HomeMy WebLinkAbout00-69 - Resolutions RESOLUTION NO. 00-69
A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING DEVELOPMENT
REVIEW 00-08, FOR A SINGLE INDUSTRIAL WAREHOUSE BUILDING
TOTALING 81,960 SQUARE FEET ON 3.96 ACRES OF LAND IN THE
GENERAL INDUSTRIAL DISTRICT (SUBAREA 14) OF THE INDUSTRIAL
AREA SPECIFIC PLAN, LOCATED AT THE NORTHWEST CORNER OF 4TH
STREET AND SANTA ANITA AVENUE AND MAKING FINDINGS IN
SUPPORT THEREOF—APN: 229-331-07.
A. Recitals.
1. Bendetti Warehouse filed an application for the approval of Development Review 00-08,
as described in the title of this Resolution. Hereinafter in this Resolution, the subject Development
Review request is referred to as "the application."
2. On the 12th day of July 2000, the Planning Commission of the City of Rancho
Cucamonga conducted a meeting on the application and concluded said meeting on that date.
3. All legal prerequisites prior to the adoption of this Resolution have occurred.
B. Resolution.
NOW, THEREFORE, it is hereby found, determined, and resolved bythe Planning Commission
of the City of Rancho Cucamonga as follows:
1. This Commission hereby specifically finds that all of the facts set forth in the Recitals,
Part A, of this Resolution are true and correct.
2. Based upon the substantial evidence presented to this Commission during the above-
referenced meeting on July 12, 2000, including written and oral staff reports, together with public
testimony, this Commission hereby specifically finds as follows:
a. The application applies to property bounded by an industrial building(Rydertruck)to
the north, industrial buildings to the south across 4th Street, industrial buildings (City of Ontario) to
the east across Santa Anita Avenue, and Day Creek Channel and Edison power lines to the west
and Interstate 15 further to the west,with an approximate street frontage of 538 feet along 4th Street
and 289 feet along Santa Anita Avenue; and
b. Storm drain improvements necessary to accommodate the project are not in excess
of that provided by the master plan of storm drainage; and
d. The project, together with the recommended conditions of approval, complies with
all minimum development standards for the City of Rancho Cucamonga; and
e. The project will provide warehousing/distribution facilities of substantial size
conveniently located relative to the industrial area and regional circulation routes.
3. Based upon the substantial evidence presented to this Commission during the above-
referenced public meeting and upon the specific findings of facts set forth in paragraphs 1 and 2
above, this Commission hereby finds and concludes as follows:
PLANNING COMMISSION RESOLUTION NO. 00-69
DR 00-08 BENDETTI WAREHOUSE
July 12, 2000
Page 2
a. That the proposed project is consistent with the objectives of the General Plan;and
b. That the proposed use is in accord with the objectives of the Development Code
and the purposes of the district in which the site is located; and
C. That the proposed use is in compliance with each of the applicable provisions of the
Development Code; and
d. That the proposed use, together with the conditions applicable thereto, will not be
detrimental to the public health, safety, or welfare or materially injurious to properties or
improvements in the vicinity.
4. Based upon the facts and information contained in the proposed Mitigated Negative
Declaration, together with all written and oral reports included for the environmental assessment for
the application, the Planning Commission finds that there is no substantial evidence that the project
will have a significant effect upon the environment and adopts a Mitigated Negative Declaration
based upon the findings as follows:
a. That the Mitigated Negative Declaration has been prepared in compliance with the
California Environmental Quality Act of 1970, as amended, and the State CEQA guidelines
promulgated thereunder; that said Mitigated Negative Declaration and the Initial Study prepared
therefore reflect the independent judgment of the Planning Commission; and, further, this
Commission has reviewed and considered the information contained in said Mitigated Negative
Declaration with regard to the application.
b. Although the Mitigated Negative Declaration identifies certain significant
environmental effects that will result if the project is approved, all significant effects have been
reduced to an acceptable level by imposition of mitigation measures on the project which are listed
below as conditions of approval.
c. That pursuant to the provisions of Section 753.5(c)of Title 14 of the California Code
of Regulations, the Planning Commission finds as follows: In considering the record as a whole,the
Initial Study and Mitigated Negative Declaration for the project, there is no evidence that the
proposed project will have potential for an adverse impact upon wildlife resources orthe habitat upon
which wildlife depends. Further, based upon substantial evidence contained in the Mitigated
Negative Declaration, the staff reports and exhibits, and the information provided to the Planning
Commission during the public hearing, the Planning Commission hereby rebuts the presumption of
adverse effect as set forth in Section 753.5(c-1-d) of Title 14 of the California Code of Regulations.
5. Based upon the findings and conclusions set forth in paragraphs 1, 2, 3, and 4 above,
this Commission hereby approves the application subject to each and every condition set forth below
and in the Standard Conditions, attached hereto and incorporated herein by this reference:
Planning Division
1) Berms shall be provided along 4th Street which undulate and have an
average height of 3 feet (maximum slope not to exceed 3%z :1).
2) No wall shall exceed an exposed height of 8 feet as viewed from
adjacent properties and streets.
3) No chain link fencing is permitted.
PLANNING COMMISSION RESOLUTION NO. 00-69
DR 00-08 BENDETTI WAREHOUSE
July 12, 2000
Page 3
4) Provide significant landscaping within landscape setbacks along the
street frontages.
