Loading...
HomeMy WebLinkAbout05-214 - Resolutions RESOLUTION NO. 05-214 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, APPROVING THE RENEWAL OF AGREEMENTS WITH KRAZAN & ASSOCIATES, INC., NINYO & MOORE, AND RMA GROUP, FOR ANNUAL SOILS AND MATERIALS TESTING SERVICES FOR PROPOSED CAPITAL IMPROVEMENT PROJECTS FOR FY 2005/2006, AND APPROVAL OF AMENDMENTS TO SUCH CONTRACTS TO INCLUDE AN UPDATED AND REVISED FEE SCHEDULE ("EXHIBIT C") REFLECTING REASONABLE, ANNUAL COST-OF-LIVING EXPENSES WHEREAS, Krazan & Associates, Inc., Ninyo & Moore, and RMA Group, Contract No. 04-098, 04-099 and 04-100, respectively, were approved by City Council on July 21, 2004; and WHEREAS, the contracts may be extended for additional one-year periods, up to an additional two years, with mutual agreement of both parties; and WHEREAS, Krazan & Associates, Inc., Ninyo & Moore, and RMA Group, have requested renewal of their contracts; and WHEREAS, Ninyo & Moore, have requested an amendment to their contract(s) to include their current fee schedule, to increase the hourly rate for supported fees, to reflect a reasonable cost-of-living increase; and WHEREAS, said request is hereby approved and by this resolution the contract(s) are hereby amended to include the current schedule of fees, to be labeled Exhibit "C within the contract(s), replacing the existing Exhibit "C". NOW, THEREFORE, the City Council of the City of Rancho Cucamonga, California, hereby resolves that said contracts are hereby renewed and amended to include the current fee schedule, and the Mayor is authorized to sign this resolution. Please see the!blowing page for formal adoption,certification and signatures Resolution No. 05-214 Page 2 of 29 PASSED, APPROVED, AND ADOPTED this 6`h day of July 2005. AYES: Alexander, Gutierrez, Michael, Spagnolo, Williams NOES: None ABSENT: None ABSTAINED: None t William J. A xander, May r ATTEST: e ra J. Ad CMC, City Clerk I, DEBRA J. ADAMS, CITY CLERK of the City of Rancho Cucamonga, California, do hereby certify that the foregoing Resolution was duly passed, approved and adopted by the City Council of the City of Rancho Cucamonga, California, at a Regular Meeting of said City Council held on the 6`h day of July 2005. Executed this 7`h day of July 2005, at Rancho Cucamonga, California. 4 Debra J. A CMC,"City Clerk Resolution No. 05-214 Page 3 of 29 HOURLY CHARGES FOR PERSONNEL SCHEDULE OF FEES Principal Engineer/Geologist/Environmental Scientist....................................... Senior Engineer/Geologist/Environmental Scientist............... ""..... """"""'" H SenierProjeclEngineer/GeologisVEnvironmental Scientist............................................................................. Project Engineer/GeologistlEn Aronmental Scientist......................................................... Senior Staff Engineer/GeologisVEnvironmental Scientist................................................................................. Concrete Coring Technician and Equipment........... ...................................... ................................................. Staff Engineer/Geologist/Environmental Scientist. GISAnalyst........................ ........................................ ............................................................................................._............................... Field Operations Manager........................... . ... Nondestructive Examination Technician,UT,MT,LP........................................................................................... $ 80 Pull Test Technician and Equipment................................................. ..................................................................... S 80 Supervisory Technician.......................................... ................................................................................................ S 74 Senior al ld/La ator/Cry Technician................................................................................................................ Technical lifustory Technician Operator......................................................................................................... ........ $ 69 Field/Laboratory Technician..................................................... ................ $ 69 .............................................................................. S 64 I Concrete Technician................................................................ Concrete/Asphalt Batch Plant Inspector.................................................................................................................;.... $ 64 SSpecial Inspector.Reinforced Concrete................................................................................................................. $ 64 pecial Inspector,Pre-stressed Concrete........................................................ Special Inspector,Reinforced Mason ......•-.--•-...... $ 64 Masonry.................................................................................................................. $ 64 Special Inspector,Structural Steel............................................................................... Special Inspector,Welding,AWS......................................................... .......................................... $ 64 Special Inspector,Fireproofing """"""" "'•------.-.-.•.---- - $ 64 P P P ���� g...orat.........ssistant.................................. Geotechnical/Environmental/Laboratory Assistant................ ""..... "'"""' $ 64 Information Specialist.................................................... ................................................................................ S 53 Data Processin ,Technical Editin ,or Re roduction.........................:......................................................._......... $ 44 OTHERCHARGES EVeh ' itness Testimony...................... ... ..............................................- $ 300 Mr .... .................................................. Preparation of Standard Test Specimens............................................ .. $ 64 /hr eterUsage ..........................�...... ............................................ . ............................................................. .......................... $ 32 /hr mission Kits.................................................. ............_. ...................................................................................... $ 30 /kit ocator(Pachometer)...................... .................................................................... $ fo 'hr Density Gauge Usage.............................................. ......................................................................... $ 9 Rv hicle Usage........................................................................................................................................ $ 6 Rtrroject Expenses..................testin , eo h sical a ui ment,and otherspecial equipment provided upon request. Cost plus 15 NOTES(Field Services) For field and laboratory technicians and special inspectors, regular hourly rates are charged during normal weekday construction hours.Overtime rates at 1.5 times Bre regular rates will be charged for work performed outside normal con- struction hours and all day on Saturdays and Sundays. Rates at twice the regularrates will be charged for all work in excess of 12 hours in one day or on holidays.Lead time for any requested service is 24 hours.Field Technician rates are based on a 2-hour minimum.Special inspection rates are based on a 4-hour minimum for the first 4 hours and an 8- hour minimum for hours exceeding 4 hours.Feld personnel are charged portal to portal. INVOICES Invoices will be submitted monthly and are due upon receipt.A service charge of 1.0 Percent per month may be charged on accounts not paid within 30 days. assssoom u am�..a a,x ��/1�/O�/�DOCe Resolution No. 05-214 Page 4 of 29 SCHEDULE OF FEESIT HOURLY CHARGES FORPERSONNEL Principal Engineer/GeologisttEnviro amental Scientist..........................._. ............................................ $ 135 ................. Senior Engineer/GeologisVEnvironmental Scientist........................... ................................................................. a 122 Senior Project Engineer/GeologisVEnvironmental Scientlst..............:................................................................... $ 122 Project Engineer/GeologistlEnvironmental Scientist.......................................................... ....................... $ 109 .............. Senior Staff Engineer/Geologist/Environmental Scientist......................... .................................... $ 98 Staff Engineer/GeologisVEnvimnmental Scientist.................................................................................................. $ 86 IS/GIS Specialist................................................................ ..................................................................................... $ 86 Field Operations Manager................................................... ................... $ 68 SupervisoryTechnician*raiatio..........nici.................................................................................................................. $ 68 SendesW Field/Laboratory Examination Technician,UT,MT,LP*..........................._. ...................... $ 75 ....................................... Senior Foratory Technician* Technician'................................... FieldlLaboretory Technician•................................................................................................................ .................. $ 57 ACI Concrete Technician•......................................................................_............. ................................................. $ 57 . Concrete/Asphalt Batch Plant Inspector•................................................_............................................................. $ 57 Special Inspector(Concrete,Masonry,Steel,Welding,and Fireproofing)*................................................._. $ 57 Technical Illustrator/CAO Operator.................. ""' .ant................................._............................................................. $ 57 Geotechnical/Enialist ntaVlaboratory Assistant............... InformationSpecialist.............................................................................._...................................................._....... $ 42 Data Processing,Technical Editin ,or Reproduction........... ...................................... $ 36 OTHER CHARGES PIDExpertWitness Testimony......................................................................_.................................................... $ 250/hr /FID Usage........................................................................................._.................................................... $ 120/day Coring Machine Usage(includes technician)............................... ................................................... $ 100/hr .........._. Anchor Auger test equipment(includes technician)...'* echnician)....................................................................................... $ 89/hr Hand Auger Equipment........................................... ........................... $ 55/day Inclinometer Usage................................................... ........... $ 20/hr Vapor Emission Kits.............................. $ 30/kit Level D Personal Protective Equipment er erson per da (P P P y).................................................................... $ 25/p/d Rebar Locator(Pachometer)-.................................................................._.................................................... $ 22/hr Nuclear Density Gauge Usage........................ ........... $ No charge FieldVehicle Usageses.........................................................................._......................................._............ $ 6/hr Direct Project Expenses................................... Cost plus 15% Laboratory testing, eo h sical a ui ment,and otherspecial equipment provided upon request. NOTES(Field Services) For field and laboratory technicians and special inspectors, regular hourly rates are charged during normal weekday construction hours. Overtime rates at 1.5 times the regular rates will to charged for work performed outside normal construction hours and all day onSaturdays and Sundays.Rates at twice the regular rates will be charged for all work in excess of 12 hours in one day or on holidays.Lead time for any requested service is 24 hours.Special inspection rates are based on a 4-hour minimum for the first 4 hours and an 8-hour minimum for hours exceeding 4 hours. Feld Technicians are charged Portal to portal. 'Indicates rates that are based on Prevailing Wage Determination made by the Slate of Califomia,Director of Industrial Relations on a semiannual basis and are subject to their revision. INVOICES Invoices will be submitted monthly and are due upon receipt.A service charge of 1.0 percent per month may be charged on accounts not paid within 30 days. P-1206.dtt a /T! 4ro-*uurP- Resolution No. 05-214 Page 5 of 29 City of Rancho Cucamonga 5oi/s and Matena/s Testing-Annual Services 3une 1, 2004 SCHEDULE OF FEES 2003 1� XM9iT C Technician el Description Rate/Cost Soil Technician $58.00 -- Senior Soil Technician $60.00 no Soil Technician-Retesting $58.00 Public Works Inspector $62.00 Public Works Technician $60.00 Public Works Inspector-Asphalt Paving $60.00 Public Works Inspector-Asphalt Plant $58.00 Public Work Inspector-Concrete Paving $60.00 Public Works Inspector-Concrete Plant $58.00 Public Works Inspector-Resident Inspection $85.00 Traffic Control Personnel $55.00 ch Laboratory Technician-Field Lab $55.00 Laboratory Technician Batch Preparation $55.00 Special Inspector-Reinforced Concrete(ICBA) $62.00 >rk Special Inspector-Pre-Stressed Concrete(ICBG) $62.00 Special Inspector-Concrete Batch Plant $62.00 so Concrete Technician(ACf) $58.00 Pick-up&Delivery of Test Specimens $45.00 ID Reinforcing or Structural Steel $58.00 Special Inspector Fire Proofing(ICBG) $62.00 Special Inspector Epoxy Bolting $62.00 Special Inspector Roofing/Nailing $62.00 Special Inspector Masonry(ICBG) $62.00 Special Inspector-Masonry(DSA) $65.00 Special Inspector-Grout Batch Plant $60.00 Special Inspector-Field Welding(AWS CWI) $62.00 Special Inspector-Shop Welding(AWS C W I) $62.00 Special Inspector-Structural Steel(ICBG) $62.00 Special Inspector-High Strength Bolting(ICBG) 562.00 Special Inspector-Timber $65.00 a RM\A Croup Nopasa/and S7trhment o/Qtv/ifimtlons 17 Resolution No. 05-214 Page 6 of 29 City of Rancho Cucamonga Soils and Materials Testing-Annual services June 1, 2004 Lab Aggregates Description Rate/Cost Abrasion by Los Angeles Rattler $225.00 Cleanness Value-Fine or Coarse $125.00 Deleterious Substance Determination $100.00 Dry Rodded Unit Weight $85.00 Durability Index-Fine&Coarse $225.00 Durability Test-Coarse $150.00 Durability Test-Fine $100.00 Fineness Modulus $80.00 Flat and Elongated Pieces-(per size fraction) $125.00 Fractured Faces-(per size fraction) $35.00 Light Weight Panicles $200.00 Moisture Content $20.00 Organic Impurities $65.00 Percent Clay in Sands by Hydrometer $90.00 Percentage Gushed Particles $125.00 Potential Reactivity-Chemical Method $350.00 Sand Equivalent $85.00 Sieve Analysis-Fine&Coarse Aggregates $110.00 Sieve Analysis-Fine