HomeMy WebLinkAbout2001/09/18 - Agenda PacketDESIGN REVIEW COMMITTEE MEETING
. ACTION AND MINUTES
TUESDAY SEPTEMBER 18, 2001 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
Committee Members: Larry McNiel Pam Stewart
Alternates: Peter Tolstoy Rich Macias
CONSENT CALENDAR
Nancy Fong
John Mannerino
The following items are expected to be routine and non-controversial. Typically they are items such
as plan revisions prepared in response to discussions at a previous meeting.
7:00 p.m.
(Alan) TREE REMOVAL PERMIT 93-04 AMENDMENT (TENTATIVE TRACT 15540)-VAN
DEALE DEVELOPMENT CORPORATION - A request for authorization to remove
additional trees as part of the development of asingle-family project that was
approved by Planning Commission Resolution No. 93-46 -APN: 207211-01, 18
through 21, 31, 32, and 34.
• PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant
regarding their development application. The following items do not legally require any public
testimony, although the Committee may open the meeting for public input.
7:10 p.m.
(Warren) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEWDRC2001-00423
- MASTER DEVELOPMENT CORPORATION - A request to construct a 72,000
square foot warehouse/distribution building on 4.48 acres of land in the General
Industrial District (Subarea 14), located on the west side of Santa Anita Avenue,
approximately 640 feet north of 4th Street -APN: 229-331-05.
7:30 p.m.
(Doug) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRCDR2001-
00497 - HOGLE-IRELAND - A request to construct a 405,940 square foot industrial
building on 19.24 acres of land in the General Industrial District (Subarea 5), located
west of Hermosa Avenue and north of 6th Street-APN: 209-211-30 and 31. Related
files: General Plan Amendment 00-04 and Development Code Amendment 00-05 and
Development Review DRCDR 00-65
PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five
• minutes per individual.
ADJOURNMENT
CONSENT CALENDAR COMMENTS
• 7:00 p.m. Alan Warren September 18, 2001
TREE REMOVAL PERMIT 93-04 AMENDMENT (TENTATIVE TRACT 15540) -VAN DEALE
DEVELOPMENT CORPORATION -A requestfor authorization to remove additional trees as part of
the development of asingle-family project that was approved by Planning Commission Resolution
No. 93-46-APN: 207211-01, 18 through 21, 31, 32, and 34.
Discussion: The Planning Commission initially approved Tentative Tract 15540 in 1993.
Subsequent extensions of the approval have been authorized subject to compliance with the
conditions of Resolution No. 93-46. The resolution included a detailed description of the Tree
Removal Permit that listed the disposition of each tree during the tract's development. The new
owner, Van Daele Development Corporation, has requested some modifications to the permit. Staff
is bringing the request, along with staffs recommendations to the Design Review Committee for
consideration in amending the previous approval.
The applicant has requested to remove additional trees that are in conflict with the development as
described on the attached letter from Thielmann Engineers date July 9, 2001. Based on review of
the Tree Removal Permit and Feld inspections staff has noted the request to remove 13 additional
trees that were to be retained in the final plan and the retention of 8 additional trees that were
authorized for removal. The difference is minus 5 trees. Staff noted the validity of some of the
requests and makes the following recommendations:
1. It should not significantly affect the final development if tree nos. 17-21 (not particularly
. noteworthy with grading problems), no. 58 (large and too close to the spine street
pavement), no. 151 (structure questionable with large offset limb and within house footprint),
nos. 188 & 189 (not noteworthy with grading problems), and no. 194 (in street location) will
be allowed to be removed for the reasons listed.
2. Staff believes it is premature to remove tree no. 60 (large significant gum may fit into plan
with trimming), no. 190 (its location should be okay with the proposed house plotting), and
no. 202 (multi-trunks parallel to house wall may be able to work around). We recommend
that these trees remain on the list to be saved; at least until construction operations may
reveal significant difficulty in their retention. If so, staff will reevaluate the situation and may
authorize additional tree removals with appropriate tree replacement plantings subject to the
City Planner approval.
Staff Recommendations: Staff recommends that the Design Review Committee approve the
amendments as outlined in items 1. and 2.
Design Review Committee Action:
Members Present: Pam Stewart, Nancy Fong
Staff Planner: Alan Warren
The Committee approved the recommended amendment as outlined in Items 1 and 2 of the Design
Review Comments.
•
DESIGN REVIEW COMMENTS
• 7:10 p.m. Warren Morelion September 18, 2001
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2001-00423 -MASTER
DEVELOPMENT CORPORATION - A request to construct a 72,000 square foot
warehouse/distribution building on 4.48 acres of land in the General Industrial District (Subarea 14),
located on the west side of Santa Anita Avenue, approximately 640 feet north of 4th Street -
APN: 229-331-05.
Desion Parameters: The site is vacant and slopes southerly at approximately 2 percent. The site is
surrounded by vacant land to the north and industrial development to the south and east. To the
west of the site is the Day Creek Channel.
The project consists of a 72,000 square foot warehouse/distribution building that fronts Santa Anita
Avenue. The building is rectangular in shape with offices located at opposite ends, allowing the
potential for multi-tenant use. The offices are 2,280 and 2,520 square feet in size. A truck loading
and parking area is located on the south side of,the building. The loading area is screened from
public view with an 8-foot high screen wall and wrought iron gate.
The building makes a bold and unique design statement. While most industrial "big boxes" use
pop-outs and/or pop-up elements to provide strong office elements, the architect has chosen a
different approach. Although the office areas do indeed project out from the main building mass, the
offices are framed inside a parapet that seems to float on steel support columns that reach the full
two-story height. The one-story offices are designed as glass cubes, which are recessed within the
• framing column elements. The building features painted concrete and sandblasted concrete as the
two primary building materials. The sandblasting is incorporated on all elevations to give the
building a 360-degree architectural theme. Mounded landscaping, and triangular wing walls are
proposed along Santa Anita Avenue.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Secondarv Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
Typically, trees are required on all sides of a building at a rate of 1 tree per 30 linear feet of
elevation. Typically, the trees would be planted within a 5-foot minimum landscape planter.
