Loading...
HomeMy WebLinkAbout1851-S I� I 1 28.5 12. 1 1 .!'12.1115.2' 12. I r Ste 96+07 Ste 98+13 MATCH CH Ex MEDIANT IPE S R MATCH Ex LANE STRIPE a f' r; 1 TRAFFIC CONTROL NOTES SCALE: 1"=W I 1. ALL SIGNING, STRIPING AND PAVEMENT MARKINGS SHALL BE IN CONFORMANCE WITH 0 25 50 100 I NT EDITION OF THE TRAFFIC MANUAL, PUBLISHED BY THE STATE OF THE CURRENT CALIFORNIA, DEPARTMENT OF TRANSPORTATION. FMA li SCALE FEET NO 2. ALL STRIPING AND PAVEMENT MARKINGS SHALL BE THERMOPLASTIC(ALKYD BASE TYPE). PARK I NG ——————s T li t ANY i I it TIME �1 3. ALL SIGNS AND ROADSIDE MARKERS SHALL BE OF HIGH INTENSITY(FHWA TYPE 111) REFLECTIVE SHEETING, EXCEPT STOP SIGNS SHALL BE DIAMOND GRADE (FHWA I49 TYPE IIIA) REFLECTIVE SHEETING. ITEMS ED PER STRIPING , TALL _ SHALL BE INS 4. SIGN POST WITHIN THE CITY OF RANCHO CUCAMONGA - ; STANDARD PLAN 401-B OF THE CITY OF RANCHO CUCAMONGA STANDARD DRAWINGS. „ I ! O INSTALL 4-INCH WIDE THERMOPLASTIC WHITE SKIP STRIPE PER CALTRANS ALL OTHER SIGNS SHALL BE MOUNTED ON METAL POSTS SIMILAR TO THE COUNTY ' vriN t2' v I DETAIL 11 (USE DETAIL 6 IN THE CITY OF RANCHO CUCAMONGA) OF SAN BERNARDINO STANDARD 3039 and 303b. I ' ' 41 INSTALL 4-INCH WIDE THERMOPLASTIC DOUBLE YELLOW CENTERLINE STRIPE 5. ALL CONFLICTING STRIPING AND PAVEMENT MARKINGS NOT SHOWN ON THE PLANS Ste 100+00.00 B I o + PER CALTRANS DETAIL 21 (USE DETAIL 22 IN THE CITY OF RANCHO CUCAMONGA) SHALL BE REMOVED BY CONTRACTOR, REMOVAL SHALL BE ACCOMPLISHED BY Sta Equation F- SANDBLASTING, GRINDING, OR AS DIRECTED BY THE GOVERNING REPRESENTATIVE. = Ste 0+00.00 Ahead ', 42 INSTALL 4-INCH WIDE THERMOPLASTIC DOUBLE YELLOW MEDIAN STRIPE PER ;', I Q W ? CALTRANS DETAIL 28 (USE DETAIL 29 IN THE CITY OF RANCHO CUCAMONGA) Wi ! 6. ALL CONFLICTING SIGNS SHALL BE EITHER REMOVED, RELOCATED OR COVERED BY i` 43 INSTALL 84NCH WIDE THERMOPLASTIC SOLID WHITE LANE LINE STRIPE THE CONTRACTOR. RELOCATABLE SIGNS SHALL BE INSTALLED AS SPECIFIED ON R A DIRECTED BY GOVERNING REPRESENTATIVE. INSTALL 44NCH WIDE THERMOPLASTIC SOLID WHITE LANE LINE STRIPE THE PLANS O S I IINSTALL 12-INCH WIDE 7. ALL EXISTING SIGNING, STRIPING AND PAVEMENT MARKINGS NOT SHOWN ON PLANS, I; v O CALTRANS STANDARD PLAN A24E STIC WHITE CROSSWALK/LIMIT LINE PER IF REMOVED/OBLITERATED, SHALL BE REPLACED/RESTORED OF SAME KIND, AND IN NORTH LINE OF SECTION 20 CONFORMANCE WITH THE CURRENT EDITION OF THE TRAFFIC MANUAL PUBLISHED T1 S, R 6 W, SBM ;j +L., O INSTALL PAVEMENT MARKINGS PER CALTRANS STANDARD PLANS A24A-A24E BY THE STATE OF CALIFORNIA, DEPARTMENT OF TRANSPORTATION. 