Loading...
HomeMy WebLinkAbout1643 GENERAL NOTES: - - - 1) All work shall be done in accordance with these plans, the City of Rancho Cucamonga Standards and � I the Standard Specifications for Pubic Works Construction -current edition. Contractor shall be familiar - - -- j with and responsible for adherence to these standards and specifications. - - - _ _ ILI 2 All pipelines or substructures of an kind, telephone or P Pe Y P power poles, water meters, valves, fire - , hydrants, etc. shown or not shown on these plans within the right-of-way limits or adjacent areas where4 -- - a - - improvement work is to be done shall be removed, relocated, or protected in place as required at no cost to - - - - -the City of Rancho Cucamonga. a 3) Any contractor performing work on this project shall familiarize himself with the site and shall be solely - - - - -_ L= responsible for any damage to existing facilities resulting directly or indirectly from his operations, whether - + i ; - —� or not such facility were shown on these plans. _ _ _ _ _ _ _ , 1 A 4) A permit shall be obtained from the City of Rancho Cucamonga Engineering Department prior to any - encroachment or construction within the City of Rancho Cucamonga's easement or right-0f-way. - - -- +71 - - - r 5) All grade stakes shall be set by the contractor or Engineer. - - _ - - _ '• - 6) All sewer, water, electricity, gas, telephone, or other utility materials , mains, or crossings shall be : constructed prior to paving. 7) Comp coon tests of embankment construction, trench backfill, a tr compaction of original ground and all ; 1 - sub-grades shall be performed at no cost to the City of Rancho Cucamonga. A written report with these a i ; a S• t ; 1 t _ compaction test shall be submitted to the city engineer for approval prior to placement of base materials : and /or surfacing. - t 3 EXP .o } ' i i ; JOINT o - - t- - 11 --�-- -- � } 8 At the completion of paving, a materials report shat �D OF - - - - -"A Lid 14 - P P 9, po I be submitted to the City Engineer, listing all tests or - determinations, completed to verify stability of the oil content and gradations of the asphalt paving. - i app +o�r6 1 - - - - t—f- -- 1 _ 9 OMITTED `h �'' 1 = - - , 1 , i 10) Estimate of quantities is provided by the Engineer only for the convenience of the developer. The _ t - --� - -- - t , - - -4 — WEAKENED contractor shall make his own determination of the construction quantities before submitting a bid. Any itemo � a PLANE JOINT i . i - t - +. - of work required by these plans which is not specifically listed in the estimate of quantities shall be - - ti `� - - - - }--1- --t -- -r-- �- -- -- - - -- -� - - - -t-� - - - - #- -;- --= -� - i t - i __ considered as included in the listed items of work. BACK OF S -=t--�- t-�- -�-i � = 11) City approval of plans does not relieve the developer from responsibility for the correction of error and � # � � � � �, CURB AND f t � i � i � _- ; , T_ � � _ � i 1 i44 a i -?= omission discovered during construction. Upon request the required plan revisions shall be promptly = - , - - P �` GUTTER - - 7 J -- - - ----a--- - - _J -1 - - _. submitted to the City Engineer for approval. - = - - - _ E IST I G tAl4� - - - 12 Work site and exterior / N . { ) streets shall be in a neat, dean, hazard free, orderly state, throughout = 1 4 i i I 1 i ; i i 1 construction. Site shall be cleaned upon request of the inspector. - RAW _ - WEAKENED J 13) Contact UNDERGROUND ALERT 1-80022-4133 and the following Utilities Companies as required, - - _ vgorking days�or to excavation - ? PLANE JOINT - -t ---} i - t j � I ' - i Cucamonga County Water Di - - I - - - --#- ---�----�- --�--�- - g ty strict (909) 987 2591 # 1i J { - ; I 9641 San Bernardino