HomeMy WebLinkAbout09-169 - Resolutions RESOLUTION NO. 09-169
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, ADOPTING THE
MEASURE "I" FIVE YEAR CAPITAL PROJECT NEEDS
ANALYSIS
WHEREAS, San Bernardino County voters approved passage of Measure "1" 2010-
2040 in November 2004 authorizing San Bernardino Associated Governments, acting as the
San Bernardino County Transportation Authority, to impose a one-half of one percent retail
transactions and use tax applicable in the incorporated and unincorporated territory of the
County of San Bernardino; and
WHEREAS, revenue from the tax can only be used for transportation improvement and
traffic management programs authorized in the Expenditure Plans set forth in Ordinance No.
89-1 of Authority; and
WHEREAS, the Strategic Plan requires each local jurisdiction applying for revenue from
the Valley Major Street and Freeway Interchange Programs to annually adopt and update a
Five-Year Capital Project Needs Analysis.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Rancho
Cucamonga, State of California, hereby adopts the Measure "I" Five-Year Capital Project
Needs Analysis, a copy of which is attached to this resolution.
Please see the following page
for formal adoption,certification and signatures
PASSED, APPROVED, AND ADOPTED this 2nd day of September 2009.
AYES: Gutierrez, Kurth, Spagnolo, Williams
NOES: None
ABSENT: Michael
ABSTAINED: None
Donald J. Kurt D., Mayor
ATTEST:
J nice C. Reynolds, Ny Clerk
I, JANICE C. REYNOLDS, CITY CLERK of the City of Rancho Cucamonga,
California, do hereby certify that the foregoing Resolution was duly passed, approved and
adopted by the City Council of the City of Rancho Cucamonga, California, at a Regular Meeting
of said City Council held on the 2nd day of September 2009.
Executed this 3rd day of September 2009, at Rancho Cucamonga, California.
Q��
nice C. Reynolds, Cit Clerk
Resolution No. 09-169 - Page 2 of 11
I CITY OF RANCHO CUCAMONGA
j MEASURE I FIVE YEAR CAPITAL PROJECT NEEDS ANALYSIS - FY 2010/15
MAP NO. ISTREET & LIMITS IMPROVEMENT I COST ESTIMATE
rValleyerial Sub-Program
Foothill Blvd at Malachite install new traffic signal $ 255,000
Church Street at Terra Vista Pkwy install new traffic signal $ 250,000
Hermosa Ave at Church St install new traffic signal $ 240,000
4 Etiwanda Ave at Whittram widen intersection and install traffic signal $ 375,000
Tl
(WD
_ 5 j Arrow Route from 500 ft east of -15 to 1300 ft east widen southside $ 874,000
ZVictoria St from Etiwanda High School to I-15 (ECL) widen and improve both shoulders $ 250,000
o Total: $ 2,244,000
0
P Valley Freewav Interchange Program
J
1 Base Line Rd at Interstate 15 drove existing interchange with new bridges and ramps, _
and improvement to Base Line Rd and East Ave $ 43,100,000
w
to
N
w — --
0
Five Year Total $ 45,344,000
J
j
Note: see individual work sheets for funding years
Contact Jer A. Dyer,-Senior Civil Engineer 909 477-2740 Ext, 4037
Page 1 of 1 8/26/2009
Capital Project Needs Analysis
.City of Rancho Cucamonga
Valley Arterial Sub-Program
(2009 dollars, in $1'OOOs - SANBAG will apply escalation factors, by year)
Project Information Phase Funding PRIOR FY 10/11 FY 11/12 FY 12/13 FY 13/14 FY 14/15
Foothill Blvd at Malachite- PASSED
install new traffic signal Total Cost: $0.00
Fund Type:
Other:
A Total Project Cost: PSBE
m $255 Total Cost: $0.00
Fund Type:
C -
o Total Measure I Request:
Z
$190
p (need to add cells with MI$) Other:
o ROW
`O Total Cost: $0.00
J
Fund Type:
Comments:
m
CD
Other:
A CONST
Total Cost: $255.00
Fund Type: MI MS-UNRES 125
MI MS-RESVD 65
DEV FEE 65
Other:
CPNA Template Valley 2009.xls-FHB-Malachite
Capital Project Needs Analysis
City of Rancho Cucamonga
Valley Arterial Sub-Program
(2009 dollars, in $1'000s - SANBAG will apply escalation factors, by year)
Project Information Phase Funding PRIOR FY 10/11 FY 11/12 FY 12/13 FY 13/14 FY 14/15
Church St at Terra Vista PA&ED
Pkwy - install new traffic Total Cost: $0.00
signal Fund Type:
Other:
Total Project Cost: PS&E
m $250 Total Cost: $0.00
W
0
c Fund Type:
o Total Measure I Request:
$190
o (need to add cells with MI$) Other:
m ROW
I. Total Cost: $0.00
co Fund Type:
Comments:
v
m Other:
rn CONST
0
Total Cost: $250.00
