HomeMy WebLinkAbout2026-07-08 - SupplementalsArrow Route Commerce Center
Rancho Cucamonga, CA
Table of
Contents
1.About Marq Logistics / BTC III Arrow Route CC 3
2.Developer Experience 4
3.Proposed Project Location 5
4.Site Plan 6
5.Architectural Design & Features 7
6.Sustainability 8
7.Community & Infrastructure Improvements 9
8.Employment Creation & Local Partnerships 10
9.Closing Remarks 11
2
Arrow Route Commerce Center
Rancho Cucamonga, CA
Global scale with local
presence & expertise.
Marq Logistics / BTC III Arrow Route CC LP
Long -term investor
and developer with a
proven track record of
high -quality real estate
across the Americas,
Europe & Asia .
Committed to
communities where we
invest.
3
Arrow Route Commerce Center
Rancho Cucamonga, CA
Completed / currently
developing more than
180 industrial projects
throughout the U.S.
Developer Experience
43 completed / active
in California, with 23 in
the Inland Empire
72
21
9
3
5655
4
64
19
11
49
71
63
51
27
31-46
61
28
67
13
1
70
23
22
52
65
29
5 6
54
57
58
15
69
50
26
18
7
68
60162
20
25
59
66
8 10
12
14 17
24
30
4748
53
62
72 industrial properties
in Southern California
4
4 industrial properties
in Rancho Cucam onga
Arrow Route Commerce Center
Rancho Cucamonga, CA
Main intersection:
Arrow Route /
Etiwanda Ave
Proposed Project Location
Adjacent uses:
Industrial all four sides
& BNSF railroad at
southern boundary.
Access to major roads,
including I -15 ramp
within 1.5 miles
5
Arrow Route Commerce Center
Rancho Cucamonga, CA
•94 -acre site
•Six new public streets
•Five buildings totaling
1,775,098 SF
•Building heights
ranging from 39 -ft to
49 -ft
•Parking stalls:
•968 auto
•20% EV capable
•444 truck
•EV ready
•Bicycle parking at
each building
Proposed Site Plan
6
Arrow Route Commerce Center
Rancho Cucamonga, CA
•Building size diversity
•Small building scale along
Arrow Route
•Architecturally enhanced
building corners & along
public streets
•Abundant glazing &
façade articulation
•Material differentiation
•Screened truck yards
Architectural Design Features
7
Arrow Route Commerce Center
Rancho Cucamonga, CA
• LEED Volume Program
•Target LEED Silver
Certification
• Energy efficiency – above
code standards
• 100% LED lighting
• Implementation of
renewable energy through
solar photovoltaic
• Drought -tolerant
landscape
• EV Charging Stations
• Water Efficiency &
Reclaimed Water
Sustainability
8
Arrow Route Commerce Center
Rancho Cucamonga, CA
• $2 6 + M in DIF’s (inclusive of $12M in Housing Linkage Fee)
• Additional $4.8 M contribution in Community & Public Art
Fee
• 3 -acre land contribution to the City for construction of a
new electrical substation
• Contribution of funds towards construction of the new
electrical substation
Public Benefits & Community Investment
9
Arrow Route Commerce Center
Rancho Cucamonga, CA
• Temporary construction jobs
• Permanent job creation:
•Reactivate this site as a potential thriving job center for
Fortune 500 companies and other employers in the near
future.
•Different building sizes to attract diverse businesses
•Sustainable project features to promote high -end business
tenants
• Partnership with local labor:
•LiUNA
•Carpenters
•CREEDLA
Employment Creation & Local Partnerships
10
Arrow Route Commerce Center
Rancho Cucamonga, CA
Closing Remarks
Thank you!
11
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 1
ARROW COMMERCE CENTER
DRC2021 -00485
PLANNING CO MMISIO N JULY 8 , 2 0 2 6
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 2
PROJECT BACKGROUND
•Who: BTC III ARROW ROUTE CC LP
•What: A request for development and
operation of five industrial buildings
totaling 1,775,098 square feet in the Neo -
Industrial Employment District and
Industrial Employment (IE) zones;
•Where: 12451 Arrow Route, APNs: 0228-
121-35, 0229-131-19, 0229-121-33,
0229-121-34
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 3
ARROW COMMERCE CENTER
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 4
Entitlement Request
•Design Review
•Tentative Parcel Map
•Conditional Use Permit
•Master Plan
•Development Agreement
EXISTING CONDITIONS
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 5
Subject Site
Ye
l
l
o
w
w
o
o
d
P
l
a
c
e
Arrow Route
Et
i
w
a
n
d
a
A
v
e
n
u
e
Approximate Project Boundaries
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 6
Development Plan Review and Tentative Parcel Map
•To subdivide a 94.25 -acre site into five new
parcels and develop five industrial warehouse
buildings totaling 1,775,098 square feet.
