HomeMy WebLinkAbout2003/02/18 - Agenda PacketDESIGN REVIEW COMMITTEE MEETING
ACTION AGENDA AND MINUTES
TUESDAY FEBRUARY 18, 2003 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
Committee Members: Larry McNiel Pam Stewart
Alternates: Peter Tolstoy Rich Macias
CONSENT CALENDAR
Dan Coleman
The following items are expected to be routine and non-controversial. Typically they are items such
as plan revisions prepared in response to discussions at a previous meeting.
NO ITEMS HAVE BEEN SCHEDULED
•
PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant
regarding their development application. The following items do not legally require any public
testimony, although the Committee may open the meeting for public input.
7:00 p.m
(Rick) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2002-00697
- A.J. Portelesi- A request to construct 6 industrial buildings ranging in size from
8,270 square feet to 13,774 square feet and totaling 67,419 square feet on 5.14 acres
of land in the General Industrial zoning district (Subarea 13), located on the northwest
corner of Charles Smith Avenue and 6th Street-APN: 229-262-30 and 32. Related
File: GPA 2002-00003.
PUBLIC COMMENTS
ADJOURNMENT
This is the time and place for the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five
minutes per individual.
DESIGN REVIEW COMMENTS
. 7:00 p.m. Rick Fisher February 18, 2003
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2002-00697 - A.J.
Portelesi- A request to construct 6 industrial buildings ranging in size from 8,270 square feet to
13,774 square feet and totaling 67,419 square feet on 5.14 acres of land in the General Industrial
zoning district (Subarea 13), located on the northwest corner of Charles Smith Avenue and
6th Street - APN: 229-262-30 and 32. Related File: GPA 2002-00003.
Background: This project was reviewed on January 14, 2003, and the Committee asked for
changes to the Site Plan and Elevations (see attached Design Review Committee minutes).
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project.
1. None. The applicant has worked with staff to redesign the Site Plan layout; particularly
Buildings B, C, D, and F, to create a logical circulation flow and use the land more efficiently.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues.
• 1. Building Elevations: a) Provide a 2-inch 'V' grove reveal line between the smooth concrete
finish and the sandblast finish to provide dimension, b) Provide spandrel glass around the
office areas in addition to the vision glass on intersection facing comers of Buildings A, C,
and E
2. Landscape Plan: a) Additional trees are required to be installed at various locations on-site
and will be verified when landscape plans are submitted for building plan check, b) Dense
clusters of trees will be required at the corners of the project and also at each driveway
entrance to provide prominence to these areas.
Staff Recommendation: Staff recommends the Design Review Committee recommend approval
of the project to the Planning Commission and that the above-mentioned items be conditions of
approval.
Attachments
Design Review Committee Action:
Members Present: Larry McNiel, Dan Coleman
Staff Planner: Rick Fisher
The Committee originally reviewed this project on January 14, 2003, and directed the applicant to
make certain revisions to the Site Plan and building elevations. The applicant redesigned the Site
Plan and eliminated one building, which allowed for greater on-site circulation. The building
. elevations were also changed to provide a more traditional industrial appearance.
DRC COMMENTS
DRC2002-00697 - A.J.PORTELESI
• February 18, 2003
Page 2
The Committee reviewed the revised plans and had the following comments: the applicant was
directed to provide spandrel glass at the corners of the following buildings facing the street
intersections: Building A north corner, Building C south comer, Building E southwest comer. In
addition, a 2-inch reveal line will be placed between the smooth concrete finish and the sandblasted
finish to provide dimension. Finally, additional trees will be installed at various locations on-site and
will be verified when Landscape Plans are submitted for building plan check.
The Committee recommended approval of the project to the Planning Commission.
Both the applicant and the architect praised staff and the City's review process. They indicated they
were glad to make the changes to their design requested by staff and the Committee because they
know the City has a vision that will guarantee a return on their investment.
•
•
DESIGN REVIEW COMMENTS
• 7:40 p.m. Rick Fisher January 14, 2003
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2002-00697 - A.J.
PORTELESI- A request to construct 7 industrial buildings ranging in size from 9,870 square feet to
13,045 square feet and totaling 78,677 square feet on 5.14 acres of land in Subarea 13 (General
Industrial) of the Industrial District, located on the northwest corner of Charles Smith Avenue and
6th Street - APN: 229-262-30, and 32. Related File: GPA 2002-00003.
Design Parameters: The 5.14-acre project site is triangular in shape and is surrounded by streets
on three sides. The 7 buildings will range in size from 9,870 square feet to 13,045 square feet and
will be used for manufacturing and warehouse activities. The office portion of the buildings will front
the public right-of-ways of Rochester Avenue, Charles Smith Avenue, and 6th Street. The loading
areas are oriented toward the interior of the site behind screen walls and security gates. Each
building will contain an office area and mezzanine with a small warehouse area in the rear that will
contain surface level loading doors. The perimeter of the site will be landscaped to screen the
parking areas from view. A grape vineyard will be planted at the comer of Charles Smith Avenue
and Rochester Avenue to commemorate the area's history as awine-producing region.
The exterior of the concrete tilt-up buildings will contain a variety of accent features. The office
entrances will contain green glass storefront doors and windows, which will be surrounded by a zinc
metal panel finish. The walls facing public streets will contain a 3/a-inch sandblasted texture finish
and will be designed to look like mountains. Other features include a zinc cap finish above the
parapet walls and decorative screen walls with wrought iron security gates to screen the loading
• areas from view. The building footprints will be staggered and off set from one another to break up
the linear appearance that is common to industrial buildings. Surrounding land uses include the
I-15 Freeway to the east, vacant land to the south, and warehouses to the north and west.
A General Plan Amendment was submitted to delete a proposed on/off ramp of the southbound
I-15 Freeway. The General Plan Amendment is scheduled for Planning Commission review on
January 22, 2003.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project:
1. This application is contingent upon approval of the related request, General Plan
Amendment GPA 2002-00003, to delete the southbound on/off ramp of the I-15 freeway
across the property.
2. The parking summary table is incorrect. Eliminate the warehouse calculation (1/1000) from
the summary table and provide the correct number of required parking spaces.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
1. The minimum width of drive aisles leading to loading areas shall be 28 feet.
• 2. Dimensions of drive aisles, parking spaces, and landscape planters shall comply with
standards of the Development Code. .
