Spec Services Contact: Chris Smart - Pipeline Division Manager, csmart@specservices.com, 714-963-8077 Location: Throughout San Diego County, California Value: $3,100,000.00 Contract Type: On-Call Project Description: GIS Surveyors was awarded the work to support Spec Services with their Client, SDG&E. The project involves a 16” natural gas transmission pipeline labeled Line 1600 (L1600) that extends for approximately 45 miles throughout San Diego County. The aim of this program is to either replace the existing natural gas pipeline or hydrotest the gas line for safety compliance. GIS Surveyors is responsible for mapping approximately 33 miles that includes right -of- way determination, easement plotting and staking, utility sweeps, and collecting and providing topographic data. Field survey crews searched for and located control monuments to aid in right-of-way and boundary determination, which allowed for development of plat and legal descriptions for new improvements and easements. With GIS Surveyors’ extensive background in right-of-way determination, easements, and utility surveying the company delivers professional surveying services that provide not only reliable information to the client, but continually deliver within the expedited design schedule set by SDG&E. The quantity of survey work to be completed on a project of this scale can typically take at least one year to complete, but because of GIS Surveyors’ commitment to our clients and professional background, we were able to complete the Phase One survey tasks in almost half the time, as well as managing and completing various change orders beyond the original scope of work. Relevance to Scope of Work • Basemapping • Right-of-way determination • Utility surveying • Construction staking • QA/QC of topographic data and exhibits • Collection of utility appurtenances • Review of easement documents • Easement plotting and staking • Pipeline Safety Enhancement Program (PSEP) standards • Land services support Key Personnel and Role Dennis Rose, PLS – Professional Land Surveyor Erik Eilers, LSIT – Project Surveyor Marshall Blackbourn – Survey Manager Mark Steele – Survey Office Technician Napoleon Corpuz, LSIT – Office Operations Manager Bryan Lambie – Party Chief Gavin McKellar – Field Operations Manager Anthony Aviles - Chief of Parties Brandon Ragone - Utility Locating Manager Rachel Lambie - Chainman Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 14 4. Third-Party/Subcontractors GIS Surveyors can complete the entire scope of work in-house and as a result will not be using any subcontractors. 5. Staff Resumes and Organization Chart Marshall Blackbourn* Survey Manager Dennis Rose, PLS* Director of Surveys/ Professional Land Surveyor KEY * Key Personnel Principal in Charge Primary Point of Contact Survey Office Staff Ryan Forest, PLS – Senior Surveyor Mick Powers, PLS – Senior Surveyor Hank Hanson, LSIT – Project Surveyor Eric Holmes, LSIT – Project Surveyor Erik Eilers, LSIT – Project Surveyor* William Patrick, LSIT – Sr. Survey Office Technician Mason Saitman - Sr. Survey Office Technician Mark Steele – Survey Office Technician*Survey Chainman Dwight Sotto - Chainman Rachel Lambie – Chainman Justis Allen - Chainman Nathan Ziobro - Chainman Andrew McCurdy - Chainman Survey Party Chief Anthony Aviles – Chief of Parties* Bryan Lambie – Party Chief Wayne Cox – Party Chief Chris Allen – Party Chief Tyler Southard – Jr. Party Chief Samuel Greaves - Jr. Party Chief Utility Locators Brandon Ragone – Utility Locating Mgr* Ben Deweese - Utility Designator Napoleon Corpuz, LSIT* Office Operations Manager Gavin McKellar* Field Operations Manager Paul Loska Jr, PE* Director of Operations/ Professional Engineer Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B DENNIS ROSE, PLS Director of Surveys/Professional Land Surveyor Education: Southwest Missouri State University: Computer Info Sys (CIS) Santiago Canyon College: Land Surveying Training Coursework University of California Los Angeles (UCLA): Management Development for Entrepreneurs (MDE) Program Professional Licenses and Certifications: Professional Land Surveyor (PLS) California No. 9045 (2013) CPR First Aid Training Professional Affiliations: California Land Surveyors Association (CLSA) Total Years of Experience: 22 Years with Firm: 9 Relevant Experience City of Yorba Linda, Equestrian Trail Segment 4, Yorba Linda, CA Professional Land Surveyor. Responsible for overseeing and providing professional land surveyor oversight to this project that consisted of land records research and boundary surveys to establish the limits of various equestrian easements for the city of Yorba Linda. City of Buena Park, Ball Road Loop Project, Buena Park, CA Professional Land Surveyor. Responsible for overseeing and providing professional land surveyor oversight to this project that consists of topographic mapping for a waterline replacement project for the City of Buena Park. San Diego Unified Port District, Austal Floating Dry Dock Survey Services (as a subcontractor to Moffatt and Nichol), National City, CA (2022) Professional Land Surveyor. Responsible for providing professional land surveyor oversight and review/sign off on all deliverables for the Austal Floating Dry Dock project. Mr. Rose and his team utilized existing tidal benchmarks and survey control provided by the client to provide topographic survey and utility locating services according to the applicable scope of work and guidelines required for completion of a grading plan for site improvements. San Diego Unified Port District, TAMT, Phase 3 Electrical Survey Services (as a subcontractor to Moffatt and Nichol), San Diego, CA (2021) Professional Land Surveyor. GIS Surveyors’ field crews completed a topo survey at the 10th Avenue Marine Terminal in support of the TAMT Phase 3 project. The scope of work for this project involved a topographic survey along a roughly 100-foot wide corridor centered on the proposed alignment of updated electrical conduits. All surface features were collected and mapped. Mr. Rose provided professional land surveyor oversight, final QA/QC, and was responsible for signing off on all deliverables. On-Call Survey and Mapping Services, SDG&E, San Diego, CA Survey Manager. GIS Surveyors Inc. was awarded an on-call survey and mapping contract with SDG&E Civil Group that covers the entire SDG&E transmission and distribution service territories. Mr. Rose, as Survey Manager, was responsible for managing SAG surveys, GPS Control, construction staking, environmental staking, boundary surveys, topographic surveys and yard staking on various tie lines and other SDG&E facilities. Biography Mr. Rose has over 22 years of experience in the survey industry and is a California licensed Professional Land Surveyor (PLS). As Director of Surveys, Mr. Rose assumes a multifaceted role that spans various crucial responsibilities. His adept leadership involves orchestrating daily business activities with precision and efficiency. Strategic planning is another cornerstone of Mr. Rose's role. His forward-thinking approach contributes to the development of robust strategies that align with the company's overarching goals and industry trends. He has established a framework that fosters operational excellence and complies with industry standards. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B MARSHALL BLACKBOURN Survey Manager Education: B.S. Agricultural Engineering Technology & Business Mississippi State University Starkville, MS Online Certificate – Hydrographic Academy Plymouth University Plymouth, England LS Exam Review Course Santiago Canyon College Orange County, CA Professional Licenses and Certifications: FAA Certified Remote Pilot Operator – Unmanned Aerial Systems (UAS) Total Years of Experience: 18 years Years with the Firm: 4 years Relevant Experience Project Manager - San Diego Gas and Electric (SDG&E) Mobile Home Park Utility Upgrade Program, San Diego and Orange Counties GIS Surveyors provided underground utilities locating and basemapping services, implementing both fixed-wing and drone aerial platforms for photogrammetry collection. Services included project control and flight planning, airborne data acquisition, project site walk and feature verification, and comprehensive basemapping. Marshall managed all aspects of this program. Project Manager - SoCalGas On-Call Surveys, San Diego, Orange and Riverside Counties GIS Surveyors is currently providing basemapping, utility mapping, land services support, construction staking and as-built surveys, while adhering to current PSEP standards. Fixed-wing and drone aerial photogrammetry collection supplements these efforts. Marshall manages all aspects of these on-call surveys, with focus on client satisfaction and data integrity. Survey QA Manager - San Diego Gas and Electric (SDG&E) System Wide LiDAR Mapping, San Diego and Imperial Counties GIS Surveyors is currently provided system wide LiDAR Mapping and PLS- CADD modeling for approximately 2000 miles of transmission lines and 6600 miles of distribution lines for the entire SDG&E overhead network. Services included establishing survey control, QA/QC surveys, LiDAR data verification, GIS asset inventory mapping, PLS CADD modeling, vegetation analysis, project management and QA/QC review and verification of the PLS CADD models. Marshall’s role is primarily focused on managing the collection of survey data for LiDAR data verification and QC. Project Surveyor - Barnard Construction West of Devers Edison Electrical Transmission Line Project, Riverside and San Bernardino Counties GIS Surveyors is provided construction support services for the entire 50- mile alignment. Services include office construction calculations, construction staking for poles, towers, right of way, roadways, construction limits, utility crossings, QA/QC surveys and as-builts. Marshall played a role in boundary and right of way calculations and drafting. Biography Marshall has 18 years of survey experience in the hydrographic survey industry, specializing in Airborne LiDAR and Multibeam Sonar acquisition, processing, QA/QC practices and project management. His professional experience includes the collection, processing, management and delivery of multiple large-scale hydrographic LiDAR projects throughout the world, with coastal zone management and the update of nautical charts as the primary focus. He is highly skilled in generating LiDAR deliverables and products and is well-versed in all aspects of both traditional and modern survey methods, covering both hydrographic and land surveying. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B NAPOLEON CORPUZ, LSIT Office Operations Manager Education: BS, Electrical Engineering Adamson University, Philippines (1989) Professional Licenses and Certifications: Land Surveyor in Training (LSIT) No. 8050 (2010) Total Years of Experience: 23 Years with Firm: 10 Relevant Experience City of Yorba Linda, Equestrian Trail Segment 4, Yorba Linda, CA Office Operations Manager. Responsible for preparing all office deliverables for to establish the limits of various equestrian easements for the city of Yorba Linda. Mr. Corpuz compiled the field data in the office and the results were reflected in a basemap with dimensions illustrating the geospatial relationship between the easements and the adjacent or encroaching walls. City of Buena Park, Ball Road Loop Project, Buena Park, CA Office Operations Manager. This project consists of topographic mapping for a waterline replacement project for the City of Buena Park. Mr. Corpuz was responsible for preparing all office deliverables. All data was compiled into a master CAD file with the rectified orthophoto as a background image. Various Land Surveying Projects, Southern California Office Operations Manager. Responsible for meeting project objectives, scope and roles. Determining and managing resourcing. Managing and tracking project budgets and costs. Preparing project plans, scheduling key milestones and managing the project according to the plan. Providing project reports. Identifying and mitigating project risks and issues. Undertaking survey production tasks and ensuring all office calculations and deliverables are completed on time, on budget and meet client’s expectations in terms of quality. Key clients include SoCalGas, SDG&E, Southern California Edison, Spec Services, Barnard Construction, Cordoba Corp SoCalGas and SDG&E, Pipeline Safety Enhancement Plan (PSEP) Party Chief and Project Surveyor. Nap has responsibility for completing field activities for boundary surveys, easement retracement, utility surveys, topographic surveys, construction staking, layout of bore pits & alignment, structure monitoring, as built surveys for PSEP lines and valve sites. In the office, he was responsible for processing field data and producing surveys for boundary, topographic, GPS control, utility location, client reports and implementing quality control processes. Biography Napoleon (Nap) has over 23 years of progressive office and field surveying experience and holds a Bachelor of Science in Electrical Engineering. He is an accomplished survey professional and is responsible for managing all office operations to ensure deliverables are produced within time, cost, and quality objectives. His survey experience includes commercial, educational, military, industrial, natural gas and electric and land development industries. In addition to his surveying experience Nap’s background includes civil engineering design. He has extensive knowledge in topographic surveys, base mapping, field surveying, GPS control, construction staking, data processing and sag surveys. Nap’s field and office experience gives him a unique ability to work with clients and understand client requests to align field and office staff. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B GAVIN MCKELLAR Chief of Parties/Field Operations Manager Education: BS, Topographic Science University of Glasgow, Scotland, UK (1993) Professional Licenses and Certifications: OSHA 30-Hour Training FAA Certified Remote Pilot Operator – Unmanned Aerial Systems (UAS) 5-Day Utility Locate Training 3-Day GPR Training CPR First Aid Training Total Years of Experience: 30 Years with Firm: 9 Relevant Experience City of Yorba Linda, Equestrian Trail Segment 4, Yorba Linda, CA Chief of Survey Parties. Responsible for conducting the field surveying portion of this project to establish the limits of various equestrian easements for the city of Yorba Linda. Mr. McKellar undertook field surveys to recover and survey various survey monuments shown on the recorded maps to establish a comprehensive basemap of all the maps associated with the equestrian trail easements. Mr. McKellar also surveyed the existing fences and walls that fell along the limits of the easements. City of Buena Park, Ball Road Loop Project, Buena Park, CA Chief of Survey Parties. This project consists of topographic mapping for a waterline replacement project for the City of Buena Park. Mr. McKellar and his field crews were responsible for establishing on-site control points tied to nearby CORS GPS stations using static GPS observations. Aerial targets were then placed on the ground to control the photogrammetric mapping carried out by our trusted partners Aerotech Mapping. Once mapping was complete, field crews performed a QA/QC walk to identify any obscured features and collect any data missed in the aerial survey. All data was compiled into a master CAD file with the rectified orthophoto as a background image. San Diego Unified Port District, National City Marine Terminal (NCMT) Berth 24-11 Rehab Survey Services (as a subcontractor to Moffatt and Nichol), National City, CA (2022) Chief of Survey Parties. Mr. McKellar and his survey crews conducted a ground- based topographic survey as well as a sub-grade utility mark-out at the site in various areas of concern as delineated by the client. Once fieldwork was completed, the survey data was reviewed, reduced, and imported into a CAD base-file (AutoCAD Civil3D format as required). San Diego Unified Port District, TAMT, Phase 3 Electrical Survey Services (as a subcontractor to Moffatt and Nichol), San Diego, CA (2021) Chief of Survey Parties. Responsible for directing and supervising GIS Surveyors’ field crews that completed a topo survey at the 10th Avenue Marine Terminal in support of the TAMT Phase 3 project, as subcontractor to M&N. The scope of work for this project involved a topographic survey along a roughly 100-foot-wide corridor centered on the proposed alignment of updated electrical conduits. All surface features were collected and mapped. Mr. McKellar provided lead direction to assigned field crews and was responsible for ensuring the collected data was accurate and fit for purpose. Biography Mr. McKellar has over 30 years of survey experience, working on small and large- scale projects for private, public, utility and government clients. He is GIS Surveyors’ Field Operations Manager and ensures our crews have up to date training, such as safety, procedures and processes and he is also responsible for scheduling and resourcing of our field crews. Mr. McKellar’s survey experience has allowed him to learn and become proficient in survey hardware and software, GPS and terrestrial measurement methods enabling him to produce high quality GIS or CAD deliverables. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PAUL LOSKA, JR. Director of Operations/Professional Engineer Education: BS, Civil Engineering, University of Idaho, Moscow, ID Professional Licenses and Certifications: Licensed Civil Engineer: • California #90670 • Idaho #P-19549 • Washington #20122793 Total Years of Experience: 8 Years with Firm: 1 Relevant Experience Project Manager, Lariviere Construction, Rathdrum ID • Managed multiple civil-construction public works projects simultaneously. • Responsible for contract review, negotiations and adherence. • Coordinated project team for schedule reviews, change order negotiations, and document compliance. • Responsible for progress payments, schedules, subcontracting, submittals, material orders, and financial reports. • Worked with project superintendents to manage the schedule, production factors, and work quality. • Responsible for client, engineer, and contractor relationship. • Supervised and mentored project engineer team who assisted in project documentation requirements. • Worked with multiple public owners. • In the winter months, lead full project estimates for upcoming work. • Investigated, sought-out, and submitted change orders. Survey Manager, Barnard Construction Company, Indiantown FL • Managed construction layout and survey operations for C44 Reservoir. • Supervised a crew of seven surveyors, eleven GPS rovers, and twenty GPS machine control units. • Coordinated survey operations with superintendents, foreman, and engineers • Used AutoCAD Civil 3D, Trimble Business Center, and Topcon Magnet Field to create GPS machine control models. • Responsible for calculating monthly construction quantities. • Modeled project quantities and layout for dirt-flow analyses using photogrammetry drone surfaces and AutoCAD Civil 3D. Estimator, Barnard Construction Company, Bozeman MT • Performed quantity takeoffs and cost analyses from plans and specifications. • Delivered cost breakdown, sequencing, and CAD support documents to lead estimators for review. • Worked with estimating team to create schedule, proposal documents, and final estimate. • Recruited and managed a list subcontractors for a several portions of work. • Lidated data through proprietary GIS software. • Responded to data inquiries from various groups within the organization. • Tested new projects before release and document training materials. • Imported pronunciations into software and update templates. Biography Paul Loska, Jr. is an experienced Project Manager and licensed Civil Engineer with over 8 years of surveying and engineering experience. Mr. Loska brings expertise in precision surveying, topographic analysis and construction staking. He coordinates with customers and ensures deliverables meet QA/QC standards. His skills in using software such as AutoCAD Civil 3D, Trimble Business Center, and his knowledge of survey instruments, is complemented by his leadership in coordinating complex projects, adherence to specifications, managing subcontractors, and excelling in relationship management. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B PAUL LOSKA, JR. Director of Operations/Professional Engineer Field Engineer and Subcontractor Manager, Kewit Infrastructure West Co., Oahu HI • Supported field operations by preparing work plans, dig permits, quantity takeoffs, and material ordering. • Assisted senior engineers with interpreting design drawings, specifications, and survey layout. • Ensured daily quality control in coordination with the client and inspectors. • Aided the superintendent in generating the daily, 3-week, and 120-day schedules. • Coordinated and managed a mason subcontractor who poured thousands of feet of curb, gutter, and sidewalk. • Managed and documented the project aggregate, concrete, and trucking costs. Civil Engineering Intern, Washington Dept. of Natural Resources, Forks WA • Verified construction compliance using survey instruments and design plans. • Designed several fish passable culverts . • Performed hydraulic analysis using ARCGIS to size culverts and design for fish passage. • Complied with Forest Practices and Tribal Biologists permit regulations. Survey Chainman and Draftsman, GIS Surveyors, Inc. Ramona CA • Staked access roads, helicopter pads, and pole sites for several major power line projects in Southern California. • Performed topographic and boundary surveys in the office and field. • Construction staked for North Island Naval Station, Point Loma Submarine Base, Miramar Air station, San Diego Gas and Electric, Par Electric, Warren James, and Southern California Edison. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B ERIK EILERS, LSIT Project Surveyor Education: (BS) Physical Science – University of Maryland, College Park, Maryland (2000) Professional Licenses and Certifications: Land Surveyor in Training (LSIT) No: 9237 (2023) Technical Skills: • ArcGIS 10+ Suite • QA/QC Airborne LiDAR data • Airborne LiDAR bathymetry and Acoustic Survey Planning • Airborne LiDAR Bathymetry data processing • Multibeam Echosounder data processing • Digitizing/Georeferencing • Process documentation • Proposal management • Survey costing and cost analysis • Photoshop • Autodesk Civil 3D • QT Modeler Total Years of Experience: 18 Years with Firm: 8 Relevant Experience San Diego Gas and Electric (SDG&E) Line 1600 Pipeline 43 Mile Replacement Project, San Diego County, California Project Surveyor. GIS Surveyors is currently providing land surveying services for approximately 45 miles of distribution pipeline lines. Mr. Eilers’ main role is to process the survey data collected in the field, perform QA/QC and package weekly deliverables. SoCal Gas Aliso Canyon Gas Storage Project, Orange County, California Project Surveyor. GIS Surveyors is currently providing land surveying services for the storage pipelines above ground. Mr. Eilers’ main role is to process the survey data collected in the field, perform QA/QC and package deliverables for each storage site. SoCal Gas Honor Rancho Ambient Air Monitor Project, Los Angeles County, California Project Surveyor. GIS Surveyors is currently providing land surveying services for the storage pipelines above ground. Mr. Eilers’ main role is to process the survey data collected in the field, perform QA/QC and package deliverables for each site. Cordoba Line 3010 Pipeline Replacement Project, San Diego County, California Project Surveyor. GIS Surveyors is currently providing land surveying services for approximately a mile of distribution pipeline lines. Mr. Eilers’ main role is to process the survey data collected in the field, perform QA/QC and package weekly deliverables. Southwest Gas (SWG) Shadow Mountain Road Project, San Bernardino County, California Chainman. GIS Surveyors was requested to provide survey support for a proposed gas distribution pipeline upgrade that would connect a gas transmission line located around Highway 395 to the City of Helendale along a seven mile stretch of Shadow Mountain Road in rural San Bernardino County, California. Mr. Eilers worked as part of a two-man survey crew to search for existing monuments and set aerial targets for the project. Biography Mr. Eilers has 18 years of experience in the Survey and Geographic Information Systems (GIS) industries. He is currently working as a Project Surveyor at GIS Surveyors’ HQ office in San Diego. Mr. Eilers supports both field and office survey operations for a variety of different clients. Prior to joining GIS Surveyors, Mr. Eilers gained extensive experience planning hydrographic surveys including survey planning of Airborne LiDAR Bathymetry and acoustic surveying methods with ArcGIS. Mr. Eilers recently passed his Land Surveyor in Training exam, a huge step in his career as a Land Surveyor. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B MARK STEELE Survey Technician Professional Licenses and Certifications: Certificate of Completion in CAD Drafting, Career Academy, Redding, CA Autodesk Revit Microsoft A+ certificate MCSA certificate Technical Skills: • Civil 3D (18+ years) • Map 3D (10+ years) • AutoCAD (20+ years) • Revit (4 years) • ArcGIS (6 years) • Bently MicroStation (10+ yrs) • Adobe Creative Suite (10+yrs) • Adobe Illustrator (10+ years) • Layout Design (10+ years) • Web Design (10+ years) Total Years of Experience: 20+ Years with Firm: 2 Relevant Experience San Diego Gas and Electric (SDG&E) Line 1600 Pipeline 43 Mile Replacement Project, San Diego County, California Survey Drafter. GIS Surveyors is currently providing land surveying services for approximately forty-five miles of distribution pipeline lines. Services include establishing survey control and photo control points, right of way survey, topographic survey, utility survey, pothole surveys, project management and QA/QC review. Mr. Steele’s role is primarily focused on survey deliverables, including, plat and legal docs, topographic survey, base mapping, utility mapping and DTM surface modeling. SoCalGas and SDG&E, Pipeline Safety Enhancement Plan (PSEP), Southern California Survey Drafter. Mark has responsibility for completing office activities for boundary surveys, easement retracement, utility surveys, topographic surveys, construction staking, layout of bore pits & alignment, structure monitoring, as built surveys for PSEP lines and valve sites. In the office, his responsibilities include processing field data and producing surveys for boundary, topographic, GPS control, utility location, client reports and implementing quality control processes. Pacific Gas and Electric (PG&E) Underground System Hardening Project, Northern and Central California Survey Drafter. This project involves the undergrounding of 10,000 miles of powerlines to reduce wildfire risk and improve reliability. As Survey Drafter, Mr. Steele is responsible for the management of various survey deliverables including the final survey map preparation, DTM surface model creation and client standard compliance. He also provides guidance and instruction to the office team concerning CAD issues and processes. Biography Mr. Steele has over 20 years of experience and holds multiple certificates in Autodesk and Adobe products. He is an accomplished survey drafter and is responsible for creating DTMs, topographic survey models, bathymetry models, UAV models and topographic survey deliverables. His survey experience includes commercial, educational, military, industrial, natural gas, and electric and land development industries. In addition to his surveying experience Mark’s background includes civil engineering design. He has extensive knowledge in topographic surveys, base mapping, field surveying, GPS control, construction staking, data processing and sag surveys. Mr. Steele’s office experience with multiple software platforms gives him a unique ability to understand client requests and standards. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B ANTHONY AVILES Chief of Parties Education: High School Diploma Barstow High School (1990) Currently studying PPI Land Surveyor in Training (LSIT) preparation course Total Years of Experience: 18 Years with Firm: 5 Relevant Project Experience Southern California Edison, West of Devers Upgrade Project, San Bernardino and Riverside Counties, CA Party Chief. GIS Surveyors provided construction support services for a 220 kV electrical transmission line, for the entire 50-mile alignment that traverses through Riverside and San Bernardino Counties. Mr. Aviles was responsible for conducting boundary surveys, geodetic control, construction staking, QA/QC surveys, as-built surveys, and topographic surveys. San Diego Gas and Electric (SDG&E) Line 1600 Pipeline Replacement Project, San Diego County, California Party Chief. GIS Surveyors is currently providing land surveying services for approximately 45 miles of distribution pipelines. Mr. Aviles’ main role is to is to manage and provide all field services including establishing survey control and photo control points, right-of-way surveys, topographic surveys, utility surveys, pothole surveys, project management and QA/QC review. Another key part of his role is communicating with the client regarding project requirements and providing field progress updates. Los Angeles Department of Power and Water (LADWP), Haskell Canyon to Sylmar Switching Station Transmission Line Conversion Project, Northern Los Angeles County, CA Party Chief. The tasks assigned to GIS Surveyors consisted of land survey and lidar support for the entire 5-year duration of the project. Mr. Aviles was responsible for proving survey field staking for all structures, foundations, conductors, access roads, drainage elements, site work limits and other various project components. Various Electric Projects in Southern California Party Chief. Mr. Aviles was tasked with overseeing a two-man survey crew, managing the maintenance, set up, and operation of Trimble GPS, Trimble S7 Total Station, and other survey equipment for various electric projects including: • SDG&E Mission Control Sub • SDG&E Fire Risk Mitigation Program • SDG&E Artesian Substation Project • SDG&E CNF Decommissioning • SDG&E South Orange County Reliability Enhancement (SOCRE) • SDG&E Strategic Undergrounding (SUG) Project Biography Mr. Aviles is an experienced and knowledgeable land survey Party Chief with 18 years’ experience in providing quality work on numerous, fast-paced, and challenging commercial, industrial, and residential land survey related projects. He possesses strong communication and organizational skills allowing for positive and productive relationships with co-workers, clients, and the general public. Mr. Aviles has experience in coordinating tasks and schedules with office staff, site superintendents, trade foreman and multiple crew members to ensure timely and efficient project deadlines. