HomeMy WebLinkAboutCO 2025-229 - AME Builders Inc CITY OF RANCHO CUCAMONGA
PUBLIC WORKS SERVICES DEPARTMENT
CONTRACT
with
AME Builders Inc.
FOR
The CIVIC CENTER WATERPROOFING
AND ROOF REPAIRS PROJECT
AWARD DATE:
November 19, 2025
City of Rancho Cucamonga
CONTRACT NUMBER
2025-229
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
CITY OF RANCHO CUCAMONGA
NOTICE INVITING BIDS FOR
PROPOSAL, CONTRACT AND
SPECIFICATIONS
FOR
"CIVIC CENTER WATERPROOFING AND ROOF REPAIRS PROJECT"
PREPARED BY:
CITY OF RANCHO CUCAMONGA
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA, CALIFORNIA 91730
(909) 477-2740
__________________________________________
JASON C. WELDAY
DIRECTOR OF ENGINEERING SERVICES/CITY ENGINEER
RCE NO. 67514
9/25/2025
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
TABLE OF CONTENTS
Notice Inviting Bids ....................................................................................................... N-1 thru 4
Instructions to Bidders ............................................................................................... I-1 thru I-7
A. Proposals
B. Delivery of Proposals
C. Withdrawal of Proposals
D. Disqualification of Bidders and Proposals
E. Addendum
F. Examination of Plans, Specifications, and Site of Work
H. Competency of Bidder
I. Award and Execution of Contract
J. Return of Proposal Guarantee
K. City Business License
L. Equivalent Materials
M. Relief of Bidders
Contract Agreement ................................................................................................. C-1 thru 6
Faithful Performance Bond .................................................................................................. B-1
Labor and Materials Bond .......................................................................................... B-2 thru 3
Compensation Insurance Certificate ................................................................................. INS-1
Maintenance Guarantee Bond .......................................................................................... MB-1
PART 1 - GENERAL PROVISIONS
Section 1 - General, Terms, Definitions, Abbreviations, Units of Measure and Symbol ... GP-1 thru 2
Section 2 - Scope of the Work ........................................................................................ GP-2 thru 3
Section 3 - Changes in Work .......................................................................................... GP-3 thru 7
Section 4 - Control of Materials ...................................................................................... GP-8 thru 9
Section 5 – Legal Relations and Responsibilities ........................................................ GP-10 thru 18
Section 6 - Prosecution, Progress and Acceptance of the Work ................................. GP-18 thru 19
Section 7 – Measurement and Payment ..................................................................... GP-19 thru 22
Section 8 - Facilities for Agency Personnel ............................................................................. GP-22
PART 4 – EXISTING IMPROVEMENTS
Section 400 – Protection and Restoration
400-1 General ............................................................................................................... IM-1
Section 402 – Utilities
402-1 Location .............................................................................................................. IM-2
402-4 Relocation ........................................................................................................... IM-2
402-7 Utility Connection ................................................................................................ IM-2
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
Table of Contents
APPENDIX – PROJECT SPECIFICATIONS – CIVIC CENTER WATERPROOFING AND ROOF
REPAIRS PROJECT
007200 General Conditions ..................................................................................................... 1
007300 Supplementary Conditions .......................................................................................1-3
011000 Summary of Work ....................................................................................................1-3
012500 Substitution Procedures ...........................................................................................1-2
012600 Contract Modification Procedures ............................................................................1-3
013100 Project Management and Coordination ....................................................................1-3
013300 Submittal Procedures ..............................................................................................1-6
013515 CALGreen Environmental Requirements .................................................................1-2
014000 Quality Requirements ..............................................................................................1-8
015000 Temporary Facilities and Controls ...........................................................................1-4
017300 Execution ...........................................................................................................1-4
017700 Closeout Procedures ...............................................................................................1-3
024119 Selective Demolition ................................................................................................1-5
024150 Roofing Demolition ..................................................................................................1-3
053100 Steel Decking ..........................................................................................................1-6
033010 Concrete Spall Repair .............................................................................................1-5
055213 Pipe Guard Railings .................................................................................................1-5
061000 Rough Carpentry .....................................................................................................1-5
071900 Water Repellents ....................................................................................................1-4
075216 SBS Modified Bituminous Membrane Roofing ....................................................... 1-12
076200 Sheet Metal and Trim ............................................................................................ 1-11
079200 Joint Sealers ...........................................................................................................1-7
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
Table of Contents
APPENDICES
1. City Working Days Calendar
2. Architectural Specifications
3. Structural Calculations
4. Bid Schedule Reference
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
N-1
NOTICE INVITING SEALED
BIDS FOR PROPOSALS FOR
"CIVIC CENTER WATERPROOFING AND ROOF REPAIRS PROJECT"
NOTICE IS HEREBY GIVEN that the City of Rancho Cucamonga will receive through the City’s
online bid management system (“Planet Bids”), on or before the hour of 2:00 p.m. on November
4, 2025, sealed bids for the "CIVIC CENTER WATERPROOFING AND ROOF REPAIRS
PROJECT" in said City. The scope of work to be performed consists of, but not limited to,
furnishing all labor, materials, equipment, supervision and incidentals necessary for removal of
existing roof, installation of new roof membrane, demolition of concrete planters, and sealants at
joints and exterior surfaces. The contract documents call for 100 working days to complete this
construction. Engineer’s Estimate is $2,710,000.00.
An optional pre-bid meeting is scheduled for 9:00 a.m. on October 15, 2025, at 10500 Civic Center
Drive, Rancho Cucamonga, CA 91730. The City strongly recommends that all prospective bidders
attend in order to familiarize themselves with the existing site conditions, potential constraints,
and any factors that may affect their bid preparation. Failure to attend the pre-bid meeting shall
not relieve the bidder from complying with all project requirements or constitute grounds for claims
related to site conditions.
Bids must be submitted on the City’s bid forms as discussed within this document. A Bidder
(“Bidder”) may obtain a copy of the Contract Documents from Planet Bids.
The schedule of events for this bid is listed in the following table.
Schedule of Events
Event Description Date & Time
Bid Posted on Planet Bids September 30, 2025, 10:00 AM
Pre-bid Meeting October 15, 2025, 9:00 am
Questions Due October 17, 2025, 4:00 pm
Bid Response Due Date November 4, 2025, 2:00 pm
After said bid closing time, Bids will be publicly released on Planet Bids.
PREVAILING WAGE: Notice is hereby given that in accordance with the provisions of California
Labor Code, Division 2, Part 7, Chapter 1, Articles 1 and 2, the Contractor is required to pay not
less than the general prevailing rate of per diem wages for work of a similar character in the
locality in which the public work is performed, and not less than the general prevailing rate of per
diem wages for holiday and overtime work. In that regard, the Director of the Department of
Industrial Relations of the State of California is required to and has determined such general
prevailing rates of per diem wages. As such, a copy of prevailing wage rates may be found at
https://www.dir.ca.gov/Public-Works/Prevailing-Wage.html. The Contracting Agency also shall
cause a copy of such determinations to be posted at the job site.
No contractor or subcontractor may be listed on a bid proposal for a public works project unless
registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5
(with limited exceptions from this requirement for bid purposes only under Labor Code section
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
N-2
1771.1(a)).
No contractor or subcontractor may be awarded a contract for public work on a public works
project unless registered with the Department of Industrial Relations pursuant to Labor Code
section 1725.5.
This project is subject to compliance monitoring and enforcement by the Department of Industrial
Relations.
For all projects, the contractors and subcontractors must furnish electronic certified payroll
records to the Labor Commissioner.
Pursuant to provisions of Labor Code Section 1775, the Contractor shall forfeit, as penalty to the
City of Rancho Cucamonga, not more than two hundred dollars ($200.00) for each laborer,
workman, or mechanic employed for each calendar day or portion thereof, if such laborer,
workman or mechanic is paid less than the general prevailing rate of wages herein before
stipulated for any work done under the attached contract, by him or by any subcontractor under
him, in violation of the provisions of said Labor Code.