1 „ (TYPE AS INDICATED) 8. THE CONTRACTOR SHALL NOTIFY COUNTY/CITY REPRESENTATIVE TO SCHEDULE WITH <, 47 INSTALL"K"MARKER AT CORNER OF MEDIAN ISLAND TRAFFIC DIVISION PERSONNEL FOR A FINAL REVIEW(WALK THROUGH) AND APPROVAL j '20Aoc ) 48 INSTALL 124NCH WIDE THERMOPLASTIC SOLID YELLOW HATCH STRIPE 1; (1�YP ACCEPTANCE. O OF TRAFFIC CONTROL DEVICES PRIOR TO PROJECT C 46 {{ 40 +40 W MEDIAN STRIPE PER CALTRANS Ste 1 49 INSTALL 4-INCH WIDE THERMOPLASTIC YELLOW 9. ALL CONSTRUCTION SIGNS SHALL BE BLACK ON ORANGE BACKGROUND WITH HIGH I INTENSITY FHWA TYPE III REFLECTIVE SHEETING, I I END YELLOW MEDIAN STRIPE DETAIL 31 BEGIN DOUBLE YELLOW STRIPE t 50 INSTALL 44NCH WIDE THERMOPLASTIC WHITE LANE LINE EXTENSION THROUGH SHALL BE IN CONFORMANCE WITH THE CURRENT EDITION INTERSECTION PER CALTRANS DETAIL 40 10, ALL CONSTRUCTION SIGNING OF THE MANUAL OF TRAFFIC CONTROLS FOR CONSTRUCTION AND MAINTENANCE WORK TRANSPORTATION- NO I ' I 42 1 IF RNIA DEPARTMENT OF AL O i HED BY THE STATE OF ZONES, PURLS i —a PARKING ANY I I F 11. ALL SCHOOL WARNING SIGNS SHALL BE DIAMOND GRADE FLOURESCENT REFLECTIVE TIME 1' I 42SHEETING YELLOW GREEN. N2 ' , I INSTALLED THROUGHOUT THIS T B E INST , -TU RN/RIGHT-TURN TRAFFIC ARROWS 0 12. ALL LEFT i PROJECT SHALL BE TYPE IV(L)/(R). I `I I Ste 2+80 I MATCH Ex LANE STRIPE ► 2" i R b Ste 2+70 `' I 4 + Sta 2+70 I ' BEGIN DOUBLE YELLOW STRIPE BEGIN IN CHANNELIZING STRIPES ''4 R I GHT LANE MUST ---------------a'•r{' I ji TURN RIGHT 3+11 I I ! RELOCATION OF TRAFFIC SIGNAL TO BE Ste` BEGIN CHANNELIZING STRIPE I PERFORMED PER SEPARATE IMPROVEMENT Ste 3+31 _ ( _ _ 1 PLANS PREPARED BY RAJAPPAN & MEYER W <Pt LANE STRIPE CONTRACTOR SHALL SANDBLAST AND REMOVE ANY CONFLICTING STRIPING AND REFRESH ANY REMAINING _ " TO BE INSTALLED ON 41 STOPPING STRIPING DISTURBED BY HIS OPERATION `� j`' I ANY RELOCATED LIGHT S 114' 12'1 12' 12' v 1r Var. 1s'I' / T ME STANDARD r 15'Min ;I REPAINT"BIKE LANE" LEGEND ADJACENT } PWA Ste 4+10 I _ a TO CATCH BASIN + RIGH J NO LANE BEGIN CHANNELIZING STRIPE .E!: W MUST 44 i 'til ' STVff I ( Z N PARKING -----------------------sT;': 2e� /'� ANY z TURN v w ANY Ste 90+56.43 Etiwanda Avenue ' ` / T I AE �/ RIGH \�i g T I =Ste 5+36.67 4th Street �'' 2w �`� �� Lp ++ ' FOUND 2" BRASS CAP 46 oNo S CID w ACCEPTED AS NORTHEAST CORNER II 3 v SECTION 20, T 1 S, R 6 W, SBM 44 �i 'r \ j— i` � � � i ♦ I .0 , � OMNI - 46 43 ao — e3 _mob CITY OF ONTARIO 87 > N OO*W50-E - -- ` I �s . 