5) Security gates and associated fencing fronting Santa Anita Avenue
shall be view obscuring to fully screen truck loading areas from view
from 4th Street. The gates shall be automatically operated so that they
are open a minimum amount of time.
6) The security gates on both street frontages shall be relocated to the
interior of the site to provide adequate vehicle stacking distance per
Engineering Division standards.
7) Provide tables, chairs, and shade for outdoor employee eating areas.
8) Truck parking spaces shall be a minimum of 14 feet wide by 50 feet
deep.
9) All equipment, both ground- and roof-mounted, shall be completely
screened from view of surrounding properties and public rights-of-way
and architecturally compatible with the elevation design.
Engineering Division
1) Missing improvements on 4th Street and Santa Anita Avenue shall be
installed including, but not limited to, curbs and gutters, sidewalks,
pavement, street trees, street lights, signing, striping etc. in accordance
with City standards; 4th Street is a Major Divided Highway and Santa
Anita Avenue is an Industrial Local. No sidewalk shall be installed at
4th Street.
2) The existing overhead utilities (telecommunications and electrical,
except for 66kV electrical) on the project side of 4th Street shall be
undergrounded from the first pole on the east side of Santa Anita
Avenue to the first pole on the west side of Day Creek Channel.
Reimbursement of one half the City adopted cost fro undergrounding
from future development as it occurs on the opposite side of the street
is not feasible because the property is located in the City of Ontario.
3) Obtain a permit for the construction of landscaping and an agreement
for maintenance from the San Bernardino Flood Control District and
provide landscaping along the Day Creek Channel frontage from the
site to the channel a minimum depth of 45 feet.
Fire District/Fire Prevention New Construction Division
1) Add Fire District access man gate at midway point along 4th Street.
2) Access doors shall be spaced at 100 foot intervals for high pile storage.
PLANNING COMMISSION RESOLUTION NO. 00-69
DR 00-08 BENDETTI WAREHOUSE
July 12, 2000
Page 4
Environmental Mitigation Measures
1) The site shall be treated with water or other soil stabilizing agent
(approved by SCAQMD and RWQCB) daily to reduce PM10 emission, in
accordance with SCAQMD Rule 403.
2) Fourth Street and Santa Anita Avenue shall be swept according to a
schedule established by the City to reduce PM10 emissions associated
with vehicle tracking of soil off-site. Timing may vary depending upon
time of year of construction.
3) Grading operations shall be suspended when wind speeds exceed 25
mph to minimize PM10 emissions from the site during such episodes.
4) Chemical soil stabilizers (approved by SCAQMD and RWQCB)shall be
applied to all inactive construction areas that remain inactive for 96
hours or more to reduce PM10 emissions.
5) The construction contractor shall select the construction equipment
used on-site based on low emission factors and high-energy efficiency.
The construction contractor shall ensure the construction grading plans
include a statement that all construction equipment will be tuned and
maintained in accordance with the manufacturer's specifications.
6) The construction contractor shall utilize electric or clean alternative fuel
powered equipment where feasible.
7) The construction contractor shall ensure that construction-grading plans
include a statement that work crews will shut off equipment when not in
use.
6. The Secretary to this Commission shall certify to the adoption of this Resolution.
APPROVED AND ADOPTED THIS 12TH DAY OF JULY 2000.
PLANNING COMMISSION OF THE CITY OF RANCHO CUCAMONGA
r
BY: C
arty 5x6Niel, Chairman
ATTEST:
Brad 50cretqry�/
PLANNING COMMISSION RESOLUTION NO. 00-69
DR 00-08 BENDETTI WAREHOUSE
July 12, 2000
Page 5
1, Brad Buller, Secretary of the Planning Commission of the City of Rancho Cucamonga, do hereby
certify that the foregoing Resolution was duly and regularly introduced, passed, and adopted by the
Planning Commission of the City of Rancho Cucamonga, at a regular meeting of the Planning
Commission held on the 12th day of July 2000, by the following vote-to-wit:
AYES: COMMISSIONERS: MACIAS, MANNERINO, MCNIEL, STEWART, TOLSTOY
NOES: COMMISSIONERS: NONE
ABSENT: COMMISSIONERS: NONE
City of Rancho Cucamonga
MITIGATION MONITORING
PROGRAM
Project File No.: Development Review 00-08
This Mitigation Monitoring Program(MMP)has been prepared for use in implementing the mitigation
measures identified in the Mitigated Negative Declaration for the above-listed project. This program
has been prepared in compliance with State law to ensure that adopted mitigation measures are
implemented (Section 21081.6 of the Public Resources Code).
Program Components -This MMP contains the following elements:
1. Conditions of approval that act as impact mitigation measures are recorded with the action and
the procedure necessary to ensure compliance.The mitigation measure conditions of approval
are contained in the adopted Resolution of Approval for the project.
2. A procedure of compliance and verification has been outlined for each action necessary. This
procedure designates who will take action, what action will be taken and when, and to whom
and when compliance will be reported.
3. The MMP has been designed to provide focused, yet flexible guidelines. As monitoring
progresses, changes to compliance procedures may be necessary based upon
recommendations by those responsible for the program.
Program Management-The MMP will be in place through all phases of the project. The project
planner, assigned by the City Planner, shall coordinate enforcement of the MMP. The project
planner oversees the MMP and reviews the Reporting Forms to ensure they are filled out correctly
and proper action is taken on each mitigation. Each City department shall ensure compliance of the
conditions (mitigation)that relate to that department.
Procedures -The following steps will be followed by the City of Rancho Cucamonga.
