HomeMy WebLinkAbout06-218 - Resolutions RESOLUTION NO. 06-218
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, APPROVING THE
RENEWAL OF AGREEMENTS WITH KRAZAN &ASSOCIATES,
INC., NINYO & MOORE, AND RMA GROUP, FOR ANNUAL
SOILS AND MATERIALS TESTING SERVICES FOR
PROPOSED CAPITAL IMPROVEMENT PROJECTS FOR FY
2006/2007, AND APPROVAL OF AMENDMENTS TO SUCH
CONTRACTS TO INCLUDE AN UPDATED AND REVISED FEE
SCHEDULE ("EXHIBIT C") REFLECTING REASONABLE,
ANNUAL COST-OF-LIVING EXPENSES
WHEREAS, Krazan & Associates, Inc., Ninyo & Moore, and RMA Group,
Contract No. 04-098, 04-099 and 04-100, respectively, were approved by City Council on July
21, 2004; and
WHEREAS, the contracts may be extended for additional one-year periods, up to
an additional two years, with mutual agreement of both parties; and
WHEREAS, Krazan & Associates, Inc., Ninyo & Moore, and RMA Group, have
requested renewal of their contracts; and
WHEREAS, Ninyo & Moore and RMA Group, have requested an amendment to
their contract(s) to include their current fee schedule, to increase the hourly rate for supported
fees, to reflect a reasonable cost-of-living increase; and
WHEREAS, said request is hereby approved and by this resolution the
contract(s) are hereby amended to include the current schedule of fees, to be labeled Exhibit
"C" within the contract(s), replacing the existing Exhibit "C".
NOW, THEREFORE, the City Council of the City of Rancho Cucamonga,
California, hereby resolves that said contracts are hereby renewed and amended to include the
current fee schedule, and the Mayor is authorized to sign this resolution.
Please see the following page
for formal adoption,certification and signatures
Resolution No. 06-218
Page 2 of 31
PASSED, APPROVED, AND ADOPTED this 5`h day of July 2006.
AYES: Alexander, Gutierrez, Michael, Spagnolo, Williams
NOES: None
ABSENT: None
ABSTAINED: None
William J. lexander, ayor
ATTEST:
Debra J. Ada C, City Clerk
I, DEBRA J. ADAMS, CITY CLERK of the City of Rancho Cucamonga,
California, do hereby certify that the foregoing Resolution was duly passed, approved and
adopted by the City Council of the City of Rancho Cucamonga, California, at a Regular Meeting
of said City Council held on the 5'h day of July 2006.
Executed this 6`h day of July 2006, at Rancho Cucamonga, California.
A%g aue�
Debra J. Ada s, MC, City Clerk
Resolution No. 06-218
Page 3 of 31
KRAZAN & ASSOCIATES, INC.
GENERAL FEE SCHEDULE
(Prevailing wage)
2004
Krazan &Associates, Inc.
4221 Brickell Street
Ontario, CA 91761
(909) 974-4400 Fax (909) 974-4022
Resolution No. 06-218
Page 4 of 31
KRAZAN « i1SSOCIATES, INC.
Schedule of Fees
Table of Contents
KEYMANAGEMENT STAFF............................................................................................................1
COMPANYPROFILE.......................................................................................................................2
TERMS OF PAYMENT AND CHARGES..............................................................................................3
GENERAL FEE SCHEDULE FOR PROFESSIONAL&TECHNICAL SERVICES..........................................5
ENVIRONMENTALSERVICES...........................................................................................................6
GEOTECHNICALSERVICES.............................................................................................................7
Exploratory Drilling, Sampling, and Travel...............................................................................7
Laboratory Tests. .......... ... . ..... .. .. ..............7
CONSTRUCTION TESTING AND INSPECTION SE :VICES .....................................................................8
Concrete..................................................................................................................................9
Reinforcement.......................................................................................................................10
Aggregates .................10
...........................................................................................................
AsphalticConcrete ....--.............................................................................---.............._.......11
Masonry and Related Materials.......... ... .. .......... ... .. ...... . . . .............................12
Miscellaneous and Specialty Testing 13
Metals..... ..... _. ..... ..................................................._........_............................ ...........
Resolution No. 06-218
Page 5 of 31
Ontario Fee Schedule
Page 1
KRAZAN & ASSOCIATES, INC.
Established 1982
Principals
THOMAS P. KRAZAN, R.C.E., R.G.E............................................. President
DEAN L.ALEXANDER, R.E.A., R.C.E., R.G.E........................Vice President
BYRON "KIP"WILLIAMSON.............................................. Managing Partner
KEY MANAGEMENT STAFF
DARREN COLEMAN RICHARD OPP
Testing & Inspection Division Manager Environmental Division Manager
CLARENCE JIANG
Geotechnical Division Manager
KRAZAN &ASSOCIATES,INC.
With Offices Serving the Western United States
Resolution No. 06-218
Page 6 of 31
Ontario Fee Schedule
Pape 2
COMPANY PROFILE
Krazan & Associates is a professional consulting firm specializing in
environmental studies, environmental chemical analysis, geotechnical engineering,
laboratory testing, construction testing and inspection, and contract drilling services.
Environmental studies are directed towards assessing and remediation
petroleum, hydrocarbon, heavy metal, herbicide, and pesticide-related contamination in
soils, groundwater, and air. Krazan & Associates services lending institutions, major oil
companies, private industry, utility companies, and governmental agencies in their
specific environmental needs. Environmental studies include soil and groundwater
investigations, as well as complex sampling and monitoring programs.
Geotechnical Engineering services include soils engineering and site selection.
Site selection services provide evaluation of the regional geologic framework, analysis
of the engineering properties of the on-site soils, determination of the slope stability,
and assessment of the effects of shallow groundwater on development.
Construction testing and inspection services provide quality control for new
construction. Services include both field and laboratory functions utilizing certified
inspectors. All Personnel are in constant radio contact with our regional offices for
immediate support and scheduling.
Contract drilling is provided to other professional firms requiring state-of-the-art
specialty drilling and sampling services for both Geotechnical Engineering and
Environmental -tudies.
K.RAZAiN S .ASSOCIATES, INC.
II uh Offices seeing the II'esmrn Unrted.Stales
Resolution No. 06-218
Page 7 of 31
Ontario Fee Schedule
Page 3
TERMS OF PAYMENT AND CHARGES
Terms of Payment
Invoices shall be deemed delinquent if not paid within 30 days of the invoice date
and will be subject to a late payment charge of 1.5% per month as liquidated
damages for additional credit and collection expenses incurred by Krazan &
Associates, Inc.
I qe(
r�G�(f C'�octc
Charges ,r
Minimum Charges
2 X(Ow
Hourly field services have a -flour minimum charge. Hourly office services have
a one hour minimum charge.
Regular Time Charges
Regular time charges are Monday through Friday, between 7 a.m. to 3:30 p.m.
Other arrangements available upon pre-approval.
Time and One-Half Charges
Time and one-half charges will be rendered on weekdays for services extending
beyond regular time, 8-12 hours of total service that day. Saturday services are
commonly available at time and one-half charges.
Double Time Charges
Services rendered on Holidays, Sunday, in excess of 8 hours on Saturday, or in
excess of 12 hours on weekdays, will be charged at double the normal rate.
Portal to Portal Charges
A portal to portal charge per call applies to all inspection and field work.
Miscellaneous and Subcontractor Charges
Miscellaneous or unusual charges, such as parking, mailing, shipping, etc.,
and/or subcontractor charges, such as backhoe fees, will be charged to the client
at cost plus 15%.