91 93 a ITY OF 9 RANC CUC ONGA O Bf3 8 , b 45 42 6 97 98 M I N D COUNTY SAN BERNARDINO 41 - COUNTY OF SAN BERNARDINO N o`�„s,, E 1 � � � OU TY OF ER _ . _. _ � 10'INSIDE N 43 47 ? 1 DIMENSION _... - 20oc(TyP) 44 T 1 8 BM ST LINE OF SECTION 17 -- EAST LINE OF SECTION 20 S, R W, S 120'TRANSITION W O �` '.� - PER CALTRANS FIGURE 6-20 a T 1 S, R 6 W, SBM '� ' 47 ' 14' r- 2 + 44 � + t` 12' 12' 20' 3 U y i �. { SEE SHEET 13 of 13 FOR ul = z ;'., �—' STRIPING WITHIN SAN BERNARDINO AVENUE CITY OF RANCHO CUCAMONGA ETIWANDA AVENUE Q I Z ! RECOMMENDED BY APPROVED BY � w f DATE CRY EN! I E —' ATE I' W i Q FILE No. CITY OF ONTARIO • s; Z i ;� M-339 f ACCEPTED BY , CHIEF, TRAFFI DIVISION ATE ASSISTANI CITY EN NEER DATE W O No PLANS PREPARED UNDER SUPERVISION OF'. FIELD BOOK NOTES COUNTY OF SAN BERNARDINO STREET IMPROVEMENT PLANS Underground Service Alert Q+�OFESSlOHgI CONSTRUCTION BENCHMARK BENCHMARK 10-35-92 SBD DEPARTMENT OF PUBLIC WORKS O�FCRE yo o Associated Engineers ROAD No. DESIGNED BY DRAWN BY CHECKED BY APPROVED BY KAISER COMMERCE CENTER a C & Tal FREE z LOCATION: LOCATION: 3311 E. SHELBY STREET J.BERKELEY J.BERKELEY R.OTTf W T R' LTTE BRASS DISK,TOP OF CONCRETE SUPPORT ONTARIO, CALIFORNIA 91764 °C No• 44 120 ”' POST FOR SW LEG OF HIGH VOLTAGE TOWER TEL. ( , 9s2 4th STREET / ETI WAN DA AVENUE FILE No. 11, t 1 -800 0113 WRA LOMA-PADUA,N/01-10&E/O ETIWANDA SUBMITTED BY C.D.E �` Exp.06-30-05 AVENUE, 10-R NE/0 RNV FENCE AND WB OFF FAX: ( -0891 22 —Z6OO Jf t `� RAMP,3-R ABOVE GROUNo RECOMMENDED P D BY ASST DIRECTOR OF TRANSPORTATION DATE STRIPING & SIGNAGE PLAN SHEET Of qrF � � �.- �� ��� oz 19-26 OF A��F 11 TWO WORKING DAYS BEFORE YOU DIG ELEVATION: ELEVATION: 1012.039 R.C.E.No. 44120 (Exp.06-30-05) DATE MARK APPR DATE D vELOPMENT ENGINEER DATE DIRECTOR OF TRANSPORTATION DATE C•U•P• W�29-97 2 1 T✓ j — J k!\WO82/e\donlstreetslintemection�intersec6on12.sht SCALE: 1"=40' 0 20 40 80 SCALE FEET FCi _m CONTRACTOR TO SANDBLAST AND REMOVE ANY CONFLICTING STRIPING NOT OTHERWISE DISTURBED BY PAVEMENT REMOVAL m SEE SHEET 12 of 13 °w 1 0 ► PORTION of WEST '/ SECTION 16 I SOUTHEJ RN 501 SDN W ' W ! I � � NO I tiPARKING 8 ANY I / W41 I / TIME t // Q N lu // l� Ste 5+36.67 San Bernardino Avenue / \ 3 , R16A/ FOUND 2 BRASS CAP - / X ACCEPTED AS NORTHWEST CORNER ; ;` ` ` - \' � \ � NORTH LINE OF SECTION 21 \ �,� \ T 1 S, R 6 W, SBM )4 SECTION 21, T 1 S, R 6 W, SBM / 200' yp - - - bDl r'3 `• 645 b 44 N I' 1 O •- ``` - .