Loading...
HomeMy WebLinkAbout96-049 - ResolutionsRESOLUTION NO. 96-049 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO CUCAMONGA , CALIFORNIA, OF PRELIMINARY APPROVAL OF CITY ENGINEER'S ANNUAL REPORTS FOR LANDSCAPE MAINTENANCE DISTRICTS NOS. 1, 2, 3A, 3B, 4, 5, 6, 7 AND 8. WHEREAS, the City Council of the City of Rancho Cucamonga does hereby resolve that: WHEREAS, pursuant to the Landscape and Lighting Act of 1972, the City Engineer is required to make and file with the City Clerk of the City an annual report in writing for which assessments are to be levied and collected to pay the costs of the maintenance and/or improvement of said Landscape Maintenance Districts Nos. 1, 2, 3A, 3B, 4, 5, 6, 7 and 8; and WHEREAS, the City Engineer has made and filed with the City Clerk of said City a report in writing as called for under and pursuant to said Act, which has been presented to this Council for consideration; and WHEREAS, said Council as duly considered said report and each and every part thereof and finds that each and every part of said report is sufficient and that said report, nor any part thereof, requires or should be modified in any respect. NOW THEREFORE, the City Council of the City of Rancho Cucamonga does hereby order as follows: 1. That the Engineer's Estimate of itemized costs and expenses of said work and of the incidental expenses in connection therewith, contained in said report be, and each of them are hereby preliminarily approved and confirmed. 2. That the diagrams showing the Assessment District referred to and described in said report, the boundaries of the subdivisions of land within said Assessment Districts are hereby preliminarily approved and confirmed. 3. That the proposed assessments upon the subdivisions of land in said Assessment Districts in proportion to the estimated benefit to be received by said subdivision, respectively, from said work and of the incidental expenses thereof, as contained in said report is hereby preliminarily approved and confirmed. 4. That said report shall stand as the City Engineer's Annual Report for the fiscal year 1996/97 for the purposes of all subsequent proceedings. Resolution No. 96-049 Page 2 PASSED, APPROVED, AND ADOPTED this 17th day of April, 1996. AYES: NOES: ABSENT: Alexander, Biane, Curatalo, Gutierrez, Williams None None ATTEST: William J. Alexanlr, Mayor , City Clerk I DEBRA J. ADAMS, CITY CLERK of the City of Rancho Cucamonga, California, do hereby certify that the foregoing Resolution was duly passed, approved, and adopted by the City Council of the City of Rancho Cucamonga, California, at a regular meeting of said City Council held on the 17th day of April, 1996. Executed this 18th day of April, 1996, at Rancho Cucamonga, California. Resolution No. 96-049 Page 3 Preliminary ANNUAL ENGINEERS REPORT CITY OF RANCHO CUCAMONGA LANDSCAPE MAINTENANCE DISTRICT NO. (GENERAL CITY) Fiscal Year 1996/97 Approved: William J. O'Neil, C~t~ Engineer Resolution No. 96-049 Page 4 City of Rancho Cucamonga Annual Engineer's Report Landscape Maintenance District No. 1 (General City Park~vays, Medians, Parks and CommuniD' Trails) Fiscal Year 96/97 The FY 96/97 annual report for Landscape Maintenance District No. 1 (General City Parkways, Medians, Parks and Community Trails) is prepared in compliance with the requirements of Article 4, Chapter 1, Division 5 of the Streets and Highways Code, State of California (Landscape and Lighting Act of 1972). Background: Landscape Maintenance District No. 1 (LMD # 1 ) represents 33.05 acrek of landscape area and 38.25 acres of parks which are located at various sites throughout the City. These sites are not considered to be associated with any one particular area within the City, but rather benefit the entire City on a broader scale. As such, the parcels within this district do not represent a distinct district area as do the City's remaining LMD's. Typically parcels within this district have been annexed upon development. The various sites maintained by the district consist of parkways, median islands, paseos, street trees, entry monuments, Community Trails and parks. The 38.25 acres of parks consist of Bear Gulch Park which is 5 acres, 20 acres of East and West BeD'I Park, 5 acres of Old Town Park. 6.5 acres of Church Street Pa?k and the Rancho Cucamonga Senior Center (formerly Rancho Cucamonga Neighborhood Center) which consists of 1.75 acres. The breakdown of maintained areas is as follows: 95/96 96/97 Ground Cover and Shrubs 21.97 24.07 Turf 1.47 1.61 Parks 38.25 38.25 Communitv Trails 7.37 7.3'7 Total Area in LMD #1 69.06 Acres 71.30Acres The ground cover, shrubs and turf areas of the various landscape areas and the parks are maintained under contract by a private landscape maintenance company while the equestrian trails are maintained by the City's Trails and Application Cre~v. .... Projected Costs: Resolution No. 96-049 Page 5 The majority, of the budgeted costs for LMD a l are for direct maintenance of turf, ground cover and shrubs and the maintenance of the parks. These functions, along with tree maintenance and certain irrigation system repair and testing are performed through a Contract Sen'ices Agreement the City has with a private landscape maintenance company. The City's Trails and Application Crew maintains the equestrian trails within the district. The projected costs to operate and maintain LMD #1 are as follows: Proposed Maintenance Budget for 1996/97 Regular Payroll Overtime Salaries Part-time Salaries Fringe Benefits