Aggregates(passing No.4) $95.00 Sieve Analysis-Coarse Aggregates(Retained on No 4) $65.00 Soundness be Sodium Sulfate-(Coarse Series) $255.00 Soundness by Sodium Sulfate(Fine Series) $330.00 Specific Gravity& Absorption of Coarse Aggregate $30.00 Apparent Specific Gravity of Fine Aggregate $40.00 Specific Gravity&Absorption of Fine Aggregate $40.00 Fine Ageregatc Anzularity(T304) $65.00 HnPosa/and AbtementofQualifiotions ty Resolution No. 05-214 Page 7 of 29 City of Rancho Cucamonga Soils and Materials Testing-Annual Services lune 1 2004 Lab Asphalt Description Rate/Cost Film Stripping $95.00 Kc Factor $65.00 Kf Factor $85.00 Moisture Vapor Susceptibility $200.00 Swell Potential(CAL 305) $165.00 Bulk Specific Gravity Per Specimen(ASTM Saturated Surface Dry) $40.00 Bulk Specific Gravity(ASTM Saturated Surface Dry Cores) $40.00 Bulk Specific Gravity Per Specimen(ASTM Parafilm Coated) $45.00 Bulk Specific Gravity(ASTM Patafihn Coated Cores) $45.00 Bulk Specific Gravity(CTM 308 Method A) $45.00 Bulk Specific Gravity(CTM 308 Method A Cores) $45.00 Bulk Specific Gravity(CTM 308 Method C) $40,00 Bulk Specific Gravity(CTM 308 Method C Cores) $40.00 Field Test Maximum Density(CAL 375) $95.00. Lab Test Maximum Density(CAL 375) $195.00 Lab Test Maximum Density-Hveem Method $195.00 Lab Test Maximum Density-Marshall Method $195.00 Theoretical Maximum Specific Gravity-Rice $175.00 Marshall Stability and Flow-lab compacted - $280.00 Marshall Stability and Flow-field compacted $190.00 Hveem Stability(CTM 366) $195.00 Hveem Stability(ASTM DI 560) $195.00 Moisture Content of Mix(CAL,370) $25.00 Moisture Content of Mix(CAL 310) $185.00 Tensile Strength Ratio(AASHTO T283) $550.00 Surface Abrasion Test(CAL 360) $450.00 Extraction-Percent Asphalt by Ignition Oven $100.00 Extraction-Percent Asphalt by Ignition Oven-Calibration $250.00 Extraction-Percent Asphalt by Solvents(Vacuum) $125.00 Extraction-Percent Asphalt by Solvents(Centrifuge) $125.00 Gradation of Extracted Aggregate $110.00 Percent Voids(CAL 367) $125.00 Percent Residue by Evaporation(ASTM D244) $100.00 Emulsion Sieve Test(ASTM D244) $75.00 Wet Tract Abrasion(ASTM D3910) $100.00 t RbHA CFOUP Psvpa /and shrrementofquamcaamrs 20 Resolution No. 05-214 Page 8 of 29 City of Rancho Cucamonga Soils and Materials Testing-Annual Services lune 1, 2004 Lab Concrete Description Rate/Cost Mix Design Review-Calculation Only $175.00 Concrete Cylinder Cured and/or Compression Tested $18.00 Compression Test Cores-8"maximum diameter(including trimming $50.00 Insulating Concrete Cylinders-Compression Test $25.00 insulating Concrete Cylinders-Constant Weight $25.00 - Flexural Strength-Concrete Beams $85.00 Gunite Compression Tests $20.00 Shotcrete Compression Tests $20.00 Concrete Modulus of Elasticity - $150.00 Concrete Shrinkage Test(set of 3) $165.00 Cement Content of Hardened Concrete $1,100.00 Splitting Tensile Test $65.00 Unit Weight of Cylinders $45.00 Air Content CAL 504 $60.00 Ball Penetraction CAL 533 - $60.00 Slab Moisture Test $16.00 Side to Side Crush(CCTI T-108) $6.00 Water Retention of Liquid Curing Compound-CTM 534 $375.00 Length of Drilled Cores CTM 531 $30.00 Surface Abrasion of Concrete(CT 550) $400.00 Density of.Spray Applied Five Proofing $40.00 Proposal and Statement of qua/ificadons 21 Resolution No. 05-214 Page 9 of 29 City of Rancho Cucamonga Soils and Materials Testing-Annual Services lune 1,2004 Lab Masonry Description hate/Cost Block Compressive Strength Test(set of 3) $75.00 Block,as Received Moisture&Absorption(set of 3) $50.00 Block,Lineal Shrinkage ASTM C426(set of 3) $50.00 Block,Unit Weight and Dimensions(set of 3) $150.00 Block,Conformance to ASTM C90(set of 9) $300.00 Brick,Compression(set of 3) $45.00 Brick,as received Moisture&Absorption(set of 3) - $70.00 Brick,5 hr Boil $55.00 Brick,Modulus of Rupture $55.00 Mortar Compression Test(2"x 4"Cylinder) $25.00 Grout Compression Test(3"x 6"Prism) $25.00 Masonry Cores,Compression-8"max.diameter $35.00 Masonry Cores,Shear-8"max.diameter $45-00 Tensile Test-CMA Method $60.00 Masonry Assemblage Compressive Strength 8"Block $55.00 Masonry Assemblage Compressive Strength 12"Block $75.00 Masonry Assemblage Compressive Strength 16'Block $95-00 Trimming of Test Specimens $30.00 Cube Compression Test 2x2x2 $16.00 Roof Tile Conformance(set of 10) $275.00 Mortar Strength of PCC Sand-CTM 515 $800.00 R&IA Group RopnwrarMstahmentofQua/irnratiwls 22 Resolution No. 05-214 Page 10 of 29 Lab Steel Description Rate/Cost Tension&Bend-Rebar(No.8 or smaller) $50.00 Tension&Bend-Rebar(No. 11) $60.00 Tension&Bend-Rebar(No. 14) $80.00 Chemical Analysis $250.00 Tension-Rebar only $20.00 Bend-Rebar only $35.00 Tension Test-Structural Steel - $65.00 Bend Test-Structural Steel $35.00 Machine Coupons for Structural Steel Chemical Analysis $250.00 7RwIn Group ~po /andSbtement ofQua//fic tfo 23 Resolution No. 05-214 Page 11 of 29 City of Rancho Cucamonga Soils and Materials Testing-Annual SerwctL-s June 1 2004 Lab Soil Description Rate/Cost Atterberg Limits - $65.00 California Bearing Ratio $350.00 Consolidation(no time rate) $150.00 Consolidation(with time rates) $200.00 Direct Shear $95.00 Expansion Index(UBC Standard 29-2) 595.00 Falling Head Permeability of Soil $100.00 Collapse Potential $90.00 Hydrometer Analysis $80.00 Lab Density Determinations by Drive Tube $15.00 Lab Moisture Determinations $8.00 Matric Suction-Filter Paper Method $65.00 Maximum Density-Optimum Moisture(ASTM D 1557) $175.00 Calif Impact Max Density(CAL 216) $190.00 Percent Organic Materials $15.00 PH&Resistivity of Soils Saturated Paste $35.00 R-Value $225.00 Oversized Rock Correction $25.00 Sand Equivalent - $50.00 Check Point-Maximum Density Optimum Moisture(ASTM D1557) Sieve Analysis of Soils $110.00 Percent Finer Than No.200-Wash Only $25.00 Soluble Sulfate $45.00 Specific Gravity of Soils $75.00 Consolidation /Swell Potential $175.00 Unconfined Compression Test $90.00 ESP-Sodium Exchange Potential $45.00 Soil Cement(set of 3) $580.00 Shrinkage factor by Resin $120.00 Soil Cement Maximum Density-Optimum Moisture(ASTM D559) $140.00 Soil Cement Laboratory Specimen Preparation D559 - $35.00 Soil Cement Compression Test D 1633 $20.00 Chloride Content(CTM 422) $30.00 r RMA GFOW Proposaiand s&ne ntdgrv/inotlons 24 Resolution No. 05-214 Page 12 of 29 Office t Description Rate/Cost Administrative $30.00 _ Secretarial $30.00 Data Entry $25.00 Report Copies $5.00 Geotechnical Report Copies $25.00 Additional Report Copies per page 50.50 Mail Expenses $0.00 Principal Engineer-Office $145.00 Principal Engineer-Field $145.00 ` Principal Engineer-Consultation 1 $145.00 Principal Engineer-Job Conference $145.00 Principal Engineer-Expert Witness - $250.00 Principal Engineer-Court Appearance $300.00 Project Engineer-Office $105.00 Project Engineer-Field $105.00 Project Engineer-Consultation $105.00 Project Engineer-Job Conference $105.00 Staff Engineer-Office $85.00 Staff Engineer-Field $85.00 Drafting $50.00 Fault Search $100.00 Response Spectra $300.00 Plan Copies (per sheet) $2.00 Plan Copies oversized(per sheet) $5.00 Project Manager-Office $105.00 Project Manager-Field $105.00 Project Manager-Job Conference $105.00 RMA Group Yropowland Stan nenl ofQrraflAoarfom 25 Resolution No. 05-214 Page 13 of 29 Office (conL) Description Rate/Cost Principal Geologist-Office $125.00 Principal Geologist-Field $125.00 Principal Geologist-Consultation $125.00 Principal Geologist-Job Conference $125.00 Principal Geologist-Expert Witness $150.00 Principal Geologist-Court Appearance $250.00 Project Geologist-Office $95.00 Project Geologist-Field 595.00 Project Geologist-Consultation 595.00 Project Geologist-Job Conference $95.00 Staff Geologist-Office $70.00 Staff Geologist-Field 570.00 VRF MA CFMp Nvpasa/and