HomeMy WebLinkAbout09-168 - Resolutions RESOLUTION NO. 09-168
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, ADOPTING THE
MEASURE "I" SIX-YEAR CAPITAL IMPROVEMENT PROGRAM
COVERING FISCAL YEARS 200912015 AND • IMPROVEMENT
PLAN EXPENDITURE STRATEGY FOR THE EXPENDITURE OF
MEASURE "I" FUNDS
WHEREAS, San Bernardino County voters approved passage of Measure "I" 1990-2010 in
November, 1989 and renewed as Measure "1" 2010-2040 in November 2004 authorizing San
Bernardino Associated Governments, acting as the San Bernardino :County Transportation
Authority, to impose a one-half of one percent retail transactions and use tax applicable in the
incorporated and unincorporated territory of the County of San Bernardino; and
WHEREAS, revenue from the tax can only be used for transportation improvement and traffic
management programs authorized in the Expenditure Plans set forth in Ordinance No. 89-1 of
Authority; and
WHEREAS, Expenditure plans of the Ordinance requires each local jurisdiction receiving
revenue from the tax to expend those funds pursuant to a Capital Improvement Program and
Improvement Plan Expenditure Strategy adopted by resolution of the local jurisdiction; and
WHEREAS, Expenditure Plans of the Ordinance also require that each local jurisdiction
annually adopt and update its Capital Improvement Plan.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Rancho
Cucamonga, State of California, hereby adopts the Measure "I" Six-Year Capital Improvement
Program and Improvement Plan Expenditure Strategy, a copy of which is attached to this
resolution.
Please see the following page
for formal adoption,certification and signatures
PASSED, APPROVED, AND ADOPTED this 2nd day of September 2009.
AYES: Gutierrez, Kurth, Spagnolo, Williams
NOES: None
ABSENT: Michael
ABSTAINED: None
(D L
Donald J. Kurth, M.D., Mayor
ATTEST:
r'
ainc0--'
Janice C. Reynolds, CitV Clerk
I, JANICE C. REYNOLDS, CITY CLERK of the City of Rancho Cucamonga,
California, do hereby certify that the foregoing Resolution was duly passed, approved and
adopted by the City Council of the City of Rancho Cucamonga, California, at a Regular Meeting
of said City Council held on the 2nd day of September 2009.
Executed this 3`d day of September 2009, at Rancho Cucamonga, California.
anice C. Reynolds, Cf y Clerk
Resolution No. 09-168 - Page 2 of 7
9
_ CITY OF RANCHO CUCAMONGA
MEASURE I SIX YEAR PLAN 2009/15
MAP NO. YEAR STREET&LIMITS 1IMPROVEMENT
j COST ESTIMATE
09/10 ----
ADA Corrective Measures-City Wide Intersection ramps and driveway modifications $ 2.0,000
1 Amethyst St-Hillside to Flood Control Area Pavement Rehabilitation(survey, design) $ _ 5,000
Concrete Services-City Wide Maintenance $ 200,000
2 Etiwanda, E/S at Chestnut Sidewalk Improvement $ _ 20,000
3 Foothill, SS at Cornwall Sidewalk Improvement __ $ 20,000
4 Haven Ave,4th St to 7th St Pavement Rehabilitation $ _483,000
5 Hellman Ave,Wilson to Hillside Pavement Rehabilitation(survey, design) $ 5,000
6 Highland, Rochester to W/S SCE Corridor Curb&Gutter, sidewalk and street lights $ 125,000
A 7 Hillside Rd, Beryl to Archibald Pavement Rehabilitation(partial funding) $ 118,000
CD N Pavement Management Evaluate Pavement Condition $ 25,000
o 8Ramona Ave, Base Line to PE Trail(SPRR) Storm Drain, Widen and Pavement Rehab partial funding) $ 120,000
Signal Maintenance Service-City Wide Maintenance $ 543,810
Z3 Striping Contract Services-City Wide Maintenance $ 150,000
Z 9 AWilson, Camelian to Beryl Pavement Rehabilitation $ 145,000
10 Wilson, Wardman Bullock to Cherry Pavement Rehabilitation(suryey, design) $ 10,000
0
0
_ FY 09110 Total $ 1,989,810
OD 10/11
I ADA Corrective Measures-City Wide Intersection ramps and driveway modifications $ 100,000
_ 1 Arrow, Rochester to east of 1-15 Pavement Rehabilitation $ 450,000
M
2 Carnelian, Lemon to Wilson Pavement Rehabilitation $ 500,000
w 3 Church, Hellman to Archibald Pavement Rehabilitation $ _ 350,000
o Concrete Services-City Wide Maintenance _ $ _ 500,000_
4 Hellman, Wilson to Hillside Pavement Rehabilitation $ 201,000
Local Streets-City Wide Pavement Rehabilitation $ 250,000
Pavement Management Evaluate Pavement Condition $ 25,000