Maintenance and Operations - Landscaping Maintenance and Operations - Facilities Vehicle Maintenance and Operations Emergency & Routine Vehicle Equipment Rental Equipment Maintenance Contract Services Parkway & Median Landscape Maintenance Park Landscape Maintenance Tree Maintenance Other Maintenance Sen, ices Tree Inventory Field Data Collection Contract Services - Facilities Capital Expenditures Rebuild Softball Field Arc at Old Town Tree Shrub & Ground Cover Replacement Calsense Retrofits Mandatory ADA Study/Implementation for Parks Infield Irrigation Upgrades Capital/Equipment Outlay Capital/Building Improvements Capital/Playground Equipment Outlay - Parks Capital Vehicles Outlay General Liability Water Utilities Telephone Utilities Electric Utilities Subtotal: Assessment Administration and General Overhead Tax Delinquency $76,460.00 $1,400.00 $2,430.00 $_8,M0.00 $35,270.00 $14,000.00 $16,990.00 $1,000.00 $3,000.00 $299,350.00 $192,250.00 $16,500.00 $18,000.00 $0.00 $8,000.00 $3,000.00 $10,000.00 $69,960.00 $30,000.00 $3,000.00 $6,130.00 $2,780.00 $10,000.00 $0.00 $8,990.00 $138,570.00 $1,070.00 $42.000.00 $1,151,080.00 $112,590.00 $63,962.00 Resolution No. 96-049 Page 6 Less: 95/96 District Carryover Assessment Revenue Required Subtotal: Total Revenue Required: $176,552.00 $1,327,632.00 <$413,895.00> $91~.736.00 For 96/97 the Capital Project Outlay budgeted for the district is as follows: $3,000 for rebuilding the softball field arc at old town park, $10,000 for tree, shrub and ground cover replacement throughout the district, $69,960 for calsense retrofits throughout the district, $3,000 for infield irrigation upgrades and $30,000 for ADA required tot lot retrofit Phase I for Bear Gulch Park.. Capital Equipment Outlay of $1,450 for 25% of a Wood Splitter, $1,380 for 25% of a Pneumatic Pruning System and $3,300 for 10% of Turf Sprayer. Capital Building Outlay of $1,280 for 25% of a Cargo Container & Concrete Pad for NurseD' and $1,500 to Replace Pipe Chase Doors. Capital Playground Equipment of $10,000 to enlarge Exercise Pads to Meet ADA requirements at Church Street Park. Analvsis: It is recommended that the assessment rate remain at $92.21 for the fiscal >'ear 1996/97. The tax delinquency represents the amount of unpaid taxes within the district. FY 96/97 Assessment Rate: The following itemizes the assessment rate for the district: Unit No. of Assess. Unit Rate/ Land Use Type Units Rate Factor A.U. Revenue Single Family Parcel 7183 $92.21 1.0 $92.21 $662,344 Multi-Family Parcel 5452 $92.21 0.5 $46.11 $251,392 Total $913,736 LANDSCAPE MAINTENANCE DISTRICT # 1 ANNEXATIONS FOR FISCAL YEAR 1996/97 Resolution No. 96-049 Page 7 May 17, 1995 TR 14116 Single Family - 18 du July 5, 1995 DR 95-03 Single Family - 12 du April 5, 1995 TR 14208 Multi-Family - 20 du Resolution No. 96-049 Page 8 Resolution No. 96-049 Page 9 ASSESSMENT DIAGRAM LANDSCAPE MAINTENANCE DISTRICT NO. 1 STREET LIGHTING MAINTENANCE DISTRICT NOS. 1 AND 2 / // / ~_- CITY OF RANCHO CUCAMONGA ;2 COUNTY OF SAN BERNARDINd./f= . ~.~ STATE OF CALIFORNIA Resolution No. 96-049 Page 10 EXHIBIT "A" ASSESSMENT DIAGRAM LANDSCAPE MAINTENANCE DISTRICT NO. 1 STREET LIGHTING MAINTENANCE DISTRICT NOS. I AND 2 CITY OF RANCHO CUCAMONGA COUNTY OF SAN BERNARDINO D~ ~-0~ STATE OF CALIFORNIA Resolution No. 96-049 Page 11 EXHiBiT LANDSCAPE MAINTENANCE DISTRICT NO. '1 n=---. i LiGHTiNG ~iAiN'i'ENANCE DiSTRiCT NOS. '~ AND 2 CiTY OF RANCHO CUCAMONGA COUNTY OF SAN BERNARDINO STATE OF CALIFORNIA Resolution No. 96-049 Page 12 Preliminary ANNUAL ENGINEERS REPORT CITY OF RANCHO CUCAMONGA LANDSCAPE MAINTENANCE DISTRICT NO. 2 (VICTORIA PLANNED COMMUNITY) Fiscal Year 1996/97 Approved: ~William J. 0 Neil, C~ty Engineer Resolution No. 96-049 Page 13 City of Rancho Cucamonga Annual Engineer's Report Landscape Maintenance District No. 2 (Victoria Planned Community) Fiscal Year 96/97 The FY 96/97 annual report for Landscape Maintenance District No. 2 (Victoria Planned Community) is prepared in compliance with the requirements of Article 4, Chapter 1, Division 5 of the Streets and Highways Code, State of California (Landscape and Lighting Act of 1972). Background: Landscape Maintenance District No. 2 (LMD #2) represents landscape sites throughout the Victoria Planned Community. These sites are associated with areas within Victoria and as such any benefit derived from the landscape installation can be directly attributed to those parcels within that community. Because of this, assessments required for this district are charged to those parcels within that planned community. The sites maintained by the district consist of parkways, median islands, street trees, paseos, Community Trails and parks. The 32.37 acres of parks in Victoria consist of Kenyon Park, Victoria Groves Park, Vintage Park, Windrows Park and Ellena Park. Ellena Park, which is 4.87 acres was accepted into this district for maintenance in March 1996. Ellena Park is located on Ellena East at Kenyon Way. The breakdown of maintained areas is as follows: 95/96 96/97 Ground Cover and Shrubs 47.99 48.68 Turf 40.13 40.61 Parks 32.37 32.37 Communitv Trails 3.00 3.'00 Total Area in LMD #2 118.62Acres 124.96 Acres The ground cover, shrubs and turf areas are maintained under contract by a private landscape maintenance company while the Community Trails are maintained by the City's Trails and Application Crew and the parks are maintained by the City's Park Maintenance Crews. Resolution No. 96-049 Page 14 Projected Costs: The majority of the budgeted