HomeMy WebLinkAbout2000/01/18 - Agenda Packet• DESIGN REVIEW COMMITTEE MEETING
ACTION AGENDA AND MINUTES
TUESDAY JANUARY 18, 2000 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
Committee Members: Larry McNiel Pam Stewart
Alternates: Peter Tolstoy Rich Macias
CONSENT CALENDAR
Dan Coleman
John Mannerino
The following items are expected to be routine and noncontroversial. Typically they are items such
as plan revisions prepared in response to discussions at a previous meeting.
7:00 p.m.
(Doug) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-59 -
PANATONNI DEVELOPMENT -The development of a 180,000 +/- square foot
industrial building on 7.95 acres of land in General Industrial District (Subarea 10) of
the Industrial Area Specifc Plan located at the northwest corner of 7th Street and
• Toronto Avenue -APN: 209-401-21.
7:10 p.m.
(Brent) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-60 -
CARPENTER'S TECHNOLOGY-The development of a 56,200 square foot industrial
building on 4 acres of land in Subarea 7 (Industrial Park) of the Industrial Area specific
Plan, located on the west side of Milliken Avenue south of Foothill Boulevard -APN:
229-011-031.
PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant
regarding their development application. The following items do not legally require any public
testimony, although the Committee may open the meeting for public input.
7:20 p.m.
(Debra) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 99-49 -
EVERGREEN/DEVCO -The development of a drugstore with adrive-through window
for prescription orders consisting of a 13,813 square foot building on a 1.52 acre
parcel in the Office Professional (OP) District, located at the northwest corner of
Haven Avenue and Alta Loma Drive. -APN: 01-262-37. Related file: Tree Removal
Permit 99-37.
8:00 p.m.
(Debra) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-70 -MASTER
. DEVELOPMENT CORPORATION -The request for approval of a rail served
distribution building comprised of 847,828 square feet located at 12167Arrow Route,
on a 39.2 acre parcel in Subarea 15 of the Industrial Development Districts (Heavy
Industrial). -APN: 229-121-15.
DRC AGENDA
January 18, 2000
Page 2
•
8:40 p.m.
(Doug) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-69 -ROBERT
GIBBS DEVELOPMENT CO. -The development of a 19,326 square foot industrial
building on 1.32 acres of land in General Industrial District (Subarea 3) of the
Industrial Area Specific Plan located at the north east corner of 9th Street and
Hellman Avenue -APN: 209-022-20.
9:20 p.m
(Rudy) DEVELOPMENT REVIEW 99-57 - LEWIS RETAIL - A request to remodel and
upgrade the facade to the existing buildings within the shopping center, Alta Loma
Square, in the Neighborhood Commercial District, located at the northeast corner of
19th Street and Carnelian Avenue -APN: 201-221-45
PUBLIC COMMENTS
This is the time and place far the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five
minutes per individual.
ADJOURNMENT
•
n
f`J
• CONSENT CALENDAR COMMENTS
7:00 p.m. Doug Fenn January 18, 2000
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-59 - PANATONNI
DEVELOPMENT-The development of a 180,000 +/- square foot industrial building on 7.95 acres
of land in General Industrial District (Subarea 10) of the Industrial Area Specific Plan located at the
north west corner of 7th Street and Toronto Avenue - APN: 209-401-21.
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Doug Fenn
The Committee approved the applicant's revision of the south elevation.
C1
•
• CONSENT CALENDAR COMMENTS
7:10 p.m. Brent Le Count January 18, 2000
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-60 -CARPENTER'S
TECHNOLOGY -The development of a 56,200 square foot industrial building on 4 acres of land
in Subarea 7 (Industrial Park) of the Industrial Area specifc Plan, located on the west side of
Milliken Avenue south of Foothill Boulevard - APN: 229-011-031.
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Brent Le Count
The Committee reviewed the revised design. The applicant shall provide a written description of
the maintenance activity associated with the at-grade loading door n the east wall of the building.
If the activity level is anticipated to be of short duration and of an infrequent nature than the
Committee will accept the free-standing panel design shown.
n
U
n
U
DESIGN REVIEW COMMENTS
7:20 p.m. Debra Meier January 18, 2000
USE PERMIT 99-49 -
tytKVrtttlyiutyc;y - the development of a drugstore witn a drive-tnrougn window ror
prescription orders consisting of a 13,813 square foot building on a 1.52 acre parcel in the Office
Professional (OP) District, located at the northwest corner of Haven Avenue and Alta Loma Drive.
- APN: 01-262-37. Related file: Tree Removal Permit 99-37.
Design Parameters: The Committee (McNiel and Fong) reviewed this project at their November6,
1999 meeting. A copy of the Design Review Committee Action is attached for reference. The
Committee was particularly concerned with a variety of Site Plan issues related to circulation and
truck delivery patterns on the site, and the proximity of the loading area to the existing
condominiums. The Committee also expressed concerns pertaining to the proposed foundation
planters along the building face, the design of the pedestrian level space and building design. The
applicant has been working diligently with staff to address the design issues. At this time, the
applicant has attempted to address the identified site issues. The applicant has indicated that they
will continue to work with staff on resolving the other identified issues pertaining to landscaping and
building design. Therefore, the focus of the Committee's review tonight is the Site Plan issues
related to the circulation and truck delivery.
Staff Comments: The following comments are intended to provide a focus for Committee
discussion regarding this project:
Site Plan
• 1. The circulation at the rear of the building provides access to the drive-thru pharmacy. The
drive-thru patrons will proceed through the order window and then U-turn to exit the site.
The truck unloading zone is now completely separate from the drive-thru circulation. The
delivery trucks will back into the delivery zone, as indicated on the Site Plan. In conjunction
with the modifications to the delivery zone, the applicant has modified the perimeter wall to
allow for the preservation of several trees that are at or near the property line. Staff believes
that this is an acceptable solution.
The trash enclosure has been relocated to the north end of the delivery zone, including a
trash compactor, which is completely screened and gated. This is an acceptable solution.
Eliminate a parking space in front of the tower at the southeast corner of the building to
expand the plaza area.
Landscaping
The proposal to provide vines on building mounted trellis, as an alternative to landscaping
along the building face, has not been modified from plans previously reviewed by the
Committee.
Provide tree planters at northeast corner of building and along north side of drive-thru.
3. West property boundary should have the following design improvement: change the tree
species from Quercus Virginana (Live Oak) to Pinus Elderica and planted at 10 feet on
. center; provide double row of shrubs for a distance of 60 feet from the delivery entry; single
row of shrubs from the end of the double row to the gate, double row of shrubs from the gate
to the north property boundary, and all shrubs to be planted at 3 feet on center. This can
be conditioned.
DRC COMMENTS
' CUP 99-49 -EVERGREEN/DEVCO
January 18, 2000
Page 2
•
4. Modify streetscape along Haven Avenue to be consistent with the established theme for the
street. Tree species should include a mix of Sycamore, Pines and Magnolia. Add a flowing
stream of river-rock and boulders along Haven Avenue and wrap around the same
treatment along Alta Loma Drive. Appropriate shrubs should be provided within the bed of
river rock. This can be conditioned.
5. Project entries should have specimen size and accent trees.
6. Building entry and plaza area should have tree wells. A suggested tree species is Palm tree.
7. Provide a continuous landscape strip along the east elevation.
8. Mounding should be provided along Haven Avenue instead of screen wall. This can be
conditioned.
9. Provide a row of shrubs in front of the screen wall along Alta Loma Drive. This can be
conditioned.
Architecture/Building Desion
1. The delivery zone is indicated on the Site Plan as "covered loading area," however, the
elevations do not show any cover element. Further, the Development Code would require
a 20-foot building setback. Even a trellis would require a 17-foot minimum setback (not 10
• feet as shown on Site Plan).
2. The Committee had raised design issues as listed in the attached November 16, 1999
Design Review Committee Action. The applicant is willing to continue to work with staff in
resolving them and they may have revised elevation for Committee's review at January 18
meeting.
Staff Recommendation: Review these and any other issues identified by the Committee; suggest
modifications as necessary. Any unresolved issues pertaining to landscaping and architecture
should be scheduled to return for Committee review at a subsequent meeting.
Attachment
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Debra Meier
The Committee reviewed the issues identified by staff in areas of Site Plan, landscaping, and
building architecture, and made the following recommendations:
Site Plan
The applicant presented revised Site Plans for the Committees discussion and consideration (dated
. January 10, 2000). The revisions made to the circulation through the drive-thru pharmacy were
found to be acceptable, including the relocation of the trash enclosure/compactor and the gated
loading area. The Committee continues to express concerns about the potential to generate
excessive noise in the loading and trash compactor area. However, the Committee recommended
approval of the Site Plan subject to the following conditions:
DRC COMMENTS
' CUP 99-49 -EVERGREEN/DEVCO
January 18, 2000
Page 3
1. The applicant shall pursue with the noise consultant whether the use of noise absorption
material can or should be added to the building wall to eliminate the "vibration" of sound
between the wall and the building.
2. The planters that direct traffic into the drive-thru pharmacy shall be expanded, and more
pronounced, in order to direct traffic into the drive-thru lane, as well as provide additional
landscaping in this location at the rear of the building.
Landscaping
The Committee recommended approval of the landscape concept subject to the following
conditions:
1. The wall along the west boundary shall be designed using split face block, which is
consistent with the block used on the building wainscot. The pilasters shall be designed
using fluted block of the same integral color.
2. The landscaping along the west property line shall be designed to not only to preserve the
existing trees, but also to supplement the landscaping for buffering and screening purposes.
The density of landscaping shall be as follows Pinus Elderica at 10-feet on center; a double
row of shrubs for a distance of 60 feet south of the delivery gate; a single row of shrubs from
the delivery gate north to the maintenance access gate; a double row of shrubs from the
maintenance gate to the north property boundary; all shrubs shall be planted 3-feet on
center or as recommended based on the chosen species.
• 3. Vines shall be placed on the west side (facing the condominium project) of the west
boundary wall.
4. The Haven Avenue streetscape is a Special Boulevard which must include the following
design elements: undulating mounding along with the use of river rock and/or boulders; and
informal massing of shrubbery which can be used to screen the parking lot. The street tree
shall be Magnolia Grandiflora "Majestic Beauty" (used within the street right-of-way). The
background tree (used behind the right-of-way) shall be informal grouping of Brachychiton
Populneus (Bottle Tree).
