HomeMy WebLinkAbout00-100 - Resolutions RESOLUTION NO. 00-100 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA,CALIFORNIA,APPROVING TENTATIVE TRACT MAP 16105, A RESIDENTIAL SUBDIVISION OF 147 LOTS, ON 28.74 ACRES OF LAND IN THE LOW-MEDIUM RESIDENTIAL DISTRICT(4 TO 8 DWELLING UNITS PER ACRE)AND THE ETIWANDA SOUTH OVERLAY DISTRICT, LOCATED BETWEEN EAST AVENUE AND THE 1-15 FREEWAY, SOUTH OF BASELINE ROAD, IN THE ETIWANDA SPECIFIC PLAN AND MAKING FINDINGS IN SUPPORT THEREOF - APN: 1100-031-08, 1100-061-02 AND 09, AND 1100-071-01 AND 02. A. Recitals. 1. Forecast Homes filed an application for the approval of Tentative Tract Map 16105 as described in the title of this Resolution. Hereinafter in this Resolution, the subject Tentative Tract Map request is referred to as "the application." 2. On the 27th day of September, 2000, the Planning Commission of the City of Rancho Cucamonga conducted a duly noticed public hearing on the application and concluded said hearing on that date. 3. All legal prerequisites prior to the adoption of this Resolution have occurred. B. Resolution. NOW, THEREFORE, it is hereby found, determined, and resolved by the Planning Commission of the City of Rancho Cucamonga as follows: 1. This Commission hereby specifically finds that all of the facts set forth in the Recitals, Part A, of this Resolution are true and correct. 2. Based upon the substantial evidence presented to this Commission during the above- referenced public hearing on September 27,2000, including written and oral staff reports,together with public testimony, this Commission hereby specifically finds as follows: a. The application applies to property located on the west side of East Avenue,south of Base Line Road, with a street frontage of approximately 990 feet on East Avenue, and an approximate lot depth of 1,730 feet, and is presently vacant; and b. The property to the north of the subject site is currently vacant with a proposed C.C.W.D.future water reservoir. The property is bounded by East Avenue to the east and the 1-15 Freeway to the west. The property to the south is an approved single-family residential development, Tract 15711; and C. The application contemplates a residential subdivision of 147 single-family residential lots on 28.74 acres of land within the Low-Medium Residential District and the Etiwanda South Overlay District of the Etiwanda Specific Plan; and PLANNING COMMISSION RESOLUTION NO. 00-100 TT 16105— FORECAST HOMES September 27, 2000 Page 2 d. The proposed project, together with the conditions applicable thereto, will not be detrimental to the public health, safety, or welfare or materially injurious to properties or improvements in the vicinity. 3. Based upon the substantial evidence presented to this Commission during the above- referenced public hearing and upon the specific findings of facts set forth in paragraphs 1 and 2 above, this Commission hereby finds and concludes as follows: a. That the tentative tract is consistent with the General Plan, Development Code,and any applicable specific plans; and b. The design or improvements of the tentative tract is consistent with the General Plan, Development Code, and any applicable specific plans; and C. The site is physically suitable for the type of development proposed; and d. The design of the subdivision is not likely to cause substantial environmental damage and avoidable injury to humans and wildlife or their habitat; and e. The tentative tract is not likely to cause serious public health problems; and f. The design of the tentative tract will not conflict with any easement acquired bythe public at large, now of record, for access through or use of the property within the proposed subdivision. 4. Based upon the facts and information contained in the proposed Mitigated Negative Declaration,together with all written and oral reports included for the environmental assessmentfor the application,the Planning Commission finds that there is no substantial evidence that the project will have a significant effect upon the environment and adopts a Mitigated Negative Declaration and Monitoring Program attached hereto, and incorporated herein by this reference, based upon the findings as follows: a. That the Mitigated Negative Declaration has been prepared in compliance with the California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared therefore reflect the independent judgment of the Planning Commission; and, further, this Commission has reviewed and considered the information contained in said Mitigated Negative Declaration with regard to the application. b. Although the Mitigated Negative Declaration identifies certain significant environmental effects that will result if the project is approved, all significant effects have been reduced to an acceptable level by imposition of mitigation measures on the project,which are listed below as conditions of approval. C. Pursuant to the provisions of Section 753.5(c)of Title 14 of the California Code of Regulations, the Planning Commission finds as follows: In considering the record as a whole, the Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the proposed project will have potential for an adverse impact upon wildlife resources or the habitat upon which wildlife depends. Further, based upon the substantial evidence contained in the Mitigated Negative Declaration, the staff reports and exhibits, and the information provided to the Planning Commission during the public hearing, the Planning Commission hereby rebuts the PLANNING COMMISSION RESOLUTION NO. 00-100 TT 16105— FORECAST HOMES September 27, 2000 Page 3 presumption of adverse effect as set forth in Section 753.5(c-1-d)of Title 14 of the California Code of Regulations. 5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above, this Commission hereby approves the application subject to each and every condition set forth below and in the Standard Conditions, attached hereto and incorporated herein by this reference. Planning Division 1) The sound wall along the west tract boundary shall have two-tone tan, split faced block with fluted block accent to match the approved sound wall for Tract 15711 to maintain uniform treatment along the 1-15 corridor. 