HomeMy WebLinkAbout93-096 - ResolutionsRESOLUI~ON NO. 93-096
A RESOLUTION OF THE CITY O0UNCIL OF ~ CITY OF RANCHO
CUCJtWDNGA, CALIFORNIA, UPHOLDING AN APPEAL AND APPRDVING
DEVELOPM~Ff REVIle4 NO. 93-05, A PdDQUFLT TO CONSTRUCT A
GOLF TRAINING FACILITY, CONSISTING OF A DRIVING RANGE,
PUITING GRFFN, C~IPPING AREA, CI/3B~OUSE, AND MAINTENANCE
BUILDING, IN ~6E Gf]gERAL INDUSTRIAL DISTRICT (SUBAREA 8)
OF THE INDUSTRIAL AREA SPECIFIC PLAN, LOCATHD ON THE
NORTH SIDE OF ARROW ROUTE, EAST OF MUIIKfN AVfNUE, AND
MAKING FINDINGS IN SUPPOR~ THEREOF - APN: 229-011-24
A. Recitals.
(i) K & K Golfing has filed an application for the approval of
Development Rmview No. 93-05 as described in the title of this Rmsolution.
Hereinafter in this Resolution, the subject Development Review request is
referred to as "the application."
(ii) On the 10th day of March 1993, the Planning C~m,~ssion of the
City of Rancho Cucamonga conducted a meeting on the application and approved
the application subject to the conditions listed in their Resolution No.
93-21.
(iii) The applicant filed an appeal on the application, pertaining to
a condition of approval requiring installation of a Master Plan Storm Drain
T.'~r~e, within the time limits prescribed by law.
(iv) On the 21st day of April 1993, the City Council of the City of
Rancho Cucamonga conducted a meeting on the application and concluded said
meeting on that date.
(v) All legal prerequisites prior to the adoption of this R~solution
have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved by the
City Council of the city of Rancho Cucamonga as follows:
1. This Council hereby specifically finds that all of the facts set
forth in the Recitals, Part A, of this Resolution are true and correct.
2. Based upon substantial evidence presentedtothis Councilduring
the above-referenced meeting on April 21, 1993, including written and oral
staff reports, this Council hereby specifically finds as follows:
a. The application applies to property located between Foothill
Boulevard and Arrow Route at Milliken Avenue with street frontages of 2,560
feet along Foothill Boulevard and 2,170 feet along Arrow RDute, and is
presently improved with detention basins, and the balance of the site is
vacant; and
Resolution No. 93-096
Page 2
b. The property to the north of the subject site is designated
for co~rcial uses and is developed with a detention basin, the pro~ to
the south is designated for industrial uses and is vacant, and the properties
to the east and west are designated for industrial uses and contain a sports
complex/animal shelter and a manufacturing building, respectively; and
c. The development of the golf training facility is consistent
with the General Industrial designation of the Industrial Area Specific Plan
and the General Industrial designation of the General Plan; and
d. The application, together with the attached conditions of
approval, will comply with all applicable standards of the Industrial Area
Specific Plan and the Development Code.
3. Based upon the substantial evidence presented to this Council
during the above-referenced meeting and upon the specific findings of facts
set forth in paragraphs 1 and 2 above, this Council hereby finds and concludes
as follows:
a. That the proposed project is consistent with the objectives
of the General Plan; and
b. That the proposed use is in accord with the objectives of
the Development Code and the purposes of the district in which the site is
c. That the proposed use is in co~¥~liance with each of the
applicable provisions of the Development Code; and
d. That the proposed use, together with the conditions
applicable thereto, will not be detrimental to the public health, safety, or
welfare or materially injurious to properties or improvements in the vicinity.
4. This Council hereby finds and certifies that the project has
been reviewed and considered in compliance with the California Environmental
Quality Act of 1970 and, further, a Negative Declaration was adopted on March
10, 1993.
5. Based upon the findings and conclusions set forth in paragralmhs
1, 2, 3, and 4 above, this Council hereby approves the application subjectto
each and every condition set forth in Planning Commiesion Resolution No.
93-21, with a modification to Engineering Division Condition No. 2 to readas
follows:
Resolution No. 93-096
Page 3
t,2.
Provide a drainage study fort he reconstruction
of the existing detention basin.
Reconstruction of said basin shall be to the
satisfaction of the City Engineer. Any berming
and spillway facilities shall also be reviewed
by the City Planner for landscape amenities."
6. This Council hereby provides notice to K & K Golfing that the
time within which judicial review of the decision represented by this
Resolution must be sought is governed by the provisions of California Code of
Civil Procedure Section 1094.6.
7. The City Clerk of the City of Rancho Cucamonga is hereby
directed to: (a) certify to the adoption of this Resolution, and (b)
forthwith transmit a certified copy of this Resolution, by certified mail,
return-receipt requested, to K & K Golfing at the address identified in City
records.
8. The City Clerk shall certify to the adoption of this Resolution.
PASSED, APPROVED, and ADOPTED this 21st day of April, 1993.
Alexander, Gutierrez, Stout, Williams
NOES: None
'-f~nn'~s L.-' S~6ut, Mayor
~~~, City Clerk
R~solution No. 93-096
Page 4
I, DEBRA J. ADAMS, CITY CLk~K of the City of Rancho Cucamonga, California, do
hereby certify that the foregoing Resolution was duly passed, approved, and
adopted by the City Council of the City of Rancho Cucamonga, California, at a
regular meeting of said City Council held on the 21st day of April, 1993.
Executed this 22nd day of April, 1993, at Rancho Cucamonga,
California.