HomeMy WebLinkAbout07-057 - Resolutions RESOLUTION NO. 07-057
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, AMENDING ELECTRIC
RATES, FEES AND CHARGES PURSUANT TO THE
REQUIREMENTS AND AUTHORITY OF CHAPTER 3.46 OF
TITLE 3 OF THE RANCHO CUCAMONGA MUNICIPAL CODE.
A. RECITALS.
(i) The City Council of the City of Rancho Cucamonga has previously adopted
Chapter 3.46 of Title 3 of the Rancho Cucamonga Municipal Code
establishing Electricity Service Rules and Regulations and authorizing that
the rates, fees and charges arising, directly or indirectly, under said
legislation be adopted pursuant to resolution, and thereafter, be amended
from time to time by resolution.
(ii) City staff has prepared a comprehensive schedule of the rates, fees and
charges that reflect the reasonable and prudent costs relating to the
acquisition and distribution of electric power to retail customers and are
recommending that the City Council adopt the recommended fees. These
rates do not present the City an opportunity to achieve profits or to impose
charges in excess of the costs reasonably related to the development,
maintenance and expansion of a municipal electric distribution system. The
City Council has directed City staff to regularly review the operations of the
City's electric utility to ensure that the rates are sufficient to cover all prudent
business costs, reserves and capital equipment acquisition but not exceeding
the amount necessary for the same. The rates, fees and charges reflect the
reasonable costs to the City system only and do not reflect any excess rates,
fees, or charges that are in excess of the reasonable costs of providing the
electrical services as set forth hereinafter.
(iii) The City Council has reviewed the adoption of this Resolution pursuant to the
requirements of the California Environmental Quality Act of 1970, as
amended, and has determined that the adoption of the Electric Rules and
Regulations has no foreseeable potential to a result in a significant impact
upon the environment and is exempt from CEQA review pursuant to State
CEQA Guidelines Section 15061(b)(3). Further, the City Council has
determined that the adoption of the fees is exempt from substantive
environmental review under Section 15273 of the State CEQA Guidelines as
no capital projects for system expansion are included in the proposed action.
(iv) All legal prerequisites to the adoption of this Resolution have occurred.
Resolution No. 07-057
Page 2 of 25
B. RESOLUTION.
NOW, THEREFORE, the City Council of the City of Rancho Cucamonga does
hereby find and resolve as follows:
SECTION 1: The facts set forth in the Recitals, Part A of this Resolution, are
true and correct.
SECTION 2: The rates, fees and charges assessed under Chapter 3.46 of Title
3 shall be as set forth on Attachment 1 hereto and incorporated by
reference as if fully set forth herein.
SECTION 3: The City Clerk shall certify to the adoption of this Resolution.
Please see the following page
for formal adoption,certification and signatures
Resolution No. 07-057
Page 3 of 25
PASSED, APPROVED, AND ADOPTED this 7`h day of March 2007.
AYES: Gutierrez, Kurth, Michael, Spagnolo, Williams
NOES: None
ABSENT: None
ABSTAINED: None
Donald J. Kurth, ., Mayor
ATTEST:
Debra J. Adams, CMC, City Clerk
I, DEBRA J. ADAMS, CITY CLERK of the City of Rancho Cucamonga,
California, do hereby certify that the foregoing Resolution was duly passed, approved and
adopted by the City Council of the City of Rancho Cucamonga, California, at a Regular Meeting
of said City Council held on the 7'h day of March 2007.
Executed this 8`h day of March 2007, at Rancho Cucamonga, California.
x6dilv 4
ebra J. Ada C C, City Clerk
Resolution No. 07-057
Page 4 of 25
Table of Contents
Electric Rates and Tariffs
SMALL COMMERCIAL 1
MEDIUM COMMERCIAL 3
MEDIUM COMMERCIAL (TIME-OF-USE) 6
LARGE COMMERCIAL 10
STREET LIGHTING 14
TRAFFIC CONTROL 17
OUTDOOR AREA LIGHTING 19
IRRIGATION SYSTEMS 21
SERVICE ESTABLISHMENT CHARGE 22
Resolution No. 07-057
Page 5 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
SMALL COMMERCIAL
A. Applicability.
Applicable to single and three-phase general service including lighting and power
Customers, except for the Customer whose monthly Maximum Demand, in the opinion
of the Utility, is expected to exceed 20 kW or has exceeded 20 kW in any three (3)
months during the preceding twelve (12) months is ineligible for service under this
Schedule. Effective with the date of ineligibility of any Customer served under this
Schedule, the Customer's account shall be transferred to another applicable Rate
Schedule.