1. A fee covering all costs and expenses, including any consultants'fees, incurred by the City in
performing monitoring or reporting programs shall be charged to the applicant.
2. A MMP Reporting Form will be prepared for each potentially significant impact and its
corresponding mitigation measure identified in the Mitigation Monitoring Checklist, attached
hereto. This procedure designates who will take action,what action will betaken and when,and
to whom and when compliance will be reported. All monitoring and reporting documentation will
be kept in the project file with the department having the original authority for processing the
project. Reports will be available from the City upon request at the following address:
City of Rancho Cucamonga - Lead Agency
Planning Division
10500 Civic Center Drive
Rancho Cucamonga, CA 91730
Mitigation Monitoring Program
Page 2
3. Appropriate specialists will be retained if technical expertise beyond the City staffs is needed,as
determined by the project planner or responsible City department,to monitor specific mitigation
activities and provide appropriate written approvals to the project planner.
4. The project planner or responsible City department will approve, by signature and date, the
completion of each action item that was identified on the MMP Reporting Form. After each
measure is verified for compliance, no further action is required for the specific phase of
development.
5. All MMP Reporting Forms for an impact issue requiring no further monitoring will be signed off
as completed by the project planner or responsible City department at the bottom of the MMP
Reporting Form.
6. Unanticipated circumstances may arise requiring the refinement or addition of mitigation
measures. The project planner is responsible for approving any such refinements or additions.
An MMP Reporting Form will be completed bythe project planner or responsible City department
and a copy provided to the appropriate design, construction, or operational personnel.
7. The project planner or responsible City department has the authority to stop the work of
construction contractors if compliance with any aspects of the MMP is not occurring afterwritten
notification has been issued. The project planner or responsible City department also has the
authority to hold certificates of occupancies if compliance with a mitigation measure attached
hereto is not occurring.The project planner or responsible City department has the authority to
hold issuance of a business license until all mitigation measures are implemented.
8. Any conditions (mitigation) that require monitoring after project completion shall be the
responsibility of the City of Rancho Cucamonga Community Development Department. The
Department shall require the applicant to post any necessary funds(or other forms of guarantee)
with the City. These funds shall be used by the City to retain consultants and/or pay for City staff
time to monitor and report on the mitigation measure for the required period of time.
9. In those instances requiring long-term project monitoring, the applicant shall provide the City
with a plan for monitoring the mitigation activities at the project site and reporting the monitoring
results to the City. Said plan shall identify the reporter as an individual qualified to know whether
the particular mitigation measure has been implemented. The monitoring/reporting plan shall
conform to the Citys MMP and shall be approved by the Community Development Director prior
to the issuance of building permits.
1:1FINAL\CEOA\MMP Form-revmpd
MITIGATION MONITORING CHECKLIST (INITIAL STUDY PART III)
Project File No.: DR 00-08 Applicant: Bendetti Warehouse Development
Initial Study Prepared by: Nancy Ferguson Date: May 18. 2000
ImplementingMitigation measures No. I Responsible Monitoring Timing of Method of Verified Sanctions for
.n for Monitoring Frequency Verification Verification Date/initials Non-compliance
Air Quality
The site shall be treated with water or other soil stabilizing CP C Review of plans FVC 2
agent)approved by SCAQMD and RWQCB)daily to reduce
PM,o emission,in accordance with SCAQMD Rule 403.
Fourth Street and Santa Anita Avenue shall be swept CP C Review of plans A/C 2
according to a schedule established by the City to reduce
PMro emissions associated with vehicle tracking of soil off-
site. Timing may vary depending upon time of year of
construction.
Grading operations shall be suspended when wind speeds CP C Review of plans A/C 2
exceed 25 mph to minimize PM10 emissions from the site
during such episodes.
Chemical soil stabilizers(approved by SCAQMD and CP C Review of plans A/C 2
RWQCB)shall be applied to all inactive construction areas
that remain inactive for 96 hours or more to reduce PMro
emissions.
The construction contractor shall select the construction CP B/C Review of plans A/C 2
equipment used on-site based on low emission factors and
high-energy efficiency. The construction contractor shall
ensure the construction grading plans include a statement
that all construction equipment will be tuned and
maintained in accordance with the manufacturer's
specifications.
The construction contractor shall utilize electric or clean CP BIC Review of plans A/C 2
alternative fuel powered equipment where feasible.
The construction contractor shall ensure that Construction- CP/CE B Review of plans c 2
grading plans include a statement that work crews will shut
off equipment when not in use.
Key to Checklist Abbreviations
f 3��
k` %':, * xd# n Method ofVication#' s� r"'"' i ,� n �," sanctions
Responsible Person- 'MonnoringFrequenoy
CDD-Community Development Director A-With Each New Development A-On-site Inspection 1 -Withhold Recordation of Final Map
CP-City Planner or designee B-Prior To Construction B-Other Agency Permit/Approval 2-Withhold Grading or Building Permit
CE-City Engineer or designee C-Throughout Construction C-Plan Check 3-Withhold Certificate of Occupancy
BO-Building Official or designee D-On Completion D-Separate Submittal(Reports/Studies/Plans) 4-Stop Work Order
PO-Police Captain or designee E-Operating 5-Retain Deposit or Bonds
FC-Fire Chief or designee 6-Revoke CUP
COMMUNITY DEVELOPMENT
DEPARTMENT
STANDARD CONDITIONS
PROJECT#: Development Review 00-08
SUBJECT: Bendetti Warehouse Development
APPLICANT: Cabot Industrial Trust
LOCATION: Northwest corner of 4th Street and Santa Anita Avenue
ALL OF THE FOLLOWING CONDITIONS APPLY TO YOUR PROJECT.
