HomeMy WebLinkAbout05-214 - Resolutions RESOLUTION NO. 05-214
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING THE
RENEWAL OF AGREEMENTS WITH KRAZAN & ASSOCIATES,
INC., NINYO & MOORE, AND RMA GROUP, FOR ANNUAL
SOILS AND MATERIALS TESTING SERVICES FOR
PROPOSED CAPITAL IMPROVEMENT PROJECTS FOR FY
2005/2006, AND APPROVAL OF AMENDMENTS TO SUCH
CONTRACTS TO INCLUDE AN UPDATED AND REVISED FEE
SCHEDULE ("EXHIBIT C") REFLECTING REASONABLE,
ANNUAL COST-OF-LIVING EXPENSES
WHEREAS, Krazan & Associates, Inc., Ninyo & Moore, and RMA Group,
Contract No. 04-098, 04-099 and 04-100, respectively, were approved by City Council on July
21, 2004; and
WHEREAS, the contracts may be extended for additional one-year periods, up to
an additional two years, with mutual agreement of both parties; and
WHEREAS, Krazan & Associates, Inc., Ninyo & Moore, and RMA Group, have
requested renewal of their contracts; and
WHEREAS, Ninyo & Moore, have requested an amendment to their contract(s)
to include their current fee schedule, to increase the hourly rate for supported fees, to reflect a
reasonable cost-of-living increase; and
WHEREAS, said request is hereby approved and by this resolution the
contract(s) are hereby amended to include the current schedule of fees, to be labeled Exhibit
"C within the contract(s), replacing the existing Exhibit "C".
NOW, THEREFORE, the City Council of the City of Rancho Cucamonga,
California, hereby resolves that said contracts are hereby renewed and amended to include the
current fee schedule, and the Mayor is authorized to sign this resolution.
Please see the!blowing page
for formal adoption,certification and signatures
Resolution No. 05-214
Page 2 of 29
PASSED, APPROVED, AND ADOPTED this 6`h day of July 2005.
AYES: Alexander, Gutierrez, Michael, Spagnolo, Williams
NOES: None
ABSENT: None
ABSTAINED: None
t
William J. A xander, May r
ATTEST:
e ra J. Ad CMC, City Clerk
I, DEBRA J. ADAMS, CITY CLERK of the City of Rancho Cucamonga,
California, do hereby certify that the foregoing Resolution was duly passed, approved and
adopted by the City Council of the City of Rancho Cucamonga, California, at a Regular Meeting
of said City Council held on the 6`h day of July 2005.
Executed this 7`h day of July 2005, at Rancho Cucamonga, California.
4
Debra J. A CMC,"City Clerk
Resolution No. 05-214
Page 3 of 29
HOURLY CHARGES FOR PERSONNEL SCHEDULE OF FEES
Principal Engineer/Geologist/Environmental Scientist.......................................
Senior Engineer/Geologist/Environmental Scientist............... ""..... """"""'" H
SenierProjeclEngineer/GeologisVEnvironmental Scientist.............................................................................
Project Engineer/GeologistlEn Aronmental Scientist.........................................................
Senior Staff Engineer/GeologisVEnvironmental Scientist.................................................................................
Concrete Coring Technician and Equipment........... ......................................
.................................................
Staff Engineer/Geologist/Environmental Scientist.
GISAnalyst........................ ........................................
............................................................................................._...............................
Field Operations Manager........................... . ...
Nondestructive Examination Technician,UT,MT,LP........................................................................................... $ 80
Pull Test Technician and Equipment.................................................
..................................................................... S 80
Supervisory Technician..........................................
................................................................................................ S 74
Senior al ld/La ator/Cry Technician................................................................................................................
Technical lifustory Technician
Operator......................................................................................................... ........ $ 69
Field/Laboratory Technician..................................................... ................ $ 69
.............................................................................. S 64
I Concrete Technician................................................................
Concrete/Asphalt Batch Plant Inspector.................................................................................................................;.... $ 64
SSpecial Inspector.Reinforced Concrete................................................................................................................. $ 64
pecial Inspector,Pre-stressed Concrete........................................................
Special Inspector,Reinforced Mason ......•-.--•-...... $ 64
Masonry.................................................................................................................. $ 64
Special Inspector,Structural Steel...............................................................................
Special Inspector,Welding,AWS......................................................... .......................................... $ 64
Special Inspector,Fireproofing """"""" "'•------.-.-.•.---- - $ 64
P P P ����
g...orat.........ssistant..................................
Geotechnical/Environmental/Laboratory Assistant................ ""..... "'"""' $
64
Information Specialist.................................................... ................................................................................ S 53
Data Processin ,Technical Editin ,or Re roduction.........................:......................................................._......... $ 44
OTHERCHARGES
EVeh '
itness Testimony...................... ... ..............................................- $ 300 Mr
.... ..................................................
Preparation of Standard Test Specimens............................................ .. $ 64 /hr
eterUsage ..........................�...... ............................................
. ............................................................. .......................... $ 32 /hr
mission Kits.................................................. ............_.
...................................................................................... $ 30 /kit
ocator(Pachometer)......................
.................................................................... $ fo 'hr
Density Gauge Usage..............................................
......................................................................... $ 9 Rv
hicle Usage........................................................................................................................................ $ 6 Rtrroject Expenses..................testin , eo h sical a ui ment,and otherspecial equipment provided upon request. Cost plus 15
NOTES(Field Services)
For field and laboratory technicians and special inspectors, regular hourly rates are charged during normal weekday
construction hours.Overtime rates at 1.5 times Bre regular rates will be charged for work performed outside normal con-
struction hours and all day on Saturdays and Sundays. Rates at twice the regularrates will be charged for all work in
excess of 12 hours in one day or on holidays.Lead time for any requested service is 24 hours.Field Technician rates
are based on a 2-hour minimum.Special inspection rates are based on a 4-hour minimum for the first 4 hours and an 8-
hour minimum for hours exceeding 4 hours.Feld personnel are charged portal to portal.
INVOICES
Invoices will be submitted monthly and are due upon receipt.A service charge of 1.0 Percent per month may be charged
on accounts not paid within 30 days.
assssoom u am�..a a,x ��/1�/O�/�DOCe
Resolution No. 05-214
Page 4 of 29
SCHEDULE OF FEESIT
HOURLY CHARGES FORPERSONNEL
Principal Engineer/GeologisttEnviro amental Scientist..........................._. ............................................ $ 135
.................
