Loading...
HomeMy WebLinkAbout2136-DGENERAL NO ES. L ALL WORK SHALL BE DONE IN ACCORDANCE WITH THIS PLANS, THE CITY OF RANCHO CUCAMONGA SrANDARDS, AND THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION - CURRENT EDITION- CONTRACTOR SHALL BE FAMILIAR WITH AND SHALL BE RESPONSIBLE FOR ADHERENCE TO THESE STANDARDS AND SPECIFICATIONS AND APPLICABLE SUPPLEMENTS, 2. ALL PIPELINES OR SUBSTRUCTURES OF ANY KIND, TELEPHONE OR POWER POLES, WATER METERS, VALVES, FIRE HYDRANTS, ETC SHOWN OR NOT SHOWN ON THESE PLANS WITHIN THE RIGHT-OF-WAY LIMITS OR IN ADJACENT AREAS WHERE IMPROVEMENT WORK IS TO BE DONE SHALL BE REMOVED, RELOCATED, OR PROTECTED IN PLACE AS REQUIRED AT NO COST TO THE CITY OF RANCHO CUCAMONGA. J. ANY CONTRACT91? PERFORMING WORK ON THIS PROJECT SHALL FAMILIARIZE HIMSELF WITH THE SITE AND SHALL BE SOLELY RESPONSIBLE FOR ANY DAMAGE TO EXISTING FACILITIES RESULTING DIRECTLY OR INDIRECTLY FROM HIS OPERATIONS, WHETHER OR NOT SUCH FACILITIES ARE SHOWN ON THESE PLANS. 4. A PERMIT SHALL BE OBTAINED FROM THE CITY OF RANCHO CUCAMONGA ENGINEERING DEPARTMENT'PRIOR TO ANY ENCROACHMENT OR CONSTRUCTION WITHIN CITY OF RANCHO CUCAMONGA EASEMENT OR RIGHT-OF-WAY 5. ALL GRADE STAKES SHALL BE SET BY THE CONTRACTOR OR ENGINEER. PAVING STAKES SHALL BE SET AT ALL HINGE POINTS, EDGE OF PAVEMENT POINTS WITHIN 0.01 FOOT Or SUB -GRADE ELEVATION AND AT NOT MORE THAN 50 FOOT INTERVALS. ADD177ONAL PAVING STAKES MAY BE REQUIRED BY CITY ENGINEER AS NEEDED AT WARPED OR VERTICAL CURVE AREAS. 6. ALL SEWER , WATER, ELECTRIC, GAS, PHONE, OR OTHER UTILITY LATERALS, MAINS, OR CROSSINGS SHALL BE CONSTRUCTED PRIOR TO PAVING. Z COMPACTION TESTS OF EMBANKMENT CONSTRUCTION TRENCH BACKFILL, COMPAC77NG ORIGINAL GROUND AND ALL SUB -GRADES SHALL BE PERFORMED AT NO COST TO THE CITY OF RANCHO CUCAMONGA. A WRITTEN REPORT WITH THESE COMPAC77ON TESTS SHALL BE SUBMITTED TO THE CITY ENGINEER FOR APPROVAL PRIOR TO THE PLACEMENT OF RASE MATERIALS ANDIOR SURFACING. S. AT THE COMPLETION OF PAVING, A MATERIALS REPORT SHALL BE SUBMITTED TO THE CITY ENGINEER, LISTING ALL TESTS OR DETERMIN477ONS COMPLETED TO VERIFY S7ABlLJTY OIL CONTENT AND GRADATION OF ASPHALT PAVING. .9. PRIOR TO THE INSTALLATION OF ANY PAVING, A MATERIALS REPORT SHALL BE SUBM17TED TO THE CITY ENGINEER, LISTING ALL TESTS OR DETERMINA- TIONS COMPLETED TO VERIFY R-mu&. SIEVE ANALYSIS AND SAND EQUIVALENT OF AGGREGATE BASE. 10-PAVING SHALL HE PERFORMED IN ACCORDANCE WITH R-VALUE AND PAVEMENT TESTS TAKEN TO DETERMINE STRUCTURAL SECTIONS PRIOR TO CONSTRUCTION OF THE STRUCTURAL SECTIONS. I I - WHEN IMPROVEMENTS ARE To BE PLACED ON NATIVE SOIL WHICH CONSISTS OF A ROCKY MATERIAL, THE SUB -GRADE SHALL BE PREPARED By REMOVING ALL ROCKS WHICH PROTRUDE ABOVE THE SUB -GRADE AND ALL VOIDS OR DEPRESSIONS SHALL BE FILLED WITH A FINE GRADE MATERIAL OF A QUALITY BETTER THAN THE NA77VE MATERIAL, 12.IF THE ASPHALT CONCRETE IS TO BE PLACED ON