APPLICANT SHALL CONTACT THE PLANNING DIVISION,(909)477-2750, FOR COMPLIANCE WITH THE
FOLLOWING CONDITIONS:
A. General Requirements Completion Date
1. The applicant shall agree to defend at his sole expense any action brought against the City, its / /
agents, officers, or employees, because of the issuance of such approval, or in the ---
alternative, to relinquish such approval. The applicant shall reimburse the City, its agents,
officers, or employees, for any Court costs and attorney's fees which the City, its agents,
officers, or employees may be required by a court to pay as a result of such action. The City
may, at its sole discretion, participate at its own expense in the defense of any such action but
such participation shall not relieve applicant of his obligations under this condition.
2. A copy of the signed Resolution of Approval or City Planner's letter of approval, and all
Standard Conditions, shall be included in legible form on the grading plans, building and ---
construction plans, and landscape and irrigation plans submitted for plan check.
B. Time Limits
1. Conditional Use Permit, Variance, or Development/Design Review approval shall expire if
building permits are not issued or approved use has not commenced within 5 years from the ---
date of approval. No extensions are allowed.
C. Site Development
1. The site shall be developed and maintained in accordance with the approved plans which
include site plans, architectural elevations, exterior materials and colors, landscaping, sign
program, and grading on file in the Planning Division, the conditions contained herein,
Development Code regulations, and the Industrial Specific Plan.
2. Occupancy of the facilities shall not commence until such time as all Uniform Building Code
and State Fire Marshal regulations have been complied with. Prior to occupancy, plans shall ---
be submitted to the Rancho Cucamonga Fire Protection District and the Building and Safety
SC—2-00
1
Project No. DR00-08
Comole0on Date
Division to show compliance. The buildings shall be inspected for compliance prior to
occupancy.
3. Revised site plans and building elevations incorporating all Conditions of Approval shall be
submitted for City Planner review and approval prior to the issuance of building permits. ---
4. All site, grading, landscape, irrigation, and street improvement plans shall be coordinated for
consistency prior to issuance of any permits (such as grading, tree removal, encroachment, ---
building, etc.) or prior to final map approval in the case of a custom lot subdivision, or
approved use has commenced,whichever comes first.
5. Approval of this request shall not waive compliance with all sections of the Development
Code, all other applicable City Ordinances, and applicable Community or Specific Plans in
effect at the time of building permit issuance.
6. A detailed on-site lighting plan, including a photometric diagram, shall be reviewed and
approved by the City Planner and Police Department (477-2800) prior to the issuance of ---
building permits. Such plan shall indicate style, illumination, location, height, and method of
shielding so as not to adversely affect adjacent properties.
7. If no centralized trash receptacles are provided, all trash pick-up shall be for individual units /
with all receptacles shielded from public view. ---
8. Trash receptacle(s) are required and shall meet City standards. The final design, locations, /
and the number of trash receptacles shall be subject to City Planner review and approval prior ---
to the issuance of building permits.
9. All ground-mounted utility appurtenances such as transformers, AC condensers, etc., shall be
located out of public view and adequately screened through the use of a combination of ---
concrete or masonry walls, berming, and/or landscaping to the satisfaction of the City Planner.
For single family residential developments, transformers shall be placed in underground
vaults.
10. All building numbers and individual units shall be identified in a clear and concise manner, f /
including proper illumination. ---
11. All parkways, open areas, and landscaping shall be permanently maintained by the property
owner, homeowners' association, or other means acceptable to the City. Proof of this ---
landscape maintenance shall be submitted for City Planner and City Engineer review and
approved prior to the issuance of building permits.
D. Building Design
1. An alternative energy system is required to provide domestic hot water for all dwelling units
and for heating any swimming pool or spa, unless other alternative energy systems are ---
demonstrated to be of equivalent capacity and efficiency. All swimming pools installed at the
time of initial development shall be supplemented with solar heating. Details shall be included
in the building plans and shall be submitted for City Planner review and approval prior to the
issuance of building permits.
2. All roof appurtenances, including air conditioners and other roof mounted equipment and/or /
projections, shall be shielded from view and the sound buffered from adjacent properties and ---
streets as required by the Planning Division. Such screening shall be architecturally
integrated with the building design and constructed to the satisfaction of the City Planner.
Details shall be included in building plans.
3. For commercial and industrial projects, paint roll-up doors and service doors to match main
building colors. ---
SC—2-00
2
Project No. DR00-08
Completion Date
E. Parking and Vehicular Access (indicate details on building plans)
1. All parking spaces shall be 9 feet wide by 18 feet long. When a side of any parking space
abuts a building, wall, support column, or other obstruction, the space shall be a minimum of ---
11 feet wide.
2. All parking lot landscape islands shall have a minimum outside dimension of 6 feet and shall
contain a 12-inch walk adjacent to the parking stall (including curb). ---
3. Ail parking spaces shall be double striped per City standards and all driveway aisles, f
entrances, and exits shall be striped per City standards. ---
4. Plans for any security gates shall be submitted for the City Planner, City Engineer, and f
Rancho Cucamonga Fire Protection District review and approval prior to issuance of building ---
permits. For residential development, private gated entrances shall provide adequate turn-
around space in front of the gate and a separate visitor lane with call box to avoid cars
stacking into the public right-of-way.