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B BRANDON RAGONE Utility Locating Manager Education: High School Diploma Professional Licenses and Certifications: Certified HughesNet Installer Total Years of Experience: 10 Years with Firm: 2 Relevant Experience Utility Designator/Chainman, GIS Surveyors Inc., CA • Designates overhead and underground utilities according to ASCE 38-02 standards. • Completes detailed field investigations of all required utilities. • Consults on schedule planning for field operations. • Reviews available record information prior to and during field investigation. • Works with office staff to ensure completeness of data transfer. • Operates geophysical locating technology, including Electro Magnetic (EM), Ground Penetrating Radar (GPR), Acoustic Pipe Locator (APL), CCTV Sewer Camera • Coordinates with clients, utility stakeholders and property stakeholders. • Leads operations in the field for various projects. • Coordinates with any subcontracted vendors of traffic control, hydro- excavation, saw cutting, etc. • Assists with training of new Utility Designators. Utility Technician, UtiliQuest LLC., Red Bluff, CA • Locates public utilities correctly and safely, maintaining integrity of underground utilities includingtelecommunications, power, cable TV, and water to ensure excavator safety and asset protection. • Utilizes utility prints and visual scans along with electromagnetic technology to locate and markunderground utilities. • Uses utility provided maps/prints to assist in identification of underground utilities. • Utilizes effective time management skills to efficiently and accurately locate underground utilities. • Works independently, conducting business from a company vehicle utilizing a computer programsystem for dispatching and auditing purposes. Communications Technician, Valley Industrial Communications, Redding, CA • Consulted with businesses and homeowners regarding CCTV security system needs. • Made recommendations regarding where cameras should be installed according to individual building’sconstruction. • Performed and tested residential installations of CCTV security systems. • Setup RF (Radio Frequency) test fixtures and testing equipment. • Performed remote support, physical equipment and cabling inspections, swap out failed components,testing of copper and fiber cables, handle storage media, and enter troubleshooting commands. • Perform hardware installations – rack / stack. • Perform cable installations (routing, terminating, testing, troubleshooting). Biography Brandon Ragone has 10 years experience working as a telecommunications technician and utility locating professional. He joined GIS Surveyors as a Utility Designator and Chainman and is an integral part of our Northern California survey crew but works throughout the state of California as-needed. His primary role is to locate and designate utilities according to ASCE 38-02 standards as safely, efficiently, and at the highest level of quality to ensure client satisfaction and operational excellence. He also works in a Chainman capacity assisting the Party Chief with field surveys and associated tasks. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 25 6. Project Management Approach GIS Surveyors follows a standard workplan for the execution of all surveying projects. The standardized work plan is essential in maintaining safety, quality, schedule and cost controls for each project and task. The work plan is easily scaled up or down to accommodat e project complexities and duration. The project workflow is outlined in Figure 1 below. Project Scoping Project Planning Kickoff Meeting Project Execution Project Close Out Lessons Learned Figure 1: GIS Surveyors Standard Project Workflow Project Scoping During the Project Scoping phase, GIS Surveyors will work with the City of Rancho Cucamonga to discuss the project scope of services, safety, security, project duration, deliverables, project assumptions and exceptions. Depending on the complexity of the scope of services, a site visit may be warranted along with additional follow-up meetings to finalize the project scope. GIS Surveyors will then prepare a scoping document including schedule and cost estimate for approval by the City. Project Planning Once the project is awarded, the project planning phase is started. GIS Surveyors will develop a tailored Project Execution Plan (PEP) that includes the following information: • Site safety and hazard assessment plan • Quality assurance and control • Communication plan and project reporting • Project schedule • Resource plan and roles and responsibilities • Cost controls • Request for information process • Risk and issue identification The PEP is made up of many components and is used to mitigate potential project difficulties by identifying them early in the project lifecycle. One of the most important components is safety. GIS Surveyors makes safety the top priority and empowers all employees to stop work to address unsafe conditions. Another key piece of the PEP is quality control. GIS Surveyors follows a comprehensive Quality Management Plan for project execution and copies of the plan can be requested by the City of Rancho Cucamonga if needed. The plan establishes the Quality Control (QC) procedures, Quality Assurance Reviews (QA), Document Control and Quality Control Records. The plan will be tailored Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 26 to be specific to the project and will address quality team roles and responsibilities, document control, QC processes and the QA review process complete with checklists to ensure all data has passed set quality criteria. Once the PEP is complete it will be passed to the City of Rancho Cucamonga to review and provide feedback prior to the project kickoff meeting. Project Kickoff Meeting Once the project has been awarded and the PEP has been approved, GIS Surveyors will schedule a project kickoff meeting to review the scope, schedule, and deliverables. The purpose of the kickoff meeting is to formally notify all team members, subconsultants (if applicable), clients and other stakeholders that the project has begun and ensure everyone has a common understanding of the project and their roles. Project Execution The project proceeds by adhering to the PEP; during this phase the survey and related services tasks are undertaken, and the deliverables are sent to the City of Rancho Cucamonga for approval. The planned processes to manage time, cost and quality objectives are put into action and any deviations are tracked and reported to the City of Rancho Cucamonga. If change orders are required, GIS Surveyors will work with the City to define and negotiate the additional services. Throughout project execution, GIS Surveyors will coordinate daily, weekly and/or monthly with all stakeholders as needed to effectively manage assigned tasks and ensure the relevant parties are informed of project progress. The project reporting mechanisms will be actioned per the requirements approved in the PEP. Project Close Out Proper project closeout is an essential final step in the project management process. GIS Surveyors will conduct a project review to ensure the project was completed as scoped and aligns with the City of Rancho Cucamonga’s expectations. To identify and document lessons learned, GIS Surveyors has implemented a close out process called a “Hot Wash”. The term is derived from the military after-action process, where all project participants discuss the project at its completion. The meeting is agnostic of title and position where all participants are free to discuss what worked and what did not, and identify lessons learned along with remedies. The lessons learned are documented and applied to projects moving forward to ensure continual process improvement. GIS Surveyors will complete client expectation and satisfaction surveys as part of the ongoing effort to improve services and processes. Budget Control Estimating and Scheduling GIS Surveyors has a dedicated set of survey personnel who specialize in estimating and scheduling. All our estimators have a strong survey background and use their experience to apply realistic judgement to the effort required to complete a task. Typical factors that a re taken into consideration when creating a cost estimate and corresponding schedule include: • Labor: The cost of human effort expended towards project objectives. • Materials: The cost of resources needed to create products. • Equipment: The cost of buying and maintaining equipment used in project work. • Services: The cost of external work that a company seeks for any given project (vendors, contractors, etc.). Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 27 •Information Technology: Hardware and software requirements. •Facilities: The cost of using specialized equipment, services, or locations. •Contingency costs: Costs added to the project budget to address specific risks. When scheduling, our team considers the project scope then establishes the sequence of tasks. Care is taken to prioritize project tasks and to link task dependencies to determine which tasks can be done simultaneously versus those that are dependent on others. Task dependencies are mapped out in the project schedule to prevent bottlenecks and blocks. Each task on the schedule details the related resources and costs associated with completing it. This allows us to accurately plan the team’s time and keep their workload balanced. Milestones are determined to signal anchors such as project start and end date, the need for budgetary checks, and progress meetings. These milestones focus on the major progress points that must be reached to achieve success. Our estimating team works with the client to offer alternative solutions where possible to reduce costs and increase efficiency. We are also able to compact project schedules by adding additional resources to projects of urgent or emergency nature. Our flexible approach to project coordination and delivery ensures all client objectives are met in terms of cost, quality, and time. Cost Controls In years of managing many projects, GIS Surveyors has learned the best way to create an effective project budget is by using historical data and referencing lessons learned. Creating the project schedule, accurate resourcing, and the hours/cost for those involved is key, the budget will be reviewed by other in-house experts for confirmation. The budget is tracked in real time throughout the course of the project via Unanet ERP system. Any deviations on budget are communicated to the client immediately to ensure they get back on track and an official change order must be implemented. Devising a clear scope document and schedule at the beginning of the project is essential to keeping the project on track in terms of cost, time, and quality. Technical Approach and Understanding of Survey Scope of Work Participate in Field Meeting to Establish Scope and Design Parameters GIS Surveyors cultivates close working relationships with all parties associated with a project to encourage communication, efficiency, and safety awareness. GIS Surveyors’ Project Managers and Surveyors will establish points of contact, budget, scope requirements, safety guidelines, design constraints and other project parameters required to satisfy the specific needs of an assigned task. An onsite kick-off meeting could help address areas of concern while providing a chance for all stakeholders to collaborate and confer with developers, engineers, surveyors, and contractors involved with the City of Rancho Cucamonga project. Record Maps/Research Investigation into existing property boundaries becomes the backbone by which all future improvements will be based. GIS Surveyors personnel are experts at interpreting City, County and Public Land record maps, as well as legal descriptions, deeds, and patents. GIS Surveyors relies on its extensive years of industry experience to assess project requirements and determine what services will meet the needs of the project. Geographic Information Systems (GIS) are utilized to investigate existing land rights, easements, encumbrances, and other records research to develop a parcel layer database with detailed attributes. At this due diligence stage, all title report data will be reviewed and analyzed as required for dividing/merging properties, public and private land Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 28 ownership delineation, easement review, public improvements/encroachments, construction, and recording historic information. The review by our Professional Land Surveyors in this stage ensures that the interpretation of work by others is sound and reliable and then the data can be compiled and relayed to the client in a comprehensive GIS based map for further project development of design parameters. Utility Research Mapping with Plan and Profile Support Additional research during this stage of the project includes investigating existing utility stakeholders in the project location. GIS Surveyors’ Survey Crews and Analysts compile available record information and sub-grade utility locating data into plan and profile drawings, incorporating stationing and depth cover/clearance with manhole and catch basin invert elevations to provide a comprehensive overview of design conflicts. All of the fieldwork needs detailed office review beforehand, so it’s important to start this early in the project. Control and Coordinate System Standards All survey tasks will be tied horizontally to the California Coordinate System of 1983 (NAD83), using the appropriate zone, and vertically to the North American Vertical Datum of 1988 (NAVD88), unless other control coordinates are provided by the City of Rancho Cucamonga. If the City of Rancho Cucamonga requires development of a continually-operating reference network, complete with GPS sensors that can monitor subsidence or deformation, the design of that network would be completed and approved in this stage. Control networks complete with aerial target layout could also be developed in this stage to address the needs of any aerial or unmanned aerial system (UAS) that may need to be utilized during the course of the project. GIS Surveyors will check the accuracy of provided control networks before utilizing it and provide all the necessary field notes, exhibits, plats, documents and Civil 3D/AutoCAD files to memorialize the results in a comprehensive deliverable. Maintenance of a City-wide vertical and horizontal survey monument and benchmark catalog system will be executed through an intuitive GIS application custom tailored to help coordinate the City of Rancho Cucamonga’s surveying functions. Boundary and Right-of-way Surveys After research is complete, a site kick-off meeting and site safety plan is completed prior to starting the control, reconnaissance, and boundary monumentation surveys by our field crews. The field crews are supported by record research data and calculations, then the data is processed and analyzed by experienced survey technicians with final review and QA/QC performed by a Licensed Surveyor (LS). The LS will supervise a control network design that will be utilized to survey boundary monuments and control the project moving forward. Static GPS baselines, Total Station Traverses and Digital Level loop data are used in the adjustment process. GIS Surveyors personnel are experienced in A.L.T.A. surveys along with preparing other maps, exhibits, and reports that can be used to accurately disclose possible encroachments upon boundaries, rights-of-way, easements, environmental limits, and other sensitive areas at the project site. With the field monument survey data, office surveyors generate a variety of base maps incorporating boundary data, record data, topographic data, as-built data, project control, route surveying data and GIS databases along with other available datasets, including aerial orthophotos and underground utility findings. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 29 Topographic and Utility Surveys In most cases, topographic and utility survey data is collected at the same time as the boundary surveys. For longer projects, this step could include an aerial photogrammetric survey and field work by the survey crew would include QC and infill for data obscured by the aircraft. GIS Surveyors carries out small-scale and large-scale topographic and bathymetric surveys using a combination of total station, laser scanner, SONAR, GPS, aerial or mobile LiDAR and UAS technologies that best fit the client’s time and accuracy requirements. If required, aerial and mobile LiDAR surveys are carried out by several trusted subcontractors utilizing Global Navigation Satellite System (GNSS) control, but the data processing, classification and verification by ground survey QA/QC checks are completed in-house along with data infill provided by our in-house static LiDAR scanning procedures. In addition, some underground utilities are located and marked out by trusted subcontractors, but the survey and QA/QC of those marks are carried out in-house. Our in-house utilization of UAS imagery can provide a visual inspection of the utility mark-out for review in the office at a later date. Mapping Services Most mapping services begin once all the field data is collected and GIS Surveyors employs a team of highly skilled draftspersons adept at supplying electronic and paper deliverables for a wide variety of design sets, construction layouts, as-built plans, and exhibits. We utilize the latest versions of industry standard programs such as Civil 3D, PLS-CADD, Microstation, Trimble Business Center and Esri products. In-house GIS application development can also be implemented to provide further data analysis and accuracy assessment products required to satisfy each project’s needs. Easement Legal Description and Plats Preparation As the project progresses into final design stages, further easement perfection services may be required. GIS Surveyors has extensive experience in reviewing and interpreting deeds, record maps, instruments, and transfer documents to plot existing easements as well as preparing documents to establish new easements as necessary while adhering to City, County, State and Fede ral requirements. Once completed, the legal description exhibits can be utilized in property acquisitions, lot line adjustments, Parcel Map Waivers, street vacations/dedications, and court filings. Professional Recording Services If the need for a filed map or professional certification arises, GIS Surveyors is experienced in the execution and filing of Record of Survey maps, Corner Records, Tract Maps, Parcel Maps, street vacations/dedications, lot line adjustments, Parcel Map waivers, and related documents for compliance with the California State Subdivision Map Act requirements and other applicable codes and regulations. Each document will be stamped and signed, as