costs for LMD #2 are for direct maintenance of turf, ground cover and shrubs. These functions, along with tree maintenance and certain irrigation system repair and testing are performed through a Contract Services Agreement the City has with a private landscape maintenance company. The City's Trails and Application Crew maintains the equestrian trails and the City's Park Maintenance Crews maintain the parks within the district. The projected costs to operate and maintain LMD #2 are as follows: Proposed Maintenance Budget for 1996/97 Regular Payroll Overtime Salaries Part Time Salaries Fringe Benefits Maintenance and Operations - Landscaping Maintenance and Operations - Facilities Vehicle Maintenance and Operations Equipment Maintenance Mileage Emergency & Routine Vehicle & Equipment Rental Contract Services Landscape Maintenance Tree Maintenance Contract Services - Facilities Capital Expenditures Capital Improvement Projects Capital Vehicle Outlay Capital Equipment Outlay Capital Outlay./Building Improvement Capital Outlay/Computer Equipment General Liability Water Utilities Electric Utilities Telephone Utilities Subtotal: $470,370.00 $5,OOO.OO $5,700.00 $174,150.00 $66,730.00 $12,000.00 $10,520.00 $3,000.00 $0.00 $1,200.00 $695,240.00 $10,240.00 $11,000.00 $206,000.00 $24,000.00 $50,980.00 $1,900.00 $1,200.00 $12,530.00 $276,150.00 $20,000.00 $1.500.00 $2,059,410.00 Assessment Admin. & General Overhead Tax Delinquency Subtotal: $145,290.00 $69,226.0O $214,516.00 Total Revenue Required: $2,273,926.00 Less: 95/96 District Carryover <$543,262.00> Assessment Revenue Required $1,730.664.00 Resolution No. 96-049 Page 15 For FY 96/97 the district budgeted $1,000 for Capital Outlay/Building Improvements to replace Pipe Chase Doors and $900 for 20% of a Cargo Container & Concrete Pad.; $19,000 for Capital Outlay/Equipment for 50% of a Riding Mower/Trailer, $2,500 for 50% of a Small Riding Mower, $1,000 for 50% ofa Edger, Blower and Line Tfin~mer, $3,500 for 50%of a Pressure Washer, $4,000 for 50% of an Aerator, $7,500 for 50% of a Cushman Type Utility Vehicle, $1,160 for 20% of a Wood Splitter, $1,100 for 25% o£a Pneumatic Pruning System, and $11,220 for 35% of a Turf Sprayer; $1,200 for Capital Outlay/Vehicle for 50% of a Crew Cab Stake bed and $12,000 for 50% of a Utility Body F-250; and $1,200 for Capital Outlay/Computer Equipment for a Lap Top Computer. Also, budgeted is $10,000 for Calsense Retrofits, $50,000 for Tree, Shrub 8,: Ground cover Replacements, $6,000 for Infield Irrigation Upgrades at Windrows Park and $140,000 for Phase I - ADA required retrofit for Windrows, Kenyon. Groves and Vintage Parks. Analvsis: In FY 95/96, the assessment rate for LMD #2 was $422.00. It is recommended this rate not increase for the FY 96/97. Part of the mason that the rate did not increase is due to the fact that water usage is down partly due to the implementation of the Calsense Moisture Control irrigation system and partly because of the increase of rainfall last season. FY 95/96 Assessment Rate: The following itemizes the assessment rate for the district: Unit No. of Unit Rate/ Land Use Type Units Rate Factor Revenue Single Family Parcel 3,764.00 $422.00 1.0 $422.00 $1,588,408 Multi-Family Parcel 170.00 $422.00 1.0 $422.00 $ 71,740 Commercial Acre 24.23 $422.00 2.0 $844.00 $ 20,450 Vacant Acre 474.55 $422.00 0.25 $105.50 $ 50,066 TOTALS $1,730,664 Resolution No. 96-049 Page 16 Resolution No. 96-049 Page 17 Preliminary ANNUAL ENGINEERS REPORT CITY OF RANCHO CUCAMONGA LANDSCAPE MAINTENANCE DISTRICT NO. 3A (HYSSOP) Fiscal Year 1996/97 Approved: William J. O'Neil, ~ Engineer Resolution No. 96-049 Page 18 City of Rancho Cucamonga Annual Engineer's Report Landscape Maintenance District No. 3a (Hyssop Maintenance District) Fiscal Year 96/97 The FY 96/97 annual report for Landscape Maintenance District No. 3a (Hyssop Maintenance District) is prepared in compliance xvith the requirements of Article 4, Chapter 1, Division 5 of the Streets and Highways Code, State of California (Landscape and Lighting Act of 1972). Background: Landscape Maintenance District No. 3a (LMD #3a) represents a landscape parkrway on Hyssop Drive south of Sixth Street. The site is associated with an area within that district and as such any benefit derived from the landscape installation can be directly attributed to those parcels within that district. Because of this, assessments required for this district are charged to those parcels within that district. The breakdown of maintained areas is as follows: Ground Cover and Shrubs Turf Total Area in LMD #3a 95/96 96/97 0.14 0.14 0.00 0.00 0.14 Acres 0.14 Acres The ground cover and shrubs areas are maintained under contract by a private landscape maintenance company. Projected Costs: The majority of the budgeted costs for LMD #3a are for direct maintenance of ground cover and shrubs. These functions, along with tree maintenance and certain irrigation system repair and testing are performed through a Contract Services Agreement the City has with a private landscape maintenance company. The projected costs to operate and maintain LMD #3a are as follows: Resolution No. 96-049 Page 19 Proposed Maintenance Budget for 1996/97 Regular Payroll Fringe Benefits Maintenance and Operations Vehicle Maintenance and Operations Contract Services Landscape and Tree Maintenance Capital Expenditures Tree and Shrub Replacement General Liability Water Utilities Electric Utilities Assessment Administration and General Overhead Tax Delinquency Subtotal: $0.00 $0.00 $350.00 $0.00 $2,200.00 $700.00 $40.00 $600.00 $120.00 $4,010.00 $240.00 $629.00 $869.00 Gross Revenue Required: $4,879.00 Less: 95/96 District Carryover <$1,569.00> Total Revenue Required: $3.310.00 For 96/97 the district budgeted $700.00 for tree and shrub replacement. No equipment purchases are budgeted in 96/97. Analysis: It is recommended the assessment rate for LMD #3a remain at $413.74 for the FY96/97 to cover the current maintenance costs of the district. The tax delinquency represents the estimated amount of unpaid taxes within the district. No new assessment units were annexed into the district this year. FY 96/97 Assessment Rate: The following itemizes the assessment rate for the district: Unit Rate/. Land Use Type Units Rate Factor A.U. Industrial Parcel 8 $413.74 1.0 $413.74 Revenue $3,310.00 Resolution No. 96-049 Page 20 jgAY o Resolution No. 96-049 Page 21 Preliminary ANNUAL ENGINEERS REPORT CITY OF RANCHO CUCAMONGA LANDSCAPE MAINTENANCE DISTRICT NO. 3b (C OMMERCIAL/TNrDUS TRIAL) Fiscal Year 1996/97 Approved: William J. O'Neil, C~t3~ Engineer CiD' of Rancho Cucamonga Annual Engineer's Report Landscape Maintenance District No. 3b (Commercial/Industrial Maintenance District) Resolution No. 96-049 Page 22 Fiscal Year 96/97 The FY 96/97 annual report for Landscape Maintenance District No. 3b (Commercial/Industrial Maintenance District) is prepared in compliance with the requirements of Article 4, Chapter 1, Division 5 of the Streets and Highways Code, State of California (Landscape and Lighting Act of 1972). Background: Landscape Maintenance District No. 3b (LMD #3b) represents landscape sites throughout the Commercial/Industrial Maintenance District. These sites are associated with areas within that district and as such any benefit derived from the landscape installation can be directly attributed to those parcels within that district. Because of this, assessments required for this district are charged to those parcels within that district. The various landscape sites that are maintained by this district consist of median islands, parkways, street trees, entry monuments and 22.87 acres of the Adult Sports Park (this does not include the stadium, parking lots or the maintenance building. The Metrolink Station located on the west side of Milliken Avenue bet~veen Jersey Boulevard and 7th Street xvill be accepted into the District this fiscal year. The Metrolink Station is a 2.45 acres facility that consists of entry and perimeter drives, parking facilities, passage loading and unloading platform, ticketing facilities and landscaping. The breakdown of maintained areas is as follows: 95/96 96/97 Ground Cover and Shrubs 7.10 9.81 Turf 3.39 3.40 Parks 22.87 22.87 Total Area in LMD #3b 33.36 Acres 36.08Acres The turf, ground cover and shrubs areas in the median island, parkways and entry monuments are maintained under contract by a private landscape maintenance company. The Adult Sports Park is maintained by City landscape and facility maintenance crews. Projected Costs: The majority of the budgeted costs for LMD #3b are for direct maintenance of turf, ground cover Resolution No. 96-049 Page 23 The projected costs to operate and maintain LMD #3b are as follows: Proposed Maintenance Budget for 1996/97 Regular Payroll Overtime Salaries Part Time Salaries Fringe Benefits Maintenance and Operations Vehicle Maintenance and Operations Equipment Maintenance Emergency & Reg. Vehicle & Equipment Rental Contract Services Landscape Maintenance - Parkways & Medians Tree Maintenance Landscape Maintenance - Sports Complex Landscape Maintenance - Metrolink Capital Expenditures Calsense Retrofits Tree Shrub & Ground cover Replacement Capital Outlay - Building Capital Outlay- Equipment Capital Outlay - Computer Equipment General Liability Water Utilities Electric Utilities Telephone Utilities Subtotal: $86.180.00 $2.500.00 $9.550.00 $32.080.00 $31.630.00 $1.030.00 $10,000.00 $1,000.00 $179.740.00 $30.060.00 S3,500.00 $10,000.00 $10,650.00 $26,000.00 $110,880.00 $28,370.00 5180.00 $4,740.00 $87.000.00 $75,180.00 $1.540.00 $741,810.00 Assessment Administration and General Overhead Tax Delinquency $42,880.00 $46.468.00 Subtotal: $89,348.00. Gross Revenue Required: $831,158.00 Less: 95/96 District Carryover _ <$250.305.00> Total Revenue Required: $580.853.00 The 96/97 Capital Project Outlay budgeted for the district is as follows: $26,000 for tree, shrub and ground cover replacement, $10,000 for calsense retrofits for the distt, ict and $650 for 35% of calsense retrofits for central/sports; for Capital Outlay/Buildings, $230 for 5% of a Cargo Resolution No. 96-049 Page 24 Container & Pad, $3.650 for Upgrading Fueling system to meet code, $4,000 to build roofs to cover Washrack, Geo-Tex Storage, and Maintenance Buildings, $3,000 for equipment carport in maintenance yard and $100,000 for ADA access to softball dugouts; for Capital outlay/Equipment $1,500 for box grader for field rake, $5,000 for 3 point hitch hydraulic linkage for Unit 53, $10,500 for 50% ofa Vertidrain, $6,000 for Cushman 670, $290 for 5% of a wood Splitter, $280 for 5% of pneumatic Pruning System, $3,300 10% turf sprayer and $1,500 for a 50 gallon skid type sprayer; and for Capital Outlax; Computer Equipment $180 for HP plus Printer. Analvsis: It is recommended that the assessment rate remain at $352.80 for the fiscal 3'ear 1996/97. The tax delinquency represents the amount of unpaid taxes within the district. FY 96/97 Assessment Rate: The following itemizes the assessment rate for the district: Unit No. of Assess. Unit Rate/ Land Use Type Units Rate Factor A.U. Comrn/Ind Acre 1646.41 $352.80 1.0 $352.80 Other Revenue: User Fees from Sports Field Lighting Revenue S580,854 LANDSCAPE MAINTENANCE DISTRICT #3B ANNEXATIONS FOR FISCAL YEAR 1996/97 Resolution No. 96-049 Page 25 April 19, 1995 CUP 94-37 3.33 ac April 19, 1995 DR 94-16 19.42 ac May 3, 1995 PM 14457 1.24 ac June 21, 1995 DR 94-21 8.14 ac July 5, 1995 DR 95-09 35.94 ac September 6, 1995 MDR 94-11 0.52 ac October 4, 1995 CUP 94-30 1.1 ac October 18, 1995 MDR 95-10 2.51 ac November 15, 1995 MDR 95-11 0.31 ac Resolution No. 96-049 Page 26 Resolution No. 96-049 Page 27 EXHIBIT 'A' ASSESSMENT DIAGRAM LANDSCAPE MAINTENANCE DISTRICT NO. 31~ STREET LIGHTING MAINTENANCE DISTRICT NOS. 1 AND 6 6TH STPEET PH~7.