The applicant has provided 5-foot planters along the north and east sides of the building, but
not along the west side. Instead, the applicant is proposing to expand the landscape planter
along the west property boundary to 10-foot 6 inches, instead of a 5-foot minimum
landscape planter along the building perimeter and a 5-foot minimum landscape planter
along the site perimeter that would normally be required for an industrial project. The Design
Review Committee may wish to discuss whether relocating the planter is an acceptable
option.
2. There appears to be enough room to relocate the first truck-parking stall to the truck loading
area. This can be done by stacking the stall on one of the 4 parallel truck parking stalls in
the loading area, if there is enough room. Removing the stall from in front of office "A"would
allow the office and loading area to be separate. It would also create more opportunity for
additional landscaping in front of the office.
• 3. The truck loading area screen wall height should be increased to 8 feet on the street side
(facing Santa Anita Avenue). The 4-foot high wall is insufficient to screen trucks, particularly
since there is a ramp up to the dock behind wall.
DRC COMMENTS
DRC2001-00423 -MASTER DEVELOPMENT CORPORATION
September 1 S, 2001
• Page 2
4. The vertical painted stripes should be continued around all sides(#4 painted reveals).
Policv Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
Provide tables and benches in outside lunch/rest areas.
Staff Recommendation: Staff recommends that the Design Review Committee approve the project
subject to the modifications as recommended above.
Design Review Committee Action:
Members Present: Pam Stewart, Nancy Fong
Staff Planner: Warren Morelion
The Committee recommended the project be revised subject to the above-mentioned conditions and
the following:
1. Replace triangle shaped tree wells in truck parking/loading area with landscape planters.
Landscape planters shall be a minimum of 5 feet in width. Length and exact location of
planters shall be at the discretion of the applicant, and subject to Design Review Committee
• review.
2. Medium to heavy sandblasting shall be used where sandblasting treatment is proposed on
the building.
3. Since permanent benches have been incorporated in the employee lunch/rest area designs,
the applicant will need to provide only tables.
4. Submit a screening concept for any roof-mounted equipment that may be necessary on the
warehouse/distribution portion of the building in the future.
The Committee recommended the project be brought back for consent calendar on
September 2, 2001, to review screening concept.
•
DESIGN REVIEW COMMENTS
• 7:30 p.m. Doug Fenn September 18, 2001
ENVIRONMENTAL ASSESSMENTAND DEVELOPMENT REVIEW DRCDR2001-00497-HOGLE-
IRELAND - A request to construct a 405,940 square foot industrial building on 19.24 acres of land in
the General Industrial District (Subarea 5), located west of Hermosa Avenue and north of 6th Street
- APN: 209-211-30 and 31. Related files: General Plan Amendment 00-04 and Development Code
Amendment 00-05 and Development Review DRCDR 00-65
Background: the Planning Commission originally approved the project on June 27, 2001, for a
393,880 square foot industrial building (General Motors warehouse tenant). On June 13, 2001, the
Planning Commission reviewed the General Plan and Development Code Amendment portion of the
project, regarding the elimination of 7th street extension along the north portion of the property to
Hermosa Avenue. The Planning Commission recommended to the City Council that the portion of
7th Street along the north boundary of the subject site should be abandoned. At the time of those
actions the applicant intended to use the property to the north for possible future expansion of
another freestanding warehouse building. Since then, a different applicant (Opus West) has
expressed interest in developing to the north of the approved (General Motors). The approved
project is proposed to be modified as follows:
The 100+/- landscaping along the north side of property has been scaled down to 26 feet
wide with gazebos, a 26-foot wide fire lane and 8-foot wide landscape planter adjacent to the
building.
• 2. The square footage has been increased to 405,970 square feet and additional office portion
has been increased. Otherwise, elevations, improvements, site layout and such are
basically the same as was previously approved (see design parameters).
Design Parameters: The site contains two vacant and adjacent rectangular shaped parcels that
total 19.24 acres. A stand of mature Eucalyptus trees along Hermosa Avenue were removed as a
result of the City's Capital Improvement program to install a underground storm drain system along
Hermosa Avenue. There is no significant vegetation on the site. The site is currently cultivated as a
vineyard. The site slopes from north to south at approximately 2 percent. The vacant industrially
designated land surrounds the entire site.
The proposed building is designed to house a single industrial warehouse tenant. The primary
building design and 21,940 square foot office portion of the building will front Hermosa Avenue. The
loading area face is oriented towards the south and does face Hermosa Avenue and staff will
condition that the loading area be screened with an 8-foot high solid screen wall.
The buildings incorporate two primary building materials, however, more sandblasted concrete could
be used (northeast corner of the building). The office portion of the buildings is well articulated with
strong vertical and horizontals changes and recess to the building plane that are carried throughout
and on all side of the buildings. Additionally, the public patio areas are designed to be accessible to
the office entryways of the facilities without conflicting with on-site traffic maneuvering areas. The
color variation of the building is silver chime, white, and cavalier blue accent squares, color scheme
on a primarily concrete tilt-up facade. There is also vertical sandblast concrete element along with
blue reflective colored glazing accents to help create contrast.
• Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
DRC COMMENTS
DRCDR2001-00497 - HOGLE-IRELAND
September 18, 2001
• Page 2
Policv Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
1. No exterior downspouts shall be visible from the adjacent right-of-ways.
Staff Recommendation: Staff recommends that the Design Review Committee approve the project
as submitted.