B. Territory.
Within the entire territory served.
C. Rates.
Energy Charge $/kWh/Meter/Month
Summer $ 0.15728
Winter 0.15390
Customer Charge- $/Meter/Day 0.512
Three Phase Service- $/Day 0.125
1. The energy charge reflects that 28.432% of the investor-owned utility energy
requirements are supplied by the California Department of Water Resources. This
percentage will be adjusted monthly to reflect actual energy purchases.
D. Special Conditions.
1. Summer and Winter Seasons are defined as follows:
The Summer Season shall commence at 12:00 a.m. on June 1't and continue until
12:00 a.m. on October I" of each year. The Winter Season shall commence at
12:00 a.m. on October 1't of each year and continue until 12:00 a.m. on June 1't of
the following year. A pro rata computation will be made for seasonal billing
purposes.
2. Voltage. Service will be supplied at one(1) standard voltage.
3. Three-Phase Service. Where the Utility provides three-phase service, the billing
will be increased by the amount shown in the Rates section above.
4. Temporary Discontinuance of Service.
1 Effective Date.March 1,2007
Resolution No. 07-057
Page 6 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
Where the use of energy is seasonal or intermittent, no adjustments will be made
for a temporary discontinuance of service. Any Customer, prior to resuming
service within twelve (12) months after such service was discontinued, will be
required to pay all charges which would have been billed if service had not been
discontinued.
5. Customer-Owned Electrical Generating Facilities.
Upon written approval by the Utility, momentary parallel operation may be
permitted to allow the Customer to test the auxiliary/emergency generating
facilities.
6. Installation of Demand Meters.
Where a Customer's usage exceeds an average of 4.500 kWh per month in the
preceding 12-month period, the Utility may, at its sole option, install a demand
Meter On the account at the Utility's expense.
7. Billing Calculation.
A Customer's bill is calculated according to the rates and conditions above. The
charges are calculated by applying the Rate Charges when applicable to the actual
billing determinants (kilowatt hours [kWh], demand [kW], etc.).
8. Power Cost Adjustment Factor(PCAF).
The rates above are subject to an adjustment as provided in Rule 12, Section E.
9. Change of Law Adjustment Factor(CLAF).
The rates above are subject to an adjustment as provided in Rule 12, Section F.
10. State Mandated Public Purpose Programs Charge.
State law requires all California electric utilities to establish a public purpose
programs charge of 2.85% of electric retail revenues to fund qualifying energy
efficiency programs, renewable energy resources, research and demonstration
projects, and services for low-income electricity customers.
2 Effective DateMarch 1,2007
Resolution No. 07-057
Page 7 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES B TARIFFS
MEDIUM COMMERCIAL
A. Applicability.
Applicable to single and three-phase service including lighting and power Customers
whose monthly Maximum Demand registers, or in the opinion of the Utility is expected
to register, above 20 kW and below 200 kW. The Customer whose monthly Maximum
Demand, in the opinion of the Utility, is expected to reach 200 kW or has reached 200
kW for any three (3) months during the preceding twelve (12) months is ineligible for
service under this Schedule. Effective with the date of ineligibility, such Customer's
account shall be transferred to another applicable Rate Schedule. Further, any Customer
served under this Schedule whose monthly Maximum Demand has registered 20 kW or
less for twelve (12) consecutive months is eligible for service under another applicable
Rate Schedule.
B. Territory.
Within the entire territory served.
C. Rates.
Energy Charge -$/kWh/Meter/Month
Non TOU Pricing Option
Summer Season $ 0.08714
Winter Season 0.07961
TOU Pricing Option
Summer Season—On-Peak 0.10894
Mid-Peak 0.09009
Off-Peak 0.06540
Winter Season—Mid-Peak 0.09342
Off-Peak 0.06896
Customer Charge - $/Meter/Month 85.75
Demand Charge - $/kW of Billing Demand/Meter/Month
Facilities Related 8.60
Time Related Summer 18.79
TOU Option Meter Charge- $/Meter/Month
Standard 16.70
RTEM 143.90
1. The energy charge reflects that 28.432% of the investor-owned utility energy
requirements are supplied by the California Department of Water Resources. This
percentage will be adjusted monthly to reflect actual energy purchases.
3 Effective DateMarch 1,2007
Resolution No. 07-057
Page 8 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
D. Special Conditions.
1. Time periods are defined as follows:
On-Peak: Noon to 6:00 p.m. summer weekdays except holidays.
Mid-Peak: 8:00 a.m. to noon and 6:00 p.m. to 11:00 p.m. summer weekdays
except holidays.
