Loading...
HomeMy WebLinkAbout939-S DIST COUNTY ROUTE POST MILES Shit L TOTAL PROJECT NO SHEETS os so. ss s�A K DEPUTY Cv IIENGINEER APPROVED PHASE II ; PHASE Is Lq FOOTHILL BLVD W i ( �N Cl-Ln DETAIL A o- DETAIL A ��� ZN DETAIL A `_' 6,� — — K, 5 6 00 6 --PL ZP � I L 5 O' 10, ELM AV L-- FOOTH ILL BLVD — 6ETA 11 A DETAIL A 0 r,-i 6cc — - U ao — n. 6 � - p ZPP1 5 691 9k ��•� SPRUCE ST S ,p _ S�pw► FOOTHILL BLVD DETAIL A DETAIL A D _ ETAIL A 6'w 1 oo 6 ac 6 00 a ZPL 6 EXISTIWG .COWTU ER g CABINET 5 RTES ,t ,r� . N 41' 57.5' , 5 FOOTHILL 6 HAVEN TO STATION 52 + 61 115' '10 1. All items to be furnished and all work to be done PL �� �� shall conform to Section 86 "Signals and Lighting" of the State of California, Standard Specifications HAVEN AV dated January, 1981 and Standard Plans dated JAN, , 1981 and as most recently revised. ASPEN ST 2. It shall be the responsibility of the contractor to verify the existence and location of all under- ground facilities, public or private, and protect SCALE 1" = 30' them from damage. The contractor shall bear the total expense of repair or replacement of any under- round facilities i ti es d m g damaged by his operations. 3. Conduit shall conform to the provisions in Section CITY OF RANCHO 86-2.05, "Conduit", of the Standard Specifications. HO CUCAMONGA Non-metallic type conduit shall not be used. In- sulated bonding bushings shall be used on metal PHASE I conduit. TRAFFIC SIGNAL 'CONDUIT PLAN 4. A No. 12 copper ,pult wire or a pull rope shall be Installed in all conduits. The pull rope shall be DETAIL A FOOTHILL 6.OU L EVA RD nylon or polypropylene with a minimum tensile strength of 500 pounds. At least two feet of pull wire or rope shall be secured and doubled back into STA 0+70 TO 52+6IROAD SURFACE ESTIMATED IUAHTITIES the conduit at each termination. _ 1 1h" CONDUIT 4820 L.F. RECOMMENDED A P OVE D S. Pull boxes shall conform to the provisions in 2� CONDUIT 410 L.F. DESIGNED Section 86-2.06 Pull Boxes of the Standard Speci- 18"� " fications. Recesses for suspension of ballasts #3 PULLBOX 25 E.A. DW8 23�8� CIT ENGINEER DATE RCE.will not be required, #5 PULLBOX . 5 E A DRAWN CONDUIT BEHIND CURB M.C. LINSCOTT, LAW 8 GREENSPAN INC. ENGINEERS - 6. No pull box shall be located in or within '1' #6of PULLBOX 6 E.A. CHECKED ISO PAULARINO AV. BLDG C, SUITE 120 any wheelchair ramp. JFF COSTA MESA, CALIFORNIA 92626 (714) 641 - 1597 SHEET D Foci, 1 PLAN 939