Conditional Use Permit
•To develop a warehouse facility in excess of
75,000 square feet.
Master Plan
•To allow for the establishment of site -specific
development standards.
PROPOSED PROJECT
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 7
PROJECT DATA
Project Data Proposed Use Warehouse Area Office Area Mezzanine Area*G.F.A.
Building 1 Industrial Warehouse 90,233 SF 7,000 SF 3,000 SF 87,223 SF
Building 2 Industrial Warehouse or
Auto Parking Lot
81,929 SF or none 5,000 SF or none 3,000 SF or none 78,929 SF or none
Building 3 Industrial Warehouse 70,637 SF 5,000 SF 3,000 SF 67,637 SF
Building 4 Industrial Warehouse 1,022,180 SF 30,000 SF 20,000 SF 1,002,180 SF
Building 5 Industrial Warehouse or
combination of
warehouse/ trailer
parking
510,129 SF or
364,100 SF
10,000 SF 10,000 SF 500,129 SF or
354,100 SF
*Mezzanine areas may be used for office space. To consider a conservative worst-case scenario, the project has included parking based on the mezzanine
area as usable office space.
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 8
DEVELOPMENT STANDARDS
Development Standard Required Proposed Compliant
Building Height
Maximum 35 feet (at front setback) and
75 feet (1 -foot increment from the front setback
line)
Building Heights Range:
39-feet to 49 -feet six inches YES
Floor Area Ratio (FAR)50-60%Building: 51.9%YES
Front Building Setback 45 feet (Arrow Route);
25 feet (Yellow Wood Road/ Juneberry Drive)
Buildings 1 -3: 45-feet
Buildings 4 & 5 are greater than 25 feet YES
Street Side Setback 25 Feet (Street A)All Buildings: 25 feet minimum YES
Average Depth of Landscape 45 feet (Arrow Route)
25 Feet (Yellow Wood Road/ Streets A-D);
45 feet (Arrow Route)
3 feet and 5 feet (Yellow Wood Road);
25 feet (Streets A and C),
4 feet (Street B), and
6 feet Street D)
YES*
Parking Setback 25 feet (Arrow Route);
15 feet (Yellow Wood Road/ Streets A-D)
25 feet (Arrow Route);
15 feet (Yellow Wood Road/ Streets A-D)YES
Interior Side Yard Setback Min. 5 feet All Building: 5 feet minimum YES
Rear Yard Setback Min. 0 feet All Buildings: 0 feet minimum YES
Open Space/Landscape Standards 10%
Buildings 1 -3 = Exceed 10%
Building 4 = 9.7%
Building 5 = 9.2%
(Project Avg./ Blend = 9.2%)
YES*
*The project applicant has requested to establish site specific development standards through the approval of a Master Plan.
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 9
MASTER PLAN DEVELOPMENT STANDARDS
Code Standard Required Proposed Deviation
Maximum Building
Footprint
Neo -Industrial (NE) = 200,000 square feet
Industrial Employment (IE) = 450,000 square feet
1,200,000 in the Neo -Industrial (NE) zone; and
520,000 in the Industrial Employment (IE) zone
Increase allowable square
footages by 1,000,000 square
feet in the NE zone, and
70,000 square feet in the IE
zone
Minimum Open Space 10% in Industrial Zones
Proposal of a single parcel open space standard
proposed at 7.5% and the project wide open space
standard at 9%
single parcels; and a 1%
reduction overall project wide
Block network
Intersection spacing inside arterial/ arterial blocks
bounded by arterials to be a minimum of 200 feet
and a maximum of 1,320 feet
Proposed alternative language requests a maximum
intersection spacing standard of 1,700 feet
Intersection spacing increased
by 380 feet
Permitted Uses Permitted and Conditionally Permitted by Municipal
Code
The applicant is proposing to allow some uses currently
requiring minor use permit to become permitted uses in
the NE and IE zones
Please see Exhibit C of the
proposed Master Plan
Narrative within the attached
project plans
Wall Heights
Wall heights shall not exceed eight feet, measured
from the finished grade immediately adjacent to the
wall and the top of the wall
Proposing wall heights shall not exceed 12’ along the
southern property boundary
4’ maximum deviation along
southern project boundary only
*The project applicant has requested to establish site specific development standards through the approval of a Master Plan.