5. The trees used along Alta Loma Drive shall be Lagerstroemia Indica "Catawba" (Crape
Myrtle) at approximately 20-feet on center.
6. Accent trees shall be used at project entries, and entry and building plaza areas. The
recommended accent tree is a palm species.
Architecture/Buildino Desion
Following preparation of the comments for Committee discussion, staff determined that the loading
area can not be covered, due to building setback restrictions from the property line. The applicant
has addressed the building design along the east elevation through incorporating the arcade along
the entire elevation, wrapping the north side of the building. In doing so, the foundation planters
have been removed, and tree wells have been added in front of the colonnade columns. The
Committee approved this revision, however, recommended that the applicant work with staff to
• resolve any remaining design details prior to being forwarded to the Planning Commission for
review and approval:
1. Incorporate additional trim on the arches along the colonnades.
2. Incorporate additional the accent elements and vary the color patterns for additional variety.
DESIGN REVIEW COMMENTS
U
8:00 p.m. Debra Meier January 18, 2000
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-70 - MASTER
DEVELOPMENT CORPORATION -The request for approval of a rail served distribution building
comprised of 847,828 square feet located at 12167Arrow Route, on a 39.2 acre parcel in Subarea
15 of the Industrial Development Districts (Heavy Industrial). - APN: 229-121-15.
Design Parameters: The site is that of the former AMPAC concrete pipe manufacturing facility. All
existing structures and pavement will be removed for the proposed development of the Origen Rail
Center, with the exception of the perimeter fences and walls, and driveways on Arrow Route.
Immediately adjacent to the site on Arrow Route is an exiting alcohol distillery; the west boundary
parallels an Edison corridor with exiting transmission towers. The proposed project is intended to
be rail served from the Santa Fe Rail line along the southerly boundary. The street frontage was
fully improved by AMPAC.
The facility includes approximately 10,000 square feet of office space and 837,828 square feet of
warehouse space. The building incorporates 88 dock high doors and 2 grade level doors along the
west elevation, and 16 rail service dock doors on the east elevation.
The structure incorporates a creative use of concrete panels and "sky turrets" to accent the building
and provide a visual distraction along the freeway corridor. Primary building materials include
concrete panels in a variety of machine grid patterns and finishes, and sand blasted concrete (south
and east elevations only). The concrete panels are proposed to include a combination of painted,
plastered, and DRIVIT finishes to provide the distinctive variety at the building entries. Secondary
materials include "solarcool" bronze reflective glass, the sky turret is comprised on KAL-WALL with
• a metal frame.
The truck dock area on the west elevation is screened from I-15 freeway by a dense planting of
Canary Island Pine, London Plane, and White Alder, in combination with the existing Leyland
Cypress trees. This planted screen will continue along the south site boundary and around to a
portion of the eastern boundary to provide screening from view from the Metrolink commuter rail
line.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion:
Architecture
The applicant has proposed the use of concrete panels with varying finishes at the building
entry elevations, and has incorporated sandblasted concrete accent bands on the south and
east elevations. The applicant has taken a very creative approach to the building design
elements, including the entry focal elements and the use of the sky turrets; however, these
elements are essentially all concrete panels. The Committee should consider whether the
proposal of varying finishes of the concrete surface, the use of DRIVIT on the concrete
panels, and sandblasted concrete on the south and east elevations, fully satisfies the
industrial building material policy requiring two primary exterior building materials.
2. The applicant is keeping the existing 8-foot walls along the street frontage. The walls should
be coated or painted to match the finish and color of the proposed building.
. Site Planning
The site should be designed to direct truck access through the middle driveway from Arrow Route,
and customer and employee parking should be directed through the easterly and westerly
driveways. In order to more fully take advantage of this concept (refer to Exhibit A):
: - ~
~
~ ~
_ a
r: ..
:~
. -. ;, _ - - _ ::ARROW
ROUTE -- ~ " - ~
._.-,
. .. _
~ ~
1 ..
~M ~
- -r~. 519'-7"
~
~ ~ _
_. .. -
.. .. ... -
~
`'' ~ ~.~
'
" ~ ,^ ~ .
-.
.. N
--
~ ~
~
-_. .,ll
~Z :Teti .~.._ . ,.
.
,
-.- . _
~
• ....
'
~ -- -
- -
_ a -11 ~- -
- 153
~ - '"'.~
144'
` `, 9,
»,
_
~`+
-
. ~~ - ---
.
~g -
~} .
~~~~,
~~~.
h~~s .~'w ~~e
:~
~.~Loy~
~~G C'o/y/r~/~~~r`s
DRC COMMENTS
DR 99-70 -MASTER DEVELOPMENT CORP.
January 18, 2000
• Page 2
The west parking area should be redesigned to circulate internally with only one opening to
the truck access path, and eliminate the ability to use the westerly driveway to directly
access the truck access path from Arrow Route
2. The opening to the east parking area from the truck access path (south of Arrow Route)
should be eliminated.
3. Incorporate enhanced pavement across the drive aisle leading from the parking areas to the
entry plaza.
Staff Recommendation: Staff recommends that the Committee review and address the issues
identified above, and recommend that the project be forwarded for Planning Commission review and
approval.
Attachment
Design Review Committee Action:
Member Present: Dan Coleman, Larry McNiel, Pam Stewart
Staff Planner: Debra Meier
• The Committee complemented the applicants on the creative approach to architectural solutions
to such a large facility. They approved the architectural concept, including the material sample
board as presented by the applicant. Materials include concrete panels (scored and painted),
sandblast finish on upper panel along the south and east elevations, metal-work storefront
overhang, "Kalwall" construction "sky turrets," and bronze glazing.
The Committee recommended that the project be forwarded to the Planning Commission for review
and approval, subject to the following conditions:
The landscaping along Arrow Route street frontage shall be supplemented with clusters of
shrubbery, and vines on the existing slump stone wall.
2. The concrete pipe sections, which surround the trees in the landscape setback area, shall be
removed.
3. Due to comments from Engineering Department staff, the most easterly driveway is to be used
for emergency access only. Therefore, vehicular entry into the easterly parking lot will be via
the central driveway. The Committee asked the applicant to analyze the parking area located
on the westerly boundary to take into consideration separation of vehicular and truck traffic
to the extent feasible, provide fence between parking lot and ceritral driveway to control
pedestrian access, and the logical route that employees will be taking in crossing the parking
area to the building entry. The Committee stated that this issue should be resolved with staff
prior to Planning Commission consideration
DESIGN REVIEW COMMENTS
lJ
8:40 p.m. Doug Fenn January 18, 2000
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-69 -ROBERT GIBBS
DEVELOPMENT
of land in General Industrial District (Subarea 3) of the Industrial Area Specific Plan located at the
CO. -The development of a 19,326 square foot industrial building on 1.32 acres
north east corner of 9th Street and Hellman Avenue - APN: 209-022-20.
Design Parameters: The site is a 1.32 acre vacant parcel. There are several existing Eucalyptus
trees at the northwest corner of the site, which will not be removed. The site slopes from north to
south at an approximately 1 percent. The site is surrounded by the Department of Motor Vehicles
(DMV) to the north and to the east are industrial buildings. Across 9th Street to the south are
industrial buildings and across the Hellman Avenue to the west is an industrial building. The
proposed building will be used for dual tenants' general industrial type activities (one of the tenants
is MAACO, an automobile painting company).
The overall building design is oriented to face the northeast corner intersection of 9th street and
Hellman Avenue. The office portion(s) of the building will front the public right-of-ways of 9th Street
and Hellman Avenue. The storage and loading areas are behind the building and are not clearly
visible of the street right-of-ways. The building design features a stucco cornice with a raised 4-foot
high parapet over the office entryways and another raised 4-foot high parapet on the eastside of the
building to blend in with the design of the facility. The facility has 360 degree architecture with
strong articulation, color variation, of a "harbor grey" and "winter sky" color scheme on a
sandblasted concrete and concrete tilt-up facade with greylite reflective colored glazing accents.
Staff Comments: The following comments are intended to provide an outline for Committee
• discussion.
Major Issues: The following broad design issues will be the focus of Committee discussion
regarding this project:
Delete gate at southeastern corner of property because vehicles waiting to enter will block
north-south access to DMV.
Secondary Issues: Once of all the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
Provide screen wall, minimum 6 feet high, between outdoor employee eating area and
delivery area.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
Provide tables and chairs for outdoor employee eating area.
2. The screen gates should be automated to ensure that the gate is open the minimum time
necessary to allow trucks in and out of the loading area.
Staff Recommendation: Staff recommends that the Design Review Committee approve the project
subject to the modification as recommend above.
' DRC COMMENTS
DR 99-69 -ROBERT GIBBS DEV. CO.
January 18, 2000
• Page 2
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Doug Fenn
The Committee recommended that additional architectural detailing be incorporated along the south
face of the building. The Committee also recommended that the access on the east side of the
property be redesigned to accommodate an acceptable queuing of vehicles. The Committee
instructed the applicant to work these items with staff, and once the items had been addressed, then
to proceed with the development process.
•
DESIGN REVIEW COMMENTS
•
9:20 p.m. Rudy Zeledon January 18, 2000
DEVELOPMENT REVIEW 99-57 - LEWIS RETAIL- A request to remodel and upgrade the facade
to the existing buildings within the shopping center, Alta Loma Square, in the Neighborhood
Commercial District, located at the northeast corner of 19th Street and Carnelian Avenue -
APN: 201-221-45.
Design Parameters: The center was constructed before the City's incorporation in 1977. The
project proposes to remodel and upgrade the facades of Building "A." Building "B," and Rite Aid.
The existing Vons store is not part of this Development Review application. The applicant has
indicted that Vons will submit a separate Development Review application for the remodel and
expansion of the store, at later time. Currently, the Washington Mutual building is under
construction undergoing a facade upgrade. The upgrade will be architecturally compatible with the
proposed design upgrade of the center. In addition, the proposed design concept for the remodel
and upgrade of center will compatible with the Blockbuster building, which was constructed in 1998.
Recently, the center's parking lot was resurfaced and re-striped to a 90-degree angle design.