Attention is directed to the provisions in Sections 1777.5 and 1777.6 of the Labor Code concerning
the employment of apprentices by the Contractor or any subcontractor under him.
Section 1777.5, as amended, requires the Contractor or subcontractor employing tradesmen in
any apprenticable occupation to apply to the joint apprenticeship committee nearest the site of
the public works project and which administers the apprenticeship program in that trade for a
certificate of approval. The certificate will also fix the ratio of apprentices to journeymen that will
be used in the performance of the contract. The ratio of apprentices to journeymen in such cases
shall not be less than one to five except:
A. When unemployment in the area of coverage by the joint apprenticeship committee
has exceeded an average of 15 percent in the 90 days prior to the request of
certificate, or
B. When the number of apprentices in training in the area exceeds a ratio of one to
five, or
C. When the trade can show that it is replacing at least 1/30 of its membership through
apprenticeship training on an annual basis statewide or locally, or
D. When the Contractor provides evidence that he employs registered apprentices on
all of his contracts on an annual average of not less than one apprentice to eight
journeymen.
The Contractor is required to make contributions to funds established for the administration of
apprenticeship programs if he employs registered apprentices or journeymen in any apprenticable
trade on such contracts and if other Contractors on the public works site are making such
contributions.
The Contractor and subcontractor under him shall comply with the requirements of Sections
1777.5 and 1777.6 in the employment of apprentices.
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
N-3
Information relative to apprenticeship standards, wage schedules, and other requirements may
be obtained from the Director of Industrial Relations, the Administrator of Apprenticeship, San
Francisco, California, or from the Division of Apprenticeship Standards and its branch offices.
Eight (8) hours of labor shall constitute a legal day's work for all workmen employed in the
execution of this contract and the Contractor and any subcontractor under him shall comply with
and be governed by the laws of the State of California having to do with working hours as set forth
in Division 2, Part 7, Chapter 1, Article 3 of the Labor Code of the State of California as amended.
The Contractor or Subcontractor shall forfeit, as a penalty to the City of Rancho Cucamonga,
twenty-five dollars ($25.00) for each worker employed in the execution of the contract by the
respective contractor or subcontractor for each calendar day during which the worker is required
or permitted to work more than 8 hours in any one calendar day and 40 hours in any one calendar
week in violation of the provisions of this article.
Contractor agrees to pay travel and subsistence pay to each workman needed to execute the
work required by this contract as such travel and subsistence payments are defined in the
applicable collective bargaining agreement filed in accordance with Labor Code Section 1773.1.
The bidder must submit with his proposal, cash, cashier's check, certified check, or bidder's bond,
payable to the City of Rancho Cucamonga for an amount equal to at least 10% of the amount of
said bid as a guarantee that the bidder will enter into the proposed contract if the same is awarded
to him, and in event of failure to enter into such contract said cash, cashiers' check, certified
check, or bond shall become the property of the City of Rancho Cucamonga. The Bid Security
must be submitted in original hard copy directly to the City at 10500 Civic Center Drive, Rancho
Cucamonga, California Attn: City Clerk’s Office prior to the specified date and time for bid opening
as set forth in the Instructions to Bidders.
If the City of Rancho Cucamonga awards the contract to the next lowest bidder, the amount of
the lowest bidder's security shall be applied by the City of Rancho Cucamonga to the difference
between the low bid and the second lowest bid, and the surplus, if any shall be returned to the
lowest bidder.
The amount of the bond to be given to secure a faithful performance of the contract for said work
shall be 100% of the contract price thereof, and an additional bond in an amount equal to 100%
of the contract price for said work shall be given to secure the payment of claims for any materials
or supplies furnished for the performance of the work contracted to be done by the Contractor, or
any work or labor of any kind done thereon, and the Contractor will also be required to furnish a
certificate that he carries compensation insurance covering his employees upon work to be done
under contract which may be entered into between him and the said City of Rancho Cucamonga
for the construction of said work.
Contractor shall possess any and all contractor licenses, in form and class as required by any
and all applicable laws with respect to any and all of the work to be performed under this contract;
including, but not limited to, a Class "A" License (General Engineering Contractor) in accordance
with the provisions of the Contractor's License Law (California Business and Professions Code,
Section 7000 et. seq.) and rules and regulation adopted pursuant thereto.
The Contractor, pursuant to the "California Business and Professions Code," Section 7028.15,
shall indicate his or her State License Number on the bid, together with the expiration date, and
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
N-4
be signed by the Contractor declaring, under penalty of perjury, that the information being
provided is true and correct.
The work is to be done in accordance with the plans, and specifications of the City of Rancho
Cucamonga on file in the Office of the City Clerk at 10500 Civic Center Drive, Rancho
Cucamonga, California.
Digital copies of the plans, specifications, and bid proposal, including any future addenda or
revisions to the bid documents, are available on Planet Bids. It is the responsibility of each
prospective Bidder to download and print all Contract Documents for review and to verify the
completeness of Contract Documents before submitting a Bid. Note, copies of the plans,
specifications, bid proposal, addendums and revisions will not be provided, digital copies must be
downloaded from the above website. Prospective bidders must register for an account on
Planet Bids to be included on the prospective bidder’s list(s) and to receive email updates
of any addenda or revisions to the bid documents. Be advised that the information contained
on this site may change over time and without notice to prospective bidders or registered users.
While effort is made to keep information current and accurate and to notify registered prospective
bidders of any changes to the bid documents, it is the responsibility of each prospective bidder to
register with Planet Bids and to check this website on a DAILY basis through the close of bids for
any applicable addenda or updates.
The successful bidder will be required to enter into a contract satisfactory to the City of Rancho
Cucamonga.
In accordance with the requirements of Section 9-3.2 of the General Provisions, as set forth in
the Plans and Specifications regarding the work contracted to be done by the Contractor, the
Contractor may, upon the Contractor's request and at the Contractor's sole cost and expense,
substitute authorized securities in lieu of monies withheld (performance retention).
The City of Rancho Cucamonga, reserves the right to reject any or all bids.
Questions regarding this Notice Inviting Sealed Bids for "CIVIC CENTER WATERPROOFING
AND ROOF REPAIRS PROJECT" shall be submitted on October 17, 2025, through Planet Bids,
per the schedule of events. All written questions, if answered, will be answered in writing,
conveyed to all interested Bidders, and posted through Planet Bids. Oral statements regarding
this Bid by any persons should be considered unverified information unless confirmed in writing.
ADVERTISE ON: September 30th, 2025, and October 7th, 2025
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
C-1
INSTRUCTIONS TO BIDDERS
A. PROPOSALS
Proposals under these specifications shall be submitted through Planet Bids on the blank forms
furnished as part of the contract documents. When presented, all forms must be completely made
out in the manner and form indicated and must also meet the following requirements:
1. The proposal must be properly signed by the bidder, whose address, telephone number,
and California Contractor's license number must be shown. Electronic signatures are
acceptable on all forms except for the Bidder’s Bond.
2. The Contractor shall perform with his own organization and with workmen under his
immediate supervision, work of a value not less than 50% of the total value of all work
embraced in the contract, except that any designated “Specialty Items” may be performed
by subcontract and the amount of any such “Specialty Items” so performed may be
deducted from the Contract Price before computing the amount required to be performed
by the Contractor with its own organization. “Specialty Items” will be identified by the
Agency in the Bid or Proposal. Where an entire item is subcontracted, the value of work
subcontracted will be based on the Contract Unit Price. When a portion of an item is
subcontracted, the value of work subcontracted will be based on the estimated percentage
of the Contract Unit Price. This will be determined from information submitted by the
Contractor, and subject to approval by the Engineer.