.~
DRC COMMENTS
DRC2002-00697 - A.J. PORTELESI
• January 14, 2003
Page 2
3. The proposed parapet walls will not completely screen the rooftop air conditioning
equipment from view of the I-15 Freeway. Provide a section drawing that shows a
secondary roof-mounted screening device that is aesthetically compatible with the exterior of
the buildings and completely screens the equipment from view.
Staff Recommendation: Staff recommends the above-mentioned items be addressed on revised
plans and returned to the Committee for further review and approval prior to Planning Commission
Review.
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Rick Fisher
The Committee directed the applicant to make certain specified changes to the Site Plan and
building elevations and review the changes with staff prior to scheduling the project for a future
Design Review Committee meeting.
•
•
DESIGN REVIEW COMMENTS
• FEBRUARY 18, 2003
PUBLIC COMMENTS
There were no public comments at this time.
ADJOURNMENT
The meeting adjourned at 7:30 p.m.
Respectfully submitted,
/r
-~ J/ ~
Bra u er
Secretary
•
•
DESIGN REVIEW COMMITTEE MEETING
TUESDAY FEBRUARY 18, 2003 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
Committee Members: Pam Stewart
Alternates: Peter Tolstoy Rich Macias
CONSENT CALENDAR
Dan Coleman
Larry McNiel
The following items are expected to be routine and non-controversial. Typically they are items such
as plan revisions prepared in response to discussions at a previous meeting.
NO ITEMS HAVE BEEN SCHEDULED
PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant
regarding their development application. The following items do not legally require any public
testimony, although the Committee may open the meeting for public input.
7:00 p.m
(Rick) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEWDRC2002-00697
- A.J. Portelesi- A request to construct 6 industrial buildings ranging in size from
8,270 square feet to 13,774 square feet and totaling 67,419 square feet on 5.14 acres
of land in the General Industrial zoning district (Subarea 13), located on the northwest
corner of Charles Smith Avenue and 6th Street-APN: 229-262-30 and 32. Related
File: GPA 2002-00003.
PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five
minutes per individual.
ADJOURNMENT
1, Mary Lou Gragg, Office Specialist 11 for the City of Rancho Cucamonga, hereby certify that a true,
accurate copy of the foregoing agenda was posted on February 13, 2003 at least 72 hours prior to
the meeting per Government Code Section 54954.2 at 10500 Civic Center Drive, Rancho
Cucamonga.
•
DESIGN REVIEW COMMENTS
• 7:00 p.m. Rick Fisher February 18, 2003
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2002-00697 - A.J.
Portelesi- A request to construct 6 industrial buildings ranging in size from 8,270 square feet to
13,774 square feet and totaling 67,419 square feet on 5.14 acres of land in the General Industrial
zoning district (Subarea 13), located on the northwest corner of Charles Smith Avenue and
6th Street-APN: 229-262-30 and 32. Related File: GPA 2002-00003.
Background: This project was reviewed on January 14, 2003, and the Committee asked for
changes to the Site Plan and Elevations (see attached Design Review Committee minutes).
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project.
1. None. The applicant has worked with staff to redesign the Site Plan layout; particularly
Buildings B, C, D, and F, to create a logical circulation flow and use the land more efficiently.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues.
• 1. Building Elevations: a) Provide a 2-inch reveal line between the smooth concrete finish and
the sandblast finish to provide dimension, b) The smooth concrete finish shall be offset
approximately 3 inches from the sandblast, c) Provide spandrel glass around the office
areas in addition to the vision glass.
2. Landscape Plan: a) Additional trees are required to be installed at various locations on-site
and will be verified when landscape plans are submitted for building plan check, b) Dense
clusters of trees will be required at the corners of the project and also at each driveway
entrance to provide prominence to these areas.
Staff Recommendation: Staff recommends the Design Review Committee recommend approval
of the project to the Planning Commission and that the above-mentioned items be conditions of
approval. .
Attachments
Design Review Committee Action:
Members Present:
Staff Planner: Rick Fisher
•
DESIGN REVIEW COMMENTS
• 7:40 p.m. Rick Fisher January 14, 2003
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2002-00697 - A.J.
PORTELESI- A request to construct 7 industrial buildings ranging in size from 9,870 square feet to
13,045 square feet and totaling 78,677 square feet on 5.14 acres of land in Subarea 13 (General
Industrial) of the Industrial District, located on the northwest corner of Charles Smith Avenue and
6th Street - APN: 229-262-30, and 32. Related File: GPA 2002-00003.
Design Parameters: The 5.14-acre project site is triangular in shape and is surrounded by streets
on three sides. The 7 buildings will range in size from 9,870 square feet to 13,045 square feet and
will be used for manufacturing and warehouse activities. The office portion of the buildings will front
the public right-of-ways of Rochester Avenue, Charles Smith Avenue, and 6th Street. The loading
areas are oriented toward the interior of the site behind screen walls and security gates. Each
building will contain an office area and mezzanine with a small warehouse area in the rear that will
contain surface level loading doors. The perimeter of the site will be landscaped to screen the
parking areas from view. A grape vineyard will be planted at the corner of Charles Smith Avenue
and Rochester Avenue to commemorate the area's history as swine-producing region.
The exterior of the concrete tilt-up buildings will contain a variety of accent features. The office
entrances will contain green glass storefront doors and windows, which will be surrounded by a zinc
metal panel finish. The walls facing public streets will contain a 3/<-inch sandblasted texture finish
and will be designed to look like mountains. Other features include a zinc cap finish above the
parapet walls and decorative screen walls with wrought iron security gates to screen the loading
• areas from view. The building footprints will be staggered and off set from one another to break up
the linear appearance that is common to industrial buildings. Surrounding land uses include the
I-15 Freeway to the east, vacant land to the south, and warehouses to the north and west.
A General Plan Amendment was submitted to delete a proposed on/off ramp of the southbound
I-15 Freeway. The General Plan Amendment is scheduled for planning Commission review on
January 22, 2003.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion. ~.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project:
1. This application is contingent upon approval of the related request, General Plan
Amendment GPA 2002-00003, to delete the southbound on/off ramp of the I-15 freeway
across the property.
2. The parking summarytable is incorrect. Eliminate the warehouse calculation (1/1000) from
the summary table and provide the correct number of required parking spaces.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
The minimum width of drive aisles leading to loading areas shall be 28 feet.