Design Review Committee Action:
Members Present: Pam Stewart, Nancy Fong
Staff Planner: Doug Fenn
The Committee approved the project and recommended it to Planning Commission.
C~
DESIGN REVIEW COMMENTS
SEPTEMBER 18, 2001
PUBLIC COMMENTS
There were no public comments at this time.
ADJOURNMENT
The meeting adjourned at 8:00 p.m.
Respectfully submitted,
;.
~ ...
Brad Buller
Secretary
DESIGN REVIEW COMMITTEE MEETING
. REVISED AGENDA
TUESDAY SEPTEMBER 18, 2001 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
Committee Members: Larry McNiel Pam Stewart
Alternates: Peter Tolstoy Rich Macias
CONSENT CALENDAR
Nancy Fong
John Mannerino
The following items are expected to be routine and non-controversial. Typically they are items such
as plan revisions prepared in response to discussions at a previous meeting.
7:00 p.m.
(Alan) TREE REMOVAL PERMIT 93-04 AMENDMENT (TENTATIVE TRACT 15540)-VAN
DEALE DEVELOPMENT CORPORATION - A request for authorization to remove
additional trees as part of the development of asingle-family project that was
approved by Planning Commission Resolution No. 93-46 -APN: 207211-01, 18
through 21, 31, 32, and 34.
• PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant
regarding their development application. The following items do not legally require any public
testimony, although the Committee may open the meeting for public input.
7:10 p.m.
(Warren) ENVIRONMENTALASSESSMENTANDDEVELOPMENTREVIEWDRC2001-00423
- MASTER DEVELOPMENT CORPORATION - A request to construct a 72,000
square foot warehouse/distribution building on 4.48 acres of land in the General
Industrial District (Subarea 14), located on the west side of Santa Anita Avenue,
approximately 640 feet north of 4th Street -APN: 229-331-05.
7:30 p.m.
(Doug) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRCDR2001-
00497 - HOGLE-IRELAND - A request to construct a 405,940 square foot industrial
building on 19.24 acres of land in the General Industrial District (Subarea 5), located
west of Hermosa Avenue and north of 6th Street -APN: 209-211-30 and 31. Related
files: General Plan Amendment 00-04 and Development Code Amendment 00-OS and
Development Review DRCDR 00-65
PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five
• minutes per individual.
• DRC AGENDA
September 18, 2001
Page 2
ADJOURNMENT
I, Mary Lou Gragg, Office Specialist 11 for the City of Rancho Cucamonga, hereby certify that a true,
accurate copy of the foregoing agenda was posted on September 13, 2001, at least 72 hours prior
to the meeting per Government Code Section 54954.2 at 10500 Civic Center Drive, Rancho
Cucamonga.
s:
•
•
CONSENT CALENDAR COMMENTS
• 7:00 p.m. Alan Warren September 18, 2001
TREE REMOVAL PERMIT 93-04 AMENDMENT (TENTATIVE TRACT 15540) -VAN DEALE
DEVELOPMENT CORPORATION - A request for authorization to remove additional trees as part of
the development of asingle-family project that was approved by Planning Commission Resolution
No. 93-46 - APN: 207211-01, 18 through 21, 31, 32, and 34.
Discussion: The Planning Commission initially approved Tentative Tract 15540 in 1993.
Subsequent extensions of the approval have been authorized subject to compliance with the
conditions of Resolution No. 93-46. The resolution included a detailed description of the Tree
Removal Permit that listed the disposition of each tree during the tract's development. The new
owner, Van Daele Development Corporation, has requested some modifications to the permit. Staff
is bringing the request, along with staffs recommendations to the Design Review Committee for
consideration in amending the previous approval.
The applicant has requested to remove additional trees that are in conflict with the development as
described on the attached letter from Thielmann Engineers date July 9, 2001. Based on review of
the Tree Removal Permit and Feld inspections staff has noted the request to remove 13 additional
trees that were to be retained in the final plan and the retention of 8 additional trees that were
authorized for removal. The difference is minus 5 trees. Staff noted the validity of some of the
requests and makes the following recommendations:
1. It should not significantly affect the final development if tree nos. 17-21 (not particularly
• noteworthy with grading problems), no. 58 (large and too close to the spine street
pavement), no. 151 (structure questionable with large offset limb and within house footprint),
nos. 188 & 189 (not noteworthy with grading problems), and no. 194 (in street location) will
be allowed to be removed for the reasons listed.
2. Staff believes it is premature to remove tree no. 60 (large significant gum may fit into plan
with trimming), no. 190 (its location should be okay with the proposed house plotting), and
no. 202 (multi-trunks parallel to house wall maybe able to work around). We recommend
that these trees remain on the list to be saved; at least until construction operations may
reveal significant difficulty in their retention. If so, staff will reevaluate the situation and may
authorize additional tree removals with appropriate tree replacement plantings subject to the
City Planner approval.
Staff Recommendations: Staff recommends that the Design Review Committee approve the
amendments as outlined in items 1. and 2.
Design Review Committee Action:
Members Present:
Staff Planner: Alan Warren
PLANS WILL BE AVAILABLE AT THE MEETING.
DESIGN REVIEW COMMENTS
• 7:10 p.m. Warren Morelion September 18, 2001
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2001-00423 -MASTER
DEVELOPMENT CORPORATION - A request to construct a 72,000 square foot
warehouse/distribution building on 4.48 acres of land in the General Industrial District (Subarea 14),
located on the west side of Santa Anita Avenue, approximately 640 feet north of 4th Street -
APN: 229-331-05.
Design Parameters: The site is vacant and slopes southerly at approximately 2 percent. The site is
surrounded by vacant land to the north and industrial development to the south and east. To the
west of the site is the Day Creek Channel.