SbtamentofQuaMwfims 26 Resolution No. 05-214 Page 14 of 29 KRAZAN & ASSOCIATES, INC. GENERAL FEE SCHEDULE (Prevailing wage) 2004 Krazan & Associates, Inc. 4221 Brickell Street Ontario, CA 91761 (909) 974-4400 Fax (909) 974-4022 Resolution No. 05-214 Page 15 of 29 KRAZAN « ASSOCIATES, INC. Schedule of Fees Table of Contents KEYMANAGEMENT STAFF............................................................................................................1 COMPANYPROFILE.......................................................................................................................2 TERMS OF PAYMENT AND CHARGES..............................................................................................3 GENERAL FEE SCHEDULE FOR PROFESSIONAL S,TECHNICAL SERVICES..........................................5 ENVIRONMENTALSERVICES...........................................................................................................6 GEOTECHNICALSERVICES.............................................................................................................7 Exploratory Drilling, Sampling, and Travel.....................................................................I.........7 LaboratoryTests......................................................................................................................7 CONSTRUCTION TESTING AND INSPECTION SEWICES .......................................................... ..........8 Concrete..................................................................................................................................9 Reinforcement......... 10 Aggregates ............................................................................................................................10 AsphalticConcrete ...-...........................................................................................................11 Masonryand ,Related Materials.............................................................................................12 Miscellaneous and Specialty Testing.....................................................................................13 Metals....... _...... ......_ ....__................._....._..............._..........._.........................._...............14 Resolution No. 05-214 Page 16 of 29 Ontario Fee Schedule Page I KRAZAN & ASSOCIATES, INC. Established 1982 Principals THOMAS P. KRAZAN, R.C.E., R.G.E............................................. President DEAN L.ALEXANDER, R.E.A., R.C.E., R.G.E. .......................Vice President BYRON "KIP"WILLIAMSON.............................................. Managing Partner KEY MANAGEMENT STAFF DARREN COLEMAN RICHARD OPP Testing & Inspection Division Manager Environmental Division Manager CLARENCE JIANG Geotechnical Division Manager KRAZAN& ASSOCIATES, INC. With Offices Serving the Western United Stales Resolution No. 05-214 Page 17 of 29 Ontario Fe:Schedule Page 2 COMPANY PROFILE Krazan & Associates is a professional consulting firm specializing in environmental studies, environmental chemical analysis, geotechnical engineering, laboratory testing, construction testing and inspection, and contract drilling services. Environmental studies are directed towards assessing and remediation petroleum, hydrocarbon, heavy metal, herbicide, and pesticide-related contamination in soils, groundwater, and air. Krazan & Associates services lending institutions, major oil companies, private industry, utility companies, and governmental agencies in their specific environmental needs. Environmental studies include soil and groundwater investigations, as well as complex sampling and monitoring programs. Geotechnical Engineering services include soils engineering and site selection. Site selection services provide evaluation of the regional geologic framework, analysis of the engineering properties of the on-site soils, determination of the slope stability, and assessment of the effects of shallow groundwater on development. Construction testing and inspection services provide quality control for new construction. Services include both field and laboratory functions utilizing certified inspectors. All personnel are in constant radio contact with our regional offices for immediate support and scheduling. Contract drilling is provided to other professional firms requiring state-of-the-art specialty dri!!ing and sampling services for both Geotechnical Engineering and Environmental studies. K.RAZAN& ASSOCIATES. INC. 0 ill,Offices Smming the 11 esic)n United States Resolution No. 05-214 Page 18 of 29 Ontario Fee Schedule Page 3 TERMS OF PAYMENT AND CHARGES Terms of Payment Invoices shall be deemed delinquent if not paid within 30 days of the invoice date and will be subject to a late payment charge of 1.5% per month as liquidated damages for additional credit and collection expenses incurred by Krazan & Associates, Inc. Charges rorr SIR oci` � Minimum Charges 2 `I KfU Hourly field services have a a'1iour minimum charge. Hourly office services have a one hour minimum charge. Regular Time Charges Regular time charges are Monday through Friday, between 7 a.m. to 3:30 p.m. Other arrangements available upon pre-approval. Time and One-Half Charges Time and one-half charges will be rendered on weekdays for services extending beyond regular time, 8-12 hours of total service that day. Saturday services are commonly available at time and one-half charges. Double Time Charges Services rendered on Holidays, Sunday, in excess of 8 hours on Saturday, or in excess of 12 hours on weekdays, will be charged at double the normal rate. Portal to Portal Charges A portal to portal charge per call applies to all inspection and field work. Miscellaneous and Subcontractor Charges Miscellaneous or unusual charges, such as parking, mailing, shipping, etc., and/or subcontractor charges, such as backhoe fees, will be charged to the client at cost plus 15%. KRAZAN& ASSOCIATES, INC. With Offices Sen,ing the Western United States Resolution No. 05-214 Page 19 of 29 Ontario Fee Schedule - Pa_oe 4 Subsistence On remote jobs or projects, subsistence, when not furnished, will be an additional charge. Cancellation Late cancellation may be subject to reasonable charges if personnel cannot be appropriately reassigned or if remobilization is required. Insurance Krazan & Associates, Inc. carries in excess of all insurance required by law. Additional costs of extra insurance certificates, co-insurance endorsements or additional insurance will be charged to the client at cost plus 15%. Supervisor Charges Supervisor charges are above and beyond unit rates quoted. KRAZAN S ASSOCIATES,INC. tT ah Offices Seri'ing the IPcstei n United States I Resolution No. 05-214 Page 20 of 29 Ontario Fee Schedule Page 5 GENERAL FEE SCHEDULE FOR PROFESSIONAL & TECHNICAL SERVICES Professional PrincipalEngineer..................................................................................................... $175.00/'rhr. Registered Senior Engineer ........................................................................................ 135,00/hr. RegisteredGeologist................................................................................................... 125.00/hr. Certified Asbestos Inspector/Manager ........................................................................ 110.00/hr. Project Engineer/Manager........................................................................................... 110.001hr. ProjectGeologist................................................................................................ ........ 110.001hr. Chemist....................................................................................................................... 