-...,T-..,....- .. ..,..,... _. - -_ __ ..,. __-,___... _. ... _... .. N8 - 2ea 46 N 43 N 9°04'50" E - 1 1 _ 48 Rte, 2 RAISED MEDIAN URB ISLAND cV ea�—R=2� 42 47 51 b E�OF IMPROVEMENTS . 45 C/) 10' INS IDE 44 Uj W DIMENSION CIS! J 45 1 rf Ste 5+36.48 San Bernardino Avenue / I _(t Intersection Etiwanda Avenue ' I 0 `Jf ,�6 °"" " \ \\ 43 I Q \\\ \\ 200oc (Typ) NO PARCEL 1 of PARCEL MAP 15118 NO \ PARKING -- s PARK I NG \—— T INE I ANY W TIME NY MATCH STRIPING AT Sta 11+80 PER R26A VV1t KAISER COMMERCE CENTER STRIPING I / SDJTJ-15RNCAL 1 r Dr� I�J J 5D J SD1\1 and SIGNAGE PLANS DATED APRIL 2002 SEE SHEET 12 of 13 SAN BERNARDINO AVENUE STRIPING ITEMS OINSTALL 44RCH WIDE THERMOPLASTIC WHITE SKIP STRIPE PER CALTRANS DETAIL 11 41 INSTALL 4-INCH WIDE THERMOPLASTIC DOUBLE YELLOW CENTERLINE STRIPE PER CALTRANS DETAIL 21 42 INSTALL 44NCH WIDE THERMOPLASTIC DOUBLE YELLOW MEDIAN STRIPE PER CALTRANS DETAIL 28 43 INSTALL 84NCH WIDE THERMOPLASTIC SOLID WHITE LANE LINE STRIPE OINSTALL 44NCH WIDE THERMOPLASTIC SOLID WHITE LANE LW STRIPE OINSTALL 124NCH WIDE THERMOPLASTIC WHITE CROSSWALKILIW'T LINE PER CALTRANS STANDARD PLAN A24E OINSTALL PAVEMENT MARKINGS PER CALTRANS STANDARD PLANS A24A-A24E (TYPE AS INDICATED) 47 INSTALL"K"MARKER AT NOSE OF MEDIAN ISLAND t 51 INSTALL R7"MEDIAN SWERVE" MON ATOP"K"MARKER CHIEF, TRAFFIC DIVISION dATE PLANS PREPARED UNDER SUPERVISION OF: FIELD BOOK NOTES COUNTY OF SAN BERNARDINO STREET IMPROVEMENT PLANS W.O. No U -4orground Service Alert QROFESSIpNq� CONSTRUCTION BENCHMARK BENCHMARK 10-35-92 SBD DEPARTMENT OF PUBLIC WORKS vO�FORE yoG C. Associated Engineers APPROVED BY ROAD No. o cat TML � s LOCATION: LOCATION: 3311 E. SHELBY STREET DESIGNED BY DRWN BY CHECKED BY STRIPING and SIG NAGE P LAN J.BERKELEY J�J.SEARKELEY R.OTTE 75400 AB n � T OT71: � BRASS DISK,TOP OF CONCRETE SUPPORT ONTARIO, CALIFORNIA 91764 -_- Np• 44120 POST FOR SW LEG OF HIGH VOLTAGE TOWER TEL. ( 982 SAN BERNARDINO AVENUE FILE No. 1 —800 *1/3 MIRA LOMA-PADUA,N/O 110 3 E/O ETIWANDA TTS C.D.E. " Exp.06-30- '� AVENUE, 10-R NE/0 RMI FENCE AND WS OFF FAX: ( } -0891 RAMP,3-R ABOVE GROUND RECOMMEND� DI iAPPROVED BY / ASST. RECTOR of TRANSPORTATION DATE Sta 5+85 to Sta 14+00 2272600 �� 133 ql� I V Of t `E�Q� Q SHEET OF C A\- _ t �L •O TV40 WORKING DAYS BEFORE YOU DIG ELEVATION: ELEVATION: 1012.039 R.C.E.No. ` 44120 (Exp.06-30-05) DATE MARK APPR DATE u IOPMENT ENGIN RW — DATE DIRECTOR OF TRANSPORTATION DATE C.