8:00 a.m.to 9:00 p.m. winter weekdays except holidays.
Off-Peak: All other hours.
Holidays are New Year's Day (January 1), Washington's Birthday (third Monday
in February), Memorial Day (last Monday in May), Independence Day (July 4),
Labor Day (first Monday in September), Veteran's Day (November 11),
Thanksgiving Day (fourth Thursday in November), and Christmas (December
25)
When any holiday listed above falls on Sunday, the following Monday will be
recognized as an off-peak period. No change will be made for holidays falling on
Saturday.
The Summer Season shall commence at 12:00 a.m. on June I` and continue until
12:00 a.m. on October I" of each year. The Winter Season shall commence at
12:00 a.m. on October lit of each vear and continue until 12:00 a.m. on June I"of
the following year. A pro rata computation will be made for seasonal billing
purposes.
2. TOU Pricing Option.
Customers may elect the TOU Pricing Option under this Schedule, but only after
installation of an interval meter provided at the customer's expense. Customers
may elect a standard interval data recorder (IDR) meter or Real Time Energy
Metering (RTEM) meter and shall pay the monthly charges, as indicated in the
Rates Section of this Schedule. Service under TOU pricing will become effective
on the next regularly scheduled meter read date following installation of the IDR
meter or RTEM meter.
3. Voltage.
Service will be supplied at one(1) standard voltage.
4. Billing Demand.
The Billing Demand shall be the kilowatts of Maximum Demand, determined to
the nearest kW. The Demand Charge shall include the following billing
components. The Time Related Component shall be for the kilowatts of
Maximum Demand recorded during (or established for) the monthly billing
period. The Facilities Related Component shall be for the kilowatts of Maximum
Demand recorded during (or established for) the monthly billing period.
4 Effective Date.March 1,2007
Resolution No. 07-057
Page 9 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
However, when the Utility determines the Customer's Meter will record little or
no energy use for extended periods of time or when the Customer's Meter has not
recorded a Maximum Demand in the preceding eleven (11) months, the Facilities
Related Component of the Demand Charge may be established at fifty percent
(50%) of the Customer's Connected Load.
5. Maximum Demand.
The Maximum Demand in any month shall be the measured maximum average
kilowatt input, indicated or recorded by instruments, during any 15-minute
metered interval in the month, but, where applicable, shall not be less than the
diversified resistance welder load computed in accordance with the section
designated Welder Service in Rule 2. Where the demand is intermittent or subject
to violent fluctuations, a 5-minute interval may be used.
6. Temporary Discontinuance of Service.
Where the use of energy is seasonal or intermittent, no adjustments will be made
for a temporary discontinuance of service. Any Customer resuming service
within twelve (12) months after such service was discontinued will be required to
pay all charges which would have been billed if service had not been
discontinued.
7. Customer-Owned Electrical Generating Facilities.
Upon written approval by the Utility, momentary parallel operation may be
permitted to allow the Customer to test the auxiliary/emergency -generating
facilities.
8. Billing Calculation.
A Customer's bill is calculated according to the rates and conditions above. The
charges are calculated by applying the Rate Charges when applicable to the actual
billing determinants (kilowatt hours [kWh], demand [kW], etc.).
9. Power Cost Adjustment Factor(PCAF).
The rates above are subject to an adjustment as provided in Rule 12, Section E.
10. Change of Law Adjustment Factor(CLAF).
The rates above are subject to an adjustment as provided in Rule 12, Section F.
11. State Mandated Public Purpose Programs Charge.
State law requires all California electric utilities to establish a public purpose
programs charge of 2.85% of electric retail revenues to fund qualifying energy
efficiency programs, renewable energy resources, research and demonstration
projects, and services for low-income electricity customers.
5 Effective Date March 1,2007
Resolution No. 07-057
Page 10 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
MEDIUM COMMERCIAL (TIME-OF-USE)
A. Applicability.
Applicable to single and three-phase service including lighting and power Customers
whose monthly Maximum Demand registers, or in the opinion of the Utility is expected
to register 200 kW through 500 kW. The customer whose monthly Maximum Demand,
in the opinion of the Utility, is expected to exceed 500 kW or has exceeded 500 kW for
any three (3) months during the preceding twelve (12) months is ineligible for service
under this Schedule and effective with the date of ineligibility, such Customer's account
shall be transferred to Large Commercial. Further, any Customer served under this
Schedule whose monthly Maximum Demand has registered below 200 kW for twelve
(12) consecutive months is ineligible for service under this Rate Schedule, and shall be
transferred to another applicable Rate Schedule.