110.00/hr. EnvironmentalSpecialist............................................................................................. 110.00/hr. Project Administration & Analysis................................................................................ 110.00/hr. Field Engineer/Inspector......................................................................................_....... 105.00/hr. FieldGeologist............................................................................................................. 105.00/tar. Technical EngineeringTechnician............................................................................................... $75.00/hr. EnvironmentalTechnician .,........................................................................................... 75.00/hr. AutoCad/Engineering Technician.................................................................................. 75.00/lar. Support Clerical..................................................................:..................................................$45.00/RepoN Subsistence.................................................................................................................85.00/days. KRAZAN& ASSOCIATES, INC. With OJ7tces Serving the Western Uneied States Resolution No. 05-214 Page 21 of 29 Ontario Fee Schedule Page 6 ENVIRONMENTAL SERVICES Asbestos Consultation and Analysis Asbestos Project Manager........................................................................................ $110.00/hr. AsbestosTechnician ..................................................................................................... 85.00/hr. Analyze for Asbestos per EPA (PLM) Procedures .................................................35.00/sample Consult for Asbestos Abatement...................................................................................By Quote Wells Groundwater Monitoring Well Installations....................................................................By Quote GroundwaterExtraction Well.........................................................................................By Quote Vapor Monitoring Well Installation.................................................................................By Quote VaporPoint Installation..................................................................................................By Quote VaporExtraction Well....................................................................................................By Quote Environmental Drilling, Exploration, Travel Light Duty Drilling (continuous flight auger by Mobile Drill Minuteman or Giddings).................................................................................. $155.00/hr. Drilling (continuous flight, hollow stem auger or rotary wash, w/2 operators) CME 45 Drill Rig (truck mounted)..................................................................... 175.00/hr. CME 55 Drill Rig (truck mounted) ..................................................................... 185.00/hr. Mobile Drill B-61/HDX Drill Rig (truck mounted) ............................................... 185.00/hr. Mileage (support vehicles)..................................................................................00.50/mi. Mileage (drill rig) .................................................. ..00.80/mi. ............................................. Other Equipment & Services Rates Sample Container Charge: Stainless Steel Tube (including caps, Teflon/aluminum foil, labels, etc.) .........$10.00/ea. 6" Brass Sleeves (including caps, Teflon/aluminum foil, labels, etc.) ...................5.00/ea. Personal Protective Equipment.....................................................................................By Quote Hydropunch II Screen/Points/Seals...............................................................................By Quote Moss Wire Line Continuous Core Soil Sampler.........................................................300.00/day Steam Cleaner or Pressure Washer...........................................................................125.00/day MagneticCable Locator.................................................................................................By Quote Photoionization Detector............................................................................................100.00/day Hermit 2000 Datalogger Aquifer Testing Equipment.....................................................By Quote Magnetometer ...............................................................................................................By Quote Electromaanerometer.. .................................................................................................By Quote Clean-up/Remedial Equipment......................................................................................By Quote Chemical rialysis of Soil and Groundwater Samples...................................................By Quote KRAZAN Sc ASSOCIATES, INC. With Offices Sen ing the Western United.Stales Resolution No. 05-214 Page 22 of 29 Ontario Fee Schedule Page 7 GEOTECHNICAL SERVICES Soils - Foundations - Geology Exploratory Drilling, Sampling, and Travel Light Duty Drilling (continuous flight auger by Mobile Drill Minuteman or Giddings, operator only)........................................................... $155.00/hr. Drilling (continuous flight, hollow stem auger or rotary wash, w/2 operators) CME 45 Drill Rig (truck mounted) ..................................................................... 175.00/hr. CME 55 Drill Rig (truck mounted) ..................................................................... 185.00/hr. Mobile Drill B-61/HDX Drill Rig (truck mounted) ............................................... 185.00/hr. Mileage (support vehicles)..................................................................................00.50/mi. Mileage (drill rig) .................................................................................................00.80/mi. Laboratory Tests Sieve Analysis, Coarse, ASTM C 136 .......................................................................$160.00/ea. Fine (including wash), ASTM C 137, C 171.................................................................95.00/ea. Hydrometer Analysis, ASTM D 422...............................................................................90.00/ea. Specific Gravity, Bulk SSD, Coarse, ASTM C 127, C 117...........................................115.00/ea. Fine, ASTM C 128.....................................................................................................195.00/ea. Atterberg Limits, ASTM D 4318...................................................................................160.00/ea. Moisture-Density Relations of Soils, ASTM D 698, D 1557, State 216 ........................175.00/ea. Consolidation Test ASTM D 2435...............................................................................225.00/ea. Triaxial Compression Test, ASTM D 2850 Unconsolidated, Undrained ..............................................................................235.00/ea. Consolidated, Undrained ..................................................................................325.00/ea. Consolidated, Undrained with Pore Pressure...................................................500.00/ea. Unconfined Compression Test, ASTM D 2166..............................................................85.00/ea. Expansion Index, UBC-29-2........................................................................................195.00tea. Direct Shear Test, ASTM D 3080 Consolidated, Drained, 3 points........................................................................215.00/ea. Permeability, Constant Falling Head, ASTM 2434 ......................................................225.00/ea. Permeability, Falling Head/Flexible Wall (ASTM D5084), 1.4"-4.. ...............................325.00'ea. Permeability, Falling Head/Flexible Wall (ASTM D5084), 6" ......................................450.00 ea. Permeability, Falling Head/Flexible Wall (ASTM D5084), 12" ....................................750.00 ea. Permeability Sample Remold ........................................................................................40.00 ea. SulfateContent..............................................................................................................40.00/ea. "R" (Resistance) Value, Cal. 301, ASTIM D 2844........................................................240.00/ea. "R" (Resistance) Value, Lime Treated or Requiring Recombining................................280.00/ea. California Bearing Ratio, ASTM D 1883......................................................................650.00/ea. Plate Bearing Test, ASTM D 1195, D 1196...................................................................By Quote IndexTests not Listed ...................................................................................................By Quote KRAZAN& ASSOCIATES,INC. !Pith Offices Senting the Western United Stater Resolution No. 05-214 Page 23 of 29 Ontario Fee Schedule Page 8 CONSTRUCTION TESTING AND INSPECTION SERVICES Administrative EngineeringReview................................................................................................... $110.00/hr. .. . . . ...... ....... .. ................. . ...... Report Preparation ........................... .................45.00/report . . . . . . . .. . .. Job Site Inspection SoilCompaction .......................................................................................................... $60.00/hr. Masonry, Concrete, Gunite, Epoxy................................................................................ 60.00/hr. Structural Steel, Welding, Bolt.Torque ..... .. .. ........ ....................... ................................. 60.00/hr. . Pile Driving, Soldier Beams, Shoring, Caissons.......................................................... 110.00/hr. Build-up Roofing. Fire Proofing ..................................................................................... 60.00/hr. Plant Inspection Structural Steel Fabrication ......................................................................................... $60.00/hr. ConcreteBatch Plant..................................................................................................... 60.00/hr. Pipe Plant (Reinforced Concrete, Clay, etc).................................................................. 60.00/hr. Glue-Laminated Fabrication (Local) .............................................................................. 60.00/hr. AsphaltBatch Plant............................................................................. ....................... 60.00/hr. Nondestructive Examination Ultrasonic, Magnetic Particle, Dye Penetrant................................................................By Quote Radiographic.................................................................................................................By Quote Pachometer.............................................................. By Quote ..................................................... Schmidt Hammer........................................ ......... ................ ...By Quote ....................................... Coring Technician and Equipment............................................................. . ..... $130.00/hr. BitCharge.... ......................................................................... ......... ............ ........................................7.00/inch KRAZAN & ASSOCIATES. INC. if ill?Offices Sen ing the Western G'rnited States Resolution No. 05-214 Page 24 of 29 Ontario Fee Schedule Page 9 Concrete Cylinder, Beams & Cores Compression Test, 6"x 12" Cylinders, Including Hold,ASTM C 39 (set of 4)...........$100.00/set Compression Test, Cores, ASTM C 42 (Does Not Include Special Prep. time) .............50.00/ea. Core Cutting (In Laboratory)..........................................................................................40.00/ea. Flexure Test, 6" x 6" Beams, ASTM C 78......................................................................95.00/ea. Splitting Tensile, 6" x 12" Cylinders, ASTM C 496 ........................................................50.00/ea. Modules of Elasticity Test- Static, ASTM C 469...........................................................85.00/ea. Unit Weight Determination ............................................................................................25.00/ea. Shrinkage Length Change (3 Beams, 4 Readings, Up to 90 Days),ASTM C 157 Modified.............$260.00 Additional Reading.....................................................................................30.00/3 bar set Storage Over 90 days, Per set of 3 Beams..............................................................20.00/month Mix Design Aggregate Tests for Concrete Mix Designs Only, Including Sieve Analysis, Specific Gravity, No. 200 Wash, Organic Impurities, Weight Per Cubic Foot, Per Aggregate Size.........................................................................................$400.00/ea. Review of Mix Design Prepared by Others..................................................................130.00/ea. TrialBatch, ASTM C192.......................................:......................................................900.00/ea. KRAZAN& ASSOCIATES,INC. With Offices Serving the Western United States Resolution No. 05-214 Page 25 of 29 Ontario Fee Schedule Page 10 Reinforcement Reinforcing Steel ASTM A 615 Tensile Test, No. 11 Bar or Smaller ........................................................................... $50.00/ea. Bend Test, No. 11 Bar or Smaller........................................... ........... ...45.00/ea. ........................ Tensile Test, No. 14 Bar............................................................................. 70.00/ea. ................... Tensile Test, No. 18 Bar................................................................................................80.00/ea. Receive and Distribute Mill Certificates................................. . .10.00/ea. ..................................... . Welded Specimens Tensile Test, Welded, No. 11 Bar or Smaller..............................................................$50.00/ea. TensileTest, Welded, No. 14 Bar.................................................................................80.00/ea. Tensile Test, Welded, No. 18 Bar............. ....................................................................80.00/ea. Tensile Test, Mechanically Spliced Bar.......................................................................115.00/ea. Nick Break, Welded Re-Bar.............................................. ....... ............. ...........:. ...........30.00/ea. . Prestress (Attachments To Be Furnished by Client) Tensile Test and Elongation In 24"for Prestress Strand, ASTM A 416 ......................$95.00/ea. Tensile Test and Elongation In 10"for Prestressing Wire, ASTM A 421.......................50.00/ea. Modules of Elasticity (Prestressing Wire)....................................................................110.00/ea. Aggregates Basic Tests Sieve Analysis - Processed (Each Size), ASTM C 136.............................................$200.00/ea. SieveAnalysis - Pit Run ..............................................................................................165.00/ea. Specific Gravity. Coarse, ASTM C 127..........................................................................95.00/ea. Specific Gravity, Fine, ASTM C 128........................ .....................95.00/ea. Absorption, ASTM C 127, 128.......................................................................................50.00/ea. Unit Weight Per Cubic Foot, ASTM C 29 .......................................................................55.00/ea. Deleterious Materials Organic Impurities, ASTM C 40.................. ........................ ..$80.00/ea. .............................. ....... Clay Lumps and Friable Particles, ASTM C 142 .........................................................1 15.00/ea. Material Finer than No. 200 Sieve, ASTM C 117...........................................................65.00/ea. Coal and Lignite, ASTM C 123....................................................................................11 5.00/ea. SoftParticles, ASTM C 235...........................................................................................80.00/ea. AcidSolubility_ ... .........................................................................................................40.00/ea. KRAZAN &ASSOCIATES, INC. With Offices Serrusg the Western United States Resolution No. 05-214 Page 26 of 29 Ontario Fee Schedule Page I I Physical Properties Soundness - Sodium or Magnesium (5 cycle), ASTM C 88 ......................................$390.00/ea. Abrasion (L.A. Rattler 100 & 500 cycles), ASTM C 131 ..............................................225.00/ea. Potential Reactivity (Chemical Method 3 Determinations), ASTM C 289 ....................450.00/ea. Potential Reactivity (Mortar Bar Method, ASTM C.227...............................................500.00/ea. Percent Flat or Elongated Particles, CRD C 119.........................................................130.00/ea. Percent Crushed Particles, Calif. 205..........................................................................105.00/ea. State Tests CleannessValue, CAL. 227 ......................................................................................$130.00/ea. DurabilityIndex, CAL. 229...........................................................................................195.00/ea. Sand Equivalent (Average of 3), CAL. 217....................................................................95.00/ea. Clay by Hydrometer Methods,ASTM D 422..................................................................90.00/ea. "R"(Resistance) Value, CAL. 301, ASTM D 2844. ....................................................240.00/ea. "R" (Resistance) Value, Lime Treated or Requiring Recombining...............................280.00/ea. Asphaltic Concrete Stability Tests Hveem, Pre-Mixed, CAL. 304.........................................................................$290.00/ea. Hveem, Lab-Mixed, CAL. 304...........................................................................400.00/ea. Marshall, Pre-Mixed,ASTM D 1559 .................................................................290.00/ea. Marshall, Lab-Mixed, ASTM D 1559...........:.....................................................400.00/ea. Maximum Density Hveem, Pre-Mixed, CAL. 304...........................................................................290.00/ea_ Hveem, Lab-Mixed, CAL. 304...........................................................................400.00/ea_ Marshall, Pre-Mixed,ASTM D 1559 ................................................................290.00/ea. Marshall, Lab-Mixed, ASTM D 1559.................................................................400.00/ea_ Gradation on Extracted Sample (Including Wash) ............................... .......................180.00/ea_ Maximum Theoretical Unit Weight(Rice Gravity)ASTM 204......................................250.00/ea- Complete Asphalt Concrete Mix Design (Hveem or Marshall).......................................By Quote Extraction, %Asphalt, ASTM D 2172 (Method B) or CAL.310 ExcludingAsh Correction..................................................................................160.00/ea_ Penetration ASTM D ...................................................................................................720.00/ea_ AsphaltCore Density.....................................................................................................35.00/ea. ACContent, CAL 382..................................................................................................160.00/ea. KRAZAN&ASSOCIATES, INC. With Of Serving the Western United Slates Resolution No. 05-214 Page 27 of 29 Ontario Fee Schedule Page 12 Masonry and Related Materials Brick ASTM C 67 Modules of Rapture (Flexure)......................................................................................$65.00/ea. CompressiveStrength...................................................................................................40.00/ea. Absorption - 5 Hour or 24 Hour .....................................................................................50.00/ea. Boil, 1, 2 or 5 Hour...................................................:.....................................................50.00/ea. Initial Rate of Absorption ...............................................................................................40.00/ea. Efflorescence.................................................................................................................50.00/ea. Dimensions, Overall, Coring, Shell and Web Thickness ............................................ 16.00/brick Coefficient of Friction (Slip Test) ...................................................................................30.00/ea. . .. Cores, Compression........................................................................... .. ......................40.00/ea. Cores, Shear, 6" and 8" Diameter, 2 Faces ................................................................60.00/core Concrete Block ASTM C 140 Moisture Content as Received ....................................................................................$40.00/ea. Absorption .....................................................................................................................65.00/ea. Compression .................................................................................................................70.00/ea. Tension............................... .....................................................................................130.00/ea. Shrinkage, Modified British, ASTM C 426 ...................................................................130.00/ea. Compression, 4,/6/8 Cores............................................................................................65.00/ea. Masonry Prisms ASTM E 447 Compression Test, Grouted Prisms ..........................................................................$150.00/ea. CuttingPrisms.,............... ............................. ........................................ ......................By Quote Unreinforced Masonry Building Tests In-Place Shear (Push) Tests .........................................................................................By Quote 15 Degree Core Shear Tests.................................... ............................................:.......By Quote WallAnchors .................................._....................... ...........................................I........:B', Quote Mortar & Grout UBC Standard 24-22 Compression, 2" x 4" Mortar Cylinder......... ................................................................$25.00/ea. Compression, 3" x 6" Grout Prisms...............................................................................25.00/ea. Compression Test, 2" Cubes, ASTM C 109..................................................................30.00/ea. Gypsum Roof Fill ASTM C 495 Compression Test .......................................................................................................