2) The decorative perimeter wall along East Avenue shall incorporate large river rock stone pilasters and a river rock planter wall in its design. The river rock stone pilasters shall be developed at a minimum of 30 inches squared and added to the most northern and southern ends of the wall. Engineering Division: 1) East Avenue frontage improvement requirements are illustrated in the attached sections from the Etiwanda Specific Plan (Figures 5-28 and 5-28A): a) Provide an additional 14 feet of right-of-way, bringing the total to 44 feet measured from the street centerline. b) Widen the existing pavement to 32 feet, measured from the street centerline, and install curb, gutter, and streetlights. c) Install sidewalk, street trees, and perimeter theme wall. 2) In addition to the local storm drain design, final drainage study shall include: a) Provide calculations for both existing and ultimate flows coming to Tentative Tract 16105 from the north. Size drainage easement and facilities to accommodate the 0100 storm for the worst case situation, existing or ultimate. b) Calculate 010, Q25 and Q100 for facility along toe of adjacent freeway to determine whether "dry lane" criteria being met. 3) The site is located within Subarea 8 of the Etiwanda/San Sevaine Area Drainage Policy: a) Development shall construct the local storm drains from the site to the master plan system and Interim Master Plan Basin No. 6, located in Tract 15711-1. PLANNING COMMISSION RESOLUTION NO. 00-100 TT 16105— FORECAST HOMES September 27, 2000 Page 4 b) Flow increases as a result of development shall be mitigated by enlarging Basin No. 6. c) Tract 15711-1 has provided land for an area wide detention basin. The developer is eligible for reimbursement to recover proportionate cost of the land and ultimate basin related facilities (outlet, etc.). Prior to recordation of the map, provide for a fair share cost for the use of the land. 4) Obtain sufficient off-site rights-of-way to install the necessary storm drains and emergency secondary access to Miller Avenue. 5) Off-site storm drains shall be installed with the first development phase. Emergency secondary access to Miller Avenue shall be constructed with any phase that extends streets more than 600 feet from East Avenue. 6) Driveways on corner lots shall be located the maximum distance allowed by the lot size from the intersection BCR to minimize conflicts between vehicles turning right and those backing out of the driveways. 7) Caltrans permit for off-site drainage protection facilities within their right-of-way shall be obtained prior to recordation of final map. Environmental Mitigation Air Quality 1) The site shall be treated with water or other soil stabilizing agent (approved by SCAQMD and RWQCB)daily to reduce PM10 emissions, in accordance with SCAQMD Rule 403. 2) East Avenue shall be swept according to a schedule established by the City to reduce PM10 emissions associated with vehicle tracking of soil off-site.Timing may vary depending upon time of year of construction. 3) Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PM10 emissions from the site during such episodes. 4) Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 emissions. 5) The construction contractor shall select the construction equipment used on-site based on low-emission factors and high-energy efficiency. The construction contractor shall ensure the construction grading plans include a statement that all construction equipment will be tuned and maintained in accordance with the manufacturer's specifications. PLANNING COMMISSION RESOLUTION NO. 00-100 TT 16105 — FORECAST HOMES September 27, 2000 Page 5 6) The construction contractor shall utilize electric or clean alternative fuel-powered equipment where feasible. 7) The construction contractor shall ensure that construction grading plans include a statement that work crews will shut off equipment when not in use. 8) The Construction Contractor shall support and encourage ride-sharing and transit incentives for the construction crew. 9) Dust generated by the development activities shall be retained on-site and kept to a minimum by following the dust control measures listed below: a) During clearing, grading, earth moving, excavation, or transportation of cut or fill materials, water trucks or sprinkler systems shall be used to prevent dust from leaving the site and to create a crust after each day's activities cease. b) During construction, water trucks or sprinkler systems shall be used to keep all areas of vehicle movement damp enough to prevent dust from leaving the site. At a minimum, this would include wetting down such areas in the later morning and after work is completed for the day, and whenever wind exceeds 15 milesP er hour. c) After clearing,grading, earth moving,or excavation is completed, the entire area of disturbed soil shall be treated immediately by pick up of the soil until the area is paved or otherwise developed so that dust generation will not occur. d) Soil stockpiled for more than two days shall be covered, kept moist, or treated with soil binders to prevent dust generation. e) Trucks transporting soil, sand, cut or fill materials and/or construction debris to or from the site shall be tarped from the point of origin. 10) The Construction Contractor shall utilize, as much as possible, pre- coated natural colored building materials, water-based or low-VOC coating, and coating transfer or spray equipment with high transfer efficiency,such as high volume low pressure(HVLP)spray method,or manual coating applications such as paint brush, hand roller, trowel, spatula, dauber, rag or sponge. Biological 1) Preserve five Eucalyptus trees in place per Arborist Report. PLANNING COMMISSION RESOLUTION NO. 00-100 TT 16105— FORECAST HOMES September 27, 2000 Page 6 2) Windrows removed to accommodate the project shall be replaced with new windrows of equivalent linear footage, minimum 5-gallon size spaced 8 feet on center, with provision for deep irrigation. 