B. Territory.
Within the entire territory served.
C. Rates.
Ener,-,v Charge - $/kWh/Meter/Month
Summer Season—On-Peak 0.11905
Mid-Peak 0.09808
Off-Peak 0.07061
Winter Season—Mid-Peak 0.10020
Off-Peak 0.07347
Customer Charge- S/Meter/Month 322.52
Demand Charge - $/kW of Billing Demand/Meter/Month
Facilities Related 8.88
Time Related
Summer Season—On-Peak 16.51
Mid-Peak 5.66
Power Factor Adjustment-$/KVA 1 0.18
1. The energy charge reflects that 28.432% of the investor-owned utility energy
requirements are supplied by the California Department of Water Resources. This
percentage will be adjusted monthly to reflect actual energy purchases.
6 Efrecove Date.March 1,2007
Resolution No. 07-057
Page 11 of 25
CITY OF RANCHO CUCAMONGA MUMCIPAL UTILITY
ELECTRIC RATES&TARIFFS
D. Special Conditions.
1. Time periods are defined as follows:
On-Peak: Noon to 6:00 p.m. summer weekdays except holidays.
Mid-Peak: 8:00 a.m. to noon and 6:00 p.m. to 11:00 p.m, summer weekdays
except holidays.
8:00 a.m. to 9:00 p.m. winter weekdays except holidays.
Off-Peak: All other hours.
Holidays are New Year's Day (January 1), Washington's Birthday (third Monday
in February), Memorial Day (last Monday in May), Independence Day (July 4),
Labor Day (first Monday in September), Veteran's Day (November 11),
Thanksgiving Day (fourth Thursday in November), and Christmas (December
25).
When any holiday listed above falls on Sunday, the following Monday will be
recognized as an off-peak period. No change will be made for holidays falling on
Saturday.
The Summer Season shall commence at 12:00 a.m. on June 1" and continue until
12:00 a.m. on October I" of each year. The Winter Season shall commence at
12:00 a.m. on October 1"of each year and continue until 12:00 a.m. on June 1"of
the following year. A pro rata computation will be made for seasonal billing
purposes.
2. Voltage.
Service will be supplied at one (1) standard voltage.
3. Billing Demand.
The Billing Demand shall be the kilowatts of Maximum Demand, determined to
the nearest kW. The Demand Charge shall include the following billing
components. The Time Related Component shall be for the kilowatts of
Maximum Demand recorded during (or established for) the monthly billing
period. The Facilities Related Component shall be for the kilowatts of Maximum
Demand recorded during (or established for) the monthly billing period.
However, when the Utility determines the Customer's Meter will record little or
no energy use for extended periods of time or when the Customer's Meter has not
recorded a Maximum Demand in the preceding eleven (11) months, the Facilities
Related Component of the Demand Charge may be established at fifty percent
(50%) of the Customer's Connected Load.
4. Maximum Demand.
Maximum Demand shall be established for the On-Peak, Mid-Peak, and Off-Peak
periods. The Maximum Demand in any month shall be the measured maximum
7 Eff,.Uve Date.March I,2007
Resolution No. 07-057
Page 12 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
average kilowatt input, indicated or recorded by instruments, during any 15-
minute metered interval in the month, but, where applicable, shall not be less than
the diversified resistance welder load computed in accordance with the section
designated Welder Service in Rule 2. Where the demand is intermittent or subject
to violent fluctuations, a 5-minute interval may be used.
5. Power Factor Adjustment.
The Customer's bill will be increased each month for power factor by the amount
shown in the Rates section above for service metered and delivered at the
applicable voltage level, based on the per kilovar of maximum reactive demand
imposed by the Utility.
The maximum reactive demand shall be the highest measured maximum average
kilovar demand indicated or recorded by metering during any 15 minute interval
in the month. The kilovars shall be determined to the nearest unit. A device will
be installed on each kilovar meter to prevent reverse operation of the meter.
6. Temporary Discontinuance of Service.
Where the use of energy is seasonal or intermittent, no adjustments will be made
for a temporary discontinuance of service. Any Customer resuming service
within twelve (12) months after such service was discontinued will be required to
pay all charges which would have been billed if service had not been
discontinued.
7. Customer-Owned Electrical Generating Facilities.
Upon written approval by the Utility, momentary parallel operation may be
permitted to allow the Customer to test the auxiliary/emergency generating
facilities.
8. Billing Calculation.
A Customer's bill is calculated according to the rates and conditions above. The
charges are calculated by applying the Rate Charges when applicable to the actual
billing determinants (kilowatt hours [kWh], demand [kW], kilovar[kVa], etc.).