The project consists of a 72,000 square foot warehouse/distribution building that fronts Santa Anita
Avenue. The building is rectangular in shape with offices located at opposite ends, allowing the
potential for multi-tenant use. The offices are 2,280 and 2,520 square feet in size. A truck loading
and parking area is located on the south side of the building. The loading area is screened from
public view with an 8-foot high screen wall and wrought iron gate.
The building makes a bold and unique design statement. While most industrial "big boxes" use
pop-outs and/or pop-up elements to provide strong office elements, the architect has chosen a
different approach. Although the office areas do indeed project out from the main building mass, the
offices are framed inside a parapet that seems to float on steel support columns that reach the full
two-story height. The one-story offices are designed as glass cubes, which are recessed within the
• framing column elements. The building features painted concrete and sandblasted concrete as the
two primary building materials. The sandblasting is incorporated on all elevations to give the
building a 360-degree architectural theme. Mounded landscaping, and triangular wing walls are
proposed along Santa Anita Avenue.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Secondarv Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
Typically, trees are required on all sides of a building at a rate of 1 tree per 30 linear feet of
elevation. Typically, the trees would be planted within a 5-foot minimum landscape planter.
The applicant has provided 5-foot planters along the north and east sides of the building, but
not along the west side. Instead, the applicant is proposing to expand the landscape planter
along the west property boundary to 10-foot 6 inches, instead of a 5-foot minimum
landscape planter along the building perimeter and a 5-foot minimum landscape planter
along the site perimeter that would normally be required for an industrial project. The Design
Review Committee may wish to discuss whether relocating the planter is an acceptable
option.
2. There appears to be enough room to relocate the first truck-parking stall to the truck loading
area. This can be done by stacking the stall on one of the 4 parallel truck parking stalls in
the loading area, if there is enough room. Removing the stall from in front of office "A"would
allow the office and loading area to be separate. It would also create more opportunity for
additional landscaping in front of the office.
• 3. The truck loading area screen wall height should be increased to 8 feet on the street side
(facing Santa Anita Avenue). The 4-foot high wall is insufficient to screen trucks, particularly
since there is a ramp up to the dock behind wall.
DRC COMMENTS
DRC2001-00423 -MASTER DEVELOPMENT CORPORATION
September 18, 2001
• Page 2
4. The vertical painted stripes should be continued around all sides(#4 painted reveals).
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
Provide tables and benches in outside lunch/rest areas.
Staff Recommendation: Staff recommends that the Design Review Committee approve the project
subject to the modifications as recommended above.
Design Review Committee Action:
Members Present:
Staff Planner: Warren Morelion
n
U
•
DESIGN REVIEW COMMENTS
• 7:30 p.m. Doug Fenn September 18, 2001
ENVIRONMENTAL ASSESSMENTAND DEVELOPMENT REVIEW DRCDR2001-00497-HOGLE-
IRELAND - A request to construct a 405,940 square foot industrial building on 19.24 acres of land in
the General Industrial District (Subarea 5), located west of Hermosa Avenue and north of 6th Street
- APN: 209-211-30 and 31. Related files: General Plan Amendment 00-04 and Development Code
Amendment 00-05 and Development Review DRCDR 00-65
Background: the Planning Commission originally approved the project on June 27, 2001, for a
393,880 square foot industrial building (General Motors warehouse tenant). On June 13, 2001, the
Planning Commission reviewed the General Plan and Development Code Amendment portion of the
project, regarding the elimination of 7th street extension along the north portion of the property to
Hermosa Avenue. The Planning Commission recommended to the City Council that the portion of
7th Street along the north boundary of the subject site should be abandoned. At the time of those
actions the applicant intended to use the property to the north for possible future expansion of
another freestanding warehouse building. Since then, a different applicant (Opus West) has
expressed interest in developing to the north of the approved (General Motors). The approved
project is proposed to be modified as follows:
The 100+/- landscaping along the north side of property has been scaled down to 26 feet
wide with gazebos, a 26-foot wide fire lane and 8-foot wide landscape planter adjacent to the
building.
. 2. The square footage has been increased to 405,970 square feet and additional office portion
has been increased. Otherwise, elevations, improvements, site layout and such are
basically the same as was previously approved (see design parameters).
Design Parameters: The site contains two vacant and adjacent rectangular shaped parcels that
total 19.24 acres. A stand of mature Eucalyptus trees along Hermosa Avenue were removed as a
result of the City's Capital Improvement program to install a underground storm drain system along
Hermosa Avenue. There is no significant vegetation on the site. The site is currently cultivated as a
vineyard. The site slopes from north to south at approximately 2 percent. The vacant industrially
designated land surrounds the entire site.
The proposed building is designed to house a single industrial warehouse tenant. The primary
building design and 21,940 square foot office portion of the building will front Hermosa Avenue. The
loading area face is oriented towards the south and does face Hermosa Avenue and staff will
condition that the loading area be screened with an 8-foot high solid screen wall.
The buildings incorporate two primary building materials, however, more sandblasted concrete could
be used (northeast cornerof the building). The office portion of the buildings is well articulated with
strong vertical and horizontals changes and recess to the building plane that are carried throughout
and on all side of the buildings. Additionally, the public patio areas are designed to be accessible to
the office entryways of the facilities without conflicting with on-site traffic maneuvering areas. The
colorvariation ofthe building is silverchime, white, and cavalierblue accentsquares, colorscheme
on a primarily concrete tilt-up facade. There is also vertical sandblast concrete element along with
blue reflective colored glazing accents to help create contrast.
• Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
DRC COMMENTS
DRCDR2001-00497 - HOGLE-IRELAND
September 18, 2001
Page 2
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
No exterior downspouts shall be visible from the adjacent right-of-ways.