Road -lrnkl - 1- f T +-; - ,- - - - - - - Rancho Cucamonga, CA - -- - - - �- - ----- 4 - - 1- z - -- - 1 z � ! i y 14) Construction contractor agrees that in accordance with generally accepted construction practices, the construction contractor will be required to assume sole and complete responsibility for the job site �kIST Ik►G V)hkL conditions during the course of the construction of the project, including safety of all persons and property; 4 1M i W AJ J C UT ANMD Q 1 that this requirement shall be made to apply bontinuously and not limited to normal working hours, and the Q-14 , RoQ>=QTY LINE construction contractor further agrees to defend, indemnify and hold design profession harmless from any L11 vF_C AT s t c�ES RF OU E E>tI5 T I1.S Ca CURB + q ty0. TU GRADS AS DIRECTFiJ and all liability real or alleged, in connection with the performance of the work on this project, except � -� ANP SLOPE d.33°�t�AX �5Y CITY INSPECT(V liability arising from the sole negligence of the design professional. - E>(IgTr1JG SPANDQEL EK%4ST 10 C, C G l 4 E tSTiU4 GN B 4�k W ktE Ca►N�< tTl�►N NOTES FKISTIlu4 STQEET SECT ION �-A , . . � ( Saw cut existing spandrel for curb cut for handicap ramp. = AIT S O2 Construct Access ramp per City Standard 102 as modified hereon. i Qcc�ss Rant P DETAILS ,- O Install street light 5800 lumens, HPSV by S.C.E., paid and coordinated by the developer. �T S � Y P I CA L S L-C T 10 N S ikPP T4 IRE sT 12.E ET NI-5 04Construct 4'wide P.C.C. sidewalk per City Standard 101.Type C I` �► TREE To 5 Install street trees, 15 gallon per Street Tree Schedule and Street Trees' Construction Notes on this E OF (AXkK ' �� ' _ _ °R o P F �T Y S 1 rV E 3TA 1+99.U0� ; CO .�� DICTION NOTES FOR STI lrT WES � � PARCEL 1 PARCEL MAP 3342 1) All street trees are to be planted in accordance with City Standard Plans. 31, f Z o,opo I s.F LOT s T E 2 x pQo POSED LOT ICAQA DRIVE 2) Prior to the commencement of any planting, an agronomic soils report shall be furnished to the City z Lit v Inspector. Any unusual toxicities or nutrient deficienies may require backfill soil amendments, as LL. Er�sT�uc, zM�oac,�chEWs a;, determined by the City Inspector. �c oEa oar, 1J0 �9� SNIA. Ile 3) All street trees are subject to inspection and acceptance by the Engineering Division. I )L 506+%-P LOT _ N I LL iDE MoAb �X EKI%TING PowER ROLE I 4) Street trees are to be planted per Public Improvement Plans only. ul I = i- _ NAME COMMON NAME PACING SIZE QTY. a� �x STREET BOTANICAL N _ _ Sapphire St. Lagerstroemia Indica Faurei' Muskogee Lavender Crape Myrtle20' 15 Gallon 7 V) x I Q i 5 TY D' i ANYAN AVE w a v 3 sT. 1- _5 0 0" f 11 Q Sr. LT. -- Ekisn+� I%Vy uc cuR(5 PEQ 7w�. 162p - --- - - Otoo4 ' o DFSCRIfP"TION OF Rt�'ISI DATE GTI']'APPRONTD VICARA '''�AQA D�iOi: CITY OF RANCHO CUCAMONGA Two-%,T i$Jt. PQvEMEuT I+IAQtiCl13G5 y I C I til I'T Y MAP IMPROVEMENT PLAN -PIAN SCA�.E IN=404 N .S . SAPPHIRE STREET aP�or4ss 1V NORTH OF ViCARA DRIVE Q� Pay H uS { �0 6,Q �1- APPROVED BY: DATE EMSTiNG SURVEY DOCUMENTATION e disturbed b this project. O� �- CITY ENGINEER .. . RCE Nd 24953 hereby certify that I have identified all survey monuments of record that could b y P 1 i 0 `� ` '�; •� CrDESIGN PREPARED IN *E•OFFICE OF: RECOMMENDED All said monuments which currently exist in the field are shown on these plans and are described as NO. C 26 4 .. follows: BROWN JIM BROWN d� ASSOCIATES ���— �Z7-98 9�� DRAWN 8320 VICARA DRIVE SHEEP 1 None ` Of. CA~v.�FU,� J. BROWN ALTA LOMA, CA. 91701-1352 0 ' j 1 -41 `� •' VOICE (909) 989-2441 Dated: 2 April 1998 �.. / CHECKED DRAWING NO. I RCE JAMBE��ft US BROWN C 26678 �'�p � �! �� FAx (9os)ss9-��s� RCE NO. 26679 16�13 DATE 2 APRiL 1998 FILE NO. ', JAZ) .31312 P3. fl - lr':F93 UJ8 3C 3VfR