Loading...
HomeMy WebLinkAbout09-026 - Resolutions RESOLUTION NO. FD 09-026 A RESOLUTION OF THE BOARD OF DIRECTORS OF THE RANCHO CUCAMONGA FIRE PROTECTION DISTRICT, RANCHO CUCAMONGA, CALIFORNIA, ESTABLISHING A REVISED FEE SCHEDULE FOR INSPECTION FEES AND PERMIT FEES, AND RESCINDING SECTION 2 AND SECTION 3 OF RESOLUTION NO. FD 06-015. A. RECITALS (i) The Government Code requires that prior to levying a new fee or increasing an existing fee or service charge as hereinafter set forth, the local agency shall hold a noticed public hearing to consider the matter. (ii) On the Rancho Cucamonga Fire Protection District conducted and concluded a duly noticed public hearing concerning the proposed fees and service charges, as required by law. (iii) All legal prerequisites to adoption of this Resolution have occurred. B. RESOLUTION NOW, THEREFORE, the Board of Directors of the Rancho Cucamonga Fire Protection District hereby finds and resolves as follows: 1. The facts set forth in Recitals, Part A of this Resolution, are true and correct. 2. Section 2 and Section 3 of Resolution No. FD 06-015 are hereby rescinded. 3. The Inspection and Permit Fees for Non-Profit organizations shall be one- half the amount of the fees herein approved. 4. The Chief is authorized to administratively make fee reduction adjustments, to administratively add permit sub-categories, and to administratively modify and/or determine fee assessment methodologies when such adjustments, additions, modifications, or determinations are necessary to ensure conformance with the cost recovery intent of the Inspection and Permit Fees approved herein. Administrative adjustments shall not result in fees that are higher than those approved herein. 5. The Board of Directors has determined that none of the fees established herein exceeds the reasonable estimated cost of providing the service to which each such fee applies. 6. The following fee schedule is hereby approved and adopted: SECTION 1: �. INSPECTION FEES Field Inspection after Initial Re-inspection $110 Requested Inspection (per hour-one hour minimum) $110 Unscheduled Field Inspection or Investigation $550 Apartment Building/Complex Annual Inspection Buildings with 3 or 4 units $188 Buildings with 5 to 7 units $240 Buildings with 8 units $330 Each additional dwelling unit beginning with the ninth unit(per unit) - $11 Condominium Complex AnnualInspection $330 Hotel/Motel Annual Inspection First 10 rooms $330 Each additional.room (per room) $11 Licensed Care Facility Pre-inspection -25 or fewer residents $50 Pre-inspection -"more than 25 residents $100 Annual Inspection Home Care Facility(More than six clients) $240 Commercial facility- First 10 rooms $330 Commercial facility- Each additional room (per room) $11 High Rise Building (per hour) $110 Large Family Daycare Annual Inspection $136 Adult/Child Care Facility(Group 1-4 Occupancies)Annual Inspection $330 Private School/Large Child Care Facility(Group E Occupancies)Annual Inspection Small School $240 Large School $330 Medical Facility Annual Inspection Hospital/ Nursing Home(Group 1-2 Occupancies) $660 Clinic $240 Ambulatory Care Facility(Group 1-2.1 Occupancy) $330 ARemate Method Annual Inspection (per hour-one hour minimum) $110 SECTION 2: PERMIT FEES A. Fire Code Activity Permits..