3) The Construction Contractor shall follow tree protection requirements listed in Appendix "B" of the May 25, 2000 Arborist Report. Noise 1) The project shall comply with the recommendations of the Noise Study prepared by Advance Engineering Acoustics dated August 17, 2000, including:to construct sound walls as high as 15 feet along the western tract boundary, as well as sound walls up to 8 feet tall within the development to mitigate 1-15 Freeway noise; and provide special window construction(including sound-rated window glazing)to mitigate interior noise levels on certain lots. 6. The Secretary to this Commission shall certify to the adoption of this Resolution. APPROVED AND ADOPTED THIS 27TH DAY OF SEPTEMBER 2000. PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA BY: LOr T. McNiel, Chairman ATTEST• Bulle , cretary I, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby certify that the foregoing Resolution was duly and regularly introduced, passed,and adopted bythe Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning Commission held on the 27th day of September 2000, by the following vote-to-wit: AYES: COMMISSIONERS: MACIAS, MANNERINO, MCNIEL, STEWART, TOLSTOY NOES: COMMISSIONERS: NONE ABSENT: COMMISSIONERS: NONE City of Rancho Cucamonga n MITIGATION MONITORING PROGRAM Project File No.: TT 16105, DR 00-34, VAR 00-04 This Mitigation Monitoring Program(MMP)has been prepared for use in implementing the mitigation measures identified in the Mitigated Negative Declaration for the above-listed project. This program has been prepared in compliance with State law to ensure that adopted mitigation measures are implemented (Section 21081.6 of the Public Resources Code). Program Components -This MMP contains the following elements: 1. Conditions of approval that act as impact mitigation measures are recorded with the action and the procedure necessary to ensure compliance. The mitigation measure conditions of approval are contained in the adopted Resolution of Approval for the project. 2. A procedure of compliance and verification has been outlined for each action necessary.This procedure designates who will take action,what action will be taken and when, and to whom and when compliance will be reported. 3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring progresses, changes to compliance procedures may be necessary based upon recommendations by those responsible for the program. Program Management-The MMP will be in place through all phases of the project. The project planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly and proper action is taken on each mitigation. Each City department shall ensure compliance of the conditions (mitigation) that relate to that department. Procedures -The following steps will be followed by the.City of Rancho Cucamonga. 1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in performing monitoring or reporting programs shall be charged to the applicant. 2. A MMP Reporting Form will be prepared for each potentially significant impact and its corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached hereto. This procedure designates who will take action,what action will be taken and when, and to whom and when compliance will be reported. All monitoring and reporting documentation will be kept in the project file with the department having the original authority for processing the project. Reports will be available from the City upon request at the following address: City of Rancho Cucamonga - Lead Agency (Planning Division) 10500 Civic Center Drive Rancho Cucamonga, CA 91730 MITIGATION MONITORING PROGRAM TT 16105 - DR 00-34 -VAR 00-04— FORECAST HOMES September 27, 2000 Page 2 3. Appropriate specialists will be retained if technical expertise beyond the City staffs is needed, as determined by the project planner or responsible City department, to monitor specific mitigation activities and provide appropriate written approvals to the project planner. 4. The project planner or responsible City department will approve, by signature and date, the completion of each action item that was identified on the MMP Reporting Form. After each measure is verified for compliance, no further action is required for the specific phase of development. 5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off as completed by the project planner or responsible City department at the bottom of the MMP Reporting Form. 6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation measures;The project planner is responsible for approving any such refinements or additions. An MMP Reporting Form will be completed by the project planner or responsible City department and a copy provided to the appropriate design, construction, or operational personnel. 7. The project planner or responsible City department has the authority to stop the work of construction contractors if compliance with any aspects of the MMP is not occurring after written notification has been issued. The project planner or responsible City department also has the authority to hold certificates of occupancies if compliance with a mitigation measure attached hereto is not occurring.The project planner or responsible City department has the authority to hold issuance of a business license until all mitigation measures are implemented. 8. Any conditions (mitigation) that require monitoring after project completion shall be the responsibility of the City of Rancho Cucamonga Community Development Department. The Department shall require the applicant to post any necessary funds (or other forms of guarantee)with the City. These funds shall be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measure for the required period of time. 9. In those instances requiring long-term project monitoring,the applicant shall provide the City with a plan for monitoring the mitigation activities at the project site and reporting the monitoring results to the City. Said plan shall identify the reporter as an individual qualified to know whether the particular mitigation measure has been implemented. The monitoring/reporting plan shall conform to the Citys MMP and shall be approved by the Community Development Director prior to the issuance of building permits. Mitigation Measures No. i Responsible Monitoring Timing of Method of Verified Sanctions for Implementing Action for Monitoring Frequency Verification Verification Date/initials Non-Compliance The construction contractor shall ensure that construction- grading plans include a statement that work crews will shut CP/BO C Review/approve A 2 off equipment when not in use. final report The construction contractor shall ensure that all bare ground surfaces will be sprayed with water or other CP/BO C Review/approve p 2 acceptable dust palliatives to