5. Handicap accessible stalls shall be provided for commercial and office facilities with 25 or I I
more parking stalls. Designate two percent or one stall, whichever is greater, of the total ---
number of stalls for use by the handicapped.
6. Motorcycle parking area shall be provided for commercial and office facilities with 25 or more f
parking stalls. Developments with over 100 parking stalls shall provide motorcycle parking at ---
the rate of one percent. The area for motorcycle parking shall be a minimum of 56 square
feet.
7. Bicycle storage spaces shall be provided in all commercial, office, industrial, and multifamily
residential projects or more than 10 units. Minimum spaces equal to five percent of the ---
required automobile parking spaces or three bicycle storage spaces, whichever is greater.
After the first 50 bicycle storage spaces are provided, additional storage spaces required are
2.5 percent of the required automobile parking spaces. Warehouse distribution uses shall
provide bicycle storage spaces at a rate of 2.5 percent on the required automobile parking
spaces with a minimum of a 3-bike rack. In no case shall the total number of bicycle parking
spaces required exceed 100. Where this results in a fraction of 0.5 or greater, the number
shall be rounded off to the higher whole number.
8. Carpool and vanpool designated off-street parking close to the building shall be provided for
commercial, office, and industrial facilities at the rate of 10 percent of the total parking area. If ---
covered, the vertical clearance shall be no less than 9 feet.
F. Trip Reduction
1. Transit improvements such as bus shelters, bus pullouts, and bus pads shall be provided.
2. Shower facility accessible to both men and women shall be provided for persons walking o f
bicycling to work for each project which meets the following thresholds: ---
Commercial 250,000 square feet
Industrial 325,000 square feet
Office 125,000 square feet
Hotels and Motels 250 rooms
G. Landscaping
1. A detailed landscape and irrigation plan, including slope planting and model home f
landscaping in the case of residential development, shall be prepared by a licensed landscape ---
architect and submitted for City Planner review and approval prior to the issuance of building
permits or prior final map approval in the case of a custom lot subdivision.
SC—2-00
3
Project No. DR00-08
Completion Date
2. Existing trees required to be preserved in place shall be protected with a construction barrier
in accordance with the Municipal Code Section 19.08.110, and so noted on the grading plans. ---
The location of those trees to be preserved in place and new locations for transplanted trees
shall be shown on the detailed landscape plans. The applicant shall follow all of the arborist's
recommendations regarding preservation, transplanting, and trimming methods.
3. A minimum of 20% of trees planted within industrial projects, and a minimum of 30% within
commercial and office projects, shall be specimen size trees-24-inch box or larger. ---
4. Within parking lots, trees shall be planted at a rate of one 15-gallon tree for every three
parking stalls, sufficient to shade 50% of the parking area at solar noon on August 21. ---
5. Trees shall be planted in areas of public view adjacent to and along structures at a rate of one
tree per 30 linear feet of building. ---
6. All private slopes of 5 feet or more in vertical height and of 5:1 or greater slope, but less than
2:1 slope, shall be, at minimum, irrigated and landscaped with appropriate ground cover for ---
erosion control. Slope planting required by this section shall include a permanent irrigation
system to be installed by the developer prior to occupancy.
7. For multi-family residential and non-residential development, property owners are responsible
for the continual maintenance of all landscaped areas on-site, as well as contiguous planted ---
areas within the public right-of-way. All landscaped areas shall be kept free from weeds and
debris and maintained in healthy and thriving condition, and shall receive regular pruning,
fertilizing, mowing, and trimming. Any damaged, dead, diseased, or decaying plant material
shall be replaced within 30 days from the date of damage.
8. The final design of the perimeter parkways, walls, landscaping, and sidewalks shall be
included in the required landscape plans and shall be subject to City Planner review and ---
approval and coordinated for consistency with any parkway landscaping plan which may be
required by the Engineering Division.
9. Special landscape features such as mounding, alluvial rock, specimen size trees, meandering
sidewalks (with horizontal change), and intensified landscaping, is required along 4th Street ---
and Santa Anita Avenue.
10. All walls shall be provided with decorative treatment. If located in public maintenance areas, / /
the design shall be coordinated with the Engineering Division. ---
11. Landscaping and irrigation shall be designed to conserve water through the principles of
Xeriscape as defined in Chapter 19.16 of the Rancho Cucamonga Municipal Code. ---
12. On projects which abut the 1-15 Freeway, the developer shall provide landscaping within the
freeway right-of-way along the boundary of this project or pay an in-lieu of construction cash
deposit. The landscape and irrigation plans shall be prepared in conformance with Caltrans
and City Standards through the City of Rancho Cucamonga. Plans shall be reviewed and
approved by the City Planner and City Engineer. Landscape and irrigation shall be installed
prior to the release of occupancy of the project. If final approvals and/or installation is not
complete at that time, the City will accept a cash deposit for future landscaping of the Caltrans
right-of-way.
H. Signs
1. The signs indicated on the submitted plans are conceptual only and not a part of this
approval. Any signs proposed for this development shall comply with the Sign Ordinance and ---
shall require separate application and approval by the Planning Division prior to installation of
any signs.