SUB -GRADE, A SOILS STERALANT REGISTERED BY THE E.P.A. FOR USE UNDER A.C. AND P.C.C. SHALL BE UNIFORMLY APPLIED AT THE MANUFACTURERS RECOMMENDED RATE FOR THE FULL PAVEMENT WIDTH PRIOR TO PAVING 13.ESTIMATE OF QUAAlTI77ES IS PROVIDED BY THE ENGINEER ONLY FOR THE CONVENIENCE OF THE DEVELOPER. THE CONTRACTOR SHALL MAKE HIS OWN DETERMINATION OF CONSTRUCTION QUANTITIES BEFORE SUBMITTING A BID. ANY ITEM OF WORK REQUIRED By THESE PLANS WHICH is NOT SPECIFICALLY LISTED IN THE ESTIMATE OF QUANTITIES SHALL BE CONSIDERED AS INCLUDED IN THE OTHER ITEMS OF WORK. 14.STREET SIGNS PER CITY OF RANCHO CUCAMONGA STANDARD PLAN NUMBERS 4DLI_A AND 401-B SHALL BE CONSTRUCTED AT EACH INTERSECTION. 15.CITY APPROVAL Or PLANS DOES NOT RELIEVE THE DEVELOPER FROM RESPONSIBILITY FOR THE CORRECT70N OF ERROR AND OMISSION DISCOVERED DURING CONSTRUC770N UPON REQUEST THE REQUIRED PLAN REVISIONS SHALL BE PROMPTLY SUBMITTED To THE CITY ENGINEER FOR APPROVAL. 16-WORK SITES AND EXTERIOR STREETS SHALL BE IN A NEAT CLEAN, HAZARD FREE, ORDERLY STATE, THROUGHOUT CONSTRUCTION SITE SHALL HE CLEANED UPON REQUEST OF THE INSPECTOR IZNA77VE SOIL IS TO BE SCARIFIED OR RIPPED BETWEEN MEDIAN CURBS PRIOR TO FILL PLACEMENT l8.CON7ACT UNDERGROUND SERVICES ALERT AS REQUIRED, TWO WORKING DAYS PRIOR TO EXCAVATION. PHONE No. I-BOG-227-2600 PROVIDED FOR YOUR CONVINIENCE ARE THE FOLLOWING A. SAN GABRIEL VALLEY MUNICIPAL WATER DISTRICT (818) 969-7911 MR JAMES FREI FOR BASE LINE ROAD CONSTRUCTION B. GENERAL TELEPHONE COMPANY (800) 483-3000 FOR UNDERGROUND SERVICE C. SOUTHERN CALIFORNIA GAS COMPANY (800) 427-2200 7981 W. LUGONIA AVENUE REDLANDS, CA. 92373 D CUCAMONGA VALLEY WATER DISTRICT (909) 987-259 1 10440 ASHFORD STREET RANCHO CUCAMONGA, CA. 91729 E. METROPOLITAN WATER DISTRICT (909) 593-7474 700 N. MORENO AVENUE LAVERNE, CA. 91730 F. SOUTHERN CALIFORNIA EDISON COMPANY (800) 655-4555 7951 REDWOOD AVENUE FONTANA, CA. 92336' G, PACIFIC TELEPHONE COMPANY (774) 999-5639 19. THE FINAL OR SURFACE LAYER OF ASPHALTIC CONCRETE ROADWAY PAVEMENT SHALL NOT BE PLACED UNTIL ALL UTILITIES & UTILITY LATERALS WITHIN THE ROADWAY HAVE BEEN INSTALLED, ALL ON -SITE IMPROVEMENTS INCLUDING ALL GRADING HAVE BEEN COMPLETED, AND ALL UNACCEPTABLE PARKWAY AND ROADWAY IMPROVEMENTS ARE REMOVED AND REPLACED TO THE SA77SFACTION OF THE CITY ENGINEER. 20ON THE INTERIOR STREETS WHERE SIDEWALK 15 ADJACENT TO THE CURB, THE INSTALLATION OF STREET LIGHTS; STREET SIGNS, AND FIRE HYDRANTS SHALL BE LOCATED BEHIND THE SIDEWALK. E s STORM DRAIN CONSTRUCTION NOTES OTC' k�O CONSTRUCT TRANSITION STRUCTURE No J PER CITY STD. 336 51 INSTALL 78" RCP - 0 LOAD PER PROFILE 52 CONSTRUCT MANHOLE NO. 4 PER CITY STD. J21 INSTALL J6- RCP - D LOAD PER PROFILE CONSTRUCT JUNCTION STRUCTURE NO 4 PER CITY STD. .333 CONSTRUCT MANHOLE NO. 2 PER CRY STD, 319 56 INSTALL 30- RCP - D LOAD PER PROFILE INSTALL 66- RCP - D LOAD PER PROFILE U8 CONSTRUCT CONCRETE COLLAR