minimize wind erosion and final report fugitive dust emissions. The construction contractor shall utilize pre-coated building Review/a materials,where possible, and low-emission application CP/BO C pprove A 2 methods. final report Biological Resources Preserve five on-site eucalyptus trees CP C As necessary C/A 2,3,4 Windrows removed to accommodate the project shall be replaced with new windrows of equivalent linear footage. CP C As necessary C/A 2,3,4 Follow tree protection requirements listed in Appendix"B" of the May 25,2000 Arborist Report. CP B As necessary C/A 2,3,4 Noise The project must have sound walls as high as 15 feet along CP B/D Review/approve C/A 2,3,4 the western tract boundary, as well as sound walls up to 8 final report feet between lot pairs: 77-78, 78-97, 103-104, 104-105, 106-107, 106-117, 107-116, 116-117 and 118-119. Provide special window construction (including sound-rated window glazing to mitigate interior noise levels. CP B/D Review/approve C/A 2,3,4 final report Key to Checklist Abbreviations r Responsible Person Monitoring.Frequency . Method of Verification - Sanctions CDD-Community Development Director A-With Each New Development A-On-site Inspection 1-Withhold Recordation of Final Map CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III) Project File No.: TT 16105, DR 00-34 and Variance 00-04 Applicant: FORECAST HOMES Initial Study Prepared by: Nancy Ferguson Date: August 31, 2000 ResponsibleMitigation Measures No. I g of Method . ImplementingVerification Verification Date/initials Non-Compliance Air Quality The site shall be treated with water or other soil stabilizing CP/BO C Review/approve A 2 agent(approved by SCAQMD and RWQCB)daily to reduce final report. PM10 emissions,in accordance with SCAQMD Rule 403. East Avenue shall be swept according to a schedule established by the City to reduce PMjo emissions CP/BO C Review/approve q 2 associated with vehicle tracking of soil off-site.Timing may final report. vary depending upon time of year of construction. Grading operations shall be suspended when wind speeds exceed 25 mph to minimize PMio emissions from the site CP/BO C Review/approve q 2 during such episodes. final report. Chemical soil stabilizers(approved by SCAQMD and RWQCB)shall be applied to all inactive construction areas that remain inactive for 96 hours or more to reduce PM10 CP/BO C Review/approve A 2 emissions. final report. The construction contractor shall select the construction equipment used on-site based on low emission factors and high-energy efficiency. The construction contractor shall ensure the construction grading plans include a statement CP/BO C Review/approve 2 that all construction equipment will be tuned and final report maintained in accordance with the manufacturer's specifications. The construction contractor shall utilize electric or clean CP/BO C Review/approve A 2 alternative fuel powered equipment where feasible. final report The construction contractor shall support and encourage CP/BO C Review/approve q 2 ride-sharing and transit incentives for the construction crew. final report BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds FC-Fire Chief or designee 6-Revoke CUP H:\ENV\MMCHKLST.DOC COMMUNITY DEVELOPMENT DEPARTMENT STANDARD CONDITIONS PROJECT#: TENTATIVE TRACT 16105 AND DEVELOPMENT REVIEW 00-34 SUBJECT: 147 LOT SUBDIVISION APPLICANT: FORECAST HOMES WEST SIDE OF EAST AVENUE, SOUTHWEST OF 1-15 FREEWAY, AND SOUTH OF BASE LINE ROAD IN THE ETIWANDA SPECIFIC LOCATION: PLAN ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT. APPLICANT SHALL CONTACT THE PLANNING DIVISION, (909) 477-2750, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: A. General Requirements Completion Date 1. The applicant shall agree to defend at his sole expense any action brought against the City, its agents, officers, or employees, because of the issuance of such approval, or in the alternative, to relinquish such approval. The applicant shall reimburse the City, its agents, officers, or employees, for any Court costs and attorney's fees which the City, its agents, officers, or employees may be required by a court to pay as a result of such action. The City may, at its sole discretion, participate at its own expense in the defense of any such action but such participation shall not relieve applicant of his obligations under this condition. 2. A copy of the signed Resolution of Approval or City Planner's letter of approval, and all Standard Conditions, shall be included in legible form on the grading plans, building and construction plans, and landscape and irrigation plans submitted for plan check. B. Time Limits 1. This tentative tract map or tentative parcel map shall expire, unless extended by the Planning Commission, unless a complete final map is filed with the City Engineer within 3 years from the date of the approval. 2. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if _/_/_ building permits are not issued or approved use has not commenced within 5 years from the date of approval. No extensions are allowed. SC-8-00 1 Project No.:TT 16105&DR 00-34 Completion Date C. Site Development 1. The site shall be developed and maintained in accordance with the approved plans which include site plans, architectural elevations, exterior materials and colors, landscaping, sign program, and grading on file in the Planning Division, the conditions contained herein, Development Code regulations, and the Etiwanda Specific Plan. 2. Revised site plans and building elevations incorporating all Conditions of Approval shall be submitted for City Planner review and approval prior to the issuance of building permits. 3. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for consistency prior to issuance of any permits (such as grading, tree removal, encroachment, building, etc.) or prior to final map approval in the case of a custom lot subdivision, or approved use has commenced,whichever comes first. 4. Approval of this request shall not waive compliance with all sections of the Development Code, _/_/_ all other applicable City Ordinances, and applicable Community or Specific Plans in effect at the time of building permit issuance. 