necessary, as acting District Surveyor. Construction Staking As the design stage is completed and moves toward construction, the detailed survey planning from project inception will have established a reliable control network by which all construction requirements can be measured. GIS Surveyors has a vast wealth of experience in all aspects of construction staking including site/work limit staking, environmental staking, structure/footing location staking, rough/final grading and road staking, utility upgrades/new construction, structure deformation monitoring and as-built surveys/certifications. We routinely stake out proposed Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 30 improvements for job walk reviews, providing on-site survey support to re-locate features or collect additional survey data as required by the engineers on the job walk. Streamlined workflows can be established according to the City of Rancho Cucamonga’s needs for on-going reporting on things such as quantity and volume surveys to ensure compliance, measure progress or quantify import and export of materials. Our experienced crews can consult as required to meet needs on -demand with real-time office support as required. As-Built Drawings GIS Surveyors stands ready to complete as-built surveys and drawings shortly after construction, and even during the construction phase of the project. Accurate monitoring of construction sites for various parameters can be provided in clear and concise reporting as required by the project demands. Professional Engineers and Surveyors will review and provide comments for various engineering plans such as but not limited to street improvement plans, storm drain plans, grading plans, Water Quality Management Plans (WQMP), and hydrology reports. GIS Surveyors’ team approach has a proven track record of success in managing, recording, and analyzing complicated data sets and intricate specifications required to make large infrastructure projects a success. Monumentation/Restoration Surveys and Centerline Ties GIS Surveyors’ Survey Crews are regularly asked to conduct monument preservation activities so that monumentation can be reestablished in the event of damage or removal throughout the course of a project. GIS Surveyors ensures that any property corners that may be potentially damaged or destroyed during construction are properly tied out beforehand, so that the corners can be restored following construction, and that Corner Records and/or Records of Survey can be filed pursuant to State law. During this process, as with all deliverables, plan review comments shall be returned to the City of Rancho Cucamonga in an expedient manner. A standard delivery schedule should be no later than 3 weeks for the first plan review and 2 weeks for the second plan review. If a third plan review is needed, it should be revised and delivered in less than 1 week as standard practice. Creative Ideas for Accomplishing Project Objectives Alternative Solutions: Unmanned Aerial Systems - Approach and Utilization Benefits Our team proposes the provision of UAS 4K ortho rectified imagery along with Light Detection and Ranging (LiDAR) capabilities to better aid in data acquisition with dangerous or limited access sites. UAS provide an opportunity to collect aerial data with m inimal mobilization costs, a reduction in aviation liability, and more accurate data capture. These systems can fly lower, slower, and more deliberately to provide higher density data capture on assets, grades and vegetation. GIS Surveyors has a team of FAA Certified UAS Pilots whose primary responsibility is ensuring the safe and efficient operation of unmanned equipment. Furthermore, our UAS fleet meets industry standards to ensure appropriate data security and asset visibility along wit h the appropriate level of aviation insurance. UAS can provide significant cost savings purely based on logistics and it is highly efficient for emergency response, small jobs, as -builts, and response to weather events. UAS data capture is highly effective and can create dense LiDAR datasets for the purposes of 3D parts modelling, virtual reality integration, and as-built condition verification. Alternative Solutions: Terrestrial Scanning Services - Approach and Utilization Benefits Our team proposes the provision of Terrestrial Scanning Services to better aid in data acquisition. GIS Surveyors currently owns and operates the Trimble SX10 Scanning Total Station. This is a fully Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 31 functioning total station with the added advantage of being able to collect high density LiDAR point cloud data and photo panoramas without the need to register subsequent scans. The Trimble SX10 provides the ability to capture point clouds that are more spatially accurate than traditional airborne LiDAR datasets, and at a fraction of the time and expense. This piece of equipment can go wherever the Surveyor can go and can be set up in mere moments to capture scans as desired on assets and infrastructure. All GIS Surveyors’ Survey Crew members are trained and proficient in the use of the Trimble SX10. Following data capture in the field, GIS Surveyors’ office staff begin working on feature coding, ensuring that all data is coded correctly. Deliverables are then generated to coincide with project and client needs, ranging from a simple XYZ point file containing coded points, to a series of paper exhibits containing diagrams and profile views, to a full 3D model containing the entire point cloud. GIS Surveyors has learned that, once the point cloud data has been collected and coded, there is no limit to the extent that the resultant data can be utilized. GIS Surveyors takes safety very seriously and supports the premise that the most successful way of keeping personnel out of harm's way is by keeping a respectful distance from, and limiting the time of exposure to, potentially unsafe conditions. Both alternative solutions proposed herein helps with that premise. Our Needs from the City of Rancho Cucamonga GIS Surveyors will need the following from the City in order to effectively perform the services outlined in this RFP: • A single point of contact to work with our Project Manager on all survey -related requests. • Clear direction with regards to the required scope of work including sketches and other materials that illustrate said scope of work. • Project history or background that can help to develop a broader understanding of everything involved. • Access instructions for locations that may be enclosed in locked gates or other landowner issues. • Schedule expectations and priorities that need to be addressed at the beginning of the project. Quality Assurance Program Overview The objective of our Quality Control (QC) Plan is to ensure the highest levels of quality are being applied and followed for cost control, schedule adherence, services and products being delivered. We will implement and maintain a tailored QC Plan updated to address specific project elements upon assignment of a project or task order. Figure 2 outlines a team methodology for quality control. It shows how the basic concept of Plan - Perform-Control is refined through continual process improvement and staff training. It also outlines the overall quality planning, assurance and control methods that are employed to mitigate risk and deliver acceptable quality levels on overall performance objectives and deliverables. All deliverables will be prepared by one team member and checked by a second qualified team member that has not been involved in the initial preparation of the work. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 32 Copies of our Quality Management Plan can be provided upon request. Figure 2: Quality Control Plan Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B SURVEY AND MAPPING APPROACH #24/25-501 City of Rancho Cucamonga Various On-Call Services 5.1 Survey and Mapping Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 2 Technical Approach to Discipline 5.1 – Survey and Mapping This document describes GIS Surveyors’ general approach to the On-Call Survey and Mapping services requested by the City of Rancho Cucamonga. Participate in Field Meeting to Establish Scope and Design Parameters GIS Surveyors cultivates close working relationships with all parties associated with a project to encourage communication, efficiency, and safety awareness. GIS Surveyors’ Project Managers and Surveyors will establish points of contact, budget, scope requirements, safety guidelines, design constraints and other project parameters required to satisfy the specific needs of an assigned task. An onsite kick-off meeting could help address areas of concern while providing a chance for all stakeholders to collaborate and confer with developers, engineers, surveyors, and contractors involved with the City of Rancho Cucamonga project. Record Maps/Research Investigation into existing property boundaries becomes the backbone by which all future improvements will be based. GIS Surveyors personnel are experts at interpreting City, County and Public Land record maps, as well as legal descriptions, deeds, and patents. GIS Surveyors relies on its extensive years of industry experience to assess project requirements and determine what services will meet the needs of the project. Geographic Information Systems (GIS) are utilized to investigate existing land rights, easements, encumbrances, and other records research to develop a parcel layer database with detailed attributes. At this due diligence stage, all title report data will be reviewed and analyzed as required for dividing/merging properties, public and private land ownership delineation, easement review, public improvements/encroachments, construction, and recording historic information. The review by our Professional Land Surveyors in this stage ensures that the interpretation of work by others is sound and reliable and then the data can be compiled and relayed to the client in a comprehensive GIS based