• 2. Dimensions of drive aisles, parking spaces, and landscape planters shall comply with
standards of the Development Code.
DRC COMMENTS
DRC2002-00697 - A.J. PORTELESI
January 14, 2003
• Page 2
3. The proposed parapet walls will not completely screen the rooftop air conditioning
equipment from view of the I-15 Freeway. Provide a section drawing that shows a
secondary roof-mounted screening device that is aesthetically compatible with the exterior of
the buildings and completely screens the equipment from view.
Staff Recommendation: Staff recommends the above-mentioned items be addressed on revised
plans and returned to the Committee for further review and approval prior to Planning Commission
Review.
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Rick Fisher
The Committee directed the applicant to make certain specified changes to the Site Plan and
building elevations and review the changes with staff prior to scheduling the project for a future
Design Review Committee meeting.
•
C~
•
DESIGN REVIEW COMMITTEE MEETING
ACTION AGENDA AND MINUTES
TUESDAY FEBRUARY 4, 2003 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
•
Committee Members: Larry McNiel Pam Stewart
Alternates: Peter Tolstoy Rich Macias
CONSENT CALENDAR
Dan Coleman
The following items are expected to be routine and non-controversial. Typicallytheyare items such
as plan revisions prepared in response to discussions at a previous meeting.
7:00 p.m
(Kirt) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2002-
00951 - NORTHTOW N HOUSING DEVELOPMENT CORPORATION-A requestto
construct single-family residences on 9 in-fill lots in the Low Residential District)
2-4 dwelling units per acre) within the Northtown area along Main Street, Reid
Avenue, Feron Boulevard, and Hermosa Avenue -APN: 209-085-16, 209-063-04,
209-061-15, 21, 34, 36, and 37. Related Files: Tentative Parcel Map SUBTPM16057,
Tentative Parcel Map SUBTPM16058, Variance DRC2002-00950, Tree Removal
Permit DRC2003-00060.
PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant
regarding their development application. The following items do not legally require any public
testimony, although the Committee may open the meeting for public input.
7:10 p.m
(Kirt) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT DRC2002-
00519-FOUNTAINHEAD SHRUGGED-A requestto constructtwo tenant buildings
including a 1,500 square foot coffee/food service restaurant and adrive-thru
(Starbucks) with a 1,300 square foot retail building on .42 acres of land in the
Regional Related Commercial District, located on the northeast corner of Foothill
Boulevard and the I-15 northbound freeway on-ramp -APN: 227-211-27. Related
Files: Preliminary Review DRC2002-00282 (Starbucks).
7:30 p.m
(Doug) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2002-
00606 - PANATTONI DEVELOPMENT - A request to construct a 472,720 square
foot industrial building on 19.67 acres of land in the General Industrial District
(Subarea 5), located west of Hermosa Avenue and north of 6th Street -APN: 209-
211-13, 209-211-16 and 17.
l J
DRC AGENDA
February 4, 2002
Page 2
•
7:50 p.m.
(Emily) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT DRC2002-
00815-ALTA LOMA SCHOOL DISTRICT -A request to construct a 21,812 square
foot two-story office building, a 15,380 square foot one-story maintenance and
operations building, and on-site bus maintenance/fueling facilities, on 4.35 acres of
land, located on the north side of Base Line Road, between Hellman Avenue and
Amethyst Avenue, in the Office Professional and General Commercial Districts -
APN: 202-091-45 and 202-091-46.
8:10 p.m
(Emily) DEVELOPMENT REVIEW DRC2001-00743 - FONG - A request to construct a
- 4,560 square foot single-family hillside home, located at the northeast corner of
Haven Avenue and Deer Canyon Drive in the Very Low Residential District -
APN: 1074-331-09.
PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five
minutes per individual.
ADJOURNMENT
L J
DESIGN REVIEW COMMENTS
• 7:00 p.m. Kirt Coury February 4, 2003
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2002-00951 -
NORTHTOW N HOUSING DEVELOPMENT CORPORATION -A request to construct single-family
residences on 9 in-fill lots in the Low Residential District) 2-4 dwelling units per acre) within the
Northtown area along Main Street, Reid Avenue, Feron Boulevard, and Hermosa Avenue -
APN: 209-085-16, 209-063-04, 209-061-15, 21, 34, 36, and 37. Related Files: Tentative Parcel
Map SUBTPM16057, Tentative Parcel Map SUBTPM16058, Variance DRC2002-00950, Tree
Removal Permit DRC2003-00060.
Project Background: This is Phase 4 of the Northtown Housing Development Corporation affordable
housing in-fill program. Northtown Housing Development Corporation's goal is to construct
affordable single-family homes to provide needed housing. The proposed house designs are
identical to Phases 1, 2, and 3, which were approved by the Planning Commission on March 8,
1995, January 14, 1998, and November 2l, 2000. The homes received an Award of Excellence in
the Planning Commission's design award program.
Staff Recommendation: Staff recommends approval of the project.
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Kirt Coury
The Committee recommended approval of the project.
•
DESIGN REVIEW COMMENTS
• 7:10 p.m. Kirt Coury February 4, 2003
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT DRC2002-00519 -
FOUNTAINHEAD SHRUGGED - A request to construct two tenant buildings including a
1,500 square foot coffee/food service restaurant and adrive-thru (Starbucks) with a 1,300 square
foot retail building on .42 acres of land in the Regional Related Commercial District, located on the
northeast corner of Foothill Boulevard and the I-15 northbound freeway on-ramp - APN: 227-211-
27. Related Files: Preliminary Review DRC2002-00282 (Starbucks).
Design Parameters: The site is located at the northeast corner of Foothill Boulevard and the
I-15 northbound freeway on-ramp. The lot is .42 acres, and is currently vacant, relatively flat, and
covered in native grasses. The site is bounded to the north and west by the I-15 freeway, to the
east by Sacred Heart Church, and to the south by Foothill Boulevard. Access to the site will be
shared with Sacred Heart Church.
The project will include a 2,800 square foot building. The two tenant building includes a
1,500 square foot coffee/food service restaurant with adrive-thru (Starbucks), and a 1,300 square
foot retail building (tenant undetermined at this time). The architecture is similar to Foothill Market
Place, and includes a plaster with light sand finish, a tower element, tube steel and wood trellis
treatments, and decorative wall file insets.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
• Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
1. Increase the wood trellis structure proposed over the drive-thru lane along the east elevation
to match the size of the trellis proposed along the northwest elevation.