Senior Engineer/GeologisVEnvironmental Scientist...........................
................................................................. a 122
Senior Project Engineer/GeologisVEnvironmental Scientlst..............:................................................................... $ 122
Project Engineer/GeologistlEnvironmental Scientist.......................................................... ....................... $ 109
..............
Senior Staff Engineer/Geologist/Environmental Scientist......................... .................................... $ 98
Staff Engineer/GeologisVEnvimnmental Scientist.................................................................................................. $ 86
IS/GIS Specialist................................................................
..................................................................................... $ 86
Field Operations Manager................................................... ................... $ 68
SupervisoryTechnician*raiatio..........nici.................................................................................................................. $ 68
SendesW Field/Laboratory
Examination Technician,UT,MT,LP*..........................._. ...................... $ 75
.......................................
Senior Foratory Technician*
Technician'...................................
FieldlLaboretory Technician•................................................................................................................
.................. $ 57
ACI Concrete Technician•......................................................................_.............
................................................. $ 57
.
Concrete/Asphalt Batch Plant Inspector•................................................_............................................................. $ 57
Special Inspector(Concrete,Masonry,Steel,Welding,and Fireproofing)*................................................._. $ 57
Technical Illustrator/CAO Operator.................. ""'
.ant................................._............................................................. $ 57
Geotechnical/Enialist ntaVlaboratory Assistant...............
InformationSpecialist.............................................................................._...................................................._....... $ 42
Data Processing,Technical Editin ,or Reproduction........... ...................................... $ 36
OTHER CHARGES
PIDExpertWitness Testimony......................................................................_.................................................... $ 250/hr
/FID Usage........................................................................................._.................................................... $ 120/day
Coring Machine Usage(includes technician)............................... ................................................... $ 100/hr
.........._.
Anchor Auger
test equipment(includes technician)...'*
echnician)....................................................................................... $ 89/hr
Hand Auger Equipment........................................... ........................... $ 55/day
Inclinometer Usage................................................... ........... $ 20/hr
Vapor Emission Kits.............................. $ 30/kit
Level D Personal Protective Equipment er erson per da
(P P P y).................................................................... $ 25/p/d
Rebar Locator(Pachometer)-.................................................................._.................................................... $ 22/hr
Nuclear Density Gauge Usage........................ ........... $ No charge
FieldVehicle Usageses.........................................................................._......................................._............ $ 6/hr
Direct Project Expenses................................... Cost plus 15%
Laboratory testing, eo h sical a ui ment,and otherspecial equipment provided upon request.
NOTES(Field Services)
For field and laboratory technicians and special inspectors, regular hourly rates are charged during normal weekday
construction hours. Overtime rates at 1.5 times the regular rates will to charged for work performed outside normal
construction hours and all day onSaturdays and Sundays.Rates at twice the regular rates will be charged for all work in
excess of 12 hours in one day or on holidays.Lead time for any requested service is 24 hours.Special inspection rates
are based on a 4-hour minimum for the first 4 hours and an 8-hour minimum for hours exceeding 4 hours. Feld
Technicians are charged Portal to portal.
'Indicates rates that are based on Prevailing Wage Determination made by the Slate of Califomia,Director of Industrial
Relations on a semiannual basis and are subject to their revision.
INVOICES
Invoices will be submitted monthly and are due upon receipt.A service charge of 1.0 percent per month may be charged
on accounts not paid within 30 days.
P-1206.dtt
a /T! 4ro-*uurP-
Resolution No. 05-214
Page 5 of 29
City of Rancho Cucamonga
5oi/s and Matena/s Testing-Annual Services 3une 1, 2004
SCHEDULE OF FEES
2003 1� XM9iT C
Technician
el Description Rate/Cost
Soil Technician $58.00
-- Senior Soil Technician $60.00
no Soil Technician-Retesting $58.00
Public Works Inspector $62.00
Public Works Technician $60.00
Public Works Inspector-Asphalt Paving $60.00
Public Works Inspector-Asphalt Plant $58.00
Public Work Inspector-Concrete Paving $60.00
Public Works Inspector-Concrete Plant $58.00
Public Works Inspector-Resident Inspection $85.00
Traffic Control Personnel $55.00
ch Laboratory Technician-Field Lab $55.00
Laboratory Technician Batch Preparation $55.00
Special Inspector-Reinforced Concrete(ICBA) $62.00
>rk Special Inspector-Pre-Stressed Concrete(ICBG) $62.00
Special Inspector-Concrete Batch Plant $62.00
so Concrete Technician(ACf) $58.00
Pick-up&Delivery of Test Specimens $45.00
ID Reinforcing or Structural Steel $58.00
Special Inspector Fire Proofing(ICBG) $62.00
Special Inspector Epoxy Bolting $62.00
Special Inspector Roofing/Nailing $62.00
Special Inspector Masonry(ICBG) $62.00
Special Inspector-Masonry(DSA) $65.00
Special Inspector-Grout Batch Plant $60.00
Special Inspector-Field Welding(AWS CWI) $62.00
Special Inspector-Shop Welding(AWS C W I) $62.00
Special Inspector-Structural Steel(ICBG) $62.00
Special Inspector-High Strength Bolting(ICBG) 562.00
Special Inspector-Timber $65.00
a RM\A Croup
Nopasa/and S7trhment o/Qtv/ifimtlons 17
Resolution No. 05-214
Page 6 of 29
City of Rancho Cucamonga
Soils and Materials Testing-Annual services June 1, 2004
Lab Aggregates
Description Rate/Cost
Abrasion by Los Angeles Rattler $225.00
Cleanness Value-Fine or Coarse $125.00
Deleterious Substance Determination $100.00
Dry Rodded Unit Weight $85.00
Durability Index-Fine&Coarse $225.00
Durability Test-Coarse $150.00
Durability Test-Fine $100.00
Fineness Modulus $80.00
Flat and Elongated Pieces-(per size fraction) $125.00
Fractured Faces-(per size fraction) $35.00
Light Weight Panicles $200.00
Moisture Content $20.00
Organic Impurities $65.00
Percent Clay in Sands by Hydrometer $90.00
Percentage Gushed Particles $125.00
Potential Reactivity-Chemical Method $350.00
Sand Equivalent $85.00
Sieve Analysis-Fine&Coarse Aggregates $110.00
Sieve Analysis-Fine Aggregates(passing No.4) $95.00
Sieve Analysis-Coarse Aggregates(Retained on No 4) $65.00
Soundness be Sodium Sulfate-(Coarse Series) $255.00
Soundness by Sodium Sulfate(Fine Series) $330.00
Specific Gravity& Absorption of Coarse Aggregate $30.00
Apparent Specific Gravity of Fine Aggregate $40.00
Specific Gravity&Absorption of Fine Aggregate $40.00
Fine Ageregatc Anzularity(T304) $65.00
HnPosa/and AbtementofQualifiotions ty
Resolution No. 05-214
Page 7 of 29
City of Rancho Cucamonga
Soils and Materials Testing-Annual Services lune 1 2004
Lab Asphalt
Description Rate/Cost
Film Stripping $95.00
Kc Factor $65.00
Kf Factor $85.00
Moisture Vapor Susceptibility $200.00
Swell Potential(CAL 305) $165.00
Bulk Specific Gravity Per Specimen(ASTM Saturated Surface Dry) $40.00
Bulk Specific Gravity(ASTM Saturated Surface Dry Cores) $40.00
Bulk Specific Gravity Per Specimen(ASTM Parafilm Coated) $45.00
Bulk Specific Gravity(ASTM Patafihn Coated Cores) $45.00
Bulk Specific Gravity(CTM 308 Method A) $45.00
Bulk Specific Gravity(CTM 308 Method A Cores) $45.00
Bulk Specific Gravity(CTM 308 Method C) $40,00
Bulk Specific Gravity(CTM 308 Method C Cores) $40.00
Field Test Maximum Density(CAL 375) $95.00.