5. If no centralized trash receptacles are provided, all trash pick-up shall be for individual units with all receptacles shielded from public view. 6. Street names shall be submitted for City Planner review and approval in accordance with the adopted Street Naming Policy prior to approval of the final map. 7. All building numbers and individual units shall be identified in a clear and concise manner, including proper illumination. 8. The Covenants, Conditions, and Restrictions (CC&Rs) shall not prohibit the keeping the equine animals where zoning requirements for the keeping of said animals have been met. Individual lot owners in subdivisions shall have the option of keeping said animals without the necessity of appealing to boards of directors of homeowners'associations for amendments to the CC&Rs. 9. The Covenants, Conditions, and Restrictions (CC&Rs) and Articles of Incorporation of the Homeowners' Association are subject to the approval of the Planning and Engineering Divisions and the City Attorney. They shall be recorded concurrently with the Final Map or prior to the issuance of building permits, whichever occurs first. A recorded copy shall be provided to the City Engineer. The Homeowners' Association shall submit to the Planning Division a list of the name and address of their officers on or before January 1 of each and every year and whenever said information changes. 10. All parkways, open areas, and landscaping shall be permanently maintained by the property owner, homeowners' association, or other means acceptable to the City. Proof of this landscape maintenance shall be submitted for City Planner and City Engineer review and approved prior to the issuance of building permits. 11. The developer shall submit a construction access plan and schedule for the development of all lots for City Planner and City Engineer approval; including, but not limited to, public notice requirements, special street posting, phone listing for community concerns, hours of construction activity, dust control measures, and security fencing. 12. Six-foot decorative block walls shall be constructed along the project perimeter. If a double wall condition would result, the developer shall make a good faith effort to work with the adjoining property owners to provide a single wall. Developer shall notify, by mail, all contiguous property owner at least 30 days prior to the removal of any existing walls/ fences along the project's perimeter. SC-8-00 2 Project No.:TT 16105&DR 00-34 Completion Date 13. For single family residential development, a 2-inch galvanized pipe shall be attached to each _I_/_ support post for all wood fences, with a minimum of two'/cinch lag bolts, to withstand high winds. Both post and pipe shall be installed in an 18-inch deep concrete footing. Pipe shall extend at least 4 feet, 6 inches above grade. 14. Wood fencing shall be treated with stain, paint, or water sealant. 15. Slope fencing along side property lines may be wrought iron or black plastic coated chain link to maintain an open feeling and enhance views. 16. On corner side yards, provide minimum 5-foot setback between walls/fences and sidewalk. 17. For residential development, return walls and corner side walls shall be decorative masonry. 18. Where rock cobble is used, it shall be real river rock. Other stone veneers may be manufactured products. D. Parking and Vehicular Access (indicate details on building plans) 1. Multiple car garage driveways shall be tapered down to a standard two-car width at street. 2. On flag lots, use a 12-foot driveway within flag to maximize landscape area. E. Landscaping 1. A detailed landscape and irrigation plan, including slope planting and model home landscaping in the case of residential development, shall be prepared by a licensed landscape architect and submitted for City Planner review and approval prior to the issuance of building permits or prior final map approval in the case of a custom lot subdivision. 2. Existing trees required to be preserved in place shall be protected with a construction barrier in accordance with the Municipal Code Section 19.08.110, and so noted on the grading plans. The location of those trees to be preserved in place and new locations for transplanted trees shall be shown on the detailed landscape plans. The applicant, shall follow all of the arborist's recommendations regarding preservation, transplanting, and trimming methods. 3. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than 2:1 slope, shall be, at minimum, irrigated and landscaped with appropriate ground cover for erosion control. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 4. All private slopes in excess of 5 feet, but less than 8 feet in vertical height and of 2:1 or greater _/_/_ slope shall be landscaped and irrigated for erosion control and to soften their appearance as follows: one 15-gallon or larger size tree per each 150 sq.ft. of slope area, 1-gallon or larger size shrub per each 100 sq. ft. of slope area, and appropriate ground cover. In addition, slope banks in excess of 8 feet in vertical height and 2:1 or greater slope shall also include one 5-gallon or larger size tree per each 250 sq. ft. of slope area. Trees and shrubs shall be planted in staggered clusters to soften and vary slope plane. Slope planting required by this section shall include a permanent irrigation system to be installed by the developer prior to occupancy. 5. For single family residential development, all slope planting and irrigation shall be continuously maintained in a healthy and thriving condition by the developer until each individual unit is sold and occupied by the buyer. Prior to releasing occupancy for those units, an inspection shall be conducted by the Planning Division to determine that they are in satisfactory condition. 6. Front yard and corner side yard landscaping and irrigation shall be required per the Development Code and/or the Etiwanda Specific Plan. This requirement shall be in addition to the required street trees and slope planting. sC-8-00 3 Project No.:TT 16105&DR 00-34 Completion Date 7. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be included in the required landscape plans and shall be subject to City Planner review and approval and coordinated for consistency with any parkway landscaping plan which may be required by the Engineering Division. 8. Special landscape features are required along East Avenue. 