(Single Event—One Time) Amusement Buildings $385 Carnivals, Fairs, and Outdoor Public Assemblages. $240 Commercial Cooking Operation at Carnival, Fair, Outdoor Event $136 Exhibits and Tradeshows $240 Explosives/blasting agents single day use $240 Fireworks; public display or special effects Small Display/ Limited effects 1-4 minutes $240 Medium Display/ Moderate effects 5-8 minutes $550 Large Display/ Extensive effects 9 or more minutes $743 Resolution No. FD 09-026— Page 2 of 14 Hazardous Materials Tank - Remove or Abandon in Place $1,128 Hot work single day operation $240 LP-gas install stationary container $188 Liquid or gas fueled vehicles in assembly area single event $188 Live Audience $240 Open burning single day use $136 Open Flames and Torches for paint removal $136 Open Flames and Torches in a hazardous fire area $136 Open Flames and Candles in assembly area - single day permit $136 Parade - inspection of floats $136 Public Assemblage- Indoor $240 Pyrotechnical special effects - See Fireworks Seasonal Sales Lot $136 Tent, Canopy, or Temporary Membrane Structure per inspection $240 B. Annually Renewable Permits Access Control Commercial $188 Residential (Requires monthly testing) $550 Aerosol Products $550 Amusement Buildings $385 Aviation Facility Servicing or Repair $550 Fuel Servicing Vehicles $240 Battery Charging Operation $240 Cellulose Nitrate Film $454 Combustible Dust Producing Operations 5,000 square feet or less $330 5,001 to 15,000 square feet $550 More than 15,000 square feel $743 Combustible Fibers $330 Commercial Cooking Operation $240 Compressed Gases Corrosive greater than 200 cubic feet $330 Flammable greater than 200 cubic feet $330 Highly Toxic- any amount $330 Inert and Simple Asphyxiant greater than 6,000 cubic feet $330 Irritant greater than 200 cubic feel $330 Medical Use Gas - Less than Table 105.6.8 Amounts Portable Cylinders $188 Piped System $240 Other Health Hazard greater than 650 cubic feet $330 Oxidizing including oxygen greater than 504 cubic feet $330 Pyrophoric - any amount $330 Radioactive - any amount $330 Sensitizer greater than 200 cubic feet $330 Toxic - any amount $330 Unstable Reactive - any amount $330 Covered Mall Building $658 Resolution No. FD 09-026— Page 3 of 14 Cryogenic Fluids $330 Cutting and Welding $330 Deep Sedation /General Anesthesia $240 Delayed and Access-Controlled Egress $188 Dipping Operations $330 Dry Cleaning Plant Small - 1 or 2 machines $240 Medium - 3 or 4 machines $440 Large - 5 or more machines $743 Emergency Helicopter Landing Facility $550 Explosives Process, manufacture, store, or sell $345 Use $240 Fire Alarm Central/Remote Station $10/acct Fire Hydrants and Valves $188 Flammable and Combustible Liquids Class I Liquids in excess of 5 gal. in a building; 10 gal. outside of a building $188 Class II or Class IIIA 25 gal. in a building; 60 gal. outside of a building $188 250 gallons or less over maximum allowable quantity $550 251-500 gallons over maximum allowable quantity $578 501-1,000 gallons over maximum allowable quantity $605 1,001-5,000 gallons over maximum allowable quantity $633 5,001-10,000 gallons over maximum allowable quantity $660 More than 10,000 gallons over maximum allowable quantity $688 Remove Class I or Class II from a UST $936 Operate Tank Vehicles, etc $330 Place a tank out of service $936 Change Contents $550 Manufacture, Process, Blend Refine Flammable/Combustible Liquids $1,128 Dispensing at Commercial, Industrial, Gov't Manufacturing Establishments $330 Dispense -Tank Vehicle to Fuel Tank $330 Use or Operate a Pipeline within a Facility $743 Floor Finishing in excess of 350 square feet using Class I or Class II liquids Commercial / Industrial $240 Residential $136 Fruit and Crop Ripening $550 Hazardous Materials in excess of amounts listed in Table 105.6.20 Gallons - 250 or fewer $550 Gallons -251-500 $578 Gallons - 501-1,000 $605 Gallons - 1,001-5,000 $633 Gallons - 5,001-10,000 $660 Gallons - More than 10,000 $688 Pounds - 1,000 or fewer $550 Pounds - 1,001-5,000 $578 Pounds - 5,001-10,000 $605 Pounds - 10,001-25,000 $633 Pounds - 25,001-50,000 $660 Pounds More than 50,000 $688 Cubic feet- 500 or fewer $550 Cubic feet - 501-2,000 $578 Resolution No. FD 09-026 — Page 4 of 14 Cubic feet - 2,001-5,000 $605 Cubic feet - 5,001-10,000 $633 Cubic feet - 10,001-25,000 $660 Cubic feet- More than 25,000 $688 HPM Facilities $440 High Piled Storage in excess of 500 square feet 500-12,000 square feet $550 12,001-20,000 square feet $578 20,001-100,000 square feet $605 100,001-500,000 square feet $633 More than 500,000 square feet $660 Hot Work Hot Work Fixed Site $330 Hot Work Operations $240 Hot Work Program $188 Industrial Ovens $330 Large Family Daycare $136 Liquid- or Gas-fueled vehicles or equipment in assembly buildin s $188 LP-Gas Store, use, handle, dispense, sell $330 Cylinder Exchange only $136 Live Audience $240 Lumber Yard and Woodworking Plant $440 Magnesium $330 Miscellaneous Combustible Storage $240 Motor Fuel Dispensing Facility $330 Open Flames Open Flames and Torches for paint removal $136 Open Flames and Torches in a hazardous fire area $136 Open Flames and Candles in assembly area/restaurant $136 Organic Coatings $330 Pallet Storage $330 Place of Assembly A-1 Theaters, Concert Halls, Auditoriums, and similar $440 A-2 Banquet Halls, Night Clubs, Restaurants Taverns Bars $385 A-3 Places of Worship, Recreation, Amusement $385 A-4 Indoor sports arenas and similar with fixed seats $440 A-5 Outdoor assembly areas and uses $660 Powder Coating $330 Private Fire Hydrant $188 Production Facility $385 Pyrotechnic Special Effects Material (See Fireworks Single Event Permit) Pyroxylin Plastics $440 Recycling and Scrap Metal Facilities $550 Refrigeration Equipment $330 Reinforced Plastics/ Resin Application $330 Repair Garage/ Industrial Facility (Includes all required permits;if actual fees are lower,actual fees will be assessed) 5,000 square feet or less $330 5,001 - 15,000 square feet $550 15,001 to 50,000 square feet $743 Resolution No. FD 09-026 — Page 5 of 14 More than 50,000 square feet-Actual permit fees Rooftop Heliport $550 i Spraying Operations $330 Stationary Storage Battery System $330 Storage of Scrap Tires and Byproducts $240 Tire Rebuilding Plants $1,128 Waste Handling Facility $550 Wood Products $440 Wrecking Yard $550 7. The Secretary to the Rancho Cucamonga Fire Protection District shall certify to the adoption of this Resolution. Please see the following page for formal adoption,certification and signatures Resolution No. FD 09-026 — Page 6 of 14 PASSED, APPROVED, AND ADOPTED this 151° day of June 2009. AYES: Gutierrez, Michael, Spagnolo NOES: None ABSENT: Kurth, Williams ABSTAINED: None J r L. Dennis Michael, Vice- resident ATTEST: nice C. Reynolds, Sec etary I, JANICE C. REYNOLDS, SECRETARY of the Rancho Cucamonga Fire Protection District, do hereby certify that the foregoing Resolution was duly passed, approved, and adopted by the Board of Directors of the Rancho Cucamonga Fire Protection District, at a Regular Meeting of said Board held on the 15'h day of June, 2009. Executed this 16th day of June 2009 at Rancho Cucamonga, California. 6Yanice C. Reynolds, S etary Resolution No. FD 09-026— Page 7 of 14 Inspection Bureau Proposed Fee Schedule and Analysis of Fee Reductions # of Proposed Current % Permits/ FY 09-10 Fee Fee Reduction Feesin Revenue Inspection Fees 07/08 Reduction Field Inspection after Initial Re-inspection $110 $110 0% * Requested Inspection per hour - one hour minimum $110 None Unscheduled Field Inspection or Investigation $550 $550 0% * Apartment Build ing/Com plex Annual Inspection Buildings with 3 or 4 units $188 $330 43% 2 $284 Buildings with 5 to 7 units $240 $363 34% 4 $492 Buildin s with 8 units $330 $374 12% 1 $44 Each additional dwelling unit