2. Move the proposed landscape finger identified along the south parking lot line (adjacent
Foothill Boulevard) over approximately 4 parking spaces to the west to line up directly in
front of the proposed building entrance.
3. The wood brackets of the rooftop tower structure should be substantial in size to avoid a
spindly appearance or the number of brackets increased.
4. Use 3-inch thick tubular steel for proposed trellis treatment.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
The proposed rooftop equipment shall be architecturally screened by the building parapet
(i.e. increase the south parapet to fully screen visibility of equipment from Foothill
Boulevard). It should be noted that all roof- and ground- mounted equipment should be fully
screened from public view.
Staff Recommendation:
• Staff recommends approval of the project with incorporation of the identified modifications.
DRC COMMENTS
DRC2002-00519 -FOUNTAINHEAD SHRUGGED
February 4, 2003
• Page 2
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Kirt Coury
The Committee recommended approval subject to the deletion of secondary condition no. 2.
•
•
DESIGN REVIEW COMMENTS
• 7:30 p.m. Doug Fenn February 4, 2003
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2002-00606 -
PANATTONI DEVELOPMENT-A request to construct a 472,720 square foot industrial building on
19.67 acres of land in the General Industrial District (Subarea 5), located west of Hermosa Avenue
and north of 6th Street - APN: 209-211-13, 209-211-16 and 17
Design Parameters: The 19.67-acre site is vacant and is bordered by Biane winery and
manufacturing to the north of the subject site. To the east across Hermosa Avenue are industrial
uses, which have been recently developed (Paragon development) and one currently under
construction (Panatonni development). To the south is the General Motors warehouse/distribution
industrial user, and to the west is vacant land. There are no mature trees or other significant
vegetation on the site.
Site development will occur in a single phase. No tenant(s) have been identified for the project. The
building will have 2 office sections, that will total 12,000 square feet and option office section, and
each of the 2 office sections have it's own outdoor employee eating area. The office portions of the
building are richly defined with details, glazing and raised architectural features to clearly delineate
primary entry points. The portion of the building that fronts onto Hermosa Avenue are richly
landscaped and architectural detailing faces the street.
The building incorporates three primary materials. The building will be concrete tilt-up painted in a
four-color scheme. Sandblasting and slate file are added as a second primary material to accent the
• office portion of the building. The project incorporates a blue reflective glazing at the office areas to
create a contrast. The building has strong 360-degree architectural details.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project:
Staff is pleased with the outcome of the project. The applicant has addressed all of staff's
major issues.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
A faux elevated sandblasted entry and/or vertical element should be developed along the
east side of the building because the buildings visibility is along Hermosa Avenue.
Additionally, the potential office, and proposed office portion at the corners of the building,
should have at least one more vertical sandblasted adjacent to their perspective truck
loading areas.
2. Provide river rock areas along streetscape to conserve water.
3. If the optional office portion of the building were to be developed then a "trellis" covered
employee-eating area should be developed in concert with the other two outdoor employee-
eating areas. (The applicant does propose a concrete patio area, just need to clarify that it
• must be trellised)
4. All wall-mounted light fixtures shall have light pointed downwards. Wall-pak type of light
fixtures that produce glare must be avoided.
DRC COMMENTS
DRC2002-00606 - PANATTONI DEVBELOPMENT
February 4, 2003
• Page 2
Policv Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
Paint roll-up doors and service doors to match main building colors.
Staff Recommendation: Staff recommends approval subject to the revisions noted above.
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Doug Fenn
The Committee recommended approval as presented.
•
•
DESIGN REVIEW COMMENTS
• 7:50 p.m. Emily W imer February 4, 2003
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT DRC2002-00815 - ALTA
LOMA SCHOOL DISTRICT - A request to construct a 21,812 square foottwo-story office building, a
15,380 square foot one-story maintenance and operations building, and on-site bus
maintenance/fueling facilities, on 4.35 acres of land, located on the north side of Base Line Road,
between Hellman and Amethyst Avenues, in the Office Professional and General Commercial
Districts - APN: 202-091-45 and 202-091-46.
Design Parameters: The project is located on the'north side of Base Line Road just west of
Amethyst Avenue. Surrounding land uses include the 80-foot wide Rails-to-Trails easement, which
runs along the southeast property line in anorth/south diagonal. To the west side of the property is
an office professional park that includes the school district main offices. To the north are
single-family homes separated with a new 6-foot high block wall. Homes are a sensitive noise
receptor; therefore, the applicant was required to provide a noise study. The study assumes the roll-
up doors to the maintenance building, that face the residences, will be kept closed. If the
maintenance facility effects the decibel level and impacts the neighbors, a condition shall be placed
to keep the roll-up doors closed at all times. Staff has requested additional analysis.
The design includes two buildings for the Alta Loma School District Operations. The first building
will be used for Administration, School Board Meetings, and the District's business functions. The
two-story Administration building fronts on Base Line Avenue and includes an entrance to the north.
The one-story Maintenance and Operations Building is situated to the northern portion of the lot with
• one entrance facing south and an employee parking area and entrance from Amethyst Avenue. The
maintenance building will provide on-site fueling and warehouse storage.
The site also includes a bus terminal, which will provide 16 bus parking spaces and a small area for
maintenance of the buses. The maintenance garage will have two bus bays and activitywill include
vehicle washing, fueling, and maintenance of the 16 buses. The activity will include minor tune-up;
however, no minor major engine repair, welding or engine rebuilding is proposed at the site. Alta
Loma School District has contracted with another facility for off-site repair and engine rebuilding.
The elevations of both of the buildings were reviewed by the Planning Commissioners at the
Pre-Application workshop. The Commissioners generally agreed that the architecture style of the
building was acceptable. The elevations for the Administration Building include plaster exterior,
standing seam metal roof as an accent, and cornice trim. The maintenance building design is
similar in architectural design, however itincorporates-split face block with a fluted concrete reveal
line, which surrounds the entire building. As an accent, plaster walls will be used at the main
entrance as well as the decorative cornice that follows the main style of the administration building.