9. Power Cost Adjustment Factor(PCAF).
The rates above are subject to an adjustment as provided in Rule 12. Section E.
10. Change of Law Adjustment Factor(CLAF).
The rates above are subject to an adjustment as provided in Rule 12, Section F.
11. State Mandated Public Purpose Programs Charge.
8 Effective Date March 1,1007
Resolution No. 07-057
Page 13 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
State law requires all California electric utilities to establish a public purpose
programs charge of 2.85% of electric retail revenues to fund qualifying energy
efficiency programs, renewable energy resources, research and demonstration
projects, and services for low-income electricity customers.
9 Effective Date.March 1,2007
Resolution No. 07-057
Page 14 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
LARGE COMMERCIAL
A. Applicability.
Applicable to general services including lighting and power Customers. This Schedule is
applicable to and mandatory for all Customers whose monthly Maximum Demand, in the
opinion of the Utility, is expected to exceed 500 kW or has exceeded 500 kW in any three
(3) months during the preceding twelve (12) months. Any existing Customer on this
Schedule whose monthly Maximum Demand has registered 500 kW or less for twelve
(12) consecutive months is ineligible for service under this Schedule and shall be
transferred to another applicable Rate Schedule. Service under this Schedule is subject to
Meter availability.
B. Territory.
Within the entire territory served.
C. Rates.
Energy Charge - $/kWh/Meter/Month
Summer Season—On-Peak $ 0.11214
Mid-Peak 0.09248
Off-Peak 0.06671
Winter Season— Mid-Peak 0.09447
Off-Peak 0.06941
Customer Charge - $/Meter/Month 414.98
Demand Charge - $/kW of Billing
Demand/Meter/Month
Facilities Related 9.71
Time Related
Summer Season—On-Peak 15.37
Mid-Peak 5.19
Power Factor Adjustment- $/KVA 0.18
1. The energy charge reflects that 28.432% of the investor-owned utility energy
requirements are supplied by the California Department of Water Resources. This
percentage will be adjusted monthly to reflect actual energy purchases.
10 Effective Date March 1,2007
Resolution No. 07-057
Page 15 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
D. Special Conditions.
1. Time periods are defined as follows:
On-Peak: Noon to 6:00 p.m. summer weekdays except holidays.
Mid-Peak: 8:00 a.m. to noon and 6:00 p.m. to 11:00 p.m. summer weekdays
except holidays.
8:00 a.m.to 9:00 p.m. winter weekdays except holidays.
Off-Peak: All other hours.
Holidays are New Year's Day (January 1), Washington's Birthday (third Monday
in February), Memorial Day (last Monday in May), Independence Day (July 4),
Labor Day (first Monday in September), Veteran's Day (November 11),
Thanksgiving Day (fourth Thursday in November), and Christmas (December
25).
When any holiday listed above falls on Sunday, the following Monday will be
recognized as an off-peak period. No change will be made for holidays falling on
Saturday.
The Summer Season shall commence at 12:00 a.m. on June I" and continue until
12:00 a.m. on October lit of each vear. The Winter Season shall commence at
12:00 a.m. on October I"of each year and continue until 12:00 a.m. on June I"of
the following year. A pro rata computation will be made for seasonal billing
purposes.
2. Voltage.
Service will be supplied at one standard voltage.
3. Maximum Demand.
Maximum Demands shall be established for the On-Peak, Mid-Peak, and Off-
Peak periods. The Maximum Demand for each period shall be the measured
maximum average kilowatt input indicated or recorded by instruments, during any
15-minute metered interval, but, where applicable, not less than the diversified
resistance welder load computed in accordance with the section designated
Welder Service in Rule 2. Where the demand is intermittent or subject to violent
fluctuations, a 5-minute interval may be used.
4. Billing Demand.
The Billing Demand shall be the kilowatts of Maximum Demand, determined to
the nearest kW. The Demand Charge shall include the following billing
components. The Time Related Component shall be for the kilowatts of
Maximum Demand recorded during(or established for)the monthly billing period
for each of the On-Peak, Mid-Peak. and Off-Peak Time Periods. The Facilities
Related Component shall be for the kilowatts of Maximum Demand recorded
11 Effecuve Date March 1,2007
Resolution No. 07-057
Page 16 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
during (or established for) the monthly billing period. However, when the Utility
determines the Customer's Meter will record little or no energy use for extended
periods of time or when the Customer's Meter has not recorded a Maximum
Demand in the preceding eleven (I I) months, the Facilities Related Component of
the Demand Charge may be established at fifty percent (50%) of the Customer's
Connected Load: Separate Demand Charge(s) for the On-Peak, Mid-Peak, and
Off-Peak Time Periods shall be established for each monthly billing period. The
Demand Charge for each time period shall be based on the Maximum Demand for
that time period occurring during the respective monthly billing period.
