Loading...
HomeMy WebLinkAboutEtiwanda MP of Drainage Fig. B-5 - LowerSAN BERNARDINO AVENUE D /I aft mm ow mm mm mm mm mm mm Comm Now Ems mm mm mm om le [w 'mm mm cc mm mm FAM am um am 841 F , PF C won Em Now mm mm man man om mm 841 Em mm pm ow om omm mm Em 1 *15: RCB TO SAN SEVAINE, CHANNEL EXTENDTO 1-10 FREEWAY om M, � om mm sm mm mm mm In= ETIWANDA AREA MASTERPLAN-PF DRAINAGE WATERSHED AREAS XVI &'xVII LOWER N C LEGEND LINK NODE LINK NODE NUMBER e P , SUBAREA,ACREAGECONCENTRATION POINT SUBAREA BOUNDARY REGIONAL MAINLINE FACILITIES SECONDARY REGIONAL FACILITIES EXISTING MASTER PLAN FACILITYa PROPOSED MASTER PLAN FACILITY DRAINAGE AREA BOUNDARY SUBAREA DRAINAGE BOUNDARY �lb 9 MASTER PLAN STORM DRAIN DESIGNATION Q 100 YR FLOW RATE (cfs) S APPROXIMATE NATURAL SLOPE OR PIPE SLOPE D PIPE DIAMETER IN INCHES OR CHANNEL HEIGHT IN FEET B BASE WIDTH. IN FEET z SIDE SLOPE