Staff Comments: The following comments are intended to provide ant outline for Committee
discussion:
Major Issues: The following broad issues will be on the focus of Committee discussion regarding
this project:
• The applicant proposes to remodel and upgrade the facades of Building "A," Building "B," and Rite
Aid. The applicant has indicated that Vons will not receive an upgrade at this time. According to the
applicant, Vons will submit a separate application for the their facade upgrade and expansion at a
later time. However, staff believes that a conceptual design of a facade upgrade for Vons should
be included with this application so that staff could assure proper transition and interface with the
proposed center facelift. In addition, staff is requesting that the applicant provide a time frame for
the facade upgrade and expansion of Vons. In the event that Vons does not submit an application,
staff would like to have the assurance that the upgrade then would be done by the applicant within
a reasonable time frame.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
The proposed towers, which will be the dominant architectural feature throughout the center,
should have additional architectural enhancement. The architectural enhancement may
included, but not limited to the following detail:
a. Provide a different color shade to the tower's facade.
b. Continue cornice treatment along top of the tower parapet.
c. Increase the thickness of the cornice detail between the tower parapet and archway
entrance (south elevation building "A").
• d. The tite patters on the tower shall be recessed and the the detail shall vary in color and
pattern work.
' DRC COMMENTS
•
DR 99-57 - LEWIS RETAIL
January 18, 2000
Page 2
2. Provide either concrete or stucco surrounds (high-density foam) to all the elements along
the storefront facades.
3. Provide tree wells (4-foot by 4-foot inside dimension) along the outer edge of the walkway
on the south elevation for Building "A." Either Crape myrtle or Palm trees shall be planted
within the tree wells.
4. Provide additional tree planters between parking stalls, consistent with the exiting planters
within the parking area.
5. Currently the light standards, within the parking area, are not in compliance with the
Development Code Standards. Staff recommends the lighting be brought up to Code
Standards and redesigned to be compatible with the proposed design concept of the center.
6. The elevations show the proposed sign height to be of 24 inches. Staff believes that the sign
height is not in proportion to the height of the building fascia. The proposed sign height
should be reduced to 18 inches.
Staff Recommendations: Staff recommends that the project be revised per the above comments
and be brought back for further review.
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Rudy Zeledon
The Committee reviewed the project and recommended approval subject to staffs above comments
with the following changes:
A conceptual design for the facade upgrade of Vons storefront is not needed with this
application. The applicant explained that they have been in discussions with Vons for
several years regarding a fapade upgrade; however, Vons has not made a decision. Under
the terms of their lease, Lewis cannot alter the Vons facade without their approval.
However, the Committee directed the applicant to continue to work with Vons in their efforts
to go upgrade the facade to their storefront.
2. Provide tree wells (4-foot by 4-foot inside dimension) along the outer edge of the walkway
on the south elevation for Building "A," where possible, subject to City Planner approval.
3. Existing light standards, within the parking area, do not have to be brought up to Code
Standards at this time. The Committee recommended that the applicant make a good faith
effort to address the lighting issue at a later time.
\I
DESIGN REVIEW COMMENTS
January 18, 2000
PUBLIC COMMENTS
There were no public comments at this time.
ADJOURNMENT
The meeting adjourned at 9:30 p.m.
Respectfully submitted,
rr
Brad
Secretary
•
• DESIGN REVIEW COMMITTEE MEETING
TUESDAY JANUARY 18, 2000 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
Committee Members: Larry McNiel Pam Stewart
Alternates: Peter Tolstoy Rich Macias
CONSENT CALENDAR
Dan Coleman
John Mannerino
The following items are expected to be routine and non-controversial. Typically they are items such
as plan revisions prepared in response to discussions at a previous meeting.
7:00 p.m.
(Doug) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-59 -
PANATONNI DEVELPMENT -The development of a 180,000 +/- square foot
industrial building on 7.95 acres of land in General Industrial District (Subarea 10) of
the Industrial Area Specific Plan located at the north west corner of 7th Street and
Toronto Avenue -APN: 209-401-21.
• 7:10 p.m.
(Brent) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-60 -
CARPENTER'STECHNOLOGY -The development of a 56,200 square foot industrial
building on 4 acres of land in Subarea 7 (Industrial Park) of the Industrial Area specific
Plan, located on the west side of Milliken Avenue south of Foothill Boulevard -APN:
229-011-031.
PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant
regarding their development application. The following items do not legally require any public
testimony, although the Committee may open the meeting for public input.
7:20 p.m.
(Debra) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 99-49 -
EVERGREEN/DEVCO: The development of a drugstore with adrive-through window
for prescription orders consisting of a 13,813 square foot building on a 1.52 acre
parcel in the Office Professional (OP) District, located at the northwest corner of
Haven Avenue and Alta Loma Drive. -APN: 01-262-37. Related file: Tree Removal
Permit 99-37.
8:00 p.m.
(Debra) DEVELOPMENT REVIEW 99-70 -MASTER DEVELOPMENT CORPORATION: The
• request for approval of a rail served distribution building comprised of 847,828 square
feet located at 12167 Arrow Route, on a 39.2 acre parcel in Subarea 15 of the
Industrial Development Districts (Heavy Industrial). -APN: 229-121-15.
DRC AGENDA
January 18, 2000
• Page 2
8:40 p.m.
(Doug) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-69 -ROBERT
GIBBS DEVELOPMENT CO. -The development of a 19,326 square foot industrial
building on 1.32 acres of land in General Industrial District (Subarea 3) of the
Industrial Area Specific Plan located at the north east comer of 9th Street and Hellman
Avenue -APN: 209-022-20.
9:20 p.m.
(Rudy) DEVELOPMENT REVIEW 99-57 - LEIWS RETAIL - A request to remodel and
upgrade the fagade to the existing buildings within the shopping center, Alta Loma
Square, in the Neighborhood Commercial District, located at the northeast corner of
19th Street and Carnelian Avenue -APN: 201-221-45
PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five
minutes per individual.
ADJOURNMENT
• 1, Mary Lou Gragg, Office Specialist 11 for the City of Rancho Cucamonga, hereby certify that a true,
accurate copy of the foregoing agenda was posted on January 13, 2000, at least 72 hours prior to
the meeting per Government Code Section 54954.2 at 10500 Civic Center Drive, Rancho
Cucamonga.
n
U
• CONSENT CALENDAR COMMENTS
7:00 p.m. Doug Fenn January 18, 2000
GIV V IRVIVIVICIV I ML MJJCJJIVICIV I MIVLI LJCV CLVrIVIOV l I~GV IGVY JJ-JJ - rf'11 V111 VIYIYI
DEVELPMENT -The development of a 180,000 +/- square foot industrial building on 7.95 acres
of land in General Industrial District (Subarea 10) of the Industrial Area Specific Plan located at the
north west corner of 7th Street and Toronto Avenue - APN: 209-401-21.
Design Review Committee Action:
Members Present:
Staff Planner: Doug Fenn
•
•
• CONSENT CALENDAR COMMENTS
7:10 p.m. Brent Le Count January 18, 2000
CIVVIRVIV IVICIV IFIL /1JJCJJIVICIVI F11Vll LICV CLVrIVICIVI f~CVIGVV JJ-VV - l'111lr LIVILI\J
TECHNOLOGY -The development of a 56,200 square foot industrial building on 4 acres of land
in Subarea 7 (Industrial Park) of the Industrial Area specific Plan, located on the west side of Milliken
Avenue south of Foothill Boulevard - APN: 229-011-031.
Design Review Committee Action:
Members Present:
Staff Planner: Brent Le Count
•
DESIGN REVIEW COMMENTS
• 7:20 p.m. Debra Meier January 18, 2000
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 99-49 -
EVERGREEN/DEVCO: The development of a drugstore with adrive-through window for
prescription orders consisting of a 13,813 square foot building on a 1.52 acre parcel in the Office
Professional (OP) District, located at the northwest corner of Haven Avenue and Alta Loma Drive.
- APN: 01-262-37. Related file: Tree Removal Permit 99-37.
Design Parameters: The Committee (McNiel and Fong) reviewed this project at their November 6,
1999 meeting. A copy of the Design Review Committee Action is attached for reference. The
Committee was particularly concerned with a variety of Site Plan issues related to circulation and
truck delivery patterns on the site, and the proximity of the loading area to the existing
condominiums. The Committee also expressed concerns pertaining to the proposed foundation
planters along the building face, the design of the pedestrian level space and building design. The
applicant has been working diligently with staff to address the design issues. At this time, the
applicant has attempted to address the identified site issues. The applicant has indicated that they
will continue to work with staff on resolving the other identified issues pertaining to landscaping and
building design. Therefore, the focus of the Committee's review tonight is the Site Plan issues
related to the circulation and truck delivery.
Staff Comments: The following comments are intended to provide a focus for Committee
discussion regarding this project:
Site Plan
• 1. The circulation at the rear of the building provides access to the drive-thru pharmacy. The
drive-thru patrons will proceed through the order window and then U-turn to exit the site.
2. The truck unloading zone is now completely separate from the drive-thru circulation. The
delivery trucks will back into the delivery zone, as indicated on the Site Plan. In conjunction
with the modifications to the delivery zone, the applicant has modified the perimeter wall to
allow for the preservation of several trees that are at or near the property line. Staff believes
that this is an acceptable solution.
3. The trash enclosure has been relocated to the north end of the delivery zone, including a trash
compactor, which is completely screened and gated. This is an acceptable solution.
4. Eliminate a parking space in front of the tower at the southeast corner of the building to
expand the plaza area.
Landscaping
1. The proposal to provide vines on building mounted trellis, as an alternative to landscaping
along the building face, has not been modified from plans previously reviewed by the
Committee.
2. Provide tree planters at northeast corner of building and along north side of drive-thru.
3. West property boundary should have the following design improvement: change the tree
species from Quercus Virginana (Live Oak) to Pinus Elderica and planted at 10 feet on center;
• provide double row of shrubs for a distance of 60 feet from the delivery entry; single row of
shrubs from the end of the double row to the gate, double row of shrubs from the gate to the
north property boundary, and all shrubs to be planted at 3 feet on center. This can be
conditioned.
DRC COMMENTS
CUP 99-49 -EVERGREEN/DEVCO
January 18, 2000
•- Page 2
4. Modify streetscape along Haven Avenue to be consistent with the established theme for the
street. Tree species should include a mix of Sycamore, Pines and Magnolia. Add a flowing
stream of river-rock and boulders along Haven Avenue and wrap around the same treatment
along Alta Loma Drive. Appropriate shrubs should be provided within the bed of river rack.
This can be conditioned.
