HomeMy WebLinkAbout2025-10-08 - SupplementalsHillside Development Review
DRC2025-00106 – 10842 Carriage Drive
10/8/2025
1
PROJECT BACKGROUND
10842 Carriage Drive HDR – DRC2025-00106 2
•Who : Joud Construction on behalf of Nabeel Salhab
•What: A request to construct a 6,201 square -foot,
two -story single -family residence with a 1,108
square -foot attached garage.
•Where: 10842 Carriage Drive - APN: 1074-531-14
•When: Accepted on April 28 th , 2025 and Deemed
Complete on July 7 th , 2025
10842 Carriage Drive
3
Subject Property
Existing Site Photographs – Facing North
10842 Carriage Drive - DRC2025-00106 5
•A request to construct a 6,201 square-foot,
two -story single -family residence with a
1,108 square-foot attached garage on a
22,888 square-foot undeveloped lot.
•The residence will additionally include a 67
square -foot covered front porch, a 507
square -foot covered rear patio, a 308
square -foot balcony, and a 400 square-foot
cabana, all of which are included in the lot
coverage calculations.
10842 Carriage Drive - DRC2025-00106 6
PROPOSED PROJECT
PROJECT PLANS
PROJECT PLANS
PROJECT PLANS
DEVELOPMENT STANDARDS
10842 Carriage Drive - DRC2025-00106 10
•Planning Staff have determined this project
qualifies for a categorical exemption per State
CEQA Guidelines Section 15303 – New
Construction or Conversion of Small Structures.
•One single family residence may be constructed
under this exemption.
•There is no substantial evidence that the project
will have a significant effect on the environment.
10842 Carriage Drive - DRC2025-00106 11
ENVIRONMENTAL REVIEW
•Notices were mailed to all property owners within
660 feet (78 property owners) on September 23 rd ,
2025, and published in the Inland Valley Daily
Bulletin on September 24 th , 2025. A physical notice
was also placed on the property on September 24 th ,
2025.
•To date, staff has received two inquiries, both of
which were regarding the entitlement process of this
project.
10842 Carriage Drive - DRC2025-00106 12
NOTICING
RECOMMENDATION
13
RECOMMENDATION
•Staff recommends approval of Hillside Development Review DRC2025 -00106 through
the adoption of the subject resolution and Conditions of Approval.
10842 Carriage Drive - DRC2025-00106 14
El Camino Development
Rancho Cucamonga, CA
4
Production
Lines
SKUs
700+
Our New Combo Center in Rancho Cucamonga, anticipated to
open in 2027, is the largest infrastructure investment our
company has ever made.
630,000 Sq Ft facility situated on 32 acres
30 M
Produced
Cases
Employees
500+
20 M
Delivered
Cases
4 K
Accounts
$600M
Invested
110
New Jobs
Onsite solar and CoGeneration Top water steward in Coke system
Low emissions with Nitrogen, Ambient Filling & Electric Vehicles
Interactive tour experience
CREATING VALUE FOR OUR LOCAL
COMMUNITIES
New jobs, property taxes
Flexible production plans with room for growth
Local economic growth Community partnerships
CREATING ECONOMIC VALUE FOR
RANCHO CUCAMONGA
$600M invested, 110 new jobs
Efficient, block-cell line layout to minimize travel
Training and conference space
Event spaces, covered parking, EV Charging, fitness center
CREATING VALUE FOR OUR
EMPLOYEES
Our Vision: Be the leader in the beverage business by delivering unmatched value to our employees, customers, and
local communities
Master Planned Campus
4-Story Parking Garage Near EntranceEngaging Environment
Employee Gathering HallEmployee Amenities
Training & Meeting Spaces
Tour Experience
to educate community on
our business, our facility
and our commitment to
sustainability
Support and
partner
Continue to support and
partner with local
community organizations
through volunteer and
donations.
Best-In-Class WURLow Emissions
Footprint
•Nitrogen Generation
•Ambient Filling
•Product made closer to
point of demand.
•8 Electric Vehicles & EV
Charging for Employees
•Solar & Quad Gen
•State of the art filling
technology.
•VSEP Water Recovery
System.
•Adiabatic Coolers
•Plant engineered to collect
and re-use water
By the time Rancho opens,
we will have replenished
two years of our water
needs back into the aquifer
Recycling Center
To achieve our zero waste to
landfill target
Recycled PET
Bottles produced in Rancho will
contain PET that was already
recycled
2+MW Solar
Of rooftop solar, creating a low
emissions footprint while
relieving the grid
Quad Gen
Onsite power, where carbon is
captured and used for
production.