The site is surrounded by chain link fencing, which will be replaced with wrought iron fencing. In
addition to the employee parking, the applicant has provided a trail rest stop that will be made of
decomposed granite base, wrought iron surrounding the area and curb. The City will provide all
other improvements at the time of Trail implementation.
n
LJ
DRC COMMENTS
DRC2002-000815- ALTA LIMA SCHOOL DISTRICT
February 4, 2003
• Page 2
Secondary issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
1. Design project and grading to not encroach into 80-foot corridor for Pacific Electric Inland
Empire Trail. Sections E-E and F-F indicate that slopes and/or retaining walls may encroach
into Trail.
2. Additional landscaping shall be provided along the north property line as a buffer with the
residences. Trees and shrubs shall be added to the landscape palette. Trees shall be a
minimum of 24-inch box, 10 feet on center.
3. Continue the theme of Cajeput Tree along the west planter area. The Conceptual
Landscape Plan illustrates the trees along a portion of the western property boundary.
Extend the theme to the front of the property toward Base Line Road.
4. Provide dense evergreen hedgerow to screen bus storage yard and maintenance facilities
from Pacific Electric Inland Empire Trail. Use non-toxic plant materials.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
1. A 6-foot decorative block wall should be constructed along northerly property line adjoining
• residential properties. The District should make a good faith effort to work with adjoining
property owners to provide s single wall at their common property line.
2. All open view fencing should be decorative metal (not chain link as shown).
Staff Recommendation: Staff recommends the Committee approve the project subject to the
above Secondary issues.
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Emily Wimer
The Committee recommended approval of the project, subject to all the conditions in Committee
Review. The landscape buffer condition was modified to provide a minimum of 15-inch box trees
adequate to screen the north property line. The City Planner will review this condition once trees are
on-site.
1
•
DESIGN REVIEW COMMENTS
• 8:10 p.m. Emily Wimer February 4, 2003
DEVELOPMENT REVIEW DRC2001-00743 -JAMES FONG - A request to construct a 4,560
square foot single-family hillside home, located at the northeast corner of Haven Avenue and Deer
Canyon Drive in the Very Low Residential District - APN: 1074-331-09.
Design Parameters:. The applicant is proposing to construct a 9,406 square foot single-family
residence on Lot 7 of Tract 16250-1 in Deer Canyon Estates. The lot size of the property is
45,200 square feet; nearly double the size of the average lots in Deer Canyon. The proposed house
includes a main dwelling area of 5,064 square feet and the second story consisting of 2,873 square
feet; hence, there are one and two-story elements. All elevations are well articulated, and wall
planes have been embellished using a variety of elements such as window surrounds, divided light
windows, columns, and balustrades. The house is primarily stucco with architectural stone detail
and limestone detail on the columns.
The two-story home with atucked-under garage/basement has three distinct levels. The main level
consists of bedrooms, kitchen, library, office, maid's quarters and a great room. The upper level
consists of the master bedroom, master bath, three additional bedrooms and a study. The lower
level consists of a four-car garage storage and laundry area. The maximum height limit is 30 in the
hillside area. To mitigate the height of the proposed home, the applicant has placed the one-story
garage on the side elevation of the home that would be most susceptible to the sloped terrain. Also
concrete planter areas have been added to the exterior elevations, which is typical of Deer Canyon
homes.
• The proposed home has significant movement proposed in the footprint, resulting in strong
articulation in the main story. A stepped entryway is featured on the South (front) elevation as two
columns, which graduate to the second story of the home. Concrete pilasters and balustrades are
repeated in all four elevations, as well as large overhangs, which add movement to the expansive
elevations. A 360-degree architecture is accomplished with the following accent features on the
elevations: decorative window moldings, divided light windows, and stucco trim on all four chimneys.
Architectural stone veneer is proposed along with concrete planters, which run along the south,
east, and west elevations. Stucco treatment is proposed on all four sides and illustrated in the
architectural style.
The house is setback over 75 feet from curb face along Deer Canyon Drive. The lot, located at the
end of the cul-de-sac on Deer Canyon Drive. The proposed two story with tucked under
garage/basement is designed with a minimum of 4 stepped pads that have a total elevation change
of 10 feet over native terrain with a grade change of 9 feet across the pad of the house. The
proposed house and garage proposes a vertical cut of 8 feet and a 9 foot interior wall from the
garage to the Cabana Room, and has combined earthwork quantities of cut to 1560 cubic yards and
fill to equal 440. Under Hillside Development Regulations, projects, which exceed the 5-foot
cuUfill maximum OR 1,500 cubic yard minimum, require review by the Design Review
Committee and by the Planning Commission. The purpose of this review is to ensure that
the proposed project meets the intent of the Hillside Regulations.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
• regarding this project:
DRC COMMENTS
DRC2001-00743 - FONG
• February 4, 2003
Page 2
1. Grading: The primary issue is whether the proposed project substantially meets the intent of
the Hillside Development Ordinance. The purpose of the Hillside Ordinance is to minimize
the impacts of grading and preserve the natural topography. The major concerns are the
quantities of earthwork, primarily comprised of 1560 cubic yards of cut and, 440 cubic yards
of fill. In contrast to conventional "flat pad" design, staff believes the proposed house
meets the guidelines of the Hillside Development Ordinance by minimizing the effects of
grading and reducing earthwork quantities through the following techniques:
Multiple stepped building pads that permit the house to follow the natural terrain
• Leaving a significant portion of the lot as natural grade (no grading).
Cutting the westerly portion into the slope
Contouring of slopes
Use of variable gradients to soften their appearance.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
1. Provide additional trim, or other accent feature required with 360-degree architecture on the
east elevation of the four-car garage.
• Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
1. Sloped area of 2:1 or greater between 5 and 8 feet in vertical height must be landscaped
and irrigated for erosion control per Standard Conditions.
2. Retaining walls are limited to a height of 4 feet in the Hillside area. Terraced retaining walls
are strongly recommended as mitigation for large slopes in the front and rear of property.
Staff Recommendation: Staff recommends approval subject to secondary issues being addressed
prior to Planning Commission.
Design Review Committee Action:
Members Present: Larry McNiel, Pam Stewart, Dan Coleman
Staff Planner: Emily Wimer
The Committee recommended approval of the project, subject to adding additional trim or other
accent feature on the east elevation of the four-car garage.
•
DESIGN REVIEW COMMENTS
• FEBRUARY 4, 2003
PUBLIC COMMENTS
There were no public comments at this time.
ADJOURNMENT
The meeting adjourned at 8:30 p.m.