PER CITY STD. 323 @ CONSTRUCT PIPE CLOSURE (FEMPORARYIBRICK & MORTAR) TYPE 8 PER S8CFCD .STD 176A INSTALL 24" RCP - D LOAD PER PROFILE 63 INSTALL 784 RCP - 0 LOAD PER PROFILE CONSTRUCT JUNCTION STRUCTURE NO 2 PER CITY STD. JJI 63 CONSTRUCT 24" CMP RISER PER'DE7AIL ON SHEET 4 71 INSTALL WATER QUALITY CLARIFIER PER STD ON SHEET 5 @ INSTALL UNDERGROUND INFILTRATION WATER QUALITY SYSTEM PER STD ON SHEET 5 11-1% �q)l INSTALL CHAIN LINK GATE WITH LOCK PER S6CFCD STD. SD-1 AND SD-2 �eR—IVATE ENGINEER'S &OTIqE LO. CONTRACrORS THE EXISTENCE AND LOCA77ON OF ANY UNDERGROUND U77LI77ES OR STRUCTURES SHOWN ON THESE PLANS ARE OBTAINED BY A SEARCH OF AVAILABLE RECORDS,• TO THE REST OF OUR KNOWLEDGE, THERE ARE NO EXISTING UTILITIES EXCEPT THOSE SHOWN ON THESE PLANS. THE CONTRACTOR IS REQUIRED TO TAKE DUE PRECAUTIONARY MEASURES TO PROTECT THE U77LITY LINES SHOWN ON THESE DRAWINGS. THE CONTRACTOR FURTHER ASSUMES ALL LIABILITY AND RESPONSIBILITY FOR THE UTILITY PIPES, CONDUITS OR STRUCTURES SHOWN OR NOT SHOWN ON THESE DRAWINGS THE CONTRACTOR AGREES THAT HE SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE CONDITIONS DURING. THE COURSE OF CONSTRUCTION OF THIS PROJECT• INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, THAT THIS SHALL APPLY CONTINUOUSLY AND NOT BE LIMITED TO NORMAL WORKING HOURS, AND THAT THE CONTRACTOR SHALL DEFEND, INDEMNIFY AND HOLD THE OWNER AND THE ENGINEER HARMLESS FROM ANY AND ALL LIABILITY REAL OR ALLEGED, IN CONNECTION WITH THE PERFORMANCE OF WORK ON THIS PROJECT EXCEP71NG FOR LIABILITY ARISING FROM THE SOLE NEGLIGENCE OF THE OWNER OR THE ENGINEER. CONTRACTOR SHALL VERIFY ALL COND177ONS AND DIMENSIONS AND SHALL REPORT ALL DISCREPANCIES TO THE ENGINEER PRIOR TO THE COMMENCEMENT OF ANY WORK IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO N077FY THE ENGINEER OF ANY DISCREPANCIES BEGINNING OF WORK MEANS ACCEPTANCE OF — CONTRACTOR SHALL COMPLY WITH ALL N.P.O.ES. REQUIREMENTS. CONTRACTOR SHALL ADJUST TO FINISH GRADE ALL MANHOLE RIMS, WATER VALVE BOXES, UTILITY BOXES AND LIDS, ETC. I EA IJ74 LF 2 EA 66 LF I EA 2 EA 14 IF 438 IF 4 EA I EA 37 LF 9 LF 2 EA I EA I EA 8855 CF K� I" = 1 WAIER"M Und4rgraund Servite; Alert CALL T LL 0 MET 1-800 227-2600 TWO WORKING DAYS BEFORE YOU DIG No. r)2183 Exp- 9-30-07 5v ISTA ST, --t LLI X Li > ASE LINE —RI3AD I STWI> PRO, CH RCI T SITE ST. � PKwY > IN > FOUTHILL BLVD. CITY OKALL CIVI CENTER DR ARROW RBUT NOTE, ENCROACHMENT PERMITS ARE M DISTRICT FOR ALL WORK WITHIN PERMIT ry DESCRIPTIC Cl T y / of F TRACT CHURCH ­ DEER OR APPROVED 8 CITY ENGINEER VICINITY MAP WOr rO —SCALE A 88REVIA TIONS. 