•U•P• ,< W129-97 3 �j k\96062fe\dgn\stre-ft\interse✓tion\intersection 13 sht r� - - --_L J ` a r—� r r-I 'Q k LL j J ALJ ALJ 1L.J EE I I .. k a r1l r 1 r _._ L J IL J Lt Ll J r r r-I r 7 L L J J L J L J K: - -- 77 r--1 r-� r F 1 1 1 SAN SEN NARDINO AVENM iiJ r � ' LCL Iy// ,�-Jy �"iJ A A� n ;;_ 1, r / GENERAL NOTES : LSV - 1 . REMOVE AND SALVAGE ALL ABOVE GROUND TRAFFIC SIGNAL POLES , MAST ARMS , VEHICLE SIGNAL HEADS , PEDESTRIAN SIGNAL HEADS , CONTROLLER ASSEMBLY , SERVICE EQUIPMENT �` + AND OTHER HARDWARE . DELIVER TO THE TRAFFIC DIVISION LOCATED AT 825 EAST THIRD L J1 . STREET , ROOM No . 115 , SAN BERNARDINO , CA 92415-0835 . NOTIFY TRAFFIC DIVISION I : 48 HOURS IN ADVANCE BY CALLING ( 909 ) 387-8186 . I APPROVED AS TO FEATURES APPROVED AS TO FEATURES I I ; AFFECTING CITY OF BOXES , TRAFFIC SIGNAL FOUNDATIONS AND ANCHOR BOLTS . BACKFILL I AFFECTING CITY TY OF ONTARIO 0 2 . REMOVE ALL PULL BO , HOLES WITH COMPACTED CLASS 11 AGGREGATE BASE . RANCHO CUCAMONGA 3 . ABANDON EXISTING CONDUIT RUNS AND LOOP DETECTORS . REMOVE AND DISPOSE OF EXISTING ` LJ �ss� ����� DATE DATE CONDUCTORS AND DETECTOR LEAD— IN CABLES . u IL J L J �STM S*NAL SCALE 1 : 20 MODnCATIONS) E- 1 o7/19/02 Alert QROfES CONSTRUCTION BENCHMARK BENCHMARK P'+S PREPARED UNDER SUPERM ION OF: FIELD BOOK NOTES COUNTY OF SAN BERNARDR40 W.O.NO. Underground Service y DEPARTMENT Of PUBLIC WORKS STREET IMPROVEMENT PLANS f.�ORE oG : TOLL FREE 1APPAN LOCATION: LOCATION: Raja. � IROAONo. DESIGNED BY DRAWN BY CHECKEDBYAPPROVED BY � � ���!°C c4bsa2 w . SS SS KM 725400 { No. � Ex 06-30-Q3 � CONSULTING ENGINEERS INC � c.0� AN B�=RNARC� AVE 470-�1 P "m 1�i�lt ArR. Im 4%^ 0% MR13 FILE NO. LL - V V `� C v�L �p E 'en Ee RE , BY ASST.DIRECTOR OF TRANSPORTATION DATE AT 129-130 F ., � ET`�W ANbA A �� O, 4l Of C A�-�F�� r*VO WORKING DAYS BEFORE YOU DIC ELEVATION: ELEVATION: APPR DATE F wt5 OATE DIRECTOR OF TPA4SPORTATION DATE Sr;"AL AND I j —�_4 M R/W w ' I o717 O Z if j ji 4 Jif; / +' _"A" PHASE DIAGRAM in �- E . C . R fN � ` / ,I I i V l n I✓ i Vi i •sem »A» t6P o g 07 I ` f — 01 �6P �4P � L 7 \ C —� 4- 04 2"C, 1 DLC 1 ,S_ 5 4 y �1OR 6 OR o4P _ f �5 qs2 �g EDISON ! 