5. Project entries should have specimen size and accent trees.
6. Building entry and plaza area should have tree wells. A suggested tree species is Palm tree.
7. Provide a continuous landscape strip along the east elevation.
8. Mounding should be provided along Haven Avenue instead of screen wall. This can be
conditioned.
9. Provide a row of shrubs in front of the screen wall along Alta Loma Drive. This can be
conditioned.
Architecture/Building Design
1. The delivery zone is indicated on the Site Plan as "covered loading area," however, the
elevations do not show any cover element. Further, the Development Code would require a 20-
foot building setback. Even a trellis would require a 17-foot minimum setback (not 10 feet as
• shown on Site Plan).
2. The Committee had raised design issues as listed in the attached November 16, 1999 Design
Review Committee Action. The applicant is willing to continue to work with staff in resolving
them and they may have revised elevation for Committee's review at January 18 meeting.
Staff Recommendation: Review these and any other issues identified by the Committee; suggest
modifications as necessary. Any unresolved issues pertaining to landscaping and architecture
should be scheduled to return for Committee review at a subsequent meeting.
Attachment
Design Review Committee Action:
Members Present:
Staff Planner: Debra Meier
•
DESIGN REVIEW COMMENTS
• 8:50 p.m. Debra Meier November 16, 1999
CONDITIONAL USE PERMIT 99-49 -EVERGREEN/DEVCO -The request for approval of a drug
store with adrive-thru window for prescription orders consisting of a 13,905 square foot building
on a 1.52-acre parcel located at the northwest corner of Haven Avenue and Alta Loma Drive in the
Office Professional (OP) District. - APN: 201-262-37. Related file: Tree Removal Permit 99-37.
Design Parameters: The project site is located immediately south of Chaffey Plaza, a small retail
center located at the southwest corner of Haven Avenue and Lemon Street; and immediately east
of the Garden Condominiums. The proposed alignment of Alta Loma Drive, along the southerly
project boundary, will be constructed by Caltrans in association with the construction of Route 30.
Due to the realignment and construction of Alta Loma Drive, the Walgreen's site will provide a new
secondary access point into the condominiums along the westerly project boundary. A new primary
access to the condominiums will be developed further west along Alta Loma Drive in cooperation
with the property owner located south of the condominiums.
The project site is presently vacant: however, the parcel contains several existing trees along the
west property boundary and along the proposed alignment of Alta Loma Drive. The project
boundary wall should be modified in three cases to create tree wells which will allow five existing
trees to remain, one additional tree will remain within the planter near the southwest portion of the
site; and four existing trees are proposed for removal. A Tree Removal Permit accompanies this
application.
Essentially this same building was approved for a Walgreen's drug store located at the corner of
Highland Avenue and 19th Street earlier this year (Conditional Use Permit 99-10). The applicant
has incorporated many of the same design elements that were added to that project through the
Design Review Committee review process.
Staff Comments: The following comments are intended to provide a focus for Committee
discussion regarding this project:
Site Plan
In general, the site appears overbuilt which forces the loading area very close to neighboring
residences. The drive aisle width on the west side of the building does not allow for adequate
space for customers coming out of the drive-thru to pass by if a delivery truck is in the loading
area. The applicant has proposed additional pass-by space by introducing turf-block grass
pavers in the landscaped setback area along the westerly property line to allow vehicles to
pass around the delivery truck, without completely eliminating the ability to have a green
planter area. Turf-block has been used only for fire access, staff is concerned that drivers
may become confused or not be comfortable with attempting to drive upon grass.
Staff has indicated to the applicant that the loading area and delivery trucks would present
a problem for patrons exiting the drive-thru window. The applicant introduced the turf-block
to address this concern. Does the Committee favor the use of the turf-block as a means of
providing extra drive aisle width at the times when the delivery truck is present?
•
DRC COMMENTS
CUP 99-49 -EVERGREEN/DEVCO
November 16, 1999
Page 2
Furthermore, the loading area is 10 feet away from the Gardens condominium complex and
could result in resident noise complaints, similar to that at Albertsons (southeast corner Base
Line Road Archibald Avenue). See Cross-Section A on Sheet A4.1.
Landscaoino
Haven Avenue is a Special Boulevard which requires design elements such as mounding,
boulders or other similar features. The applicant has included mounding, a split face block
wall, and the use of 24-inch box Virginia Live Oak. Staff has suggested to the applicant that
additional trees are necessary that would be background trees and could also provide shade
to the parking along the east portion of the site.
2. Rather than providing trees along the east and south building elevations, the applicant has
chosen to provide foundation planters with shrubs, as well as a metal trellis applied to the
building wall that will accommodate vine growth. The Committee should discuss whether
they will accept this treatment in lieu of the requirement for trees along the building frontage.
3. The applicant has not indicated the type of trailing plant material will be used to grow on the
building-mounted metal trellis at the south and east elevations.
Architecture/Buildino Design
(Please note: The building elevations illustrate a tree on each elevation, based on information
provided on the Landscape Plan there are no trees provided along the building frontages. See
comment #2 above.)
1. Review the proposed material sample board in conjunction with photographs of the Chaffey
Plaza development for compatibility. Photographs will be available at the meeting.
2. Consider the development of an entry plaza space that is in proportion to the "signage"tower
element and canopy at the store entrance (see south and east elevations). The canopy wall
of this tower sets right at the curb line on the south elevation. For a rather large architecture
element, very little ground surface has been provided at the pedestrian level.
Staff Recommendation: Review these and any other issues identified by the Committee; suggest
modifications as necessary. Any unresolved issues should be scheduled to return for Committee
approval at a subsequent meeting.
Design Review Committee Action:
Members Present: Larry McNiel, Nancy Fong
Staff Planner: Debra Meier
The Committee cannot recommend this project for favorable Planning Commission action without
• redesign of the items noted below. Project shall be returned for additional Committee review on
December 14, 1999. Revised plans must be submitted to staff by November 30, 1999.
DRC COMMENTS
CUP 99-49 -EVERGREEN/DEVCO
November 16, 1999
Page 3
Site Plan
The building footprint was too large for the parcel selected where the access for delivery
trucks and customers and landscaping along the building is being compromised.
2. The use of turf-block along the west property line is typically a feature reserved for
emergency access purposes or overFlow parking situations for large venues (i.e. Quake
Stadium), and should not be considered as meeting the landscape and setback requirements.
3. Delivery areas adjacent to residential neighborhoods can cause undue stress on the
residents from noise, diesel fumes, and disruption of privacy. The Committee stated that they
need to be sure that the project does not have built-in features that will be future cause for
concern to the Garden Condominiums, especially if the store were ever transferred to a
different retail user. The Committee believed that the user always understates delivery
expectations. Suggested solutions as discussed by the Committee included but not limited
to: enclosing or covering the delivery area, not routing customers down the rear alley of the
building, routing the drive-thru traffic to U-turn at the rear of the building, etc. The applicant
should look at options or solutions that resolve layout conflicts.
Landscaoing
• 1. The trellis with vines was not an appropriate alternative to landscaping at the building face.
This ties into the overall site design constraints as discussed above.
Architecture/Building Design
The building material and color palette was acceptable to the Committee, and is compatible
with the Chaffey Plaza Development immediately north of the site.
The pedestrian level space at the building entry is extremely small for the size of the
architectural entry tower proposed. The pedestrian level plaza space should be more
proportionate to architecture, including accessible colonnades and hard scape.
•
• DESIGN REVIEW COMMENTS
• 8:00 p.m. Debra Meier January 18, 2000
DEVELOPMENT REVIEW 99-70 -MASTER DEVELOPMENT CORPORATION: The request for
approval of a rail served distribution building comprised of 847,828 square feet located at
12167 Arrow Route, on a 39.2 acre parcel in Subarea 15 of the Industrial Development Districts
(Heavy Industrial). -APN: 229-121-15.
Design Parameters: The site is that of the former AMPAC concrete pipe manufacturing facility. All
existing structures and pavement will be removed for the proposed development of the Origen Rail
Center, with the exception of the perimeter fences and walls, and driveways on Arrow Route.
Immediately adjacent to the site on Arrow Route is an exiting alcohol distillery; the west boundary
parallels an Edison corridor with exiting transmission towers. The proposed project is intended to
be rail served from the Santa Fe Rail line along the southerly boundary. The street frontage was
fully improved by AMPAC.
The facility includes approximately 10,000 square feet of office space and 837,828 square feet of
warehouse space. The building incorporates 88 dock high doors and 2 grade level doors along the
west elevation, and 16 rail service dock doors on the east elevation.
The structure incorporates a creative use of concrete panels and "sky turrets" to accent the building
and provide a visual distraction along the freeway corridor. Primary building materials include
concrete panels in a variety of machine grid patterns and finishes, and sand blasted concrete (south
and east elevations only). The concrete panels are proposed to include a combination of painted,
plastered, and DRIVIT finishes to provide the distinctive variety at the building entries. Secondary
materials include "solarcool" bronze reflective glass, the sky turret is comprised on KAL-WALL with
~, a metal frame.
The truck dock area on the west elevation is screened from I-15 freeway by a dense planting of
Canary Island Pine, London Plane, and White Alder, in combination with the existing Leyland
Cypress trees. This planted screen will continue along the south site boundary and around to a
portion of the eastern boundary to provide screening from view from the Metrolink commuter rail line.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion:
Architecture
The applicant has proposed the use of concrete panels with varying finishes at the building
entry elevations, and has incorporated sandblasted concrete accent bands on the south and
east elevations. The applicant has taken a very creative approach to the building design
elements, including the entry focal elements and the use of the sky turrets; however, these
elements are essentially all concrete panels. The Committee should consider whether the
proposal of varying finishes of the concrete surface, the use of DRIVIT on the concrete
panels, and sandblasted concrete on the south and east elevations, fully satisfies the
industrial building material policy requiring two primary exterior building materials.
2. The applicant is keeping the existing 8-foot walls along the street frontage. The walls should
be coated or painted to match the finish and color of the proposed building.
Site Planning
The site should be designed to direct truck access through the middle driveway from Arrow Route,
and customer and employee parking should be directed through the easterly and westerly
driveways. In order to more fully take advantage of this concept (refer to Exhibit A):
DRC COMMENTS
DR 99-70 -MASTER DEVELOPMENT CORP.
• January 18, 2000
Page 2
The west parking area should be redesigned to circulate internally with only one opening to
the truck access path, and eliminate the ability to use the westerly driveway to directly
access the truck access path from Arrow Route
2. The opening to the east parking area from the truck access path (south of Arrow Route)
should be eliminated.
