HomeMy WebLinkAbout1643 GENERAL NOTES:
- - -
1) All work shall be done in accordance with these plans, the City of Rancho Cucamonga Standards and
� I
the Standard Specifications for Pubic Works Construction -current edition. Contractor shall be familiar - - --
j
with and responsible for adherence to these standards and specifications.
- - -
_ _
ILI
2 All pipelines or substructures of an kind, telephone or
P Pe Y P power poles, water meters, valves, fire
- ,
hydrants, etc. shown or not shown on these plans within the right-of-way limits or adjacent areas where4 --
- a - -
improvement work is to be done shall be removed, relocated, or protected in place as required at no cost to - - - - -the City of Rancho Cucamonga.
a
3) Any contractor performing work on this project shall familiarize himself with the site and shall be solely - - - -
-_
L= responsible for any damage to existing facilities resulting directly or indirectly from his operations, whether - +
i ;
- —�
or not such facility were shown on these plans. _ _ _ _ _ _ _
, 1 A
4) A permit shall be obtained from the City of Rancho Cucamonga Engineering Department prior to any -
encroachment or construction within the City of Rancho Cucamonga's easement or right-0f-way. - - -- +71
- - -
r
5) All grade stakes shall be set by the contractor or Engineer. - - _ - - _ '•
-
6) All sewer, water, electricity, gas, telephone, or other utility materials , mains, or crossings shall be
: constructed prior to paving.
7) Comp coon tests of embankment construction, trench backfill,
a tr compaction of original ground and all ;
1
-
sub-grades shall be performed at no cost to the City of Rancho Cucamonga. A written report with these a i ; a
S• t ; 1 t _
compaction test shall be submitted to the city engineer for approval prior to placement of base materials
:
and /or surfacing. - t 3 EXP .o } ' i i ;
JOINT o - - t- - 11 --�--
--
� }
8 At the completion of paving, a materials report shat �D OF - - - - -"A Lid
14 -
P P 9, po I be submitted to the City Engineer, listing all tests or -
determinations, completed to verify stability of the oil content and gradations of the asphalt paving. -
i
app +o�r6 1 - - - - t—f- --
1
_ 9 OMITTED `h �'' 1 = - -
,
1 ,
i
10) Estimate of quantities is provided by the Engineer only for the convenience of the developer. The
_
t - --� - -- - t , - - -4 —
WEAKENED
contractor shall make his own determination of the construction quantities before submitting a bid. Any itemo �
a PLANE JOINT i . i - t - +.
- of work required by these plans which is not specifically listed in the estimate of quantities shall be - - ti `� - - - - }--1- --t -- -r-- �- -- -- - - -- -� - - - -t-� - - - - #- -;- --= -� -
i t
- i __ considered as included in the listed items of work. BACK OF S -=t--�- t-�- -�-i �
= 11) City approval of plans does not relieve the developer from responsibility for the correction of error and � # � � � � �, CURB AND f t � i � i � _- ; , T_ � � _ � i 1 i44 a i
-?= omission discovered during construction. Upon request the required plan revisions shall be promptly = - , - - P �` GUTTER - - 7 J -- - - ----a--- - -
_J -1 - - _.