Signal Maintenance Service-City Wide Maintenance $ 525,000
Striping Contract Services-City Wide Maintenance $ 150,000
5 Wilson, Wardman Bullock to Cherry Pavement Rehabilitation $ .322,000
FY 10/11 Total, $ 3,373,000
11/12
1 Archibald, Foothill to Base Line Pavement Rehabilitation with Storm Drain partial funding) 1 $ 400,000
2 Arrow, Hellman to Archibald Pavement Rehabilitation $ 350,000
3 Banyan, WCL to Sapphire Pavement Rehabilitation $ 300,000
Concrete Services-City Wide Maintenance $ 500,000
4 Hellman, N/0 210 to Wilson Pavement Rehabilitation j $ _____45
5 ,000
Page 1 of 3 8/25/2009
CITY OF RANCHO CUCAMONGA
MEASURE I SIX YEAR PLAN 2009/15
MAP NOJ YEAR STREET& LIMITS JIMPROVEMENT COST ESTIMATE
5 Lemon, Sapphire to Carnelian Pavement Rehabilitation _1 $ 285,000
Local Streets-City Wide Pavement Rehabilitation _ 1 $ _ 250,000
Pavement Management Evaluate Pavement Condition 25,000
Signal Maintenance Service-City Wide Maintenance $— 525,000
Striping Contract Services- City Wide Maintenance $ 150,000
FY 11/12 Total $ 3,235,000
12/13 —
ADA Corrective Measures- City Wide Intersection ramps and driveway modifications 1 $ 100,000
1 Archibald, Hillside to NCL Pavement Rehabilitation $ _ 550,000
2 Banyan,Archibald to Haven Pavement Rehabilitation 500,000
m 3 Banyan, Etiwanda to School(w/o East) Pavement Rehabilitation $ 200,000
V/ Concrete Services-Cit Wide Maintenance $ 500,000
0
c Local Streets-City Wide Pavement Rehabilitation $ 250,000
4 Milliken Ave, Foothill to Base Line Pavement Rehabilitation $ 622,000
Z Pavement Management Evaluate Pavement Condition $ 25,000
0
m FY 12/13 Total $ 2,747,000
13/14
1 Arrow, Etiwanda to ECL Pavement Rehabilitation _ $ , 250,000
00
Concrete Services-City Wide Maintenance $ 500,000
Local Streets-City Wide Pavement Rehabilitation $ _ 250,000
2 Milliken, Fairmont Wy to Rte 210 Pavement Rehabilitation $ 450,000
m Pavement Management Evaluate Pavement Condition $ 25,000
A
0 3 Rochester, Foothill to Base Line Pavement Rehabilitation $ 600,000
FY 13/14 Total $ 2,075,000
14/15
1 6th St, Hermosa to Haven-rehab Pavement Rehabilitation $ 300,000
ADA Corrective Measures-City Wide Intersection ramps and driveway modifications $ 100,000
2 Archibald, 8th St to Foothill Pavement Rehabilitation $ 650,000
Concrete Services-City Wide Maintenance $ 500,000
Local Streets-City Wide Pavement Rehabilitation $ 250,000
3 Milliken-Arrow to Foothill Pavement Rehabilitation $ _ 350,000
Pavement Management Evaluate Pavement Condition $ 25,000
FY 14/15 Total $ 2,175,000
Six Year Total $ 15,594,810
Page 2 of 3 8/25/2009
CITY OF RANCHO CUCAMONGA
MEASURE I SIX YEAR PLAN 2009/15
MAP NO. YEAR ISTREET&LIMITS IMPROVEMENT COST ESTIMATE
Measure I Revenue Estimate(6 Yrs.)from SANBAG $_ 12,235,000
L _
Rancho Cucamonga Measure I Fund Balance $ 4,045,314
_ Less Administration $ (2,988,000)
_ Total Measure I Revenue Estimate(6 Yrs.) $ 13,292,314
(Contact: Jerry A. Dyer, Senior Civil Engineer 909 477-2740 Ext,4037
CD
TI
Ca
0
O
C_
O
7
Z
O
O
t0
OD
ao •
I
d
CD
C.A
0
v
Page 3 of 3 8/25/2009
CITY OF RANCHO CUCAMONGA
MEASURE I CAPTIAL IMPROVEMENT PLAN
EXPENDITURE STRATEGY
2009/2015
The Measure 'T' Capital Improvement Plan Expenditure Strategy for the expenditure of
Measure I funds will use the City's General Plan Circulation Element as a basis. It is
anticipated that the funds will be allocated in the following manner:
Percent Type of Improvement
35 Maintenance, Rehabilitation and Repair of Existing Roadways
10 Traffic Signal Improvements
20 Street Widening
10 Intersection Improvements
10 Railroad Crossing Improvements
15 Slurry and Chip Seal of Existing Streets
Resolution No. 09-168— Page 6 of 7
r - '
1mua:s 1 2
II ` sY[f[x
kk ■ `%
• 5 4 �� R '– �� �I vaaoi=�c • I —vaaW.v • —� 1 1VE� `
1 B
J
7 2 rt.�� 2 ! - I v mrt 9
:
CD
4
o �I 8 .. ul i
IYII■i R. ��I � rt. �� �I f4N� ��.�
o UPLANDFONTANA
aopm
■ �', �` __. 9 I '�w.m�srI .e■'' Si,,1 <.. 9
CD
-4 '
�- a pp
s
is
.h
LEGEND:
=r, ® 09/10 PROJECTS
PROEM
! :�- —•.• 11%12 PROJECTS
17 13 PROJECTS
•'�' .__��.__�1' tltl -saw*. _,_--'� ._...: � I 13/14PROJEQS
14/15 PROJECTS
5 —=jai`
-- .-�'-� ""='-_-_� ;�. ��_ _ ' MEASURE I
CrrYS OF ONTARID��..
SIX YEAR PLAN
CUCAMO GA t 2009 TO 2015
N
O