9. Landscaping and irrigation systems required to be installed within the public right-of-way on the perimeter of this project area shall be continuously maintained by the developer. 10. All walls shall be provided with decorative treatment. If located in public maintenance areas, the design shall be coordinated with the Engineering Division. 11. On projects which abut the 1-15 Freeway, the developer shall provide landscaping within the freeway right-of-way along the boundary of this project or pay an in-lieu of construction cash deposit. The landscape and irrigation plans shall be prepared in conformance with Caltrans and City Standards through the City of Rancho Cucamonga. Plans shall be reviewed and approved by the City Planner and City Engineer. Landscape and irrigation shall be installed prior to the release of occupancy of the project. If final approvals and/or installation are not complete at that time, the City will accept a cash deposit for future landscaping of the Caltrans right-of-way. F. Environmental 1. A final acoustical report shall be submitted for City Planner review and approval prior to the issuance of building permits. The final report shall discuss the level of interior noise attenuation to below 45 CNEL, the building materials and construction techniques provided, and if appropriate, verify the adequacy of the mitigation measures. The building plans will be checked for conformance with the mitigation measures contained in the final report. 2. Mitigation measures are required for the project. The applicant is responsible for the cost of implementing said measures, including monitoring and reporting. Applicant shall be required to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the amount of $719.00 prior to the issuance of building permits, guaranteeing satisfactory performance and completion of all mitigation measures. These funds may be used by the City to retain consultants and/or pay for City staff time to monitor and report on the mitigation measures. Failure to complete all actions required by the approved environmental documents shall be considered grounds for forfeit. G. Other Agencies 1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and location of mail boxes. Multi-family residential developments shall provide a solid overhead structure for mail boxes with adequate lighting. The final location of the mail boxes and the design of the overhead structure shall be subject to City Planner review and approval prior to the issuance of building permits. APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 477-2710, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: H. General Requirements 1. Submit four complete sets of plans including the following: a. Site/Plot Plan; b. Foundation Plan; SC-8-00 4 Project No.:TT 16105&DR 00-34 Completion Date c. Floor Plan; d. Ceiling and Roof Framing Plan; e. Electrical Plans (2 sets, detached) including the size of the main switch, number and size of service entrance conductors, panel schedules, and single line diagrams; f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water and waste diagram, sewer or septic system location, fixture units, gas piping, and heating and air conditioning; and g. Planning Division Project Number (i.e., TT #, CUP #, DR #, etc.) clearly identified on the outside of all plans. 2. Submit two sets of structural calculations, energy conservation calculations, and a soils report. Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal. 3. Separate permits are required for fencing and/or walls. 4. Contractors must show proof of State and City licenses and Workers' Compensation coverage to the City prior to permit issuance. I. Site Development 1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be marked with the project file number (i.e., CUP 98-01). The applicant shall comply with the latest adopted Uniform Building Code, Uniform Mechanical Code, Uniform Plumbing Code, National Electric Code, Title 24 Accessibility requirements, and all other applicable codes, ordinances, and regulations in effect at the time of permit application. Please contact the Building and Safety Division for availability of the Code Adoption Ordinance and applicable handouts. 2. Prior to issuance of building permits for a new residential dwelling unit(s) or major addition to existing unit(s), the applicant shall pay development fees at the established rate. Such fees may include, but are not limited to: City Beautification Fee, Park Fee, Drainage Fee, Transportation Development Fee, Permit and Plan Checking Fees, and School Fees. Applicant shall provide a copy of the school fees receipt to the Building and Safety Division prior to permit issuance. 3. Street addresses shall be provided by the Building Official, after tract/parcel map recordation and prior to issuance of building permits. 4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday _/_/_ through Saturday, with no construction on Sunday or holidays. J. New Structures 1. Provide compliance with the Uniform Building Code for the property line clearances considering use, area, and fire-resistiveness. 2. Provide compliance with the Uniform Building Code for required occupancy separation(s). 3. Roofing material shall be installed per the manufacturer's"high wind" instructions. K. Grading 1. Grading of the subject property shall be in accordance with the Uniform Building Code, City Grading Standards, and accepted grading practices. The final grading plan shall be in substantial conformance with the approved grading plan. sc-"o 5 Project No.:TT 16105&DR 00-34 li Completion Date 2. A soils report shall be prepared by a qualified engineer licensed by the State of California to perform such work. 3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the time of application for grading plan check. 4. The final grading plans shall be completed and approved prior to issuance of building permits. 