KRAZAN& ASSOCIATES,INC.
11',rh OjT cs Servtng the Western Untied Slates
Resolution No. 06-218
Page 8 of 31
Ontario Fee Schedule
Pate 3
Subsistence
On remote jobs or projects, subsistence, when not furnished, will be an
additional charge.
Cancellation
Late cancellation may be subject to reasonable charges if personnel cannot be
appropriately reassigned or if remobilization is required.
Insurance
Krazan & Associates, Inc. carries in excess of all insurance required by law.
Additional costs of extra insurance certificates, co-insurance endorsements or
additional insurance will be charged to the client at cost plus 15%.
Supervisor Charges
Supervisor charges are above and beyond unit rates quoted.
KRAZAN S ASSOCIATES, INC.
IPuh Offices Scrrrng the II CS(OI'11 C.'OlIeCI Stores
Resolution No. 06-218
Page 9 of 31
Ontario Fee Schedule
Pate 5
GENERAL FEE SCHEDULE FOR
PROFESSIONAL & TECHNICAL SERVICES
Professional
PrincipalEngineer ..................................................................................................... $175.00/hr.
Registered Senior Engineer ........................................................................................ 135.00/hr.
RegisteredGeologist................................................................................................... 125.00/hr.
Certified Asbestos Inspector/Manager ........................................................................ 110.00/hr.
Project Engineer/Manager........................................................................................... 110.00/hr.
ProjectGeologist......................................................................................................... 110.00/hr.
Chemist....................................................................................................................... 110.00/hr.
Environmental Specialist............................................................................................. 110.00/hr.
Project Administration 8 Analysis................................................................................ 110.00/hr.
Field Engineer/inspector.............................................................................................. 105.00/hr.
FieldGeologist............................................................................................................. 105.00/hr.
Technical
EngineeringTechnician............... ..................................................... ......... ..... .. . .. . $75.00/hr.
EnvironmentalTechnician.............................................................................................75.00/hr.
Autocad/Engineering Technician.................................................................................. 75.00/hr.
Support
Clerical............ ...................$45.00/Repan
......................................................................................
Subsistence.................................................................................................................85.00/day.
KRAZAN& ASSOCIATES, INC.
ff,ah Offices Serving the Western Unaed Stales
Resolution No. 06-218
Page 10 of 31
Ontario Fee Schedule
Page 6
ENVIRONMENTAL SERVICES
Asbestos Consultation and Analysis
Asbestos Project Manager ........................................................................................ $110.00/hr.
AsbestosTechnician ................. . . .... . .. . . ................................................................ 85.00/hr.
Analyze for Asbestos per EPA (PLM) Procedures .................................................35.00/sample
Consult for Asbestos Abatement...................................................................................By Quote
Wells
Groundwater Monitoring Well Installations....................................................................By Quote
Groundwater Extraction Well.........................................................................................By Quote
Vapor Monitoring Well Installation.................................................................................By Quote
VaporPoint Installation..................................................................................................By Quote
VaporExtraction Well....................................................................................................By Quote
Environmental Drilling, Exploration, Travel
Light Duty Drilling (continuous flight auger by Mobile Drill
Minutemanor Giddings).................................................................................. $155.00/hr.
Drilling (continuous flight, hollow stem auger or rotary wash, w/2 operators)
CME 45 Drill Rig truck mounted) ..................................................................... 175.00/hr.
CME 55 Drill Rig truck mounted ................................................. 185.00/hr.
Mobile Drill B-61/HDX Drill Rigtruck mounted 185.00/hr.
Mileage (support vehicles 00.50/mi.
Mileage drill rig) 00.80/mi.
Other Equipment & Services Rates
Sample Container Charge:
Stainless Steel Tube (including caps, Teflon/aluminum foil, labels, etc.) .........$10.00/ea.
6" Brass Sleeves (including caps, Teflon/aluminum foil, labels, etc.) ...................5.00/ea.
Personal Protective Equipment.....................................................................................By Quote
Hydropunch II Screen/Points/Seals.......................................................................: .By Quote
Moss Wire Line Continuous Core Soil Sampler ..._.................................... ...............300.00/day
Steam Cleaner or Pressure Washer..................................................................._......125.00/day
MagneticCable Locator.................................................................................................By Quote
Photoionization Detector ..._.......................................................................................100.00/day
Hermit 2000 Datalogcer Aquifer Testing Equipment.....................................................By Quote
Magnetomeier ...............................................................................................................By Quote
Electromaenetometer.._.._..................................._.......................................................By Quote
Clean-up/Remedial Equipment_....._................................................... .........................By Quote
Chemical ?.nalvsis of Soil and Groundwater Samples...._.............................................By Quote
KRAZAN S ASSOCIATES, INC.
11 ith Offices Semng the Neste,n United States
Resolution No. 06-218
Page 11 of 31
Ontario Fee Schedule
Page 7
GEOTECHNICAL SERVICES
Soils - Foundations - Geology
Exploratory Drilling, Sampling, and Travel
Light Duty Drilling (continuous flight auger by Mobile Drill
Minuteman or Giddings, operator only) .................................... $155.00/hr.
Drilling (continuous flight, hollow stem auger or rotary wash, w/2 operators)
CME 45 Drill Rig truck mounted) ..................................................................... 175.00/hr.
CME 55 Drill Rig (truck mounted) ..................................................................... 185.00/hr.
Mobile Drill B-61/HDX Drill Rig truck mounted .................... 185.00/hr.
(
Mileage (support vehicles ......................................00.50/mi.
PP )............................................
Mileage (drill rig) .................................................................................................00.80/mi.
Laboratory Tests
Sieve Analysis, Coarse, ASTM C 136.......................................................................$160.00/ea.
Fine (including wash), ASTM C 137, C 177.................................................................95.00/ea.
Hydrometer Analysis, ASTM D 422.................... ..........................................................90.00/ea.
Specific Gravity, Bulk SSD, Coarse, ASTM C 127, C 117...........................................115.00/ea.
Fine, ASTM C 128.....................................................................................................195.00/ea.
Atterberg Limits, ASTM D 4318............................ ......................................................160.00/ea.
Moisture-Density Relations of Soils, ASTM D 698, D 1557, State 216 ..................... .175.00/ea.
Consolidation Test ASTM D 2435...............................................................................225.00/ea.
Triaxial Compression Test, ASTM D 2850
Unconsolidated, Undrained ..............................................................................235.00/ea.
Consolidated, Undrained ..................................................................................325.00/ea.
Consolidated, Undrained with Pore Pressure...................................................500.00/ea.
Unconfined Compression Test, ASTM D 2166..............................................................85.00/ea.
Expansion Index, UBC-29-2........................................................................................195.00/ea.
Direct Shear Test, ASTM D 3080
Consolidated, Drained, 3 points........................................................................215.00/ea.
Permeability, Constant Falling Head, ASTM 2434 ......................................................225.00/ea.
Permeability, Falling Head/Flexible Wall (ASTM D5084), 1.4"-4" ...............................325.00 ea.
Permeability, Falling Head/Flexible Wall (ASTM D5084), 6.. ......................................450.00 ea.
Permeability, Falling Head/Flexible Wall (ASTM D5084), 12" ....................................750.00 ea.
Permeability Sample Remold ........................................................................................40.00 ea.
SulfateContent..............................................................................................................40.00/ea.
"R" (Resistance) Value, Cal. 301, ASTM D 2844 ........................................................240.00/ea.