SC-2-00
4
Project No. DR00-08
Completion Date
I. Environmental
1. Mitigation measures are required for the project. The applicant is responsible for the cost of
implementing said measures, including monitoring and reporting. Applicant shall be required ---
to post cash, letter of credit, or other forms of guarantee acceptable to the City Planner in the
amount of$719 or to the issuance of building permits, guaranteeing satisfactory performance
and completion of all mitigation measures. These funds may be used by the City to retain
consultants and/or pay for City staff time to monitor and report on the mitigation measures.
Failure to complete all actions required by the approved environmental documents shall be
considered grounds for forfeit.
J. Other Agencies
1. The applicant shall contact the U.S. Postal Service to determine the appropriate type and I
location of mail boxes. Multi-family residential developments shall provide a solid overhead ---
structure for mail boxes with adequate lighting. The final location of the mail boxes and the
design of the overhead structure shall be subject to City Planner review and approval prior to
the issuance of building permits.
APPLICANT SHALL CONTACT THE BUILDING AND SAFETY DIVISION, (909) 477-2710, FOR
COMPLIANCE WITH THE FOLLOWING CONDITIONS:
K. General Requirements
1. Submit four complete sets of plans including the following:
a. Site/Plot Plan;
b. Foundation Plan;
C. Floor Plan;
d. Ceiling and Roof Framing Plan;
e. Electrical Plans (2 sets, detached) including the size of the main switch, number and
size of service entrance conductors, panel schedules, and single line diagrams;
f. Plumbing and Sewer Plans, including isometrics, underground diagrams, water and
waste diagram, sewer or septic system location, fixture units, gas piping, and heating
and air conditioning; and
g. Planning Division Project Number(i.e., TT#, CUP#, DR#, etc.)clearly identified on the
outside of all plans.
2. Submit two sets of structural calculations, energy conservation calculations, and a soils report.
Architect's/Engineer's stamp and "wet"signature are required prior to plan check submittal
3. Separate permits are required for fencing and/or walls. / f
4. Contractors must show proof of State and City licenses and Workers' Compensation
coverage to the City prior to permit issuance. ---
5. Business shall not open for operation prior to posting the Certificate of Occupancy issued by /
the Building and Safety Division. ---
L. Site Development
1. Plans shall be submitted for plan check and approved prior to construction. All plans shall be
marked with with the project file number (i.e., CUP 98-01). The applicant shall comply with the
latest adopted Uniform Building Code, Uniform Mechanical Code, Uniform Plumbing Code,
National Electric Code, Title 24 Accessibility requirements, and all other applicable codes,
ordinances, and regulations in effect at the time of permit application. Please contact the
SC-2-00
5
Project No. DR00-08
Completion Date
Building and Safety Division for availability of the Code Adoption Ordinance and applicable
handouts.
2. Prior to issuance of building permits for a new residential dwelling unit(s) or major addition to I
existing unit(s), the applicant shall pay development fees at the established rate. Such fees ---
may include, but are not limited to: City Beautification Fee, Park Fee, Drainage Fee,
Transportation Development Fee, Permit and Plan Checking Fees, and School Fees.
Applicant shall provide a copy of the school fees receipt to the Building and Safety Division
prior to permit issuance.
3. Street addresses shall be provided by the Building Official, after tract/parcel map recordation
and prior to issuance of building permits. ---
4. Construction activity shall not occur between the hours of 8:00 p.m. and 6:30 a.m. Monday
through Saturday,with no construction on Sunday or holidays. ---
5. Construct trash enclosure(s) per City Standard (available at the Planning Division's public
counter). ---
6. The following is required for side yard use for increase in allowable area:
a. Provide a reduced site plan (8 %"x 11")which indicates the non-buildable easement.
b. Recorded "Covenant and Agreement for the Maintenance of a Non-Buildable
Easement,"which is signed by the appropriate property owner(s).
C. Sample document is available from the Building and Safety Division.
M. New Structures
1. Provide smoke and heat venting in accordance with UBC Section 906.
N. Grading
1. Grading of the subject property shall be in accordance with the Uniform Building Code, City
Grading Standards, and accepted grading practices. The final grading plan shall be in ---
substantial conformance with the approved grading plan.
2. A soils report shall be prepared by a qualified engineer licensed by the State of California to f
perform such work. ---
3. A geological report shall be prepared by a qualified engineer or geologist and submitted at the
time of application for grading plan check. ---
4. The final grading plans shall be completed and approved prior to issuance of building permits.
5. A separate grading plan check submittal is required for all new construction projects and for
existing buildings where improvements being proposed will generate 50 cubic yards or more ---
of combined cut and fill. The Grading Plan shall be prepared, stamped, and signed by a
California Registered Civil Engineer.
APPLICANT SHALL CONTACT THE ENGINEERING DIVISION, (909) 477-2740, FOR COMPLIANCE
WITH THE FOLLOWING CONDITIONS:
O. Street Improvements
1. Construct the following perimeter street improvements including, but not limited to:
SC—2-00
6
Project No. DR00-08
Completion Date
Curb& A.C. Side- Drive Street Street Comm Median Bike Other
Street Name Gutter Pvmt walk Appr. Lights Trees Trail Island Trail
Santa Anita X X X X
Avenue
4th Street X X X d
Notes: (a) Median island includes landscaping and irrigation on meter. (b) Pavement
reconstruction and overlays will be determined during plan check. (c) If so marked, sidewalk
shall be curvilinear per Standard 114. (d) If so marked, an in-lieu of construction fee shall be
provided for this item.
