HomeMy WebLinkAbout87-483 - Resolutions RESOLUTION NO. 87-483
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RAN(~O
CUCAMDNGA ORDERING THE WORK IN CONNECTION WITH ANNEXATION
NO. 5 TO STREET LIGHTING MAINTENANCE DISTRICT NO. 3 AND
ACCEPTING THE FINAL ENGINEER' S REPORT FOR CUP 85-26
WHEREAS, the City Council of the City of Rancho Cucamonga did on the
5th day of August, 1987, adopt its Resolution of Intention No. 87-407 to order
the therein described work in connection with Annexation No. 5 to Street
Lighting Maintenance District No. 3, which Resolution of Intention No. 87-407
was duly and legally published in the time, form and manner as required by law,
shown by the Affidavit of Publication of said Resolution of Intention on f~_le
in the office of the City Clerk; and
WHEREAS, after the adoption thereof, notice of the passage of said
Resolution of Intention, headed "Notice of Improvement", was duly and legally
posted in the time, form, manner, location, and number ae required by law, as
appears from the Affidavit of Posting said notices, on file in the office of
the City Clerk; and
WHEREAS, after the adoption thereof, notices of the adoption of the
Resolution of Intention were duly mailed to all persons owning real property
proposed to be assessed for the improvements described in said Resolution of
Intention No. 87-407, according to the names and addresses of such owners as
the same appears on the last mailing or as known to the City Clerk of the City
of Rancho Cucemonga, which said copies were duly mailed in the time, form, and
manner as required by law, as appears from the Affidavit of Mailing on file in
the office of the City Clerk; and
WHEREAS, said City Council having duly received considered evidence,
oral and documentary, concerning the jurisdiction facts in this proceeding and
concerning the necessity for the contemplated work and the benefits to be
derived therefrom and said City Council having now acquired jurisdiction to
order the proposed work.
SECTION 1: It is hereby resolved by the City Council of the City of
Rancho Cucamonga that the public interest and convenience requires the
annexation to the District and the ordering of the work, and said City Council
hereby orders that the work, as set forth and described in said Resolution of
Intention No. 87-407, be done and made; and
SECTION 2: The Report filed by the Engineer is hereby finally
approved; and
SECTION 3: The assessments and method of assessment in the Engineer's
Report are hereby approved.
SECTION 4: The assessments shall not begin until after 60 percent
of said tracts have been occupied.
Resolution No. 87-483
Page 2
PASSED, APPROVED, and ADOPTED this 2nd day of September, 1987.
AYES: Brown, Buquet, Stout, King, Wright
NOES: None
ABSENT: None
Dennis L. Stout, Mayor
ATTEST:
Beverly A/Authelet. City Cl&rk
I, BEVERLY A. AUTHELET, CITY CLERK of the City of Rancho Cucamonga,
California, do hereby certify that the foregoing Resolution was duly passed,
approved, and adopted by the City Council of the City of Rancho Cucamonga,
California, at a regular meeting of said City Council held on the 2nd day of
September, 1 987.
Executed this 3rd day of September, 1987 at Rancho Cucamonga,
California.
Beverly ~A/Authelet. City' !~r~/
Resolution No. 87-483
Page 3
CITY OF RANCHO CUCAMONGA
Engineer's Report for
Street Lighting Maintenance District No. 3 (Victoria)
Annexation No. 5 for
CUP 85-26
SECTION 1. Authority for Report
This report is in compliance with the requirements of Article 4,
Chapter 1, Division 15 of the Streets and Highways Code, State of
California (Landscaping and Lighting Act of 1972).
SECTION 2. General Description
This City Council has elected to annex the development enumerated in
Exhibit "A" into Street Lighting Maintenance District No. 3. The City
Council has determined that the street lights to be maintained will have
an effect upon all lots within said development as well as on the lots
directly abutting the street 1 ights.
Work to be provided for with the assessments established'by the
di strict are:
The furnishing of services and materials for the ordinary and
usual maintenance, operating and servicing of street light
improvements on arterial and certain col lector streets.
Improvement maintenance is considered of general benefit to
all areas in the District and cost shall be divided on a per
1 ot basi s. In the case of condomi ni urns with ai rspace
ownership only, and apartments, a dwelling unit shall be
considered to benefit the same as a lot.
SECTION 3. Plans and Specifications
The plans and specifications for street lighting have been prepared
by the developers. The plans and street lights are as stipulated in the
condi ti ons of approval for the development and as approved by the C i ty
Engineering Division. Reference is hereby made to the subject project
map or development plan and the assessment diagrm for the exact location
of the street lighting areas. The plans and specifications for street
lighting improvement on the individual development is hereby made a part
of this report to the same extent as if said plans and specifics were
attached hereto.
Detailed maintenance activities on the street lighting district
include: the repair, removal or replacement of all or any part of
any improvement, providing for the illumination of the subject area.
Resolution No. 87-483
Page 4
SECTION 4. Estimated Costs
No costs -- wi 11 be incurred for street 1 ighti ng improvement
construction. All improvements will be constructed by developers. Based
on available data, it is estimated that maintenance costs for assessment
purposes will be as indicated below. These costs are estimated only,
actual assessments will be based on actual cost data.
The estimated total cost for Lighting Maintenance District No. 3 is
shown below:
1. S.C.E. Maintenance and Energy:
Lamps Annex New Lamp
Lamp Size* YTD No. 5 Total
5800L 758 0 758
9500L 6 0 6
*High Pressure Sodi~ Vapor
Total Total Annual
Lamp Size Lamps Rate Mo's Maint. Cost
5800L 758 X $ 8.93 X 12 - $54,576.00
9500L 6 X $10.16 X 12 - 731.52
Total A~nual Maint. Cost = ~
2. Costs per dwelling Unit:
YTD Assessment Unit - 2256; Assess. Unit this Annex. 1 Total · 2257
Total Annual Maintenance Cost - $55 307.52- $24.50/year/unit
No. of Units in District ~
Assessment shall apply to each lot as explained in Section 6.
SECTION 5. Assessment Diagram
Copies of the proposed Assessment Diagrams are attached to this
report and labeled "Street Lighting Maintenance District No. 3",
Annexation No. 5. These diagrams are hereby incorporated within the text
of this report.
Resolution No. 87-483
Page 5
SECTIOt 6. Assessment
Improvements for the District are found to be of general benefit to
all dwelling units within the District and that assessment shall be equal
for each unit. Where there is more than one dwelling unit per lot or
parcel of assessable land, the assessment for each lot or parcel shall be
proportional to the n~nber of dwelling units per lot or parcel.
It is proposed that all future development shall be annexed to the
District.
SECTION 7. Order of Events
1. City Council adopts Resolution of Preliminary Approval of City
Engineer's Report.
2. City Council adopts Resolution of Intention to annex a District and
sets public hearing date.
3. City Council conducts public hearing, considers all testimony and
determines to form a District or abandon the proceedings.
4. Every year in May, the City Engineer files a report with the City
Counci 1.
5. Every year in June, the City Council conducts a public hearing and
approves, or modifies and approves the individual assessments.
EXHIBIT "A"
Properties and improvements to be included within Annexation No. 5 to
Street Lighting Maintenance District 3:
Assessment Arterial
PROJECT Unit 5800L g5OOL 27~ 500L
CUP 85-26 I O 0 0
Resolution No. 87-483
~',,ge 6 ASSESSMENT DIAGRAM
STREET LIGHTING MAINTENANCE DISTRICT NO.
ANNEXATION NO.
I
/
~)~/. ~:~ C~ O~ ~C~O CUC~ONGA A ~' '
~" '~ ~A~ OF C~T-~~