beginning with the ninth unit per unit $11 $11 0% 140 See Note 1 * Condominium Complex Annual Inspection $330 $330 0% Hotel/Motel Annual Inspection o First 10 rooms $330 $330 0% °O Each additional room per room) $11 $11 0% Licensed Care Facilityd Pre-inspection - 25 or fewer residents $50 $50 O% 1 Pre-inspection - more than 25 residents $100 $100 0% N Annual Inspection Home Care Facility More than six clients $240 ^ O • Commercial facility- First 10 rooms $330 $660 50% 3 $990 LL Commercial facility- Each additional room per room $11 None o High Rise Building per hour $110 $110 0% Z • Large Family Daycare Annual Inspection $136 None o Adult/Child Care Facility Group 1-4 Occupancies)Annual Inspection $330 ^ 5 * Private School / Large Child Care Facility(Group E Occupancies)Annual Inspection $440 0 Small School Less than 50 students $240 45% 2 $480 Large School 50 or more students $330 25% 8 $2,640 Medical Facility Annual Inspection Hospital / Nursing Home Group 1-2 Occupancies) $660 $660 0% Clinic $240 ^ 64% Ambulatory Care Facility Group 1-2.1 Occupancy) $330 ^ 50% Alternate Method Annual Inspection per hour-one hour minimum $110 $110 0% 2 #of Proposed Current % Permits/ FY 09-10 Fee Fee Reduction Fees in Revenue Permit Fees 07/08 Reduction Single Event/ Day Permit • Amusement Buildings $385 None Carnivals,.Fairs, and Outdoor Public Assemblages $240 $240 0% • Commercial Cooking Operation at Carnival, Fair, Outdoor Event $136 None • Exhibits and Tradeshows $240 None Explosives /blasting agents single day use $240 $345 . 30% * Fireworks; public display or special effects $1,293 Small Display/Limited effects 1-4 minutes $2401 None 81%1 See Note 2 Medium Display/ Moderate effects 5-8 minutes $550 None 57% See Note 2 Large Display/ Extensive effects 9 or more minutes $743 None 43% See Note 2 * Hazardous Materials Tank - Remove or abandon in place $1,128 $1,128 0% Hot work single day operation $240 $240 0% o LP-gas install stationary container $188 $188 0% ) Liquid or 92S fueled vehicles in assembly area single event $188 $188 0% • Live Audience $240 None f1 Open burning single day use $136 $136 0% Open Flames and Torches for paint removal $136 None N • Open Flames and Torches in a hazardous fire area $136 None 0 o6 Open Flames and Candles in assembly area - single day permit $136 $136 0% 0 Parade - inspection of Floats $136 . $136 0% L LL • Public Assemblage- Indoor $240 None o Pyrotechnical special effects - See Fireworks None $188 Z • Seasonal Sales Lot $136 None 0 0 Tent, Canopy, or Temporary Membrane Structure per inspection 1 $240 $240 0% 0 w 0 3 #of Proposed Current % Permits/ FY 09-10 Fee Fee Reduction Fees in Revenue Annual Permit 07/08 Reduction Access Control $550 Commercial $188 None Residential (Requires monthly testing) $550 $550 0a/ Aerosol Products $550 $550 0% • Amusement Buildings $385 None Aviation Facility Servicing or Repair $550 $550 0% Fuel Servicing Vehicles $240 $550 56% Battery Charging Operation $240 $330 27% 2 $180 Cellulose Nitrate Film $454 $454 0% • Combustible Dust Producing Operations $743 5,000 square feet or less $330 None 56% 2 $1,486 5,001 to 15,000 square feet $550 None 26% 4 $2,972 More than 15,000 square feet $743 None 0% Combustible Fibers $330 $550 40% t1 • Commercial Cooking Operation $2401 None Compressed Gases m Corrosive greater than 200 cubic feet $330 $550 40% o Flammable greater than 200 cubic feet $330 $550 40% 9 $1,980 p Highly Toxic-any amount $330 $743 56% 0 Inert and Simple Asphyxiant greater than 6,000 cubic feet $330 $743 56°/n 4 $1,652 u Irritant greater than 200 cubic feet $330 $550 40% ° Z • Medical Use Gas - Less than Table 105.6.8 Amounts C Portable Cylinders $1881 None 0 Piped System $240 