Incorporate enhanced pavement across the drive aisle leading from the parking areas to the
entry plaza.
Staff Recommendation: Staff recommends that the Committee review and address the issues
identified above, and recommend that the project be forwarded for Planning Commission review and
approval.
Design Review Committee Action:
Member Present:
Staff Planner: Debra Meier
u
•
~~ ~ ;
~
! , :
,. _: .;~ ;:ARROW
RO TE - - -
, _
~V: .f~ -
~ :
,
-
~~, - .. .- lj `519"-7"
-~
'
,.
- ..:..
:. _
..
-
-
._
:' _ -
,
-
4 ~1'
153' r---
144 --
_ - -~`~
9. - 1T
- _ _ -
_~ m
~`;` _ - _ - - z
__ `_ - - - -
. .' .. - . ~
:? .ems',-. ~. _ N _ _ _____ _ ___ __ __~-- i-_ __-_-___ ~_ __ -_
.- ..
S~
~~ .
lp, NA 41 4• 24,.. -3 ' 24" --~{' 48
o,~
~~
•
~ GsVy~/uC~G,~~Y~~ ' .
h~,eoss ,~'~v ~.e
~~°Loy~,~ . .
• G.f~a~.t~~.
ve 99 ~o
~~C co~rr~~~r~s
~~,y~,grr .~
v
V
N
A.
~ I
N
t
i ~
I
V
~ O
i m
j Y
1 i
I ~i ~
li
~(
~, .-
DESIGN REVIEW COMMENTS
• 8:40 p.m. Doug Fenn January 18, 2000
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-69 -ROBERT GIBBS
DEVELOPMENT CO. -The development of a 19,326 square foot industrial building on 1.32 acres
of land in General Industrial District (Subarea 3) of the Industrial Area Specific Plan located at the
north east corner of 9th Street and Hellman Avenue - APN: 209-022-20.
Desiqn Parameters: The site is a 1.32 acre vacant parcel. There are several existing Eucalyptus
trees at the northwest corner of the site, which will not be removed. The site slopes from north to
south at an approximately 1 percent. The site is surrounded by the Department of Motor Vehicles
(DMV) to the north and to the east are industrial buildings. Across 9th Street to the south are
industrial buildings and across the Hellman Avenue to the west is an industrial building. The
proposed building will be used for dual tenants' general industrial type activities (one of the tenants
is MAACO, an automobile painting company).
The overall building design is oriented to face the northeast corner intersection of 9th street and
Hellman Avenue. The office portion(s) of the building will front the public right-of-ways of 9th Street
and Hellman Avenue. The storage and loading areas are behind the building and are not clearly
visible of the street right-of-ways. The building design features a stucco cornice with a raised 4-foot
high parapet over the office entryways and another raised 4-foot high parapet on the eastside of the
building to blend in with the design of the facility. The facility has 360 degree architecture with
strong articulation, color variation, of a "harbor grey" and "winter sky" color scheme on a
sandblasted concrete and concrete tilt-up facade with greylite reflective colored glazing accents.
Staff Comments: The following comments are intended to provide an outline for Committee
• discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project:
Delete gate at southeastern corner of property because vehicles waiting to enter will block
north-south access to DMV.
Secondary Issues: Once of all the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
Provide screen wall, minimum 6 feet high, between outdoor employee eating area and
delivery area.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
1. Provide tables and chairs for outdoor employee eating area.
2. The screen gates should be automated to ensure that the gate is open the minimum time
necessary to allow trucks in and out of the loading area.
Staff Recommendation: Staff recommends that the Design Review Committee approve the project
subject to the modification as recommend above.
• Desiqn Review Committee Action:
Members Present:
Staff Planner: Doug Fenn
DESIGN REVIEW COMMENTS
9:20 p.m. Rudy Zeledon January 18, 2000
DEVELOPMENT REVIEW 99-57 - LEIWS RETAIL - A request to remodel and upgrade the facade
to the existing buildings within the shopping center, Alta Loma Square, in the Neighborhood
Commercial District, located at the northeast corner of 19th Street and Carnelian Avenue -
APN: 201-221-45.
Design Parameters: The center was constructed before the City's incorporation in 1977. The
project proposes to remodel and upgrade the facades of Building "A." Building "B," and Rite Aid.
The existing Vons store is not part of this Development Review application. The applicant has
indicted that Vons will submit a separate Development Review application for the remodel and
expansion of the store, at later time. Currently, the Washington Mutual building is under
construction undergoing a facade upgrade. The upgrade will be architecturally compatible with the
proposed design upgrade of the center. In addition, the proposed design concept for the remodel
and upgrade of center will compatible with the Blockbuster building, which was constructed in 1998.
Recently, the center's parking lot was resurfaced and re-striped to a 90-degree angle design.
Staff Comments: The following comments are intended to provide ant outline for Committee
discussion:
Maior Issues: The following broad issues will be on the focus of Committee discussion regarding
this project:
• The applicant proposes to remodel and upgrade the facades of Building "A;' Building "B;' and Rite
Aid. The applicant has indicated that Vons will not receive an upgrade at this time. According to the
applicant, Vons will submit a separate application for the their facade upgrade and expansion at a
later time. However, staff believes that a conceptual design of a facade upgrade for Vons should
be included with this application so that staff could assure proper transition and interface with the
proposed center facelift. In addition, staff is requesting that the applicant provide a time frame for
the facade upgrade and expansion of Vons. In the event that Vons does not submit an application,
staff would like to have the assurance that the upgrade then would be done by the applicant within
a reasonable time frame.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
The proposed towers, which will be the dominant architectural feature throughout the center,
should have additional architectural enhancement. The architectural enhancement may
included, but not limited to the following detail:
a. Provide a different color shade to the tower's facade.
b. Continue cornice treatment along top of the tower parapet.
c. Increase the thickness of the cornice detail between the tower parapet and archway
entrance (south elevation building "A").
. d. The file patters on the tower shall be recessed and the file detail shall vary in color and
pattern work.
' DRC COMMENTS
DR 99-57 - LEW IS RETAIL
January 18, 2000
Page 2
2. Provide either concrete or stucco surrounds (high-density foam) to all file elements along the
storefront facades.
3. Provide tree wells (4-foot by 4-foot inside dimension) along the outer edge of the walkway
on the south elevation for Building "A." Either Crape myrtle or Palm trees shall be planted
within the tree wells.
4. Provide additional tree planters between parking stalls, consistent with the exiting planters
within the parking area.
5. Currently the light standards, within the parking area, are not in compliance with the
Development Code Standards. Staff recommends the lighting be brought up to Code
Standards and redesigned to be compatible with the proposed design concept of the center.
6. The elevations show the proposed sign height to be of 24 inches. Staff believes that the sign
height is not in proportion to the height of the building fascia. The proposed sign height
should be reduced to 18 inches.
Staff Recommendations: Staff recommends that the project be revised per the above comments
and be brought back for further review.
Design Review Committee Action:
Members Present:
Staff Planner: Rudy Zeledon
\J
u
DESIGN REVIEW COMMITTEE MEETING
ACTION AGENDA AND MINUTES
TUESDAY - JANUARY 4, 2000 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
t. J
•
Committee Members: Larry McNiel Pam Stewart
Alternates: Peter Tolstoy Rich Macias
CONSENT CALENDAR
Dan Coleman
John Mannerino
The following items are expected to be routine and non-controversial. Typically they are items such
as plan revisions prepared in response to discussions at a previous meeting.
7:00 p.m
(Doug) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-55 -
TRAMMEL CROW & CO. -The development of four industrial buildings totaling
1,021,000 square feet on 48.93 acres of land in the Minimum Impact Heavy
Industrial District (Subarea 9) of the Industrial Area Specific Plan, located on the
south side of Arrow Route, east and west of Milliken Avenue -APN: 229-111-30,
35-42, 44, 46 and 57.
7:10 p.m.
(Warren) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 99-17 -AIR
TOUCH CELLULAR -The development of a wireless communication facility
consisting of a 65-foot stealth monopole on 3.34 acres of land in the Low Residential
District (2~ dwelling units per acre), located at 8248 19th Street, Cucamonga County
Water District Well No. 24 -APN: 201-201-40.
PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant
regarding their development application. The following items do not legally require any public
testimony, although the Committee may open the meeting for public input.
7:20 p.m.
(Doug) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-59 -
PANATONNI DEVELPMENT -The development of a 180,000 +/- square foot
industrial building on 7.95 acres of land in General Industrial District (Subarea 10)
s of the Industrial Area Specific Plan located at the north west comer of 7th Street and
Toronto Avenue -APN: 209-401-21.
7:40 p.m.
(Rudy)
PROPERTIES LLC - A residential subdivision of 13 single family lots on 4.37 acres
of land in the Low Residential District (2-4 dwelling units per acre), located south of
Banyan Street, on the east side of Archibald Avenue and on the west side of London
Avenue -APN: 201-251-01. Related files: Development Review 99-42, Tree
Removal Permit 99-13. Continued from November 30, 1999.
' DRC AGENDA
January 4, 2000
• Page 2
•
(Rudy) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-42 - PKT
PROPERTIES LLC - A design review of building elevations and detailed site plan for
Tentative Tract 15963 consisting of 13 single family lots on 4.37 acres of land in the
Low Residential District (2-4 dwelling units per acre), located south of Banyan Street,
on the east side of Archibald Avenue and on the west side of London Avenue -APN:
201-251-01. Related files: Tentative Tract 15963. Continued from November 30,
1999.
8:10 p.m
(Brent) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-60 -
CARPENTER'S TECHNOLOGY -The development of a 56,200 square foot
industrial building on 4 acres of land in Subarea 7 (Industrial Park) of the Industrial
Area specific Plan, located on the west side of Milliken Avenue south of Foothill
Boulevard -APN: 229-011-031.
PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five
minutes per individual.
ADJOURNMENT
n
CONSENT CALENDAR
• 7:00 P.M. Doug Fenn January 4, 2000
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-55 -TRAMMEL CROW
AND CO. - A request to construct four industrial buildings (Building A - 52,700 square feet, Building
"B" - 215,300 square feet, Building "C" - 421,900 square feet, and Building "D" - 331,100 square
feet) totaling 1,021,000 square feet on 48.93 acres of land in Subarea 9 (Minimum Impact Heavy
Industrial) of the Industrial Specific Plan located on the - APN: 229-111-30, 35-42, 44, 46 and 57
Staff Comments: The Committee reviewed the project at the December 14, 1999 meeting and
accepted the secondary issue changes. However, the Committee rejected the proposed sample
board of the material that will be utilized around the office entrances of the project. The applicant
was informed to bring back a revised sample board to the satisfaction of the Committee to the
January 4, 2000, Design Review meeting.