With the proposal, the Contractor shall list (a) the name, address, and the California
Contractor License Number of each subcontractor who will perform work included in the
contract, and (b) the portion of work which will be done by each subcontractor. All
subcontractors performing work in excess of 1/2% of the total value of the contract or, in
the case of bids or offers for the construction of streets or highways, including bridges, in
excess of 1/2% of the total value of the contract or ten thousand dollars ($10,000.00)
whichever is greater, shall be listed. The successful bidder shall be prohibited from
performing work on this project with a subcontractor who is ineligible to perform work on
the project pursuant to Section 1777.1 or 1777.7 of the Labor Code.
3. The correction of any discrepancies in or omission from the drawings, specifications or
other contract documents or any interpretation thereof during the bidding period will be
made only by written addendum. See Item E, Addendum, for further information and
instructions.
4. Bids shall not contain any recapitulation, inserted by the Bidder, of work to be done.
Alternative proposals will not be considered unless specifically requested. No oral or
telephone modifications will be considered.
5. Each bid shall be valid for no less than thirty (30) days after the opening of the proposals.
6. No mention shall be made in the proposal of Sales Tax, Use Tax, or any other tax, as all
amounts bid will be deemed and held to include any such taxes which may be applicable.
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
C-2
BID BOND
Bid must be accompanied by cash, cashier's check, certified check, or surety bond in an amount
not less than 10% of the total amount of bid. Checks and bond shall be made payable to the City
of Rancho Cucamonga. The bid security must be submitted in original hard copy directly to the
City Clerk’s office at 10500 Civic Center Drive, Rancho Cucamonga, California Attn: City Clerk’s
Office prior to specified time and date for the Bid opening.
BID SCHEDULE
The Bid Schedule is available on Planet Bids through the “Line Items” tab. Bidders must insert
and submit their Bid prices directly through Planet Bids by selecting “Place eBid” under the “Line
Items” tab. The Bid Schedule will be incorporated into the Contract Documents. Failure to submit
the Bid Schedule will render a bid nonresponsive. The costs of any Work shown or required in
the Contract Documents, are to be included in the Lump Sum Pay Item and no additional
compensation shall be due to the Contractor by virtue of the Contractor’s compliance with the
Contract Documents. The contractor shall submit a Schedule of Values in duplicate within 15 days
after date established in Notice to Proceed. The Schedule of Values shall be approved by the
engineer prior to construction.
Appendix 4 shows a bid schedule reference. This bid schedule is provided as a basis for reference
only, and the City does not, expressly or by implication, agree that the actual amount of work will
correspond therewith, but reserves the right to increase or decrease the amount of any portion of
the work, or to omit any portion of the work, as may be deemed advisable or necessary by the
Designer or Engineer. It is the Bidder’s responsibility to confirm that all necessary items to
construct the improvements are accounted for within pricing submitted.
COMPLETION OF BID FORMS
Bids shall only be prepared using copies of the Bid Forms which are included in the Contract
Documents posted on Planet Bids. The use of substitute Bid Forms other than clear and correct
photocopies of those provided by the City will not be permitted. Bids shall be executed by an
authorized signatory as described in these Instructions to Bidders. Electronic signatures are
acceptable on all forms except for the Bidder’s Bond. In addition, Bidders shall fill in all blank
spaces (including inserting “N/A” where applicable), and initial all interlineations, alterations, or
erasures to the Bid Forms. Bidders shall neither delete, modify, nor supplement the printed matter
on the Bid Forms nor make substitutions thereon. USE OF BLACK OR BLUE INK, INDELIBLE
PENCIL, OR A TYPEWRITER IS REQUIRED. Deviations in the Bid Forms may result in the Bid
being deemed non-responsive.
The following listed documents includes all bid forms that are required to be submitted for the
Bidder to be considered responsive. All forms must be submitted electronically through Planet
Bids directly with the exception of the Bid Bond as discussed above. Details for submitting the Bid
Schedule via Planet Bids are discussed above.
· Bid Schedule – Lump Sum Pricing (Through Planet Bids)
· Bidder Agreement
· Bidder Information
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
C-3
· Subcontractor Information
· Declaration of Eligibility to Contract
· Certificate of Non-Discrimination by Contractors
· Non-Collusion Declaration
· Bid Bond (Original hard copy directly to the City Clerk’s office as discussed above)
· Signed Addendum Forms (If Necessary) – Submitted as one combined PDF
Failure of a Bidder to fully execute and submit all of the listed documents with the Bid will render
a Bid as non-responsive and subject to rejection.
SIGNATURE OF CONTRACTOR
Corporation
The signature must contain the name of the corporation, must be signed by the President,
Secretary, or Assistant Secretary. Other persons may sign for the corporation in lieu of the above;
however, a Certified copy (including the original corporate seal) of a resolution of the corporate
board of directors so authorizing them to do so must also be provided to the City Clerk's office as
part of the Bidder’s response.
Partnership
The names of all persons comprising the partnership or copartnership must be stated. The bid
must be signed by all partners comprising the partnership unless proof in the form of a certified
copy of a certificate of partnership acknowledging the signer to be a general partner authorized
to sign the contract on behalf of the partnership is presented to the City Clerk, in which case the
general partner may sign.
Joint Venture
Bids submitted as a joint venture must so state and be signed by each joint venture.
Individual
Bids submitted by an individual must be signed by the bidder, unless a general power of attorney,
not more than 60 days old, must be provided as part of the Bidder’s response to the City Clerk's
office, in which case the attorney in fact may sign for the individual.
The above rules also apply in the case of the use of a fictitious business name. In addition, where
a fictitious name is used, it must be so indicated in the signature.
B. DELIVERY OF PROPOSAL
Bids shall be submitted electronically through the Planet Bids as individual attachments. No other
method of submitting Bids will be accepted. Bidders may not submit Bids by fax, email, telephone,
mail, or other means; any Bids received through any means other than Planet Bids will be returned
unopened.
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
C-4
It is the responsibility solely of Bidder to see that its Bid is properly submitted to Planet Bids in
proper form and prior to the stated closing time. THE ELECTRONIC BID MANAGEMENT
SYSTEM WILL NOT ACCEPT LATE BIDS. City will only consider Bids that have transmitted
successfully and have been issued a confirmation number with a time stamp from Planet Bids
indicating that the Bid was submitted successfully. Bidders shall be solely responsible for
informing themselves with respect to the proper utilization of the online bid management system,
for ensuring the capability of their computer system to upload the required documents, and for
the stability of their internet service. Failure of the Bidder to successfully submit an electronic Bid
shall be at the Bidder’s sole risk, and no relief will be given for late and/or improperly submitted
Bids.
Bidders experiencing any technical difficulties with the bid submission process may contact Planet
Bids Support at (818) 992-1771. Neither the City nor Planet Bids make any guarantee as to the
timely availability of assistance or assurance that any given problem will be resolved by the bid
submission date and/or time.
C. WITHDRAWAL OF PROPOSALS
Any Bid may be withdrawn through Planet Bids, incurring no penalty, at any time prior to the
scheduled closing time for receipt of bids. Requests to withdraw Bids shall be worded so as not
to reveal the amount of the original Bid. Withdrawn Bids may be resubmitted until the time and
day set for the receipt of bids, provided that resubmitted Bids are in conformance with the
instructions herein.
D. DISQUALIFICATION OF BIDDERS AND PROPOSALS
The bidder's attention is directed to the "California Business and Professions Code," Section
7028.15, which requires the Contractor to indicate his or her State License Number on the bid,
together with the expiration date, and be signed by the Contractor declaring, under penalty of
perjury, that the information being provided is true and correct.
"Any bid not containing this information, or a bid containing information which is subsequently
proven false, shall be considered non-responsive and shall be rejected by the public agency."
More than one proposal for the same work from any individual, firm partnership, corporation, or
association under the same or different names will not be accepted; and reasonable grounds for
believing that any bidder is interested in more than one proposal for the work will be cause for
rejecting all proposals in which such bidder is interested.