"R" (Resistance) Value, Lime Treated or Requiring Recombining...............................280.00/ea.
California Bearing Ratio, ASTM D 1883......................................................................650.00/ea.
Plate Bearing Test, ASTM D 1195, D 1196...................................................................By Quote
IndexTests not Listed ...................................................................................................By Quote
KRAZAN & ASSOCIATES, INC.
11ith Offices Serving the Western United States
Resolution No. 06-218
Page 12 of 31
Untano fee SChedUie
Page 8
CONSTRUCTION TESTING AND INSPECTION SERVICES
Administrative
EngineeringReview................................................................................................... $110.00/hr.
ReportPreparation ................................................................................................... 45.00/report
Job Site Inspection
SoilCompaction .......................................................................................................... $60.00/hr.
Masonry, Concrete, Gunite, Epoxy................................................................................ 60.00/hr.
Structural Steel, Welding, Bolt.Torque ..........................................................................60.00/hr.
Pile Driving, Soldier Beams, Shoring, Caissons .......................................................... 110.00/hr.
Build-upRoofing, Fire Proofing .......... 60.00/hr.
Plant Inspection
Structural Steel Fabrication ......................................................................................... $60.00/hr..
ConcreteBatch Plant....... ....... ............. .......... .... . .. . ... . ....... .. ... ... . ............ 60.00/hr.
Pipe Plant (Reinforced Concrete, Clay, etc). ................................................................. 60.00/hr.
Glue-Laminated Fabrication (Local) .............................................................................. 60.00/hr.
AsphaltBatch Plant....................................................................................................... 60.00/hr.
Nondestructive Examination
Ultrasonic, Magnetic Particle, Dye Penetrant................................................................By Quote
Radiographic .................................................................................................................By Quote
Pachometer....:................................................................................:.............................By Quote
SchmidtHammer...........................................................................................................By Quote
Coring
Technician and Equipment........................................................................................ $130.00/hr.
BitCharge......._ ........... ........................ .......................................................................7.00/inch
KRAZ.4N S ASSOCIATES, INC.
i1 ah Offices Sen Ing the Wes Cern Luted Stares
Resolution No. 06-218
Page 13 of 31
Ontario Fee Schedule
Page 9
Concrete
Cylinder, Beams & Cores
Compression Test, 6" x 12" Cylinders, Including Hold,ASTM C 39 (set of 4)...........$100.00/set
Compression Test, Cores, ASTM C 42 (Does Not Include Special Prep. time) ............50.00/ea.
Core Cuffing (In Laboratory) 40.00/ea.
..........................................................................................
Flexure Test, 6" x 6" Beams, ASTM C 78......................................................................95.00/ea.
Splitting Tensile, 6" x 12" Cylinders, ASTM C 496 ........................................................50.00/ea.
Modules of Elasticity Test - Static, ASTM C 469...........................................................85.00/ea.
Unit Weight Determination .............................
..............................................................2 5.00/ea.
Shrinkage
Length Change (3 Beams, 4 Readings, Up to 90 Days), ASTM C 157 Modified.............$260.00
......
Additional Reading................. 30.00/3 bar set
..........................................
Storage Over 90 days, Per set of 3 Beams..............................................................20.00/month
Mix Design
Aggregate Tests for Concrete Mix Designs Only, Including Sieve Analysis, Specific
Gravity,
No. 200 Wash, Organic Impurities, Weight Per Cubic Foot,
PerAggregate Size.........................................................................................$400.00/ea.
Review of Mix Design Prepared by Others..................................................................130.00/ea.
TrialBatch, ASTM C192..............................................................................................900.00/ea.
KRAZAN& ASSOCIATES,INC.
With Offices Serving the Western United States
Resolution No. 06-218
Page 14 of 31
Ontario Fee Schedule
Page 10
Reinforcement
Reinforcing Steel ASTM A 615
Tensile Test, No. 11 Bar or Smaller ........................................................................... $50.00/ea.
Bend Test, No. 11 Bar or Smaller.........................................:........................................45.00/ea.
TensileTest, No. 14 Bar................................................................................................70.00/ea.
Tensile Test, No. 18 Bar................................................ ..............................................80.00/ea.
Receive and Distribute Mill Certificates .........................................................................10.00/ea.
Welded Specimens
Tensile Test, Welded, No. 11 Bar or Smaller..............................................................$50.00/ea.
Tensile Test, Welded, No. 14 Bar .................................................................................80.00/ea.
Tensile Test, Welded, No. 18 Bar .................................................................................80.00/ea.
Tensile Test, Mechanically Spliced Bar.......................................................................115.00/ea.
Nick Break, Welded Re-Bar...........................................................................................30.00/ea.
Prestress (Attachments To Be Furnished by Client)
Tensile Test and Elongation In 24" for Prestress Strand, ASTM A 416 ......................$95.00/ea.
Tensile Test and Elongation In 10' for Prestressing Wire, ASTM A 421.......................50.00/ea.
Modules of Elasticity (Prestressing Wire)....................................................................110.00/ea.
Aggregates
Basic Tests
Sieve Analysis - Processed (Each Size), ASTM C 136 .............................................$100.00/ea.
SieveAnalysis - Pit Run ..............................................................................................165.00/ea.
Specific Gravity, Coarse, ASTM C 127..........................................................................95.00/ea.
Specific Gravity, Fine, ASTM C 128..............................................................................95.00/ea.
Absorption, ASTM C 127, 128.......................................................................................50.00/ea.
Unit Weight Per Cubic Foot, ASTM C 29 ......................................................................55.00/ea.
Deleterious Materials
Organic Impurities, ASTM C 40.................. ................................................................$80.00/ea.
Clay lumps and Friable Particles, ASTM C 142 .........................................................115.00/ea.
Material Finer than No. 200 Sieve, ASTM C 117...........................................................65.00/ea.
Coal and Lignite, ASTivl C 123....................................................................................115.00/ea.
Soft Particles. ASTM C 235...........................................................................................80.00/ea.
AcidSolubility . _. ..........................................................................................................40.00/ea.
KAAZAN & ASSOCIATES, INC.
frith Offices SerTrng rhe Western United Srmes
Resolution No. 06-218
Page 15 of 31
unrano ree�cneaute
Physical Properties Pale I 1
Soundness - Sodium or Magnesium (5 cycle), ASTM C 88 ................................
Abrasion (L.A. Rattler 100 & 500 cycles), ASTM C 131 .................. $390.00/ea.
Potential Reactivity(Chemical Method 3 Determinations), ASTM C 289. - .... . ......450.00/ea.
Potential Reactivity (Mortar Bar Method, ASTM C 227 ...................................
Percent Flat or Elongated Particles, CRD C 119.........................................................190.00/ea.
Percent Crushed Particles, Calif. 205............................................
............................105.00/ea.
State Tests
CleannessValue, CAL. 227......................................................................................$130.00/ea.
Durability Index, CAL. 229................... . . .. ...
Sand Equivalent (Average of 3), CAL. 2'-1'7"-*
17.. ......... ..... ......
..................................................................195.00/ea.
Clay by Hydrometer Methods, ASTM D 422...................
....
...........................................90.00/ea.
"R" (Resistance) Value, CAL. 301, ASTM D 2844.......................................................240.00/ea.
"R" (Resistance) Value, Lime Treated or Requiring Recombining......................
.........280.00/ea.
Asphaltic Concrete
Stability Tests
Hveem, Pre-Mixed, CAL. 304.........................................................................$290.00/ea.
Hveem, Lab-Mixed, CAL. 304...........................................................................400.00/ea.