Staff Recommendation: Staff recommends that the Design Review Committee approve the project
as submitted.
Design Review Committee Action:
Members Present:
Staff Planner: Doug Fenn
•
•
DESIGN REVIEW COMMITTEE MEETING
• ACTION AGENDA AND MINUTES
TUESDAY SEPTEMBER 4, 2001 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
70500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
Committee Members: Larry McNiel Pam Stewart
Alternates: Peter Tolstoy ,Rich Macias
CONSENT CALENDAR
Nancy Fong
John Mannerino
The following items are expected to be routine and non-controversial. Typically they are items such
as plan revisions prepared in response to discussions at a previous meeting.
7:00 p.m
(Kirt) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW
DRCDR00-41 -CABOT INDUSTRIAL TRUST -The development of an
830,000 square foot industrial building on 39.96 acres of land in the Industrial
Park District (Subrea 6), located on the south side of 6th Street between Haven
and Hermosa Avenues -APN: 210-072-06, 11, 16, 17 and 35. Related Files:
Industrial Area Specific Plan Amendment 00-02, and Tree Removal Permit
DRC2001-00394.
• PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant
regarding their development application. The following items do not legally require any public
testimony, although the Committee may open the meeting for public input.
7:10 p.m.
(Debra) UNIFORM SIGN PROGRAM DRC2001-00471 -COSTCO WHOLESALE-A
requestfora Uniform Sign Program permitforthe previouslyapproved Costco
Wholesale store (Conditional Use Permit 00-34) in the Industrial Park District
(Subarea 12) located at 11800 4th Street -APN: 229-263-69.
7:30 p.m.
(Doug) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW
DRC2001-00393 - HOGLE-IRELAND, INC. -A request to develop a 111,042
square foot, two-story office building on 12.2 acres of land in the Industrial Park
District (Subarea 7) located at the southwest corner of Foothill Boulevard and
Elm Avenue -APN: 208-352-64 and portions of 62-70.
PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five
minutes per individual.
,~ ADJOURNMENT
• CONSENT CALENDAR COMMENTS
7:00 p.m. Kirt Court September 4, 2001
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRCDR00-41 -CABOT
INDUSTRIAL TRUST -The development of an 830,000 square foot industrial building on 39.96
acres of land in the Industrial Park District (Subrea 6), located on the south side of 6th Street
between Haven and Hermosa Avenues - APN: 210-072-06, 11, 16, 17 and 35. Related Files:
Industrial Area Specific Plan Amendment 00-02, and Tree Removal Permit DRC2001-00394.
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Kirt Coury
The applicant made the revisions per the Committee's direction. The Committee recommended
approval.
•
•
• DESIGN REVIEW COMMENTS
7:10 p.m. Debra Meier September 4, 2001
UNIFORM SIGN PROGRAM DRC2001-00471-COSTCO WHOLESALE-Arequestfora Uniform
Sign Program permit for the previously approved Costco Wholesale store (Conditional Use Permit
00-34) in the Industrial Park District (Subarea 12) located at 118004th Street-APN: 229-263-69.
Desion Parameters: The Costco Wholesale store was approved by the Commission in March 2001.
They are now in the plan check process, and as a part of required conditions of approval, they have
submitted an application for a Uniform Sign Program. The store is 148,663 square feet in area with
a freestanding gasoline-dispensing island. Due to the nature of the project, the Uniform Sign
Program is being utilized in order to address the unique aspects of the structure as well as the
specific user.
The Sign Ordinance typically allows one wall sign per building face, a maximum of 3 per business.
The wall signs shall not exceed 10 percent of the building face, for a maximum area of 150 square
feet per sign. Monument signs are also permitted along the perimeter streets based on the
following: one per street frontage with a maximum sign area of 24 square feet and a maximum
height of 8 feet; or two per street frontage with a maximum sign area of 24 square feet and a
maximum height of 6 feet (signs must be separated by a minimum of 300 feet); or one per street
frontage of 500 feet or more with a maximum sign area of 48 square feet and 8 feet maximum
height. Each business within the Uniform Sign Program is further limited to a maximum of three
signs, in any combination of wall and/or monument. In addition, the Sign Ordinance prohibits the
• use of signage on the pump island canopy and only allows on the wall of a building (which this gas
station does not have)
Unlike a typical gas station, Costco has proposed using wall signs exclusively; no monument pricing
signs are proposed. As a membership club, they are exempt from law requiring pricing signs along
the street. The Uniform Sign Program proposes fourwall-mounted signs on the Costco building, and
four gasoline station canopy signs. The building mounted signs are proposed on the south, east,
and west elevations (179.66 square feet each), and over the entrance on the southeast corner of the
building (125 square feet). signage has also been proposed on each face of the gasoline station
canopy at 26.34 square feet each.
Maior Issues: The proposed Uniform Sign Program is not consistent with the City Sign Ordinance
with respect to the total number, location and size of signs. No Variance application was submitted.
Total Number of Signs Proposed - As noted in the background information above, the City
Sign Ordinance allows three signs (in any combination of wall and/or monument) per
business. Costco has proposed four Costco Wholesale wall signs and no monument signs.
Staff Recommendation: Comply with Sign Ordinance limitation of three wall signs by eliminating
one of the wall signs elevations.
1. Size of individual wall-mounted signs - As noted on the background information above, the
City Sign Ordinance allows wall-mounted monument signs that are a maximum of 10 percent
of building face, not to exceed 150 square feet in area. Costco has proposed four wall-
mounted signs that are 179.66 square feet in area (7 feet 0 inches high by 25 feet 8 inches
• wide).
Staff Recommendation: Revise to comply with Sign Ordinance limitation of 150 square feet. All
other "big box" retailers in the City have complied, including the existing Costco store.
