Loading...
HomeMy WebLinkAbout108 -J 7-, =77=` r a A- 77 Z 4- -4 0S 76 Z' 41 _3 PROF1 HJRV SCALES V R GENERAL N 0 T E S ZM;" N BENCH MARK RDINO COUNTY STANDARDS SCALE 1 " 4 1 . AILL WORK SH?ALL BE DONE IN ACCORDANCE WITH THESE PLANS, AND THE SAN BERN�e SPG14516LE FOR ADHERANCE SAN BERNARDINO COUNTY ROAD DEPT,,.D,ATUM TRACTOR SHALL BE FAMILIAR WITH, AND SffALL BE RE B.M. NO. A-257 AND SPECIFICATIONS-CON ATIONS TO THESE STANDARD SPECIFIC . 'CHIS. 11 C3 11 'IN CURB, WEST SIDE OF 2. SHADING ON STREET PLANS A.C. PAVEMENT TO BE INSTALLED. SO. OF PRIVATE, ST. - AVING, A' M,ATERIALS REPORT SH-ALL.,. BE SUBMITTED TO THE CONTRACTS ENGINEER CARNELIAN AVE.,,1 3. 'AT THE COMPLETION OF P ETERMINATIONS COMPLETED TO VERIFY: SOUTH, OF D. f . BERNARDINO COUNTY ROAD DEPT. 'LISTING ALL TESTSCR 0 CHERRY LANE OF THE SAN _EQU OF AGGR IVALENT EG�ATE BASES. (A) R-1VALUE, SIEVE ANALYSIS AND S,AND' ELEVATIOIV: 1994.52 OIL CONTENT AND SIEVE ANALYSIS OF ASPHALT SURFACING. (B) STABILITY-1 TRED FROM THE SAN BERNARDINO COUNTY ROAD DEPT PRIOR TO ANY ENCROACHMENT 6-0 4,, PERMIT WILL BE REQU, SAN B I ERNARDING COUNTY ROAD DEPT. RIGH -OF-WAY. T OR, ,CONSTRUCTION WITHIN GISTERED BY THE 7 RADE, A SOIL STERILANT RE TO BE PLACED DIRECTLY ON SUBG REC OMMENVED IS 5. IF ASPHALt CONCRETE AT THE MANUFACTURERIS AND p,,,c.C,, SHALL E UNIFORMLY APPLIED 0 NDER ,A.C. E.P.A� FOR USE U VEMENT WIDTH PRIOR TO PAVING RATE FOR 'THE FULL PA 'VALVES. ' ATE PHONE OR POWER POLESO W, R METERS$ KIND (AND TE,LE S OR, SUBSTRUCTURES OF ANY NT OR IN 6. �Att PIPE LINE IMITS OF THIS DEVELOPME WITHIN 'THE t THESE PLANS C . ) SHOWN OR NOT SHOWN ON CUIRED HYDRANTSO ET REMOVED OR RELOC,ATED RE ADJACENT AREAS WHERE IMPROVEMENT WORK IS TO BE DONE SHALL BE, SPONSIBTLITY TO NOTIFY IT SHALL BE THE OWNERS RE 01�ALq AT' NO COST TO THE' COUNTY OF SAN BERN,ARDINO %layse-I-VkE- ALL AGENCIES CONCERNED. f ES NOT INCLUDE THE ESTIMATE OF QUANTITIES. 7. THEAPPROV1AL OF THIS PLAN DO 16 0"') 'WHICH CONSISTS OF A ROCKY MATERIAL THE, SUBGR-ADE - -----777- WHEN -ASPH,ALT CONCRETE IS PLACED ON NATIVE SOIL ID111 OR -7rl- 8� --7rr— ROC'KS WHICH PROTRUDE ABOVE THE SUBGRADE AND AL1. SHALL BE PREPARED BY , iH TIVE REMOVING ALL MATERIAL OF A QUALITY BETTER THAN *7 E� NA Am 4 10 14;a;'Vef 7 7 -DEPRESS NS. SH,ALL BE FILLED WITH A FINE GRADED A A VENUE J.1a G*A R, 'am's Ew -RA-Mot-L MATERIAL.., AND 0 CO2vc KFIL,L COMPACTING OR16INAL GRGJN[,$ .�Coi - - - , Q� ENCH BAC WITH Q F EMBANKMENT. CONSTRUCTION TR PAC TI10,N TESTS TEN REPO!" 70, 9. COM -S 0 ALL AT NO COST TO SAN BERNARD Z5 TNO COUNTY. A 'WRIT UZ SUB-G'RADES * H,ALL BE, PERFORMED NO? 100o CONTRACTS ADMINISTRATION 61VISION 0" BMITTED T07HE COMP,ACTI ON TEST -4 THESE S, SHALL BE SU SE MATERIAL, .11N.)