5. Power Factor Adjustment.
The Customer's bill will be increased each month for power factor by the amount
shown in the Rates section above for service metered and delivered at the
applicable voltage level, based on the per kilovar of maximum reactive demand
imposed by the Utility.
The maximum reactive demand shall be the highest measured maximum average
kilovar demand indicated or recorded by metering during any 15 minute metered
interval in the month. The kilovars shall be determined to the nearest unit. A
device will be installed on each kilovar Meter to prevent reverse operation of the
Meter.
6. Temporary Discontinuance of Service.
Where the use of energy is seasonal or intermittent, no adjustments will be made
for a temporary discontinuance of service. Any Customer, prior to resuming
service within twelve (12) months after such service was discontinued, will be
required to pay all charges which would have been billed if service had not been
discontinued.
7. Customer-Owned Electrical Generating Facilities.
Upon written approval by the Utility, momentary parallel operation may be
permitted to allow the Customer to test the auxiliary/emergency generating
facilities.
8. Contracts.
An initial three-year facilities contract may be required where Applicant requires
new or added serving capacity exceeding 2,000 kVA.
9. Billing Calculation.
A Customers bill is calculated according to the rates and conditions above. The
charges are calculated by applying the Rate Charges when applicable to the actual
billing determinants(kilowatt hours [kWh], demand [kW], kilovar [kVa], etc.).
12 Effective Date.March I,2007
Resolution No. 07-057
Page 17 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
10. Power Cost Adjustment Factor(PCAF).
The rates above are subject to an adjustment as provided in Rule 12, Section E.
11. Change of Law Adjustment Factor(CLAF).
The rates above are subject to an adjustment as provided in Rule 12, Section F.
12. State Mandated Public Purpose Programs Charge.
State law requires all California electric utilities to establish a public purpose
programs charge of 2.85% of electric retail revenues to fund qualifying energy
efficiency programs, renewable energy resources, research and demonstration
projects, and services for low-income electricity customers.
13 Effective Date:March 1.2007
Resolution No. 07-057
Page 18 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
STREET LIGHTING
A. Applicability.
Applicable to meter for the lighting of streets, and publicly-owned and publicly-operated
automobile parking lots which are opened to the general public where the City owns and
maintains the street lighting equipment and associated facilities included under this Schedule.
B. Territory.
Within the entire territory served.
C. Rates
High Pressure Sodium Vapor Lamps—All Night Service
Lamp Wattage Initial Lumens $/Lam /Month
150 16,000 $ 12.76
250 27,500 16.65
1. The charge per lamp reflects that 28.432% of the investor-owned utility energy
requirements are supplied by the California Department of Water Resources. This
percentage will be adjusted monthly to reflect actual energy purchases.
D. Special Conditions
1. The Applicant shall install streetlights that will be served by the Utility. These
streetlights must be installed in accordance with the Utility's specifications and
the developer will deed such facilities to the City.
2. Requirements and Restrictions.
a. The Applicant for street light service shall specify the type of service,
lamp size, and location of street lights.
b. Service shall not be furnished under this Schedule where location,
mounting height, and/or other considerations are unacceptable to the
Utility.
C. The installation of street lighting equipment and facilities hereunder is
contingent upon the utility obtaining easements, and rights of way, as may
be required, satisfactory to the Utility for the required poles, lines,
equipment, and facilities.
d. Should the Applicant not commence using the street lighting in a bona fide
manner within ninety (90) days after date of completion and installation of
14 Effective Date March 1,2007
Resolution No. 07-057
Page 19 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
a street light or street lighting system requested by the Applicant, the
Utility will bill, and the Applicant shall pay, the applicable lamp
charges(s).
3. Hours of Service.
Under the Utility's standard all night operating schedule, approximately
4,140 hours of service per year will be furnished.
4. Maintenance.
The Utility shall exercise reasonable care and diligence in maintaining its
street light facilities or Utility-owned attachments thereto. Where the
Utility experiences, or expects to experience, maintenance costs exceeding
its normal maintenance expense resulting from, but not limited to,
vandalism, the Utility may require the customer to pay the excess
maintenance expense.
5. Liability of the Utility.
The Utility shall not, by taking action pursuant to its tariffs, be liable for
any loss. damage, or injury,established or alleged, which may result, or be
claimed to result,therefrom.