8C - BEGINNING OF CURVE Ec - END OF CURVE 8CR - BEGINNING OF CURB RETURN ECR - END OF CURB RETURN VC - VER77CAL CURVE Bvc - BEGINNING OF VERTICAL CURVE Mvc - MIDDLE OF VERTICAL CURVE Eve - OVII OF VER77CAL CURVE Moc - MIDDLE OF CURVE CF - CURB FACE a - CENTERLINE EP - EDGE OF PAVEMENT FL - FLOWUNE FS - FINISHED SURFACE GB - GRADE BREAK PL - PROPERTY LINE FRC - POINT OF REVERSE CURVE RP - RADIUS POINT R/W - RIGHT OF WAY Tc - TOP OF CURB IR - TANGENT R47E COUNTY FLOOD CONTROL f, REVISION [ DATE I APPROVED �'./H:O CUCAMONGA 0 �REET STORM- DRAIN An bl HANNEL TO CENTER AVE, K" ITLE SHEET DATE: RCE: 24953 _ RCE No ■ 12/19/20064,3433Ind, 1:1,cft t > ------ ------ -------- . . . . . . . - I z --- ------- ......... . .. ----- --------- - + 4- VMAX=15 I ry --- --- -------- --- - ---- ---------- - -- ---- -------- L - - L - -A . ... ...-INSTALL �F 1,8"R&-- 1-�250-1 AND 11+00 12+100 *CONTRACTOR TO VERIFY LOCATIONCONSTRUCTION.': ELEVATION PRIOR TO START OF10+00 � 0 CURVE DATA TABLE # DELTA RADIUS LENGTH TANGENT C1 106'13'54" 90-00 166.87 119.94 C2 89'58'19" 45.00 70.66 44.98 Underground Service Alert CALL TOLL FREE 227-2600 TWO WORKING DAYS BEFORE YOU DIG 1— 1) EN CAP 5X LAT. ' SI"59 EN LI A�4s.Tpw 22' PRIVATE dRA INA GE EA SEAUEN LINE 8 (PRIVATE) lag -10 PFFX1StGRAD[NG AND OMINKGE PLM DV,'C- FACILITY, ppl 0"-sp EX CHANNEL (SEE SBCFCD FILE 254174 SET OF 86 SHEETS)' SBCFCD RIW t /7 :MIA: i Y �U7 0=78 E) X E3 El ------- �pyl" Lu Mm: DENOTES PRIVATE FACILITY — NOT himummm BY CITY MAINTENANCE RZj) UVN�I KUU I MANHVLL NV, Z VtM UJIT J)W. J79 @INSTALL 30" RCP - D LOAD PER*PROFILE @INSTALL 66" RCP - D LOAD PER PROFILE @ CONSTRUCT PIPE CLOSURE (TEMPORARY/BRICK & MORTAR) TYPE 13 PER SBCFCD STD 176A @ INSTALL 18" RCP - D LOAD PER PROFILE @ CONSTRUCT JUNCTION STRUCTURE NO, 2 PER CITY STD. 331 @ CONSTRUCT 24" CIVIP RISER PER DETAIL ON SHEET 4 SCONSTRUCT JUNCTION STRUCTURFE NO. 4 PER CITY STO. 393 @ INSTALL WATER QUALITY CLARIFIER PER STD ON SHEET 5 @ INSTALL UNDERGROUND INFILTRATION WATER QUALITY SYSTEM PER STD ON SHEET 5 @ INSTALL CHAIN LINK GATE WITH LOCK PER SBCFCD STD. SD-1 AND SD-2 IS THE RESPONSIBILITY OF THE SITE I I OWNER OR P.O.A. &ADD PRIVATE STORM DRAIN LINC CONNEE-rms PER 1 9 /1711 t5 z PRECISE GRAIANG AND DRAINAGE PIM DAC W1 6 ­60693 < r ni DESCRIPTION of,REVISION oATE APPROVED CITY of (RANCHO, CUCAMONGA 4 TRACT NO. 174351. OFF -SITE M M, CHU RCH STREET STORM: DRAIN V) DEER -CREEK CHANNEL TO CENTER AVE. FROM STA I 0+00,oOO M STA, 17+89,,21 APPROVED BY: DATE CITY ENGINEER RCE: DESIGN A TS ENCOMPASS ASSOCIATES, IINC. RECOMMENDED No. 62183 ExFr. 9-30-07 SIN PLACE 6699;ca NCROCUCRMONOR, CA 91737 RA DRAWN SHEET A T$ 2 OF---4!— cjv a At%. RCE No 62183 CHECKED DRAWING NO. A TS DATE FILE No CT SHEET O. OF J.\102-12$\Streefs\sd-offflte-02.,Iw9, 12/19/2006 9-32-45 AM, 1-1, als Underground Service Alert CALL TOLL FREE 1-800 227-2600 TWO WORKING DAYS BEFORE YOU DIG t T1 3 0 0 j 9 N 7 00 11" 7'J8" zt) 50 Q 1 r� r) 7" 7 ZI pE ......... .. T 224�00 21+00 F.GALE IN FEET (51) INSTALL 780 RCP - D LOAD PER PROFILE 52 41m53 CONSTRUCT MANHOLE NO. 4 PER CITY STD. 321 INSTALL 36" RCP - D LOAD PER PROFILE 54 CONSTRUCT JUNCTION STRUCTURE NO. 4 PER CITY STD. 333 55 