Loading...
HomeMy WebLinkAbout00-136 - Resolutions RESOLUTION NO. 00-136 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT REVIEW 00-40, A REQUEST TO CONSTRUCT A WAREHOUSE/OFFICE BUILDING CONSISTING OF 27,018 SQUARE FEET ON 1.72 ACRES OF LAND IN THE GENERAL INDUSTRIAL DISTRICT (SUBAREA 8) OF THE INDUSTRIAL AREA SPECIFIC PLAN, LOCATED AT THE SOUTHEAST CORNER OF ARROW ROUTE AND UTICA AVENUE, AND MAKING FINDINGS IN SUPPORT THEREOF -APN: 209-491-79 A. Recitals. 1. Arrow and Utica Partners, LLC has filed an application for the approval of Development Review 00-40 as described in the title of this Resolution. Hereinafter in this Resolution,the subject Development Review request is referred to as "the application." 2. On December 13, 2000, the Planning Commission of the City of Rancho Cucamonga conducted a meeting on the application and concluded said meeting on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon substantial evidence presented to this Commission during the above- referenced meeting on December 13,2000, including written and oral staff reports,this Commission hereby specifically finds as follows: a. The application applies to property located on the southeast comer of Arrow Route and Utica Avenue,with an Arrow Route street frontage of approximately 187 feet and Utica Avenue Street frontage of approximately 259 feet, and is presently improved with curb,and gutter only;and b. The property to the north of the subject site is developed with light industrial/office buildings, the property to the south is developed with two industrial buildings, the properties to the east and west are both vacant; and C. The application contemplates the construction of an industrial warehouse building consisting of a 24,410 square feet warehouse with a 2,175 square foot office area,for a total gross building area of 27,018 square feet; and d. The proposed tilt-up concrete building is designed to be consistent with the architectural style of the surrounding area. 3. Based upon the substantial evidence presented to this Commission during the above- referenced meeting and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: PLANNING COMMISSION RESOLUTION NO. 00-136 DR 00-40 ARROW & UTICA PARTNERS, LLC December 13, 2000 Page 2 a. That the proposed project is consistent with the objectives of the General Plan; and b. That the proposed use is in accord with the objectives of the Development Code and the purposes of the district in which the site is located; and C. That the proposed use is in compliance with each of the applicable provisions of the Development Code; and d. That the proposed use, together with the conditions applicable thereto,will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. e. That the vacation and re-establishment of inundation areas on-site is in conformance with the General Plan. 4. Based upon the facts and information contained in the proposed Negative Declaration, together with all written and oral reports included for the environmental assessment for the application,the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Negative Declaration attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. That the Negative Declaration has been prepared in compliance with the California Environmental Quality Act of 1970,as amended, and the State CEQA guidelines promulgated there under; that said Negative Declaration and the Initial Study prepared therefore reflect the independent judgment of the Planning Commission;and,further,this Commission has reviewed and considered the information contained in said Negative Declaration with regard to the application. b. That, based upon the changes and alterations, which have been incorporated into the proposed project, no significant adverse environmental effects will occur. C. Pursuant to the provisions of Section 753.5(c) of Title 14 of the California Code of Regulations, the Planning Commission finds as follows: In considering the record as a whole, the Initial Study and Negative Declaration for the project,there is no evidence that the proposed project will have potential for an adverse impact upon wildlife resources or the habitat upon which wildlife depends. Further, based upon the substantial evidence contained in the Negative Declaration,the staff reports and exhibits, and the information provided to the Planning Commission during the public hearing, the Planning Commission hereby rebuts the presumption of adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference: Planning Division 1) The sandblasted concrete column element and reveals along the north elevation shall wrap around to the entire east elevation. PLANNING COMMISSION RESOLUTION NO. 00-136 DR 00-40 ARROW & UTICA PARTNERS, LLC December 13, 2000 Page 3 2) Catalog cuts of the proposed outdoor amenities within the outdoor eating/plaza area (benches,tables,etc.)and construction details shall be reviewed and approved by the City Planner, prior to the issuance of building permits. 3) The design of the lighting fixtures and their structural support shall be architecturally compatible with the design of the building. Freestanding light standards shall not exceed 25 feet or the height of the on-site building. 