Design Review Committee Action
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Doug Fenn
The Committee reviewed the sample board and recommended approval of the project
•
r1
U
CONSENT CALENDAR
• 7:10 p.m. Warren Morelion January 4, 2000
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 99-17 -AIR TOUCH
CELLULAR -The development of a wireless communication facility consisting of a 65-foot stealth
monopole on 3.34 acres of land in the Low Residential District (2-4 dwelling units per acre), located
at 8248 19th Street, Cucamonga County Water District Well No. 24 - APN: 201-201-40.
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Warren Morelion
The Committee recommended approval of the project provided the applicant build a monopalm tree
with 6-7 real Palm trees grouped around the facility as additional screening. The Committee also
asked that the utility room underneath the facility be built of decorative block or stucco (gray in
color), rather than made of a veneered material. No barbed wire will be allowed on tap of the chain
link fence around the utility room.
•
•
DESIGN REVIEW COMMENTS
• 7:20 p.m. Doug Fenn January 4, 2000
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-59 - PANATONNI
DEVELPMENT -The development of a 180,000 +/- square foot industrial building on 7.95 acres
of land in General Industrial District (Subarea 10) of the Industrial Area Specific Plan located at the
north west corner of 7th Street and Toronto Avenue - APN: 209-401-21.
Design Parameters: The site is vacant parcel and contains no significant vegetation. The site
slopes from north to south at an approximately 2 percent. The site is surrounded by industrial
development to the north and across Toronto Avenue to the east, and across 7th Street to the south
and to the west. The proposed building will be used for dual tenant warehouse/distribution activities.
The office portion(s) of the building will front the public right-of-way of 7th Street. The loading area
will front 7th Street but will be screened by a bermed decorative screen wall. The loading area was
designed to face south because of the potential nuisance of the Santa Ana winds. The building
design features a simple design with emphasis on the office portions with articulation, color
variation, and use of sandblasted concrete with blue reflective colored glazing accents.
The building orientation proposes truck loading docks facing 7th Street frontage. The Industrial
Area Specific Plan requires trucks to be screened from public view.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project:
• 1. Provide stronger vertical relief on the south face of and midway between the office
entryway(s) of the building.
2. Provide sandblasted concrete banding at least 5-feet wide at the top of the building plane
along the south elevation which faces 7th Street.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
The screen gates should be automated to ensure that the gate is open the minimum time
necessary to allow trucks in and out of the loading area.
2. Downspouts on the south face of the building must be inside of the building.
3. The employee plaza areas shall be relocated or designed to be accessible for employees
and not adjacent to the truck loading area and vehicular parking.
Staff Recommendation: Staff recommends that the project be revised and return to Design
Review Committee as a consent calendar item.
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
• Staff Planner: Doug Fenn
The Committee recommended that along the south face of the building a couple of additional
vertical elements be designed along the facade, and to return the revision to the Design Review
Committee as a consent calendar item on January 18, 2000.
DESIGN REVIEW COMMENTS
• 7:40 p.m. Rudy Zeledon January 4, 2000
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT N0.15963 - PKT PROPERTIES LLC
- A residential subdivision of 13 single family lots on 4.37 acres of land in the Low Residential
District (2-4 dwelling units per acre), located south of Banyan Street, on the east side of Archibald
Avenue and on the west side of London Avenue -APN: 201-251-01. Related files: Development
Review 99-42, Tree Removal Permit 99-13. (Cont'd from November 30, 1999)
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-42 - PKT PROPERTIES
LLC - A design review of building elevations and detailed site plan for Tentative Tract 15963
consisting of 13 single family lots on 4.37 acres of land in the Low Residential District (2-4 dwelling
units per acre), located south of Banyan Street, on the east side of Archibald Avenue and on the
west side of London Avenue -APN: 201-251-01. Related files: Tentative Tract 15963. (Cont'd from
November 30, 1999)
Background: This item was reviewed by the Committee (McNiel and Fong) on October 19, 1999.
The previous Design Review Comments and action have been attached for reference. At the
October 19 meeting, the applicant was directed to work closely with staff to resolve the major and
secondary issues presented. The Committee felt that all four proposed house design concepts were
very similar and therefore difficult to differentiate.
Staff Comments: The applicant has meet with staff and worked on resolving the design issues.
The applicant has resubmitted a new plan that included the fallowing changes to the proposed
house products, however, staff feels that the applicant has not addressed the Committees concerns
• and the major and secondary issues presented at the October 19, 1999 meeting.
1. On house Plans 102 A and B, the right elevations have been enhanced to include exposed
rafter tails along the eaves, a stucco over trim band below the gable pitch roof and a window
with stucco trim over.
2. On house Plan 102A, a pot shelf was added to the front bedroom window.
Staff Recommendations: Staff recommends that the applicant continue to work with staff in
addressing the outstanding issues and return to Design Review Committee for further review.
Attachment
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Rudy Zeledon
The Committee did not approve the project and directed the applicant to continue to work with staff
to resolve the design issues presented. The applicant declined to continue to work with staff to
resolve the design issues. The applicant expressed his decision to go forward with the project to
the Planning Commission as proposed, with a denial recommendation by the Committee.
r1
U
A
.,.
.~.
~~ .~ 'r~
,.~
.•' :-'`~ - ~ y'am'
~a:
,,
....--•-
DOORS 8~ ENTRY
•
(~riRRf "i~~ %L
D,~~A~~L
HT EAVE
~~
Co~~s
.~ l/
___,
~.
~`? '
~6~e
..~ .
UNIQUE DETAILS
PORCHES & BALCONIES
_; ~;.
~~' % 1
~.,.
.;
~-,
~~
WINDOW TREATMENT
r
fa
`~I~a~ ~i
WINDOW TREATMENT
PORCHES ~ BALCONIES
DOORS & ENTRY
•
24' OVERHANG AT
EXPOSED RAFTER TAI
.- ;/ ~
d=')_ '<
-.- ..~,,
a, a
OVERHANGS
~-
~ ~~
~~
., .
,~t"~''~
_~
ONC."S" TILE
,..: ~ - -
ROOF PITCH 8~ MATERIAL
SMOOTH STUCCO
\J
;I„ i., .
-~ .
~~
.~~
'`ir
::
= ~ : ~ ~ ~ LLILJ~LI~U
~~ '~ ~. ~ CHIMNEYS
EXTERIOR FINISH
DESIGN REVIEW COMMENTS
• 8:10 p.m. Brent Le Count January 4, 2000
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-60 -CARPENTER'S
TECHNOLOGY -The development of a 56,200 square foot industrial building on 4 acres of land
in Subarea 7 (Industrial Park) of the Industrial Area Specific Plan, located on the west side of
Milliken Avenue south of Foothill Boulevard - APN: 229-011-031
Design Parameters: The site is located within the Catellus Master Plan area which was approved
by Planning Commission in April of 1999. The site slopes from north to south at approximately
2 percent. There is an existing industrial building and rail spur to the west of the site. The GATX
Building A is under construction to the east across Milliken Avenue. The building design
incorporates the basic geometric and archway patterns that were established by the GATX
buildings. The anticipated business activity involves large container truck loading which would occur
within the building on the south side. The building will be visually prominent from Foothill Boulevard,
especially while the land to the north remains vacant.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project:
1. Provide the enhanced wall treatment design shown at the northeast corner of the building
on the northwest corner as well given it's visual prominence relative to Foothill Boulevard.
2. Eliminate loading door on east elevation.
• Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
Increase the amount of sandblasted concrete. Suggest providing sandblasted concrete in
most or all of the square features along the parapets.
2. Provide enhanced entry/driveway designs per the Catellus Master Plan provisions including
landscaping, specialized paving and hardscape features, and artwork.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
All roof and ground mounted equipment shall be fully screened from surrounding properties
and streets. This may pose a challenge given that the site is visible from Foothill Boulevard
which is several feet higher in elevation.
2. Screen walls shall not exceed an exposed height of 8 feet visible from surrounding
properties of streets. Suggest sloping ground level up to screen walls to conceal height.
3. Provide at least one tree per 30 linear feet of building wall exposed to public view plus one
tree per 30 linear feet of site perimeter, and one tree per 3 parking spaces to provide shade.
This is a minimum landscaping requirement. Additional trees to enhance the main entry
points and complement the building architecture shall be provided.
• 4. Provide an employee out door eating area including seating and shade. The design of the
outdoor eating area features shall match that established by the GATX project/Catellus
Master Plan.
DRC COMMENTS
DR 99-60 -CARPENTER'S TECHNOLOGY
• January 4, 2000
Page 2
Staff Recommendation: Staff recommends that the Design Review Committee recommend
approval subject to the above comments.
Attachments
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Brent Le Count
The Committee reviewed the project and requested that the project be brought back for further
review in light of the following:
The Committee is not opposed to locating the at-grade loading door on the east (Milliken
Avenue) elevation so long as it can be demonstrated that there will not be excessive outdoor
activity near the door and that a trellis or other overhead type of structure be built in front of
the door to minimize it's appearance. The door shall also be painted to match the adjacent
building wall.
2. The Committee is in favor of providing no landscaping along the west side of the building to
accommodate future rail service to the building and to minimize maintenance burden.
• 3. The applicant agreed to the above items as well as the other items identified by staff.
•
Driveway Entrances
• tr - Primary driveway entrances into individual sites will incorporate the use of enhanced
landscaping, special paving and hardscape features that identify primary entrances into a
site.
z 7'nto.tko'
~~ aaa~to rorat~:
soewux sox 3s opt. rsosc'2a• e~
rnxp -. / ~~% _ ! Loodon F~ -
Lnrsda -
•
o Secondary driveway entrances will incorporate similar features used for the primary
driveways, but in a moderate fashion.
Subarea 7
a Art work or enhanced architectural features on buildings are desirable at major entry
drives leading into sites. _ ,
# Light fixtures and their structural support will be architecturally compatible with the
surrounding buildings. Free-standing light standards will not exceed 25 feet, or the height
of the shortest on-site building. All lighting fixtures along Foothill Boulevard will be
consistent and in keeping with the Foothill Boulevard design theme.
a Hardscape features should be consistent throughout the Corporate Park and designed to
• be compatible with building architectural features.