Lab Test Maximum Density(CAL 375) $195.00
Lab Test Maximum Density-Hveem Method $195.00
Lab Test Maximum Density-Marshall Method $195.00
Theoretical Maximum Specific Gravity-Rice $175.00
Marshall Stability and Flow-lab compacted - $280.00
Marshall Stability and Flow-field compacted $190.00
Hveem Stability(CTM 366) $195.00
Hveem Stability(ASTM DI 560) $195.00
Moisture Content of Mix(CAL,370) $25.00
Moisture Content of Mix(CAL 310) $185.00
Tensile Strength Ratio(AASHTO T283) $550.00
Surface Abrasion Test(CAL 360) $450.00
Extraction-Percent Asphalt by Ignition Oven $100.00
Extraction-Percent Asphalt by Ignition Oven-Calibration $250.00
Extraction-Percent Asphalt by Solvents(Vacuum) $125.00
Extraction-Percent Asphalt by Solvents(Centrifuge) $125.00
Gradation of Extracted Aggregate $110.00
Percent Voids(CAL 367) $125.00
Percent Residue by Evaporation(ASTM D244) $100.00
Emulsion Sieve Test(ASTM D244) $75.00
Wet Tract Abrasion(ASTM D3910) $100.00
t
RbHA CFOUP
Psvpa /and shrrementofquamcaamrs 20
Resolution No. 05-214
Page 8 of 29
City of Rancho Cucamonga
Soils and Materials Testing-Annual Services lune 1, 2004
Lab Concrete
Description Rate/Cost
Mix Design Review-Calculation Only $175.00
Concrete Cylinder Cured and/or Compression Tested $18.00
Compression Test Cores-8"maximum diameter(including trimming $50.00
Insulating Concrete Cylinders-Compression Test $25.00
insulating Concrete Cylinders-Constant Weight $25.00
- Flexural Strength-Concrete Beams $85.00
Gunite Compression Tests $20.00
Shotcrete Compression Tests $20.00
Concrete Modulus of Elasticity - $150.00
Concrete Shrinkage Test(set of 3) $165.00
Cement Content of Hardened Concrete $1,100.00
Splitting Tensile Test $65.00
Unit Weight of Cylinders $45.00
Air Content CAL 504 $60.00
Ball Penetraction CAL 533 - $60.00
Slab Moisture Test $16.00
Side to Side Crush(CCTI T-108) $6.00
Water Retention of Liquid Curing Compound-CTM 534 $375.00
Length of Drilled Cores CTM 531 $30.00
Surface Abrasion of Concrete(CT 550) $400.00
Density of.Spray Applied Five Proofing $40.00
Proposal and Statement of qua/ificadons 21
Resolution No. 05-214
Page 9 of 29
City of Rancho Cucamonga
Soils and Materials Testing-Annual Services lune 1,2004
Lab Masonry
Description hate/Cost
Block Compressive Strength Test(set of 3) $75.00
Block,as Received Moisture&Absorption(set of 3) $50.00
Block,Lineal Shrinkage ASTM C426(set of 3) $50.00
Block,Unit Weight and Dimensions(set of 3) $150.00
Block,Conformance to ASTM C90(set of 9) $300.00
Brick,Compression(set of 3) $45.00
Brick,as received Moisture&Absorption(set of 3) - $70.00
Brick,5 hr Boil $55.00
Brick,Modulus of Rupture $55.00
Mortar Compression Test(2"x 4"Cylinder) $25.00
Grout Compression Test(3"x 6"Prism) $25.00
Masonry Cores,Compression-8"max.diameter $35.00
Masonry Cores,Shear-8"max.diameter $45-00
Tensile Test-CMA Method $60.00
Masonry Assemblage Compressive Strength 8"Block $55.00
Masonry Assemblage Compressive Strength 12"Block $75.00
Masonry Assemblage Compressive Strength 16'Block $95-00
Trimming of Test Specimens $30.00
Cube Compression Test 2x2x2 $16.00
Roof Tile Conformance(set of 10) $275.00
Mortar Strength of PCC Sand-CTM 515 $800.00
R&IA
Group
RopnwrarMstahmentofQua/irnratiwls 22
Resolution No. 05-214
Page 10 of 29
Lab Steel
Description Rate/Cost
Tension&Bend-Rebar(No.8 or smaller) $50.00
Tension&Bend-Rebar(No. 11) $60.00
Tension&Bend-Rebar(No. 14) $80.00
Chemical Analysis $250.00
Tension-Rebar only $20.00
Bend-Rebar only $35.00
Tension Test-Structural Steel - $65.00
Bend Test-Structural Steel $35.00
Machine Coupons for Structural Steel
Chemical Analysis $250.00
7RwIn Group ~po /andSbtement ofQua//fic tfo 23
Resolution No. 05-214
Page 11 of 29
City of Rancho Cucamonga
Soils and Materials Testing-Annual SerwctL-s June 1 2004
Lab Soil
Description Rate/Cost
Atterberg Limits - $65.00
California Bearing Ratio $350.00
Consolidation(no time rate) $150.00
Consolidation(with time rates) $200.00
Direct Shear $95.00
Expansion Index(UBC Standard 29-2) 595.00
Falling Head Permeability of Soil $100.00
Collapse Potential $90.00
Hydrometer Analysis $80.00
Lab Density Determinations by Drive Tube $15.00
Lab Moisture Determinations $8.00
Matric Suction-Filter Paper Method $65.00
Maximum Density-Optimum Moisture(ASTM D 1557) $175.00
Calif Impact Max Density(CAL 216) $190.00
Percent Organic Materials $15.00
PH&Resistivity of Soils Saturated Paste $35.00
R-Value $225.00
Oversized Rock Correction $25.00
Sand Equivalent - $50.00
Check Point-Maximum Density Optimum Moisture(ASTM D1557)
Sieve Analysis of Soils $110.00
Percent Finer Than No.200-Wash Only $25.00
Soluble Sulfate $45.00
Specific Gravity of Soils $75.00
Consolidation /Swell Potential $175.00
Unconfined Compression Test $90.00
ESP-Sodium Exchange Potential $45.00
Soil Cement(set of 3) $580.00
Shrinkage factor by Resin $120.00
Soil Cement Maximum Density-Optimum Moisture(ASTM D559) $140.00