Proposals in which the prices are obviously unbalanced, and those which are incomplete or show
any alteration of form or contain any additions or conditional or alternate bids that are not called
for or otherwise permitted, may be rejected. A proposal on which the signature of the bidder has
been omitted will be rejected.
E. ADDENDUM
The correction of any discrepancies in or omission from the drawings, specifications or other
contract documents or any interpretation thereof during the bidding period will be made only by
written addendum. A copy of each such addendum will be posted on Planet Bids, and it shall be
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
C-5
the bidder’s responsibility to download all posted addenda and a signed copy of the addendum
shall be submitted as part of the bid documents through Planet Bids. Failure to do so may result
in bid rejection. Said addendum shall be made part of the contract. Any other interpretation or
explanation of such documents will not be considered binding. Please Note: Bidders are
responsible for ensuring that they have received any and all Addenda. To this end, each Bidder
should visit Planet Bids to verify that it has received all Addenda issued, if any, prior to the Bid
opening. The Bidder shall indicate the Addenda received prior to bidding in the space provided
in the Bid Form. Failure to indicate all Addenda may be sufficient cause for rejecting the Bid.
F. EXAMINATION OF PLANS, SPECIFICATIONS, AND SITE OF WORK
The plans and specifications to which the proposal forms refer are on file and open to inspection
in the office of the City Engineer.
Bidders must satisfy themselves by personal examination of the work site, plans, specifications,
and other contract documents, and by any other means as they may believe necessary, as to the
actual physical conditions, requirements and difficulties under which the work must be performed.
No bidder shall at any time after submission of a proposal make any claim or assertion that there
was any misunderstanding or lack of information regarding the nature of amount of work
necessary for the satisfactory completion of the job. Any errors, omissions, or discrepancies
found in the plans, specifications, or other contract documents shall be called to the attention of
the Resident Engineer and clarified prior to the submission of proposals.
G. ESTIMATED QUANTITIES
The quantities given in the proposal and contract form are approximate, being given as a basis
for the comparison of bids only, and the City does not, expressly or by implication, agree that the
actual amount of work will correspond therewith, but reserves the right to increase or decrease
the amount of any class or portion of the work, or to omit any portion of the work, as may be
deemed advisable or necessary by the Engineer.
However, when the quantity shown in the Proposal has the designation (F) following the Bid Item
in the Schedule of Unit Cost and Lump Sum amounts, that designation indicates the final pay
quantity and/or costs and shall be the final quantity used for which payment will be made, unless
the dimensions of the portion of the work shown on the plans are revised by the Engineer, or
unless the portion of the work is eliminated. If the dimensions of the specific portion of the work
are revised, and the revisions result in an increase or decrease in the estimated quantity of the
portion of the work, the final quantity for payment will be revised in the amount represented by
the changes in the dimensions. If the specific portion of the work is eliminated then the final pay
quantity designated for the specific portion of the work will be eliminated.
The estimated quantity of each specific portion of the work designated on the plans as a final
pay quantity shall be considered as approximate only and no guarantee is made that the
quantities which can be determined by computations, based on the details and dimensions
shown on the plans, will equal the estimated quantities. No allowance will be made in the event
that the quantities based on computations do not equal the estimated quantities.
When portions of an item have been designated on the plan as final pay quantities, portions not
so designated will be measured and paid for in accordance with the applicable provisions of
these specifications and the special provisions.
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
C-6
In case of a discrepancy between the quantities shown on the plan as final pay quantities and
the quantity of the same item shown in the Engineer’s Estimate, payment will be based on the
final pay quantities shown on the plans.
H. COMPETENCY OF BIDDER
The bidder shall be licensed under the provisions of Chapter 9, Division 3, of the Business and
Professions Code of the State of California to do the type of work contemplated in the contract
and shall be skilled and regularly engaged in the general class or type of work called for under
this contract. To assist in the determination of competency, the Contractor shall complete the
attached "Bidder Information" form.
I. AWARD AND EXECUTION OF CONTRACT
Acceptance or Rejection
The City of Rancho Cucamonga, reserves the right to reject any or all bids. The City reserves the
right to waive inconsequential errors and/or irregularities.
Award of Contract
The lowest responsive bidder will be calculated per Section 20103.8 (a) of the Public Contract
Code as the lowest bid price on the base contract without consideration of additive (or deductive)
items. The award of a contract, if it be awarded, will be to the above lowest responsive bidder.
No proposal will be considered from a Contractor who is not registered as a prospective
bidder on the City’s Planet Bids website.
The award, if made, will be made as expeditiously as possible after the opening of the proposals
and in recognition of Section A.7. above. In no case will an award be made until all necessary
investigations are made into the responsibility of the bidder to whom it is proposed to award the
contract.
Contractor shall possess any and all contractor licenses, in form and class as required by any
and all applicable laws with respect to any and all of the work to be performed under this contract;
including, but not limited to, a Class "A" License (General Engineering Contractor) that authorize
the contractor and subcontractors to perform the work contemplated under this bid package in
accordance with the provisions of the Contractor's License Law (California Business and
Professions Code, Section 7000, et. seq.) and rules and regulations adopted pursuant thereto at
the time this contract is awarded.
Bonds
The Contractor shall furnish a good and sufficient surety bond issued by a surety company
authorized to do business in the State of California in the sum equal to 100% of the total bid,
conditioned for the Faithful Performance by the Contractor of all covenants, stipulations any
agreements contained in said contract; an addition, the Contractor shall furnish a Labor and
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
C-7
Materials Bond and a sum equal to 100% of the contract price, as required by the provisions of
Section 9554 of the California Civil Code.
Workers' Compensation
Before commencing any work under the contract, the successful bidder must file with the Engineer
a certificate by an insurance carrier authorized under the laws of the State to insure employers
against liability for compensation under the "Worker's Compensation Insurance and Safety Act,"
stating that such bidder has taken out for the term for which the contract is to run, compensation
insurance covering his full liability work or labor necessary to carry out the provisions of this
contract, and an agreement to immediately notify said Engineer if said policy should lapse or be
canceled. In the event that such policy should become inoperative at any time before the
completion of the work, all work shall cease immediately until a new policy is obtained and any
time so lost shall not entitle Contractor to any extension of time.
Execution of Contract
The Contract shall be signed by the successful bidder and returned together with the other
required documents, within fifteen (15) days after the bidder has received notice that the contract
has been awarded, unless extended by said City Council in writing. No proposal shall be
considered binding upon the City until the execution of the contract.
Failure to execute a contract and file acceptable documents as provided herein within fifteen (15)
days from receipt of notice of award shall be just cause for the annulment of the award. In the
event of failure to enter into such contract, the lowest bidder’s security (cash, cashier’s check,
certified check, or bond) shall become the property of the City of Rancho Cucamonga.
If the City of Rancho Cucamonga awards the contract to the next lowest bidder, the amount of
the lowest bidder’s security shall be applied by the City of Rancho Cucamonga to the difference
between the low bid and the second lowest bid, and the surplus, if any shall be returned to the
lowest bidder.
Liquidated Damages and Working Days
Attention is directed to the provisions of Section 6-9 of the Specifications.
The Contractor shall pay to the City of Rancho Cucamonga the sum of $5,200 per day for each
and every calendar day's delay in finishing the work in excess of 100 working days.
J. RETURN OF PROPOSAL GUARANTEE
The cash, check or bond of a bidder to whom the contract has been awarded will be returned to
him after all of the acts, for the performance of which said security is required, have been fully
performed. The cash, checks or bonds of the remaining qualified bidders will be returned when
the bidder to whom the contract has been awarded has properly executed and returned all of the
required Contract Documents. Cash, checks or bid bonds of other bidders will be returned when
their proposals are rejected or in any event at the expiration of thirty (30) days from the date of
award of contract.