Low Energy & Emissions Site Aesthetics Traffic & Commuting
Energy Use:
•Advanced energy metering and controls to
optimize power use.
•100% LED lighting throughout the interior and
exterior of the building.
•Daylighting in admin spaces to reduce lighting
loads and provide natural light.
•Solar 2 MW+ of onsite Solar
•Quad Gen generate 3 MW of power onsite.
Emissions:
•20% of materials sourced within 500 mi
radius of site.
•Refrigerant management in production space
along with CO2 based system.
•Target of 50% recycled content in core and
shell materials.
•100% electric MHE fleet in distribution and
production facility operations.
•8 ZEV Tractors in distribution fleet with plans
for future additions
Indoor:
•Indoor air quality performance standards.
•Acoustic performance strategies to increase
sound absorption and reducing sound travel
from production areas.
•Wellness room & fitness center to support
team members physical & mental health.
Outdoor:
•Reduced heat island effect by installing
white/cool roof, reflective paving and
additional trees for shading.
•On-site stormwater retention in
underground tanks reducing the site’s impact
on existing stormwater systems.
•Perimeter screen wall will include
greenscape features and drought resistant
plantings.
•Providing access to open spaces for
employees and pedestrians to enjoy.
Electric Vehicle Charging:
•Employees & Guests (50+ spaces)
•Fleet tractors that service Rancho
•Service vehicles vans
Commuting:
•Public transit access from new bus stop on
Haven Street/ 6th Street area.
•Alternative transportation including bike
storage, employee showers, rideshare
parking and EV spaces.
•Covered Parking in 95% of parking spaces.
•Tractor Idling Program limits idling at onsite.
Industrial:
•Network re-alignment reduces Southern
California Miles Driven per year.
•Onsite generation of CO2 and Nitrogen
reduces daily deliveries needed.
Positions in the first 3 years.
500-600
Employment Economic Growth Partnerships
Construction Benefits:
Several hundred trades and suppliers on site
from late 2025 through 2028.
Developing partnership with local businesses
in Rancho to bring economic value during
project.
Investment in Utility and Infrastructure
Improvements.
Ongoing
Increase in property
taxes.
Improved public
aesthetics and
maintenance along
6th St & Haven
Avenue: Public Art,
Bus Terminal, Pocket
Parks.
Donations & Volunteering
Events: Steps for Vets, Red Cross Blood Drive, Ronald
McDonald, Sheriff’s Rodeo, Annual Hiring Fair…
Partners:
350
Jobs returning from
Fontana, CA.
Union and skilled trade roles.
Training and development programs.
New jobs at the opening of Rancho
to support technical functions.
100+
Rancho Cucamonga
Sheriff’s Department
Rancho Cucamonga
Chamber of Commerce
53 5k+$68K+345
Community
activations
Cases
donated
Supplies and
in-kind
donations
Volunteer
hours
Career Opportunities:
Presence in Community
Inland Empire
Economic Partnership
Since January 2024:
Thank you!
Look forward to continuing our
partnership with the Rancho
Cucamonga community.
El Camino Project
Primary Case File No: DRC2023 -00067
October 8 th , 2025
PROJECT BACKGROUND
DRC2023-00067 2
•Who : Lo n e O a k –Ra n c h o , LLC ;
•What : A request for entitlements to
subdivide parcels and redevelop/ expand
an existing beverage distribution center;
•Where : 30.1 acres bounded by Haven
Ave., 6 th Street, Utica Ave., and 7 th Street
(does NOT include 9121 Haven Avenue);
•When :
•Accepted on March 28, 2023;
•Deemed Complete on June 29, 2023.