6. Removal, Relocation or Modification of Facilities.
Where street lighting service and facilities are ordered removed by a customer,
the customer shall pay to the Utility a nonrefundable amount equal to the total
estimated cost installed less any Customer contribution, plus the estimated cost of
removal less the estimated net salvage value of the facilities.
Where street lighting service and facilities were ordered removed by a Customer
and such service and facilities, or their equivalent are ordered reinstalled within
thirty-six (36) months from the date of the order to remove, the Customer shall
pay to the Utility in advance of reinstallation a nonrefundable amount equal to the
cost of removal of the prior facilities and the estimated cost of such reinstallation.
Where street lighting facilities are ordered modified and /or relocated by a
Customer, the Customer shall pay to the Utility, in advance of such modification
and/or relocation, a nonrefundable amount equal to the estimated cost of such
modification and/or relocation. This includes facilities that now serve street light
load only, but that may have been installed originally to serve other than street
light load.
Utility-owned facilities removed or installed remain the sole property of the
Utility.
15 Effectne Date March I,2007
Resolution No. 07-057
Page 20 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES g TARIFFS
7. Billing Calculation.
A Customer's bill is calculated according to the rates and conditions above.
8. Power Cost Adjustment Factor(PCAF).
The rates above are subject to an adjustment as provided in Rule 12, Section E.
9. Change of Law Adjustment Factor(CLAF).
The rates above are subject to an adjustment as provided in Rule 12, Section F.
10. State Mandated Public Purpose Programs Charge.
State law requires all California electric utilities to establish a public purpose
programs charge of 2.85% of electric retail revenues to fund qualifying energy
efficiency programs, renewable energy resources, research and demonstration
projects, and services for low-income electricity customers.
16 Effective Date.March 1,2007
Resolution No. 07-057
Page 21 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
TRAFFIC CONTROL
A. Applicability.
Applicable to single and three-phase service for traffic directional signs or traffic signal
systems located on streets, highways and other public thoroughfares and to railway
crossing and track signals; for public thoroughfare lighting that is utilized twenty-four
(24) hours per day or is not controlled by switching equipment, such as tunnel or
underpass lighting; and, to public authorities for the illumination of bus stop shelters
located in the dedicated road right-of-way where such service is combined with other
traffic control service as defined above.
B. Territory.
The entire territory served.
C. Rates.
$/Traffic Signal/Month $ 59.31
1. The energy charge reflects that 28.432% of the investor-owned utility energy
requirements are supplied by the California Department of Water Resources. This
percentage will be adjusted monthly to reflect actual energy purchases.
D. Special Conditions
1. Voltage.
Service will be supplied at one (1) standard voltage not in excess of 240 volts or,
at the option of the Utility, at 240/480 volts,three wire, single-phase.
2. Billing Calculation.
A Customer's bill is calculated according to the rate and conditions above.
3. Power Cost Adjustment Factor(PCAF).
The rate above is subject to an adjustment as provided in Rule 12, Section E.
4. Change of Law Adjustment Factor(CLAF).
The rate above is subject to an adjustment as provided in Rule 12; Section F.
5. State Mandated Public Purpose Programs Charge.
State law requires all California electric utilities to establish a public purpose
programs charge of 2.85% of electric retail revenues to fund qualifying energy
efficiency programs, renewable energy resources, research and demonstration
projects, and services for low-income electricity customers.
17 Effective Date. March 1,2007
Resolution No. 07-057
Page 22 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
OUTDOOR AREA LIGHTING
A. Applicability.
Applicable to single-phase service for metered outdoor area lighting load, controlled for
dusk to dawn operation and used for purposes other than street and highway lighting such
as, but not limited to parking lots, pedestrian walkways, billboards, building exteriors,
security, sports and recreation areas, monuments, decorative areas, and bus shelters.
B. Territory.
Within the entire territory served.
C. Rates.
Energy Charge - $/kWh/Meter/Month $ 0.07610
Customer Charge-$/Meter/Month 8.40
1. The energy charge reflects that 28.432% of the investor-owned utility energy
requirements are supplied by the California Department of Water Resources. This
percentage will be adjusted monthly to reflect actual energy purchases.
D. Special Conditions
1. Voltage.
Service will be provided at one(1) standard voltage.
2. Three-Phase Service.
Where, in the sole opinion of the Utility, it is impractical to provide single-phase
service under this Schedule,three-phase service will be provided.