2. Improvement Plans and Construction:
a. Street improvement plans, including street trees, street lights, and intersection safety
lights on future signal poles, and traffic signal plans shall be prepared by a registered ---
Civil Engineer and shall be submitted to and approved by the City Engineer. Security
shall be posted and an agreement executed to the satisfaction of the City Engineer
and the City Attorney guaranteeing completion of the public and/or private street
improvements, prior to final map approval or the issuance of building permits,
whichever occurs first.
b. Prior to any work being performed in public right-of-way, fees shall be paid and a
construction permit shall be obtained from the City Engineer's Office in addition to any ---
other permits required.
C. Pavement striping, marking, traffic signing, street name signing, traffic signal conduit,
and interconnect conduit shall be installed to the satisfaction of the City Engineer. ---
d. Signal conduit with pull boxes shall be installed with any new construction or
reconstruction project along major or secondary streets and at intersections for future ---
traffic signals and interconnect wiring. Pull boxes shall be placed on both sides of the
street at 3 feet outside of BCR, ECR, or any other locations approved by the City
Engineer.
Notes:
(1) Pull boxes shall be No. 6 at intersections and No. 5 along streets, a maximum
of 200 feet apart, unless otherwise specified by the City Engineer.
(2) Conduit shall be 3-inch (at intersections) or 2-inch (along streets) galvanized
steel with pull rope or as specified.
e. Handicapped access ramps shall be installed on all corners of intersections per City
Standards or as directed by the City Engineer. ---
f. Existing City roads requiring construction shall remain open to traffic at all times with
adequate detours during construction. Street or lane closure permits are required. A ---
cash deposit shall be provided to cover the cost of grading and paving, which shall be
refunded upon completion of the construction to the satisfaction of the City Engineer.
g. Concentrated drainage flows shall not cross sidewalks. Under sidewalk drains shall
be installed to City Standards, except for single family residential lots. ---
h. Street names shall be approved by the City Planner prior to submittal for first plan
check. ———
SC–2-00
7
Project No. DR00-08
Completion Date
3. Street improvement plans per City Standards for all private streets shall be provided for review
and approval by the City Engineer. Prior to any work being performed on the private streets, ---
fees shall be paid and construction permits shall be obtained from the City Engineer's Office in
addition to any other permits required.
4. Street trees, a minimum of 15-gallon size or larger, shall be installed per City Standards in
accordance with the City's street tree program. ---
5. Intersection line of sight designs shall be reviewed by the City Engineer for conformance with
adopted policy. On collector or larger streets, lines of sight shall be plotted for all project ---
intersections, including driveways. Local residential street intersections and commercial or
industrial driveways may have lines of sight plotted as required.
P. Public Maintenance Areas
1. A signed consent and waiver form to join and/or form the appropriate Landscape and Lighting
Districts shall be filed with the City Engineer prior to final map approval or issuance of building ---
permits whichever occurs first. Formation costs shall be borne by the developer.
Q. Drainage and flood Control
1. A permit from the San Bernardino County Flood Control District is required for work within its / /
right-of-way. ———
R. Utilities
1. Water and sewer plans shall be designed and constructed to meet the requirements of the
Cucamonga County Water District (CCWD), Rancho Cucamonga Fire Protection District, and ---
the Environmental Health Department of the County of San Bernardino. A letter of
compliance from the CCWD is required prior to final map approval or issuance of permits,
whichever occurs first. Such letter must have been issued by the water district within 90 days
prior to final map approval in the case of subdivision or prior to the issuance of permits in the
case of all other residential projects.
S. General Requirements and Approvals
1. A non-refundable deposit shall be paid to the City, covering the estimated operating costs for
all new street lights for the first six months of operation, prior to final map approval or prior to ---
building permit issuance if no map is involved.
APPLICANT SHALL CONTACT THE FIRE PREVENTION/NEW CONSTRUCTION UNIT,
(909)477-2730, FOR COMPLIANCE WITH THE FOLLOWING CONDITIONS:
T. General Fire Protection Conditions
1. Mello Roos Community Facilities District requirements shall apply to this project. The
developer shall commence, participate in, and consummate or cause to be commenced, ---
participated in, or consummated, a Mello-Roos Community Facilities District (CFD) for the
Rancho Cucamonga Fire Protection District to finance construction and/or maintenance of a
fire station to serve the development. The CFD shall be formed by the District and the
developer by the time recordation of the final map occurs.
2. Fire flow requirement shall be 6.000 gallons per minute, Per '97 UFC Appendix III-A, 5, (b)
(Table).
-OR-
a. A fire flow shall be conducted by the builder/developer and witnessed by fire
department personnel prior to water plan approval.
SC-2-00
8
Project No. DR00-08
Completion Date
b. For the purpose of final acceptance, an additional fire flow test of the on-site
hydrants shall be conducted by the builder/developer and witnessed by fire
department personnel after construction and prior to occupancy.
3. Fire hydrants are required. All required public or on-site fire hydrants shall be installed,
flushed, and operable prior to delivery of any combustible building materials on site (i.e., ---
lumber, roofing materials, etc.). Hydrants flushing shall be witnessed by fire department
personnel.
4. Existing fire hydrant locations shall be provided prior to water plan approval. Required
hydrants, if any, will be determined by the Fire District. Fire District standards require a 6-inch ---
riser with a 4-inch and a 2-1/2-inch outlet. Substandard hydrants shall be upgraded to meet
this standard. Contact the Fire Safety Division for specifications on approved brands and
model numbers.
5. Hydrant reflective markers (blue dots) shall be required for all hydrants and installed prior to
final inspection.