5. A separate grading plan check submittal is required for all new construction projects and for existing buildings where improvements being proposed will generate 50 cubic yards or more of combined cut and fill. The Grading Plan shall be prepared, stamped, and signed by a California Registered Civil Engineer. APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: L. Dedication and Vehicular Access 1. Rights-of-way and easements shall be dedicated to the City for all interior public streets, community trails, public paseos, public landscape areas, street trees, traffic signal encroachment and maintenance, and public drainage facilities as shown on the plans and/or tentative map. Private easements for non-public facilities (cross-lot drainage, local feeder trails, etc.) shall be reserved as shown on the plans and/or tentative map. 2. Dedication shall be made of the following rights-of-way on the perimeter streets (measured from street centerline): 44 total feet on East Avenue. 3. Corner property line cutoffs shall be dedicated per City Standards. 4. Vehicular access rights shall be dedicated to the City for the following streets, except for approved openings: East Avenue. 5. The developer shall make a good faith effort to acquire the required off-site property interests necessary to construct the required public improvements, and if he/she should fail to do so, the developer shall, at least 120 days prior to submittal of the final map for approval, enter into an agreement to complete the improvements pursuant to Government Code Section 66462 at such time as the City acquires the property interests required for the improvements. Such agreement shall provide for payment by the developer of all costs incurred by the City to acquire the off-site property interests required in connection with the subdivision. Security for a portion of these costs shall be in the form of a cash deposit in the amount given in an appraisal report obtained by the developer, at developer's cost. The appraiser shall have been approved by the City prior to commencement of the appraisal. This condition applies in particular, but not limited to: Temporary emergency access and storm drain. M. Street Improvements 1. All public improvements (interior streets, drainage facilities, community trails, paseos, landscaped areas, etc.) shown on the plans and/or tentative map shall be constructed to City Standards. Interior street improvements shall include, but are not limited to, curb and gutter, AC pavement, drive approaches, sidewalks, street lights, and street trees. SC-8-00 6 Project No.:TT 16105&DR 00-34 Comoletion Date 2. Construct the following perimeter street improvements including, but not limited to: _I_I_ Street Name Curb& A.C. Side- Drive Street Street Comm Median Bike her Gutter Pvmt walk Appr. Lights Trees Trail Island Trail East Avenue x x x I I x x (e)(f) Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be provided for this item. (e)Access ramps. (f) Perimeter theme wall. 3. Improvement Plans and Construction: a. Street improvement plans, including street trees, street lights, and intersection safety lights on future signal poles, and traffic signal plans shall be prepared by a registered Civil Engineer and shall be submitted to and approved by the City Engineer. Security shall be posted and an agreement executed to the satisfaction of the City Engineer and the City Attorney guaranteeing completion of the public and/or private street improvements, prior to final map approval or the issuance of building permits, whichever occurs first. b. Prior to any work being performed in public right-of-way, fees shall be paid and a construction permit shall be obtained from the City Engineer's Office in addition to any other permits required. c. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit, and interconnect conduit shall be installed to the satisfaction of the City Engineer. d. Signal conduit with pull boxes shall be installed with any new construction or reconstruction project along major or secondary streets and at intersections for future traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the street at 3 feet outside of BCR, ECR, or any other locations approved by the City Engineer Notes: (1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a maximum of 200 feet apart, unless otherwise specified by the City Engineer. (2) Conduit shall be 3-inch (at intersections) or 2-inch (along streets) galvanized steel with pull rope or as specified. e. Handicapped access ramps shall be installed on all corners of intersections per City Standards or as directed by the City Engineer. f. Existing City roads requiring construction shall remain open to traffic at all times with adequate detours during construction. Street or lane closure permits are required. A cash deposit shall be provided to cover the cost of grading and paving, which shall be refunded upon completion of the construction to the satisfaction of the City Engineer. g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall be installed to City Standards, except for single family residential lots. h. Street names shall be approved by the City Planner prior to submittal for first plan check. 4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in accordance with the City's street tree program. 5. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with adopted policy. On collector or larger streets, lines of sight shall be plotted for all project intersections, including driveways. Local residential street intersections and commercial or industrial driveways may have lines of sight plotted as required. SC-8-00 7 Project No.:TT 16105&DR 00-34 Completion Date 6. A permit shall be obtained from Caltrans for any work within the following right-of-way: Interstate 15 freeway. N. Public Maintenance Areas 1. A separate set of landscape and irrigation plans per Engineering Public Works Standards shall be submitted to the City Engineer for review and approval prior to final map approval or issuance of building permits, whichever occurs first. The following landscaped parkways, medians, paseos, easements, trails or other areas shall be annexed into the Landscape Maintenance District: East Avenue. 2. Public landscape areas are required to incorporate substantial areas 40%) of mortared cobble or other acceptable non-irrigated surfaces. 3. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting _/_/_ Districts shall be filed with the City Engineer prior to final map approval or issuance of building permits whichever occurs first. Formation costs shall be borne by the developer. 