Rancho Cucamonga Corporate Park Master Plan Page 19
.i
•
•i
7
~O
qr
rSIl~
?i!i
~~+c11~6R' "~
a, ~Il~is~M~
~~ '~'~
_J
. ~. .
11119'IIII~
~~
~s
~~
~~
i~
g~
i~ i JI B
i i d i~ d
I f 1 1 1 ~ E
i i
i i
`
i
i -
° ' '' S'' ~ ~g s
~
~
;~
; 4
?d '
,3i
. i ~1
:p ~ m
i~ ;1i i ( i 3 0
``
1 1!E i i :' '~
1 ~
i d
E ~~'
' :1 ~ O~
A
d
f I
1
i dd
,iE I
-~ } LL.
Q
'
~i Pi '
9
d
d ~` <
E
f
f i ~
~~
;
;~
s
Via,
~,
o. Z
m
®®~
o ~ o c~o o
~
=
~
Z~
oo.
. ~i~
• , , ?;, , i
:
s i ' E ~p
4~ i~~ i 3 i i! s i!
~f
1~
9 ; '~ j ; ; ,. I p; l
ii I! ii {! f !! ~' it ~s j! `f i I
EI ~~ ~~ i i~ i~ ~i .~ !i I~ si if
t~
~9~OM~'a900o d~
P
~ (( ~ b~
d. ~
-.i k ~
i ~ ~' 'I
i Q I
Q
I
[i
~y
F ~ ~~
4 ~~ ~' \ii
1__ ~--~ _
_
f
~~ ~ E
~
~ k a
t alb
~~ii
~ Z uld
~ y
_
~• ~ v
z
6
u
p~~i
3 JOI
c ~~~
i vijE
~-.lt.lan.~.n L.~-lt~tl..~d~11~, pc~...l~
t / IY
.IPi rt J f ~
i3~i sip..
~__!.
~`.. i ~
_ _ ~ i.:::
_ P
~\ j~~- ~ is ~ ~ i
~~_~ Lt.:, o 0
i-::,. p i
^r.
!, :: ~ 4 ~
-~o ~ :.{i: ~T i
~~ ~` ~ ~
:, ~~ ~ ,.-
ratLrc=~ av_~u°-
_ ~ ~ I
1~.~1 ~ Y
i ~
DESIGN REVIEW COMMENTS
• January 4, 2000
PUBLIC COMMENTS
There were no public comments at this time.
ADJOURNMENT
The meeting adjourned at 8:40 p.m.
Respectfully submitted,
Br uller
Secretary
•
DESIGN REVIEW COMMITTEE MEETING
• TUESDAY JANUARY 4, 2000 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
Committee Members: Larry McNiel Pam Stewart Dan Coleman
Alternates: Peter Tolstoy Rich Macias John Mannerino
CONSENT CALENDAR
The following items are expected to be routine and non-controversial. Typically they are items such
as plan revisions prepared in response to discussions at a previous meeting.
7:00 p.m.
(Doug) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-55 -
TRAMMEL CROW & CO. -The development of four industrial buildings totaling
1,021,000 square feet on 48.93 acres of land in the Minimum Impact Heavy
Industrial District (Subarea 9) of the Industrial Area Specific Plan, located on the
south side of Arrow Route, east and west of Milliken Avenue -APN: 229-111-30,
35-42, 44, 46 and 57.
7:10 p.m.
(Warren) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 99-17 -AIR
• TOUCH CELLULAR -The development of a wireless communication facility
consisting of a 65-foot stealth monopole on 3.34 acres of land in the Low Residential
District (2.4 dwelling units per acre), located at 8248 19th Street, Cucamonga County
Water District Well No. 24 -APN: 201-201-40.
PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant
regarding their development application. The following items do not legally require any public
testimony, although the Committee may open the meeting for public input.
7:20 p.m.
(Doug) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-59 -
PANATONNI DEVELPMENT -The development of a 180,000 +/- square foot
industrial building on 7.95 acres of land in General Industrial District (Subarea 10)
of the Industrial Area Specific Plan located at the north west comer of 7th Street and
Toronto Avenue -APN: 209-401-21.
7:40 p.m.
(Rudy) ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT N0.15963 - PKT
PROPERTIES LLC - A residential subdivision of 13 single family lots on 4.37 acres
of land in the Low Residential District (2-4 dwelling units per acre), located south of
Banyan Street, on the east side of Archibald Avenue and on the west side of London
Avenue -APN: 201-251-01. Related files: Development Review 99-42, Tree
• Removal Permit 99-13. Continued from November 30, 1999.
DRC AGENDA
January 4, 2000
Page 2
• (Rudy) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-42 - PKT
PROPERTIES LLC - A design review of building elevations and detailed site plan for
Tentative Tract 15963 consisting of 13 single family lots on 4.37 acres of land in the
Low Residential District (2~ dwelling units per acre), located south of Banyan Street,
on the east side of Archibald Avenue and on the west side of London Avenue -APN:
201-251-01. Related files: Tentative Tract 15963. Continued from November 30,
1999.
8:10 p.m.
(Brent) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-60 -
CARPENTER'S TECHNOLOGY -The development of a 56,200 square foot
industrial building on 4 acres of land in Subarea 7 (Industrial Park) of the Industrial
Area specific Plan, located on the west side of Milliken Avenue south of Foothill
Boulevard -APN: 229-011-031.
PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five
minutes per individual.
ADJOURNMENT
• 1, Mary Lou Gragg, Office Specialist 11 for the City of Rancho Cucamonga, hereby certify that a true,
accurate copy of the foregoing agenda was posted on December 29, 1999, at least 72 hours prior
to the meeting per Government Code Section 54954.2 at 10500 Civic Center Drive, Rancho
Cucamonga.
n
U
CONSENT CALENDAR
7:00 P.M. Doug Fenn January 4, 2000
•
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-55 -TRAMMEL CROW
AND CO. -A request to construct four industrial buildings (Building A - 52,700 square feet, Building
"B" - 215,300 square feet, Building "C" - 421,900 square feet, and Building "D" - 331,100 square
feet) totaling 1,021,000 square feet on 48.93 acres of land in Subarea 9 (Minimum Impact Heavy
Industrial) of the Industrial Specific Plan located on the - APN: 229-111-30, 35-42, 44, 46 and 57
Staff Comments: The Committee reviewed the project at the December 14, 1999 meeting and
accepted the secondary issue changes. However, the Committee rejected the proposed sample
board of the material that will be utilized around the office entrances of the project. The applicant
was informed to bring back a revised sample board to the satisfaction of the Committee to the
January 4, 2000, Design Review meeting.
Design Review Committee Action:
Members Present:
Staff Planner: Doug Fenn
•
•
CONSENT CALENDAR
7:10 p.m. Warren Morelion January 4, 2000
• ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT 99-17 -AIR TOUCH
CELLULAR -The development of a wireless communication facility consisting of a 65-foot stealth
monopole on 3.34 acres of land in the Low Residential District (2-4 dwelling units per acre), located
at 8248 19th Street, Cucamonga County Water District Well No. 24 - APN: 201-201-40.
Desicln Review Committee Action:
Members Present:
Staff Planner: Warren Morelion
•
•
DESIGN REVIEW COMMENTS
lJ
7:20 p.m. Doug Fenn January 4, 2000
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-59 - PANATONNI
DEVELPMENT -The development of a 180,000 +/- square foot industrial building on 7.95 acres
of land in General Industrial District (Subarea 10) of the Industrial Area Specific Plan located at the
north west corner of 7th Street and Toronto Avenue - APN: 209-401-21.
Design Parameters: The site is vacant parcel and contains no significant vegetation. The site
slopes from north to south at an approximately 2 percent. The site is surrounded by industrial
development to the north and across Toronto Avenue to the east, and across 7th Street to the south
and to the west. The proposed building will be used for dual tenant warehouse/distribution activities.
The office portion(s) of the building will front the public right-of-way of 7th Street. The loading area
will front 7th Street but will be screened by a bermed decorative screen wall. The loading area was
designed to face south because of the potential nuisance of the Santa Ana winds. The building
design features a simple design with emphasis on the office portions with articulation, color
variation, and use of sandblasted concrete with blue reflective colored glazing accents.
The building orientation proposes truck loading docks facing 7th Street frontage. The Industrial
Area Specific Plan requires trucks to be screened from public view.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project:
1. Provide stronger vertical relief on the south face of and midway between the office
entryway(s) of the building.
2. Provide sandblasted concrete banding at least 5-feet wide at the top of the building plane
along the south elevation which faces 7th Street.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
The screen gates should be automated to ensure that the gate is open the minimum time
necessary to allow trucks in and out of the loading area.
2. Downspouts on the south face of the building must be inside of the building.
3. The employee plaza areas shall be relocated or designed to be accessible for employees
and not adjacent to the truck loading area and vehicular parking.
Staff Recommendation: Staff recommends that the project be revised and return to Design
Review Committee as a consent calendar item.
Desictn Review Committee Action:
Members Present:
• Staff Planner: Doug Fenn
DESIGN REVIEW COMMENTS
•
7:40 p.m. Rudy Zeledon January 4, 2000
ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT N0.15963 - PKT PROPERTIES LLC
- A residential subdivision of 13 single family lots on 4.37 acres of land in the Low Residential
District (2-4 dwelling units per acre), located south of Banyan Street, on the east side of Archibald
Avenue and on the west side of London Avenue -APN: 201-251-01. Related files: Development
Review 99-42, Tree Removal Permit 99-13. (Cont'd from November 30, 1999)
LLC - A design review of building elevations and detailed site plan for Tentative Tract 15963
consisting of 13 single family lots on 4.37 acres of land in the Low Residential District (2-4 dwelling
units per acre), located south of Banyan Street, on the east side of Archibald Avenue and on the
west side of London Avenue -APN: 201-251-01. Related files: Tentative Tract 15963. (Cont'd from
November 30, 1999)
Background: This item was reviewed by the Committee (McNiel and Fong) on October 19, 1999.
The previous Design Review Comments and action have been attached for reference. At the
October 19 meeting, the applicant was directed to work closely with staff to resolve the major and
secondary issues presented. The Committee felt that all four proposed house design concepts were
very similar and therefore difficult to differentiate.
Staff Comments: The applicant has meet with staff and worked on resolving the design issues.