Project Site
Zoning
General Plan Land Use
Northwest from 6th Street and Utica Avenue
9267 Haven Avenue
(To be renovated)
9227 Haven Avenue
(To be demolished)
North from 6th Street
9227 Haven Avenue
(To be demolished)9267 Haven Avenue
(To be renovated)
Looking east across Haven Avenue
Looking north along Haven Avenue
Looking north along Haven Avenue
Proposed Project
Project:
•Propose a phased redevelopment and expansion
of existing beverage distribution facility:
Phase 1 includes construction of:
•Approx. 959,441 square feet for new
“PC/DC/ASRS” and elevated truck deck;
•4 -story parking structure;
•Maintain and renovate 9267 Haven Avenue
office building
•Water Well at 6 th Street and Utica Avenue
DRC2023-00067 11
PROPOSED PROJECT
Phase 2 includes two options:
•Potential re-use of 10655 7 th Street (Phase
2A)
•Potential demo and rebuild of new building
at 10655 7 th Street (Phase 2B);
•Construction and operation of “co -gen”
facility;
CVWD Water Well
DRC2023-00067
DRC2023-00067 8
DRC2023-00067 8
DRC2023-00067 8
Looking northeast from 6th and Utica
Looking northeast from 6th Street
Looking northeast from 6th and Utica
DRC2023-00067 8
DRC2023-00067 17
Looking north from 6th Street
Looking north from 6th Street
DRC2023-00067 8
DRC2023-00067 8
Looking northeast from 6th Street near Haven Avenue
Looking east from Haven Avenue
DRC2023-00067 21
Looking north along Haven Avenue
Looking east from Haven Avenue
Looking south along Haven Avenue frontage
DRC2023-00067 21
DRC2023-00067 8
DRC2023-00067
Design Review
•Required to allow construction of
proposed project;
Master Plan
•Establishes site -specific development
standards. Legislative action to be
approved by City Council;
Vesting Tentative Parcel Map
•To consolidate project site into 3 lots.
Vests project to fees in place project
was deemed complete
DRC2023-00067 24
ENTITLEMENTS REQUIRED
Conditional Use Permit
•For Manufacturing, Light-La r g e w i th
distribution/ warehouse component;
Tree Removal Permit
•To remove onsite trees, including
heritage trees. Replacement trees
required.
Important note
The Project application previously included a Development Agreement,
Tentative Parcel Map and Uniform Sign Program. Upon further consideration,
the applicant changed to a Vesting Tentative Parcel Map and removed the DA
and USP. This action has no impact to overall project scope, design or
operational characteristics.
Regarding the Master Plan, applicant
proposes site -specific development
standards for the following:
DRC2023-00067 25
ENTITLEMENTS REQUIRED (Cont.)
•Building Typology
•Building Facades
•Building Articulation
•Ground Floor Entrances and Treatments
•Corridor Fronting Ground Floor Use Restrictions
•Build -to -Line and Frontage Areas
•Parking Standards
•Bicycle Parking
•Signage
•Open Space Standards
•Walls and Fences
Drc2023-00067 10
DEVELOPMENT STANDARDS
•The Fire, Engineering and Building
Departments have also reviewed the
project and have provided conditions
of approval included with this staff
report;
•In addition, coordination with SoCal
Edison, CVWD and FAA.
DRC2023-00067 27
INTERDEPARTMENTAL REVIEW
•The Project was reviewed by the Design Review Committee on May 7,
2024. Committee recommended project proceed to Commission as
presented.
•Project required to satisfy the public art requirement in the Development
Code. Estimated value of public art based on square footage is
approximately $775,000.
DRC2023-00067 28
Design Review and Public Art
•Per State CEQA Guidelines, An EIR was
prepared for this project (SCH2023080369);
•Environmental documentation included with this
staff report for reference;
•Even with mitigation, Project results in
significant and unavoidable impacts to
SCAQMD thresholds for NOx plus greenhouse
gas exceedance;
•Statement of Overriding Considerations has
been prepared for Council consideration.
DRC2023-00067 29
ENVIRONMENTAL REVIEW
As required, this item was advertised as follows:
•Published in the Inland Valley Daily Bulletin on
September 22, 2025;
•Notices mailed to property owners and interested
parties on September 23, 2025;
•The project site was also posted with physical
notices on September 24, 2025;
•To date, staff has received correspondence which
have been included with Exhibit E or otherwise
provided.
DRC2023-00067 30
NOTICING
NEXT STEPS
NEXT STEPS
•Planning Commission is a recommending
body for this Project, including EIR
Certification;
•Separate noticed public hearing before the
City Council (date to be determined);
•City Council is the final authority on both EIR
and project.
DRC2023-00067 32
RECOMMENDATION
RECOMMENDATION
Staff recommends that the Commission
approve Resolution 2025 -032, recommending
that the City Council approve the project,
subject to the Conditions of Approval.
DRC2023-00067 34