Loading...
HomeMy WebLinkAbout99-202 - ResolutionsRESOLUTION NO. 99-202 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF RANCHO CUCAMONGA, CALIFORNIA, AMENDING THE FIVE- YEAR CAPITAL IM PROVE M ENT PROG RAM FOR FISCAL YEARS 199811999 THROUGH 2002~2003 On Wednesday, September 15, 1999, on motion by Councilmember, Bob Dutton, seconded by Mayor Pro-Tem, Diane Williams., and carried, the City Council of the City of Rancho Cucamonga, County of San Bernardino, finds as follows: WHEREAS, San Bernardino County voters approved passage of Measure 'T' in November, 1989 authorizing San Bernardino Associated Governments, acting as the San Bernardino County Transportation Authority, to impose a one-half of one percent retail transactions and use tax applicable in the incorporated and unincorporated territory of the County of San Bernardino; and WHEREAS, revenue from the tax can only be used for transportation improvement and traffic management programs authorized in the Expenditure Plans set forth in Ordinance No. 89-1 of Authority; and WHEREAS, Expenditure plans of the Ordinance requires each local jurisdiction receiving revenue from the tax to expend those funds pursuant to a Five-Year Capital Improvement Program and Twenty-Year Transportation Plan adopted by resolution of the local jurisdiction, and WHEREAS, Expenditure Plans of the Ordinance also require that each local jurisdiction annually adopt and update the Five and Twenty-Year plans. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Rancho Cucamonga, State of California, hereby adopts the Measure 'T' Five-Year Capital Improvement Program and Twenty-Year Transportation Plan, a copy of which is attached to this resolution. PASSED, APPROVED, AND ADOPTED this 15th day of September, 1999. Alexander, Biane, Curatalo, Dutton, Williams AYES: NOES: None ABSENT: None ABSTAINED: None William J. Mayor Resolution No. 99-202 Page 2 ATTEST: CMC, City Clerk I, DEBRA J. ADAMS, CITY CLERK of the City of Rancho Cucamonga, California, do hereby certify that the foregoing Resolution was duly passed., approved and adopted by the City Council of the City of Rancho Cucamonga, California, at a regular meeting of said City Council held on the 15t" day of September, 1999. Executed this 16th day of September, 1999, at Rancho Cucamonga, California. Debra J. Adbrrfs, CMC, City Clerk Measure 1 5-year CIP Projects 1998/03 Amended Fiscal Year Year I - FY98/99 t¥oiect Title Amethyst flora 19th St to North City Limits Day Creek B!vd From Base Line Rd. to Highland Ave Day Creek Blvd. From Base Line Rd to Highland Ave. ADA Corrective Measures, City-wide ?avemerit Management System hwentory Arroxv Rte From Nlitliken Ave easterly Archibald Ave at 4th St, northeast corner Haven Ave from Foothill to Base Line 4th St from Santa Anita to Pin-N-Sav Carnelian From San Bernardino Rd to Base Line Rd Local Streets, City-wide I taven Ave. from Base Line Rd. to t tighland Ave Traffic Signals, Citv-xvide Iml~rovement Description Pavement rehabilitation and widening Construct major portion of west roadbed to connect to IBmre Route 30 Freeway Construct }tighland Ave portion of Day Creek Blvd project Intersection ramps and driveway modifications Inventory City's Pavement Condition Widen pavement on north side \Viden for right turn lane on 4th St and deceleration lane on Archibald Ave. Pavement rehabilitation Pavement rehabilitation Street widening and pavement rehabilitation Pavement rehabilitation Widen west roadbed including replacing existing open channel with an undergroun Signals and related improvements Year 1 - FY98/99 Total Cost tZYtbnate $10,000 $90,000 $1,743,750 $70,000 $150,000 $5,000 $287,OOO $340,000 $20,000 $100,000 $400,000 $5,000 $100,000 $3,320,750 I of 3 I ~-/ I'c.r Year 2- h'99/00 Year3- h'00101 l'r,,j,,~ t I itle AOA CotrechYe tqeaSureS, CRy-wide AmethySt horn H~ghland to north city hrmLS .&,row from Grove to Baker Beryl St. hom Base Line Rd. to t9th St. Foothdl BI from Grove Ave. to Vineyard HaYen AYe horn ~se Line Rd. to Highland Ave. Ph Ph [I t~al Street, O~-wide Tratfic Dgnals. Cid-wide ADA Corrective Heasures, Cit'y-wtde Etiwand~ Ave. horn Foothill Blvd. To Base Line Rd. Haven AYe from Base Line Rd. to Highland ~ve Fh Lc<al S[teeU, OtV-wide Intersection ramps and driveway modff, cations Paven~ent rehabilitation Pave~nt rehabd~tation Pave~nt rehabilitation Design median & street widening W,den west ~d~ including ~eplacing existing o~n channel with an underground storm drain Pageant rehabilitation Dgnals and related improvemenU Y~r2- ~99/00To~1 Inter~Gion ramps and driveway m~ifications ~sig~ street widening and pavement rehabih~tion W~den west r~d~d including replac ng exist~n o~n channel w~th an underground storm drain Pave~nt rehabditation Y~r 3- ~00/OlTo~I $150,000 $400,000 $500.000 ~200.000 ~t,000.000 $500.000 $500.000 $130,000 $3.380.000 $100.000 ilOO,000 ~t.100.000 Yuar 4- FY01/02 ! Etl,,anda Ave ~rom F~thtl! Blvd. TO Base RO Ph l Ave horn Base Line Rd. to H~ghland Pl~ IV Year 5 - F¥02!D3 6thSt horn Archibakl Ave. to Deer Creek Ch ADA Correct,re t.leasures, Oty-',,,de Etl,.,anda Ave. horn F~thill Blvd. [o Base Line RO Ph II ~{3,.en A'.e [[om Uase true Rd to H~hland A'~e Ph V (90'3) Jnte~s.~f. tion ramps and ddvev~a¥ w~odifical. lons Sheet widening and ~idening o[ l-lS underpass W,den west Toadbed including replacing ex~stJon open channe! v~th an underg[ound storm dram S,gnals and relaled improvements Year 4 - FY01102 ToLal Des,gn streel widening. bridge widening and pavement r e ha b,i~ta hon Interaction ramps and driveway mod~ficabons Const sUeet v, idening V,hden ¥,'est madbed including ~eptacing ex~M~on open ¢hannd '.',Mh an underground Storm dram Year 5- F¥O2103ToLal ?,easure I Revenu£ Estimate (5 Yts.) $ 70.000 $800.000 sSO0.000 $140.000 $1.St0.000 $250.000 $100.000 $500,000 $S00.000 ~1.350.000 $6,406,683