Marshall, Pre-Mixed, ASTM D 1559 ........................................................
Marshall, Lab-Mixed, ASTM D 1559....................................................... ""'290.00/ea.
Maximum Density 400.00/ea.
Hveem, Pre-Mixed, CAL. 304 ............................................................ ...........290.00/ea.
Hveem, Lab-Mixed, CAL. 304...........................................................................400.00/ea.
Marshall, Pre-Mixed, ASTM D 1559 ...............................................................290.00/ea.
Marshall, Lab-Mixed, ASTM D 1559.................................................................400.00/ea.
Gradation on Extracted Sample (Including Wash) ......................................................180.00/ea.
Maximum Theoretical Unit Weight (Rice Gravity)ASTM 204......................................250.00/ea.
Complete Asphalt Concrete Mix Design (Hveem or Marshall).......................................By Quote
Extraction, % Asphalt, ASTM D 2172 (Method B) or CAL.310
Excluding Ash Correction..................................................................................160.00/ea.
PenetrationASTM D ...................................................................................................
Asphalt Core Density 720.00/ea.
P ty.....................................................................................................35.00/ea.
AC Content, CAL 382.............................................................:
............................160.00/ea.
KRAZAN & ASSOCIATES,INC.
With Offrees Serving the Western United Slates
Resolution No. 06-218
Page 16 of 31
vj1,W 1V• JPage 12
Masonry and Related Materials
Brick ASTM C 67
Modules of Rapture (Flexure)......................................................................................$65.00/ea.
CompressiveStrength...................................................................................................40.00/ea.
Absorption - 5 Hour or 24 Hour .....................................................................................50.00/ea.
Boil, 1, 2 or 5 Hour.........................................................................................................50.00/ea.
InitialRate of Absorption ...............................................................................................40.00/ea.
Efflorescence............................................... .................50.00/ea.
................................................
Dimensions, Overall, Coring, Shell and Web Thickness ............................................ 16.00/brick
Coefficient of Friction (Slip Test .....................30.00/ea.
Cores, Compression............................................
.....
.............
.........
.........
......................
40.00/ea.
Cores, Shear, 6" and 8" Diameter, 2 Faces ................................................................60.00/core
Concrete Block ASTM C 140
Moisture Content as Received ....................................................................................$40.00/ea.
Absorption .................................................... ............65.00/ea.
. ................................................ .
.
Compression ......................................................................................................
...........70.00/ea.
Tension........................................................................................................................130.00/ea.
Shrinkage, Modified British, ASTM C 426 ...................................................................130.00/ea.
Compression, 4,/6/8 Cores............................................................................................65.00/ea.
Masonry Prisms ASTM E 447
Compression Test, Grouted Prisms ..........................................................................$150.00/ea.
CuttingPrisms ...............................................................................................................By Quote
Unreinforced Masonry Building Tests
In-Place Shear (Push) Tests .........................................................................................By Quote
15 Degree Core Shear Tests.........................................................................................By Quote
Wall Anchors ........................ ... . . . ...... ...... .... ... . ..... . . .... .... ...... By Quote
Mortar & Grout UBC Standard 24-22
Compression, 2" x 4" Mortar Cylinder......... ................................................................$25.00/ea.
Compression, 3" x 6" Grout Prisms...............................................................................25.00/ea.
Compression Test, 2" Cubes, ASTM C 109..................................................................30.00/ea.
Gypsum Roof Fill ASTM C 495
CompressionTest .......................................................................................................$16.00/ea.
Density...........................................................................................................................25.00/ea.
Gunite
Compression, 2, 4, 6" Cores, ASTM C 42.........................................................._.......$40.00/ea.
KRAZAN & ASSOCIATES,INC.
With Offices Serving the Western Untied States
Resolution No. 06-218
Page 17 of 31
Roofing Tile Page 13
Roofing Tile Breaking Strength per U.B.C...................................................................$25.00/ea.
Roofing Tile Absorption...............................................................................
......
............40.00/ea.
Roofing Tile Additional/Special Tests............................................................................By Quote
Slate
Modulesof Rupture.....................................................................................................$50.00/ea.
Modules of Elasticity....................................................................................................130.00/ea.
Water Absorption...........................................................................................................50.00/ea.
Weathering....................................................................................................................65.00/e a.
Fireproofing Tests
Field Sampling by Technician....................................................... . $75.00/hr.
.......................... . .
Oven Dry Density....................................................................................................40.00/sample
Miscellaneous and Specialty Testing
Testing Machines
Testing Machine with Operator in Laboratory
60,000 to 250,000 Machine (Compression Only)
30 Minutes including set-up time, Minimum..........................................................$110.00
60 Minutes including set-up time, Minimum............................................................160.00
400,000 Pound Machine (Universal)
30 Minutes including set-up time, Minimum............................................................160.00
60 Minutes including set-up time, Minimum............................................................225.00
LoadTests..........................................................................................................By Quote
Calibration of Skidmore-Wilhelm Device & Torque Wrench
Calibration of Skidmore-Wilhelm Device, in Lab ...............................................................$70.00
Calibration of Torque Wrench, each bolt size (3 Required).................................................60.00
Calibration of Hydraulic Jacks
FirstJack...........................................................................................................................$70.00
Each Additional Jack (same time).............................................................................60.00
Preparation of Electrical System for Test, each ............................................................By Quote
Note: Extra handling charges will be made on any ram or pump too heavy
or bulky for one man to safely lift.
APIGauge Calibration......... ................................................ ......................................$90.00/ea.
HydrostaticTests.........................................................................................................ey Quote
KRAZAN& ASSOCIATES, INC.
With Officer Serving the Western United States
Resolution No. 06-218
Page 18 of 31
- - - _ Page 14
Manhole Cover Tests
1-3 .............................................................................................................................$100.00/ea.
Morethan 3 ...................................................................................................................85.00/ea.
Mechanical Testing Services
Tensile Test- No Strain Measurement, Yield by Halt of Dial
Upto 100,000 Ib. ..............................................................................................$30.00/ea.
100,001 to 200,000 Ib.........................................................................................45.00/ea.
Over200,000 Ib., each .......................................................................................By Quote
Tensile Test-.Mechanical Non-Printout Extensometerfor Strain..................................30.00/ea.
Tensile Test- Electronic Extensometer with Recorded Printout...................................50.00/test
Morethan 1 test.............................................................................................................By Quote
Load Tests, Flexural, Bend, Impact, Axial, Racking ......................................................By Quote
StrainGauge Testing.....................................................................................................By Quote
Bend Test......................................................................................................................
30.00/ea.
Note: Sockets furnished by client
Salt Spray
SetUp .............................................................................................................................$195.00
24 Hours, per panel.............................................................................................................40.00
Multi-Channel Computer Aided Data Acquisition of:
Acceleration...................................................................................................................By Quote
Vibration ........................................................................................................................By Quote
Movements (1.0001 inch)..............................................................................................By Quote
Pressure........................................................................................................................By Quote
Machine Control Movement...........................................................................................By Quote
Temperature..................................................................................................................By Quote
StrainGauge ..................................................................................................................By Quote
StressAnalysis..............................................................................................................By Quote
Metals
Weld Procedure Qualification and Welder Qualification
WeldTensile Test........................................................................................................$60.00/ea.
WeldBend Test.............................................................................................................33.00/ea.
Machining for Weld Test, 1/2" thickness and less.................................................... 32.00/ea.
Machining for Weld Test, over 1/2" thickness ...............................................................47.00/ea.