/oR TO PLACEMENT OF BA TMENT FOR, APPROVAL PRIOR COUNTY. TRANSPORTATION DEPAR IFe e0l 7 X� rND -SURFACING., Ll ' ING 5:;,4 ae 11 40 Y THE ENGINEER ONLY, FOR THE CONVENIENCE-OF TH� B`-'M 1 T f' If& C01 7 Z.9 10. ESTIMATE OF QUANTITIES IS �PROVIDED B al7d 10W 11he IS OWN DETERMIN,ATION Or CONSTRUCTION QUANTITIE'S BEFORE SL "I"HE -ESTIMATE /0 1�7 1'5�d 7 C R SHALL MAKE. H ,/C7 ,/C7 5e ,/C7 5e /C7 5e THE ' CONTRA 'TO -5E PLANS WHICH, IS NOT SPECIFICALLY, LISTED IN E-) a/w/ nna?y COM1771-W6 A BID. ' 'ANY ITEM OF WORK �REQUIRED BY TH OF WORK. 6j,- 01a 601751. Cular 9/4/� ArCCIJ 4 r4 R OF QUANTITIES SHALL BE CONSIDERED AS INCLUDED IN THE OTHER ITEMS 4. \b 77' 'ESTIMATE OF UANTI I E-S LE THE CONTRACTOR TO CONS WORK TO THE INEER To ENAB N kki\N� ADEQUATE STAKES SHALL 13E SET BY THE ENG 3 278 S.F. kAf- 33 (D - ,,A,,,C, PAVEMENT' PLAN GRADESo', 0 :�T�M� AtAE tk- Nv4kCAL V-1 ftl V104AE P RB-te- aurrc-,,;�, 330 t.F., F,5T%tAkTF Lkgu:x:�: kT- '02, li, � _ I C.C. CU Ct`"iELtAN3 NVE 94"US Ljw-vcAA A*Mt�Swam I�9,5,f 4" P.C.C. SIDEWALK 1 , 980 S.F AP ML I_G_1'26 t 5"V_m�_K at'7-F,_ ioT� k ivA5 k1152 15-F. 0xv 51 3� EXCAVATION AND 'GRADING LUMP SUM 'L.S. VA 4,) CG1.AST?-k1C_T%0XJ tX01'rE--S VbZ �5Te1E--,E_-r TP-F 15 tVleMel7l C6 50 I. =5T%ZF_(:-r TV-SES P�%E Tb 15F- PLO,"Ir--D t Ll P%CCf--'F-DNv.10E \OQ IT" SA. SPECIAL NOTE FROM PRIVATE ENGINEER TO CONTRACTOR 45T11-VAID MID PILAv4s. to 1P ItA5-Tp�tL STgEjE�T_V9:EE'S PER-T"F- Contractor agrees that he shall assume sole and complete ,responsibility for job site NkJ conditions during the course of construction of this Project, including safety of all persons TOTUE WtAtAF,"tZtAE"T CF P 3� r ro /C�4 45 tinuously and not be limited to normal It TN T I _t%A -5�40"- eE 'FUP-141evAr-070 TIAF_ C114 NLA4 U"11954h)- T6)QCrT%P_c, Of- _ _\C i SV�o and property; that this requirement shall apply con VECM11M 5NCXF(LL 56(L AtALF-I..*1vto-mirs,NS SygS,,: A working hours; and that the Contractor shall defend, indemnify and hold the owner and 5 C.e-* TP11tv F09- 6N1TAf_C1TJ Co.,Vs the Engineer harmless from any and all liability, real or alleged, in connection with the 'I,O'�-L 5TV-EST TV-ees �AINF_(_T-VN t".1s PW C JT,4 is Project, excepting for liability arising from the sole negli- 'Pec-Tiop'l PWZ kC(_F_?vP,"CC, 61 TVIS mwe tkv?v,6kW Pee , - performance�of work on th 7 Ffto 51�ANIL gence of the Owner or the Engineer. 5TC) Im -[We ?.-I, Lcwlte.�x 1 01 51_P-E�EX TV-F-e'rz Nee Tts evF- PL0-"N_=Tb PF-7— M16L 1c,ko,�Af roqewtr,AT ?LA,%1 _T?_A&A�5veeeae`tAV_DiLLf-&Zeo6k' pkA15Q al 0 ze N Vee CIT1 5Tr) la ic...M. Z I I o 4. , 1013 D _ C, Y1_71C4Z S45C r/0/4/ 7' V14. 0. NO. 0 COUNTY OF SAN BERNARDIN I %,`,rP 'R0VEME�NT PLA,NS A VENUE vf_AVE 67ARIVEL 1A A/ CAIRIVEL IAN A , //17 If ASSOCIATED ENGINEERft,4 A FIELD BOOK REF ROAD DEPARTMENT MINOR. SUB,. NO. ' W-i-T-01464 ROAD NO. C14 t-tca"T. 6r Trtes.-:�,,Dewe k9maAa 2134,50 Aq Z %ZC zoo4k-0%0S1 0%( APM BY CARNELIAN' AVENUE - EAST SIDE 4 C0tAAUt1nq TV Designad By 316 EAST "E" STREET UN ITS LVDC. 14 Drown By `FT CALIF 91764 1012 FEET NORTH TO 13112 i--T'� 53 - 54 14, ONTARIO, CoMmISSIO ER ENGR., DATE ASSTROA Chocked By Go 5818 HILLSIDE ROA 714 - 98 NORTH OF r YICINI rY MAP lop Rocommondad By C1 i f",AA4 tl M A SHEET R.4 fJ(7 14 1'-Z7-749 OUNTY ENGINEER 77- r.74 A SCALC DATE RMSIONS A! DATE R.C.E. 0 1104 ..........