None 0 Other Health Hazard greater than 650 cubic feet $330 $743 56% Oxidizing including oxygen greater than 504 cubic feet $330 $550 40% Pyrophoric- any amount $330 $743 567/6- Radioactive 6%Radioactive -any amount $330 $743 56% Sensitizer greater than 200 cubic feet $330 $550 40% Toxic- any amount $330 $743 560 Unstable Reactive -any amount $330 $743 56% Covered Mall Building $658 $658 0% Cryogenic Fluids $330 $647 49% 3 $951 Cutting and Welding $330 $330 0% • Deep Sedation /General Anesthesia $240 None • Delayed and Access-Controlled Egress $188 None Dipping Operations $330 $330 0% 4 #of Proposed Current % Permits/ FY 09-10 Fee Fee Reduction Fees in Revenue Annual Permit 07/08 Reduction * Dry Cleaning Plant $743 Small - 1 or 2 machines $240 None 68% See Note 2 Medium - 3 or 4 machines $440 None 410% See Note 2 Large - 5 or more machines $743 None 0% See Note 2 Emergency Helicopter Landing Facility $550 None Explosives Process, manufacture, store, or sell $345 $1,321 74% 1 $976 Use $240 $743 68% Fire Alarm Central/Remote Station $10/acct $10/acct Fire Hydrants and Valves $188 $454 59% v Flammable and Combustible Liquids • Class I Liquids in excess of 5 gal. in a building; 10 gal. outside $188 None ° • Class II or Class IIIA 25 gal. in a building; 60 gal. outside of a building $188 None 250 gallons or less over maximum allowable quantity $550 $550 0% m 251-500 gallons over maximum allowable quantity $578 $578 0% a 501-1,000 gallons over maximum allowable quantity $605 $605 0% I 1,001-5,000 gallons over maximum allowable quantity $633 $633 0% N 5,001-10,000 gallons over maximum allowable quantity $660 $660 0% m ' More than 10,000 gallons over maximum allowable quantity $688 $688 0% O Remove Class I or Class II from a UST $936 $936 0% a Operate Tank Vehicles, etc $330 $550 400% o Place a tank out of service $936 $936 0% Z Change Contents $550 $550 0%1 o Manufacture, Process, Blend, Refine Flammable/Combustible Liquids $1,128 $1,899 41% 1 $771 • Dispensing at Comm, Industrial, Gov't, Manufacturing Establishments $330 None • Dispense -Tank Vehicle to Fuel Tank $330 None Use or Operate a Pipeline within a Facility $743 $743 0% • • Floor Finishing in excess of 350 square feet using Class I or Class 11 liquids Commercial/ Industrial $240 None Residential $136 None Fruit and Crop Ripening $550 $550 0% Hazardous Materials in excess of amounts listed in Table 105.6.20 Gallons -250 or fewer $550 $839 34% 3 $867 Gallons - 251-500 $578 $936 38% Gallons - 501-1,000 $605 $1,032 41% Gallons - 1,001-5,000 $633 $1,128 44% Gallons - 5,001-10,000 $660 $1,225 46% Gallons - More than 10,000 1 $6881 $1,321 48% i 5 # of Proposed Current % Permits/ FY 09-10 Fee Fee Reduction Fees in Revenue Annual Permit 07/08 Reduction Pounds - 1,000 or fewer $550 $839 34% Pounds - 1,001-5,000 $578 $936 38% Pounds - 5,001-10,000 $605 $1,032 41% Pounds - 10,001-25,000 $633 $1,128 44% Pounds - 25,001-50,000 $660 $1,225 46% Pounds More than 50,000 $688 $1,321 48% Cubic feet - 500 or fewer $550 $839 34% Cubic feet - 501-2,000 $578 $936 38% Cubic feet- 2,001-5,000 $605 $1,032 41% Cubic feet - 5,001-10,000 $633 $1,128 44% V Cubic feet- 10,001-25,000 $660 $1,225 46% w Cubic feet- More than 25,000 $688 $1,321 48% ° N HPM Facilities $440 $440 00% High Piled Storage in excess of 500 square feet 500-12,000 square feet $550 $550 0%1 M 12,001-20,000 square feet $578 $578 0% 1 20,001-100,000 square feet $605 $605 0% N 100,001-500,000 square feet $633 $633 0% C6 More than 500,000 square feet $660 $660 0% o Hol Work 0 LL HotWork Fixed Site $330 $330 0% 0 Hot Work Operations $240 $330 27% 15 $1,350 Z • Hot Work Program $188 None r- 0 Industrial Ovens $330 $330 0% • Large Family Daycare $136 None 0 