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
C-8
K. CITY BUSINESS LICENSE
Municipal Ordinances requires the issuance of a City Business License as a condition precedent
to being engaged as a Contractor within the City.
L. EQUIVALENT MATERIALS
Attention is directed to the provisions of Section 4-6 of the Standard Specifications for Public
Works Construction.
M. RELIEF OF BIDDERS
Attention is directed to the provisions of Government Code Sections 14350 to 14355, inclusive,
(State Contract Act) concerning relief of bidders and in particular to the requirement therein, that
if the bidder claims a mistake was made in his bid, the bidder shall give the City written notice
within five days after the opening of the bids of the alleged mistake, specifying in the notice in
detail how the mistake occurred
N. PRE-BID MEETING
A pre-bid meeting is scheduled for 9:00 a.m. on October 15, 2025, at 10500 Civic Center Drive.
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
BIDDER INFORMATION
The bidder shall furnish the following information. Additional sheets may be attached if necessary.
Name of Firm:
Type of Firm: Corporation Individual Partnership
Business Mailing Address:
Place of Business:
Telephone No.:
Contractor's License: State: License No.:
Public Works DIR No.:
Names and titles of all
members of the firm:
Number of years as a contractor in construction work of this type:
Three projects of this type recently completed:
Contract Amount Type of Project
Date
Completed
Owner's Name &
Address
Person who inspected site of the proposed work for your firm:
Name:
Inspection
Date:
NOTE: If requested by the City, the Bidder shall furnish a notarized financial statement,
references, and other information, sufficiently comprehensive to permit an appraisal of his current
financial condition.
UCLA , 1060 Veteran Ave., Los Angeles, CA 900954/8/2025 $1,288,432.00 UCLA Young Hall
City of El Monte, 11333 Valley Blvd., El Monte, CA 917336/14/2024El Monte Community Center $1,403,538.00
City of Glendale, 633 E. Broadway, Glendale, CA 912066/6/2024Glendale Central Library Roof $3,097,476.00
10/15/2025Joon Im
6 Years
Secretary
President
Junghee Seo
Don Seo
1000455020
Upland, CA 91786
2095 W Arrow Rte.
909-766-3200
1057266CA
Upland, CA 91786
2095 W Arrow Rte.
X
AME Builders, Inc. dba AME Roofing
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
SUBCONTRACTORS INFORMATION
In compliance with Section 2-3 of the Standard Specifications and the Provisions of the Public
Contract Code Section 4100, the undersigned bidder herewith sets forth the name, location of the
place of business and California Contractors License Number of each subcontractor who will
perform work or labor or render service to the general contractor in or about the construction of
the work or improvement in an amount in excess of onehalf of one percent (1/2%) of the general
contractor's total bid or, in the case of bids or offers for the construction of streets or highways,
including bridges, in excess of onehalf of one percent (1/2%) of the general contractor's total bid
or ten thousand dollars ($10,000.00), whichever is greater and the portion of the work which will
be done by each subcontractor as follows:
Subcontractor's
Name
Business
Address
License
No
DIR
No.
Description of
Work
Percent (%)
of Total Bid
Total % of the work to be performed by Subcontractors listed above: %
Effective July 1, 2014, the bidder shall provide the California Contractor License Number of each
subcontractor listed. New Section 4104 contains the following language:
“An inadvertent error in listing the California contractor license number provided pursuant to
paragraph (1) shall not be grounds for filing a bid protest or grounds for considering the bid
nonresponsive if the corrected contractor’s license number is submitted to the public entity by the
prime contractor within 24 hours after the bid opening and provided the corrected contractor’s
license number corresponds to the submitted name and location for that subcontractor.”
B&M Tear Off Inc Brentwood, CA 769864 1000009312 Demolition 6.5%
Asia General Compton, CA 932915 1000052552 Guardrail 4%
10.5
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
City of Rancho Cucamonga - Construction
Q & A for Project Civic Center Waterproofing and Roof
Repairs Project
Issued on 09/30/2025
Bid Due on November 04, 2025 2:00 PM (PDT)
Exported on 10/28/2025
Submitted By Submit Date Question Answer Release Date Set Status
Danny Letner, Inc. dba Letner Roofing Company 10/16/2025 2:23:25 PM
Hello, is it accurate that the only acceptable license to bid as
a prime for this project is a Class "A" license? or will B, or C39
be accepted as well?
Only a Class "A" license will be acceptable
to bid as a prime for this project. 10/21/2025 9:20:01 AM 1.1 Released Via Email
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
City of Rancho Cucamonga - Construction
Civic Center Waterproofing and Roof Repairs Project, bidding on 11/04/2025 2:00 PM (PST)
Page 1 of 4
Printed 11/19/2025
PlanetBids
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
City of Rancho Cucamonga - Construction
Civic Center Waterproofing and Roof Repairs Project, bidding on 11/04/2025 2:00 PM (PST)
Page 2 of 4
Printed 11/19/2025
PlanetBids
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
City of Rancho Cucamonga - Construction
Civic Center Waterproofing and Roof Repairs Project, bidding on 11/04/2025 2:00 PM (PST)
Page 3 of 4
Printed 11/19/2025
PlanetBids
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
City of Rancho Cucamonga - Construction
Civic Center Waterproofing and Roof Repairs Project, bidding on 11/04/2025 2:00 PM (PST)
Page 4 of 4
Printed 11/19/2025
PlanetBids
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
C-9
C O N T R A C T
AGREEMENT
KNOW ALL MEN BY THESE PRESENT: That the following agreement is made and entered into,
in triplicate, as of the date executed by the City Clerk and the Mayor, by and
between AME Builders, Inc. , hereinafter referred to as the "CONTRACTOR" and
the City of Rancho Cucamonga, California, hereinafter referred to as "CITY."
WHEREAS, pursuant to the Notice Inviting Sealed Bids or Proposals, bids were received, publicly
opened, and declared on the date specified in said notice; and
WHEREAS, City did accept the bid of Contractor; and
WHEREAS, City has authorized the City Clerk and Mayor to enter into a written contract with
Contractor for furnishing labor, equipment, and material for the construction of "CIVIC CENTER
WATERPROOFING AND ROOF REPAIRS PROJECT."
NOW THEREFORE, in consideration of the mutual covenants herein contained, it is agreed:
1. GENERAL SCOPE OF WORK: Contractor shall furnish all necessary labor, tools,
materials, appliances, and equipment for and do the work for the "CIVIC CENTER
WATERPROOFING AND ROOF REPAIRS PROJECT." Said work to be performed in
accordance with specifications and standards on file in the office of the City Engineer and
in accordance with bid prices hereinafter mentioned and in accordance with the instruction
of the City Engineer.
2. INCORPORATED DOCUMENTS TO BE CONSIDERED COMPLEMENTARY: The
aforesaid specifications are incorporated herein by reference thereto and made a part
hereof with like force and effect as if all of said documents were set forth in full herein.
Said documents, the Resolution Inviting Bids attached hereto, together with this written
agreement, shall constitute the entire contract between the parties. This contract is
intended to require a complete and finished piece of work and anything necessary to
complete the work properly and in accordance with the law and lawful governmental
regulations shall be performed by the Contractor whether set out specifically in the
contract or not. Should it be ascertained that any inconsistency exists between the
aforesaid documents and this written agreement, the provisions of this written agreement
shall control.
3. TERMS OF CONTRACT: The undersigned bidder agrees to execute the contract within
fifteen (15) days from the date of notice of award of the contract or upon notice by City
after the fifteen (15) days, and to complete his portion of the work within 100 working days
from the date specified in the Notice to Proceed. The bidder agrees further to the
assessment of liquidated damages in the amount of $5,200 for each calendar day the
work remains incomplete beyond the expiration of the completion date. City may deduct
the amount thereof from any monies due or that may become due the Contractor under
this contract. Progress payments made after the scheduled date of completion shall not
constitute a waiver of liquidated damages.
