HomeMy WebLinkAbout108 -J
7-,
=77=`
r
a A-
77
Z
4- -4
0S
76
Z'
41
_3
PROF1
HJRV
SCALES V R
GENERAL N 0 T E S
ZM;"
N BENCH MARK RDINO COUNTY STANDARDS
SCALE 1 " 4 1 . AILL WORK SH?ALL BE DONE IN ACCORDANCE WITH THESE PLANS, AND THE SAN BERN�e
SPG14516LE FOR ADHERANCE
SAN BERNARDINO COUNTY ROAD DEPT,,.D,ATUM TRACTOR SHALL BE FAMILIAR WITH, AND SffALL BE RE
B.M. NO. A-257 AND SPECIFICATIONS-CON ATIONS
TO THESE STANDARD SPECIFIC .
'CHIS. 11 C3 11 'IN CURB, WEST SIDE OF 2. SHADING ON STREET PLANS A.C. PAVEMENT TO BE INSTALLED.
SO. OF PRIVATE, ST. - AVING, A' M,ATERIALS REPORT SH-ALL.,. BE SUBMITTED TO THE CONTRACTS ENGINEER
CARNELIAN AVE.,,1 3. 'AT THE COMPLETION OF P ETERMINATIONS COMPLETED TO VERIFY:
SOUTH, OF D. f . BERNARDINO COUNTY ROAD DEPT. 'LISTING ALL TESTSCR 0
CHERRY LANE OF THE SAN _EQU OF AGGR
IVALENT EG�ATE BASES.
(A) R-1VALUE, SIEVE ANALYSIS AND S,AND'
ELEVATIOIV: 1994.52 OIL CONTENT AND SIEVE ANALYSIS OF ASPHALT SURFACING.
(B) STABILITY-1
TRED FROM THE SAN BERNARDINO COUNTY ROAD DEPT PRIOR TO ANY ENCROACHMENT
6-0 4,, PERMIT WILL BE REQU, SAN B I ERNARDING COUNTY ROAD DEPT. RIGH -OF-WAY.
T
OR, ,CONSTRUCTION WITHIN
GISTERED BY THE
7 RADE, A SOIL STERILANT RE
TO BE PLACED DIRECTLY ON SUBG REC OMMENVED
IS
5. IF ASPHALt CONCRETE AT THE MANUFACTURERIS
AND p,,,c.C,, SHALL
E UNIFORMLY APPLIED
0 NDER ,A.C.
E.P.A� FOR USE U
VEMENT WIDTH PRIOR TO PAVING
RATE FOR 'THE FULL PA 'VALVES. '
ATE
PHONE OR POWER POLESO W, R METERS$
KIND (AND TE,LE
S OR, SUBSTRUCTURES OF ANY NT OR IN
6. �Att PIPE LINE IMITS OF THIS DEVELOPME
WITHIN 'THE t
THESE PLANS
C . ) SHOWN OR NOT SHOWN ON CUIRED
HYDRANTSO ET REMOVED OR RELOC,ATED RE
ADJACENT AREAS WHERE IMPROVEMENT WORK IS TO BE DONE SHALL BE, SPONSIBTLITY TO NOTIFY
IT SHALL BE THE OWNERS RE
01�ALq AT' NO COST TO THE' COUNTY OF SAN BERN,ARDINO
%layse-I-VkE- ALL AGENCIES CONCERNED.
f ES NOT INCLUDE THE ESTIMATE OF QUANTITIES.
7. THEAPPROV1AL OF THIS PLAN DO
16 0"') 'WHICH CONSISTS OF A ROCKY MATERIAL THE, SUBGR-ADE
- -----777- WHEN -ASPH,ALT CONCRETE IS PLACED ON NATIVE SOIL
ID111 OR
-7rl- 8�
--7rr— ROC'KS WHICH PROTRUDE ABOVE THE SUBGRADE AND AL1.
SHALL BE PREPARED BY , iH
TIVE
REMOVING ALL MATERIAL OF A QUALITY BETTER THAN *7 E� NA
Am 4 10
14;a;'Vef 7 7 -DEPRESS NS. SH,ALL BE FILLED WITH A FINE GRADED
A A VENUE J.1a
G*A R, 'am's Ew -RA-Mot-L MATERIAL.., AND
0 CO2vc KFIL,L COMPACTING OR16INAL GRGJN[,$
.�Coi - - - , Q� ENCH BAC WITH
Q F EMBANKMENT. CONSTRUCTION TR
PAC TI10,N TESTS TEN REPO!"
70, 9. COM
-S
0 ALL AT NO COST TO SAN BERNARD
Z5 TNO COUNTY. A 'WRIT
UZ
SUB-G'RADES * H,ALL BE, PERFORMED
NO? 100o
CONTRACTS ADMINISTRATION 61VISION 0"
BMITTED T07HE
COMP,ACTI
ON TEST
-4 THESE S, SHALL BE SU SE MATERIAL, .11N.)/oR
TO PLACEMENT OF BA
TMENT FOR, APPROVAL PRIOR
COUNTY. TRANSPORTATION DEPAR
IFe e0l 7
X�
rND
-SURFACING.,
Ll
' ING
5:;,4 ae 11 40 Y THE ENGINEER ONLY, FOR THE CONVENIENCE-OF TH� B`-'M 1 T f'
If& C01 7 Z.9 10. ESTIMATE OF QUANTITIES IS �PROVIDED B
al7d 10W 11he IS OWN DETERMIN,ATION Or CONSTRUCTION QUANTITIE'S BEFORE SL "I"HE -ESTIMATE
/0 1�7 1'5�d 7 C R SHALL MAKE. H
,/C7
,/C7 5e
,/C7 5e
/C7 5e THE ' CONTRA 'TO -5E PLANS WHICH, IS NOT SPECIFICALLY, LISTED IN
E-)
a/w/ nna?y COM1771-W6 A BID. ' 'ANY ITEM OF WORK �REQUIRED BY TH OF WORK.