CONSTRUCT MANHOLE NO, 2 PER CITY STD. 31!9 56 INSTALL 30" RCP - D LOAD PER PROFILE 57 INSTALL 66" RCP - D LOAD PER PROFILE 58 CONSTRUCT CONCRETE COLLAR PER CITY STD. 329 INSTALL 24" RCP - D LOAD PER PROFILE n82 CONSTRUCT JUNCTION STRUCTURE NO. 2 PER CITY STD. 331 iL L�4q, — ��jp 1 Q muw 1( ­�_ -VWAX 48 -PT CD �iqr _V 7- i z 1 L 3� 4 tTq F _E 7 i. IL Rv)_ Jas I 1 I co IN STALL, 14[.13 1L CS4 30 "RCPI 11 50 D ....... .......... . Q100=59 CFS INSTALL 30.01 LF INSTALL 20,96 LF VMAX=24 FPS 24"RCP - 1350 D 36"RCP - 1350 D 0100=31 CFS Q100=91 CFS VMAX=10 FPS VMAX=13 FPS LA To At LA To A3 LA Tv A2 DESCRIPTION of REVISION DATE APPROVED CITY of RAINCHO CUCAMONGA La TRACT NO. 17435B. OFFmSITE 2 CHURCH STREET STORM DRAIN ty o cn DEER CREEK CHANNEL TO CENTER AVE, FROM STA 17+89,21 TO STA 28+75,46 APPROVED BY: DATE: CITY ENGINEER 'N RCE: 24953 0 Uj DESIGN A TS ENCOMPASS ASSWATES, INC. PQL RECOMMENDED U_ (n No. 62183 Exp: 9-30-07 comsukrime awl ENOINIENS DRAWN 5699 COUSINS PtAa UNCHOCKAIVIONGA CA91737 SHEET A TS 3 pCAL-. CHECKED RGE No 62183 DRAWING NO. 0e A TS I DATE1:L!2 FILE N. CT SHEET NO, J-\102.128\Strmfs\sd� ffsitt-03.dwg, 12/19/2006 941-54 AM, 10, ift TYPE CI-Afi-AWa n-C, ryasrf °JAENraKE; ra QI rn SaDt!$'ll' T66Dd Id a3dY�S P,�R tACtN it•apt 33 r—R E TO,, E P vCED W OWN Z7� T Y�/ 77,2 HWdSAFTMCol �i �IN�4tc4'flu" xill i msic FELATNE COMPACTION afta, e7 i N°DTES: T, All Irakict+a3': tom' iHf +origin pr Wiest shiffi oa hocktkted &.4 coaitiourk" guar Sections it" -'aB-•itaii'of that Stanoond 2. Spread BOX" iFPsJP I* to Rhea far trench plavi F J9tis less ITT= Sao rift. it. .3.. Aft pants. aliag Im ceUI Hole 3a'n+ffi: tap ar Aicitttmrem jeittgl era Peat f:. 4. Urvini amen iRe, m+sinteted Ilse mg City Engineer, tr,6YfEh etch shop he stra'sgnt grddli a=" "loo, pind shall hit 6a ctlawf" at vale- 5: lifer to t of A.C:.. povettelml, edge' shoo he cut to a a@EM WFUtal and stregne odge oats tmk coat im tacut of cat. 5. The itntira trZlrmied term. TT' 'WFI snag hn wae?pged moth ta'' min. C$.-Aft-4Opg {C. t 6mm paao a' Pa?%eg roactLlrta B rea diAMN. DLAW KNOX ar Belli for an' a "ih or lotRvAr.. N s:. Pti xg'f+1 AcG', naL;:t. mEfich > a �I aanimiAll ft D,25" :thick �u� wCale, rlad,,r tiles - � dksarmd ua Via I in ina Ano. - P Titer' OIL RANCHO CUCA'CJiNG , CA"LWORT-1A ti WPP*mrra ak, - _ -- TRENCH REPAIR 5f� 4 x CITY t'$€Ft TCMCI a§E a47iN §TPiNUn'7;CI §FICO1rtGAiTtgN ¢D$. etffi� i4aR%e ':'A F i I rt[ FbaR 'iF HFr f "a:Si r��El I6T114. N+ hre. 0•, 11- :.r(1 ID [t .'r C] c al". N4i t I W - f h .FN. . 7T19T F2 yT1.(i tl+l FE5 r f F,l ..3G tl x yr I �r`-n=rY�sv-tm a ■ 9 MT 10 If m - u � A s. '._ 'll VITRO 91,ILWJR b NO. A F Dr tA r Ai I 'All , I9 �Rc is rI r I 1 r. 3 31ry 1_frJ f... • mx Ia . r a SRce s..v9 vYa IAO K !l Ui: q!