The applicant has resubmitted a new plan that included the following changes to the proposed
house products, however, staff feels that the applicant has not addressed the Committees concems
• and the major and secondary issues presented at the October 19, 1999 meeting.
1. On house Plans 102 A and B, the right elevations have been enhanced to include exposed
rafter tails along the eaves, a stucco over trim band below the gable pitch roof and a window
with stucco trim over.
2. On house Plan 102A, a pot shelf was added to the front bedroom window.
Staff Recommendations: Staff recommends that the applicant continue to work with staff in
addressing the outstanding issues and return to Design Review Committee for further review.
Attachment
Design Review Committee Action:
Members Present:
Staff Planner: Rudy Zeledon
•
DESIGN REVIEW COMMENTS
8:00 P.M. Rudy Zeledon October 19, 1999
•~ ENVIRONMENTAL ASSESSMENT AND TENTATIVE TRACT 15963 - PKT PROPERTIES LLC -
A residential subdivision of 13 single family lots on 4.37 acres of land in the Low Residential District
(2-4 dwelling units per acre), located south of Banyan Street, on the east side of Archibald Avenue
and on the west side of London Avenue -APN: 201-251-01. Related files: Development Review
99-42 and Tree Removal Permit 99-13.
LLC - A design review of building elevations and detailed site plan for Tentative Tract 15963
consisting of 13 single family lots on 4.37 acres of land in the Low Residential District (2-4 dwelling
units per acre), located south of Banyan Street, on the east side of Archibald Avenue and on the
west side of London Avenue -APN: 201-251-01. Related files: Tentative Tract 15963 and Tree
Removal Permit 99-13.
Desion Parameters: The project site is located on the east side of Archibald Avenue, north of
Lemon Street. The site contains 4.37 acres of vacant land with a few Eucalyptus trees on the
perimeter of the site and an existing single family home on the south west portion on the site. The
site has a natural slope of approximately 2 to 3 percent from north to south and is surround on all
sides by single family homes.
The site is proposed to be developed under the Low Residential Standards of Development Code.
The proposal is for the subdivision of 4.37 acres of land into 13 single family lots. The lots will
range in size from 8,301 square feet to 12,246 square feet, with an average size lot of 10,900
square feet. Two single story house plans are being proposed.
• Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad issues will be on the focus of Committee discussion regarding
this project:
1. House plans 101-A & B appear to be a Spanish style design, however, additional
architectural detail and treatment is needed to enhance the front elevations, which could
include the following detail. (Please see attachment):
a. Enriched eave detail such as exposed rafter tails.
b. Corbel treatment on front windows.
c. Provide decorative quatrefoil element below gable roofs.
d. Enhancement of the front entry way, by extending the covered porch out about 6-feet
on house plan 102-A
2. House plans 102-A & B are designed in a traditional American style. Additional
architectural detail and treatment is also needed in the effort to enhance the front
elevations. The additional architectural treatment and detail shall include the following
(Please see attachment):
a. Enriched eave detail, such as cornice detail.
~.
DRC COMMENTS ,
TT 15963 & DR 99-42 - PKT PROPERTIES LLC
October 19, 1999
Page 2
b. Remove existing stucco wainscot treatment and replace with stone or brick veneer.
3. Provide architectural treatment to all elevations (i.e., 360 degree architecture). Avoid
expanses of blank walls, as shown on the right and left side elevations. Provide articulation
to the building plane to make it visually attractive
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
1. Provide a minimum of 3-foot offset between the one and two garages, to offset wall plane
on all proposed house plans.
Staff Recommendations: Staff recommends the project be revised and returned to Design
Review Committee, as a consent item, prior to scheduling for Planning Commission.
Attachment
Design Review Committee Action:
Members Present: Larry McNiel, Nancy Fong
Staff Planner: Rudy Zeledon
The Committee did not approve the project, and directed the applicant to work closely with staff to
resolve the major and secondary issues presented.
~~~ ~~f
.. _ .. y L , i ' L ~ _ ,
~; .~.:.
A ~~ ,,,~~
. , ~ ~.,
~I
,,
I~-c._y-'~s'~ .
i ~i
,.
~.
_ ~
,~ __.:
• ~.l
L•;
•'~~'.'J4 V~.
DOORS 8~ ENTRY
o ~ p
` C
WINDOW TREATMENT
(,~~~RfR~~ ~ L
D,~~A~~L
HT EAVE
•i
~~~e
,~Ls .~~
UNIQUE DETAILS
PORCHES 8~ BALCONIES
~~~
.%
r
~;=
i~
`~Ic~~ ~i
WINDOW TREATMENT"
PORCHES 8~ BALCONIES
DOORS 8 ENTRY
•
24" OVERHANG AT
EXPOSED RAFTER TAI
-F. IG nvvr ri i ~,
~~~.ry~ ~
~•') ~ \
~-' ~j~
~' a ~~ ~~~
OVERHANGS ~f~ '~~
~~~
ONC.'S' TILE
ROOF PITCH 8~ MATERIAL
a~ SMOOTH STUCCO
•
~'
T
CHIMNEYS
..-~.,
~~
•~~
,.
..
~~~~:.~_~.~aoooaaal ~I ~
EXTERIOR FINISH
DESIGN REVIEW COMMENTS
8:10 p.m. Brent Le Count January 4, 2000
• ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW 99-60 -CARPENTER'S
TECHNOLOGY -The development of a 56,200 square foot industrial building on 4 acres of land
in Subarea 7 (Industrial Park) of the Industrial Area Specific Plan, located on the west side of
Milliken Avenue south of Foothill Boulevard - APN: 229-011-031
Design Parameters: The site is located within the Catellus Master Plan area which was approved
by Planning Commission in April of 1999. The site slopes from north to south at approximately
2 percent. There is an existing industrial building and rail spur to the west of the site. The GATX
Building A is under construction to the east across Milliken Avenue. The building design
incorporates the basic geometric and archway patterns that were established by the GATX
buildings. The anticipated business activity involves large container truck loading which would occur
within the building on the south side. The building will be visually prominent from Foothill Boulevard,
especially while the land to the north remains vacant.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues wilt be the focus of Committee discussion
regarding this project:
Provide the enhanced wall treatment design shown at the northeast corner of the building
on the northwest corner as well given it's visual prominence relative to Foothill Boulevard.
2. Eliminate loading door on east elevation.
• Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
Increase the amount of sandblasted concrete. Suggest providing sandblasted concrete in
most or all of the square features along the parapets.
2. Provide enhanced entry/driveway designs per the Catellus Master Plan provisions including
landscaping, specialized paving and hardscape features, and artwork.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
All roof and ground mounted equipment shall be fully screened from surrounding properties
and streets. This may pose a challenge given that the site is visible from Foothill Boulevard
which is several feet higher in elevation.
2. Screen walls shall not exceed an exposed height of 8 feet visible from surrounding
properties of streets. Suggest sloping ground level up to screen walls to conceal height.
3. Provide at least one tree per 30 linear feet of building wall exposed to public view plus one
tree per 30 linear feet of site perimeter, and one tree per 3 parking spaces to provide shade.
This is a minimum landscaping requirement. Additional trees to enhance the main entry
points and complement the building architecture shall be provided.
• 4. Provide an employee out door eating area including seating and shade. The design of the
outdoor eating area features shall match that established by the GATX projecUCatellus
Master Plan.
DRC COMMENTS
DR 99-60 -CARPENTER'S TECHNOLOGY
January 4, 2000
• Page 2
Staff Recommendation: Staff recommends that the Design Review Committee recommend
approval subject to the above comments.
Attachments
Design Review Committee Action:
Members Present:
Staff Planner: Brent Le Count
LJ
Driveway Entrances
~ Primary driveway entrances into individual sites will incorporate the use of enhanced
landscaping, special paving and hardscape features that identify primary entrances into a
site.
24's~o~
~~ soisis ~ /s~ost 2a• e~
.tarmmdaacalJoRa
•
~ Secondary driveway entrances will incorporate similar features used for the primary
driveways, but in a moderate fashion.
Subarea 7
..
# Art work or enhanced architectural features on buildings are desirable at major entry
drives leading into sites. _
~ Light fixtures and their structural support will be architecturally compatible with the
surrounding buildings. Free-standing light standards will not exceed 25 feet, or the height
of the shortest on-site building. All lighting fixtures along Foothill Boulevard will be
consistent and in keeping with the Foothill Boulevard design theme.
# Hardscape features should be consistent throughout the Corporate Park and designed to
• be compatible with building architectural features.
Rancho Cucamonga Corporate Park Master Plan Page 19
i~
i
ii
M ut
J
~~
of
•
rsp
~~E6
~ ~ •„
r~V ~~VE
j~11`~1~ ~
::
~~ g a a a a~ ~ i ii iii
- 7P' ~ a ~ ~ d a a j 4~ ;
• ' 4 S i ~ . f
i a
! o j ~ '° f
' ~ ~ ~ • 9 7~1~ f { 5
iI !;f
k 1 ? "a
~ d ~ Yi oar} i ! ,(
i ! Ei,
~ f~t ~ 9` ~ C ][ 7 a (9 A a (~ ~ ~ P
~ ~ h 7 9 1! E ~I ~ 4P iki~ C j 9 ~a
< ~ 9 p gg gg11 ~, ff\\ A-
a~ ~ ~ < , -
(; 0 A
d 3 6 : i ~ a ~~ s 3 i i 4
' a
3 ~ 1 )i
aa 99 9 r S AA f !
g 3 ~ t 3 8 { ? 9 ~ ~ S ~1
6~
~pP ~ e
6 ~ 'r =€ ~ f ! 3 ~ Pp l
~ k~s yd$ ~~ ~3s ~I ~~¢~ g~ s~ ~4 ~@ ~f
yp 3~ i~ ~~ .€ jE j{ 3~ j~ ~. ~~"e~ 5F f 4
d F€C~®~~8f®d~~~o Sii
m
~ a~
~o
3~
~ ~
I ~a
Q Q S~
~~,
Q ~
a~ ~~
o=
~~ ~
~w
`~
o ~
a§
~~
~ ~ ~ ~~
~~
8
4
d
~ e
M:
~ z
8
3
sg
T
O
E ~m~
mec
W
`¢
U
O
6 ~
'~s°
~ i~'
z~~~
~ 2a~c
F
a
0
w
~z
^o
N~~
a
z
6 Fes'
U~U€
I~~