DRC COMMENTS
DRC2001-00471 - COSTCO WHOLESALE
September 4, 2001
• Page 2
Gasoline station canopy signs -Sign Ordinance prohibits the use of signage on the canopy
of a gasoline service station. The Uniform Sign Program proposes a Costco gasoline sign
on each of the four elevations.
Staff Recommendation: Provide a monument sign on 4th Street that identifies the "COSTCO
GASOLINE" and eliminate all canopy signs. Since this is a membership only gas station, there is no
need for multiple signs.
1: Pricing Signs -none are proposed, and presumably, the only pricing information would be
on each pump. The Sign Ordinance limits pump signs to 2 square feet of non-pricing
informational text, including "such items as self serve, full serve, air, water, cashier, and shall
be non-illuminated."
Staff Recommendation: Approve as proposed. Since only Costco members can use this station,
staff does not believe a pricing monument sign along the street is needed.
Secondary Issues: The Uniform Sign Program also includes provision for on-site directional signs
that are used strategically on the site for identification of the following: RECEIVING, ENTRANCE
and EXIT, TIRE SALES and TIRE INSTALLATION areas. The Entrance/Exit signs are 18 inches in
height; the remaining directional signs are 21 inches in height. All are strategically located as noted
on the attached elevations.
• Staff Recommendation: The directional signage is used only as needed to identify the specific use
areas of the building. Staff recommends that the TIRE SALES AND INSTALLATION (combined into
a single sign copy) be placed at the location where TIRE INSTALLATION is presently proposed; and
eliminate the separate TIRE SALES identification signage. Staff recommends that the Committee
approve the use of all other directional signage as proposed.
Attachments
Design Review Committee Action:
Member Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Debra Meier
The Committee made the following action with respect to signage for Costco:
The total number of signs used to identify Costco shall not exceed three as required by the
Sign Ordinance.
2. The overall size of each building mounted sign shall not exceed 150 square feet as required
by the Sign Code.
3. The Costco gasoline station will not be permitted to use signage on the canopy. The
applicant may instead utilize a monument sign on 4th Street, or other alternative that is
consistent with the Sign Code.
s
• DESIGN REVIEW COMMENTS
7:30 p.m. Doug Fenn September 4, 2001
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2001-00393 - HOGLE-
IRELAND, INC. - A request to develop a 111,042 square foot, two-story office building on 12.2
acres of land in the Industrial Park District (Subarea 7) located at the southwest corner of Foothill
Boulevard and Elm Avenue - APN: 208-352-64 and portions of 62-70.
Background: The Planning Commission previously approved Conditional Use Permit 97-13
(Wohl/Rancho Partners) for a shopping center of 116,394 square feet on this property. That
approval will expire on August 27, 2002.
Site and Surrounding Land Use Parameters: The site is leveled with a slight grade to the south and
with an old vineyard that is still under viticulture production. No unique physical characteristics are
evident on the site. Mimi's Cafe borders the subject site on the west. Just north of the site, across
Foothill Avenue, is a portion of the Terra Vista Town Center shopping center. Vacant property is to
the east of Elm Avenue and across the street to the south of Eucalyptus Street.
Design Parameter Overview and Issues: The applicant proposes to develop atwo-story
professional office building for Mercury General Corporation (an insurance company) and a future
restaurant site (yet to be determined). The office building will front along Foothill Avenue, and is
over 600 feet in length. The master planned future restaurant will be located at the southwest
corner of Foothill Boulevard and Elm Avenue. The proposed project will be more than adequately
• developed with 658 parking spaces, while the project requires only 529 spaces. The applicant
intends to submit a future lot line adjustment to adjust the property line to the west to accommodate
33 additional parking spaces for the existing Mimi's Cafe.
The building design has various textures, split-face block, wood siding, metal mullion accents, and
cement shingle roofing. Architectural design is a prairie style with an alpine undertone. Additional
features and elements that were recommended by staff include stronger enhanced amounts of
textures, colonnades facades, and tower elements. Seven cupolas rising above the weathered
cement fiber shingle roof accentuate the building. The larger central cupola is an architectural
enhancement and will be interiorly lit to create a soft glow during the evening hours. The outer
cupolas are functional, providing ventilation to the building. The roof pitch is at a ratio of
approximately 5:12 and will conceal all roof top equipment.
On the south, elevation retaining walls provide a raised terrace garden with walkways connecting to
employee lounge area. A water fountain and an elaborate hardscape at the main entrance heighten
the primary entryway. The future restaurant will be under a separate Design Review process.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion. Staff will meet with the applicant on August 27, 2001, to discuss some of the referenced
items below. What is listed as major and/or secondary issues could be addressed before the
Design Review meeting.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project:
• 1. The roof mass must be minimized and stronger architectural detail must be incorporated at the
primary entryway of the building.
DRC COMMENTS
DRC2001-00393 - HOGLE IRELAND, INC.
September 4, 2001
• ~ Page 2
2. Split-face block should be changed to stacked stone, brick, or river rock. This includes the
base of the proposed monument sign.
3. Sidewalk on the west side of the property, south of the office building, should be extended
west to provide a connection to Mimi's Cafe.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
Project intersection at the southwest corner of Foothill Boulevard and Elm Avenue must be
designed with the approved concept of the Foothill Boulevard -Historic Route 66 concept as
approved by the City.
2. Public art must be provided and visible from Foothill Boulevard, and must reflect either
vineyard or Route 66 theme. Suggested location for the art is the main entry plaza (replacing
orwithin fountain) on the south side of the building. Provide a double doorfoyerdesign forthe
north entryways to mitigate seasonal high winds.
Staff Recommendation: Staff recommends that the project be revised in light of the above
comments and brought back for further review or as a consent item.
• Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Doug Fenn
The applicant made changes per staffs recommendations. The Committee approved the project
per the applicant's design changes as recommended by staff.
•
DESIGN REVIEW COMMENTS
• September 4, 2001
PUBLIC COMMENTS
There were no public comments at this time.
ADJOURNMENT
The meeting adjourned at 8:30 p.m.
Respe ly sub ' ted
Brad Buller
Secretary
u
•
DESIGN REVIEW COMMITTEE MEETING
TUESDAY SEPTEMBER 4. 2001 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
Committee Members: Larry McNiel Pam Stewart
Alternates: Peter Tolstoy Rich Macias
CONSENT CALENDAR
Nancy Fong
John Mannerino
The following items are expected to be routine and non-controversial. Typically they are items such
as plan revisions prepared in response to discussions at a previous meeting.
7:00 p.m
(Kirt) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW
DRCDR00-41 -CABOT INDUSTRIAL TRUST -The development of an
830,000 square foot industrial building on 39.96 acres of land in the Industrial
Park District (Subrea 6), located on the south side of 6th Street between Haven
and Hermosa Avenues-APN: 210-072-06, 11, 16, 17 and 35. Related Files:
Industrial Area Specific Plan Amendment 00-02, and Tree Removal Permit
DRC2001-00394.
• PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant
regarding their development application. The following items do not legally require any public
testimony, although the Committee may open the meeting for public input.
7:10 p.m
(Debra) UNIFORM SIGN PROGRAM DRC2001-00471 -COSTCO WHOLESALE-A
requestforaUniform Sign Program permitforthe previouslyapproved Costco
Wholesale store (Conditional Use Permit 00-34) in the Industrial Park District
(Subarea 12) located at 11800 4th Street-APN: 229-263-69.
7:30 p.m.
(Doug)
DRC2001-00393 - HOGLE-IRELAND. INC. - A request to develop a 111,042
square foot, two-story office building on 12.2 acres of land in the Industrial Park
District (Subarea 7) located at the southwest corner of Foothill Boulevard and
Elm Avenue -APN: 208-352-64 and portions of 62-70.
PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five
• minutes per individual.
ADJOURNMENT
1, Melissa Andrewin, Office Specialist 11 for the City of Rancho Cucamonga, hereby certify that a true,
accurate copy of the foregoing agenda was posted on August 30, 2001, at least 72 hours priorto the
meeting per Government Code Section 54954.2 at 10500 Civic Center Drive, Rancho Cucamonga.
. ~~?~~,d~ LC/f~ie~ts~
C~
J
•
• CONSENT CALENDAR COMMENTS
7:00 p.m. Kirt Court September 4, 2001
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRCDR00-41 -CABOT
INDUSTRIAL TRUST -The development of an 830,000 square foot industrial building on 39.96
acres of land in the Industrial Park District (Subrea 6), located on the south side of 6th Street
between Haven and Hermosa Avenues - APN: 210-072-06, 11, 16, 17 and 35. Related Files:
Industrial Area Specific Plan Amendment 00-02, and Tree Removal Permit DRC2001-00394.
•
•
• DESIGN REVIEW COMMENTS
7:10 p.m. Debra Meier September 4, 2001
UNIFORM SIGN PROGRAM DRC2001-00471-COSTCO WHOLESALE-A requestfora Uniform
Sign Program permit for the previously approved Costco Wholesale store (Conditional Use Permit
00-34) in the Industrial Park District (Subarea 12) located at 118004th Street-APN: 229-263-69.
Design Parameters: The Costco Wholesale store was approved by the Commission in March 2001.
They are now in the plan check process, and as a part of required conditions of approval, they have
submitted an application for a Uniform Sign Program. The store is 148,663 square feet in area with
a freestanding gasoline-dispensing island. Due to the nature of the project, the Uniform Sign
Program is being utilized in order to address the unique aspects of the structure as well as the
specific user.
The Sign Ordinance typically allows one wall sign per building face, a maximum of 3 per business.
The wall signs shall not exceed 10 percent of the building face, for a maximum area of 150 square
feet per sign. Monument signs are also permitted along the perimeter streets based on the
following: one per street frontage with a maximum sign area of 24 square feet and a maximum
height of 8 feet; or two per street frontage with a maximum sign area of 24 square feet and a
maximum height of 6 feet (signs must be separated by a minimum of 300 feet); or one per street
frontage of 500 feet or more with a maximum sign area of 48 square feet and 8 feet maximum
height. Each business within the Uniform Sign Program is further limited to a maximum of three
signs, in any combination of wall and/or monument. In addition, the Sign Ordinance prohibits the
use of signage on the pump island canopy and only allows on the wall of a building (which this gas
• station does not have)
Unlike a typical gas station, Costco has proposed using wall signs exclusively; no monument pricing
signs are proposed. As a membership club, they are exempt from law requiring pricing signs along
the street. The Uniform Sign Program proposes fourwall-mounted signs on the Costco building, and
four gasoline station canopy signs. The building mounted signs are proposed on the south, east,
and west elevations (179.66 square feet each), and over the entrance on the southeast comer of the
building (125 square feet). signage has also been proposed on each face of the gasoline station
canopy at 26.34 square feet each.
Maior Issues: The proposed Uniform Sign Program is not consistent with the City Sign Ordinance
with respect to the total number, location and size of signs. No Variance application was submitted.
Total Number of Signs Proposed -As noted in the background information above, the City
Sign Ordinance allows three signs (in any combination of wall and/or monument) per
business. Costco has proposed four Costco W holesale wall signs and no monument signs.
Staff Recommendation: Comply with Sign Ordinance limitation of three wall signs by eliminating
one of the wall signs elevations.