Respecttully submitted,
Brad Buller
Secretary
•
•
• DESIGN REVIEW COMMITTEE MEETING
TUESDAY FEBRUARY 4, 2003 7:00 P.M.
RANCHO CUCAMONGA CIVIC CENTER
RAINS ROOM
10500 CIVIC CENTER DRIVE
RANCHO CUCAMONGA
w
Committee Members: Pam Stewart
Alternates: Peter Tolstoy Rich Macias
CONSENT CALENDAR
Dan Coleman
Larry McNiel
The following items are expected to be routine and non-controversial. Typicallythey are items such
as plan revisions prepared in response to discussions at a previous meeting.
7:00 p.m
(Kirt) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2002-
00951 - NORTHTOWN HOUSING DEVELOPMENT CORPORATION -A requestto
construct single-family residences on 9 in-fill lots in the Low Residential District)
2-4 dwelling units per acre) within the Northtown area along Main Street, Reid
Avenue, Feron Boulevard, and Hermosa Avenue -APN: 209-085-16, 209-063-04,
209-061-15, 21, 34, 36, and 37. Related Files: Tentative Parcel Map SUBTPM16057,
Tentative Parcel Map SUBTPM16058, Variance DRC2002-00950, Tree Removal
Permit DRC2003-00060.
PROJECT REVIEW ITEMS
This is the time and place for the Committee to discuss and provide direction to an applicant
regarding their development application. The following items do not legally require any public
testimony, although the Committee may open the meeting for public input.
7:10 p.m
(Kirt) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT DRC2002-
00519 - FOUNTAINHEAD SHRUGG ED - A request to construct two tenant buildings
including a 1,500 square foot coffee/food service restaurant and adrive-thru
(Starbucks) with a 1,300 square foot retail building on .42 acres of land in the
Regional Related Commercial District, located on the northeast corner of Foothill
Boulevard and the I-15 northbound freeway on-ramp -APN: 227-211-27. Related
Files: Preliminary Review DRC2002-00282 (Starbucks).
7:30 p.m
(Doug) ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2002-
00606 - PANATTONI DEVELOPMENT - A request to construct a 472,720 square
foot industrial building on 19.67 acres of land in the General Industrial District
(Subarea 5), located west of Hermosa Avenue and north of 6th Street -APN: 209-
211-13, 209-211-16 and 17.
•
w
DRC AGENDA
February 4, 2002
Page 2
7:50 p.m.
(Emily) ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT DRC2002-
00815 -ALTA LOMA SCHOOL DISTRICT- A request to construct a 21,812 square
foot two-story office building, a 15,380 square foot one-story maintenance and
operations building, and on-site bus maintenance/fueling facilities, on 4.35 acres of
land, located on the north side of Base Line Road, between Hellman Avenue and
Amethyst Avenue, in the Office Professional and General Commercial Districts -
APN: 202-091-45 and 202-091-46.
8:10 p.m
(Emily) DEVELOPMENT REVIEW DRC2001-00743 - FONG - A request to construct a
4,560 square foot single-family hillside home, located at the northeast corner of
Haven Avenue and Deer Canyon Drive in the Very Low Residential District -
APN: 1074-331-09.
PUBLIC COMMENTS
This is the time and place for the general public to address the Committee. State law prohibits the
Committee from addressing any issue not previously included on the Agenda. The Committee may
receive testimony and set the matter for a subsequent meeting. Comments are limited to five
minutes per individual.
ADJOURNMENT
I, Mary Lou Gragg, Office Specialist II for the City of Rancho Cucamonga, hereby certi/y that a true,
accurate copy of the foregoing agenda was posted on January 30, 2003 at least 72 hours prior to
the meeting per Government Code Section 54954.2 at 10500 Civic Center Drive, Rancho
Cucamonga.
•
DESIGN REVIEW COMMENTS
• 7:00 p.m. Kirt Coury February 4, 2003
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2002-00951 -
NORTHTOW NHOUSING DEVELOPMENT CORPORATION -A requestto construct single-family
residences on 9 in-fill lots in the Low Residential District) 2-4 dwelling units per acre) within the
Northtown area along Main Street, Reid Avenue, Feron Boulevard, and Hermosa Avenue -
APN: 209-085-16, 209-063-04, 209-061-15, 21, 34, 36, and 37. Related Files: Tentative Parcel
Map SUBTPM16057, Tentative Parcel Map SUBTPM16058, Variance DRC2002-00950, Tree
Removal Permit DRC2003-00060.
Project Background: This is Phase 4 of the Northtown Housing Development Corporation affordable
housing in-fill program. Northtown Housing Development Corporation's goal is to construct
affordable single-family homes to provide needed housing. The proposed house designs are
identical to Phases 1, 2, and 3, which were approved by the Planning Commission on March 8,
1995, January 14, 1998, and November 21, 2000. The homes received an Award of Excellence in
the Planning Commission's design award program.
Staff Recommendation: Staff recommends approval of the project
Desion Review Committee Action:
Members Present:
• Staff Planner: Kirt Coury
•
DESIGN REVIEW COMMENTS
7:10 p.m. Kirt Coury February 4, 2003
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT DRC2002-00519 -
FOUNTAINHEAD SHRUGGED - A request to construct two tenant buildings including a
1,500 square foot coffee/food service restaurant and adrive-thru (Starbucks) with a 1,300 square
foot retail building on .42 acres of land in the Regional Related Commercial District, located on the
northeast corner of Foothill Boulevard and the I-15 northbound freeway on-ramp -APN: 227-211-
27. Related Files: Preliminary Review DRC2002-00282 (Starbucks).
Design Parameters: The site is located at the northeast corner of Foothill Boulevard and the
-15 northbound freeway on-ramp. The lot is .42 acres, and is currently vacant, relatively flat, and
covered in native grasses. The site is bounded to the north and west by the I-15 freeway, to the
east by Sacred Heart Church, and to the south by Foothill Boulevard. Access to the site will be
shared with Sacred Heart Church.
The project will include a 2,800 square foot building. The two tenant building includes a
1,500 square foot coffee/food service restaurant with adrive-thru (Starbucks), and a 1,300 square
foot retail building (tenant undetermined at this time). The architecture is similar to Foothill Market
Place, and includes a plaster with light sand finish, a tower element, tube steel and wood trellis
treatments, and decorative wall file insets.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
• Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
1. Increase the wood trellis structure proposed over the drive-thru lane along the east elevation
to match the size of the trellis proposed along the northwest elevation.