map for further project development of design parameters. Utility Research Mapping with Plan and Profile Support Additional research during this stage of the project includes investigating existing utility stakeholders in the project location. GIS Surveyors’ Survey Crews and Analysts compile available record information and sub-grade utility locating data into plan and profile drawings, incorporating stationing and depth cover/clearance with manhole and catch basin invert elevations to provide a comprehensive overview of design conflicts. All of the fieldwork needs detailed office review beforehand, so it’s important to start this early in the project. Control and Coordinate System Standards All survey tasks will be tied horizontally to the California Coordinate System of 1983 (NAD83), using the appropriate zone, and vertically to the North American Vertical Datum of 1988 (NAVD88), unless other control coordinates are provided by the City of Rancho Cucamonga. If the City of Rancho Cucamonga requires development of a continually-operating reference network, complete with GPS sensors that can monitor subsidence or deformation, the design of that network would be completed and approved in this stage. Control networks complete with aerial target layout could also be developed in this stage to address the needs of any aerial or unmanned aerial system (UAS) that may need to be utilized during the course of the project. GIS Surveyors will check the accuracy of provided control networks before utilizing it and provide all the necessary field notes, exhibits, Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 3 plats, documents and Civil 3D/AutoCAD files to memorialize the results in a comprehensive deliverable. Maintenance of a City-wide vertical and horizontal survey monument and benchmark catalog system will be executed through an intuitive GIS application custom tailored to help coordinate the City of Rancho Cucamonga’s surveying functions. Boundary and Right-of-way Surveys After research is complete, a site kick-off meeting and site safety plan is completed prior to starting the control, reconnaissance, and boundary monumentation surveys by our field crews. The field crews are supported by record research data and calculations, then the data is processed and analyzed by experienced survey technicians with final review and QA/QC performed by a Licensed Surveyor (LS). The LS will supervise a control network design that will be utilized to survey boundary monuments and control the project moving forward. Static GPS baselines, Total Station Traverses and Digital Level loop data are used in the adjustment process. GIS Surveyors personnel are experienced in A.L.T.A. surveys along with preparing other maps, exhibits, and reports that can be used to accurately disclose possible encroachments upon boundaries, rights-of-way, easements, environmental limits, and other sensitive areas at the project site. With the field monument survey data, office surveyors generate a variety of base maps incorporating boundary data, record data, topographic data, as-built data, project control, route surveying data and GIS databases along with other available datasets, including aerial orthophotos and underground utility findings. Topographic and Utility Surveys In most cases, topographic and utility survey data is collected at the same time as the boundary surveys. For longer projects, this step could include an aerial photogrammetric survey and field work by the survey crew would include QC and infill for data obscured by the aircraft. GIS Surveyors carries out small-scale and large-scale topographic and bathymetric surveys using a combination of total station, laser scanner, SONAR, GPS, aerial or mobile LiDAR and UAS technologies that best fit the client’s time and accuracy requirements. If required, aerial and mobile LiDAR surveys are carried out by several trusted subcontractors utilizing Global Navigation Satellite System (GNSS) control, but the data processing, classification and verification by ground survey QA/QC checks are completed in-house along with data infill provided by our in-house static LiDAR scanning procedures. In addition, some underground utilities are located and marked out by trusted subcontractors, but the survey and QA/QC of those marks are carried out in-house. Our in-house utilization of UAS imagery can provide a visual inspection of the utility mark-out for review in the office at a later date. Mapping Services Most mapping services begin once all the field data is collected and GIS Surveyors employs a team of highly skilled draftspersons adept at supplying electronic and paper deliverables for a wide variety of design sets, construction layouts, as-built plans, and exhibits. We utilize the latest versions of industry standard programs such as Civil 3D, PLS-CADD, Microstation, Trimble Business Center and Esri products. In-house GIS application development can also be implemented to provide further data analysis and accuracy assessment products required to satisfy each project’s needs. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 4 Easement Legal Description and Plats Preparation As the project progresses into final design stages, further easement perfection services may be required. GIS Surveyors has extensive experience in reviewing and interpreting deeds, record maps, instruments, and transfer documents to plot existing easements as well as preparing documents to establish new easements as necessary while adhering to City, County, State and Fede ral requirements. Once completed, the legal description exhibits can be utilized in property acquisitions, lot line adjustments, Parcel Map Waivers, street vacations/dedications, and court filings. Professional Recording Services If the need for a filed map or professional certification arises, GIS Surveyors is experienced in the execution and filing of Record of Survey maps, Corner Records, Tract Maps, Parcel Maps, street vacations/dedications, lot line adjustments, Parcel Map waivers, and related documents for compliance with the California State Subdivision Map Act requirements and other applicable codes and regulations. Each document will be stamped and signed, as necessary, as acting District Surveyor. Construction Staking As the design stage is completed and moves toward construction, the detailed survey planning from project inception will have established a reliable control network by which all construction requirements can be measured. GIS Surveyors has a vast wealth of experience in all aspects of construction staking including site/work limit staking, environmental staking, structure/footing location staking, rough/final grading and road staking, utility upgrades/new construction, structure deformation monitoring and as-built surveys/certifications. We routinely stake out proposed improvements for job walk reviews, providing on-site survey support to re-locate features or collect additional survey data as required by the engineers on the job walk. Streamlined workflows c an be established according to the City of Rancho Cucamonga’s needs for on-going reporting on things such as quantity and volume surveys to ensure compliance, measure progress or quantify import and export of materials. Our experienced crews can consult as required to meet needs on-demand with real-time office support as required. As-Built Drawings GIS Surveyors stands ready to complete as-built surveys and drawings shortly after construction, and even during the construction phase of the project. Accurate monitoring of construction sites for various parameters can be provided in clear and concise reporting as required by the project demands. Professional Engineers and Surveyors will review and provide comments for various engineering plans such as but not limited to street improvement plans, storm drain plans, grading plans, Water Quality Management Plans (WQMP), and hydrology reports. GIS Surveyors’ team approach has a proven track record of success in managing, recording, and analyzing complicated data sets and intricate specifications required to make large infrastructure projects a success. Monumentation/Restoration Surveys and Centerline Ties GIS Surveyors’ Survey Crews are regularly asked to conduct monument preservation activities so that monumentation can be reestablished in the event of damage or removal throughout the course of a project. GIS Surveyors ensures that any property corners that may be potentially damaged or destroyed during construction are properly tied out beforehand, so that the corners can be restored following construction, and that Corner Records and/or Records of Survey can be filed pursuant to State law. During this process, as with all deliverables, plan review comments shall be returned to Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Various On-Call Services - SOQ #24/25-501 5.1 Survey and Mapping 5 the City of Rancho Cucamonga in an expedient manner. A standard delivery schedule should be no later than 3 weeks for the first plan review and 2 weeks for the second plan review. If a third plan review is needed, it should be revised and delivered in less than 1 week as standard practice. Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Request for Statement of Qualifications (SOQ) #24/25-501 for Various On-Call Services __________________________________________________________________________________________________ ____________________________________________________________________________________________________________ Page 23 of 30 “EXHIBIT A” CITY OF RANCHO CUCAMONGACONFLICT OF INTEREST/NON-DISCLOSURE STATEMENT It is the policy of the City of Rancho Cucamonga to prevent personal or organizational conflict of interest, or the appearance of such conflict of interest, in the award and administration of City Contracts, including, but not limited to Contracts for Professional Services Agreements (“PSA”) with potential Consultants. I do not have specific knowledge of confidential information regarding SOQ responses received in response to the Request for Statement of Qualifications (SOQ) #24/25-501 Various On-Call Services. I agree not to disclose or otherwise divulge any information pertaining to the contents, status, or ranking of any SOQ response to anyone. I understand the terms and "disclose or otherwise divulge" to include, but are not limited to, verbal conversations, written correspondence, reproduction of any part or any portion of any SOQ response, or removal of same from designated areas. I, the undersigned, hereby certify that the following statements are true and correct and that I understand and agree to be bound by commitments contained herein. ______________________________________ (Print Name) ______________________________________ (Relationship to the City) ______________________________________ (Relationship to the Consultant) ______________________________________ (Signature) ______________________________________ (Date) Exhibits are not to be included in your bid response. All referenced Exhibits must be submitted in Planet Bids system under the Response Types, Exhibits A – G. 01/02/2025 Dennis Rose, PLS None Director of Surveys Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Request for Statement of Qualifications (SOQ) #24/25-501 for Various On-Call Services __________________________________________________________________________________________________ ____________________________________________________________________________________________________________ Page 24 of 30 “EXHIBIT B, PROFESSIONAL SERVICES AGREEMENT EXCEPTIONS SUMMARY” Mark the appropriate choice, below: _____ Vendors accepts the PSA without exception. OR _____ Vendors proposes exceptions to the PSA. Summarize all exceptions on a separate document. Enclose a written summary of each change and title as “Exception Summary”, which shall include the Vendors’ rationale for proposing each such exception. Each exception must be labeled with the Section number in the PSA. Failure to properly reference exceptions in the submitted summary may deem the response as non-responsive. ___________________________________ Signature ___________________________________ Printed Name ___________________________________ Title ___________________________________ Date Exhibits are not to be included in your bid response. All referenced Exhibits must be submitted in Planet Bids system under the Response Types, Exhibits A – G. Dennis Rose, PLS Director of Surveys 01/02/2025 Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Request for Statement of Qualifications (SOQ) #24/25-501 for Various On-Call Services __________________________________________________________________________________________________ ____________________________________________________________________________________________________________ Page 25 of 30 “EXHIBIT C, ACKNOWLEDGMENT OF INSURANCE REQUIREMENTS AND CERTIFICATION OF ABILITY TO PROVIDE AND MAINTAIN COVERAGES SPECIFIED” I, _______________________________ the ______________________________________________ (President, Secretary, Manager, Owner or Representative) of __________________________________________________________________, certify that the (Name of Company, Corporation or Owner) Specifications and General Provisions regarding insurance requirements as stated within the Professional Services Agreement (PSA), for the Purchase Contract designated Request for Statement of Qualifications (“SOQ”) #24/25-501 for Various On-Call Services have been read and understood and that our Vendors is able to provide and maintain the coverage as specified in the PSA. Failure to provide said coverage, upon request to finalize the PSA prior to award shall be enough cause for immediate disqualification of award. Failure to maintain said coverage shall result in termination of the contract. ___________________________________ Signature ___________________________________ Printed Name ___________________________________ Title ___________________________________ Date Exhibits are not to be included in your bid response. All referenced Exhibits must be submitted in Planet Bids system under the Response Types, Exhibits A – G. Dennis Rose, PLS Director of Surveys GIS Surveyors Dennis Rose, PLS Director of Surveys 01/02/2025 Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Request for Statement of Qualifications (SOQ) #24/25-501 for Various On-Call Services __________________________________________________________________________________________________ ____________________________________________________________________________________________________________ Page 26 of 30 “EXHIBIT D” ADDENDUM ACKNOWLEDGEMENT The Consultants hereby acknowledges the following Addenda Number(s) to this SOQ have been received, if any. Consultants understands failure to acknowledge any addenda issued may cause the SOQ response to be considered non-responsive. It is the Consultants’ responsibility to log into the Bid System to identify and download the number of addenda that have been posted. • __________________ • __________________ • __________________ • __________________ ___________________________________ Signature ___________________________________ Printed Name ___________________________________ Title ___________________________________ Date Exhibits are not to be included in your bid response. All referenced Exhibits must be submitted in Planet Bids system under the Response Types, Exhibits A – G. Addendum No. 001 Dennis Rose, PLS Director of Surveys 01/02/2025 Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Request for Statement of Qualifications (SOQ) #24/25-501 for Various On-Call Services __________________________________________________________________________________________________ ____________________________________________________________________________________________________________ Page 27 of 30 “EXHIBIT E DEBARMENT and SUSPENSION CERTIFICATION FORM I certify that neither _____________________________ (Consultant) nor any of its proposed subcontractors are not currently listed on the governmentwide exclusions in the System for Award Management (SAM), in accordance with the guidelines under 2 CFR 200 that implement Executive Orders 12549 (3 CFR part 1986 Comp., p. 189) and 12689 (3 CFR part 1989 Comp., p. 235), and that neither Consultant nor any of its proposed subcontractors are tax delinquent with the State of California. I acknowledge that if Consultants or any of its subcontractors subsequently are placed under suspension or debarment by a local, state or federal government entity, or if Consultants or any of its subcontractors subsequently become delinquent in California taxes, our Proposal will be disqualified. ___________________________________ Signature ___________________________________ Printed Name ___________________________________ Title ___________________________________ Date Exhibits are not to be included in your bid response. All referenced Exhibits must be submitted in Planet Bids system under the Response Types, Exhibits A – G. GIS Surveyors Dennis Rose, PLS Director of Surveys 01/02/2025 Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Request for Statement of Qualifications (SOQ) #24/25-501 for Various On-Call Services __________________________________________________________________________________________________ ____________________________________________________________________________________________________________ Page 28 of 30 “EXHIBIT F, PARTICIPATION CLAUSE” It is hereby understood that other government entities, such as cities, counties, and special/school districts may utilize this RFP response at their option for equipment or services at the RFP response price for a period of ________ days. Said entities shall have the option to participate in any award made because of this solicitation. Any such piggy-back awards will be made independently by each agency, and the city is not an agent, partner or representative of these agencies and is not obligated or liable for any action of debts that may arise out of such independently negotiated piggy-back procurement. Each public agency shall accept sole responsibility of its own order placement and payments of the Vendors. Successful Vendors will extend prices as proposed herein to other governmental agencies, please specify. YES __________ NO _________ Exhibits are not to be included in your bid response. All referenced Exhibits must be submitted in Planet Bids system under the Response Types, Exhibits A – G. 300 Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B City of Rancho Cucamonga Request for Statement of Qualifications (SOQ) #24/25-501 for Various On-Call Services __________________________________________________________________________________________________ ____________________________________________________________________________________________________________ Page 29 of 30 “EXHIBIT G” SIGNATURE OF AUTHORITY The undersigned firm declares that he has carefully examined the specifications and read the above terms and conditions, and hereby proposes and agrees, if this SOQ response is accepted, to furnish all material in accordance with the specifications and instructions, in the time and manner therein prescribed for the unit cost amounts set forth in the following SOQ response. THE CONSULTANTS IN SUBMITTING THIS SOQ RESPONSE MUST FILL IN THE FOLLOWING INFORMATION. FAILURE TO DO SO MAY DEEM YOUR SOQ RESPONSE AS NON-RESPONSIVE. Company Name: Address: (Street, Su. # City, State, Zip) Telephone #: Fax #: E-mail address: Web Address: Authorized Representative: (print) Title: Signature: Date: Exhibits are not to be included in your bid response. All referenced Exhibits must be submitted in Planet Bids system under the Response Types, Exhibits A – G. GIS Surveyors 858-679-1732 N/A drose@gissurveyors.com Dennis Rose, PLS Director of Surveys www.gissurveyors.com 10911 Technology PlaceSan DiegoCA 92127 01/02/2025 Docusign Envelope ID: DBFC7C24-7496-43B8-BA24-243D7384BDE1Docusign Envelope ID: 02AE5A75-4032-4C1B-9708-81502D499D6B