Soil Cement Laboratory Specimen Preparation D559 - $35.00
Soil Cement Compression Test D 1633 $20.00
Chloride Content(CTM 422) $30.00
r
RMA GFOW
Proposaiand s&ne ntdgrv/inotlons 24
Resolution No. 05-214
Page 12 of 29
Office
t
Description Rate/Cost
Administrative $30.00
_ Secretarial $30.00
Data Entry $25.00
Report Copies
$5.00
Geotechnical Report Copies $25.00
Additional Report Copies per page 50.50
Mail Expenses $0.00
Principal Engineer-Office $145.00
Principal Engineer-Field $145.00
` Principal Engineer-Consultation
1 $145.00
Principal Engineer-Job Conference
$145.00
Principal Engineer-Expert Witness - $250.00
Principal Engineer-Court Appearance $300.00
Project Engineer-Office $105.00
Project Engineer-Field $105.00
Project Engineer-Consultation $105.00
Project Engineer-Job Conference $105.00
Staff Engineer-Office $85.00
Staff Engineer-Field $85.00
Drafting
$50.00
Fault Search
$100.00
Response Spectra $300.00
Plan Copies (per sheet) $2.00
Plan Copies oversized(per sheet) $5.00
Project Manager-Office $105.00
Project Manager-Field $105.00
Project Manager-Job Conference $105.00
RMA Group
Yropowland Stan nenl ofQrraflAoarfom 25
Resolution No. 05-214
Page 13 of 29
Office
(conL)
Description Rate/Cost
Principal Geologist-Office $125.00
Principal Geologist-Field $125.00
Principal Geologist-Consultation $125.00
Principal Geologist-Job Conference $125.00
Principal Geologist-Expert Witness $150.00
Principal Geologist-Court Appearance $250.00
Project Geologist-Office $95.00
Project Geologist-Field 595.00
Project Geologist-Consultation 595.00
Project Geologist-Job Conference $95.00
Staff Geologist-Office $70.00
Staff Geologist-Field 570.00
VRF
MA CFMp Nvpasa/and SbtamentofQuaMwfims 26
Resolution No. 05-214
Page 14 of 29
KRAZAN & ASSOCIATES, INC.
GENERAL FEE SCHEDULE
(Prevailing wage)
2004
Krazan & Associates, Inc.
4221 Brickell Street
Ontario, CA 91761
(909) 974-4400 Fax (909) 974-4022
Resolution No. 05-214
Page 15 of 29
KRAZAN « ASSOCIATES, INC.
Schedule of Fees
Table of Contents
KEYMANAGEMENT STAFF............................................................................................................1
COMPANYPROFILE.......................................................................................................................2
TERMS OF PAYMENT AND CHARGES..............................................................................................3
GENERAL FEE SCHEDULE FOR PROFESSIONAL S,TECHNICAL SERVICES..........................................5
ENVIRONMENTALSERVICES...........................................................................................................6
GEOTECHNICALSERVICES.............................................................................................................7
Exploratory Drilling, Sampling, and Travel.....................................................................I.........7
LaboratoryTests......................................................................................................................7
CONSTRUCTION TESTING AND INSPECTION SEWICES .......................................................... ..........8
Concrete..................................................................................................................................9
Reinforcement......... 10
Aggregates ............................................................................................................................10
AsphalticConcrete ...-...........................................................................................................11
Masonryand ,Related Materials.............................................................................................12
Miscellaneous and Specialty Testing.....................................................................................13
Metals....... _...... ......_ ....__................._....._..............._..........._.........................._...............14
Resolution No. 05-214
Page 16 of 29
Ontario Fee Schedule
Page I
KRAZAN & ASSOCIATES, INC.
Established 1982
Principals
THOMAS P. KRAZAN, R.C.E., R.G.E............................................. President
DEAN L.ALEXANDER, R.E.A., R.C.E., R.G.E. .......................Vice President
BYRON "KIP"WILLIAMSON.............................................. Managing Partner
KEY MANAGEMENT STAFF
DARREN COLEMAN RICHARD OPP
Testing & Inspection Division Manager Environmental Division Manager
CLARENCE JIANG
Geotechnical Division Manager
KRAZAN& ASSOCIATES, INC.
With Offices Serving the Western United Stales
Resolution No. 05-214
Page 17 of 29
Ontario Fe:Schedule
Page 2
COMPANY PROFILE
Krazan & Associates is a professional consulting firm specializing in
environmental studies, environmental chemical analysis, geotechnical engineering,
laboratory testing, construction testing and inspection, and contract drilling services.