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 10
MASTER PLAN DEVELOPMENT STANDARDS
Street City Standard Proposed Deviation
Street A
66’ right-of-way; 44’ paved roadway; 11’ parkway
(including sidewalk and landscaping each side); 25’
landscaped setback per Industrial Zoning
57’ right-of-way, 44’ paved roadway; 11’ parkway
line) and 2’ parkway on west property line
Parkway setback reduced from 11’
approx. 2’ adjacent to west property
line/ project boundary
Yellow Wood
Road
66’ right-of-way; 44’ paved roadway; 11’ parkway
(including sidewalk and landscaping each side); 25’
landscaped setback per Industrial Zoning
66’ right-of-way; 44’ paved roadway; 11’ parkway
(including sidewalk and landscaping each side)
approx. 3’ and 4’ landscaped setback
Landscape setback reduced from 25’
to approx. 3’ adjacent to Building 3
area, and 4’ adjacent to Building 5
area
Street B
66’ right-of-way; 44’ paved roadway; 11’ parkway
(including sidewalk and landscaping each side); 25’
landscaped setback per Industrial Zoning
66’ right-of-way; 44’ paved roadway; 11’ parkway
(including sidewalk and landscaping each side)
approx. 4’ landscaped setback each side
Landscape setback reduced from 25’
to approx. 4’ on each side of the
street for Street B (between Buildings
1, 2, 3, and 4)
Street D
66’ right-of-way; 44’ paved roadway; 11’ parkway
(including sidewalk and landscaping each side); 25’
landscaped setback per Industrial Zoning
and Conditionally Permitted by Municipal Code
50’ right-of-way; 20’ paved roadway; 6’ parkway
proposed on westerly right-of-way, 4’ landscape
parkway proposed on easterly right-of-way
Landscape setback reduced from 25’
to approx. 6’ feet on westerly right-of-
way; and 4’ landscape parkway
proposed on easterly right-of-way
Street Knuckle
Standard Engineering Standard Modified knuckle with a small radius on the outside
and a large radius on the inside
Allows for the ultimate curb alignment
to stay consistent throughout
development
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 11
•Project proposes a modern design constructed of
concrete tilt-up panels with reveal lines and a flat
roof
•Multiple gray paint tones, vision glass, and
spandrel glass will provide a modern aesthetic
•Office will be located at one or more corners of the
buildings and will feature more extensive glass
work, tiles, metal canopies, and aluminum
storefront framing with tempered glazing at all
doors
•Design meets architectural design standards
ARCHITECTURAL DESIGN
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 12
ARCHITECTURAL DESIGN
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 13
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 14
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 15
•Pursuant to State CEQA Guidelines, an
Environmental Impact Report (EIR)(SCH No.
2023110033), has been prepared for this
project;
•NOP was published from Nov.1 -Nov.30, 2023
•NOA was published from October November
17, 2025
•The EIR found that upon implementation of
mitigation measures, there are two significant
and unavoidable impacts: 1) Air Quality, and
2) Transportation
ENVIRONMENTAL REVIEW
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 16
•Scoping Meeting for EIR – November 1, 2023;
•Design Review Committee meeting on June 17,
2025; Committee members were complimentary of
project and voted to move forward to full
commission as presented.
•Project is required to satisfy public art requirement.
REVIEW PROCESS
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 17
•Notices mailed to all property owners within
1500 feet [73 property owners] on June 25,
2026.
•To date, staff have received two inquiries
regarding this project.
NOTICING
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 18
RECOMMENDATION
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 19
RECOMMENDATION
Staff recommends approval of Design Review
DRC2021-00485, Tentative Parcel Map
SUBTPM20488, Conditional Use Permit
DRC2025-00061, Development Agreement
DRC2023-00408 , and Master Plan DRC2023-
00349 through the adoption of the subject
resolution and Conditions of Approval.
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 1
11335 JERSEY CONDITIONAL USE
PERMIT
DRC2025 -00294
PLANNING CO MMISSIO N JULY 8 , 2 0 2 6
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 2
PROJECT BACKGROUND
•Who – Kimley Horn on behalf of Clover
Rancho Cucamonga Corporation;
•What – A Request for a Conditional Use
Permit to allow select industrial uses for
continued and potential future operation at
an existing industrial warehouse;
•Where – 11335 Jersey Boulevard at the
southeast corner of Jersey Boulevard and
Milliken Avenue.
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 3
EXISTING CONDITIONS
Existing Site Conditions
•9 -acre parcel;
•Located in the Neo -Industrial zone;
•Improved with a 170,275 sq ft industrial
warehouse;
•Currently occupied with a legal non-
conforming Wholesale and Distribution
use as well as a permitted Office use .
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 4
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 5
Conditional Use Permit
•Permit existing legal non -conforming
Wholesale and Distribution - Medium use ;
•Permit future Wholesale and Distribution –
Medium, Storage Warehouse,
Manufacturing Light – Large, and E-
Commerce Distribution/ Fulfillment Center –
Large uses;
•No new construction, expansion, or
development.
PROPOSED PROJECT
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 6
•Type 1 Categorical Exemption – Existing
Facilities.
•No new construction or intensification of use.
•No substantial evidence that the proposed CUP
will have significant impact on the environment.