3. Separate Point of Delivery.
When requested by the Applicant or Customer, and agreed upon by the Utility, an
additional Point of Delivery may be provided, separate from any other Point of
Delivery provided under any other applicable Rate Schedule. Customers so
served shall not be permitted to have an electrical interconnection beyond the
Utility's Point of Delivery between the separately metered loads except upon
written approval of the Utility.
A change from this Schedule to any other Rate Schedule will be permitted if the
additional Point of Delivery is removed. Any such removal shall be at the
Customer's expense.
18 Effective Date.March 1,2007
Resolution No. 07-057
Page 23 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
Any rearrangement of facilities required to provide the additional Point of
Delivery shall be at the expense of the requesting Applicant or Customer.
4. Controlled Operation.
Service under this Schedule requires the control of lamps in a manner acceptable
to the Utility so that lamps will not be lighted daily from dawn to dusk. Customer
shall install, own, operate, and maintain the control device. The Utility shall have
the right to periodically inspect the control device to ensure its correct operation
and maintenance.
5. Distribution Line Extension.
Distribution Line Extensions to reach an outdoor area light or area lighting system
shall be in accordance with Rule 15.
6. Services.
Services shall be installed and maintained as provided in Rule 16.
7. Incidental Loads.
Incidental, non-lighting loads may be served under this Schedule only where such
Connected Loads do not exceed fifteen percent (15) of the Customer's total
Connected Load. Incidental Loads must also be controlled for dusk to dawn
operation exclusively.
8. Billing Calculation.
A Customer's bill is calculated according to the rates and conditions above. The
charges are calculated by applying the Rate Charges when applicable to the actual
billing determinants(kilowatt hours [kWh], demand [kW], etc.).
9. Power Cost Adjustment Factor(PCAF).
The rates above are subject to an adjustment as provided in Rule 12, Section E.
10. Change of Law Adjustment Factor(CLAF).
The rates above are subject to an adjustment as provided in Rule 12, Section F.
11. State Mandated Public Purpose Programs Charge.
State law requires all California electric utilities to establish a public purpose
programs charge of 2.85% of electric retail revenues to fund qualifying energy
efficiency programs, renewable energy resources, research and demonstration
projects, and services for low-income electricity customers.
19 Etfeai,e Date March I,2007
Resolution No. 07-057
Page 24 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
IRRIGATION SYSTEMS
A. Applicability.
Applicable where the Utility determines that 100% of the customer's electrical usage is
for limited irrigation service except for the Customer whose monthly Maximum Demand,
in the opinion of the Utility, is expected to exceed 20 kW or has exceeded 20 kW in any
three (3) months during the preceding twelve (12) months is ineligible for service under
this Schedule. Effective with the date of ineligibility of any Customer served under this
Schedule, the Customer's account shall be transferred to another applicable Rate
Schedule.
B. Territory.
The entire territory served.
C. Rates.
1 $/Irrigation Svstem/Month
1. The energy charge reflects that 28.432% of the investor-owned utility energy
requirements are supplied by the California Department of Water Resources. This
percentage will be adjusted monthly to reflect actual energy purchases.
D. Special Condition
I. Voltage.
Service will be supplied at one (1) standard voltage not in excess of 240 volts or,
at the option of the Utility, at 240/480 volts,three wire, single-phase.
2. Billing Calculation.
A Customer's bill is calculated according to the rate and conditions above.
3. Power Cost Adjustment Factor(PCAF).
The rate above is subject to an adjustment as provided in Rule 12, Section E.
4. Change of Law Adjustment Factor(CLAF).
The rate above is subject to an adjustment as provided in Rule 12, Section F.
5. State Mandated Public Purpose Programs Charge.
State law requires all California electric utilities to establish a public purpose
programs charge of 2.85% of electric retail revenues to fund qualifying energy
efficiency programs, renewable energy resources, research and demonstration
projects, and services for low-income electricity customers.
20 Effcn,.Date.March 1,2007
Resolution No. 07-057
Page 25 of 25
CITY OF RANCHO CUCAMONGA MUNICIPAL UTILITY
ELECTRIC RATES&TARIFFS
SERVICE ESTABLISHMENT CHARGE
A. Applicability.
Applicable to General Service and Domestic Service customers.
B. Territory.
Within the entire territory served.
C. Rates.
For each establishment of electric service.................................... $15.00
D. Special Conditions.
1. The service establishment charge provided for herein is in addition to the charges
calculated in accordance with the applicable schedule and may be made each time an
account is established. As used herein, establishment means each time an account is
opened. including a turn on of electric service or a change of name which requires a
meter reading.
2. In case the customer requests that electric service be established on the day of his
request or outside of regular hours, an additional charge of$9.00 may be made.
21 Effective Date.March 1,2007