4) The trash enclosure(s) shall be designed in accordance with City Standards and shall be architecturally integrated with the design of the building. 5) The applicant shall work with staff in toning down the proposed secondary (Mayan, Frazee #DE 968) and accent colors (Cuprite, Frazee#DE 965) for the building. The revised color scheme shall be subject to City Planner review and approval. 6) Decorative paving shall be provided outside public right-of-way, at driveway entrance. 7) The proposed block wall, along the south property line (between the two adjacent buildings to the south) shall be constructed using a combination of decorative masonry wall and wrought iron subject to City Planner review and approval. Engineering Division 1) Complete Arrow Route frontage improvements in accordance with the City "Major Arterial' standards as required, including sidewalk, access ramp(a modified ramp design may be necessary),and street trees. Replace R26(S) "No Stopping" signs as necessary and provide additional traffic striping and signage as required. 2) Complete Utica Avenue frontage improvements in accordance with the City 'Industrial Local Street' standards as required including driveway, curbside drain outlets, sidewalk, access ramp (a modified ramp design may be necessary), street trees, and one 5800 Lumen HPSV street light. Replace R26(s) "No Stopping" signs and R-1 "Stop" sign as necessary and provide additional traffic striping including stop limit line, stop pavement markings, and other signage as required. 3) Revise Drawing No. 1340 as follows: a) Current standard drawing numbers shall be used. b) Redesign sidewalk layout consistent with current City Standards. PLANNING COMMISSION RESOLUTION NO. 00-136 DR 00-40 ARROW & UTICA PARTNERS, LLC December 13, 2000 Page 4 c) Continue to use designated street trees shown, but add a note requiring 8-foot minimum planting areas. d) Add rockwork along the Arrow Route frontage. 4) Parkway shall slope at 2 percent from the top of curb to 1-foot behind the sidewalk along all street frontages. 5) Sidewalks shall cross the drive approach at the zero curb face. Provide additional public right-of-way as needed. 6) Provide a drainage report for the on-site storm drain. If any inlets will be in sump condition, design shall be Q100. The parkway culvert flow line shall have a 2 percent grade. Provide right-of- encroachment for constructing a temporary inlet/desilting facilities on the adjoining property. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 13TH DAY OF DECEMBER 2000. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA r BY: rry T. c i , Chairman ATT�Brad �if , ecretary 1, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certifythatthe foregoing Resolution was dulyand regularly introduced, passed,and adopted bythe Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 13th day of December, 2000, by the following vote-to-wit: AYES: COMMISSIONERS: MACIAS, MANNERINO, MCNIEL, STEWART, TOLSTOY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: Development Review 00-40 SUBJECT: 27,018 square foot industrial Warehouse APPLICANT: Arrow & Utica Partners, LLC LOCATION: Southeast corner of Arrow Route and Utica Avenue ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. A copy of the signed Resolution of Approval or City Planner's letter of approval, and all Standard Conditions, shall be included in legible form on the grading plans, building and construction plans, and landscape and irrigation plans submitted for plan check. B. Time Limits 1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if _/_/_ building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Division, the conditions contained herein, Development Code regulations, and the Industrial Area Specific Plan SC-S-00 1 Project No. DR 00-40 Completion Date 2. Prior to any use of the project site or business activity being commenced thereon, all Conditions of Approval shall be completed to the satisfaction of the City Planner. 3. Occupancy of the facilities shall not commence until such time as all Uniform Building Code and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety Division to show compliance. The buildings shall be inspected for compliance prior to occupancy. 4. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for City Planner review and approval prior to the issuance of building permits. 5. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced, whichever comes first. 6. Approval of this request shall not waive compliance with all sections of the Development Code, all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 7. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and approved by the City Planner and Police Department (477-2800) prior to the issuance of building permits. Such plan shall indicate style, illumination, location, height, and method of shielding so as not to adversely affect adjacent properties. 8. Trash receptacle(s) are required and shall meet City standards. The final design, locations, and the number of trash receptacles shall be subject to City Planner review and approval prior to the issuance of building permits. 