Environmental studies are directed towards assessing and remediation
petroleum, hydrocarbon, heavy metal, herbicide, and pesticide-related contamination in
soils, groundwater, and air. Krazan & Associates services lending institutions, major oil
companies, private industry, utility companies, and governmental agencies in their
specific environmental needs. Environmental studies include soil and groundwater
investigations, as well as complex sampling and monitoring programs.
Geotechnical Engineering services include soils engineering and site selection.
Site selection services provide evaluation of the regional geologic framework, analysis
of the engineering properties of the on-site soils, determination of the slope stability,
and assessment of the effects of shallow groundwater on development.
Construction testing and inspection services provide quality control for new
construction. Services include both field and laboratory functions utilizing certified
inspectors. All personnel are in constant radio contact with our regional offices for
immediate support and scheduling.
Contract drilling is provided to other professional firms requiring state-of-the-art
specialty dri!!ing and sampling services for both Geotechnical Engineering and
Environmental studies.
K.RAZAN& ASSOCIATES. INC.
0 ill,Offices Smming the 11 esic)n United States
Resolution No. 05-214
Page 18 of 29
Ontario Fee Schedule
Page 3
TERMS OF PAYMENT AND CHARGES
Terms of Payment
Invoices shall be deemed delinquent if not paid within 30 days of the invoice date
and will be subject to a late payment charge of 1.5% per month as liquidated
damages for additional credit and collection expenses incurred by Krazan &
Associates, Inc.
Charges rorr SIR oci` �
Minimum Charges 2 `I KfU
Hourly field services have a a'1iour minimum charge. Hourly office services have
a one hour minimum charge.
Regular Time Charges
Regular time charges are Monday through Friday, between 7 a.m. to 3:30 p.m.
Other arrangements available upon pre-approval.
Time and One-Half Charges
Time and one-half charges will be rendered on weekdays for services extending
beyond regular time, 8-12 hours of total service that day. Saturday services are
commonly available at time and one-half charges.
Double Time Charges
Services rendered on Holidays, Sunday, in excess of 8 hours on Saturday, or in
excess of 12 hours on weekdays, will be charged at double the normal rate.
Portal to Portal Charges
A portal to portal charge per call applies to all inspection and field work.
Miscellaneous and Subcontractor Charges
Miscellaneous or unusual charges, such as parking, mailing, shipping, etc.,
and/or subcontractor charges, such as backhoe fees, will be charged to the client
at cost plus 15%.
KRAZAN& ASSOCIATES, INC.
With Offices Sen,ing the Western United States
Resolution No. 05-214
Page 19 of 29
Ontario Fee Schedule -
Pa_oe 4
Subsistence
On remote jobs or projects, subsistence, when not furnished, will be an
additional charge.
Cancellation
Late cancellation may be subject to reasonable charges if personnel cannot be
appropriately reassigned or if remobilization is required.
Insurance
Krazan & Associates, Inc. carries in excess of all insurance required by law.
Additional costs of extra insurance certificates, co-insurance endorsements or
additional insurance will be charged to the client at cost plus 15%.
Supervisor Charges
Supervisor charges are above and beyond unit rates quoted.
KRAZAN S ASSOCIATES,INC.
tT ah Offices Seri'ing the IPcstei n United States
I
Resolution No. 05-214
Page 20 of 29
Ontario Fee Schedule
Page 5
GENERAL FEE SCHEDULE FOR
PROFESSIONAL & TECHNICAL SERVICES
Professional
PrincipalEngineer..................................................................................................... $175.00/'rhr.
Registered Senior Engineer ........................................................................................ 135,00/hr.
RegisteredGeologist................................................................................................... 125.00/hr.
Certified Asbestos Inspector/Manager ........................................................................ 110.00/hr.
Project Engineer/Manager........................................................................................... 110.001hr.
ProjectGeologist................................................................................................ ........ 110.001hr.
Chemist....................................................................................................................... 110.00/hr.
EnvironmentalSpecialist............................................................................................. 110.00/hr.
Project Administration & Analysis................................................................................ 110.00/hr.
Field Engineer/Inspector......................................................................................_....... 105.00/hr.
FieldGeologist............................................................................................................. 105.00/tar.
Technical
EngineeringTechnician............................................................................................... $75.00/hr.
EnvironmentalTechnician .,........................................................................................... 75.00/hr.
AutoCad/Engineering Technician.................................................................................. 75.00/lar.
Support
Clerical..................................................................:..................................................$45.00/RepoN
Subsistence.................................................................................................................85.00/days.
KRAZAN& ASSOCIATES, INC.
With OJ7tces Serving the Western Uneied States
Resolution No. 05-214
Page 21 of 29
Ontario Fee Schedule
Page 6
ENVIRONMENTAL SERVICES
Asbestos Consultation and Analysis
Asbestos Project Manager........................................................................................ $110.00/hr.
AsbestosTechnician ..................................................................................................... 85.00/hr.
Analyze for Asbestos per EPA (PLM) Procedures .................................................35.00/sample
Consult for Asbestos Abatement...................................................................................By Quote
Wells
Groundwater Monitoring Well Installations....................................................................By Quote
GroundwaterExtraction Well.........................................................................................By Quote
Vapor Monitoring Well Installation.................................................................................By Quote
VaporPoint Installation..................................................................................................By Quote
VaporExtraction Well....................................................................................................By Quote
Environmental Drilling, Exploration, Travel
Light Duty Drilling (continuous flight auger by Mobile Drill
Minuteman or Giddings).................................................................................. $155.00/hr.
Drilling (continuous flight, hollow stem auger or rotary wash, w/2 operators)
CME 45 Drill Rig (truck mounted)..................................................................... 175.00/hr.
CME 55 Drill Rig (truck mounted) ..................................................................... 185.00/hr.
Mobile Drill B-61/HDX Drill Rig (truck mounted) ............................................... 185.00/hr.
Mileage (support vehicles)..................................................................................00.50/mi.
Mileage (drill rig) .................................................. ..00.80/mi.
.............................................
Other Equipment & Services Rates
Sample Container Charge:
Stainless Steel Tube (including caps, Teflon/aluminum foil, labels, etc.) .........$10.00/ea.
6" Brass Sleeves (including caps, Teflon/aluminum foil, labels, etc.) ...................5.00/ea.