Weld-Macro Etch...........................................................................................................52.00/ea.
Welo-Fracture Test........................................................................................................33.00/ea.
Weld-Radiographic........................................................................................................By Quote
ReportCharge ........................................... ..................................................................45.00/ea.
Weld Procedures Qualifications ....................................................................................By Quote
KRAZAN &ASSOCIATES,INC.
With Offices Serving the Western United States
Resolution No. 06-218
Page 19 of 31
Professional Service Agreement June 19,2006
Rancho Cucamonga, California Projcct No. 2059650018
EXHIBIT "C'
SCHEDULE OF FEES (AMENDMENT JULY 5, 2006)
HOURLY CHARGES FOR PERSONNEL
Prindpal Engineer/GeologisUEnvironmental ScienfisL_........................................................._........................... $ 139
Senior Engineer/Geologist/Environmental Scientist........ ........._........................._........_...._............._..._.......... $ 133
Senior Project Engineer/GeologisUEnvironmental Scientist..................... .................. .......... $ 127
Project Engineer/Geologist/Environmental Scientist_............._._..._.._.............._.._..._....__................_....._-.__. $ 123
Senior Staff Engineer/Geologist/Environmental Scientist. . ................._................_.........._.._......... $ 109
Staff Engineer/GeologisUEnvironmental Scientist...................................................._._...._................_.__........... $ 96
GIsAnalyst.........................._............._........_............................_........................._....__........_...._...__.......-...... $ 96
FieldOperations Manager.............._.___...._...................................._.......__..............._........._._......_............ $ 85
Nondestructive Examination Technician,UT,MT,LP........................__..................................___...................... $ 80
Pull Test Technician and Equipment..._...................._............................................._.......................................... $ 80
SupervisoryTechnician..._.........._......._.....-.........._...................._......_.........................._................................ $ 74
Senior Field/Laboratory Technician.... ........................................._..................................._...._.............._ $ 69
Technical Illustrator/CAD Operator._............._......._ ..........................................................................__._...... $ 69
Field[Laboratory Technician..._................_.....__.._.._.................._.........................................................._..._.... $ 64
ACIConcrete Technician......__............................__..........._..._..._.........._............._.._.................._................... $ 64
Concrete/Asphalt Batch Plant Inspector............................................................._............._._.......__..............._... $ 64
Special Inspector,Reinforced Concrete...... ............................_.............................-........._..... .................... $ 64
Special Inspector,Pre-stressed Concrete..............._...................................-......_....................__..................... $ 64
Special Inspector.Reinforced Masonry.........___....._.................................................._....................................... $ 64
Special Inspector,Structural Steel ...._.........._.............................._._.___....._...................................................... $ 64
Special Inspector,Welding.AWS............_....... ...........__... .......................__... ................................. ...- $ 64
Special Inspector,Fireproofing...... ..._........_
Geotechnical/Environmental/Laboratory Assistant.................................._..._.....__.................................._..._-... $ 53
InformationSpecialist._.....................-____........................................_............................................................. $ 52
Data Processing,Technical Editing,or Reproduction.........._............._................................................................. $ 44
OTHER CHARGES
Expert Witness Testimony...................................._.._....................._.:...._..._..__......................................_. $ 300 /hr
Concrete Coring Equipment(includes one technician)....................................___...................____.......... $ 145 /hr
Special Preparation of Standard Test Specimens.._............._..._..._....._..............,.._._......_........................ $ 64 /hr
InclinometerUsage .............- ..._................._._.................._............__.................._....._..............._._......... $ 32 /hr
VaporEmissionKits.............._............................._....._._.......__..._.............. .......... ................................. $ 30 [kit
Rebar Locator(Pachometer)............................................ . ................. $ 10 /hr
NuclearDensity Gauge Usage__..._._.........................................................__............................................ $ 9 [hr
FieldVehicle Usage....................-.................._......_....._................_.__.....................__........................... $ 8 /hr
Direct Project Expenses.._ __........................................._................._.._.............._...._............__.......Cost plus 15
Laboratory testing, eo h sical equipment,and otherspecial equipment rovided upon request.
NOTES(Field Services)
For field and laboratory technicians and special inspectors, regular hourly rates are charged during normal weekday
construction hours.Overtime rates at 1.5 limes the regular rates will be charged for work performed outside normal con-
struction hours and all day on Saturdays. Rates at twice the regular rates will be charged for all work in excess of 12
hours in one day or on Sundays and holidays. Lead time for any requested service is 24 hours. Field Technician rates
are based on a 2-hour minimum. Special inspection rates are based on a 4-hour minimum for the first 4 hours and an 8-
hour minimum for hours exceeding 4 hours.Field personnel are charged portal to portal.
INVOICES
Invoices will be submitted monthly and are due upon receipt.A service charge of 1.0 percent per month may be charged
on accounts not paid within 30 days.
zosacsooia
C2
Resolution No. 06-218
Page 20 of 31
Professional Service Agreement June 19,2006
Rancho Cucamonga, California Project No. 205965001 R
SCHEDULE OF FEES FOR LABORATORY TESTING
Laboratory Test, Test Designation, and Price Per Test
Sells Concrete
AUerbwg Limits,04318,CT 204_._................................___.E 130 Cement Analysis Chemical and Physical,C log $ 1,500
California Bearing Ratio(CBR),D 1883--.-............ .......$ 400 Compression Tests,602 Cylinder,C 39........._....._.......................$ 19
Chloride and Sulfate Content,CT 417&CT 422..__._.__......$ 120 Concrete Mu Design Review,Job Spec $ 125
Consolidation,D2435.CT 219._...................__.............._.___.$ 250 Concrete Mix Design,per Trial Battle,6 cylinder,Act..................__.$ 675
Consolidation-Time Rale,D 2435,CT 219.............................E 60 Concrete Cores,Compression(excludes sampling),C 42.__._.___$ 50
Direct Shear-Remolded,D3060.................................__.....$ 260 Drying Shrinkage,C 157.....__....._.............._....................................E 225
Dked Shear-Undisturbed,D 3080 ---- . .. ..........E 225 Flexural Test,C 78........_..................._......... .............._..__$ 45
Double Hydmmeter Analysis,D422,CT203 .._.._..__,._.-$ 270 Flexural Test,C 297 $ 50
Durability Index,CT 229.-- .............. .........--S 140 Flexural Test,CTS23_.....-..... ....................... __._...$ 55
Expansion Index,D 4829,UBG 18-2......_.._........___.._........$ 150 Gunite/Shotcrete,Panels,3 ant cones per panel and test, ACI...._...S 225
Expansion Potential(Method A),D4546--.- ..............- .$ 130 Jobsite Testing Laboratory. ._._._...._......_ Duoie
Expansive Pressure(Method C),D4546..._..........__....._........$ 13o Lightweight Concrete Fill,Compression,C 495 ................. 35
Geofabnic Tensile and Elongation Test,D 4632......----_.—$ 150 Petrographic Analysis,C 856...... _...
......_......._.._.....$ 1,000
Hydraulic GontludMly,D 5084_..203.............