9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be I I located out of public view and adequately screened through the use of a combination of concrete or masonry walls, berming, and/or landscaping to the satisfaction of the City Planner. For single family residential developments, transformers shall be placed in underground vaults. 10. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 11. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners' association, or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for City Planner and City Engineer review and approved prior to the issuance of building permits. D. Building Design 1. All roof appurtenances, including air conditioners and other roof mounted equipment and/or projections, shall be shielded from view and the sound buffered from adjacent properties and streets as required by the Planning Division. Such screening shall be architecturally integrated with the building design and constructed to the satisfaction of the City Planner. Details shall be included in building plans. 2. For commercial and industrial projects, paint roll-up doors and service doors to match main building colors. E. Parking and Vehicular Access (indicate details on building plans) 1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space abuts a building, wall, support column, or other obstruction, the space shall be a minimum of 11 feet wide. SC-10-00 2 Project No. DR 00-40 Completion Dale 2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall contain a 12-inch walk adjacent to the parking stall (including curb). 3. All parking spaces shall be double striped per City standards and all driveway aisles, entrances, and exits shall be striped per City standards. 4. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or more / /_ parking stalls. Designate two percent or one stall, whichever is greater, of the total number of stalls for use by the handicapped. 5. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at the rate of one percent. The area for motorcycle parking shall be a minimum of 56 square feet. 6. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily residential projects or more than 10 units. Minimum spaces equal to five percent of the required automobile parking spaces or three bicycle storage spaces, whichever is greater. After the first 50 bicycle storage spaces are provided, additional storage spaces required are 2.5 percent of the required automobile parking spaces. Warehouse distribution uses shall provide bicycle storage spaces at a rate of 2.5 percent on the required automobile parking spaces with a minimum of a 3-bike rack. In no case shall the total number of bicycle parking spaces required exceed 100. Where this results in a fraction of 0.5 or greater, the number shall be rounded off to the higher whole number. 7. Carpool and vanpool designated off-street parking close to the building shall be provided for _/_/_ commercial, office, and industrial facilities at the rate of 10 percent of the total parking area. If covered, the vertical clearance shall be no less than 9 feet. F. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for City Planner review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within commercial and office projects, shall be specimen size trees -24-inch box or larger. 3. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three parking stalls, sufficient to shade 50% of the parking area at solar noon on August 21. 4. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one I / tree per 30 linear feet of building. 5. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1 slope, shall be, at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 6. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater slope shall be landscaped and irrigated for erosion control and to soften their appearance as follows: one 15-gallon or larger size tree per each 150 sq. ft. of slope area, 1-gallon or larger size shrub per each 100 sq. ft. of slope area, and appropriate ground cover. In addition, slope banks in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 7. For multi-family residential and non-residential development, property owners are responsible for the continual maintenance of all landscaped areas on-site, as well as contiguous planted areas SC-10-00 3 Project No.DR 00-40 Completion Date within the public right-of-way. All landscaped areas shall be kept free from weeds and debris and maintained in healthy and thriving condition, and shall receive regular pruning, fertilizing, mowing, and trimming. Any damaged, dead, diseased, or decaying plant material shall be replaced within 30 days from the date of damage. 8. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be included in the required landscape plans and shall be subject to City Planner review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Division. 9. Special landscape features such as mounding, alluvial rock, specimen size trees, meandering I /_ sidewalks (with horizontal change), and intensified landscaping, is required along Arrow Route. 10. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 11. All walls shall be provided with decorative treatment. If located in public maintenance areas, the design shall be coordinated with the Engineering Division. 