- F NFRA' I IUC;-F I ILL C-M1 LT1 F_h9C.' A af. FTi% jr. earl<:.Tq. SHh:L ZaFC'Pv U] TI C Lr- T i tr TII $ ?.fr-1ai1 n'if3:-TnG'i 51£•ain ?E RC TkJ 5. S:=rtGi 3'.a, SIICCS' At rl1 rG S'P,InL n L I _•._ ?:IdL' SI aU. LL }i:•]LL c, 1 _ 11 r D :r.YG_ '+LL ul 'It Wi }. ST,FCVK''>.J','Ill 51 ' Pia 'i r.ciiF•I[f Uh FPS fTtFR+lAF Ic "L iR-Jr-t H-MEN P•?1 IF All 1W FEN E FAR;[' SN L- 9E G` allLF iaFtig5_ !. Si'•N TW PI Aje, i LL .ATE s'Y14L C'Eti IF „a C Ead,E'" F JT-IEav' HCrtEC fit a'4 iLL Pa- :10 i.. 11 Lf i t1 i t 'a F 6 2 li t" N 11,311AFi1fP' iH? I IIL L4_ IN ) Iil ,A, 1 AJ.i 1 N`d'1 IP ItA :Liter T P FI. T :TI['1 ? ntF t) t15 SP fsi +F X < 4. 'U L C{ 11 F Ysl +".I - ';'IL FI L N L t l r21 JP W. :`tLJ. U V ,ylA 1 -1 flitiR 'a +L t-'IY;H3.,'NLE F 1,i ::'lk' F' Il JHbLti .. :IwCMIR M rJ L dC. 1'. CIUII+AM. CO'P.... EM AND ,J..T rCall T<; LE c. W1 " Af -413 SP l L 52..1r;UG ILL 13-{• p MLS V_ LAIli .leU I,-,. HLLf.'Lll N'..• L61xP-1',`i C RF!',- Ff t J FI`i UA I H. T 1 h^tlP 5 13 LL HAM Ftm.1 .NAIL.- Hf 12', or 'opal );T ILL'S PANE) 51lE L31G -H_ coup •F I4 FAc4m. H lHi aain 1 i +Hti RT "IF It ( AMIR PJ111 }a<tcE AER " I,r31 bHLG %I I'1- W.L. F_,A1 ) H: LN FFa Ti (� d A iii1ITArl t T I T . ivat n. F1 W 108AH I,,I_+,N:AL illNI It" Wr ,Ma. I. Ta@E HORIZONTAL ANGLE Or C NOT EXCEED 5*45'. AND I DRAWINGS, CLEVA°T ONDPT AND REOty@R BYPtCiTt 11. 3. A IF 4000 psi AT 29 DAYS: 4. FLOOR or STRtlminx SHALL LINE, 5. REINFORCING STiEEL'SHALL.B) lidINIMUM DF I V2` CLEAR FRG DfiOtlTtaG OR LESS@ ON CENTESE R. S, ELEVATION S APPLIES AT tNS T. TRANSITION STRUCTURE SHIAI OPERATION° EXCEPT THAT TH OPT16K OF PLACING Ay THE .1 LONGITUDINAL KEYWAY. 8. THE, LENGTH OF IME STRUCTI OF THE, CON T RAGTOR TD REE' EXTENDEO PORTION OF SAU'Li IN THE TABLE. BUT ANY 'N Al ARE APPRIDTaED BY THE ENGINE S. EMBEDMENT THAS SHOWP E ON E 101 WHEN DIMENSION C 13 NOY'9P CONSTRUCTED AND A B 5 "BAI It. WHEN F.L rATIOK in ANDI ECG ' 6. $BALL TD SbRIHd1NSi I A615. TH A UNLESS ta3 SPACED 18- NOT :BE IH PROJECT N. WHEN YATIDN 5 r It 5 _- yi -. s ra. IC•:a I�.H•Y"1.11 IIII IN PIPE & RISER n lung 170 AT THE TOP OF CURB AT R OF CHURCH SWEET AND i WEFT STA. 5't78 50 56.01 f ..Q r i i @ ! I I IL PIPE 4. r, I Brick laid lengthwise and mortared 'x 1"t Cement grout 'Zinstde edge of R.C.P. grc+m capping at and of pipe SE�GTIi or end of pipe (if broken) —AD" Camanf groat copping. ..a , NTu. -Brick mortar closure i ELEVATION PIPE CLOSURETIFFITYPE "B" (Brick and Mortar) NOTE: t. Typo "RI" ciosm for "D" not larger than $AYt EIERN ARDfNO COUNTY 36IF unless approved or macified by the FLOOD CONTROL DISTRICT Engineer. aETrl § OWN. BY I DATE See specifications for additional information- O,L• 5-5-63 FLE No. S.P. I I7SA E a F . H r :: `e r+cs3 .. P L 1. P ev _ Aatpvw 'rrr. .: IT lL 4 1 3G L t 31 , I' ' N-m �d LI ,• •�y; ` • I r i i:wYh'• r+xasrr F a IF . � Ww y\'.. •'� '� esn ly ml - \ ♦ _r. ~ u x hl • i I/ Jf• 1( YSy l5-1 'Yi j f✓! =t m en .n It \�-t�' �' x n h Y` \• 't •', Rr � '+, ry �..(na :c,e +``" f r �� \ •�.t�-'¢L.xxN � .� ^`'n� \ { S. J/.,�"i/% EQ r +:..'