~I P.tl. 42/~6 EXISTING ITEMS TREE STREET LIGHT P.rl. * - CUP 94-37 - ~[ ....................................................... 4TH STREET CITY OF RANCHO CUCAMONGA COUNTY OF SAN BERNARDINO STATE OF CALIFORNIA CUP. 94-37 EXHIBIT "A" Resolution No. 96-049 Page 28 EXHIBIT 'A' LANDSCAPE MAINTENANCE DISTRICT NO. 3B STREET LIGHTING MAINTENANCE DISTRICT NOS. 1 A;'g~ 6 r'J I V'///////// // : DR 94-16 [APN 229-131-03~- ?'///////////' :1 CITY OF RANCHO CUCAMONGA COUNTY O;: SAN BERNARDINO STATE O; CAL~i;OP~N~ rm ~ Resolution No. 96-049 Page 29 ~ XHII~IT 'A' ASSESSMENT DIAGRAM LANDSCAPE MAINTENANC~ DISTRICT NO. STREET LJ~I'IT;NG iMA-"NT~.NANC-'= DISTRICT NOS. 1 AND PARCEL I PARCEL 2 CITY OF RANCHO CUCAMON~t, COUNTY OF SAN BERNARDIN~/~ 14457 STATE OF CALIFORNIA Resolution No. 96-049 Page 30 EXHIBIT "A' ASSESSMENT DIAGRAM LANDSCAPE MAINTENANCE DISTRICT NO. 3B STREET LIGHTING MAINTENANCE DISTRICT NOS. I AND 6 CITY OF RANCHO CUCAMONGA COUNTY OF SAN BERNARDIN%R ~-,~/ STATE OF CALIFORNIA Resolution No. 96-049 Page 31 EXHIBIT 'A' AS,..~ESSMENT DIAGRAM LANDSCAPE MAINTENANCE DI~T3=IICT NO. ....~1~ STREET ~N(~ MAINTENANCE DISTRICT NO. I AND ~' Z LEGEND STREET UGHT 8 EA. STREET TREE' 36 E.4. EXIST7NG STREET UGHT E"XI$7'7NS STREET 7'REE 4. TH STREET CiTY OF RANCHO CUCAMONGA COUNTY OF SAN BERNARDINO STATE OF CALIFORNIA Resolution No. 96-049 Page 32 EXHIBIT 'A' ASSESSMENT DIAGRAM LANDSCAPE MAINTENANCE DISTRICT NO. 3~ STREET LIGHTING MAINTENAHCE DISTRICT NOS. 1 AND 6 8TH CITY OF RANCHO CUCAMONGA COUNTY OF SAN BERNARDINO MDR 94-11 STATE OF CALIFORNIA ~T ,,A,, Resolution No. 96-049 Page 33 EXHIBIT "A" ASSESSMENT DIAGRAM LANDSCAPE MAINTENANCE DISTRICT NO. STREET LIGHTING MAINTENANCE DISTRICT NOS. 3B 1 AND 6 BASE LINE ROAD Z <~ m m P A ~ ,.., :c l . -] A.P.N. 0207-051-27 / LEGEND ~ STREET LIGHT (STREET TREE 1 EA. 12 EA. CITY OF RANCHO CUCAMONGA COUNTY OF SAN BERNARDINO STATE OF CALIFORNIA CUP 94-,30 Resolution No. 96-049 Page 34 EX~I~IT 'A' ASS~SS[~EF~T D;AGRAM LANDSCAPE MAINTENANCE DISTRICT NO. 35 STREET LIGHTING MAINTENANCE DISTRICT NOS. I AND co - APN 209-021-22 9TH CITY OF RANCHO CUCAMONGA COUNTY OF SAN BERNARDINO ~R 95-10 STATE OF CALIFORNIA ~:~T ".~" Resolution No. 96-049 Page 35 EXHIBIT 'A' .~1 , ASSESSMENT DIAGRAM LANDSCAPE MAINTENANCE DISTRICT NO. 3 B STREET LIGHTING MAINTENANCE DISTRICT NOS. 1 AND 6 BASE LINE ROAD '"'~ ............ :; I ,EGENT) INSTALL STREET TREES CITY OF RANCHO CUCAMONGA COUNTY OF SAN BERNARDINO STATE OF CALIFORNIAH DR N,'r. S. Resolution No. 96-049 Page 36 Preliminary ANNUAL ENGINEERS REPORT CITY OF RANCHO CUCAMONGA LANDSCAPE MAINTENANCE DISTRICT NO. 4 (TERRA VISTA PLANNED COMMUNITY) Fiscal Year 1996/97 Approved: "William J. O'Neil, Cigy Engineer Resolution No. 96-049 Page 37 City of Rancho Cucamonga Annual Engineer's Report Landscape Maintenance District No. 4 (Terra Vista Planned Community) Fiscal Year 1996/97 The FY 96/97 annual report for Landscape Maintenance District No. 4 (Terra Vista Planned Community ) is prepared in compliance with the requirements of Article 4, Chapter 1, Division 5 of the Streets and Highways Code, State of California (Landscape and Lighting Act of 1972). Background: Landscape Maintenance District No. 4 (LMD #4) represents landscape sites throughout the Terra Vista Planned Community. These sites are associated with areas within that district and as such any benefit derived from the landscape installation can be directly attributed to those parcels within that district. Because of this, assessments required for this district are charged to those parcels within that district. La Mission Park located at the northxvest comer of Church Street and Elm Avenue will be accepted into the District for maintenance this fiscal year. La Mission is a 7.98 acre park that includes a tot lot, basketball courts, sand volley ball courts, picnic areas, exercise stations, restrooms and a parking lot. The various landscape sites in Terra Vista that are maintained by the district consist of parkways, median islands, street trees, paseos and parks. The 38.25 acres of park consist of Coyote Canyon Park, Milliken Park, West Greenway Park, Spruce Park and La Mission Park The breakdown of maintained areas is as follo~vs: 95/96 96/97 Ground Cover and Shrubs 8.35 8.35 Turf 6.58 6.58 Phrks 28.25 36.23 Total Area in LMD #4 43.18Acres 51.16 Acres The turf, ground cover and shrubs areas that make up the parkways, median islands and paseos are maintained under contract by a private landscape maintenance company, the parks are maintained by the City's Park Maintenance Crews. Resolution No. 96-049 Page 38 Projected Costs: The majority of the budgeted costs for LMD ~ are for direct maintenance of turf, ground cover and shrubs. These functions, along