3 G^ i f ► ! ! »C VAULT o o2 --� 3 _: , it I ; " � ` c. o o 3" C 3 2 i ! } I� it o3 o8 CONDUCTORS BY SCE) % I i 3 6 SERVICE) 6 ; 7 ! i -r R/W - //'�//��• 4 10 LIGHTING) i 4 : r IIS i i POLE LOCATION CODE I! .1 irk' ',EXACT LOCA'',I ON BY ENGINEER IN THE FIELD ) No 3 06PPB N ! 6 PP B i. 50' MA R/W --- - R W - 6 /- ...... Ar .- UD .Iy_ �r , v 1f _ R/W EV 2 - _ _------ --- - -- 8 2 1 DLC _ �3 �8 �,8P �6 DLA 1 - , t � I • FOURTH STREET 2 ,, ll, 1� 2—W-8;_ I. " _ ._.. • 345 TO LIMIT LINE jyp _.._ _.___.__w _ ___.__-__.- _ -._ _ ___ - - _.. _.___-- • EV : X i 1 _ , ; RANCHU CUCA� 3 ----- 4 E 5 • -- --- -- ---- ----- - - --- -- _._._ - , - --- A ONT ` 4-- _ 1 1 3-W- =- 1 -E-5 2-E-5 - — - � - -- - -- i 345' TO LIMIT LINE ----- !z ___..___..._.__ _ _..__ __.__..__ •, .._._.___ _.____ _._..__-- , _ --_--_- ---- T ------._. . : :` .` l ' ', ' T-lF!. 1 '� \ / .t. 1 -E-2 2-E-2 / - - SAN BERN AVENUE 57 � L -- ,- _ ` 1 / o2 - 2"C, 1 DLC �;'� ;�,✓\,� 04 v4 - - -- - 6 - - R/W 2„C, 6 D LC 4 P PB i A _ iY 40 M \ GENERAL NOTES : 9 G 1 . ALL VEHICLE I ND I CAT I ONS SHALL BE 1 2 _ _ - 3"C; CONDUCTOR AND CONDUIT SCHEDULE POLE AND EQUIPMENT SCHEDULE AWG SIZE OR CONDUIT SIZE AND RUN NUMBERS PLACEMENT CABLE SIZE PHASE POLE OR LUMINAIRE SIGNAL MOUNTING PPB CIRCUIT STANDARD DIMENSIONS 1 2 3 4 5 6 7 8 9 10 LOC TYPE' SIG MA LUM MA POLE HT. A B C HPS VEHICLE PED PHASE REMARKS POLE A 1 /1 1 /1 1 /1 61 -5- 129MAS SP- 1 —CS q.� INSTALL R73-6 ON MAST ARM. (PER 1999 60 15 30 — +5.0 3 200W MAS SV- 1 —T INSTALL STREET NAME SIGN ETIWANDA AVE ON POLE B 1 /1 1 /1 SPEC) SEPARATE MAST ARM. POLE C 1 /1 1 /1 1 /1 © 15 15' 30' +5.0' — 3' 20OW SV-2—TA SP- 1 —CS 6 _____0_ 3/12 WIRE POLE D 1 /1 1 /1 1 /1 1 /1 © M. CONDUCTOR POLE E 1 /1 1 /1 1 /1 1 /1 1 /1 29-5-80 50' 15' 30' +29.0' — 3' 20OW MAS MAS SV- 1 —T SP- 1 —CS 6--*-- INSTALL STREET INSTALL R73-6 ONAME ASIGN ST R'DETAIL A & DETAIL B" ON CABLE POLE F 1 /1 1 /1 1 /1 1 /1 1 /1 1 /1 SEPARATE MAST ARM. POLE G 1 /1 1 /1 1 /1 1 /1 1 /1 POLE H 1 /1 1 /1 1 /1 1 /1 @ 1 —A 10' — +25.0' 3' TV-2—T SP- 1 —CS 8--*-- POLE INSTALL R73-6 ON MAST ARM. TOTAL CABLES 8/8 8/8 4/4 3/3 2/2 1 /1 3/3 2/2 1 /1 26-4-80 40' 15' 10' — — 1 .0' 3' 200W MAS MAS JSV- 1 —T g .