$16.00/ea. Density...........................................................................................................................25.00/ea. Gunite Compression, 2, 4, 6 Cores, ASTM C 42................................_..................................$40.001/ea. KRAZAN& ASSOCIATES,INC. With Offices Serving the Western United Slates Resolution No. 05-214 Page 28 of 29 Ontario Fee Schedule Page 13 Roofing Tile Roofing Tile Breaking Strength per U.B.C...................................................................$25.00/ea. Roofing Tile Absorption.................................................................................................40.00/ea. Roofing Tile Additional/Special Tests............................................................................By Quote Slate Modules of Rupture.....................................................................................................$50.00/ea. Modules of Elasticity....................................................................................................130.00/ea. WaterAbsorption...........................................................................................................50.00/ea. Weathering....................................................................................................................65.00/ea. Fireproofing Tests Field Sampling by Technician...................................................................................... $75.00/hr. OvenDry Density....................................................................................................40.00/sample Miscellaneous and Specialty Testing Testing Machines Testing Machine with Operator in Laboratory 60,000 to 250,000 Machine (Compression Only) 30 Minutes including set-up time, Minimum..........................................................$110.00 60 Minutes including set-up time, Minimum........................................................:...160.00 400,000 Pound Machine (Universal) 30 Minutes including set-up time, Minimum............................................................160.00 60 Minutes including set-up time, Minimum............................................................225.00 LoadTests................................................... ................ ....................................By Quote Calibration of Skidmore-Wilhelm Device & Torque Wrench Calibration of Skidmore-Wilhelm Device, in Lab ...............................................................$70.00 Calibration of Torque Wrench, each bolt size (3 Required).................................................60.00 Calibration of Hydraulic Jacks FirstJack...........................................................................................................................$70.00 Each Additional Jack (same time).............................................................................60.00 Preparation of Electrical System for Test, each ............................................................By Quote Note: Extra handling charges will be made on any ram or pump too heavy or bulky for one man to safely lift. API Gauge Calibration..........................................................................._.....................$90.00/ea. Hydrostatic Tests.........................................................................................................By Quote KRAZAN'& ASSOCIATES,INC. With Offices Serving the Western United Slates Resolution No. 05-214 Page 29 of 29 Ontario Fee Schedule Manhole Cover Tests Page IGS 1-3_.......................................................... ......... ............................................ .... ...$100.00/ea. Morethan 3 .................................... ........................... .. ....85..00/ea. .............................................. Mechanical Testing Services Tensile Test - No Strain Measurement, Yield by Halt of Dial Upto 100,000 lb. _................................................................. .........................$30..00/ea. 100,001 to 200,000 Ib.........................................................................................45-00/ea. Over 200,000 Ib., each .......................................................... By Quote .............................. Tensile Test-.Mechanical Non-Printout Extensometer for Strain..................................30.00/ea. Tensile Test- Electronic Extensometer with Recorded Printout...................................50.00/test Morethan 1 test......................... . .... . .. .......................................................................By Quote Load Tests, Flexural, Bend, Impact, Axial, Racking....................... ...By Quote ............................ Strain Gauge Testing.....................................................................................................By Quote BendTest......................................................................................................................30.00/ea. Note: Sockets furnished by client Salt Spray SetUp .............................................................................................................................$195.00 24 Hours, per panel............................................... ..........40.00 .................................................... Multi-Channel Computer Aided Data Acquisition of: Acceleration.......................................................... . ...By Quote Vibration...................................................................................................................... .By Quote Movements (1.0001 inch)..............................................................................................By Quote Pressure.......................................................................................................... By Quote ............ Machine Control Movement...........................................................................................By Quote Temperature..................................................................................................................By Quote StrainGauge .................................................................................................................By Quote : . Stress Analysis...................................................................................... . . .By Quote Metals Weld Procedure Qualification and Welder Qualification WeldTensile Test........................................................................................................$60.00/ea. WeldBend Test.............................................................................................................33.00/ea. Machining for Weld Test, 1/2" thickness and less.........................................................32.00/ea. Machining for Weld Test, over 1/2" thickness ...............................................................47.00/ea. Weld-Macro Etch...........................................................................................................52.00/ea. Welf1-Fracture Test............................... ...............................33.00/ea. Weld-Radiographic.........................................................................................................By Qwote ReportCharge ........................................... ..................................................................45.001/ea. Weld Procedures Qualifications ....................................................................................By Qtuote KRAZAN!& ASSOCIATES,INC. With Offices Serving the Western United States