Personal Protective Equipment.....................................................................................By Quote
Hydropunch II Screen/Points/Seals...............................................................................By Quote
Moss Wire Line Continuous Core Soil Sampler.........................................................300.00/day
Steam Cleaner or Pressure Washer...........................................................................125.00/day
MagneticCable Locator.................................................................................................By Quote
Photoionization Detector............................................................................................100.00/day
Hermit 2000 Datalogger Aquifer Testing Equipment.....................................................By Quote
Magnetometer ...............................................................................................................By Quote
Electromaanerometer.. .................................................................................................By Quote
Clean-up/Remedial Equipment......................................................................................By Quote
Chemical rialysis of Soil and Groundwater Samples...................................................By Quote
KRAZAN Sc ASSOCIATES, INC.
With Offices Sen ing the Western United.Stales
Resolution No. 05-214
Page 22 of 29
Ontario Fee Schedule
Page 7
GEOTECHNICAL SERVICES
Soils - Foundations - Geology
Exploratory Drilling, Sampling, and Travel
Light Duty Drilling (continuous flight auger by Mobile Drill
Minuteman or Giddings, operator only)........................................................... $155.00/hr.
Drilling (continuous flight, hollow stem auger or rotary wash, w/2 operators)
CME 45 Drill Rig (truck mounted) ..................................................................... 175.00/hr.
CME 55 Drill Rig (truck mounted) ..................................................................... 185.00/hr.
Mobile Drill B-61/HDX Drill Rig (truck mounted) ............................................... 185.00/hr.
Mileage (support vehicles)..................................................................................00.50/mi.
Mileage (drill rig) .................................................................................................00.80/mi.
Laboratory Tests
Sieve Analysis, Coarse, ASTM C 136 .......................................................................$160.00/ea.
Fine (including wash), ASTM C 137, C 171.................................................................95.00/ea.
Hydrometer Analysis, ASTM D 422...............................................................................90.00/ea.
Specific Gravity, Bulk SSD, Coarse, ASTM C 127, C 117...........................................115.00/ea.
Fine, ASTM C 128.....................................................................................................195.00/ea.
Atterberg Limits, ASTM D 4318...................................................................................160.00/ea.
Moisture-Density Relations of Soils, ASTM D 698, D 1557, State 216 ........................175.00/ea.
Consolidation Test ASTM D 2435...............................................................................225.00/ea.
Triaxial Compression Test, ASTM D 2850
Unconsolidated, Undrained ..............................................................................235.00/ea.
Consolidated, Undrained ..................................................................................325.00/ea.
Consolidated, Undrained with Pore Pressure...................................................500.00/ea.
Unconfined Compression Test, ASTM D 2166..............................................................85.00/ea.
Expansion Index, UBC-29-2........................................................................................195.00tea.
Direct Shear Test, ASTM D 3080
Consolidated, Drained, 3 points........................................................................215.00/ea.
Permeability, Constant Falling Head, ASTM 2434 ......................................................225.00/ea.
Permeability, Falling Head/Flexible Wall (ASTM D5084), 1.4"-4.. ...............................325.00'ea.
Permeability, Falling Head/Flexible Wall (ASTM D5084), 6" ......................................450.00 ea.
Permeability, Falling Head/Flexible Wall (ASTM D5084), 12" ....................................750.00 ea.
Permeability Sample Remold ........................................................................................40.00 ea.
SulfateContent..............................................................................................................40.00/ea.
"R" (Resistance) Value, Cal. 301, ASTIM D 2844........................................................240.00/ea.
"R" (Resistance) Value, Lime Treated or Requiring Recombining................................280.00/ea.
California Bearing Ratio, ASTM D 1883......................................................................650.00/ea.
Plate Bearing Test, ASTM D 1195, D 1196...................................................................By Quote
IndexTests not Listed ...................................................................................................By Quote
KRAZAN& ASSOCIATES,INC.
!Pith Offices Senting the Western United Stater
Resolution No. 05-214
Page 23 of 29
Ontario Fee Schedule
Page 8
CONSTRUCTION TESTING AND INSPECTION SERVICES
Administrative
EngineeringReview................................................................................................... $110.00/hr.
.. . . . ...... ....... .. ................. . ......
Report Preparation ........................... .................45.00/report
. . . . . . . .. . ..
Job Site Inspection
SoilCompaction .......................................................................................................... $60.00/hr.
Masonry, Concrete, Gunite, Epoxy................................................................................ 60.00/hr.
Structural Steel, Welding, Bolt.Torque ..... ..
.. ........
....................... ................................. 60.00/hr.
.
Pile Driving, Soldier Beams, Shoring, Caissons.......................................................... 110.00/hr.
Build-up Roofing. Fire Proofing ..................................................................................... 60.00/hr.
Plant Inspection
Structural Steel Fabrication ......................................................................................... $60.00/hr.
ConcreteBatch Plant..................................................................................................... 60.00/hr.
Pipe Plant (Reinforced Concrete, Clay, etc).................................................................. 60.00/hr.
Glue-Laminated Fabrication (Local) .............................................................................. 60.00/hr.
AsphaltBatch Plant............................................................................. ....................... 60.00/hr.
Nondestructive Examination
Ultrasonic, Magnetic Particle, Dye Penetrant................................................................By Quote
Radiographic.................................................................................................................By Quote
Pachometer.............................................................. By Quote
.....................................................
Schmidt Hammer........................................ .........
................ ...By Quote
.......................................
Coring
Technician and Equipment............................................................. . ..... $130.00/hr.
BitCharge.... ......................................................................... ......... ............
........................................7.00/inch
KRAZAN & ASSOCIATES. INC.
if ill?Offices Sen ing the Western G'rnited States
Resolution No. 05-214
Page 24 of 29
Ontario Fee Schedule
Page 9
Concrete
Cylinder, Beams & Cores
Compression Test, 6"x 12" Cylinders, Including Hold,ASTM C 39 (set of 4)...........$100.00/set
Compression Test, Cores, ASTM C 42 (Does Not Include Special Prep. time) .............50.00/ea.
Core Cutting (In Laboratory)..........................................................................................40.00/ea.
Flexure Test, 6" x 6" Beams, ASTM C 78......................................................................95.00/ea.
Splitting Tensile, 6" x 12" Cylinders, ASTM C 496 ........................................................50.00/ea.
Modules of Elasticity Test- Static, ASTM C 469...........................................................85.00/ea.
Unit Weight Determination ............................................................................................25.00/ea.