Liquid-or Gas-fueled vehicles or equipment in assembly buildings $188 $188 0% LP-Gas Store, use, handle, dispense, sell $330 $330 0% Cylinder Exchange only $136 $330 59% 8 $1,552 • Live Audience $240 None Lumber Yard and Woodworking Plant $440 $440 0% Magnesium $330 $330 0% • Miscellaneous Combustible Storage $240 None Motor Fuel Dispensing Facility $330 $330 0% Open Flames • Open Flames and Torches for paint removal $136 None • Open Flames and Torches in a hazardous fire area $136 None Open Flames and Candles in assembly area/restaurant $136 $550 75% Organic Coatings $330 $330 0% 6 # of Proposed Current % Permits/ FY 09-10 Fee Fee Reduction Fees in Revenue Annual Permit 07108 Reduction Pallet Storage $330 $330 0% Place of Assembly A-1 Theaters, Concert Halls, Auditoriums, and similar $440 $440 0% A-2 Banquet Halls, Night Clubs, Restaurants, Taverns, Bars $385 $385 0% A-3 Places of Worship, Recreation, Amusement $385 $385 0% A-4 Indoor sports arenas and similar with fixed seats $440 $440 0% A-5 Outdoor assembly areas and uses $660 $660 05% Powder Coating $330 $330 0% Private Fire Hydrant $188 $454 59% • Production Facility $385 None Pyrotechnic Special Effects Material See Fireworks Single Event Permit None $188 w • Pyroxylin Plastics $440 None 0 • Recycling and Scrap Metal Facilities $550 None Refrigeration Equipment $330 $330 0% rn • Reinforced Plastics/ Resin Application m $330 None p * Repair Garage/ Industrial FacilityI (Includes all required permits;if actual fees are lower,actual fees will be assessed) N 5,000 square feet or less $330 None See Note 3 m 5,001 - 15,000 square feet $550 None See Note 3 o ` 15,001 to 50,000 square feet $743 None See Note 3 0 More than 50,000 square feet -Actual permit fees Varies Varies • Rooftop Heliport $550 None Z Spraying Operations $330 $330 0%1 o Stationary Storage Battery System $330 $330 0% • Storage of Scrap Tires and Byproducts $240 None 0 CO • Tire Rebuilding Plants $1,1281 None of • Waste Handling Facility $5501 None Wood Products $440 $440 0% WreckingYard $550 $550 0% ' 7 of Total Total FY 07-08 % Overall Permits/ FY 09-10 Analysis Revenue Revenue Fees Revenue Reduction Affected Reduction $443,418 4.38% 1 209 $19,427 * Previously approved administrative fee adjustments that are now Incorporated Into the Fee Schedule ♦ New Permit Category in 2007 California Fire Code There is currently Inconsistency In the fees that are assessed for these facilities because there is not a specific fee for this type of facility. By giving these facilities there own fees we provide for consistency among the inspection districts. • Major Permit Category that has been subcategorized by the District to ensure fee equity based on the differing size of the operation. Note 1 All apartment communities with nine or more units will realize an annual fee reduction of$44 since the per unit fee is now applicable when there are nine or more units as opposed to the previous fee schedule where the per unit fee was applicable when there were five or more units. This will result in a total revenue reduction of approximately$6,000. Note 2 The proposed fee was applied via an administrative adjustment; a fee reduction does not need to be calculated. Note 3 The Repair Garage /Small Industrial Shop permit was created with sub-categorized fees prior to Initiating any small shop inspections; a fee reduction does not need to be calculated. m Please note: There were 704 permits issued in FY 07-08. Only those permits that will be affected by the reduced fees are included In this spreadsheet. Permits o whose fees remain unchanged are not included in the V of Permits/ Fees Affected" column. c o'Revised 26 March 2009 Z 0 m v co 0 6 N -T) fD A O A