4. INSURANCE: Contractor shall procure and maintain for the duration of the contract, and
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
C-10
for 2 years thereafter, insurance against claims for injuries to persons or damages to
property which may arise from or in connection with the performance of the work
hereunder by the Contractor, his agents, representatives, employees, or subcontractors.
MINIMUM SCOPE AND LIMIT OF INSURANCE
Coverage shall be at least as broad as:
a. Commercial General Liability (CGL): Insurance Services Office (ISO) Form CG 00
01 covering CGL on an “occurrence” basis, including products and completed
operations, property damage, bodily injury and personal & advertising injury with
limits no less than $5,000,000 per occurrence. If a general aggregate limit applies,
either the general aggregate limit shall apply separately to this project/location
(ISO CG 25 03 or 25 04) or the general aggregate limit shall be twice the required
occurrence limit.
b. Automobile Liability: Insurance Services Office Form CA 0001 covering Code 1
(any auto), with limits no less than $1,000,000 per accident for bodily injury and
property damage.
c. Workers’ Compensation insurance as required by the State of California, with
Statutory Limits, and Employers’ Liability insurance with a limit of no less than
$1,000,000 per accident for bodily injury or disease.
d. Builder’s Risk (Course of Construction) insurance utilizing an “All Risk” (Special
Perils) coverage form, with limits equal to the completed value of the project and
no coinsurance penalty provisions.
e. Surety Bonds. Contractor shall provide the following Surety Bonds:
i. Bid bond
ii. Performance bond
iii. Payment bond
iv. Maintenance bond
f. The Payment Bond and the Performance Bond shall be in a sum equal to the
contract price. If the Performance Bond provides for a one-year warranty a
separate Maintenance Bond is not necessary. If the warranty period specified in
the contract is for longer than one year a Maintenance Bond equal to 10% of the
contract price is required. Bonds shall be duly executed by a responsible corporate
surety, authorized to issue such bonds in the State of California and secured
through an authorized agent with an office in California.
g. Professional Liability (if Design/Build), with limits no less than $2,000,000 per
occurrence or claim, and $2,000,000 policy aggregate. The retroactive date must
be shown, and this date must be before the execution date of the contract or the
beginning of contract work. Insurance must be maintained and evidence of
insurance must be provided for at least five (5) years after completion of contract
work. If coverage is canceled or non-renewed, and not replaced with another
claims-made policy form with a retroactive date prior to the contract effective, or
start of work date, the Contractor must purchase extended reporting period
coverage for a minimum of five (5) years after completion of contract work. A copy
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
C-11
of the claims reporting requirements must be submitted to the Entity for review.
h. Contractors’ Pollution Legal Liability and/or Asbestos Legal Liability and/or Errors
and Omissions (if project involves environmental hazards) with limits no less than
$1,000,000 per occurrence or claim, and $2,000,000 policy aggregate. If the
services involve lead-based paint or asbestos identification/remediation, the
Contractors Pollution Liability policy shall not contain lead-based paint or asbestos
exclusions. If the services involve mold identification/remediation, the Contractors
Pollution Liability policy shall not contain a mold exclusion, and the definition of
Pollution shall include microbial matter, including mold.
If the contractor maintains broader coverage and/or higher limits than the minimums
shown above for all policies, the Entity requires and shall be entitled to the broader
coverage and/or higher limits maintained by the contractor. Any available insurance
proceeds in excess of the specified minimum limits of insurance and coverage shall
be available to the Entity.
Self-Insured Retentions
Self-insured retentions must be declared to and approved by the Entity. At the option of
the Entity, either: the contractor shall cause the insurer shall to reduce or eliminate such
self-insured retentions as respects the Entity, its officers, officials, employees, and
volunteers; or the Contractor shall provide a financial guarantee satisfactory to the Entity
guaranteeing payment of losses and related investigations, claim administration, and
defense expenses. The policy language shall provide, or be endorsed to provide, that
the self-insured retention may be satisfied by either the named insured or Entity.
Other Insurance Provisions:
Additional Insured
The Entity, its officers, officials, employees, and volunteers are to be covered as
additional insureds on the CGL policy with respect to liability arising out of work or
operations performed by or on behalf of the Contractor including materials, parts,
or equipment furnished in connection with such work or operations and
automobiles owned, leased, hired, or borrowed by or on behalf of the Contractor.
General liability coverage can be provided in the form of an endorsement to the
Contractor’s insurance at least as broad as one of the following ISO ongoing
operations Forms: CG 20 10 or CG 20 26 or CG 20 33 (not allowed from
subcontractors), or CG 20 38; and one of the following ISO completed operations
Forms: CG 20 37, 2039 (not allowed from subcontractors), or CG 20 40.
Primary Insurance
For any claims related to this project, the Contractor’s insurance coverage shall be
primary insurance coverage at least as broad as ISO CG 20 01 04 13 as respects
the Entity, its officers, officials, employees, and volunteers. Any insurance or self-
insurance maintained by the Entity, its officers, officials, employees, or volunteers
shall be excess of the Contractor’s insurance and shall not contribute with it.
Notice of Cancellation
Contractor shall provide immediate written notice if (1) any of the required
insurance policies is terminated; (2) the limits of any of the required polices are
reduced; (3) or the deductible or self-insured retention is increased. In the event
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
C-12
of any cancellation or reduction in coverage or limits of any insurance, Contractor
shall forthwith obtain and submit proof of substitute insurance.
Builder’s Risk (Course of Construction) Insurance
Contractor may submit evidence of Builder’s Risk insurance in the form of Course
of Construction coverage. Such coverage shall name the Entity as a loss payee as
their interest may appear.
If the project does not involve new or major reconstruction, at the option of the
Entity, an Installation Floater may be acceptable. For such projects, a Property
Installation Floater shall be obtained that provides for the improvement, remodel,
modification, alteration, conversion or adjustment to existing buildings, structures,
processes, machinery and equipment. The Property Installation Floater shall
provide property damage coverage for any building, structure, machinery or
equipment damaged, impaired, broken, or destroyed during the performance of
the Work, including during transit, installation, and testing at the Entity’s site.
Acceptability of Insurers
Insurance is to be placed with insurers authorized to conduct business in the state
with a current A.M. Best rating of no less than A: VII, unless otherwise acceptable
to the Entity.
Waiver of Subrogation
Contractor hereby agrees to waive rights of subrogation which any insurer of
Contractor may acquire from Contractor by virtue of the payment of any loss.
Contractor agrees to obtain any endorsement that may be necessary to affect this
waiver of subrogation, but this provision applies regardless of whether or not the
Entity has received a waiver of subrogation endorsement from the
insurer. However, the Workers’ Compensation policy shall be endorsed with a
waiver of subrogation in favor of the Entity for all work performed by the Contractor,
its employees, agents and subcontractors.
Verification of Coverage
Contractor shall furnish the Entity with original Certificates of Insurance including
all required amendatory endorsements (or copies of the applicable policy language
effecting coverage required by this clause) and a copy of the Declarations and
Endorsement Page of the CGL policy listing all policy endorsements to Entity
before work begins. However, failure to obtain the required documents prior to the
work beginning shall not waive the Contractor’s obligation to provide them. The
Entity reserves the right to require complete, certified copies of all required
insurance policies, including endorsements, required by these specifications, at
any time.
Subcontractors
Contractor shall require and verify that all subcontractors maintain insurance
meeting all the requirements stated herein, and Contractor shall ensure that Entity
is an additional insured on insurance required from subcontractors. For CGL
coverage subcontractors shall provide coverage with a form at least as broad as
CG 20 38 04 13.
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
C-13
Special Risks or Circumstances
Entity reserves the right to modify these requirements, including limits, based on
the nature of the risk, prior experience, insurer, coverage, or other circumstances.