submitted to the City Engineer for approval. - = - - - _
E IST I G tAl4� - - -
12 Work site and exterior / N .
{ ) streets shall be in a neat, dean, hazard free, orderly state, throughout = 1 4 i i I 1 i ; i i 1
construction. Site shall be cleaned upon request of the inspector. - RAW
_
-
WEAKENED J
13) Contact UNDERGROUND ALERT 1-80022-4133 and the following Utilities Companies as required, - - _
vgorking days�or to excavation - ? PLANE JOINT - -t ---} i - t j �
I '
-
i
Cucamonga County Water Di - - I - - - --#- ---�----�- --�--�- -
g ty strict (909) 987 2591 # 1i J { - ;
I 9641 San Bernardino Road -lrnkl - 1- f T +-; - ,- - - - - - -
Rancho Cucamonga, CA - -- - - - �- - -----
4 - - 1- z - -- -
1 z �
! i
y
14) Construction contractor agrees that in accordance with generally accepted construction practices, the
construction contractor will be required to assume sole and complete responsibility for the job site �kIST Ik►G V)hkL
conditions during the course of the construction of the project, including safety of all persons and property; 4 1M i W AJ J C UT ANMD Q 1
that this requirement shall be made to apply bontinuously and not limited to normal working hours, and the Q-14 , RoQ>=QTY LINE
construction contractor further agrees to defend, indemnify and hold design profession harmless from any L11 vF_C AT s t c�ES RF OU E E>tI5 T I1.S Ca CURB +
q ty0. TU GRADS AS DIRECTFiJ
and all liability real or alleged, in connection with the performance of the work on this project, except � -� ANP SLOPE d.33°�t�AX �5Y CITY INSPECT(V
liability arising from the sole negligence of the design professional. - E>(IgTr1JG SPANDQEL EK%4ST 10 C, C G l 4 E tSTiU4 GN B 4�k W ktE
Ca►N�< tTl�►N NOTES FKISTIlu4 STQEET
SECT ION �-A , . . �
( Saw cut existing spandrel for curb cut for handicap ramp. =
AIT S
O2 Construct Access ramp per City Standard 102 as modified hereon. i
Qcc�ss Rant P DETAILS ,-
O Install street light 5800 lumens, HPSV by S.C.E., paid and coordinated by the developer. �T S � Y P I CA L S L-C T 10 N
S ikPP T4 IRE sT 12.E ET NI-5
04Construct 4'wide P.C.C. sidewalk per City Standard 101.Type C I` �► TREE To
5 Install street trees, 15 gallon per Street Tree Schedule and Street Trees' Construction Notes on this E OF (AXkK ' �� ' _ _ °R o P F �T Y S 1 rV E
3TA 1+99.U0� ;
CO .�� DICTION NOTES FOR STI lrT WES � � PARCEL 1 PARCEL MAP 3342
1) All street trees are to be planted in accordance with City Standard Plans. 31, f Z o,opo I s.F LOT
s T E
2 x pQo POSED LOT
ICAQA DRIVE
2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to the City z Lit v
Inspector. Any unusual toxicities or nutrient deficienies may require backfill soil amendments, as LL. Er�sT�uc, zM�oac,�chEWs a;,
determined by the City Inspector. �c oEa oar, 1J0 �9� SNIA.
Ile
3) All street trees are subject to inspection and acceptance by the Engineering Division. I )L 506+%-P LOT _ N I LL iDE MoAb
�X EKI%TING PowER ROLE I
4) Street trees are to be planted per Public Improvement Plans only. ul I
= i-
_ NAME COMMON NAME PACING SIZE QTY. a� �x
STREET BOTANICAL N _ _
Sapphire St. Lagerstroemia Indica Faurei' Muskogee Lavender Crape Myrtle20' 15 Gallon 7 V) x I Q
i 5 TY D' i ANYAN AVE w
a v
3 sT. 1- _5 0 0" f 11 Q
Sr. LT. --
Ekisn+� I%Vy uc cuR(5 PEQ 7w�. 162p -
--- - -
Otoo4 ' o DFSCRIfP"TION OF Rt�'ISI DATE GTI']'APPRONTD
VICARA '''�AQA D�iOi: CITY OF RANCHO CUCAMONGA
Two-%,T i$Jt. PQvEMEuT I+IAQtiCl13G5
y I C I til I'T Y MAP IMPROVEMENT PLAN
-PIAN SCA�.E IN=404 N .S . SAPPHIRE STREET
aP�or4ss 1V NORTH OF ViCARA DRIVE
Q� Pay H uS {
�0 6,Q �1- APPROVED BY: DATE
EMSTiNG SURVEY DOCUMENTATION
e disturbed b this project. O� �- CITY ENGINEER .. . RCE Nd 24953
hereby certify that I have identified all survey monuments of record that could b y P 1 i 0 `� ` '�; •�
CrDESIGN PREPARED IN *E•OFFICE OF: RECOMMENDED
All said monuments which currently exist in the field are shown on these plans and are described as NO. C 26 4 ..
follows: BROWN
JIM BROWN d� ASSOCIATES ���— �Z7-98
9�� DRAWN 8320 VICARA DRIVE SHEEP
1 None ` Of. CA~v.�FU,� J. BROWN ALTA LOMA, CA. 91701-1352 0 ' j
1
-41
`� •' VOICE (909) 989-2441
Dated: 2 April 1998 �.. / CHECKED DRAWING NO.
I
RCE JAMBE��ft US BROWN C 26678 �'�p � �! �� FAx (9os)ss9-��s�
RCE NO. 26679 16�13
DATE 2 APRiL 1998 FILE NO.