.` t\ � •> +a '?e!/'rr /w�t� � %j�jr�a '. '\\ � 1� ri' =:o L+x: ..J. fa e)z,r 1 ]r'.- br \• r. �y • x[- f if6 1y :�N: ' t •' m M ufl} .. .- i Q6• Sy i �LJ »ttr.=tt�t 91v ' •" nu -I • `lour x),, l �ijl wS I• - Y„ ax;; sys=.5+:' I tdIFd 3m. N,.:i„ ' Ie..dLC11 I•t. ("�.. .'I li )i" ..aa-..+ ,0 sie *a tT] ram.-G.. J fC v I.T�NY_ ro'< YH r •5 .6'ha ']] 'F •I 9... .s p, r -AC 1 n.t �I•� J ['f �1:1 t rfi RFrz 3X -X.... r R Y �a-X oi.r( H'al P 11111 �' M1 .l. A :. X i a r VA .:C U. �,: ,p •.. X A, Fo- v5r. ' - S n P ail ,� •.1----rc—r1� ,n„ r X `y 4 41, I :a- ... ]Y r \4'°,' -•- a .- - PF :yl tm,:f.f =!I"(:nL III:-) I ES S L'T, C 3 vim' 3'- u � , a "•e,...[ a.l �rto- rTacn t +" $}•��"n t5 -• +. f ii )Jl E. 1t. TlJU: PT ?i :. ­aW RFII{ . T ItY.a FN[. O i L ri:ri '-' 'h ; f3 y: •,cgir. ire '` +- m. K er rr . RIn11: rCtl WM TC• III- L-Li l cf-- k.t \ t. "" •: N n 1 t 'fi a tp Is `".F .1c..[>r TsCTRtI �. 't'Yt S• �, X* .S �4..: ikai � J- �.G, 2iYG •„U'i `" x'i IF Is rl f u re r }{) .•> .e: 1 :. .`. E N9' # by al, Fd ar t t'J: Ti' ra" ser tlk� c F Xi.)30UN� f k 'F'F lr 1137 a, p a r i ' '• -�`---` , s a u J n) s aft l atu:. iIvjUl.1t 'l l AC 01 Cfl MKd $TII fL.CH: f` r y tl b.SII. �� li�i •:d;..r' _ i it ~?Y b J faf r - _ i'E {EH'R F ?i: YJ' 3- 9 1. .K-: D'IF; s:'➢A>YU.aX, tt ''i Ma •i.i W> c -Oa.i 1 -e'. Lv [ I I H 1 J n as 1 al'L R'p 6 i. 5 - Zn t `.-• FeA TJL } il. it 1i 61 F] { ;Aar f 'X T.: Cr it C. _ L t'MTi9G1> - - - .- - '• - - _. Lr<T iR 4A V4 -E -ilUi ..y f3iF£ T t.1 c�•J �111� r, E '.,,II: 1 or, ':IIop(:' T ,Q �':; �lbI 'E f:a ui'GF � r v° ui,v i:T� o cl; R,SII Tm».. .{ a.. ie f9. .va.:t.• 13 Yl Mill tie. FtdryTW.Irr R,. N+T:r1Fi 4/G 9 iM irfR q1•. C•.iMU wnr u' a A. i..•2• ...., '. xa ,AL 'l . -`61 3L A Fun; M �,.. i F M1 'FYI ..e,: RJ 'Nt i' t-. '+,+{,• :-.um. 4•A HOr : JK .ILL 1y. .t CAf.ItF - 1$yh, i n 914"Al -iRif. m. >. 10, w2 Oiy' Rl i(l gr , ':Fr-,.:-ti fR. fV' t .m:.:v- .. --• __ ..., e _LM .1.+'tr-4 fxcP -1 ,i_W,Eel aa $zc Crx-v i{<D i :IU : ! '� L <"R7 ]: JM1 1 iM13 )11a.Te1 3 ;C '}tit"..).:.II,N, :Jl v: t ->' , .-. ale. 1st, i i+ L maw•' �,. - .. 1 ..., .. •• :F:..: - 3^F.. ...... ..e J._ C... .. e .. _..... .. S. _.... _. ... M1 ,. m_+.r T. _ . .. .. .. rt .+ U.C. ( t- B 4 1. i I v r•' n a 1 b i ."i+i t• . n ca 1.. of l ) 4h .,•i ..- _�_�..�.\:;_.tI-j.f�r' _n..�v. P"' n. as F3 LhR Nrwc c U-) v-. -+t+ V _'---. - : :. KJi ` _ i X -, 11 9 FF •a 9, 11 C: }A rY;a, <' : " � : �\• eS .. -:'l'• ::: '�, _ d' T<• S A- JJ i . _ tv K : AS T: n ... .._.;..: PI ,. . T< �..a.-. �.-:: - ' .. ... ... .H.,t{I-.hRdd3k_ i5 r N .aHe?: 1._:..: .: ,. ,..... JF.. 4r � _ LI c- Ei. .,� !:. c. IY ✓ r i' ,z ,4 baY 4J1.. .kt LP L'V ... , ., :! ..... ., 1. -; •.e ~A ! s .,:. 'd :...: _. .bw ^'1'rl:nr e>. L I F9.PF ''+ 1 I i v ,' .• eelwr S"� x(9f. -:6 "'12%ITS y�- _ ,x• ,>:�• ..� Mr ,u rot flat f _ J'if5 YC, . i.e-Ci ilr i` t F. ^.h -•3 ::{_1L ,IryR.i d6:FLIL.,71 "+1l+] xl H,d 1N3 '.:1. 