5. PREVAILING WAGE: Notice is hereby given that in accordance with the provisions of
California Labor Code, Division 2, Part 7, Chapter 1, Articles 1 and 2, the Contractor is
required to pay not less than the general prevailing rate of per diem wages for work of a
similar character in the locality in holiday and overtime work. In that regard, the Director
of the Department of Industrial Relations of the State of California is required to and has
determined such general prevailing rates of per diem wages. Copies of such prevailing
rates of per diem wages are on file in the office of the City Clerk of the City of Rancho
Cucamonga, 10500 Civic Center Drive, Rancho Cucamonga, California, and are available
to any interested party on request. City also shall cause a copy of such determinations to
be posted at the job site.
Pursuant to provisions of Labor Code Section 1775, the Contractor shall forfeit, as penalty
to City, not more than two hundred dollars ($200.00) for each laborer, workman, or
mechanic employed for each calendar day or portion thereof if such laborer, workman, or
mechanic is paid less than the general prevailing rate of wages hereinbefore stipulated for
any work done under the attached contract, by him or by any subcontractor under him, in
violation of the provisions of said Labor Code.
6. APPRENTICESHIP EMPLOYMENT: In accordance with the provisions of Section 1777.5
of the Labor Code as amended by Chapter 971, Statutes of 1939, and in accordance with
the regulations of the California Apprenticeship Council, properly indentured apprentices
may be employed in the prosecution of the work.
Attention is directed to the provisions in Section 1777.5 and 1777.6 of the Labor Code
concerning the employment of apprentices by the Contractor or any subcontractor under
him.
Section 1777.5, as amended, requires the Contractor or subcontractor employing
tradesmen in any apprenticable occupation to apply to the joint apprenticeship committee
nearest the site of the public works project and which administers the apprenticeship
program in that trade for a certificate of approval. The certificate will also fix the ratio of
apprentices to journeymen that will be used in the performance of the contract. The ratio
of apprentices to journeymen in such cases shall not be less than one to five except:
a. When unemployment in the area of coverage by the joint apprenticeship committee has
exceeded an average of 15 percent in the 90 days prior to the request for certificate, or
b. When the number of apprentices in training in the area exceeds a ratio of one to five,
or
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
C-14
c. When the trade can show that it is replacing at least 1/30 of its membership through
apprenticeship training on an annual basis statewide or locally, or
d. When the Contractor provides evidence that he employs registered apprentices on all
of his contracts on an annual average of not less than one apprentice to eight
journeymen.
The Contractor is required to make contributions to funds established for the
administration of apprenticeship programs if he employs registered apprentices or
journeymen in any apprenticable trade on such contracts and if other contractors on the
public works site are making such contributions.
The Contractor and subcontractor under him shall comply with the requirements of
Sections 1777.5 and 1777.6 in the employment of apprentices.
7. LEGAL HOURS OF WORK: Eight (8) hours of labor shall constitute a legal day's work for
all workmen employed in the execution of this contract, and the Contractor and any
subcontractor under him shall comply with and be governed by the laws of the State of
California having to do with working hours set forth in Division 2, Part 7, Chapter 1, Article
3, of the Labor Code of the State of California as amended.
The Contractor or Subcontractor shall forfeit, as a penalty to the City of Rancho
Cucamonga, twenty-five dollars ($25.00) for each worker employed in the execution of the
contract by the respective contractor or subcontractor for each calendar day during which
the worker is required or permitted to work more than 8 hours in any one calendar day
and 40 hours in any one calendar week in violation of the provisions of this article.
8. TRAVEL AND SUBSISTENCE PAY: Contractor agrees to pay travel and subsistence pay
to each workman needed to execute the work required by this contract as such travel and
subsistence payments are defined in the applicable collective bargaining agreements filed
in accordance with Labor Code Section 1773.1.
9. CONTRACTOR'S LIABILITY: The City of Rancho Cucamonga and its elected officials,
officers, agents and employees shall not be answerable or accountable in any manner for
any loss or damage that may happen to the work or any part thereof, or for any of the
materials or other things used or employed in performing the work; or for injury or damage
to any person or persons, either workmen, employees of the Contractor or his
subcontractors or the public, or for damage to adjoining or other property from any cause
whatsoever arising out of or in connection with the performance of the work. The
Contractor shall be responsible for any damage or injury to any person or property
resulting from defects or obstructions or from any cause whatsoever, except the sole
negligence or willful misconduct of the City, its employees, servants, or independent
contractors who are directly responsible to City during the progress of the work or at any
time before its completion and final acceptance.
The Contractor will indemnify City against and will hold and save City harmless from any
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
C-15
and all actions, claims, damages to persons or property, penalties, obligations, or liabilities
that may be asserted or claimed by any person, firm, entity, corporation, political
subdivision, or other organization arising out of or in connection with the work, operation,
or activities of the Contractor, his agents, employees, subcontractors, or invitees provided
for herein, whether or not there is concurrent passive or active negligence on the part of
City, but excluding such actions, claims, damages to persons or property, penalties,
obligations, or liabilities arising from the sole negligence or willful misconduct of City, its
employees, servants, or independent contractors who are directly responsible to City, and
in connection therewith:
a. The Contractor will defend any action or actions filed in connection with any of said
claims, damages, penalties, obligations, or liabilities and will pay all costs and
expenses, including attorneys' fees incurred in connection therewith.
b. The Contractor will promptly pay any judgment or award rendered against the
Contractor or City covering such claims, damages, penalties, obligations, and liabilities
arising out of or in connection with such work, operations, or activities of the Contractor
hereunder or reasonable settlement in lieu of judgment or award, and the Contractor
agrees to save and hold the City harmless therefrom.
c. In the event City is made a party to any action or proceeding filed or prosecuted against
the Contractor for damages or other claims arising out of or in connection with the
project, operation, or activities of the Contractor hereunder, the Contractor agrees to
pay to City any and all costs and expenses incurred by City in such action or proceeding
together with reasonable attorneys' fees.
So much of the money due to the Contractor under and by virtue of the contract as shall
be considered necessary by City may be retained by City until disposition has been
made of such actions or claims for damage as aforesaid.
10. NON-DISCRIMINATION: No discrimination shall be made in the employment of persons
upon public works because of age, disability, race, color, religion, sex, sexual orientation
or national origin of such persons, and every contractor for public works violating this
section is subject to all the penalties imposed for a violation of Division 2, Part 7, Chapter
1 of the Labor Code in accordance with the provisions of Section 1735 of said Code.
11. CONTRACT PRICE AND PAYMENT: City shall pay to the Contractor for furnishing the
material and doing the prescribed work per the unit prices set forth in accordance with
Contractor's Proposal.
IN WITNESS WHEREOF, the parties hereto have caused these present to be duly executed with
all the formalities required by law on the respective dates set forth opposite their signatures.
State of California Contractor's License #:
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
1057266
AME Builders, Inc.2095 W Arrow Rte.
CAUnited States
Upland
91786
C-16
Date
By:
Signature Print Name &Title
By:
Signature Print Name &Title
CITY OF RANCHO CUCAMONGA, CALIFORNIA
By: BY:
L. Dennis Michael, Mayor Kim Sevy, City Clerk
Date
Contractor's Business Phone Number: . Emergency Name and Phone
Number at which Contractor can be reached at any time: ____________________________
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
Don Seo
11/25/2025 | 1:40 PM PST
President
1
Junghee Seo Secretary
1 (909) 766-3200
(714) 719-4223
11/25/2025 | 2:49 PM PST
B-1
C O N T R A C T
FAITHFUL PERFORMANCE BOND
KNOW ALL MEN BY THESE PRESENT: THAT . as Principal,
and , as Surety, are held
and firmly bound unto the City of Rancho Cucamonga, hereinafter called City, in the just and full
amount of Two Million Four Hundred Twelve Thousand Eight Hundred Dollars (Written)
$ 2,412,800 (Figures) payment whereof we hereby bind ourselves,
our heirs, executors administrators, successors and assigns, jointly and severally, firmly by these
presents. Given under our hands and sealed with our seal this day of , 20 .