.................................E 275 Splinirg Tensile Strength,C 496 § 70
Hydrometer h,&Organic 2,CTof Peat/Organic
Scil..............$ 175 Reinforcing and Structural Steel
Moisture, nly,&OrganiCMatter of PeaVOganic Soils._.._.....E 100
Fireproofing Density Test,UBC]E_._..__.__.:................................E 50 i
Moisture anly,D221Q 2937 ......._.._.__..._._ ..$ 25
"��������'���������� Hardiness Test Rockwall.A-370 $ 45
PermeMoisture and Density,D 2937...... ............._ ........_..§ 35 High Strength Bolt,Nut&Washer Conformancesol A-32..............$ 110
pHard Resi CH,D24643..-. . .......$ 210 9 9
pH and ResisBv'Iry,CT643...._.__. ............ .....E 125 Mechanically Spliced Reinforcing Tensile Test ACl E 05
Proctor Density 1557.D698.CT 216,&..............................A 160 PoaStress Strand(]wire),A 416....._........._.--- - _.$ 125
AASHTO T-1 Bo(Rork corrections add$80) Chemical Analysis,A-36,A-615 .........................E 110
R-yaNe,D2844,CT301 _$ 225 Reinforarg Tensile or Bend up to No.11,A 615&A 706..._._...__$ 45
_.... ....
Sant Equivalent,D 2419 217 Cr 21] ....5 Bo Struduml Steel Tensile Test.U..l0 200,000 lbs.
Sieve Analysis,D 422,CT200Wsh 202..... __._. _.____$ 100 (machiWelded
extra),T 370-ensile Te ...,1
Sieve Analysts,200 Wash,D1140,CT 202.__.._...._.__..___..$ BO Welled Reinforcing Tensile Test Up t0 Na.11 bars.ACI..........._...$ 50
Specific Gravity,D 854...._......................... .._. __.._$ 80 Asphalt Concrete
Tdatdal Shear,C D D 4767,T 297 _._...S 350
Triaxial Shear,C.U.,wiloore
aor pressure.D 4767,767 T 2297 per pl.$ 300 Asphalt Mu Design,Review.
pe ........_....E 2,000
......._..........................
Triaxial Shear,Co..w/opore pressure,D, .- 2297......pl..$ 175 Extraction,
Design Re view,Job Spec-.____.._......__................._.A 195
Tnaual Shear.1pmss2850....66......_.___.._...._....................$ 125 Extraction,ng.CT 3fi,including Gradation,021]2,CT 310....___$ 195
Wax Density,
ComPresskm,DZ1667208 ........._.. .._...._$ 90 Hve Snoring.CT and Unit
._-._...._. .. .................8 90
Wax Densily,D1188__.............. ___._.... _.._._...q 80 Marsh l Stably ,and UrM Weight CTM or ASTM C7366___..._.._..$ 175
Marshall Stab9iry,Floe and Unit Weight,T-245... E 195
Roblin o Maximum Theoretical Unit Wright.D2041............._._._........._._--$ 110
Built-up Roofing,rut-mut samples,D 2829 . $ 150 Swell,CT 305_..._........................__.....__.._................._.__...._._.$ 150
._... .. ....... __._..
Roofing Maleriak Analysis D 2829 _...... _......$ 450 U^d Weight sample or cure,D 2726.CT 308.. .._. $ 80
Roofing Tile Absorption(aetgf5),UBC 15-5._.____..............S 175 Aggregates
Roofing Tile Strength Test,(set of 5),UBC 1S5_..-._._._._...'$ VS Absorption,Coarse.C127__._..-................__.... ........_....._._.$ 30
Mason Absorption.Fine,C 126 $ 30
Brig Absorption,24-hour submersion,C 67.._....................__.$ 4o Clay Lumps and Friable Particles.0 142_.._....._..............................$ 95
Brick Absorption,5-hour boiling,C 67 ... ...........It 50 Cleanness Value,OT 227 -.. __.............. .............._._._..E 110
Brick Absorption,7day,C 67 -_-- ._._ ....... .$ 55
Crushed Particles,CT 205........ .................... _._.....____.$ 130
. ...._..
Brick Compression Test Cb]...... ........E 40 Durability,Coarse,CT 229_.. __.. _. . ._.................$ 120
Brink Modulus nce,C67...._.__.. __... .___..$ 40 Los
Fine0sion,C.131 ....._.... ... ........_......$ 120
Bock Modulus of Rupture.C 67.... _ .............,§ 35 Los Angeles g propon,C 131 or 6 535........... ..__.._.___..$ 165
��'��'� Mortar Makin dies o/linea aggregate, _.___._...
Brick Moisture as received,C 67_ _....... _._$ 30 9 tirope 99re9 - -.E 250
BrickSaturationBlock Comp tlenion Te t......____ .........................E 45 Organic l Read Mtyofs. 0..___ .....lM __-_....._S 50
Concrete Block Compression Test,8x8x16,C 140..................8 55 Potential Readivily of Aggregate(Chemical Method),G 269......__..$ 350
Concrete Block Conformance Package,C 90__......................S 400 Sand Equivalent,GT 217...... ....._._.. ......................__....$ 80
Concrete Block Unear Shrinkage,C 426............... .._.____.$ 110 Slave Analysis,Coarse Aggregate C 136...... ............-.1 95
Concrete Block Und Weight and Absorption,C 140_...............5 50 Sieve Analysis,Fine Aggregate(including wash),C 136.................$ 95
Cores,Compression or Shear Bond,CA Code..........._...........$ 50 Sodium Sulfate Soundness(per size traction),C 88 $ 145
Masonry Grout,3x3v6 prism compression,UBC 21-16..._..._..$ 25 Specific Gravity,Coarse,C 127.....................__._..............._....._.E 65
Masonry Mortar,2x4 cylinder compression.UBC 21-16...._....$ 25 Speofic Gravity,Fine,C 128. __..._.... .............._.._.§ 75
Masonry Prism,half size.compression,UBC 21 17__. _......$ 100
Special preparation of standard test speamens will be charged at me technician's hourly rate.
Ninyo&Moore is accredited to perform the AASHTO equivalent of many ASTM test procedures.
205Y6xlplR Rdpi' 6®®a��®&/!tlE®�y�
C2 9�!
