HomeMy WebLinkAbout939-S DIST COUNTY ROUTE POST MILES Shit L
TOTAL PROJECT NO SHEETS
os so. ss
s�A K
DEPUTY Cv IIENGINEER
APPROVED
PHASE II ; PHASE Is
Lq FOOTHILL BLVD W
i ( �N
Cl-Ln
DETAIL A o-
DETAIL A ��� ZN
DETAIL A `_'
6,� — — K, 5
6 00
6 --PL
ZP � I
L
5
O' 10,
ELM AV
L-- FOOTH ILL BLVD —
6ETA 11 A DETAIL A
0
r,-i 6cc — -
U ao —
n. 6 � - p
ZPP1
5
691 9k
��•� SPRUCE ST
S ,p _ S�pw►
FOOTHILL BLVD
DETAIL A DETAIL A
D
_ ETAIL A 6'w
1 oo 6 ac
6 00
a ZPL
6
EXISTIWG .COWTU ER g CABINET 5
RTES ,t
,r� . N
41' 57.5' , 5
FOOTHILL 6 HAVEN TO STATION 52 + 61
115' '10 1. All items to be furnished and all work to be done PL �� ��
shall conform to Section 86 "Signals and Lighting"
of the State of California, Standard Specifications
HAVEN AV dated January, 1981 and Standard Plans dated JAN, ,
1981 and as most recently revised. ASPEN ST
2. It shall be the responsibility of the contractor
to verify the existence and location of all under-
ground facilities, public or private, and protect SCALE 1" = 30'
them from damage. The contractor shall bear the
total expense of repair or replacement of any under-
round facilities i ti es d m
g damaged by his operations.
3. Conduit shall conform to the provisions in Section CITY OF RANCHO 86-2.05, "Conduit", of the Standard Specifications. HO CUCAMONGA
Non-metallic type conduit shall not be used. In-
sulated bonding bushings shall be used on metal PHASE I
conduit. TRAFFIC SIGNAL 'CONDUIT PLAN
4. A No. 12 copper ,pult wire or a pull rope shall be
Installed in all conduits. The pull rope shall be DETAIL A FOOTHILL 6.OU L EVA RD
nylon or polypropylene with a minimum tensile
strength of 500 pounds. At least two feet of pull
wire or rope shall be secured and doubled back into STA 0+70 TO 52+6IROAD SURFACE ESTIMATED IUAHTITIES
the conduit at each termination. _
1 1h" CONDUIT 4820 L.F. RECOMMENDED A P OVE D
S. Pull boxes shall conform to the provisions in 2� CONDUIT 410 L.F.
DESIGNED
Section 86-2.06 Pull Boxes of the Standard Speci- 18"� "
fications. Recesses for suspension of ballasts #3 PULLBOX 25 E.A. DW8 23�8�
CIT ENGINEER DATE RCE.will not be required, #5 PULLBOX . 5 E A DRAWN
CONDUIT BEHIND CURB M.C. LINSCOTT, LAW 8 GREENSPAN INC. ENGINEERS
- 6. No pull box shall be located in or within '1' #6of PULLBOX 6 E.A. CHECKED
ISO PAULARINO AV. BLDG C, SUITE 120
any wheelchair ramp. JFF COSTA MESA, CALIFORNIA 92626 (714) 641 - 1597
SHEET D Foci,
1
PLAN 939