2. Move the proposed landscape finger identified along the south parking lot line (adjacent
Foothill Boulevard) over approximately 4 parking spaces to the west to line up directly in
front of the proposed building entrance.
3. The wood brackets of the rooftop tower structure should be substantial in size to avoid a
spindly appearance or the number of brackets increased.
4. Use 3-inch thick tubular steel for proposed trellis treatment.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
The proposed rooftop equipment shall be architecturally screened by the building parapet
(i.e. increase the south parapet to fully screen visibility of equipment from Foothill
Boulevard). It should be noted that all roof- and ground- mounted equipment should be fully
screened from public view.
Staff Recommendation:
• Staff recommends approval of the project with incorporation of the identified modifications.
DRC COMMENTS
DRC2002-00519 -FOUNTAINHEAD SHRUGGED
February 4, 2003
• Page 2
Design Review Committee Action:
Members Present:
Staff Planner: Kirt Coury
l J
r1
LJ
DESIGN REVIEW COMMENTS
• 7:30 p.m. Doug Fenn February 4, 2003
ENVIRONMENTAL ASSESSMENT AND DEVELOPMENT REVIEW DRC2002-00606 -
PANATTONIDEVELOPMENT-Arequest to construct a 472,720 square foot industrial building on
19.67 acres of land in the General Industrial District (Subarea 5), located west of Hermosa Avenue
and north of 6th Street - APN: 209-211-13, 209-211-16 and 17
Desion Parameters: The 19.67-acre site is vacant and is bordered by Biane winery and
manufacturing to the north of the subject site. To the east across Hermosa Avenue are industrial
uses, which have been recently developed (Paragon development) and one currently under
construction (Panatonni development). To the south is the General Motors warehouse/distribution
industrial user, and to the west is vacant land. There are no mature trees or other significant
vegetation on the site.
Site development will occur in a single phase. No tenant(s) have been identified forthe project. The
building will have 2 office sections, that will total 12,000 square feet and option office section, and
each of the 2 office sections have it's own outdoor employee eating area. The office portions of the
building are richly defined with details, glazing and raised architectural features to clearly delineate
primary entry points. The portion of the building that fronts onto Hermosa Avenue are richly
landscaped and architectural detailing faces the street.
The building incorporates three primary materials. The building will be concrete tilt-up painted in a
four-color scheme. Sandblasting and slate file are added as a second primary material to accent the
• office portion of the building. The project incorporates a blue reflective glazing at the office areas to
create a contrast. The building has strong 360-degree architectural details.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
regarding this project:
Staff is pleased with the outcome of the project. The applicant has addressed all of staff's
major issues.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
1. A faux elevated sandblasted entry and/or vertical element should be developed along the
east side of the building because the buildings visibility is along Hermosa Avenue.
Additionally, the potential office, and proposed office portion at the corners of the building,
should have at least one more vertical sandblasted adjacent to their perspective truck
loading areas.
2. Provide river rock areas along streetscape to conserve water.
3. If the optional office portion of the building were to be developed then a "trellis" covered
employee-eating area should be developed in concert with the other two outdoor employee-
eatingareas. (The applicant does propose a concrete patio area, just need to clarify that it
• must be trellised) ,
4. All wall-mounted light fixtures shall have light pointed downwards. Wall-pak type of light
fixtures that produce glare must be avoided.
DRC COMMENTS
DRC2002-00606 - PANATTONI DEVBELOPMENT
February 4, 2003
• Page 2
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
Paint roll-up doors and service doors to match main building colors.
Staff Recommendation: Staff recommends approval subject to the revisions noted above.
Design Review Committee Action:
Members Present:
Staff Planner: Doug Fenn
•
C 1
DESIGN REVIEW COMMENTS
• 7:50 p.m. Emily Wimer February 4, 2003
ENVIRONMENTAL ASSESSMENT AND CONDITIONAL USE PERMIT DRC2002-00815 -ALTA
LOMA SCHOOL DISTRICT - A request to construct a 21,812 square foottwo-story office building, a
15,380 square foot one-story maintenance and operations building, and on-site bus
maintenance/fueling facilities, on 4.35 acres of land, located on the north side of Base Line Road,
between Hellman and Amethyst Avenues, in the Office Professional and General Commercial
Districts - APN: 202-091-45 and 202-091-46.
Design Parameters: The project is located on the north side of Base Line Road just west of
Amethyst Avenue. Surrounding land uses include the 80-foot wide Rails-to-Trails easement, which
runs along the southeast property line in anorth/south diagonal. To the west side of the property is
an office professional park that includes the school district main offices. To the north are
single-family homes separated with a new 6-foot high block wall. Homes are a sensitive noise
receptor; therefore, the applicant was required to provide a noise study. The study assumes the roll-
up doors to the maintenance building, that face the residences, will be kept closed. If the
maintenance facility effects the decibel level and impacts the neighbors, a condition shall be placed
to keep the roll-up doors closed at all times. Staff has requested additional analysis.
The design includes two buildings for the Alta Loma School District Operations. The first building
will be used for Administration, School Board Meetings, and the District's business functions. The
two-story Administration building fronts on Base Line Avenue and includes an entrance to the north.
The one-story Maintenance and Operations Building is situated to the northern portion of the lot with
• one entrance facing south and an employee parking area and entrance from Amethyst Avenue. The
maintenance building will provide on-site fueling and warehouse storage.
The site also includes a bus terminal, which will provide 16 bus parking spaces and a small area for
maintenance of the buses. The maintenance garage will have two bus bays and activitywill include
vehicle washing, fueling, and maintenance of the 16 buses. The activity will include minortune-up;
however, no minor major engine repair, welding or engine rebuilding is proposed at the site. Alta
Loma School District has contracted with another facility for off-site repair and engine rebuilding.
The elevations of both of the buildings were reviewed by the Planning Commissioners at the
Pre-Application workshop. The Commissioners generally agreed that the architecture style of the
building was acceptable. The elevations for the Administration Building include plaster exterior,
standing seam metal roof as an accent, and cornice trim. The maintenance building design is
similar in architectural design, however itincorporates-split face block with a fluted concrete reveal
line, which surrounds the entire building. As an accent, plaster walls will be used at the main
entrance as well as the decorative cornice that follows the main style of the administration building.