4>-,. tfa 'aN: y •nL Sl M'$$. i ... \`:T y, ✓1: ✓' t5 'F '-;, - r `` `� -.;va x , T . -'=;: ''� r. - ! j im rTNil= = SA arirF ill P ,1 SH X_,. rs,: •x1xTFT, +x4 « F ,icaj ""+ -/ - - S 5 n u 7 a:PeR IId.1 [_ UY-N C r_}+@3at h`-i.-•,%'-fl �\°: � :.. {I s+N #YM4.1,:. >�) fft SI Td: .T1..L,)�%•. :: "'� �5Y r .-,_' f- s ... _ •r:,r u.r.Ica e r'• b5< >, ' 3 i - • ' i iKt{iF qi ' 1 A -1 i it. tl F55 xlSNiiLS;> }I IIL :n ; YPS ? .. .4vao.a -�i L.,,. _ e (' .-'L" .36.Mf: {UP „ni 7 +.51F55 t „T L`3. 'T I,t' Ttr -t a.r bi :% - .-J. '. ;- t . 1. .L..:. aN:f 4': 5 $' );E iT �E- ai F lryY` NIc, 1 t Afij', .- - lei wxF +1 nP •: .. .- _ .PAL bLi H1 H :•9. 1 IL Il +1a.-1.. -„µFr . {h a' 14f M11- F FAIR: -.. - * '. -'[•'M 1 Ar P}- I •vJ C r '. _ H WIT Mr. P •''. mael w,i x la E: - .. .Ili at Ik fhF , aF 1 .,� l ry' ae14,1 N p TC ".lCt[ fVi `_ H .>:✓`- ._d I,w T }l..iJ1 �"i 1�i dm:I t: Li..ea pc--Ld ic; :c-t2L ur>t tsit n6. d>r. u.. n r I FIT. r -- ,1 •fi u : FCC r q. iE ;E:.t.lef X rwX n R pvK rl a . J Tr v' , DATE r a''°i I'R. a+v+ '-• .. IS tN C:, J t5 r4,: x nbY! .r' S d 'I-c In Mot h Ct+Jar - C" r C : Iry 1 Aq w'1 l 1, : - ,G i _,Ail Flat n :air r. M�C.EL E _1N :f •I, Exs1= Ti�', t A"fr^, art wIm-rroit..,IV l s �- u� ero mrF. s Eft; ` 1 [lk,l i i ,-) ,',^;.cl � : '1 wriim frff:FFklr- bNr In. a_r. F k t •q:�7_, rw _ ,- .q .. „ .,Aw71CT R` M.Ati: JStVM Underground Service Mari• ALL TOLL ��tg�yFE 1 ®[:J'4A'A8 227-21600 TWO WORKING DAYS BEFORE YOU DIG DESCRIPTION )f a + 1ae CITY of NCHO ACT NO- IF FW S.1ON DOTE APPROVED z CUCA ONGA E r I Art- }% APPROVED BY: DATE: r� CITY ENGINEER c, RCE: 495'3 DESIGNATS f ENCOMPASS ASSOCIATES, INC. RECOMMENDED V) No. B21S3 u) CONSiftlY GG@Ytt6%GlAFFNR4 VAX a-t d L q Exp: 9-30-07 it DRAWN 5699, COUSINS PUG RANCHO CUCAMONGA £A 9T 73Y SHEET L,f] I C 1 V I1, S;a�T A TS (909) 684-943 OF —AE— C I CHECKED ''� RCE Na D2183 DRAVd(NG NO. ATS ~ DATE � "I _e T FILE No _4 T SHEET. _ OF hill 02-Tgg\Sh*mF\sd-aRslteO4Av yr 12/19/2006 9:31:011 AM,1:1, ads HEAVYWEIGHT STABILIZATION NETTING (iYP) INLET OUA� NTI17 �&TiMATE➢ OU� A17177ES 77 TOTAL UNITS GEO—TEXTILE _ {2)ROLLS = 1,Dgq SO. YDS. 4 START UNITS HEAVY-{JU7Y NETING = {t)4a? PIECE 59 MIDDLE UNITS LIGHT —DUTY NETTiN6 = (3)RpLLS=99q FT 4 END UNITS PVC CROSS —DYER PIPES (M4°) 6 TOTAL 8,855 GF STOR'AGE (*SEE NOTE BELOW) STORMCHAMBER (8" STONE ABOVE AND BELOW)=115 CF/UNkT *NOTE: THERE IS ADDITIONAL STORAGE IN THE 12" STONE BUFFERAROUND THE SYSTEM NO T l BY CITY DESCRIPTION Of REVISION GATE APPROVED CI'T Of RAINCHO CUCAMONGA 174ft OFF -SITE TRA:CT No. CHUR:CH STREET STORM DRAIN DEE" CREEK CHANNEL TO CENTER AVE uj to Lu WATER QUAG APPROVED r- y. DETAILS CITY ENGINEEER DATE:; DESIGN A TS RCE: 4953 ENCOMPASS ASSOCIATES,'PNC. RE C(3 NLYED s� )RAWN &n caxslinveawl ftNF s —� I A TS RANCI i �»� ' 11191 z 4 ("g) asa. SHEET HECKED 5 ATS — RCE No 62183