Loading...
HomeMy WebLinkAbout93-096 - ResolutionsRESOLUI~ON NO. 93-096 A RESOLUTION OF THE CITY O0UNCIL OF ~ CITY OF RANCHO CUCJtWDNGA, CALIFORNIA, UPHOLDING AN APPEAL AND APPRDVING DEVELOPM~Ff REVIle4 NO. 93-05, A PdDQUFLT TO CONSTRUCT A GOLF TRAINING FACILITY, CONSISTING OF A DRIVING RANGE, PUITING GRFFN, C~IPPING AREA, CI/3B~OUSE, AND MAINTENANCE BUILDING, IN ~6E Gf]gERAL INDUSTRIAL DISTRICT (SUBAREA 8) OF THE INDUSTRIAL AREA SPECIFIC PLAN, LOCATHD ON THE NORTH SIDE OF ARROW ROUTE, EAST OF MUIIKfN AVfNUE, AND MAKING FINDINGS IN SUPPOR~ THEREOF - APN: 229-011-24 A. Recitals. (i) K & K Golfing has filed an application for the approval of Development Rmview No. 93-05 as described in the title of this Rmsolution. Hereinafter in this Resolution, the subject Development Review request is referred to as "the application." (ii) On the 10th day of March 1993, the Planning C~m,~ssion of the City of Rancho Cucamonga conducted a meeting on the application and approved the application subject to the conditions listed in their Resolution No. 93-21. (iii) The applicant filed an appeal on the application, pertaining to a condition of approval requiring installation of a Master Plan Storm Drain T.'~r~e, within the time limits prescribed by law. (iv) On the 21st day of April 1993, the City Council of the City of Rancho Cucamonga conducted a meeting on the application and concluded said meeting on that date. (v) All legal prerequisites prior to the adoption of this R~solution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the City Council of the city of Rancho Cucamonga as follows: 1. This Council hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon substantial evidence presentedtothis Councilduring the above-referenced meeting on April 21, 1993, including written and oral staff reports, this Council hereby specifically finds as follows: a. The application applies to property located between Foothill Boulevard and Arrow Route at Milliken Avenue with street frontages of 2,560 feet along Foothill Boulevard and 2,170 feet along Arrow RDute, and is presently improved with detention basins, and the balance of the site is vacant; and Resolution No. 93-096 Page 2 b. The property to the north of the subject site is designated for co~rcial uses and is developed with a detention basin, the pro~ to the south is designated for industrial uses and is vacant, and the properties to the east and west are designated for industrial uses and contain a sports complex/animal shelter and a manufacturing building, respectively; and c. The development of the golf training facility is consistent with the General Industrial designation of the Industrial Area Specific Plan and the General Industrial designation of the General Plan; and d. The application, together with the attached conditions of approval, will comply with all applicable standards of the Industrial Area Specific Plan and the Development Code. 3. Based upon the substantial evidence presented to this Council during the above-referenced meeting and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Council hereby finds and concludes as follows: a. That the proposed project is consistent with the objectives of the General Plan; and b. That the proposed use is in accord with the objectives of the Development Code and the purposes of the district in which the site is c. That the proposed use is in co~¥~liance with each of the applicable provisions of the Development Code; and d. That the proposed use, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. 4. This Council hereby finds and certifies that the project has been reviewed and considered in compliance with the California Environmental Quality Act of 1970 and, further, a Negative Declaration was adopted on March 10, 1993. 5. Based upon the findings and conclusions set forth in paragralmhs 1, 2, 3, and 4 above, this Council hereby approves the application subjectto each and every condition set forth in Planning Commiesion Resolution No. 93-21, with a modification to Engineering Division Condition No. 2 to readas follows: Resolution No. 93-096 Page 3 t,2. Provide a drainage study fort he reconstruction of the existing detention basin. Reconstruction of said basin shall be to the satisfaction of the City Engineer. Any berming and spillway facilities shall also be reviewed by the City Planner for landscape amenities." 6. This Council hereby provides notice to K & K Golfing that the time within which judicial review of the decision represented by this Resolution must be sought is governed by the provisions of California Code of Civil Procedure Section 1094.6. 7. The City Clerk of the City of Rancho Cucamonga is hereby directed to: (a) certify to the adoption of this Resolution, and (b) forthwith transmit a certified copy of this Resolution, by certified mail, return-receipt requested, to K & K Golfing at the address identified in City records. 8. The City Clerk shall certify to the adoption of this Resolution. PASSED, APPROVED, and ADOPTED this 21st day of April, 1993. Alexander, Gutierrez, Stout, Williams NOES: None '-f~nn'~s L.-' S~6ut, Mayor ~~~, City Clerk R~solution No. 93-096 Page 4 I, DEBRA J. ADAMS, CITY CLk~K of the City of Rancho Cucamonga, California, do hereby certify that the foregoing Resolution was duly passed, approved, and adopted by the City Council of the City of Rancho Cucamonga, California, at a regular meeting of said City Council held on the 21st day of April, 1993. Executed this 22nd day of April, 1993, at Rancho Cucamonga, California.