The condition of the foregoing obligation is such that,
WHEREAS, the above-named principal is about to enter into a contract with the City, whereby
said principal agrees to construct "CIVIC CENTER WATERPROOFING AND ROOF REPAIRS
PROJECT" in accordance with the AGREEMENT dated , which said contract
is hereby referred to and made a part hereof to the same extent as if the same were herein
specifically set forth;
NOW, THEREFORE, if the said principal shall well and truly do and perform all things agreed by
the principal in said contract to be done and performed, then this obligation is to be void; otherwise
it will remain in full force and effect;
PROVIDED, that for value received the undersigned stipulate and agree that no amendment,
change, extension of time, alteration or addition to said contract, or agreement, or of any feature
or item or items of performance required therein or thereunder shall in any manner affect the
obligations of the undersigned under this bond; and the surety does hereby waive notice of such
amendment, limitation of time for bringing action on this bond by the City, change, extension of
time, alteration or addition to said contract or agreement and of any feature or time of performance
required therein or thereunder.
WITNESS our hands this day of , 20 .
By: Title:
Surety: By:
Individual Partnership Corporation
Other, explain
SIGNATURES OF CONTRACTOR MUST BE ACKNOWLEDGED BEFORE A NOTARY PUBLIC.
PLEASE ATTACH APPROPRIATE ACKNOWLEDGMENT FORMS
(INDIVIDUAL, PARTNERSHIP, CORPORATION, ETC.).
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
B-2
Bond No.:
PAYMENT BOND
(Labor and Materials)
KNOW ALL PERSONS BY THESE PRESENTS that:
WHEREAS the CITY OF RANCHO CUCAMONGA (name of City) (“City”) has awarded to
(Name and address of Contractor)
(“Principal”), a contract (the “Contract”) for the work described as follows:
“CIVIC CENTER WATERPROOFING AND ROOF REPAIRS PROJECT”
WHEREAS, Principal is required under the terms of the Contract and the California Civil Code to
secure the payment of claims of laborers, mechanics, materialmen, and other persons as
provided by law.
NOW THEREFORE, we, the undersigned Principal, and
(Name and address of Surety)
(“Surety”) a duly admitted surety insurer under the laws of the State of California, as Surety, are
held and firmly bound unto City in the penal sum of
Two Million Four Hundred Twelve Thousand Eight Hundred Dollars ($2,412,800 ), this amount being
not less than one hundred percent (100%) of the total contract price, in lawful money of the United
States of America, for the payment of which sum well and truly to be made, we bind ourselves,
our heirs, executors, administrators, successors, and assigns, jointly and severally, firmly by these
presents.
THE CONDITION OF THIS OBLIGATION IS SUCH THAT, if the hereby bounded Principal, his,
her or its heirs, executors, administrators, successors or assigns, or subcontractors shall fail to
pay any of the persons named in Section 9100 of the California Civil Code, or any amounts due
under the Unemployment Insurance Code with respect to work or labor performed under the
Contract, or for any amounts required to be deducted, withheld, and paid over to the Employment
Development Department from the wages of employees of the Principal and subcontractors
pursuant to Section 13020 of the Unemployment Insurance Code, with respect to work or labor
performed under the Contract, the Surety will pay for the same in an amount not exceeding the
penal sum specified in this bond; otherwise, this obligation shall become null and void.
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
B-3
Payment Bond (continued)
This bond shall insure to the benefit of any of the persons named in Section 9100 of the California
Civil Code so as to give a right of action to such persons or their assigns in any suit brought upon
the bond. In case the suit is brought upon this bond, Surety further agrees to pay all court costs
and reasonable attorneys’ fees in an amount fixed by the court.
FURTHER, the Surety, for value received, hereby stipulates and agrees that no change,
extension of time, alteration, addition or modification to the terms of the Contract, or of the work
to be performed thereunder, or the specifications for the same, shall in any way affect its
obligations under this bond, and it does hereby waive notice of any such change, extension of
time, alteration, addition, or modification to the terms of the Contract or to the work or to the
specifications thereunder. Surety hereby waives the provisions of California Civil Code Sections
2845 and 2849.
IN WITNESS WHEREOF, two (2) identical counterparts of this instrument, each of which shall for
all purposes be deemed an original hereof, have been duly executed by Principal and Surety, on
the date set forth below, the name of each corporate party being hereto affixed and these presents
duly signed by its undersigned representative(s) pursuant to authority of its governing body.
Date:
“Principal” “Surety”
By: By:
Its Its
By: By:
Its Its
(Seal) (Seal)
Note: This bond must be executed in duplicate and dated, all signatures must be notarized, and
evidence of the authority of any person signing as attorney-in-fact must be attached.
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
INS-1
C O N T R A C T
WORKER'S COMPENSATION INSURANCE CERTIFICATE
The Contractor shall execute the following form as required by the California Labor Code,
Sections 1860 and 1861:
I am aware of the provision of Section 3700 of the Labor Code which requires every employer to
be insured against liability for worker's compensation or to undertake self-insurance in
accordance with the provisions of that code, and I will comply with such provisions before
commencing the performance of the work of this contract.
Date (Contractor)
By:
(Signature)
(Title)
Attest:
By:
(Signature)
(Title)
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377
AME Builders, Inc.11/25/2025 | 1:40 PM PST
President
Secretary
MB-1
MAINTENANCE GUARANTEE BOND
FOR
“CIVIC CENTER WATERPROOFING AND ROOF REPAIRS PROJECT”
WHEREAS, the City Council of the City of Rancho Cucamonga, State of
California, and (hereinafter designated as “Contractor”) have entered into
an agreement, Contract # , whereby Contractor agrees to install and complete certain
designated public improvements, which said agreement, dated , 20 , and identified as
project located is hereby referred to and made a part
hereof; and
WHEREAS, said Contractor is required under the terms of said
agreement to furnish a bond for the faithful performance of said agreement, guaranteeing all
improvements free of all defects for a period of one (1) year after acceptance of by
the City.
NOW, THEREFORE, we the Contractor and as
surety, are held and firmly bound unto the City of Rancho Cucamonga (hereinafter called “City”),
in the penal sum of Dollars ($ ) lawful money of
the United States, for the payment of which sum well and truly to be made, we bind ourselves,
our heirs, successors, executors and administrators, jointly and severally, firmly by these
presents.
The condition of this obligation is such that if the above bonded Contractor, his or its heirs,
executors, administrators, successors or assigns, shall in all things stand to and abide by, and
well and truly keep and perform the covenants, conditions and provisions in the said agreement
and any alteration thereof made as therein specified, and in all respects according to their true
intent and meaning, and shall indemnify and same harmless City, its officers, agents and
employees, as therein stipulated, then this obligation shall become null and void; otherwise, it
shall be and remain in full force and effect.
As a part of the obligation secured hereby and in addition to the face
amount specified therefore, there shall be included costs and reasonable expenses and fees,
including reasonable attorney’s fees, incurred by City in successfully enforcing such obligation,
all to be taxed as costs and included in any judgment rendered.
The surety hereby stipulates and agrees that no change, extension of
time, alteration or addition to the terms of the agreements or to the work to be performed
thereunder or the specifications accompanying the same shall in any way affect its obligations on
this bond, and it does hereby waive notice of any such change, extension of time, alteration or
addition to the terms of the agreement or to the work or to the specifications.
IN WITNESS WHEREOF, this instrument has been duly executed by the
Contractor and surety above named on , 20 .
CONTRACTOR SURETY
Name Name
Address Address
By: By:
PLEASE ATTACH POWER OF ATTORNEY TO ALL BONDS
SIGNATURES MUST BE NOTARIZED
Docusign Envelope ID: FA0297DC-D3E6-4704-A8CF-3F7C23490377