12. Landscaping and irrigation shall be designed to conserve water through the principles of Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. G. Signs 1. The signs indicated on the submitted plans are conceptual only and not a part of this approval. Any signs proposed for this development shall comply with the Sign Ordinance and shall require separate application and approval by the Planning Division prior to installation of any signs. H. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mail boxes. Multi-family residential developments shall provide a solid overhead structure for mail boxes with adequate lighting. The final location of the mail boxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: I. General Requirements 1. Submit five complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; c. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and SC-10-00 4 Project No. DR 00-40 Completion Date g. Planning Division Project Number (i.e., TT #, CUP #, DR #, etc.) clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal. 3. Separate permits are required for fencing and/or walls. 4. Contractors must show proof of State and City licenses and Workers' Compensation coverage to the City prior to permit issuance. 5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by the Building and Safety Division. J. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number (i.e., CUP 98-01). The applicant shall comply with the latest adopted Uniform Building Code, Uniform Mechanical Code, Uniform Plumbing Code, National Electric Code, Title 24 Accessibility requirements, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Please contact the Building and Safety Division for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new commercial or industrial development or addition to an existing development, the applicant shall pay development fees at the established rate. Such fees may include, but are not limited to: Transportation Development Fee, Drainage Fee, School Fees, Permit and Plan Checking Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Division prior to permit issuance. 3. Street addresses shall be provided by the Building Official, after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday through Saturday, with no construction on Sunday or holidays. 5. Construct trash enclosure(s) per City Standard (available at the Planning Division's public counter). K. New Structures 1. Provide compliance with the Uniform Building Code for the property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the Uniform Building Code for required occupancy separation(s). 3. Exterior walls shall be constructed of the required fire rating in accordance with UBC Table 5-A 4. Upon tenant improvement plan check submittal, additional requirements may be needed. L. Grading 1. Grading of the subject property shall be in accordance with the Uniform Building Code, City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. SC-10-00 5 Project No.DR 00-40 Completion Date 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading plans shall be completed and approved prior to issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The Grading Plan shall be prepared, stamped, and signed by a California Registered Civil Engineer. APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: M. Street Improvements 1. All public improvements (interior streets, drainage facilities, community trails, paseos, landscaped areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards. Interior street improvements shall include, but are not limited to, curb and gutter, AC pavement, drive approaches, sidewalks, street lights, and street trees. 2. Construct the following perimeter street improvements including, but not limited to: Street Name Curb& A.C. Side- Drive Street Street Comm Median Bike Other Gutter Pvmt walk Appr. Lights Trees Trail Island Trail Arrow Route c x Utica Avenue c x x x Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be provided for this item 3. Improvement Plans and Construction: a. Street improvement plans, including street trees, street lights, and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements, prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. c. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer SC-10-00 6 Project No. DR 00-40 Completion Date Notes: (1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a maximum of 200 feet apart, unless otherwise specified by the City Engineer. (2) Conduit shall be 3-inch (at intersections) or 2-inch (along streets) galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving, which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the City Planner prior to submittal for first plan check. 4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 5. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with _/_/_ adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. N. Public Maintenance Areas 1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. 2. Parkway landscaping on Arrow Route shall conform to the approved street tree concept. O. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system, water, gas, electric power, telephone, and cable TV (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. 