Resolution No. 06-218
Page 21 of 31
EXHIBIT "C"
(AMENDMENT JULY 5, 2006)
VRMA IMF~ MATERIALS TESTING LABORATORY
City of Rancho Cucamonga
Annual Soils and Materials Testing
Contract Extension
Rancho Cucamonga,CA
June 21,2006
SCHEDULE OF FEES
2006
Technician
Description Rate/Cost
Soil Technician $62.00
Senior Soil Technician $62.00
Soil Technician-Retesting $62.00
Public Works Inspector $62.00
Public Works Technician $62.00
Public Works Inspector-Asphalt Paving $62.00
Public Works Inspector- Asphalt Plant $62.00
Public Work Inspector-Concrete Paving 562.00
Public Works Inspector-Concrete Plant $62.00
Public Works Inspector-Resident Inspection $85.00
Traffic Control Personnel $60.00
Laboratory Technician-Field Lab $60.00
Laboratory Technician Batch Preparation 560.00
.Special Inspector-Reinforced Concrete(ICBG) $65.00
Special Inspector- Pre-Stressed Concrete(ICBG) $65.00
Special Inspector-Concrete Batch Plant 565.00
Concrete Technician (ACI) 562.00
Pick-up&Delivery of Test Specimens $48.00
1D Reinforcing or Structural Steel $62.00
Special Inspector Fire Proofing(ICBG) $65.00
Special Inspector Epoxy Bolting $65.00
Special Inspector Roofing/Nailing $65.00
Special Inspector Masonry(ICBG) $65.00
Special Inspector-Masonry (DSA) $65.00
Special Inspector-Grout Batch Plant $65.00
Special Inspector-Field Welding(AWS CW I) $65.00
Special Inspector- Shop Welding(AWS CWI) $65.00
Special Inspector-Structural Steel (ICBG) $65.00
Special Inspector-High Strength Bolting(ICBG) $65.00
Special Inspector-Timber $70.00
RMA Job N°: 05-142-0 Page 2
E -d L82b Goo 6n6 dnoi0 HWN WdLI =E 9002 t2 Jnr
Resolution No. 06-218
Page 22 of 31
VRMA YFOVp MATERIALS TESTING LABORATORY
City of Rancho Cucamonga
Annual Soils and Materials Testing
Contract Extension
Rancho Cucamonga,CA
June 21,2006
Technician
cont
Description Rate/Cost
Ultrasonic Testing- Level Il Technician $75.00
Ultrasonic Testing - Level III Technician $95.00
Magnetic Particle Technician- Level II $75.00
Liquid Penetrants Technician- Level II $75.00
Anchor Pull Tests $75.00
Bolt Torque Tests $75.00
Project Inspector(IOR) $85.00
Asphalt Coring $80.00
Concrete Coring $80.00
Horizontal Wall Coring $85.00
Assistant Wall Coring $58.00
Coring Bit Wear(per inch) $2.00
Supervising Soil Technician $85.00
Supervising- Public Works $85.00
Supervising - Special Inspection $85.00
Quality Control Manager $85.00
Per Diem $65.00
Shift Differential $2.00
RMA Job N": 05-142-0 Page 3
b d L82b 686 6o6 dno,g HWN WdLI :6 9002 12 unr
Resolution No. 06-218
Page 23 of 31
1
RMA Grovp MATERIALS TESTING LABORATORY
City of Rancho Cucamonga
Annual Soils and Materials Testing
Contract Extension
Rancho Cucamonga,CA
June 21, 2006
Lab Aggregates
Description Rate/Cost
Abrasion by Los Angeles Rattler $150.00
Cleanness Value-Fine or Coarse $150.00
Deleterious Substance Determination $120.00
Dry Rodded Unit Weight $100.00
Durability Index-Fine&Coarse $275.00
Durability Test—Coarse $180100
Durability Test—Fine $145.00
Fineness Modulus $80.00
Flat and Elongated Pieces-(per size fraction) $150.00
Fractured Faces- (per size fraction) $50.00
Light Weight Particles $200.00
Moisture Content $20.00
Organic Impurities $80.00
Percent Clay in Sands by Hydrometer $150.00
Percentage Crushed Particles $145.00
Potential Reactivity- Chemical Method $350.00
Sand Equivalent $100.00
Sieve Analysis-Fine&Coarse Aggregates $130.00
Sieve Analysis-Fine Aggregates (passing No.4) $115.00
Sieve Analysis-Coarse Aggregates (Retained on No 4) $gO.00
Soundness by Sodium Sulfate-(Coarse Series) $375.00
Soundness by Sodium Sulfate (Fine Series) $495.00
Specific Gravity & Absorption of Coarse Aggregate $65.00
Apparent Specific Gravity of Fine Aggregate $85.00
Specific Gravity & Absorption of Fine Aggregate $125.00
Fine Aggregate Angularity(1'304) $95.00
RMA Job NO: 05-142-0 Page 4
g -d LB24 686 606 dno�g HWN WdLI :E 9002 I U,,
Resolution No. 06-218
Page 24 of 31
RMA Croup MATERIALS TESTING LABORATORY
City of Rancho Cucamonga
Annual Soils and Materials Testing
Contract Extension
Rancho Cucamonga, CA
June 21,2006
Lab Asphah
Description Rate/Cost
Film Stripping $115.00
Kc Factor $95.00
Kf Factor $125.00
Moisture Vapor Susceptibility $245.00
Swell Potential(CAL 305) $180.00
Bulk Specific Gravity Per Specimen(ASTM Saturated Surface Dry) $40.00
Bulk Specific Gravity(ASTM Saturated Surface Dry Cores) $40.00
Bulk Specific Gravity Per Specimen(ASTM Parafilm Coated) $50.00
Bulk Specific Gravity(ASTM Parafilm Coated Cores) $50.00
Bulk Specific Gravity(CTM 308 Method A) $45.00
Bulk Specific Gravity(CTM 308 Method A Cores) $45.00
Bulk Specific Gravity(CTM 308 Method C) $40.00
Bulk Specific Gravity(CTM 308 Method C Cores) $40.00
Field Test Maximum Density(CAL 375) $140.00
Lab Test Maximum Density(CAL 375) $175.00
Lab Test Maximum Density-Hveem Method $175.00
Lab Test Maximum Density-Marshall Method $175.00
Theoretical Maximum Specific Gravity-Rice $195.00
Marshall Stability and Flow - lab compacted $280.00
Marshall Stability and Flow- field compacted $220.00
fiveem Stability $195.00
Hveem Stability and Density $225.00
Moisture Content of Mix(CAL 370) $50.00
Moisture Content of Mix(CAL 310) 5185.00
Tensile Strength Ratio(AASHTO T283) $575.00
Surface Abrasion Test(CAL 360) $650.00
Extraction - Percent Asphalt by Ignition Oven $120.00
Extraction- Percent Asphalt by Ignition Oven -Calibration $250.00
Extraction-Percent Asphalt by Solvents(Vacuum) 5175.00
Extraction-Percent Asphalt by Solvents(Centrifuge) $175.00
Gradation of Extracted Aggregate $130.00
Percent Voids(CAL 367) $195.00
Percent Resdue by Evaporation (ASTM D244) $125.00
R,v1A Job N°: 05-142-0 Page 5
9 -Ol LB2b BBB G06 dnorg uwd WdLl :c 9002 le unr
Resolution No. 06-218
Page 25 of 31
VRFMAGFOUP MATERIALS TESTING LABORATORY
City of Rancho Cucamonga
Annual Soils and Materials Testing
Contract Extension
Rancho Cucamonga,CA
June 21,2006
Lab Concrete
Description Ratc/Cost
Mix Design Review- Calculation Only $225.00
Concrete Cylinder Cured and/or Compression Tested $21.00
Compression Test Cores-8"maximum diameter(including trimming $50.00
Insulating Concrete Cylinders-Compression Test $45.00
Insulating Concrete Cylinders-Constant Weight $45.00
Flexural Strength-Concrete Beams $105.00
Gunite Compression Tests $25.00
Shoterete Compression Tests 525.00
Concrete Modulus of Elasticity $175.00
Concrete Shrinkage Test(set of 3) $430.00
Cement Content of Hardened Concrete $1,500.00
Splitting Tensile Test $75.00
Unit Weight of Cylinders S55.00
Air Content CAL 504 $70.00
Ball Penetraction CAL 533 $70.00
Slab Moisture Test $45.00
Side to Side Crush(CCTI T-108) $21.00
Water Retention of Liquid Cluing Compound -CTM 534 $425.00
Length of Drilled Cores CTM 531 $45.00