Shrinkage
Length Change (3 Beams, 4 Readings, Up to 90 Days),ASTM C 157 Modified.............$260.00
Additional Reading.....................................................................................30.00/3 bar set
Storage Over 90 days, Per set of 3 Beams..............................................................20.00/month
Mix Design
Aggregate Tests for Concrete Mix Designs Only, Including Sieve Analysis, Specific
Gravity,
No. 200 Wash, Organic Impurities, Weight Per Cubic Foot,
Per Aggregate Size.........................................................................................$400.00/ea.
Review of Mix Design Prepared by Others..................................................................130.00/ea.
TrialBatch, ASTM C192.......................................:......................................................900.00/ea.
KRAZAN& ASSOCIATES,INC.
With Offices Serving the Western United States
Resolution No. 05-214
Page 25 of 29
Ontario Fee Schedule
Page 10
Reinforcement
Reinforcing Steel ASTM A 615
Tensile Test, No. 11 Bar or Smaller ........................................................................... $50.00/ea.
Bend Test, No. 11 Bar or Smaller........................................... ........... ...45.00/ea.
........................
Tensile Test, No. 14 Bar............................................................................. 70.00/ea.
...................
Tensile Test, No. 18 Bar................................................................................................80.00/ea.
Receive and Distribute Mill Certificates................................. . .10.00/ea.
..................................... .
Welded Specimens
Tensile Test, Welded, No. 11 Bar or Smaller..............................................................$50.00/ea.
TensileTest, Welded, No. 14 Bar.................................................................................80.00/ea.
Tensile Test, Welded, No. 18 Bar.............
....................................................................80.00/ea.
Tensile Test, Mechanically Spliced Bar.......................................................................115.00/ea.
Nick Break, Welded Re-Bar.............................................. ....... .............
...........:. ...........30.00/ea.
.
Prestress (Attachments To Be Furnished by Client)
Tensile Test and Elongation In 24"for Prestress Strand, ASTM A 416 ......................$95.00/ea.
Tensile Test and Elongation In 10"for Prestressing Wire, ASTM A 421.......................50.00/ea.
Modules of Elasticity (Prestressing Wire)....................................................................110.00/ea.
Aggregates
Basic Tests
Sieve Analysis - Processed (Each Size), ASTM C 136.............................................$200.00/ea.
SieveAnalysis - Pit Run ..............................................................................................165.00/ea.
Specific Gravity. Coarse, ASTM C 127..........................................................................95.00/ea.
Specific Gravity, Fine, ASTM C 128........................ .....................95.00/ea.
Absorption, ASTM C 127, 128.......................................................................................50.00/ea.
Unit Weight Per Cubic Foot, ASTM C 29 .......................................................................55.00/ea.
Deleterious Materials
Organic Impurities, ASTM C 40.................. ........................ ..$80.00/ea.
.............................. .......
Clay Lumps and Friable Particles, ASTM C 142 .........................................................1 15.00/ea.
Material Finer than No. 200 Sieve, ASTM C 117...........................................................65.00/ea.
Coal and Lignite, ASTM C 123....................................................................................11 5.00/ea.
SoftParticles, ASTM C 235...........................................................................................80.00/ea.
AcidSolubility_ ... .........................................................................................................40.00/ea.
KRAZAN &ASSOCIATES, INC.
With Offices Serrusg the Western United States
Resolution No. 05-214
Page 26 of 29
Ontario Fee Schedule
Page I I
Physical Properties
Soundness - Sodium or Magnesium (5 cycle), ASTM C 88 ......................................$390.00/ea.
Abrasion (L.A. Rattler 100 & 500 cycles), ASTM C 131 ..............................................225.00/ea.
Potential Reactivity (Chemical Method 3 Determinations), ASTM C 289 ....................450.00/ea.
Potential Reactivity (Mortar Bar Method, ASTM C.227...............................................500.00/ea.
Percent Flat or Elongated Particles, CRD C 119.........................................................130.00/ea.
Percent Crushed Particles, Calif. 205..........................................................................105.00/ea.
State Tests
CleannessValue, CAL. 227 ......................................................................................$130.00/ea.
DurabilityIndex, CAL. 229...........................................................................................195.00/ea.
Sand Equivalent (Average of 3), CAL. 217....................................................................95.00/ea.
Clay by Hydrometer Methods,ASTM D 422..................................................................90.00/ea.
"R"(Resistance) Value, CAL. 301, ASTM D 2844. ....................................................240.00/ea.
"R" (Resistance) Value, Lime Treated or Requiring Recombining...............................280.00/ea.
Asphaltic Concrete
Stability Tests
Hveem, Pre-Mixed, CAL. 304.........................................................................$290.00/ea.
Hveem, Lab-Mixed, CAL. 304...........................................................................400.00/ea.
Marshall, Pre-Mixed,ASTM D 1559 .................................................................290.00/ea.
Marshall, Lab-Mixed, ASTM D 1559...........:.....................................................400.00/ea.
Maximum Density
Hveem, Pre-Mixed, CAL. 304...........................................................................290.00/ea_
Hveem, Lab-Mixed, CAL. 304...........................................................................400.00/ea_
Marshall, Pre-Mixed,ASTM D 1559 ................................................................290.00/ea.
Marshall, Lab-Mixed, ASTM D 1559.................................................................400.00/ea_
Gradation on Extracted Sample (Including Wash) ...............................
.......................180.00/ea_
Maximum Theoretical Unit Weight(Rice Gravity)ASTM 204......................................250.00/ea-
Complete Asphalt Concrete Mix Design (Hveem or Marshall).......................................By Quote
Extraction, %Asphalt, ASTM D 2172 (Method B) or CAL.310
ExcludingAsh Correction..................................................................................160.00/ea_
Penetration ASTM D ...................................................................................................720.00/ea_
AsphaltCore Density.....................................................................................................35.00/ea.
ACContent, CAL 382..................................................................................................160.00/ea.
KRAZAN&ASSOCIATES, INC.
With Of Serving the Western United Slates
Resolution No. 05-214
Page 27 of 29
Ontario Fee Schedule
Page 12
Masonry and Related Materials
Brick ASTM C 67
Modules of Rapture (Flexure)......................................................................................$65.00/ea.
CompressiveStrength...................................................................................................40.00/ea.
Absorption - 5 Hour or 24 Hour .....................................................................................50.00/ea.
Boil, 1, 2 or 5 Hour...................................................:.....................................................50.00/ea.