2. Size of individual wall-mounted signs - As noted on the background information above, the
City Sign Ordinance allows wall-mounted monument signs that are a maximum of 10 percent
of building face, not to exceed 150 square feet in area. Costco has proposed four wall-
mounted signs that are 179.66 square feet in area (7 feet 0 inches high by 25 feet 8 inches
• wide).
Staff Recommendation: Revise to comply with Sign Ordinance limitation of 150 square feet. All
other "big box" retailers in the City have complied, including the existing Costco store.
DRC COMMENTS
DRC2001-00471 -COSTCO WHOLESALE
September 4, 2001
• Page 2
3. Gasoline station canopy signs -Sign Ordinance prohibits the use of signage on the canopy
of a gasoline service station. The Uniform Sign Program proposes a Costco gasoline sign
on each of the four elevations.
Staff Recommendation: Provide a monument sign on 4th Street that identifies the "COSTCO
GASOLINE" and eliminate all canopy signs. Since this is a membership only gas station, there is no
need for multiple signs.
4. Pricing Signs -none are proposed, and presumably, the only pricing information would be
on each pump. The Sign Ordinance limits pump signs to 2 square feet of non-pricing
informational text, including "such items as self serve, full serve, air, water, cashier, and shall
be non-illuminated."
Staff Recommendation: Approve as proposed. Since only Costco members can use this station,
staff does not believe a pricing monument sign along the street is needed.
Secondary Issues: The Uniform Sign Program also includes provision for on-site directional signs
that are used strategically on the site for identification of the following: RECEIVING, ENTRANCE
and EXIT, TIRE SALES and TIRE INSTALLATION areas. The Entrance/Exit signs are 18 inches in
height; the remaining directional signs are 21 inches in height. All are strategically located as noted
on the attached elevations.
• Staff Recommendation: The directional signage is used only as needed to identify the specific use
areas of the building. Staff recommends that the TIRE SALES AND INSTALLATION (combined into
a single sign copy) be placed at the location where TIRE INSTALLATION is presently proposed; and
eliminate the separate TIRE SALES identification signage. Staff recommends that the Committee
approve the use of all other directional signage as proposed.
Attachments
Design Review Committee Action:
Member Present:
Staff Planner: Debra Meier
•
•
DESIGN REVIEW COMMENTS
7:30 p.m. Doug Fenn September 4, 2001
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2001-00393- HOGLE-
IRELAND, INC. - A request to develop a 111,042 square foot, two-story office building on 12.2
acres of land in the Industrial Park District (Subarea 7) located at the southwest corner of Foothill
Boulevard and Elm Avenue - APN: 208-352-64 and portions of 62-70.
Background: The Planning Commission previously approved Conditional Use Permit 97-13
(Wohl/Rancho Partners) for a shopping center of 116,394 square feet on this property. That
approval will expire on August 27, 2002.
Site and Surrounding Land Use Parameters: The site is leveled with a slight grade to the south and
with an old vineyard that is still under viticulture production. No unique physical characteristics are
evident on the site. Mimi's Cafe borders the subject site on the west. Just north of the site, across
Foothill Avenue, is a portion of the Terra Vista Town Center shopping center. Vacant property is to
the east of Elm Avenue and across the street to the south of Eucalyptus Street.
Desion Parameter Overview and Issues: The applicant proposes to develop atwo-story
professional office building for Mercury General Corporation (an insurance company) and a future
restaurant site (yet to be determined). The office building will front along Foothill Avenue, and is
over 600 feet in length. The master planned future restaurant will be located at the southwest
corner of Foothill Boulevard and Elm Avenue. The proposed project will be more than adequately
• developed with 658 parking spaces, while the project requires only 529 spaces. The applicant
intends to submit a future lot line adjustment to adjust the property line to the west to accommodate
33 additional parking spaces for the existing Mimi's Cafe.
The building design has various textures, split-face block, wood siding, metal mullion accents, and
cement shingle roofing. Architectural design is a prairie style with an alpine undertone. Additional
features and elements that were recommended by staff include stronger enhanced amounts of
textures, colonnades facades, and tower elements. Seven cupolas rising above the weathered
cement fiber shingle roof accentuate the building. The larger central cupola is an architectural
enhancement and will be interiorly lit to create a soft glow during the evening hours. The outer
cupolas are functional, providing ventilation to the building. The roof pitch is at a ratio of
approximately 5:12 and will conceal all roof top equipment.
On the south, elevation retaining walls provide a raised terrace garden with walkways connecting to
employee lounge area. A water fountain and an elaborate hardscepe at the main entrance heighten
the primary entryway. The future restaurant will be under a separate Design Review process.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion. Staff will meet with the applicant on August 27, 2001, to discuss some of the referenced
items below. What is listed as major and/or secondary issues could be addressed before the
Design Review meeting.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project:
• 1. The roof mass must be minimized and stronger architectural detail must be incorporated at the
primary entryway of the building.
DRC COMMENTS
DRC2001-00393 - HOGLE IRELAND, INC.
September 4, 2001
• Page 2
2. Split-face block should be changed to stacked stone, brick, or river rock. This includes the
base of the proposed monument sign.
3. Sidewalk on the west side of the property, south of the office building, should be extended
west to provide a connection to Mimi's Cafe.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
Project intersection at the southwest comer of Foothill Boulevard and Elm Avenue must be
designed with the approved concept of the Foothill Boulevard -Historic Route 66 concept as
approved by the City.
2. Public art must be provided and visible from Foothill Boulevard, and must reflect either
vineyard or Route 66 theme. Suggested location for the art is the main entry plaza (replacing
or within fountain) on the south side of the building. Provide a double doorfoyerdesign forthe
north entryways to mitigate seasonal high winds.
Staff Recommendation: Staff recommends that the project be revised in light of the above
comments and brought back for further review or as a consent item.
n
LJ
n
U