4. All required public landscaping and irrigation systems shall be continuously maintained by the developer until accepted by the City. 5. Parkway landscaping on the following street(s) shall conform to the results of the respective Beautification Master Plan: East Avenue Beautification Concept. O. Drainage and Flood Control 1. A final drainage study shall be submitted to and approved by the City Engineer prior to final map approval or the issuance of building permits, whichever occurs first. All drainage facilities shall be installed as required by the City Engineer. P. Utilities 1. Provide separate utility services to each parcel including sanitary sewerage system, water, gas, electric power, telephone, and cable N (all underground) in accordance with the Utility Standards. Easements shall be provided as required. 2. The developer shall be responsible for the relocation of existing utilities as necessary. 3. Water and sewer plans shall be designed and constructed to meet the requirements of the _/_/_ Cucamonga County Water District(CCWD), Rancho Cucamonga Fire Protection District, and the Environmental Health Department of the County of San Bernardino. A letter of compliance from the CCWD is required prior to final map approval or issuance of permits, whichever occurs first. Such letter must have been issued by the water district within 90 days prior to final map approval in the case of subdivision or prior to the issuance of permits in the case of all other residential projects. Q. General Requirements and Approvals 1. Etiwanda/San Sevaine Area Regional Mainline, Secondary Regional, and Master Plan Drainage Fees shall be paid prior to final map approval or prior to building permit issuance if no map is involved. 2. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for all new street lights for the first six months of operation, prior to final map approval or prior to building permit issuance if no map is involved. SC-8-00 8 Project No.:TT 16105&DR 00-34 Completion Date 3. Prior to finalization of any development phase, sufficient improvement plans shall be completed beyond the phase boundaries to assure secondary access and drainage protection to the satisfaction of the City Engineer. Phase boundaries shall correspond to lot lines shown on the approved tentative map. APPLICANT SHALL CONTACT THE FIRE PREVENTION/NEW CONSTRUCTION UNIT, (909) 477-2730, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: R. General Fire Protection Conditions 1. Mello Roos Community Facilities District requirements shall apply to this project. The developer _/_/_ shall commence, participate in, and consummate or cause to be commenced, participated in, or consummated, a Mello-Roos Community Facilities District(CFD)for the Rancho Cucamonga Fire Protection District to finance construction and/or maintenance of a fire station to serve the development. The CFD shall be formed by the District and the developer by the time recordation of the final map occurs. 2. Fire flow requirement shall be: a. 1 500 gallons per minute, Per'97 UFC Appendix III-A, 3, (b)(Increase). b. A fire flow shall be conducted by the builder/developer and witnessed by fire department personnel prior to water plan approval. C. For the purpose of final acceptance, an additional fire flow test of the on-site hydrants shall be conducted by the builder/developer and witnessed by fire department personnel after construction and prior to occupancy. 3. Fire hydrants are required. All required public or on-site fire hydrants shall be installed, flushed, and operable prior to delivery of any combustible building materials on site (i.e., lumber, roofing materials, etc.). Hydrants flushing shall be witnessed by fire department personnel. 4. Existing fire hydrant locations shall be provided prior to water plan approval. Required hydrants, if any, will be determined by the Fire District. Fire District standards require a 6-inch riser with a 4-inch and a 2-1/2-inch outlet. Substandard hydrants shall be upgraded to meet this standard. Contact the Fire Safety Division for specifications on approved brands and model numbers. 5. Prior to the issuance of building permits for combustible construction, evidence shall be submitted to the Fire District that an approved temporary water supply for fire protection is available, pending completion of the required fire protection system. 6. Hydrant reflective markers (blue dots) shall be required for all hydrants and installed prior to final inspection. 7. An automatic fire extinguishing system(s)will be required as noted below: a. Other: To mitigate access if second access cannot be provided. Note: Special sprinkler densities are required for such hazardous operations as woodworking, plastics manufacturing, spray painting, flammable liquids storage, high piled stock, etc. Contact the Fire Safety Division to determine if the sprinkler system is adequate for proposed operations. 8. Roadways within project shall comply with the Fire District's fire lane standards, as noted: a. All roadways per Rancho Cucamonga Fire Protection District Ordinance 32. 9. Fire department access shall be amended to facilitate emergency apparatus. 10. Emergency secondary access shall be provided in accordance with Fire District standards. SC-8-00 9 Project No.:TT 16105&DR 00-34 Completion Date 11. Emergency access, a minimum of 26 feet wide, shall be provided, and maintained free and clear of obstructions at all times during construction, in accordance with Fire District requirements. 12. Fire District fee(s), plus a $1 per"plan page" microfilm fee will be due to the Rancho Cucamonga Fire Protection District as follows: a. $132 for CCWD Water Plan review/underground water supply. b. $132 for Single Family Residential Tract (per phase). "Note: Separate plan check fees for Tenant Improvement work, fire protection systems (sprinklers, hood systems, alarms, etc.) and/or any consultant reviews will be assessed upon submittal of plans. APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS: S. Security Hardware 1. A secondary locking device shall be installed on all sliding glass doors. 2. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be used. 3. All garage or rolling doors shall have slide bolts or some type of secondary locking devices. T. Windows 1. All sliding glass windows shall have secondary locking devices and should not be able to be lifted from frame or track in any manner. U. Building Numbering 1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for nighttime visibility. SC-8-00 10