with tree maintenance and certain irrigation system repair and testing are performed through a Contract Services Agreement the City has with a private landscape maintenance company. The projected costs to operate and maintain LMD #4 are as follows: Proposed Maintenance Budget for 1996/97 Regular Payroll Overlime Part Time Salaries Fringe Benefits Maintenance and Operations - Landscaping Maintenance and Operations - Facilities Mileage Vehicle Maintenance and Operations Equipment Maintenance Emergency & Routine Vehicle & Equipment Rental General Liability Contract Services Landscape Maintenance Tree Maintenance Contract Services - Facilities Capital Expenditures Infield Irrigation Upgrades-Coyote & Spruce Calsense Retrofits Tree, Shrub & Ground cover Replacement Rip Rap Slopes Capital Outlay / Equipment Capital Outlay / Vehicles Capital Outlay/Computer Equipment Capital Outlay/Building Improvements Water Utilities Electric Utilities Telephone Assessment Administration and General Overhead Tax Delinquency Subtotal: Subtotal $321,280.00 $1,000.00 $5,370.00 $118,980.00 $56,830.00 $12,000.00 $0.00 $30,000.00 $3,000.00 $1,200.00 $5,790.00 $235,500.00 $12,120.00 $11,500.00 $6,000.00 $10,000.00 $20,000.00 $34,00O.O0 $49,850.00 $30,000.00 $1,200.00 $6,950.00 $106,660.00 $20,000.00 $700.00 $1,099,930.00 $89,760.00 $21.010.00 $110,770.00 Gross Revenue Required: Less: 95/96 District Carryover: Total Revenue Required: Resolution No. 96-049 Page 39 $1,210,700.00 <$155.705.00> $1,054,995.00 For FY 96/97 the district budgeted $6,000 for Infield Irrigation Upgrades at Coyote and Spruce Parks, $10,000 for Calsense retrofits, $20,000 of tree, shrub and groundcover replacement and $34,000 to rip rap slopes. Under Capital Outlay for Vehicles, $15,000 has been budgeted for 50% of a Crew Cab Stake bed for Parks and $15,000 for 50% of a Utility Body F-250 for the irrigation crews; under Capital Outlay for Equipment $19,000 has been budgeted for 50% of a riding mower w/trailer, $2,500 for 50% of a small riding mower, $1,000 for 50% of an edger, blower and line trimmer, $3,500 for 50% of a pressure washer, $4,000 for 50% of an aerator, $7,500 for a Cushman type utility vehicle $580 for 10% of a wood splitter, $550 for 10% of pneumatic pruning system, and $11,220 for 35% of a turf sprayer; under Capital Outlay for Building Improvements $1,000 is budgeted to replace pipe chase doors, $2,500 to resurface Spruce Park restroom floor (drainage), $3,000 to install a drinking fountain in new tot lot/picnic area of Milliken Park, and $450 for 10% 'of the cargo container & concrete Pad for nursery; under Capital Outlay for Computer Equipment $1,200 has been budgeted for a lap top computer w/modem. Analvsis: It is recommended not to increase for the FY 96/97. Attached is the Assessment Rate Computation Chart. FY 96/97 Assessment Rate: The following itemizes the assessment rate for the district: Unit No. of Rate/. Land Use Type Units A.U. Revenue Single Family Parcel 1660.00 $252.5.0 $419,150 Multi Parcel 2610.00 $222.00 $579,420 Commercial Acre 147.33 $382.99 $56,425 TOTAL $1.054,995 o 0 o o o 0 0 0 0 0 o o o 0 0 ~0 o 0 0 0 o o o o o 0 0 0 o 0 0 ~0 ~0 0 o o o o o 0 o o Resolution No. 96-049 Page 40 0 r~ Resolution No. 96-049 Page 41 Resolution No. 96-049 Page 42 Preliminary ANNUAL ENGINEERS REPORT CITY OF RANCHO CUCAMONGA LANDSCAPE MAINTENANCE DISTRICT NO. 5 (TOT LOT) Fiscal Year 1996/97 Approved: 'William J. O'Neil, C~;ngineer Resolution No. 96-049 Page 43 City of Rancho Cucamonga Annual Engineer's Report Landscape Maintenance District No. 5 (Tot Lot Maintenance District) Fiscal Year 96/97 The FY 96/97 annual report for Landscape Maintenance District No. 5 (Tot Lot Maintenance District) is prepared in compliance with the requirements of Article 4, Chapter 1, Division 5 of the Streets and Highways Code, State of California (Landscape and Lighting Act of 1972). Background: Landscape Maintenance District No. 5 (LMD #5) represents a landscaped Tot Lot, located on the southwest comer of Andover Place and Bedford Drive. This site is associated with a group of 44 single family parcels which all have a common usage of the Tot Lot such that any benefit derived from the landscaping can be directly attributed .to those particular parcels. Because of this, assessments required for this district are charged to those specific parcels. There is only one site maintained by the district. It consists of a Tot Lot and a small amount of shrubs beds and ground cover. The quantities of maintained areas consist of: Ground Cover and Shrubs Total Area in LMD 95/96 96/97 0.33 O.33. 0.~_~ 0..~.~ The ground cover and shrubs areas are maintained under contract by a private landscape maintenance company. Projected Costs: The majority of the budgeted costs for LMD #5 are for direct maintenance of ground cover and shrubs. These functions, along with tree maintenance and certain irrigation system repair and testing are performed through a Contract Services Agreement the City has with a private landscape maintenance company. The projected costs to operate and maintain LMD #5 are as follows: Resolution No. 96-049 Page 44 Proposed Maintenance Budget for 1996/97 Regular Payroll Fringe Benefits Maintenance and Operations Vehicle Maintenance and Operations $0 $0 $410.00 $70.00 Contract Services Landscape Maintenance Capital Expenditures Tree, Shrub & Ground Cover Replacement General Liability Water Utilities Electric Utilities Telephone Utilities Subtotal: $1,410.00 $1,000.00 $30.00 $280.00 $130.00 $120.00 S3,450.00 Assessment Administration and General Overhead Tax Delinquency $610.00 $50.00 $1,030.00 Gross Revenue Required $4,480.00 Add: 95/96 District Deficit: S505.00 Total Revenue Required: $4.985.00 For 96/97 the district budgeted $1,000 for shrub and ground cover replacement. Analvsis: The FY 95/96 rate of assessment is $113.29. It is recommended that there be no increase from FY 96/97 No new assessment units have been annexed in the district. FY 96/97 Assessment Rate: The following itemizes the assessment rate for the district: Unit No. of Rate/. Land Use Type Units Rate Factor A.U. Revenue Single Family Parcel 44 $113.29 1.0 $113.29 $4.985.00 Resolution No. 96-049 Page 45 C: Resolution No. 96-049 Page 46 Preliminary ANNUAL ENGINEERS REPORT CITY OF RANCHO CUCAMONGA LANDSCAPE MAINTENANCE DISTRICT NO. 6 (CARYN PLANNED COMMUNITY) Fiscal Year 1996/97 Approved: / William J. O'Neil,C~ity Engineer Resolution No. 96-049 Page 47 City of Rancho Cucamonga Annual Engineer's Report Landscape Maintenance District No. 6 (Caryn Planned Community) Fiscal Yea/' 96/97 The FY 96/97 annual report for Landscape Maintenance District No. 6 (Caryn Planned Community) is prepared in compliance with the requirements of.Article 4, Chapter 1. Division 5 of the Streets and Highways Code, State of California (Landscape and Lighting Act of 1972). Background: Landscape Maintenance District No. 6 (LMD #6) represents landscape sites throughout the Caryn Planned Community. These sites are associated with areas within that district and as such any benefit derived from the landscape installation can be directly attributed to those parcels within that district. Because of this, assessments required for this district are charged to those parcels within that district. The various landscape sites in Caryn that are maintained by the district consist of park7vays, median islands, community trails, street trees and paseos. The breakdown of maintained areas is as follows: Ground Cover and Shrubs Turf Community Trails 95/96 96/97 20.74 20.74 3.94 3.94 _3.30 3.30 27.98 Ac 27.98 Ac The turf, ground cover and shrubs areas that make up the parkways, median islands and paseos are maintained under contract by a private landscape maintenance company, while the Community Trails are maintained by the City's Park Maintenance Crew. Projected Costs: The majority of the budgeted costs for LMD #6 are for direct maintenance of turf, ground cover and shrubs. These functions, along with tree maintenance and certain irrigation system repair and testing are performed through a Contract Services Agreement the City has with a private landscape maintenance company. Resolution No. 96-049 Page 48 The projected costs to operate and maintain LMD #6 are as follows: Proposed Maintenance Budget for 1996/97 Regular Payroll Pan Time Salaries Fringe Benefits Maintenance and Operations Vehicle Maintenance and Operations Emergency & Reg. Vehicle Rental Contract Services Landscape Maintenance Tree Maintenance Capital Expenditure Landscape Plant Material Replacement Mt. Baldwin Ct. Playground Block Wall Mt. Baldwin Ct. Playground Lighting Calsense Retrofit Capital Outlay/Building Improvements Capital Outlay/Equipment General Liability Water Utilities Electric Utilities Telephone Utilities Subtotal: Assessment Administration and General Overhead Tax Delinquency 'Subtotal: Gros~ Revenue Required: Less: 95/96 District Carryover Total Revenue Required: $8,990.00 $520.00 $3,310.00 $7,510.00 $1,910.00 $5O0.00 $176,430.00 518,620.00 $20,000.00 $10,260.00 $8,000.00 $10,000.00 $450.00 $1,130.00 $3,060.00 $70,260.00 $2,550.00 $70O.00 $~44,200.00 $27,160.00 $11.568.00 $38,728.OO $382,928.00 < $93.726.00> $289.202.00 Analvsis: The FY 95/96 rate of assessment is $246.97. It is recommended there be no increase for FY 96/97 No new assessment units were annexed in the district. The tax delinquency represents the projected amount of unpaid taxes within the district. FY 96/97 Assessment Rate: The following itemizes the assessment rate for the district: Unit No. of Rate/. Land Use Type Units Rate Factor A.U. Single Family Parcel 1,171.00 $246.97 1.0 $246.97 Resolution No. 96-049 Page 49 Revenue $289.202.00 Resolution No. 96-049 Page 50 Resolution No. 96-049 Page 51 Prelim'mary ANNUAL ENGiNEERS REPORT CITY OF RANCHO CUCAMONGA LANDSCAPE MAiNTENANCE DISTRICT NO. 7 (NORTH ETIWANDA) Fiscal Year 1996/97 Appproved: William J. O'Neil, ~ ~;ngineer Resolution No. 96-049 Page 52 City of Rancho Cucamonga Annual Engineer's Report Landscape Maintenance District No. 7 (Etiwanda North) Fiscal Year 96/97 The FY 96/97 annual report for Landscape Maintenance District No.7 (Etiwanda North) is prepared in compliance with the requirements of Article 4, Chapter 1, Division 5 of the Streets and Highways Code, State of California (Landscape and Lighting Act of 1972). Background: Landscape Maintenance District No. 7 (LMD #7) represents landscape sites throughout the Eti~vanda North area. These sites are associated with areas within that district and as such any benefit derived from the landscape installation can be directly attributed to those parcels within that district. Because of this, assessments required for this district are charged to those parcels within that district. Northeast Park, located on the east side of East Avenue and north of Summit Avenue, is due to complete construction in August of 1996. It will be accepted into the district for maintenance this fiscal year. Northeast Park is a 12 acre facility that will consist of