Surface Abrasion of Concrete(CT 550) $400.00
Density of Spray Applied Fire Proofing $50.00
RMA Job N 05-142-0 Page 6
L 'd L924 686 606 dnojg UWN WdLI :E 9000 12 unC
Resolution No. 06-218
Page 26 of 31
ORFMAGroup MATERIALS TESTING LABORATORY
City of Rancho Cucamonga
Annual Soils and Materials Testing
Contract Extension
Rancho Cucamonga,CA
June 21, 2006
Lab Masonry
Description Rate/Cost
Block Compressive Strength Test(set of 3) $75.00
Block, as Received Moisture&Absorption(set of 3) $50.00
Block, Lineal Shrinkage ASTM C426(set of 3) $145.00
Block, Unit Weight and Dimensions(set of 3) $225.00
Block,Conformance to ASTM C90(set of 9) $450.00
Brick,Compression(set of 3) $75.00
Brick, as received Moisture&Absorption(set of 3) $50.00
Brick, 5 hr Boil $95.00
Brick,Modulus of Rupture $95.00
Mortar Compression Test(2"x 4" Cylinder) $25.00
Grout Compression Test(3"x 6" Prism) $25.00
Masonry Cores, Compression-8"max. diameter $55.00
Masonry Cores,Shear-8"max. diameter $65.00
Tensile Test- CMA Method $75.00
Masonry Assemblage Compressive Strength 8" Block $55.00
Masonry Assemblage Compressive Strength 12" Block $75.00
Masonry Assemblage Compressive Saength 16" Block $95.00
Trimming of Test Specimens $30.00
Cube Compression Test 2x2x2 $21.00
Roof Tile Conformance(set of 10) $425.00
Mortar Strength of PCC Sand-CTM 515 $800.00
RMA Job N°: 05-142-0 Page 7
13 LBZb 696 BOB dnojg dub NdLT :E 9002 is unr
Resolution No. 06-218
Page 27 of 31
RMA Group MATERIALS TESTING LABORATORY
City of Rancho Cucamonga
Annual Soils and Materials Testing
Contract Extension
Rancho Cucamonga,CA
June 21,2006
Lab Steel
Description Rate/Cost
Tension &Bend-Rebar(No. 11 or smaller) $65.00
Tension &Bend-Rebar(No. 14) $90.00
Tension &Bend-Rebar(No. 18) $120.00
Chemical Analysis $250.00
Tension Test—Rebar $30.00
Bend Test—Rebar $35.00
Tension Test- Structural Steel $75.00
Bend Test- Structural Steel $45.00
RMA Job N°: 05-142-0 Page 8
G L824 686 606 dnojq HWd Wd8j :E goo2 12 ��C
Resolution No. 06-218
Page 28 of 31
RMA GFOvp MATERIALS TESTING LABORATORY
City of Rancho Cucamonga
Annual Soils and Materials Testing
Contract Extension
Rancho Cucamonga, CA
June 21, 2006
Lab Soil
Description Rate/Cost
Atterberg Limits $125.00
California Bearing Ratio-Corps.Eng.Method $425.00
Consolidation(no time rate) $145.00
Consolidation (with time rates) $175.00
Direct Shear $165.00
Expansion Index(UBC Standard 29-2) $125.00
Permeability of Soil $175.00
Hydro Collapse Potential $120.00
Hydrometer Analysis $150.00
Lab Density Determinations by Drive Tube $15.00
Lab Moisture Determinations $8.00
Manic Suction-Filter Paper Method $95.00
Maximum Density-Optimum Moisture(ASTM D1557) $145.00
Calif Impact Max Density(CAL 216) $165.00
Percent Organic Materials $20.00
pH&Resistivity of Soils Saturated Paste $35.00
R-Value $245.00
Sand Equivalent $100.00
Sieve Analysis of Soils $130.00
Sieve Analysis of Soils -Wash Only $50.00
Soluble Sulfate $45.00
Specific Gravity of Soils $125.00
Swell Potential $175.00
Unconfined Compression Test $120.00
ESP-Sodium Exchange Potential $45.00
Soil Cement (set of 3) $580.00
Shrinkage factor by Resin $120.00
Maximum Density-Optimum Moisture Soil Cement (ASTM D558) $165.00
Laboratory Specimen Preparation D559 $55.00
Compression Test Soil Cement D1633 $25.00
Chloride Content(CTM 422) $30.00
Corrosion Testing CTM 643 $95.00
RMA Job N°:05-142-0 Page 9
01 'd Luau 666 606 dnoig Ewa wdete Booz 12 UnC
Resolution No. 06-218
Page 29 of 31
i
aM/1 6rovp MATERIALS TESTING LABORATORY
City of Rancho Cucamonga
Annual Soils and Materials Testing
Contract Extension
Rancho Cucamonga,CA
June 21,2006
Professional and Office
Personnel
Description Rate/Cost
Principal Engineer $175.00
Principal Engineer-Expert Witness $325.00
Principal Engineer-Court Appearance $500.00
Principal Geologist $175.00
Principal Geologist-Expert Witness - $325.00
Principal Geologist-Court Appearance $500.00
Project Engineer $125.00
Project Geologist $125.00
Project Manager $115.00
Staff Engineer $105.00
Staff Geologist $105.00
Drafting $75.00
Administrative $35.00
10
RMA Job N': 05-742-0 Page
I I 'd L924 686 606 dnoig HWa Wd9T :E 9o0Z e Jnr-
Resolution No. 06-218
Page 30 of 31
VRFMACroup MATERIALS TESTING LABORATORY
City of Rancho Cucamonga
Annual Soils and Materials Testing
Contract Extension
Rancho Cucamonga,CA
June 21,2006
Exploratory Equipment
Descrinti Rate/Cost
Dutch Cone Pentrometer $185.00 -
Portable Drilling Equipment $205.00
Backhoe $95.00
Bucket Auger $205.00
Hollow Stem Auger $205.00
Air Rotary Drill Rig $225.00
Rotary Wash Drill Rig $225.00
RMA Job N 05-142-0 Page 11
Z[ 'd LBZb 686 606 dnoj0 uwd WdBI ;E 9002 SZ unr '.
Resolution No. 06-218
Page 31 of 31
ORMACroup MATERIALS TESTING LABORATORY
City of Rancho Cucamonga
Annual Soils and Materials Testing
Contract Extension
Rancho Cucamonga,CA
June 21,2006
GENERAL NOTES
GENERAL CHARGES
• Inspection charges start at the scheduled show up time at the job site.There will be a minimum
Two (2) hour show up charge and a ninimum four (4) hour charge for all inspections and a
minimum eight(8)hours for any work over four(4)hours.
• RMA requires twenty-four (24) hour prior notification for scheduling inspectors and/or
technicians.
• Materials test and Inspection report mail expenses will be charged at a rate of$5.00 per report.
This charge will include the distribution of up to 4 copies of each report to various agencies
and/or consultants via U.S.Mail. Additional copies will be charged at a rate of$0.50 per report
page. Special delivery or overnight charges will be charged at cost plus 15% unless billed
directly to and paid for by client.
• Preliminary Geotechnical,Investigation and Grading reports will be charged at a-rate of$25.00
per report.
• Reproduction charges for plan copies will be $1.50 per page for 24"x 36"or smaller plans and
$2.50 per page for larger plans.
• Outside services will be billed at cost plus 15%,unless billed directly to and paid for by client.
OVERTIME CHARGES
• Work performed in excess of 8 hours per day and/ or on Saturdays will be charged at 1.5 times
the unit rate for the appropriate personnel.
• Work performed on Sunday or recognized holidays will be charged at 2.0 times the unit rate for
the appropriate personnel.
PER DIEM ANDTRAATL CI-LARGES
• An $85.00 charge per day will be applied when our personnel are required to stay ovemight
at remote locations.
• Travel time to remote locations will be billed at the rate for the personnel performing the work
while traveling to a remote location or a location requiring overnight stay.
NIGHT WORK
• A $2.00 per hour surcharge will be added to all personnel rates for work performed during
night shifts.
RMA Job N°: 05-142-0 Page 12