6j,- 01a
601751. Cular 9/4/� ArCCIJ 4
r4 R OF QUANTITIES SHALL BE CONSIDERED AS INCLUDED IN THE OTHER ITEMS
4. \b
77' 'ESTIMATE OF UANTI I E-S LE THE CONTRACTOR TO CONS WORK TO THE
INEER To ENAB
N kki\N� ADEQUATE STAKES SHALL 13E SET BY THE ENG
3 278 S.F.
kAf- 33 (D - ,,A,,,C, PAVEMENT' PLAN GRADESo',
0
:�T�M� AtAE tk- Nv4kCAL V-1 ftl V104AE P RB-te- aurrc-,,;�, 330 t.F., F,5T%tAkTF Lkgu:x:�: kT-
'02, li, � _
I C.C. CU
Ct`"iELtAN3 NVE 94"US Ljw-vcAA A*Mt�Swam
I�9,5,f 4" P.C.C. SIDEWALK 1 , 980 S.F AP
ML I_G_1'26 t 5"V_m�_K at'7-F,_ ioT� k ivA5 k1152 15-F.
0xv
51 3� EXCAVATION AND 'GRADING LUMP SUM 'L.S.
VA 4,)
CG1.AST?-k1C_T%0XJ tX01'rE--S VbZ �5Te1E--,E_-r TP-F 15 tVleMel7l C6
50
I. =5T%ZF_(:-r TV-SES P�%E Tb 15F- PLO,"Ir--D t Ll P%CCf--'F-DNv.10E \OQ IT"
SA. SPECIAL NOTE FROM PRIVATE ENGINEER TO CONTRACTOR
45T11-VAID MID PILAv4s. to 1P ItA5-Tp�tL STgEjE�T_V9:EE'S PER-T"F- Contractor agrees that he shall assume sole and complete ,responsibility for job site
NkJ
conditions during the course of construction of this Project, including safety of all persons
TOTUE WtAtAF,"tZtAE"T CF P 3� r ro
/C�4 45 tinuously and not be limited to normal
It TN
T I _t%A
-5�40"- eE 'FUP-141evAr-070 TIAF_ C114 NLA4 U"11954h)- T6)QCrT%P_c, Of- _ _\C i SV�o and property; that this requirement shall apply con
VECM11M 5NCXF(LL 56(L AtALF-I..*1vto-mirs,NS SygS,,: A working hours; and that the Contractor shall defend, indemnify and hold the owner and
5 C.e-* TP11tv F09-
6N1TAf_C1TJ Co.,Vs the Engineer harmless from any and all liability, real or alleged, in connection with the
'I,O'�-L 5TV-EST TV-ees �AINF_(_T-VN t".1s PW C JT,4 is Project, excepting for liability arising from the sole negli-
'Pec-Tiop'l PWZ kC(_F_?vP,"CC, 61 TVIS mwe tkv?v,6kW Pee , - performance�of work on th
7 Ffto 51�ANIL gence of the Owner or the Engineer.
5TC) Im -[We ?.-I, Lcwlte.�x
1 01 51_P-E�EX TV-F-e'rz Nee Tts evF- PL0-"N_=Tb PF-7— M16L 1c,ko,�Af roqewtr,AT ?LA,%1 _T?_A&A�5veeeae`tAV_DiLLf-&Zeo6k' pkA15Q
al 0 ze N
Vee CIT1 5Tr)
la ic...M. Z I I o 4. , 1013
D _ C,
Y1_71C4Z S45C r/0/4/
7' V14. 0. NO.
0
COUNTY OF SAN BERNARDIN I %,`,rP 'R0VEME�NT PLA,NS
A VENUE vf_AVE
67ARIVEL 1A A/ CAIRIVEL IAN A , //17 If ASSOCIATED ENGINEERft,4 A FIELD BOOK REF ROAD DEPARTMENT MINOR. SUB,. NO. ' W-i-T-01464 ROAD NO.
C14 t-tca"T. 6r Trtes.-:�,,Dewe k9maAa 2134,50
Aq Z %ZC zoo4k-0%0S1 0%( APM BY CARNELIAN' AVENUE - EAST SIDE
4 C0tAAUt1nq TV Designad By
316 EAST "E" STREET UN ITS
LVDC.
14 Drown By `FT
CALIF 91764 1012 FEET NORTH TO 13112 i--T'� 53 - 54
14, ONTARIO, CoMmISSIO ER ENGR., DATE
ASSTROA
Chocked By
Go 5818 HILLSIDE ROA
714 - 98 NORTH OF
r
YICINI rY MAP lop Rocommondad By C1 i f",AA4 tl M A SHEET
R.4 fJ(7 14
1'-Z7-749 OUNTY ENGINEER
77- r.74 A
SCALC DATE RMSIONS A! DATE
R.C.E. 0 1104
..........