The site is surrounded by chain link fencing, which will be replaced with wrought iron fencing. In
addition to the employee parking, the applicant has provided a trail rest stop that will be made of
decomposed granite base, wrought iron surrounding the area and curb. The City will provide all
other improvements at the time of Trail implementation.
n
t.J
•
DRC COMMENTS
DRC2002-000815- ALTA LIMA SCHOOL DISTRICT
February 4, 2003
Page 2
Secondary issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
Design project and grading to not encroach into 80-foot corridor for Pacific Electric Inland
Empire Trail. Sections E-E and F-F indicate that slopes and/or retaining walls may encroach
into Trail.
•
2. Additional landscaping shall be provided along the north property line as a buffer with the
residences. Trees and shrubs shall be added to the landscape palette. Trees shall be a
minimum of 24-inch box, 10 feet on center.
3. Continue the theme of Cajeput Tree along the west planter area. The Conceptual
Landscape Plan illustrates the trees along a portion of the western property boundary.
Extend the theme to the front of the property toward Base.Line Road.
4. Provide dense evergreen hedgerow to screen bus storage yard and maintenance facilities
from Pacific Electric Inland Empire Trail. Use non-toxic plant materials.
Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
1. A 6-foot decorative block wall should be constructed along northerly property line adjoining
residential properties. The District should make a good faith effort to work with adjoining
property owners to provide s single wall at their common property line.
2. All open view fencing should be decorative metal (not chain link as shown).
Staff Recommendation: Staff recommends the Committee approve the project subject to the
above Secondary issues.
Design Review Committee Action:
Members Present:
Staff Planner: Emily Wimer
•
DESIGN REVIEW COMMENTS
• 8:10 p.m. Emily Wimer February 4, 2003
DEVELOPMENT REVIEW DRC2001-00743 -JAMES FONG - A request to construct a 4,560
square foot single-family hillside home, located at the northeast corner of Haven Avenue and Deer
Canyon Drive in the Very Low Residential District-APN: 1074-331-09.
Design Parameters: The applicant is proposing to construct a 9,406 square foot single-family
residence on Lot 7 of Tract 16250-1 in Deer Canyon Estates. The lot size of the property is
45,200 square feet; nearly double the size of the average lots in Deer Canyon. The proposed house
includes a main dwelling area of 5,064 square feet and the second story consisting of 2,873 square
feet; hence, there are one and two-story elements. All elevations are well articulated, and wall
planes have been embellished using a variety of elements such as window surrounds, divided light
windows, columns, and balustrades. The house is primarily stucco with architectural stone detail
and limestone detail on the columns.
Thetwo-story home with atucked-under garage/basement has three distinct levels. The main level
consists of bedrooms, kitchen, library, office, maid's quarters and a great room. The upper level
consists of the master bedroom, master bath, three additional bedrooms and a study. The lower
level consists of afour-car garage storage and laundry area. The maximum height limit is 30 in the
hillside area. To mitigate the height of the proposed home, the applicant has placed the one-story
garage on the side elevation of the home that would be most susceptible to the sloped terrain. Also
concrete planter areas have been added to the exterior elevations, which is typical of Deer Canyon
homes.
• The proposed home has significant movement proposed in the footprint, resulting in strong
articulation in the main story. A stepped entryway is featured on the South (front) elevation as two
columns, which graduate to the second story of the home. Concrete pilasters and balustrades are
repeated in all four elevations, as well as large overhangs, which add movement to the expansive
elevations. A 360-degree architecture is accomplished with the following accent features on the
elevations: decorative window moldings, divided light windows, and stucco trim on all four chimneys.
Architectural stone veneer is proposed along with concrete planters, which run along the south,
east, and west elevations. Stucco treatment is proposed on all four sides and illustrated in the
architectural style.
The house is setback over 75 feet from curb face along Deer Canyon Drive. The lot, located at the
end of the cul-de-sac on Deer Canyon Drive. The proposed two story with tucked under
garage/basement is designed with a minimum of 4 stepped pads that have a total elevation change
of 10 feet over native terrain with a grade change of 9 feet across the pad of the house. The
proposed house and garage proposes a vertical cut of 8 feet and a 9 foot interior wall from the
garage to the Cabana Room, and has combined earthwork quantities of cut to 1560 cubic yards and
fill to equal 440.. Under Hillside Development Regulations, projects, which exceed the 5-foot
cuUfill maximum OR 1,500 cubic yard minimum, require review by the Design Review
Committee and by the Planning Commission. The purpose of this review is to ensure that
the proposed project meets the intent of the Hillside Regulations.
Staff Comments: The following comments are intended to provide an outline for Committee
discussion.
Maior Issues: The following broad design issues will be the focus of Committee discussion
• regarding this project:
DRC COMMENTS
DRC2001-00743 - FONG
February 4, 2003
• Page 2
1. Grading: The primary issue is whether the proposed project substantially meets the intent of
the Hillside Development Ordinance. The purpose of the Hillside Ordinance is to minimize
the impacts of grading and preserve the natural topography. The major concerns are the
quantities of earthwork, primarily comprised of 1560 cubic yards of cut and, 440 cubic yards
of fill. In contrast to conventional "flat pad" design, staff believes the proposed house
meets the guidelines of the Hillside Development Ordinance by minimizing the effects of
grading and reducing earthwork quantities through the following techniques:
Multiple stepped building pads that permit the house to follow the natural terrain
Leaving a significant portion of the lot as natural grade (no grading).
Cutting the westerly portion into the slope
Contouring of slopes
Use of variable gradients to soften their appearance.
Secondary Issues: Once all of the major issues have been addressed, and time permitting, the
Committee will discuss the following secondary design issues:
1. Provide additional trim, or other accent feature required with 360-degree architecture on the
east elevation of the four-car garage.
• Policy Issues: The following items are a matter of Planning Commission policy and should be
incorporated into the project design without discussion:
1. Sloped area of 2:1 or greater between 5 and 8 feet in vertical height must be landscaped
and irrigated for erosion control per Standard Conditions.
2. Retaining walls are limited to a height of 4 feet in the Hillside area. Terraced retaining walls
are strongly recommended as mitigation for large slopes in the front and rear of property.
Staff Recommendation: Staff recommends approval subject to secondary issues being addressed
prior to Planning Commission. .
Design Review Committee Action:
Members Present:
Staff Planner: Emily Wimer
•