Initial Rate of Absorption ...............................................................................................40.00/ea.
Efflorescence.................................................................................................................50.00/ea.
Dimensions, Overall, Coring, Shell and Web Thickness ............................................ 16.00/brick
Coefficient of Friction (Slip Test) ...................................................................................30.00/ea.
. ..
Cores, Compression........................................................................... .. ......................40.00/ea.
Cores, Shear, 6" and 8" Diameter, 2 Faces ................................................................60.00/core
Concrete Block ASTM C 140
Moisture Content as Received ....................................................................................$40.00/ea.
Absorption .....................................................................................................................65.00/ea.
Compression .................................................................................................................70.00/ea.
Tension............................... .....................................................................................130.00/ea.
Shrinkage, Modified British, ASTM C 426 ...................................................................130.00/ea.
Compression, 4,/6/8 Cores............................................................................................65.00/ea.
Masonry Prisms ASTM E 447
Compression Test, Grouted Prisms ..........................................................................$150.00/ea.
CuttingPrisms.,............... ............................. ........................................ ......................By Quote
Unreinforced Masonry Building Tests
In-Place Shear (Push) Tests .........................................................................................By Quote
15 Degree Core Shear Tests.................................... ............................................:.......By Quote
WallAnchors .................................._....................... ...........................................I........:B', Quote
Mortar & Grout UBC Standard 24-22
Compression, 2" x 4" Mortar Cylinder......... ................................................................$25.00/ea.
Compression, 3" x 6" Grout Prisms...............................................................................25.00/ea.
Compression Test, 2" Cubes, ASTM C 109..................................................................30.00/ea.
Gypsum Roof Fill ASTM C 495
Compression Test .......................................................................................................$16.00/ea.
Density...........................................................................................................................25.00/ea.
Gunite
Compression, 2, 4, 6 Cores, ASTM C 42................................_..................................$40.001/ea.
KRAZAN& ASSOCIATES,INC.
With Offices Serving the Western United Slates
Resolution No. 05-214
Page 28 of 29
Ontario Fee Schedule
Page 13
Roofing Tile
Roofing Tile Breaking Strength per U.B.C...................................................................$25.00/ea.
Roofing Tile Absorption.................................................................................................40.00/ea.
Roofing Tile Additional/Special Tests............................................................................By Quote
Slate
Modules of Rupture.....................................................................................................$50.00/ea.
Modules of Elasticity....................................................................................................130.00/ea.
WaterAbsorption...........................................................................................................50.00/ea.
Weathering....................................................................................................................65.00/ea.
Fireproofing Tests
Field Sampling by Technician...................................................................................... $75.00/hr.
OvenDry Density....................................................................................................40.00/sample
Miscellaneous and Specialty Testing
Testing Machines
Testing Machine with Operator in Laboratory
60,000 to 250,000 Machine (Compression Only)
30 Minutes including set-up time, Minimum..........................................................$110.00
60 Minutes including set-up time, Minimum........................................................:...160.00
400,000 Pound Machine (Universal)
30 Minutes including set-up time, Minimum............................................................160.00
60 Minutes including set-up time, Minimum............................................................225.00
LoadTests................................................... ................ ....................................By Quote
Calibration of Skidmore-Wilhelm Device & Torque Wrench
Calibration of Skidmore-Wilhelm Device, in Lab ...............................................................$70.00
Calibration of Torque Wrench, each bolt size (3 Required).................................................60.00
Calibration of Hydraulic Jacks
FirstJack...........................................................................................................................$70.00
Each Additional Jack (same time).............................................................................60.00
Preparation of Electrical System for Test, each ............................................................By Quote
Note: Extra handling charges will be made on any ram or pump too heavy
or bulky for one man to safely lift.
API Gauge Calibration..........................................................................._.....................$90.00/ea.
Hydrostatic Tests.........................................................................................................By Quote
KRAZAN'& ASSOCIATES,INC.
With Offices Serving the Western United Slates
Resolution No. 05-214
Page 29 of 29
Ontario Fee Schedule
Manhole Cover Tests Page IGS
1-3_.......................................................... ......... ............................................ .... ...$100.00/ea.
Morethan 3 .................................... ...........................
.. ....85..00/ea.
..............................................
Mechanical Testing Services
Tensile Test - No Strain Measurement, Yield by Halt of Dial
Upto 100,000 lb. _................................................................. .........................$30..00/ea.
100,001 to 200,000 Ib.........................................................................................45-00/ea.
Over 200,000 Ib., each .......................................................... By Quote
..............................
Tensile Test-.Mechanical Non-Printout Extensometer for Strain..................................30.00/ea.
Tensile Test- Electronic Extensometer with Recorded Printout...................................50.00/test
Morethan 1 test......................... . .... . .. .......................................................................By Quote
Load Tests, Flexural, Bend, Impact, Axial, Racking....................... ...By Quote
............................
Strain Gauge Testing.....................................................................................................By Quote
BendTest......................................................................................................................30.00/ea.
Note: Sockets furnished by client
Salt Spray
SetUp .............................................................................................................................$195.00
24 Hours, per panel............................................... ..........40.00
....................................................
Multi-Channel Computer Aided Data Acquisition of:
Acceleration.......................................................... . ...By Quote
Vibration...................................................................................................................... .By Quote
Movements (1.0001 inch)..............................................................................................By Quote
Pressure.......................................................................................................... By Quote
............
Machine Control Movement...........................................................................................By Quote
Temperature..................................................................................................................By Quote
StrainGauge .................................................................................................................By Quote
: . Stress Analysis...................................................................................... . . .By Quote
Metals
Weld Procedure Qualification and Welder Qualification
WeldTensile Test........................................................................................................$60.00/ea.
WeldBend Test.............................................................................................................33.00/ea.
Machining for Weld Test, 1/2" thickness and less.........................................................32.00/ea.
Machining for Weld Test, over 1/2" thickness ...............................................................47.00/ea.
Weld-Macro Etch...........................................................................................................52.00/ea.
Welf1-Fracture Test............................... ...............................33.00/ea.
Weld-Radiographic.........................................................................................................By Qwote
ReportCharge ........................................... ..................................................................45.001/ea.
Weld Procedures Qualifications ....................................................................................By Qtuote
KRAZAN!& ASSOCIATES,INC.
With Offices Serving the Western United States