ENVIRONMENTAL REVIEW
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 7
•The application was reviewed by the Fire,
Engineering, and Building Departments;
•Standard conditions of approval provided.
REVIEW PROCESS
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 8
•Notices mailed to all property owners within
1,500 feet (54 property owners) on June 24,
2026 and published in the Inland Valley Daily
Bulletin on June 26, 2026.
•To date, staff have received no inquiries
regarding this project.
NOTICING
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 9
RECOMMENDATION
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 10
RECOMMENDATION
Staff recommends approval of DRC2025-
00294 through the adoption of the subject
resolution and Conditions of Approval.
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 1
8535 Oakwood Place
DRC2025 -00326
July 9 2 0 2 6 – Pla nning Commission Hea ring
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 2
PROJECT BACKGROUND
•Who – Kimley Horn on behalf of SVF
Arrow Center Corporation
•What – A Request for a Conditional Use
Permit to allow select industrial uses for
continued and potential future operation at
an existing industrial warehouse structure.
•Where – 8535 Oakwood Place, SE Corner
of Oakwood Pl and Arrow Rte.
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 3
Existing Site Conditions
•12.9-acre parcel in NI zone.
•Currently improved with
220,712 sq ft industrial
building.
•Site has improved with parking,
landscaping, and street
improvements.
EXISTING CONDITIONS
N
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 4
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 5
Overview of Entitlement
•Legalize existing Legal
Nonconforming Manufacturing Light
– Large use.
•Permit future E-Commerce
Distribution/ Fulfillment, Storage
Warehouse, and Wholesale &
Distribution, Medium use.
•No new construction, expansion, or
development.
PROPOSED PROJECT
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 6
PARKING STANDARDS
Parking Ratio Required Parking
Office 4/ 1000 sq ft 26
Warehouse - First 20,000 sq ft 1 space per 1,000 sq ft 20
Warehouse - Second 20,000 sq ft 1 space per 2,000 sq ft 10
Warehouse - Sq ft over 40,000 1 space per 4,000 sq ft 43
Trailer Parking Spaces 1 Per Dock Door 20
Trailer Queuing Spaces 1 Per 10 Dock Doors 2
Total Parking Spaces Required 121
Total Parking Spaces Provided 140 (incl. 25 Trailer Stalls)
Parking Surplus 19
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 7
•Type 1 Categorical Exemption – Existing
Facilities.
•No new construction or intensification of use.
•No substantial evidence that the proposed CUP
will have significant impact on the environment.
ENVIRONMENTAL REVIEW
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 8
•The application was reviewed by the Fire,
Engineering, and Building Departments.
•Standard conditions of approval provided
REVIEW PROCESS
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 9
•Notices mailed to all property owners within
1500 feet (42 property owners) on June 24,
2026, and published in the Inland Valley
Daily Bulletin on June 26, 2026.
•To date, staff have received no inquiries
regarding this project.
NOTICING
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 10
RECOMMENDATION
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 11
RECOMMENDATION
Staff recommends approval of DRC2025-
00326 through the adoption of the subject
resolution and Conditions of Approval.
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 1
TIME EXTENSION
DRC2026 -00153
Pla nning Commission Meeting – July 8 , 2 0 2 6
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 2
PROJECT BACKGROUND
•Who: Lions Gate Partners, LLC
•What: Request to extend Design Review
DRC2022-000354 an additional two years
•Where: Northeast corner of Foothill Boulevard
and Lion Street; APN: 0208-632-47.
Rendering of Proposed Development
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 3
Project Site
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 4
•Design Review DRC2024-00354:
o Multi-family development of 145 units.
o 12 units under State Density Bonus Law
•Modification DRC2026-00004:
o Reduced unit count to 138
o Reduced overall building height to 45 feet
o Removed fourth floor mezzanines.
PREVIOUSLY APPROVED PROJECT
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 5
TIME EXTENSION
Entitlement Effective Date Original Expiration
Date
Proposed Expiration
Date
DRC2022-00354 August 26, 2024 August 26, 2026 August 26, 2028
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 6
•Categorically Exempt from the California
Environmental Quality Act (CEQA) under:
o Section 15061(B)(3) - the general rule that
CEQA applies only to projects which have
the potential for causing a significant effect
on the environment, of CEQA.
ENVIRONMENTAL REVIEW
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 7
•Notices were mailed to all eight-seven (87)
property owners within 660 feet of the project
site on June 24, 2026 and the legal ad for
this project was published in the Inland Valley
Daily Bulletin on June 26, 2026.
•Staff received one email from a resident
regarding the time extension.
NOTICING
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 8
RECOMMENDATION
CITY OF RANCHO CUCAMONGA PLANNING DEPARTMENT 9
RECOMMENDATION
Staff recommends approval of Time Extension
DRC2026-00153 through the adoption of
Resolution 2026-022 with the attached
conditions of approval.