3. Water and sewer plans shall be designed and constructed to meet the requirements of the Cucamonga County Water District (CCWD), Rancho Cucamonga Fire Protection District, and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CCWD is required prior to final map approval or issuance of permits, whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. P. General Requirements and Approvals 1. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all new street lights for the first six months of operation, prior to final map approval or prior to building permit issuance if no map is involved. SC-10-00 7 Project No.DR 00-40 Completion Date APPLICANT SHALL CONTACT THE FIRE PREVENTION/NEW CONSTRUCTION UNIT, (909) 477-2730, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: Q. General Fire Protection Conditions 1. Mello Roos Community Facilities District requirements shall apply to this project. The developer shall commence, participate in, and consummate or cause to be commenced, participated in, or consummated, a Mello-Roos Community Facilities District(CFD)for the Rancho Cucamonga Fire Protection District to finance construction and/or maintenance of a fire station to serve the development. The CFD shall be formed by the District and the developer by the time recordation of the final map occurs. 2. Fire flow requirement shall be: 4,500gallons per minute, Per'97 UFC Appendix III-A, 3, (b) (Increase). -OR x A fire flow shall be conducted by the builder/developer and witnessed by fire department personnel prior to water plan approval. x For the purpose of final acceptance, an additional fire flow test of the on-site hydrants shall be conducted by the builder/developer and witnessed by fire department personnel after construction and prior to occupancy. 3. Fire hydrants are required. All required public or on-site fire hydrants shall be installed, flushed, and operable prior to delivery of any combustible building materials on site (i.e., lumber, roofing materials, etc.). Hydrants flushing shall be witnessed by fire department personnel. 4. Prior to the issuance of building permits for combustible construction, evidence shall be submitted to the Fire District that an approved temporary water supply for fire protection is available, pending completion of the required fire protection system. 5. Hydrant reflective markers (blue dots) shall be required for all hydrants and installed prior to final inspection. 6. An automatic fire extinguishing system(s)will be required as noted below: x Per Rancho Cucamonga Fire Protection District Ordinance 15. Note: Special sprinkler densities are required for such hazardous operations as woodworking, plastics manufacturing, spray painting, flammable liquids storage, high piled stock, etc. Contact the Fire Safety Division to determine if the sprinkler system is adequate for proposed operations. 7. Sprinkler system monitoring shall be installed and operational immediately upon completion of sprinkler system. 8. Roadways within project shall comply with the Fire District's fire lane standards, as noted: x All roadways per Rancho Cucamonga Fire Protection District Ordinance 32. x Other: roadway radius required is 50 feet outside and 20 feet inside. 9. Fire department access shall be amended to facilitate emergency apparatus. 10. Emergency access, a minimum of 26 feet wide, shall be provided, and maintained free and clear of obstructions at all times during construction, in accordance with Fire District requirements. 11. A Knox rapid entry key vault shall be installed prior to final inspection. Proof of purchase shall be submitted prior to final building plan approval. Contact the Fire Safety Division for specific details and ordering information. SC-10-00 8 Project No. DR 00-40 Completion Date 12. Fire District fee(s), plus a $1 per"plan page" microfilm fee will be due to the Rancho Cucamonga Fire Protection District as follows: x $132 for CCW D Water Plan review/underground water supply. x $677 for New Commercial and Industrial Development (per new building).** **Note: Separate plan check fees for Tenant Improvement work, fire protection systems (sprinklers, hood systems, alarms, etc.) and/or any consultant reviews will be assessed upon submittal of plans. 13. Plans shall be submitted and approved prior to construction in accordance with 1997 UBC, UFC, UPC, UMC, and RCFD Standards 32 and 15 and 1996 NEC. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: R. Security Lighting 1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. These areas should be lighted from sunset to sunrise and on photo sensored cell. 2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings, with direct lighting to be provided by all entryways. Lighting shall be consistent around the entire development. 3. Lighting in exterior areas shall be in vandal-resistant fixtures. S. Security Hardware 1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used. 2. All garage or rolling doors shall have slide bolts or some type of secondary locking devices. T. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime visibility. 2. Developer shall paint roof top numbers on one or more roofs of this development. They shall be a minimum of three feet in length and two feet in width and of contrasting color to background. The stencils for this purpose are on loan at the Rancho Cucamonga Police Department. SC-10.00 9