two non-lighted football/soccer fields, tot lot, picnic area, open play area, restrooms, parking lot and multi-purpose trail. The various landscape sites in the Etiwanda North area that are maintained by the district consist of parkways, median islands, street trees, Community. Trails and paseos. The breakdown of maintained areas is as follows: 95/96 96/97 Ground Cover and Shrubs 7.54 7.54 Turf 4.02 4.02 Parks 0 12.00 Community Trails 2.00 2.00 Total Area in LMD #7 13.56 Ac 25.56 Ac The turf, ground cover and shrubs areas that make up the parkways, median islands and paseos are maintained under contract by a private landscape maintenance company, while the Community Trails and Northeast Park are maintained by the City's Park Maintenance Crew and the City Facility Maintenance Crew. Resolution No. 96-049 Page 53 The projected costs to operate and maintain LMD #7 are as follows: Proposed Maintenance Budget for 1996/97 Regular Payroll Over Time Salaries Part Time Salaries Fringe Benefits Maintenance and Operations - Landscaping Maintenance and Operations - Facilities Equipment Maintenance Vehicle Maintenance and Operations Emergency & Routine Vehicle & Equipment Rental Contract Services Landscape Maintenance Tree Maintenance Contract Services - Facilities Capital Expenditures General Liability Water Utilities Electric Utilities Telephone Utilities $25,730.00 $500.00 $2,280.00 $9,570.00 $13,810.00 $1,900.00 $500.00 $1,330.00 $250.00 $89,650.00 $20,500.00 $3,400.00 $0.00 $1,760.00 $20,000.00 $1,010.00 $1.500.00 Assessment Administration and General Overhead Tax Delinquency Subtotal: Subtotal: $193,690.00 $21,760.00 $87.887.00 $109,647.00 Gross Revenue Required: $303,337.00 Less: 95/96 District Carryover <$279.00> Total Revenue Required: S303.058.00 For 96/97 Fiscal Year no capital expenditures have been budgeted. Resolution No. 96-049 Page 54 Analysis: The FY 96/97 rate o£assessment is $307.05 per unit. FY 95/96. FY 96/97 Assessment Rate: The following itemizes the assessment rate for the district: Unit No. of Rate/. Land Use Type Units Rate Factor A.U. Single Family Parcel 987.00 $307.05 1.0 $307.05 It is recommended there be no increase from Revenue $303.058.00 Resolution No. 96-049 Page 55 j gAY Resolution No. 96-049 Page 56 Preliminary ANNUAL ENGINEERS REPORT CITY OF RANCHO CUCAMONGA LANDSCAPE MAINTENANCE DISTRICT NO. 8 (SOUTH ETIWANDA) Fiscal Year 1996/97 Approved: William J. O'Neil, Cit3~ngineer Resolution No. 96-049 Page 57 City of Rancho Cucamonga Annual Engineefts Report Landscape Maintenance District No. 8 (South Eftwanda Area) Fiscal Year 96/97 The FY 96/97annual report for Landscape Maintenance District No.8 (South Etiwanda Area) is prepared in compliance with the requirements of Article 4, Chapter 1, Division 5 of the Streets and Highways Code, State of California (Landscape and Lighting Act of 1972). Background: Landscape Maintenance District No. 8 (LMD #8) represents landscape sites throughout the South Eftwanda area. These sites are associated with areas within that district and as such any benefit derived from the landscape installation can be directly attributed to those parcels within that district. Because of this, assessments required for this district are charged to those parcels within that district. The various landscape sites in the South Etiwanda area that are maintained by the district consist of parkways, median islands, street trees, CommuniD' Trails and paseos. The breakdown of maintained areas is as follows: 95/96 96/97 Ground Cover and Shrubs 0.23 0.23 Turf 0.14 0.14 Community Trails ' 0.00 0.00 Total Area in LMD #8 0.37 Ac 0.37 Ac The turf, ground cover and shrubs areas that make up the parkways, are maintained under contract by a private landscape maintenance company, while the Community Trails are maintained by the City's Park Maintenance Crew. Projected Costs: The majority of the budgeted costs for LMD #8 are for direct maintenance of turf, ground cover and shrubs. These functions, along with tree maintenance and certain irrigation system repair and testing are performed through a Contract Services Agreement the City has with a private landscape maintenance company. Resolution No. 96-049 Page 58 The projected costs to operate and maintain LMD #8 are as folloxvs: Proposed Maintenance Budget for 96/97 Regular Payroll Fringe Benefits Maintenance and Operations Vehicle Maintenance and Operations Contingency Tree Replacement Contract Service: Landscape Maintenance Tree Maintenance Capital Expenditures Landscape Plant Material Replacement Calsense Retrofits General Liability Water Utilities Electric Utilities Telephone Utilities Subtotal: $0 $0 $1,100.00 $370.00 $0.00 $6,930.00 $12,000.00 $2,000.00 $5,OOO.O0 $240.00 $1,470.00 $80.00 $120.00 $29,310.00 Assessment Administration and General Overhead Tax Delinquency Subtotal: $1,790.00 $164.00 $1,954.00 Gross Revenue Required: $31,264.00 Less: 95/96 District Carryover _ <$14.904.00> Total Revenue Required: $16.357.00 For 96/97 the district budgeted $2,000 for landscape plant material replacement and $5,000 for Calsense retrofits. Analysis: The FY 96/97 rate of assessment is $151.45. It is recommended there be no increase from FY 95/96. No new assessment units have been annexed in the district. Resolution No. 96-049 Page 59 FY 96/97 Assessment Rate: The following itemizes the assessment rate for the district: Unit No. of Rate/. Land Use Type Units Rate Factor A.U. Single Family Parcel 108.00 $151.45 1.0 $151.45 Revenue $16.357.00 Resolution No. 96-049 Page 60