� INSTALL R96/R96B ON SIGNAL POLE. INSTALL STREET NAME / SIGN "ETIWANDA AVE" ON SEPARATE MAST ARM. No. 8 AWG STREET LIGHT 2 2 2 2 2 2 2 2 O 1 —A 10' +5.0' — 3 TV-2—T SP- 1 —CS INSTALL R96/R96B ON SIGNAL POLE. MAS INSTALL STREET NAME SIGN "DETAIL A & DETAIL B" ON SERVICE 2 © 26-4-80 40' 15' 30' + 14.0 — 3 20OW MAS SV- 1 —T SP- 1 —CS SEPARATE MAST ARM. INSTALL R73-3 ON MAST ARM. No. 6 AWG GROUND 1 O 15 15' 30' — 0.0 3' 20OW SV-2—TA 4 —� 01 4 4 4 4 2 2 2 2 OI 15 15' 30' — — — 20OW 02 DETECTOR 03 4 4 4 4 4 4 04 2 1 LEAD—IN 05 4 4 4 4 CABLE 06 2 2 2 2 REFLECTORIZED STREET NAME SIGNS: TYPE B 07 2 2 1 . SIGNS SHALL BE INSTALLED ON SEPARATE 8' HORIZONTAL MAST ARM. (SEE SPECIAL PROVISIONS). 08 2 2 2 2 2 2 2. SIGNS SHALL BE CONSTRUCTED OF 3M DIAMOND GRADE REFLECTIVE SHEETING AND LETTERS. 3. LETTERING SHALL BE 8" U.C. AND 6" L.C. TOTAL 22 21 12 12 6 6 6 6 4. BOTH SIDES SHALL BE PRINTED. 5. COLORS SHALL BE WHITE ON GREEN. EV A 1 1 1 6. SIGNS SHALL BE INSTALLED ON ALUMINUM FRAMES WITH SAFEWAY HRD—EZL BRACKETS. EV B 1 1 1 1 1 EV C 1 1 1 San Bernardino Ave �— San Bernardino Ave EV D 1 1 1 1 1 Fourth Street Fourth Street —� COND. SIZE 3-3%2 " 3-3%2 " 2-3" 4" 3" 2%2 " 3%2 " 3" 2" 2" DETAIL A DETAIL B SIGNAL CABLE (12 CONDUCTOR) SHALL BE RUN UP TO THE TERMINAL COMPARTMENT OF EACH SIGNAL STANDARD. STRIP THE CABLE AT THIS POINT. THE UNUSED CONDUCTORS SHALL HAVE THE ENDS INSULATED AT THE TERMINAL COMPARTMENT. APPROVED AS TO FEATURES APPROVED AS TO FEATURES INSTALL 3 WIRE CONDUCTOR CABLE FOR POLES D,E,F, AND H FOR FUTURE USE. AFFECTING CITY OF AFFECTING CITY OF ONTARIO RANCHO CUCAMONGA �.� � ►,� DATE DATE (CONDUCTOR, POLE AND EQUIPMENT SCHEDULES) 08/05/02 E- 3- Underground Service Alert CONSTRUCTION BENCHMARK BENCHMARK QROF�ONq� PLANS PREPARED UNDER SUPERVISION OF: FIELD BOOK NOTES COUNTY OF SAN BERNARDINO STREET IMPROVEMENT PLANS W.O. No. �o F S ti ORE ,��, � _� DEPARTMENT F PUBLIC WORKS t 0� o YOG AL JAPPAN ?, - ROAD No. �+ LOCATION: DESIGNED BY DRAWN BY CHECKED BY APPROVED BY LOC ., REE LOCATION: FOURTH STREET Q o Call: TOLL F 04680 • KM 725400 U G> N . _03 Ra a an&Me er SAN BERNARDINO AVE FILE �. 1 -800 SY C.D.E. sf 1 �� CONSULTING ENGINEERS INC REC NDED/APPR D BY ASST.DIRECTOR OF TRANSPORTATION DATE AT 227-2600 4TF 11�Fp�� 100 1r12h M.. !en doh QA f6113 ETiWANDA AVENUE SHEET 129-1 3O F C A Rww (4" 1b-2772 Fam (4oa) sp-egos TWO WORKING DAYS BEFORE YOU DIG ELEVATION: ELEVATION: ..• / _ MARK IPPR DATE EF C VI N DATE DIRECTOR OF TRANSPORTATION DATE SIGNAL AND LIGHTING #r S