HomeMy WebLinkAbout99-202 - ResolutionsRESOLUTION NO. 99-202
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
RANCHO CUCAMONGA, CALIFORNIA, AMENDING THE FIVE-
YEAR CAPITAL IM PROVE M ENT PROG RAM FOR FISCAL YEARS
199811999 THROUGH 2002~2003
On Wednesday, September 15, 1999, on motion by Councilmember, Bob Dutton,
seconded by Mayor Pro-Tem, Diane Williams., and carried, the City Council of the City of Rancho
Cucamonga, County of San Bernardino, finds as follows:
WHEREAS, San Bernardino County voters approved passage of Measure
'T' in November, 1989 authorizing San Bernardino Associated Governments, acting as the
San Bernardino County Transportation Authority, to impose a one-half of one percent retail
transactions and use tax applicable in the incorporated and unincorporated territory of the
County of San Bernardino; and
WHEREAS, revenue from the tax can only be used for transportation
improvement and traffic management programs authorized in the Expenditure Plans set
forth in Ordinance No. 89-1 of Authority; and
WHEREAS, Expenditure plans of the Ordinance requires each local
jurisdiction receiving revenue from the tax to expend those funds pursuant to a Five-Year
Capital Improvement Program and Twenty-Year Transportation Plan adopted by resolution
of the local jurisdiction, and
WHEREAS, Expenditure Plans of the Ordinance also require that each local
jurisdiction annually adopt and update the Five and Twenty-Year plans.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of
Rancho Cucamonga, State of California, hereby adopts the Measure 'T' Five-Year Capital
Improvement Program and Twenty-Year Transportation Plan, a copy of which is attached
to this resolution.
PASSED, APPROVED, AND ADOPTED this 15th day of September, 1999.
Alexander, Biane, Curatalo, Dutton, Williams
AYES:
NOES: None
ABSENT: None
ABSTAINED: None
William J.
Mayor
Resolution No. 99-202
Page 2
ATTEST:
CMC, City Clerk
I, DEBRA J. ADAMS, CITY CLERK of the City of Rancho Cucamonga, California,
do hereby certify that the foregoing Resolution was duly passed., approved and adopted by the City
Council of the City of Rancho Cucamonga, California, at a regular meeting of said City Council held
on the 15t" day of September, 1999.
Executed this 16th day of September, 1999, at Rancho Cucamonga, California.
Debra J. Adbrrfs, CMC, City Clerk
Measure 1 5-year CIP Projects 1998/03 Amended
Fiscal Year
Year I - FY98/99
t¥oiect Title
Amethyst flora 19th St to North City
Limits
Day Creek B!vd From Base Line Rd. to
Highland Ave
Day Creek Blvd. From Base Line Rd to
Highland Ave.
ADA Corrective Measures, City-wide
?avemerit Management System
hwentory
Arroxv Rte From Nlitliken Ave easterly
Archibald Ave at 4th St, northeast
corner
Haven Ave from Foothill to Base Line
4th St from Santa Anita to Pin-N-Sav
Carnelian From San Bernardino Rd to
Base Line Rd
Local Streets, City-wide
I taven Ave. from Base Line Rd. to
t tighland Ave
Traffic Signals, Citv-xvide
Iml~rovement Description
Pavement rehabilitation and widening
Construct major portion of west roadbed to connect
to IBmre Route 30 Freeway
Construct }tighland Ave portion of Day Creek Blvd
project
Intersection ramps and driveway modifications
Inventory City's Pavement Condition
Widen pavement on north side
\Viden for right turn lane on 4th St and deceleration
lane on Archibald Ave.
Pavement rehabilitation
Pavement rehabilitation
Street widening and pavement rehabilitation
Pavement rehabilitation
Widen west roadbed including replacing existing
open channel with an undergroun
Signals and related improvements
Year 1 - FY98/99 Total
Cost tZYtbnate
$10,000
$90,000
$1,743,750
$70,000
$150,000
$5,000
$287,OOO
$340,000
$20,000
$100,000
$400,000
$5,000
$100,000
$3,320,750
I of 3
I ~-/ I'c.r
Year 2- h'99/00
Year3- h'00101
l'r,,j,,~ t I itle
AOA CotrechYe tqeaSureS, CRy-wide
AmethySt horn H~ghland to north city hrmLS
.&,row from Grove to Baker
Beryl St. hom Base Line Rd. to t9th St.
Foothdl BI from Grove Ave. to Vineyard
HaYen AYe horn ~se Line Rd. to Highland
Ave. Ph Ph [I
t~al Street, O~-wide
Tratfic Dgnals. Cid-wide
ADA Corrective Heasures, Cit'y-wtde
Etiwand~ Ave. horn Foothill Blvd. To Base
Line Rd.
Haven AYe from Base Line Rd. to Highland
~ve Fh
Lc<al S[teeU, OtV-wide
Intersection ramps and driveway modff, cations
Paven~ent rehabilitation
Pave~nt rehabd~tation
Pave~nt rehabilitation
Design median & street widening
W,den west ~d~ including ~eplacing existing o~n
channel with an underground storm drain
Pageant rehabilitation
Dgnals and related improvemenU
Y~r2- ~99/00To~1
Inter~Gion ramps and driveway m~ifications
~sig~ street widening and pavement rehabih~tion
W~den west r~d~d including replac ng exist~n o~n
channel w~th an underground storm drain
Pave~nt rehabditation
Y~r 3- ~00/OlTo~I
$150,000
$400,000
$500.000
~200.000
~t,000.000
$500.000
$500.000
$130,000
$3.380.000
$100.000
ilOO,000
~t.100.000
Yuar 4- FY01/02
!
Etl,,anda Ave ~rom F~thtl! Blvd. TO Base
RO Ph l
Ave horn Base Line Rd. to H~ghland
Pl~ IV
Year 5 - F¥02!D3
6thSt horn Archibakl Ave. to Deer Creek Ch
ADA Correct,re t.leasures, Oty-',,,de
Etl,.,anda Ave. horn F~thill Blvd. [o Base
Line RO Ph II
~{3,.en A'.e [[om Uase true Rd to H~hland
A'~e Ph V
(90'3)
Jnte~s.~f. tion ramps and ddvev~a¥ w~odifical. lons
Sheet widening and ~idening o[ l-lS underpass
W,den west Toadbed including replacing ex~stJon open
channe! v~th an underg[ound storm dram
S,gnals and relaled improvements
Year 4 - FY01102 ToLal
Des,gn streel widening. bridge widening and pavement
r e ha b,i~ta hon
Interaction ramps and driveway mod~ficabons
Const sUeet v, idening
V,hden ¥,'est madbed including ~eptacing ex~M~on open
¢hannd '.',Mh an underground Storm dram
Year 5- F¥O2103ToLal
?,easure I Revenu£ Estimate (5 Yts.)
$ 70.000
$800.000
sSO0.000
$140.000
$1.St0.000
$250.000
$100.000
$500,000
$S00.000
~1.350.000
$6,406,683