Fund Type: MI MS-UNRES 130
MI MS-RESVD 60
DEV FEE 60
Other:
CPNA Template Valley 2009.xis-Church-TerraVista
Capital Project Needs Analysis
City of Rancho Cucamonga
Valley Arterial Sub-Program
(2009 dollars, in $1'OOOs - SANBAG will apply escalation factors, by year)
Project Information Phase Funding PRIOR FY 10/11 FY 11/12 FY 12/13 FY 13/14 FY 14/15
Hermosa Ave at Church St- PA&ED
install new traffic signal Total Cost: $0.00
Fund Type:
Other:
Total Project Cost: PS&E
$240 Total Cost: $0.00
Fund Type: a
Total Measure 1 Request: �o
$187
m
(need to add cells with MI$) Other: (-
ROW 1
rn
Total Cost: $0.00
Fund Type: o
Comments:
0
Z
Other: o
CONST :3
Total Cost: $240.00 0
Fund Type: MI MS-UNRES 134
MI MS-RESVD 53
DEV FEE 53
Other:
CPNA Template Valley 2009.xis-Hermosa-Church
Capital Project Needs Analysis
City of Rancho Cucamonga
Valley Arterial Sub-Program
(2009 dollars, in $1'000s'- SANBAG will apply escalation factors, by year)
Project Information Phase Funding PRIOR FY 10/11 FY 11/12 FY 12/13 FY 13/14 FY 14/15
Etiwanda Ave at Whittram - PA&ED
widen intersection and install Total Cost: $0.00
traffic signal Fund Type:
Other:
Total Project Cost: PS&E
$375 Total Cost: $25.00
Fund Type: MI MS-UNRES 25 0
Total Measure I Request: I
a)
$329
m
(need to add cells with MI$) : r Other: CL d
ROW rn
Total Cost: $0.00
Fund Type: o
Comments:
0
Z
Other: o
CONST
Total Cost: $350.00 U)
Fund Type: MI MS-UNRES 258
MI MS-RESVD 46
DEV FEE 46
Other:
CPNA Template Valley 2009.xis-Etiwanda-Whittram
Capital Project Needs Analysis
City of Rancho Cucamonga
Valley Arterial Sub-Program
(2009 dollars, in $1'000s - SANBAG will apply escalation factors, by year)
Project Information Phase Funding PRIOR FY 10/11 FY 11/12 FY 12/13 FY 13/14 FY 14/15
Arrow Route from 500 feet PAGED
east of 1-15 freeway to 1300 Total Cost: $0.00
feet east-widen southside Fund Type:
Other:
Total Project Cost: PS&E
$874,000 Total Cost: $50.00
Fund Type: MI MS-RESVD 25 0
Total Measure I Request: DEV FEE 25 W
$40 m
(need to add cells with MI$) Other: a
ROW rn
Total Cost: $30.00 �o
Fund Type: MI MS-RESVD 15 rn
0
Comments: DEV FEE 15 6
Z
Other: o
CONST
Total Cost: $0.00 U)
Fund Type: D
Other:
CPNA Template Valley 2009.xls-Arrow-EO-1-15
Capital Project Needs Analysis
City of Rancho Cucamonga
Valley Arterial Sub-Program
(2009 dollars, in $1'OOOs - SANBAG will apply escalation factors, by year)
Project Information Phase Funding PRIOR FY 10111 FY 11112 FY 12/13 FY 13/14 FY 14/15
Victoria St from Etiwanda PA&ED
High School to 1-15 (East City Total Cost: $0.00
Limit) -widen and improve Fund Type:
both shoulders
Other:
Total Project Cost: PS&E
$250 Total Cost: $0.00
Fund Type: MI MS-RESVD 8 0
Total Measure I Request: DEV FEE g
$125 rn
(need to add cells with MI$) Other: a-
ROW 1
rn
Total Cost: $0.00 `o
Fund Type: o
Comments:
0
Z
Other: C
0
CONST 3
Total Cost: $0.00 0
N
Fund Type: MI MS-RESVD 117
DEV FEE 117
Other:
CPNA Template Valley 2009.xls-Victoria-EHS
Capital Project Needs Analysis
City of Rancho Cucamonga
Valley Freeway Interchange Program
(2009 dollars, in $1'000s - SANBAG will apply escalation factors, by year)
Project Information Phase Funding PRIOR FY 10/11 FY 11/12 FY 12/13 FY 13/14 FY 14/15
Base Line Rd at 1-15 PAGED
Improvement to existing Total Cost: $1,050.00
interchange- new bridge Fund Type: DEMO 750
structures and ramps, and
improvement to Base Line Rd
and East Ave Other: 300
Total Project Cost: PSBE
$43,100 Total Cost: $4,015.00 w
Fund Type: DEMO 2750 0
Total Measure I Request:
$18,000
(need to add cells with MI$) Other: 1265 a
ROW 1
Total Cost: $7,500.00
Fund Type: o
Comments:
DEMO funds are Federal z
SAFETEA-LU or IMD Other: 7500 0
CONST
Total Cost: $30,535.00 0
Fund Type: MI MS-RESVD 9000 9000 of
DEMO 4000 .
DEV FEE 8535
Other:
CPNA Template Valley 2009.xis-BL-115
ILLitla R I ! '
jAVJ
' ��.
�oo� o
�J •:,. AVL Mfl..ND AVE - - -
n.
c resin
0 ����
• ` �/ Awa w Vemw n.9
7 ST. s
° UPLAND 1� 9 �(
1p
r= ,ASE Ear _ FONTANA
•��- nava s. 9 � Fi A
BLVD. abo a. a
' �� •m n. I I ❑❑ .nat ava 4 I VAL EYARIERIAL
SUBPROGRAM
�Rsa. .
' °'� ® VAl1EY M
•.. rrA MEIfOIANGE PROGRAM
• i I
MEASURE I
N.T.S.
•• FIVE YEAR CPNA PLAN
CrrY Or �auaniva ONTARIO 2010 TO 2015
RANCHO ; Fw rEevAr
CUCAMONGA