6. An automatic fire extinguishing system(s)will be required as noted below:
X Per Rancho Cucamonga Fire Protection District Ordinance 15. I_I_
Note: Special sprinkler densities are required for such hazardous operations as
woodworking, plastics manufacturing, spray painting, flammable liquids storage, high piled
stock, etc. Contact the Fire Safety Division to determine if the sprinkler system is adequate
for proposed operations.
7. A fire alarm system(s)shall be required as noted below:
X Per Rancho Cucamonga Fire Protection District Ordinance 15. /_/_
X California Code Regulations Title 24. /_/_
8. Roadways within project shall comply with the Fire District's fire lane standards, as noted:
x All roadways per Rancho Cucamonga Fire Protection District Ordinance 32. I_I_
9. Fire department access shall be amended to facilitate emergency apparatus.
10. All trees and shrubs planted in any median shall be kept trimmed to a minimum of 14 feet,
6 inches from the ground up, so as not to impede fire apparatus. ---
11. A Knox rapid entry key vault shall be installed prior to final inspection. Proof of purchase shall
be submitted prior to final building plan approval. Contact the Fire Safety Division for specific ---
details and ordering information.
12. Gated/restricted entry(s) require installation of a Knox rapid entry key system. Contact the
Fire Safety Division for specific details and ordering information. ---
13. A tenant use letter shall be submitted prior to final building plan approval. Contact the Fire
Safety Division for the proper form letter. ---
14. Fire District fee(s), plus a $1 per "plan page" microfilm fee will be due to the Rancho
Cucamonga Fire Protection District as follows: ---
X $132 for CCWD Water Plan review/underground water supply.
X $677 for New Commercial and Industrial Development(per new building).**
**Note: Separate plan check fees for Tenant Improvement work, fire protection systems
(sprinklers, hood systems, alarms, etc.) and/or any consultant reviews will be assessed upon
submittal of plans.
SC—2-00
9
Project No. DR00-08
Completion Date
15. Plans shall be submitted and approved prior to construction in accordance with 1997 UBC, I I
UFC, UPC, UMC, and RCFD Standards 32 and 15 and 1996 NEC. ---
U. Special Permits
1. Special permits may be required, depending on intended use, as noted below:
a. General Use Permit shall be required for any activity or operation not specifically I_I_
described below, which in the judgement of the Fire Chief is likely to produce conditions
hazardous to life or property.
b. High piled combustible stock. I_I_
NOTE: SEPARATE PLAN CHECK FEES FOR TENANT IMPROVEMENTS, FIRE PROTECTION
SYSTEMS (SPRINKLERS, HOOD SYSTEMS, ALARMS, ETC.), AND/OR ANY
CONSULTANT REVIEWS WILL BE ASSESSED UPON SUBMITTAL OF PLANS.
NOTE: A SEPARATE GRADING PLAN CHECK SUBMITTAL IS REQUIRED FOR ALL NEW
CONSTRUCTION PROJECTS AND FOR EXISTING BUILDINGS WHERE
IMPROVEMENTS BEING PROPOSED WILL GENERATE 50 CUBIC YARDS OR MORE
OF COMBINED CUT AND FILL. THE GRADING PLAN SHALL BE PREPARED,
STAMPED AND SIGNED BY A CALIFORNIA REGISTERED CIVIL ENGINEER.
APPLICANT SHALL CONTACT THE POLICE DEPARTMENT, (909) 477-2800, FOR COMPLIANCE
WITH THE FOLLOWING CONDITIONS:
V. Security Lighting
1. All parking, common, and storage areas shall have minimum maintained 1-foot candle power. I I
These areas should be lighted from sunset to sunrise and on photo sensored cell. ---
2. All buildings shall have minimal security lighting to eliminate dark areas around the buildings, I I
with direct lighting to be provided by all entryways. Lighting shall be consistent around the ---
entire development.
3. Lighting in exterior areas shall be in vandal-resistant fixtures. I /
W. Security Hardware
1. One-inch single cylinder dead bolts shall be installed on all entrance doors. If windows are I /
within 40 inches of any locking device, tempered glass or a double cylinder dead bolt shall be ---
used.
2. All garage or rolling doors shall have slide bolts or some type of secondary locking devices. I I
X. Security Fencing
1. All businesses or residential communities with security fencing and gates will provide the I I
police with a keypad access and a unique code. The initial code is to be submitted to the ---
Police Crime Prevention Unit along with plans. If this code is changed due to a change in
personnel or for any other reason, the new code must be supplied to the Police via the 24-hour
dispatch center at (909) 941-1488 or by contacting the Crime Prevention Unit at (909) 477-
2800 extension 2474 or 2475.
Y. Building Numbering
1. Numbers and the backgrounds shall be of contrasting color and shall be reflective for I I
nighttime visibility. ---
2. Developer shall paint roof top numbers on one or more roofs of this development. They shall I /
be a minimum of three feet in length and two feet in width and of contrasting color to ---
SC-2-00
10
Project No. DR00-08
Completion Date
background. The stencils for this purpose are on loan at the Rancho Cucamonga Police
Department.
Z. Alam Systems
1. Install a burglar alarm system and a panic alarm if needed. Instructing management and
employees on the operation of the alarm system will reduce the amount of false alarms and in ---
turn save dollars and lives.
2. Alarm companies shall be provided with the 24-hour Sheriffs dispatch number:
(909)941-1488. f
SC-2-00
11